Generated by pacms.orera.in on date: 2024-05-19

Promoter Details
Promoter Name :
RN Choudhary
Project Name :
DHPL PLATINUM
Project Location :
(Residential Project, B+G+4 & G+2, No. of Units-135)

Form- I

A. Promoter's Details

:  M/S. DEVAVRAT HOMES PVT. LTD :  Private Company
:   U70101OR1999PTC005838 :View
NA :  209/20 PRAGATI VIHAR, CS PUR, BHUBANESWAR 751021
:  Plot No.209/20, Pragati Vihar, Chandrasekharpur, Bhubaneswar-751021, Dist. Khordha, Odisha :  MAIL@DEVAHOMES.IN
:  9437566770 :  9437566770
:  AABCD9148C :View
:  Have already completed and handed over one Real Estate Project at Bhubaneswar :  Orissa
NA

B. Details of Board of Directors / Partners / MC Members

:  Sunita Choudhary :  
:  Managing Director :  AAZPK7130L
:PAN Card :  rnchoudhary@gmail.com
:  MA :  9438132887
:  Has already completed and handed over one Apartment Project at Bhubaneshwar.
:  Yes :  NA
:  RAJIV NAYAN Choudhary :  
:  Director :  AAJPC5430B
:PAN Card :  rnchoudhary@gmail.com
:  B TECH (CIVIL :  9437566770
:  Has already completed and handed over one Apartment Project at Bhubaneshwar.
:  Yes :  NA

Annexure-1

Details of last projects already implemented (Ongoing or Complete)

Have you implemented any project(s) previously (May be Ongoing or Completed):No
1. :  DHPL SAHOO COMPLEX :  Residential
:  PLOT NO 3958, 3957, MOUZA: GADAKANA, BHUBANESWAR :  Completed
:  No

:   :  
:   :  
:  
: No :  NA
: No :  NA
2. :  DHPL ENCLAVE ONE :  Residential
:  PLOT NO 1627 MOUZA: KALARANGHA, BHUBANESWAR :  Ongoing
:  RP/19/2020/0403 NA
:  Joint Venture
:  ONE BLOCKS BLOCK B+4 NA NA :  ONE BLOCKS BLOCK B+4
:  No

:   :  
:   :  
:  
: No :  NA
: No :  NA
3. :  DHPL VILLA ONE :  Residential
:  PLOT NO 1640/2027/5478 & Others, MOUZA: Kalarangha, BHUBANESWAR :  Ongoing
:  RP/19/2020/003999 NA
:  Joint Venture
:  8 No Row Housing (Double Storied) NA NA :  8 No Row Housing (Double Storied)
:  No

:   :  
:   :  
:  
: No :  NA
: No :  NA
4. :  DHPL SCB Residency :  Residential
:  PLOT NO 1488 & Others, MOUZA: GADAKANA, BHUBANESWAR :  Ongoing
:  RERA Registration Applied NA
:  Joint Venture
:  Two BLOCKS BLOCK A: B+G+4 BLOCK B B+G+4 NA NA :  Two BLOCKS BLOCK A: B+G+4 BLOCK B B+G+4
:  No

:   :  
:   :  
:  
: No :  NA
: No :  NA

Annexure-2

Details of the project to be registered

:   New :  DHPL PLATINUM
:  Residential :  (Residential Project, B+G+4 & G+2, No. of Units-135)
:  Khordha :  Bhubaneswar
:  752101 :  Urban Local Body
:  BHUBANESWAR MUNICIPAL CORPORATION
:  BLOCK: A= B+G+4 BLOCK: B= B+G+4 BLOCK: C= B+G+4 BLOCK: D = G+2 :  NA

Land Details of the Project


:  4/2850 :  412/613
:  RUDRAPUR :  805.3177
:  No :  445.1505
No :  View
:  View
:  Other Person
:  Sabitri Mallick :  Purchased from recorded owners and after purchase mutated property in her name.
: No
: Yes
:  1081507410 :  31-07-2015
:  DSR Bhubaneswar :  Attached

:  3 :  108
:  Rudrapur :  1659.197
:  Yes
No :  View
:  View
:  Other Person
:  SARAT CHANDRA SAHOO :  ANCESTRAL Property
: No
: Yes
:  11081602337 :  04-03-2016
:  DSR Bhubaneswar :  Attached

:  28/9090 :  412/956
:  Rudrapur :  218.528
:  Yes
No :  View
:  View
:  Other Person
:  RANJU BALA RATH :  Purchased from recorded owners and after purchase mutated property in her name.
: No
: Yes
:  11081507713 :  24-08-2015
:  DSR BHUBANESWAR :  Attached

:  28/9015 :  412/822
:  RUDRAPUR :  210.435
:  Yes
No :  View
:  View
:  Other Person
:  SANKARSAN SAHOO :  Purchased from recorded owners and after purchase mutated property in his name.
: No
: Yes
:  11081507714 :  24-08-2015
:  DSR BHUBANESWAR :  Attached

:  28/9089 :  412/955
:  Rudrapur :  481.5719
:  Yes
No :  View
:  View
:  Other Person
:  Mamata Mishra :  Purchased from recorded owners and after purchase mutated property in her name.
: No
: Yes
:  11081509510 :  03-11-2015
:  DSR BHUBANESWAR :  Attached

:  28 :  412/1172
:  RUDRAPUR :  161.873
:  Yes
No :  View
:  View
:  Other Person
:  BHASKAR CHANDRA NAYAK & Smt Samita Nayak :  Clarifications on Objection regarding area is attached as additional documents. Purchased from recorded owners and after purchase mutated property in his name.
: No
: Yes
:  11081509511 :  03-11-2015
:  DSR BHUBANESWAR :  Attached

:  28/9957 :  412/1167
:  RUDRAPUR :  275.184
:  Yes
No :  View
:  View
:  Other Person
:  BHAHYASHREE MALLICK :  Purchased from recorded owners and after purchase mutated property in her name.
: No
: Yes
:  11081509512 :  03-11-2015
:  DSR BHUBANESWAR :  Attached

:  28/9064 :  412/929
:  RUDRAPUR :  319.699
:  Yes
No :  View
:  View
:  Other Person
:  SAROJA ROY :  Purchased from recorded owners and after purchase mutated property in her name.
: No
: Yes
:  11081511369 :  30-12-2015
:  DSR BHUBANESWAR :  Attached

:  29 :  412/164
:  RUDRAPUR :  2225.753
:  Yes
No :  View
:  View
:  Other Person
:  Muralidhar Srichandan & Manoj Kumar Srichandan :  Purchased from recorded owners and after purchase mutated property in his name.
: No
: Yes
:  1124899515 :  24-06-2016
:  DSR BHUBANESWAR :  Attached

Development Agreement

: Yes
Serial No. Particulars of the Person Land/Plot Details Share of the Person Document Attached
1 Mrs Sabitri Mallick 4/2850 35%   Agreement Copy
2 Ranjubala Ratha 28/9090 1 NO 3 BR FLAT   Agreement Copy
3 Sankarsan Sahoo 28/9015 1 NO 3 BR FLAT   Agreement Copy
4 Mamata Mishra 28/9089 37.50%   Agreement Copy
5 Bhaskar Chandra Nayak 28 1 NO 3 BR FLAT   Agreement Copy
6 Bhagyashree Malik 28/9957 35%   Agreement Copy
7 Saraja Roy 28/9064 2 NO 3 BR FLAT   Agreement Copy
8 Sarat Chandra Sahoo 3 33%   Agreement Copy
9 Muralidhar Srichandan & Manoj Kumar Srichandan 29 30%   Agreement Copy

Building Plan

  View   View
  Download site plan 14-05-2023

Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 The owner/applicant/Technical Person shall strictly adhere to the terms and conditions imposed in the NOC/Clearances given by Fire Prevention officer/National Airport Authority/SEIAA, Ministry of Forest & Environment/PHED etc wherever applicable 31-10-2023 In progress.
2 The owner/applicant/Technical Person shall strictly adhere to the terms and conditions imposed in the NOC/Clearances given by Fire Prevention officer/National Airport Authority/SEIAA, Ministry of Forest & Environment/PHED etc wherever applicable 31-10-2023 In progress.
3 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner 31-10-2023 In progress.
4 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance, fire tender, physically handicapped persons and outside visitors with signage as per norms under Regulation of BDA (Planning & Building Standards) Regulations, 2018 31-10-2023 In progress.
5 Plantation over 20% of the plot area shall be made by the applicant as per provision under Regulation of BDA (Planning & Building Standards) Regulations, 2018 31-10-2023 In progress.
6 If the construction / development are not as per the approved plan / deviated beyond permissible norms, the performance security shall be forfeited and action shall be initiated against the applicant/builder / developer as per the provisions of the ODA Act, 1982 Rules and Regulations made there under 31-10-2023 In progress.
7 The Owner/ Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/ construction defects, Authority will be no way be held responsible for the same in what so ever manner 31-10-2023 In progress.
8 The concerned Architect / Applicant / Developer are fully responsible for any deviations additions & alternations beyond approved plan/ defective construction etc. shall be liable for action as per the provisions of the Regulation 31-10-2023 In progress.
9 The applicant shall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/BDA before commencement of construction 31-10-2023 In progress.
10 All the stipulated conditions of the NOC/Clearances given by BMC, PHED, shall be adhered to strictly. No storm water/water shall be discharged to the public road/public premises and other adjoining plots. 31-10-2023 In progress.
11 Adhere to the provisions of BDA (Planning & Building Standards) Regulation strictly and conditions thereto 31-10-2023 In progress.
12 Submit NOC towards fire safety from competent Authority before obtaining Occupancy Certificate 31-10-2023 In progress.
13 The Authority shall in no way be held responsible for any structural failure and damage due to earthquake/cyclone/any other natural disaster 31-10-2023 In progress.
14 Submit document towards fee gift of road before obtaining occupancy Certificate. 31-10-2023 In progress.
15 Parking space measuring 3220.45sqm as shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose 31-10-2023 In progress.

Layout Plan

: Yes :  View

Location Map with geo-coordinates of bend points

Point No. Latitude Longitude
1 20°19'51.46'' 85°52'58.25''
2 20°19'52.39'' 85°52'56.87''
3 20°19'52.26'' 85°52'56.72''
4 20°19'52.73'' 85°52'56.02''
5 20°19'50.72'' 85°52'55.20''
6 20°19'51.35'' 85°52'54.17''
7 20°19'51.98'' 85°52'53.12''
8 20°19'53.63'' 85°52'54.67''
9 20°19'53.55'' 85°52'54.72''
10 20°19'54.38'' 85°52'55.61''
11 20°19'52.69'' 85°52'55.61''
12 20°19'51.75'' 85°52'58.42''
View

Milestone of Project Construction

Description* Scheduled date of completion Current Status Site Images
Site Development 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D.
Roof Casting NA NA NA
Ground Floor/Stilt Floor 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D.
1 Floor 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
Brick Work & Plastering NA NA NA
Ground Floor/Stilt Floor 31-12-2022 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
1 Floor 31-12-2022 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
Electrical Works 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
Concealed Cabling including Plugs & switches 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
Installation & Charging of Transformer 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
Connection to Flats/Apartments 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
PH works 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
Laying of concealed Pipes 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
PH Fittings 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
Overhead Water Tanks 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
Water Supply Connection to all units 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
STP construction and completion 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
Distempering & Colouring of all units and exteriors 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
Fixation of doors and windows 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
Scheduled Date of handing over possession 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
Development of common areas, parks, gardens etc 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
2 Floor 31-12-2022 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
3 Floor 31-12-2022 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
4 Floor 31-12-2022 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
2 Floor 31-12-2022 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
3 Floor 31-12-2022 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
4 Floor 31-12-2022 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
Site Development 31-10-2023 CPMPLETED NA
NA NA NA NA
Ground Floor/Stilt Floor 31-10-2023 CPMPLETED NA
1 Floor 31-10-2023 CPMPLETED NA
NA NA NA NA
Ground Floor/Stilt Floor 31-12-2022 CPMPLETED NA
1 Floor 31-12-2022 CPMPLETED NA
Electrical Works 31-10-2023 CPMPLETED NA
Concealed Cabling including Plugs & switches 31-10-2023 CPMPLETED NA
Installation & Charging of Transformer 31-10-2023 CPMPLETED NA
Connection to Flats/Apartments 31-10-2023 CPMPLETED NA
PH works 31-10-2023 CPMPLETED NA
Laying of concealed Pipes 31-10-2023 CPMPLETED NA
PH Fittings 31-10-2023 CPMPLETED NA
Overhead Water Tanks 31-10-2023 CPMPLETED NA
Water Supply Connection to all units 31-10-2023 CPMPLETED NA
STP construction and completion 31-10-2023 CPMPLETED NA
Distempering & Colouring of all units and exteriors 31-10-2023 CPMPLETED NA
Fixation of doors and windows 31-10-2023 CPMPLETED NA
Scheduled Date of handing over possession 31-10-2023 CPMPLETED NA
Development of common areas, parks, gardens etc 31-10-2023 CPMPLETED NA
2 Floor 31-12-2022 CPMPLETED NA
3 Floor 31-12-2022 CPMPLETED NA
4 Floor 31-12-2022 CPMPLETED NA
2 Floor 31-12-2022 CPMPLETED NA
3 Floor 31-12-2022 CPMPLETED NA
4 Floor 31-12-2022 CPMPLETED NA
Site Development 31-10-2023 CPMPLETED NA
NA 31-10-2023 COMPLETED NA
Ground Floor/Stilt Floor 31-10-2023 CPMPLETED NA
1 Floor 31-10-2023 CPMPLETED NA
NA 31-10-2023 COMPLETED NA
Ground Floor/Stilt Floor 31-12-2022 CPMPLETED NA
1 Floor 31-12-2022 CPMPLETED NA
Electrical Works 31-10-2023 CPMPLETED NA
Concealed Cabling including Plugs & switches 31-10-2023 CPMPLETED NA
Installation & Charging of Transformer 31-10-2023 CPMPLETED NA
Connection to Flats/Apartments 31-10-2023 CPMPLETED NA
PH works 31-10-2023 CPMPLETED NA
Laying of concealed Pipes 31-10-2023 CPMPLETED NA
PH Fittings 31-10-2023 CPMPLETED NA
Overhead Water Tanks 31-10-2023 CPMPLETED NA
Water Supply Connection to all units 31-10-2023 CPMPLETED NA
STP construction and completion 31-10-2023 CPMPLETED NA
Distempering & Colouring of all units and exteriors 31-10-2023 CPMPLETED NA
Fixation of doors and windows 31-10-2023 CPMPLETED NA
Scheduled Date of handing over possession 31-10-2023 CPMPLETED NA
Development of common areas, parks, gardens etc 31-10-2023 CPMPLETED NA
2 Floor 31-12-2022 CPMPLETED NA
3 Floor 31-12-2022 CPMPLETED NA
4 Floor 31-12-2022 CPMPLETED NA
2 Floor 31-12-2022 CPMPLETED NA
3 Floor 31-12-2022 CPMPLETED NA
4 Floor 31-12-2022 CPMPLETED NA
Site Development 31-10-2023 CPMPLETED NA
NA 31-10-2023 COMPLETED NA
Ground Floor/Stilt Floor 31-10-2023 CPMPLETED NA
1 Floor 31-10-2023 CPMPLETED NA
NA 31-10-2023 COMPLETED NA
Ground Floor/Stilt Floor 31-12-2022 CPMPLETED NA
1 Floor 31-12-2022 CPMPLETED NA
Electrical Works 31-10-2023 CPMPLETED NA
Concealed Cabling including Plugs & switches 31-10-2023 CPMPLETED NA
Installation & Charging of Transformer 31-10-2023 CPMPLETED NA
Connection to Flats/Apartments 31-10-2023 CPMPLETED NA
PH works 31-10-2023 CPMPLETED NA
Laying of concealed Pipes 31-10-2023 CPMPLETED NA
PH Fittings 31-10-2023 CPMPLETED NA
Overhead Water Tanks 31-10-2023 CPMPLETED NA
Water Supply Connection to all units 31-10-2023 CPMPLETED NA
STP construction and completion 31-10-2023 CPMPLETED NA
Distempering & Colouring of all units and exteriors 31-10-2023 CPMPLETED NA
Fixation of doors and windows 31-10-2023 CPMPLETED NA
Scheduled Date of handing over possession 31-10-2023 CPMPLETED NA
Development of common areas, parks, gardens etc 31-10-2023 CPMPLETED NA
2 Floor 31-12-2022 CPMPLETED NA
3 Floor 31-12-2022 CPMPLETED NA
4 Floor 31-12-2022 CPMPLETED NA
2 Floor 31-12-2022 CPMPLETED NA
3 Floor 31-12-2022 CPMPLETED NA
4 Floor 31-12-2022 CPMPLETED NA
Site Development 31-10-2023 CPMPLETED NA
NA 31-10-2023 COMPLETED NA
Ground Floor/Stilt Floor 31-10-2023 CPMPLETED NA
1 Floor 31-10-2023 CPMPLETED NA
NA 31-10-2023 COMPLETED NA
Ground Floor/Stilt Floor 31-12-2022 CPMPLETED NA
1 Floor 31-12-2022 CPMPLETED NA
Electrical Works 31-10-2023 CPMPLETED NA
Concealed Cabling including Plugs & switches 31-10-2023 CPMPLETED NA
Installation & Charging of Transformer 31-10-2023 CPMPLETED NA
Connection to Flats/Apartments 31-10-2023 CPMPLETED NA
PH works 31-10-2023 CPMPLETED NA
Laying of concealed Pipes 31-10-2023 CPMPLETED NA
PH Fittings 31-10-2023 CPMPLETED NA
Overhead Water Tanks 31-10-2023 CPMPLETED NA
Water Supply Connection to all units 31-10-2023 CPMPLETED NA
STP construction and completion 31-10-2023 CPMPLETED NA
Distempering & Colouring of all units and exteriors 31-10-2023 CPMPLETED NA
Fixation of doors and windows 31-10-2023 CPMPLETED NA
Scheduled Date of handing over possession 31-10-2023 CPMPLETED NA
Development of common areas, parks, gardens etc 31-10-2023 CPMPLETED NA
2 Floor 31-12-2022 CPMPLETED NA
3 Floor 31-12-2022 CPMPLETED NA
4 Floor 31-12-2022 CPMPLETED NA
2 Floor 31-12-2022 CPMPLETED NA
3 Floor 31-12-2022 CPMPLETED NA
4 Floor 31-12-2022 CPMPLETED NA

Category and no. of units to be developed

:  Residential
:  
:  135
:  
:  
:  
Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership
Carpet Area Balcony Area Exclusive Open Terrace Area
1 A001 88.82 6.68 10.6 Promoter
2 A002 88.82 6.68 10.6 Land Owner
3 A003 90.47 6.68 12.75 Promoter
4 A004 90.47 6.68 12.75 Promoter
5 A005 88.25 7.61 9.65 Promoter
6 A006 86.07 6.68 12.75 Promoter
7 A007 86.73 6.68 11.68 Promoter
8 A008 86.73 7.61 13.45 Promoter
9 A009 88.89 7.61 14.65 Promoter
10 A010 86.76 6.68 12.65 Land Owner
11 A011 87.45 6.68 13.95 Land Owner
12 A012 87.45 7.61 10.95 Promoter
13 A014 58.61 4.25 7.54 Promoter
14 A015 60.3 00 0 Land Owner
15 A016 31.79 0 0 Land Owner
16 A017 84.13 3.94 6.78 Promoter
17 A018 83.57 3.94 2.59 Promoter
18 A019 56.71 00 0 Land Owner
19 A101 88.82 6.68 0 Promoter
20 A102 88.82 6.68 0 Land Owner
21 A103 90.47 6.68 0 Land Owner
22 A104 90.47 6.68 0 Promoter
23 A105 88.25 7.61 0 Promoter
24 A106 86.07 6.68 0 Promoter
25 A107 86.73 6.68 0 Promoter
26 A108 86.73 7.61 0 Promoter
27 A109 88.89 7.61 0 Land Owner
28 A110 86.76 6.68 0 Land Owner
29 A111 87.45 6.68 0 Land Owner
30 A112 87.45 7.61 0 Promoter
31 A114 58.61 4.25 0 Land Owner
32 A115 60.3 0 0 Land Owner
33 A116 31.79 00 0 Promoter
34 A117 84.13 3.94 0 Promoter
35 A118 83.57 3.94 0 Land Owner
36 A119 56.71 00 0 Land Owner
37 A201 88.82 6.68 0 Promoter
38 A202 88.82 6.68 0 Land Owner
39 A203 90.47 6.68 0 Land Owner
40 A204 90.47 6.68 0 Promoter
41 A205 88.25 7.61 0 Promoter
42 A206 86.07 6.68 0 Promoter
43 A207 86.73 6.68 0 Promoter
44 A208 86.73 7.61 0 Promoter
45 A209 88.89 7.61 0 Promoter
46 A210 86.76 6.68 0 Land Owner
47 A211 87.45 6.68 0 Land Owner
48 A212 87.45 7.61 0 Promoter
49 A214 58.61 4.25 0 Land Owner
50 A215 60.3 00 0 Land Owner
51 A216 31.79 00 0 Promoter
52 A217 84.13 3.94 0 Promoter
53 A218 83.57 3.94 0 Land Owner
54 A219 56.71 00 0 Land Owner
55 A301 88.82 6.68 0 Promoter
56 A302 88.82 6.68 0 Land Owner
57 A303 90.47 6.68 0 Land Owner
58 A304 90.47 6.68 0 Promoter
59 A305 88.25 7.61 0 Promoter
60 A306 86.07 6.68 0 Promoter
61 A307 86.73 6.68 0 Promoter
62 A308 86.73 7.61 0 Promoter
63 A309 88.89 7.61 0 Land Owner
64 A310 86.76 6.68 0 Promoter
65 A311 87.45 6.68 0 Land Owner
66 A312 87.45 7.61 0 Promoter
67 A314 58.61 4.25 0 Land Owner
68 A315 60.3 00 0 Promoter
69 A316 31.79 00 0 Promoter
70 A317 84.13 3.94 0 Promoter
71 A318 83.57 3.94 0 Promoter
72 A319 56.71 00 0 Promoter
73 A401 88.82 6.68 0 Promoter
74 A402 88.82 6.68 0 Promoter
75 A403 90.47 6.68 0 Promoter
76 A404 90.47 6.68 0 Promoter
77 A405 88.25 7.61 0 Promoter
78 A406 86.07 6.68 0 Promoter
79 A407 86.73 6.68 0 Promoter
80 A408 86.73 7.61 0 Promoter
81 A409 88.89 7.61 0 Promoter
82 A410 86.76 6.68 0 Promoter
83 A411 87.45 6.68 0 Promoter
84 A412 87.45 7.61 0 Promoter
85 A414 58.61 4.25 0 Land Owner
86 A415 60.3 0 0 Promoter
87 A416 31.79 0 0 Promoter
88 A417 84.13 3.94 0 Promoter
89 A418 83.57 3.94 0 Promoter
90 A419 56.71 0 0 Promoter
91 C101 63.44 2.37 0 Promoter
92 C102 63.44 2.37 0 Land Owner
93 C103 61.65 3.26 0 Land Owner
94 C201 63.44 2.37 0 Promoter
95 C202 63.44 2.37 0 Land Owner
96 C203 61.65 3.26 0 Land Owner
97 C301 63.44 2.37 0 Land Owner
98 C302 63.44 2.37 0 Promoter
99 C303 61.65 3.26 0 Land Owner
100 C401 63.44 2.37 0 Promoter
101 C402 63.44 2.37 0 Promoter
102 C403 61.65 3.26 0 Promoter
103 D001 49.35 0 0 Promoter
104 D101 49.35 0 0 Promoter
105 D201 49.35 0 0 Promoter
106 B001 21.85 0 0 Promoter
107 B002 21.85 0 0 Promoter
108 B003 22.48 0 0 Promoter
109 B004 24.92 0 0 Promoter
110 B005 24.63 0 0 Promoter
111 B006 22.97 0 0 Promoter
112 B101 21.85 0 0 Promoter
113 B102 21.85 0 0 Promoter
114 B103 22.48 0 0 Promoter
115 B104 24.92 0 0 Promoter
116 B105 24.63 0 0 Promoter
117 B106 22.97 0 0 Promoter
118 B201 21.85 0 0 Promoter
119 B202 21.85 0 0 Promoter
120 B203 22.48 0 0 Promoter
121 B204 24.92 0 0 Promoter
122 B205 24.63 0 0 Promoter
123 B206 22.97 0 0 Promoter
124 B301 21.85 0 0 Promoter
125 B302 21.85 0 0 Promoter
126 B303 22.48 0 0 Promoter
127 B304 24.92 0 0 Promoter
128 B305 24.63 0 0 Promoter
129 B306 22.97 0 0 Promoter
130 B401 21.85 0 0 Promoter
131 B402 21.85 0 0 Promoter
132 B403 22.48 0 0 Promoter
133 B404 24.92 0 0 Promoter
134 B405 24.63 0 0 Promoter
135 B406 22.97 0 0 Promoter
Types of garages and parking
House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
A001 Covered Parking 1 4.30 x 3.70 15.91 Included
A002 Covered Parking 4 4.30 x 3.70 15.91 Included
A003 Covered Parking 20 5.28 x 3.70 19.54 Included
A004 Covered Parking 23 5.28 x 3.70 19.54 Included
A005 Covered Parking 6 4.45 x 3.15 14.02 Included
A006 Covered Parking 19 4.45 x 3.15 14.02 Included
A007 Covered Parking 69 5.00 x 2.80 14.00 Included
A008 Covered Parking 70 5.00 x 2.80 14.00 Included
A009 Covered Parking 43 4.50 x 3.00 15.72 Included
A010 Covered Parking 30 5.24 x 3.00 15.72 Included
A011 Covered Parking 35 5.24 x 3.23 16.93 Included
A012 Covered Parking 58 4.50 x 3.29 14.81 Included
A014 Covered Parking 78 5.50 x 2.58 14.19 Included
A015 Covered Parking 83 5.50 x 3.00 16.50 Included
A016 Covered Parking 97 4.50 x 1.90 8.55 Included
A017 Covered Parking 29 5.24 x 2.50 13.10 Included
A018 Covered Parking 84 5.82 x 3.40 19.79 Included
A019 Covered Parking 91 4.30 x 2.29 9.85 Included
A101 Covered Parking 28 5.24 x 3.00 15.72 Included
A102 Covered Parking 5 4.30 x 3.60 15.48 Included
A103 Covered Parking 67 5.61 x 3.29 18.46 Included
A104 Covered Parking 24 5.24 x 3.40 17.82 Included
A105 Covered Parking 44 4.50 x 3.00 13.50 Included
A106 Covered Parking 47 4.50 x 2.97 13.37 Included
A107 Covered Parking 48 4.50 x 2.95 13.28 Included
A108 Covered Parking 9 4.45 x 2.97 13.22 Included
A109 Covered Parking 75 4.77 x 2.85 13.59 Included
A110 Covered Parking 31 5.24 x 3.40 17.82 Included
A111 Covered Parking 36 5.58 x 3.40 18.97 Included
A112 Covered Parking 59 4.50 x 3.29 14.81 Included
A114 Covered Parking 79 5.50 x 2.90 15.95 Included
A115 Covered Parking 77 4.77 x 2.77 13.21 Included
A116 Covered Parking 98 4.77 x 2.29 10.92 Included
A117 Covered Parking 62 4.77 x 3.23 15.41 Included
A118 Covered Parking 85 4.81 x 3.12 15.01 Included
A119 Covered Parking 92 4.30 x 2.29 9.85 Included
A201 Covered Parking 51 4.50 x 3.40 15.30 Included
A202 Covered Parking 53 4.50 x 3.26 14.67 Included
A203 Covered Parking 27 5.24 x 3.40 17.82 Included
A204 Covered Parking 21 5.28 x 3.29 17.37 Included
A205 Covered Parking 16 4.45 x 2.97 13.22 Included
A206 Covered Parking 8 4.45 x 2.95 13.13 Included
A207 Covered Parking 10 4.45 x 2.95 13.13 Included
A208 Covered Parking 15 4.45 x 2.95 13.13 Included
A209 Covered Parking 41 4.50 x 3.13 14.09 Included
A210 Covered Parking 32 5.24 x 3.29 17.24 Included
A211 Covered Parking 37 5.50 x 4.75 26.13 Included
A212 Covered Parking 60 4.50 x 4.14 18.63 Included
A214 Covered Parking 80 5.50 x 2.84 15.62 Included
A215 Covered Parking 76 4.77 x 2.85 13.59 Included
A216 Covered Parking 104 5.24 x 1.85 9.69 Included
A217 Covered Parking 73 4.77 x 3.00 14.31 Included
A218 Covered Parking 86 4.81 x 3.12 15.01 Included
A219 Covered Parking 93 4.45 x 2.45 10.90 Included
A301 Covered Parking 54 4.50 x 3.26 14.67 Included
A302 Covered Parking 2 4.30 x 3.29 14.15 Included
A303 Covered Parking 22 5.28 x 3.29 17.37 Included
A304 Covered Parking 25 5.24 x 3.29 17.24 Included
A305 Covered Parking 17 4.45 x 2.95 13.13 Included
A306 Covered Parking 65 4.60 x 2.81 12.93 Included
A307 Covered Parking 66 4.60 x 2.81 12.93 Included
A308 Covered Parking 99 5.61 x 2.29 12.85 Included
A309 Covered Parking 40 4.50 x 2.95 13.28 Included
A310 Covered Parking 33 5.24 x 3.29 17.24 Included
A311 Covered Parking 38 4.50 x 2.84 12.78 Included
A312 Covered Parking 64 4.77 x 3.69 17.60 Included
A314 Covered Parking 81 5.50 x 2.50 13.75 Included
A315 Covered Parking 42 4.50 x 2.71 12.20 Included
A316 Covered Parking 105 5.58 x 1.17 6.53 Included
A317 Covered Parking 74 4.77 x 2.81 13.40 Included
A318 Covered Parking 87 4.81 x 3.62 17.41 Included
A319 Covered Parking 94 5.28 x 2.29 12.09 Included
A401 Covered Parking 3 4.30 x 3.29 14.15 Included
A402 Covered Parking 46 4.50 x 3.13 14.09 Included
A403 Covered Parking 26 5.24 x 3.29 17.24 Included
A404 Covered Parking 68 5.61 x 3.00 16.83 Included
A405 Covered Parking 49 4.50 x 2.84 12.78 Included
A406 Covered Parking 50 4.50 x 2.84 17.41 Included
A407 Covered Parking 52 4.50 x 2.84 12.78 Included
A408 Covered Parking 7 4.45 x 2.84 12.64 Included
A409 Covered Parking 57 4.50 x 4.14 18.63 Included
A410 Covered Parking 34 5.24 x 4.14 21.69 Included
A411 Covered Parking 39 4.50 x 2.95 13.28 Included
A412 Covered Parking 63 4.77 x 3.29 15.69 Included
A414 Covered Parking 82 5.50 x 2.77 15.24 Included
A415 Covered Parking 56 3.50 x 3.45 12.08 Included
A416 Covered Parking 106 5.82 x 1.53 8.90 Included
A417 Covered Parking 89 4.81 x 3.12 15.01 Included
A418 Covered Parking 61 4.77 x 4.80 22.90 Included
A419 Covered Parking 95 5.28 x 2.29 12.09 Included
C101 Covered Parking 116 4.00 x 2.89 11.56 Included
C102 Covered Parking 108 4.29 x 3.00 12.87 Included
C103 Covered Parking 109 4.29 x 3.32 14.24 Included
C201 Covered Parking 117 4.00 x 3.79 15.16 Included
C202 Covered Parking 110 4.29 x 3.19 13.69 Included
C203 Covered Parking 111 4.29 x 3.00 12.87 Included
C301 Covered Parking 118 4.38 x 3.37 14.76 Included
C302 Covered Parking 113 4.00 x 2.87 11.48 Included
C303 Covered Parking 114 4.00 x 3.10 12.40 Included
C401 Covered Parking 119 4.38 x 3.00 13.14 Included
C402 Covered Parking 115 4.00 x 3.25 13.00 Included
C403 Covered Parking 107 4.29 x 1.57 6.74 Included
D001 Covered Parking 121 4.00 x 3.38 13.52 Included
D101 Covered Parking 121 4.00 x 3.38 13.52 Included
D201 Covered Parking 123 4.38 x 1.80 7.88 Included
B002 Covered Parking EW02 2.00 x 1.00 2 Included
B003 Covered Parking EW03 2.00 x 1.00 2 Included
B004 Covered Parking EW04 2.00 x 1.00 2 Included
B005 Covered Parking EW05 2.00 x 1.00 2 Included
B006 Covered Parking EW06 2.00 x 1.00 2 Included
B101 Covered Parking EW07 2.00 x 1.00 2 Included
B102 Covered Parking EW08 2.00 x 1.00 2 Included
B103 Covered Parking EW09 2.00 x 1.00 2 Included
B104 Covered Parking EW10 2.00 x 1.00 2 Included
B105 Covered Parking EW11 2.00 x 1.00 2 Included
B106 Covered Parking EW12 2.00 x 1.00 2 Included
B201 Covered Parking EW13 2.00 x 1.00 2 Included
B202 Covered Parking EW14 2.00 x 1.00 2 Included
B203 Covered Parking EW15 2.00 x 1.00 2 Included
B204 Covered Parking EW16 2.00 x 1.00 2 Included
B205 Covered Parking EW17 2.00 x 1.00 2 Included
B206 Covered Parking EW18 2.00 x 1.00 2 Included
B301 Covered Parking EW19 2.00 x 1.00 2 Included
B302 Covered Parking EW20 2.00 x 1.00 2 Included
B303 Covered Parking EW21 2.00 x 1.00 2 Included
B304 Covered Parking EW22 2.00 x 1.00 2 Included
B305 Covered Parking EW23 2.00 x 1.00 2 Included
B306 Covered Parking EW24 2.00 x 1.00 2 Included
B401 Covered Parking EW25 2.00 x 1.00 2 Included
B402 Covered Parking EW26 2.00 x 1.00 2 Included
B403 Covered Parking EW27 2.00 x 1.00 2 Included
B404 Covered Parking EW28 2.00 x 1.00 2 Included
B405 Covered Parking EW29 2.00 x 1.00 2 Included
B406 Covered Parking EW30 2.00 x 1.00 2 Included
B001 Covered Parking EW01 2.00 x 1.00 2 Included
Yes

Facilities to be provided

Particulars of Facilities Status of the facility Brief description of facility
Drinking Water Facility Ground Water Copy of Consent Letter
Fire Fighting Facility Yes NA 1. ELECTRICLA INSTALLATION WITH FIRE RETDARTANT PROPERTY. 2. OTHER PROVISIONS WITH NBC 2016 3. FIRE EXTINGUISHER AS IN 2910-2010
Emergency Evacuation Services No
Use of Renewable Energy No
Lift Facility Yes 8 PASSENGER Automatic Door LIFT with ARD Manufactured By ECE
Market Complex No
Community Hall Yes 237.562 SQM
Gymnasium No
Swimming Pool No
Play Ground No
Park/Garden No
Plantation Area Yes 1138.50 SqM 72 No Tress to be planted.
Others(Please Specify) No
Internal Road Yes 1164.65 Sq M. Concrete Pavers Block
External Road Yes 9.14 M Concrete Road
Elecricity Supply Yes Copy of Consent Letter
Other Amenities No

Bank Particulars of the Project

  STATE BANK OF INDIA
  RCE CAMPUS BHUBANESWAR
  38690228993
  SBIN0005302
   View
  9437488712
  9437488712

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
M Aakashdeep Architect Plot No 948/A Prashanti Vihar, Baramunda, Bhubaneswar MOBILE 9437015399 CA/2005/35305 DHPL Sahoo Complex. DHPL Enclave One
RAMESH K KEJRIWAL Chartered Accountant ROOM NO 13, FIRST FLOOR, APEX MARKET COMPLEX, CUUTACK ROAD BHUBANESWAR MOBILE 9437043043 REG NO 324527E DHPL Sahoo Complex. DHPL Enclave One
RN CHOUDHARY Construction Engineer 209/20 PRAGATI VIHAR CS PUR BHUBANESWAR 751021 RTD/DTP/CER/111/2018 DHPL SCB Residency

Financial Details

:  1546 :   View
  31-10-2023 :  700
:  446 :  400

Documents Attached

Description of Document Option Documents
Fire Safety Certificate Undertaking Attached
Affidavit in Form-A as per clause-l of sub-section-2 of section-4 of the Act Yes Attached
Allotment letter format Yes Attached
Conveyance Deed Format Yes Attached
Affidavit to adopt agreement for sale format as per Rule-8(1) of ORE (R and D) Rules, 2017 Yes Attached
Annual Report 2020-21 Attached
Annual Report 2018-19 Attached
IT Return 2020-21 Attached
IT Return 2018-19 Attached
Audit Report 2020-21 Attached
Audit Report 2018-19 Attached
Annual Report 2019-20 Attached
IT Return 2019-20 Attached
Audit Report 2019-20 Attached

Additional Documents Attached

Sl. No. Title of the document Upload Document
1 Plot Boundary Report
2 Project Status Report
3 Plan Revision Clarification
4 Land Owner Share Allocation
5 Cash Flow Fy 2016-17
6 Cash Flow Fy 2017-18
7 Cash Flow Fy 2018-19
8 Bank Finance Clarification
9 CA Report Fy 2016-17
10 CA Report Fy 2017-18
11 CA Report Fy 2018-19
12 Annual Report 2016-17
13 Annual Report 2017-18
14 Annual Report 2018-19
15 Provisional Objection Regarding due to Plan Revision
16 Flat Details in EXCEL
17 Clarification on Plot 6
18 Objection Plot Boundary dtd 28-04-2021

Other documents

“I undertake that the information submitted by me in this application are correct and true to best my knowledge. I also understand that providing false or wrong information is punishable under the Section-60 of the Real Estate (Regulation & Development) Act, 2016. I also further understand that furnishing wrong or false information will lead to rejection of my application registration of the project with forfeiture of registration fee and other charges deposited by me.”
  Clarification on Cadanal Plot 27 Ac 0.130 Dec attached as additional documents 18.

Construction Progress

Updated Construction Progress

SL NO. Description Scheduled date of completion Current Status Remarks
1 Site Development 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D.
2 Roof Casting NA NA NA
3 Ground Floor/Stilt Floor 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D.
4 1 Floor 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
5 Brick Work & Plastering NA NA NA
6 Ground Floor/Stilt Floor 31-12-2022 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
7 1 Floor 31-12-2022 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
8 Electrical Works 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
9 Concealed Cabling including Plugs & switches 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
10 Installation & Charging of Transformer 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
11 Connection to Flats/Apartments 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
12 PH works 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
13 Laying of concealed Pipes 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
14 PH Fittings 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
15 Overhead Water Tanks 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
16 Water Supply Connection to all units 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
17 STP construction and completion 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
18 Distempering & Colouring of all units and exteriors 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
19 Fixation of doors and windows 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
20 Scheduled Date of handing over possession 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
21 Development of common areas, parks, gardens etc 31-10-2023 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
22 2 Floor 31-12-2022 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
23 3 Floor 31-12-2022 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
24 4 Floor 31-12-2022 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
25 2 Floor 31-12-2022 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
26 3 Floor 31-12-2022 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
27 4 Floor 31-12-2022 Construction started in nearly 45% part of Block. Progress Achieved 90%. Construction to start in Balance 55% part Block A, Block B, Block C & also Block D. NA
Updated Changes on 11-07-2023
28 Site Development 31-10-2023 CPMPLETED NA
29 NA NA NA NA
30 Ground Floor/Stilt Floor 31-10-2023 CPMPLETED NA
31 1 Floor 31-10-2023 CPMPLETED NA
32 NA NA NA NA
33 Ground Floor/Stilt Floor 31-12-2022 CPMPLETED NA
34 1 Floor 31-12-2022 CPMPLETED NA
35 Electrical Works 31-10-2023 CPMPLETED NA
36 Concealed Cabling including Plugs & switches 31-10-2023 CPMPLETED NA
37 Installation & Charging of Transformer 31-10-2023 CPMPLETED NA
38 Connection to Flats/Apartments 31-10-2023 CPMPLETED NA
39 PH works 31-10-2023 CPMPLETED NA
40 Laying of concealed Pipes 31-10-2023 CPMPLETED NA
41 PH Fittings 31-10-2023 CPMPLETED NA
42 Overhead Water Tanks 31-10-2023 CPMPLETED NA
43 Water Supply Connection to all units 31-10-2023 CPMPLETED NA
44 STP construction and completion 31-10-2023 CPMPLETED NA
45 Distempering & Colouring of all units and exteriors 31-10-2023 CPMPLETED NA
46 Fixation of doors and windows 31-10-2023 CPMPLETED NA
47 Scheduled Date of handing over possession 31-10-2023 CPMPLETED NA
48 Development of common areas, parks, gardens etc 31-10-2023 CPMPLETED NA
49 2 Floor 31-12-2022 CPMPLETED NA
50 3 Floor 31-12-2022 CPMPLETED NA
51 4 Floor 31-12-2022 CPMPLETED NA
52 2 Floor 31-12-2022 CPMPLETED NA
53 3 Floor 31-12-2022 CPMPLETED NA
54 4 Floor 31-12-2022 CPMPLETED NA
Updated Changes on 06-10-2023
55 Site Development 31-10-2023 CPMPLETED NA
56 NA 31-10-2023 COMPLETED NA
57 Ground Floor/Stilt Floor 31-10-2023 CPMPLETED NA
58 1 Floor 31-10-2023 CPMPLETED NA
59 NA 31-10-2023 COMPLETED NA
60 Ground Floor/Stilt Floor 31-12-2022 CPMPLETED NA
61 1 Floor 31-12-2022 CPMPLETED NA
62 Electrical Works 31-10-2023 CPMPLETED NA
63 Concealed Cabling including Plugs & switches 31-10-2023 CPMPLETED NA
64 Installation & Charging of Transformer 31-10-2023 CPMPLETED NA
65 Connection to Flats/Apartments 31-10-2023 CPMPLETED NA
66 PH works 31-10-2023 CPMPLETED NA
67 Laying of concealed Pipes 31-10-2023 CPMPLETED NA
68 PH Fittings 31-10-2023 CPMPLETED NA
69 Overhead Water Tanks 31-10-2023 CPMPLETED NA
70 Water Supply Connection to all units 31-10-2023 CPMPLETED NA
71 STP construction and completion 31-10-2023 CPMPLETED NA
72 Distempering & Colouring of all units and exteriors 31-10-2023 CPMPLETED NA
73 Fixation of doors and windows 31-10-2023 CPMPLETED NA
74 Scheduled Date of handing over possession 31-10-2023 CPMPLETED NA
75 Development of common areas, parks, gardens etc 31-10-2023 CPMPLETED NA
76 2 Floor 31-12-2022 CPMPLETED NA
77 3 Floor 31-12-2022 CPMPLETED NA
78 4 Floor 31-12-2022 CPMPLETED NA
79 2 Floor 31-12-2022 CPMPLETED NA
80 3 Floor 31-12-2022 CPMPLETED NA
81 4 Floor 31-12-2022 CPMPLETED NA
Updated Changes on 07-01-2024
82 Site Development 31-10-2023 CPMPLETED NA
83 NA 31-10-2023 COMPLETED NA
84 Ground Floor/Stilt Floor 31-10-2023 CPMPLETED NA
85 1 Floor 31-10-2023 CPMPLETED NA
86 NA 31-10-2023 COMPLETED NA
87 Ground Floor/Stilt Floor 31-12-2022 CPMPLETED NA
88 1 Floor 31-12-2022 CPMPLETED NA
89 Electrical Works 31-10-2023 CPMPLETED NA
90 Concealed Cabling including Plugs & switches 31-10-2023 CPMPLETED NA
91 Installation & Charging of Transformer 31-10-2023 CPMPLETED NA
92 Connection to Flats/Apartments 31-10-2023 CPMPLETED NA
93 PH works 31-10-2023 CPMPLETED NA
94 Laying of concealed Pipes 31-10-2023 CPMPLETED NA
95 PH Fittings 31-10-2023 CPMPLETED NA
96 Overhead Water Tanks 31-10-2023 CPMPLETED NA
97 Water Supply Connection to all units 31-10-2023 CPMPLETED NA
98 STP construction and completion 31-10-2023 CPMPLETED NA
99 Distempering & Colouring of all units and exteriors 31-10-2023 CPMPLETED NA
100 Fixation of doors and windows 31-10-2023 CPMPLETED NA
101 Scheduled Date of handing over possession 31-10-2023 CPMPLETED NA
102 Development of common areas, parks, gardens etc 31-10-2023 CPMPLETED NA
103 2 Floor 31-12-2022 CPMPLETED NA
104 3 Floor 31-12-2022 CPMPLETED NA
105 4 Floor 31-12-2022 CPMPLETED NA
106 2 Floor 31-12-2022 CPMPLETED NA
107 3 Floor 31-12-2022 CPMPLETED NA
108 4 Floor 31-12-2022 CPMPLETED NA
Updated Changes on 08-04-2024
109 Site Development 31-10-2023 CPMPLETED NA
110 NA 31-10-2023 COMPLETED NA
111 Ground Floor/Stilt Floor 31-10-2023 CPMPLETED NA
112 1 Floor 31-10-2023 CPMPLETED NA
113 NA 31-10-2023 COMPLETED NA
114 Ground Floor/Stilt Floor 31-12-2022 CPMPLETED NA
115 1 Floor 31-12-2022 CPMPLETED NA
116 Electrical Works 31-10-2023 CPMPLETED NA
117 Concealed Cabling including Plugs & switches 31-10-2023 CPMPLETED NA
118 Installation & Charging of Transformer 31-10-2023 CPMPLETED NA
119 Connection to Flats/Apartments 31-10-2023 CPMPLETED NA
120 PH works 31-10-2023 CPMPLETED NA
121 Laying of concealed Pipes 31-10-2023 CPMPLETED NA
122 PH Fittings 31-10-2023 CPMPLETED NA
123 Overhead Water Tanks 31-10-2023 CPMPLETED NA
124 Water Supply Connection to all units 31-10-2023 CPMPLETED NA
125 STP construction and completion 31-10-2023 CPMPLETED NA
126 Distempering & Colouring of all units and exteriors 31-10-2023 CPMPLETED NA
127 Fixation of doors and windows 31-10-2023 CPMPLETED NA
128 Scheduled Date of handing over possession 31-10-2023 CPMPLETED NA
129 Development of common areas, parks, gardens etc 31-10-2023 CPMPLETED NA
130 2 Floor 31-12-2022 CPMPLETED NA
131 3 Floor 31-12-2022 CPMPLETED NA
132 4 Floor 31-12-2022 CPMPLETED NA
133 2 Floor 31-12-2022 CPMPLETED NA
134 3 Floor 31-12-2022 CPMPLETED NA
135 4 Floor 31-12-2022 CPMPLETED NA

Booking Status

Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership Status
Carpet Area Balcony Area Exclusive Open Terrace Area
1 A001 88.82 6.68 10.6 Promoter
2 A002 88.82 6.68 10.6 Land Owner
3 A003 90.47 6.68 12.75 Promoter
4 A004 90.47 6.68 12.75 Promoter
5 A005 88.25 7.61 9.65 Promoter
6 A006 86.07 6.68 12.75 Promoter
7 A007 86.73 6.68 11.68 Promoter
8 A008 86.73 7.61 13.45 Promoter
9 A009 88.89 7.61 14.65 Promoter
10 A010 86.76 6.68 12.65 Land Owner
11 A011 87.45 6.68 13.95 Land Owner
12 A012 87.45 7.61 10.95 Promoter
13 A014 58.61 4.25 7.54 Promoter
14 A015 60.3 00 0 Land Owner
15 A016 31.79 0 0 Land Owner
16 A017 84.13 3.94 6.78 Promoter
17 A018 83.57 3.94 2.59 Promoter
18 A019 56.71 00 0 Land Owner
19 A101 88.82 6.68 0 Promoter
20 A102 88.82 6.68 0 Land Owner
21 A103 90.47 6.68 0 Land Owner
22 A104 90.47 6.68 0 Promoter
23 A105 88.25 7.61 0 Promoter
24 A106 86.07 6.68 0 Promoter
25 A107 86.73 6.68 0 Promoter
26 A108 86.73 7.61 0 Promoter
27 A109 88.89 7.61 0 Land Owner
28 A110 86.76 6.68 0 Land Owner
29 A111 87.45 6.68 0 Land Owner
30 A112 87.45 7.61 0 Promoter
31 A114 58.61 4.25 0 Land Owner
32 A115 60.3 0 0 Land Owner
33 A116 31.79 00 0 Promoter
34 A117 84.13 3.94 0 Promoter
35 A118 83.57 3.94 0 Land Owner
36 A119 56.71 00 0 Land Owner
37 A201 88.82 6.68 0 Promoter
38 A202 88.82 6.68 0 Land Owner
39 A203 90.47 6.68 0 Land Owner
40 A204 90.47 6.68 0 Promoter
41 A205 88.25 7.61 0 Promoter
42 A206 86.07 6.68 0 Promoter
43 A207 86.73 6.68 0 Promoter
44 A208 86.73 7.61 0 Promoter
45 A209 88.89 7.61 0 Promoter
46 A210 86.76 6.68 0 Land Owner
47 A211 87.45 6.68 0 Land Owner
48 A212 87.45 7.61 0 Promoter
49 A214 58.61 4.25 0 Land Owner
50 A215 60.3 00 0 Land Owner
51 A216 31.79 00 0 Promoter
52 A217 84.13 3.94 0 Promoter
53 A218 83.57 3.94 0 Land Owner
54 A219 56.71 00 0 Land Owner
55 A301 88.82 6.68 0 Promoter
56 A302 88.82 6.68 0 Land Owner
57 A303 90.47 6.68 0 Land Owner
58 A304 90.47 6.68 0 Promoter
59 A305 88.25 7.61 0 Promoter
60 A306 86.07 6.68 0 Promoter
61 A307 86.73 6.68 0 Promoter
62 A308 86.73 7.61 0 Promoter
63 A309 88.89 7.61 0 Land Owner
64 A310 86.76 6.68 0 Promoter
65 A311 87.45 6.68 0 Land Owner
66 A312 87.45 7.61 0 Promoter
67 A314 58.61 4.25 0 Land Owner
68 A315 60.3 00 0 Promoter
69 A316 31.79 00 0 Promoter
70 A317 84.13 3.94 0 Promoter
71 A318 83.57 3.94 0 Promoter
72 A319 56.71 00 0 Promoter
73 A401 88.82 6.68 0 Promoter
74 A402 88.82 6.68 0 Promoter
75 A403 90.47 6.68 0 Promoter
76 A404 90.47 6.68 0 Promoter
77 A405 88.25 7.61 0 Promoter
78 A406 86.07 6.68 0 Promoter
79 A407 86.73 6.68 0 Promoter
80 A408 86.73 7.61 0 Promoter
81 A409 88.89 7.61 0 Promoter
82 A410 86.76 6.68 0 Promoter
83 A411 87.45 6.68 0 Promoter
84 A412 87.45 7.61 0 Promoter
85 A414 58.61 4.25 0 Land Owner
86 A415 60.3 0 0 Promoter
87 A416 31.79 0 0 Promoter
88 A417 84.13 3.94 0 Promoter
89 A418 83.57 3.94 0 Promoter
90 A419 56.71 0 0 Promoter
91 C101 63.44 2.37 0 Promoter
92 C102 63.44 2.37 0 Land Owner
93 C103 61.65 3.26 0 Land Owner
94 C201 63.44 2.37 0 Promoter
95 C202 63.44 2.37 0 Land Owner
96 C203 61.65 3.26 0 Land Owner
97 C301 63.44 2.37 0 Land Owner
98 C302 63.44 2.37 0 Promoter
99 C303 61.65 3.26 0 Land Owner
100 C401 63.44 2.37 0 Promoter
101 C402 63.44 2.37 0 Promoter
102 C403 61.65 3.26 0 Promoter
103 D001 49.35 0 0 Promoter
104 D101 49.35 0 0 Promoter
105 D201 49.35 0 0 Promoter
106 B001 21.85 0 0 Promoter
107 B002 21.85 0 0 Promoter
108 B003 22.48 0 0 Promoter
109 B004 24.92 0 0 Promoter
110 B005 24.63 0 0 Promoter
111 B006 22.97 0 0 Promoter
112 B101 21.85 0 0 Promoter
113 B102 21.85 0 0 Promoter
114 B103 22.48 0 0 Promoter
115 B104 24.92 0 0 Promoter
116 B105 24.63 0 0 Promoter
117 B106 22.97 0 0 Promoter
118 B201 21.85 0 0 Promoter
119 B202 21.85 0 0 Promoter
120 B203 22.48 0 0 Promoter
121 B204 24.92 0 0 Promoter
122 B205 24.63 0 0 Promoter
123 B206 22.97 0 0 Promoter
124 B301 21.85 0 0 Promoter
125 B302 21.85 0 0 Promoter
126 B303 22.48 0 0 Promoter
127 B304 24.92 0 0 Promoter
128 B305 24.63 0 0 Promoter
129 B306 22.97 0 0 Promoter
130 B401 21.85 0 0 Promoter
131 B402 21.85 0 0 Promoter
132 B403 22.48 0 0 Promoter
133 B404 24.92 0 0 Promoter
134 B405 24.63 0 0 Promoter
135 B406 22.97 0 0 Promoter

Financial Status

SL No. Funds Collected from the Allottees Funds Borrowed from Financial Institutions Funds Employed from Own Sources Expenditure As On Date Status
1 0 0 2120 2120 14-07-2023 PROJECT COMPLETED OCCUPANCY CERT OBTAINED
2 0 0 0 0 06-10-2023 WORK COMPLETED FINAL OCCUPANCY CERT OBTAINED
3 0 0 2120 2120 07-01-2024 WORK COMPLETED FINAL OCCUPANCY CERT OBTAINED
4 0 0 0 0 08-04-2024 WORK COMPLETED FROM OWN FUNDS. FINAL OCCUPANCY CERT OBTAINED

Updated Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 The owner/applicant/Technical Person shall strictly adhere to the terms and conditions imposed in the NOC/Clearances given by Fire Prevention officer/National Airport Authority/SEIAA, Ministry of Forest & Environment/PHED etc wherever applicable 31-10-2023 In progress.
2 The owner/applicant/Technical Person shall strictly adhere to the terms and conditions imposed in the NOC/Clearances given by Fire Prevention officer/National Airport Authority/SEIAA, Ministry of Forest & Environment/PHED etc wherever applicable 31-10-2023 In progress.
3 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner 31-10-2023 In progress.
4 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance, fire tender, physically handicapped persons and outside visitors with signage as per norms under Regulation of BDA (Planning & Building Standards) Regulations, 2018 31-10-2023 In progress.
5 Plantation over 20% of the plot area shall be made by the applicant as per provision under Regulation of BDA (Planning & Building Standards) Regulations, 2018 31-10-2023 In progress.
6 If the construction / development are not as per the approved plan / deviated beyond permissible norms, the performance security shall be forfeited and action shall be initiated against the applicant/builder / developer as per the provisions of the ODA Act, 1982 Rules and Regulations made there under 31-10-2023 In progress.
7 The Owner/ Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/ construction defects, Authority will be no way be held responsible for the same in what so ever manner 31-10-2023 In progress.
8 The concerned Architect / Applicant / Developer are fully responsible for any deviations additions & alternations beyond approved plan/ defective construction etc. shall be liable for action as per the provisions of the Regulation 31-10-2023 In progress.
9 The applicant shall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/BDA before commencement of construction 31-10-2023 In progress.
10 All the stipulated conditions of the NOC/Clearances given by BMC, PHED, shall be adhered to strictly. No storm water/water shall be discharged to the public road/public premises and other adjoining plots. 31-10-2023 In progress.
11 Adhere to the provisions of BDA (Planning & Building Standards) Regulation strictly and conditions thereto 31-10-2023 In progress.
12 Submit NOC towards fire safety from competent Authority before obtaining Occupancy Certificate 31-10-2023 In progress.
13 The Authority shall in no way be held responsible for any structural failure and damage due to earthquake/cyclone/any other natural disaster 31-10-2023 In progress.
14 Submit document towards fee gift of road before obtaining occupancy Certificate. 31-10-2023 In progress.
15 Parking space measuring 3220.45sqm as shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose 31-10-2023 In progress.
Updated Changes on 11-07-2023
16 The owner/applicant/Technical Person shall strictly adhere to the terms and conditions imposed in the NOC/Clearances given by Fire Prevention officer/National Airport Authority/SEIAA, Ministry of Forest & Environment/PHED etc wherever applicable 31-10-2023 COMPLETED
17 The owner/applicant/Technical Person shall strictly adhere to the terms and conditions imposed in the NOC/Clearances given by Fire Prevention officer/National Airport Authority/SEIAA, Ministry of Forest & Environment/PHED etc wherever applicable 31-10-2023 COMPLETED
18 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner 31-10-2023 COMPLETED
19 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance, fire tender, physically handicapped persons and outside visitors with signage as per norms under Regulation of BDA (Planning & Building Standards) Regulations, 2018 31-10-2023 COMPLETED
20 Plantation over 20% of the plot area shall be made by the applicant as per provision under Regulation of BDA (Planning & Building Standards) Regulations, 2018 31-10-2023 COMPLETED
21 If the construction / development are not as per the approved plan / deviated beyond permissible norms, the performance security shall be forfeited and action shall be initiated against the applicant/builder / developer as per the provisions of the ODA Act, 1982 Rules and Regulations made there under 31-10-2023 COMPLETED
22 The Owner/ Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/ construction defects, Authority will be no way be held responsible for the same in what so ever manner 31-10-2023 COMPLETED
23 The concerned Architect / Applicant / Developer are fully responsible for any deviations additions & alternations beyond approved plan/ defective construction etc. shall be liable for action as per the provisions of the Regulation 31-10-2023 COMPLETED
24 The applicant shall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/BDA before commencement of construction 31-10-2023 COMPLETED
25 All the stipulated conditions of the NOC/Clearances given by BMC, PHED, shall be adhered to strictly. No storm water/water shall be discharged to the public road/public premises and other adjoining plots. 31-10-2023 COMPLETED
26 Adhere to the provisions of BDA (Planning & Building Standards) Regulation strictly and conditions thereto 31-10-2023 COMPLETED
27 Submit NOC towards fire safety from competent Authority before obtaining Occupancy Certificate 31-10-2023 COMPLETED
28 The Authority shall in no way be held responsible for any structural failure and damage due to earthquake/cyclone/any other natural disaster 31-10-2023 COMPLETED
29 Submit document towards fee gift of road before obtaining occupancy Certificate. 31-10-2023 COMPLETED
30 Parking space measuring 3220.45sqm as shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose 31-10-2023 COMPLETED
Updated Changes on 06-10-2023
31 The owner/applicant/Technical Person shall strictly adhere to the terms and conditions imposed in the NOC/Clearances given by Fire Prevention officer/National Airport Authority/SEIAA, Ministry of Forest & Environment/PHED etc wherever applicable 31-10-2023 COMPLETED
32 The owner/applicant/Technical Person shall strictly adhere to the terms and conditions imposed in the NOC/Clearances given by Fire Prevention officer/National Airport Authority/SEIAA, Ministry of Forest & Environment/PHED etc wherever applicable 31-10-2023 COMPLETED
33 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner 31-10-2023 COMPLETED
34 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance, fire tender, physically handicapped persons and outside visitors with signage as per norms under Regulation of BDA (Planning & Building Standards) Regulations, 2018 31-10-2023 COMPLETED
35 Plantation over 20% of the plot area shall be made by the applicant as per provision under Regulation of BDA (Planning & Building Standards) Regulations, 2018 31-10-2023 COMPLETED
36 If the construction / development are not as per the approved plan / deviated beyond permissible norms, the performance security shall be forfeited and action shall be initiated against the applicant/builder / developer as per the provisions of the ODA Act, 1982 Rules and Regulations made there under 31-10-2023 COMPLETED
37 The Owner/ Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/ construction defects, Authority will be no way be held responsible for the same in what so ever manner 31-10-2023 COMPLETED
38 The concerned Architect / Applicant / Developer are fully responsible for any deviations additions & alternations beyond approved plan/ defective construction etc. shall be liable for action as per the provisions of the Regulation 31-10-2023 COMPLETED
39 The applicant shall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/BDA before commencement of construction 31-10-2023 COMPLETED
40 All the stipulated conditions of the NOC/Clearances given by BMC, PHED, shall be adhered to strictly. No storm water/water shall be discharged to the public road/public premises and other adjoining plots. 31-10-2023 COMPLETED
41 Adhere to the provisions of BDA (Planning & Building Standards) Regulation strictly and conditions thereto 31-10-2023 COMPLETED
42 Submit NOC towards fire safety from competent Authority before obtaining Occupancy Certificate 31-10-2023 COMPLETED
43 The Authority shall in no way be held responsible for any structural failure and damage due to earthquake/cyclone/any other natural disaster 31-10-2023 COMPLETED
44 Submit document towards fee gift of road before obtaining occupancy Certificate. 31-10-2023 COMPLETED
45 Parking space measuring 3220.45sqm as shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose 31-10-2023 COMPLETED
Updated Changes on 07-01-2024
46 The owner/applicant/Technical Person shall strictly adhere to the terms and conditions imposed in the NOC/Clearances given by Fire Prevention officer/National Airport Authority/SEIAA, Ministry of Forest & Environment/PHED etc wherever applicable 31-10-2023 COMPLETED
47 The owner/applicant/Technical Person shall strictly adhere to the terms and conditions imposed in the NOC/Clearances given by Fire Prevention officer/National Airport Authority/SEIAA, Ministry of Forest & Environment/PHED etc wherever applicable 31-10-2023 COMPLETED
48 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner 31-10-2023 COMPLETED
49 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance, fire tender, physically handicapped persons and outside visitors with signage as per norms under Regulation of BDA (Planning & Building Standards) Regulations, 2018 31-10-2023 COMPLETED
50 Plantation over 20% of the plot area shall be made by the applicant as per provision under Regulation of BDA (Planning & Building Standards) Regulations, 2018 31-10-2023 COMPLETED
51 If the construction / development are not as per the approved plan / deviated beyond permissible norms, the performance security shall be forfeited and action shall be initiated against the applicant/builder / developer as per the provisions of the ODA Act, 1982 Rules and Regulations made there under 31-10-2023 COMPLETED
52 The Owner/ Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/ construction defects, Authority will be no way be held responsible for the same in what so ever manner 31-10-2023 COMPLETED
53 The concerned Architect / Applicant / Developer are fully responsible for any deviations additions & alternations beyond approved plan/ defective construction etc. shall be liable for action as per the provisions of the Regulation 31-10-2023 COMPLETED
54 The applicant shall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/BDA before commencement of construction 31-10-2023 COMPLETED
55 All the stipulated conditions of the NOC/Clearances given by BMC, PHED, shall be adhered to strictly. No storm water/water shall be discharged to the public road/public premises and other adjoining plots. 31-10-2023 COMPLETED
56 Adhere to the provisions of BDA (Planning & Building Standards) Regulation strictly and conditions thereto 31-10-2023 COMPLETED
57 Submit NOC towards fire safety from competent Authority before obtaining Occupancy Certificate 31-10-2023 COMPLETED
58 The Authority shall in no way be held responsible for any structural failure and damage due to earthquake/cyclone/any other natural disaster 31-10-2023 COMPLETED
59 Submit document towards fee gift of road before obtaining occupancy Certificate. 31-10-2023 COMPLETED
60 Parking space measuring 3220.45sqm as shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose 31-10-2023 COMPLETED
Updated Changes on 08-04-2024
61 The owner/applicant/Technical Person shall strictly adhere to the terms and conditions imposed in the NOC/Clearances given by Fire Prevention officer/National Airport Authority/SEIAA, Ministry of Forest & Environment/PHED etc wherever applicable 31-10-2023 COMPLETED
62 The owner/applicant/Technical Person shall strictly adhere to the terms and conditions imposed in the NOC/Clearances given by Fire Prevention officer/National Airport Authority/SEIAA, Ministry of Forest & Environment/PHED etc wherever applicable 31-10-2023 COMPLETED
63 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner 31-10-2023 COMPLETED
64 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance, fire tender, physically handicapped persons and outside visitors with signage as per norms under Regulation of BDA (Planning & Building Standards) Regulations, 2018 31-10-2023 COMPLETED
65 Plantation over 20% of the plot area shall be made by the applicant as per provision under Regulation of BDA (Planning & Building Standards) Regulations, 2018 31-10-2023 COMPLETED
66 If the construction / development are not as per the approved plan / deviated beyond permissible norms, the performance security shall be forfeited and action shall be initiated against the applicant/builder / developer as per the provisions of the ODA Act, 1982 Rules and Regulations made there under 31-10-2023 COMPLETED
67 The Owner/ Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/ construction defects, Authority will be no way be held responsible for the same in what so ever manner 31-10-2023 COMPLETED
68 The concerned Architect / Applicant / Developer are fully responsible for any deviations additions & alternations beyond approved plan/ defective construction etc. shall be liable for action as per the provisions of the Regulation 31-10-2023 COMPLETED
69 The applicant shall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/BDA before commencement of construction 31-10-2023 COMPLETED
70 All the stipulated conditions of the NOC/Clearances given by BMC, PHED, shall be adhered to strictly. No storm water/water shall be discharged to the public road/public premises and other adjoining plots. 31-10-2023 COMPLETED
71 Adhere to the provisions of BDA (Planning & Building Standards) Regulation strictly and conditions thereto 31-10-2023 COMPLETED
72 Submit NOC towards fire safety from competent Authority before obtaining Occupancy Certificate 31-10-2023 COMPLETED
73 The Authority shall in no way be held responsible for any structural failure and damage due to earthquake/cyclone/any other natural disaster 31-10-2023 COMPLETED
74 Submit document towards fee gift of road before obtaining occupancy Certificate. 31-10-2023 COMPLETED
75 Parking space measuring 3220.45sqm as shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose 31-10-2023 COMPLETED

Updated Project Documents

Sl. No. Title of the document Upload Document
1 PART OCCUPANCY CERT
2 FIRE NOC
3 CGWA NOC
4 FINAL OCCUPANCY CERT
5 FIRE SAFETY CERT FINAL
6 CA AUDIT CERT 01
7 CA AUDIT CERT 02
8 QPR PROFORMA
9 STATUS REPORT
10 QPR 2023 Q4
11 QPR 2023 Q4
12 QPR 2024 Q1
13 QPR 2024 Q1
:  Sunita Choudhary :  
NA :  AAZPK7130L
:PAN Card :  rnchoudhary@gmail.com
:  MA :  9438132887
:  Has already completed and handed over one Apartment Project at Bhubaneshwar.
:  Yes :  NA
:  RAJIV NAYAN Choudhary :  
NA :  AAJPC5430B
:PAN Card :  rnchoudhary@gmail.com
:  B TECH (CIVIL :  9437566770
:  Has already completed and handed over one Apartment Project at Bhubaneshwar.
:  Yes :  NA

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
M Aakashdeep Architect Plot No 948/A Prashanti Vihar, Baramunda, Bhubaneswar MOBILE 9437015399 CA/2005/35305 DHPL Sahoo Complex. DHPL Enclave One
RAMESH K KEJRIWAL Chartered Accountant ROOM NO 13, FIRST FLOOR, APEX MARKET COMPLEX, CUUTACK ROAD BHUBANESWAR MOBILE 9437043043 REG NO 324527E DHPL Sahoo Complex. DHPL Enclave One
RN CHOUDHARY Construction Engineer 209/20 PRAGATI VIHAR CS PUR BHUBANESWAR 751021 RTD/DTP/CER/111/2018 DHPL SCB Residency

Updated Units

House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
A001 Covered Parking 1 4.30 x 3.70 15.91 Included
A002 Covered Parking 4 4.30 x 3.70 15.91 Included
A003 Covered Parking 20 5.28 x 3.70 19.54 Included
A004 Covered Parking 23 5.28 x 3.70 19.54 Included
A005 Covered Parking 6 4.45 x 3.15 14.02 Included
A006 Covered Parking 19 4.45 x 3.15 14.02 Included
A007 Covered Parking 69 5.00 x 2.80 14.00 Included
A008 Covered Parking 70 5.00 x 2.80 14.00 Included
A009 Covered Parking 43 4.50 x 3.00 15.72 Included
A010 Covered Parking 30 5.24 x 3.00 15.72 Included
A011 Covered Parking 35 5.24 x 3.23 16.93 Included
A012 Covered Parking 58 4.50 x 3.29 14.81 Included
A014 Covered Parking 78 5.50 x 2.58 14.19 Included
A015 Covered Parking 83 5.50 x 3.00 16.50 Included
A016 Covered Parking 97 4.50 x 1.90 8.55 Included
A017 Covered Parking 29 5.24 x 2.50 13.10 Included
A018 Covered Parking 84 5.82 x 3.40 19.79 Included
A019 Covered Parking 91 4.30 x 2.29 9.85 Included
A101 Covered Parking 28 5.24 x 3.00 15.72 Included
A102 Covered Parking 5 4.30 x 3.60 15.48 Included
A103 Covered Parking 67 5.61 x 3.29 18.46 Included
A104 Covered Parking 24 5.24 x 3.40 17.82 Included
A105 Covered Parking 44 4.50 x 3.00 13.50 Included
A106 Covered Parking 47 4.50 x 2.97 13.37 Included
A107 Covered Parking 48 4.50 x 2.95 13.28 Included
A108 Covered Parking 9 4.45 x 2.97 13.22 Included
A109 Covered Parking 75 4.77 x 2.85 13.59 Included
A110 Covered Parking 31 5.24 x 3.40 17.82 Included
A111 Covered Parking 36 5.58 x 3.40 18.97 Included
A112 Covered Parking 59 4.50 x 3.29 14.81 Included
A114 Covered Parking 79 5.50 x 2.90 15.95 Included
A115 Covered Parking 77 4.77 x 2.77 13.21 Included
A116 Covered Parking 98 4.77 x 2.29 10.92 Included
A117 Covered Parking 62 4.77 x 3.23 15.41 Included
A118 Covered Parking 85 4.81 x 3.12 15.01 Included
A119 Covered Parking 92 4.30 x 2.29 9.85 Included
A201 Covered Parking 51 4.50 x 3.40 15.30 Included
A202 Covered Parking 53 4.50 x 3.26 14.67 Included
A203 Covered Parking 27 5.24 x 3.40 17.82 Included
A204 Covered Parking 21 5.28 x 3.29 17.37 Included
A205 Covered Parking 16 4.45 x 2.97 13.22 Included
A206 Covered Parking 8 4.45 x 2.95 13.13 Included
A207 Covered Parking 10 4.45 x 2.95 13.13 Included
A208 Covered Parking 15 4.45 x 2.95 13.13 Included
A209 Covered Parking 41 4.50 x 3.13 14.09 Included
A210 Covered Parking 32 5.24 x 3.29 17.24 Included
A211 Covered Parking 37 5.50 x 4.75 26.13 Included
A212 Covered Parking 60 4.50 x 4.14 18.63 Included
A214 Covered Parking 80 5.50 x 2.84 15.62 Included
A215 Covered Parking 76 4.77 x 2.85 13.59 Included
A216 Covered Parking 104 5.24 x 1.85 9.69 Included
A217 Covered Parking 73 4.77 x 3.00 14.31 Included
A218 Covered Parking 86 4.81 x 3.12 15.01 Included
A219 Covered Parking 93 4.45 x 2.45 10.90 Included
A301 Covered Parking 54 4.50 x 3.26 14.67 Included
A302 Covered Parking 2 4.30 x 3.29 14.15 Included
A303 Covered Parking 22 5.28 x 3.29 17.37 Included
A304 Covered Parking 25 5.24 x 3.29 17.24 Included
A305 Covered Parking 17 4.45 x 2.95 13.13 Included
A306 Covered Parking 65 4.60 x 2.81 12.93 Included
A307 Covered Parking 66 4.60 x 2.81 12.93 Included
A308 Covered Parking 99 5.61 x 2.29 12.85 Included
A309 Covered Parking 40 4.50 x 2.95 13.28 Included
A310 Covered Parking 33 5.24 x 3.29 17.24 Included
A311 Covered Parking 38 4.50 x 2.84 12.78 Included
A312 Covered Parking 64 4.77 x 3.69 17.60 Included
A314 Covered Parking 81 5.50 x 2.50 13.75 Included
A315 Covered Parking 42 4.50 x 2.71 12.20 Included
A316 Covered Parking 105 5.58 x 1.17 6.53 Included
A317 Covered Parking 74 4.77 x 2.81 13.40 Included
A318 Covered Parking 87 4.81 x 3.62 17.41 Included
A319 Covered Parking 94 5.28 x 2.29 12.09 Included
A401 Covered Parking 3 4.30 x 3.29 14.15 Included
A402 Covered Parking 46 4.50 x 3.13 14.09 Included
A403 Covered Parking 26 5.24 x 3.29 17.24 Included
A404 Covered Parking 68 5.61 x 3.00 16.83 Included
A405 Covered Parking 49 4.50 x 2.84 12.78 Included
A406 Covered Parking 50 4.50 x 2.84 17.41 Included
A407 Covered Parking 52 4.50 x 2.84 12.78 Included
A408 Covered Parking 7 4.45 x 2.84 12.64 Included
A409 Covered Parking 57 4.50 x 4.14 18.63 Included
A410 Covered Parking 34 5.24 x 4.14 21.69 Included
A411 Covered Parking 39 4.50 x 2.95 13.28 Included
A412 Covered Parking 63 4.77 x 3.29 15.69 Included
A414 Covered Parking 82 5.50 x 2.77 15.24 Included
Updated Changes
A415 Covered Parking 56 3.50 x 3.45 12.08 Included
A416 Covered Parking 106 5.82 x 1.53 8.90 Included
A417 Covered Parking 89 4.81 x 3.12 15.01 Included
A418 Covered Parking 61 4.77 x 4.80 22.90 Included
A419 Covered Parking 95 5.28 x 2.29 12.09 Included
C101 Covered Parking 116 4.00 x 2.89 11.56 Included
C102 Covered Parking 108 4.29 x 3.00 12.87 Included
C103 Covered Parking 109 4.29 x 3.32 14.24 Included
C201 Covered Parking 117 4.00 x 3.79 15.16 Included
C202 Covered Parking 110 4.29 x 3.19 13.69 Included
C203 Covered Parking 111 4.29 x 3.00 12.87 Included
C301 Covered Parking 118 4.38 x 3.37 14.76 Included
C302 Covered Parking 113 4.00 x 2.87 11.48 Included
C303 Covered Parking 114 4.00 x 3.10 12.40 Included
C401 Covered Parking 119 4.38 x 3.00 13.14 Included
C402 Covered Parking 115 4.00 x 3.25 13.00 Included
C403 Covered Parking 107 4.29 x 1.57 6.74 Included
D001 Covered Parking 121 4.00 x 3.38 13.52 Included
D101 Covered Parking 121 4.00 x 3.38 13.52 Included
D201 Covered Parking 123 4.38 x 1.80 7.88 Included
B002 Covered Parking EW02 2.00 x 1.00 2 Included
B003 Covered Parking EW03 2.00 x 1.00 2 Included
B004 Covered Parking EW04 2.00 x 1.00 2 Included
B005 Covered Parking EW05 2.00 x 1.00 2 Included
B006 Covered Parking EW06 2.00 x 1.00 2 Included
B101 Covered Parking EW07 2.00 x 1.00 2 Included
B102 Covered Parking EW08 2.00 x 1.00 2 Included
B103 Covered Parking EW09 2.00 x 1.00 2 Included
B104 Covered Parking EW10 2.00 x 1.00 2 Included
B105 Covered Parking EW11 2.00 x 1.00 2 Included
B106 Covered Parking EW12 2.00 x 1.00 2 Included
B201 Covered Parking EW13 2.00 x 1.00 2 Included
B202 Covered Parking EW14 2.00 x 1.00 2 Included
B203 Covered Parking EW15 2.00 x 1.00 2 Included
B204 Covered Parking EW16 2.00 x 1.00 2 Included
B205 Covered Parking EW17 2.00 x 1.00 2 Included
B206 Covered Parking EW18 2.00 x 1.00 2 Included
B301 Covered Parking EW19 2.00 x 1.00 2 Included
B302 Covered Parking EW20 2.00 x 1.00 2 Included
B303 Covered Parking EW21 2.00 x 1.00 2 Included
B304 Covered Parking EW22 2.00 x 1.00 2 Included
B305 Covered Parking EW23 2.00 x 1.00 2 Included
B306 Covered Parking EW24 2.00 x 1.00 2 Included
B401 Covered Parking EW25 2.00 x 1.00 2 Included
B402 Covered Parking EW26 2.00 x 1.00 2 Included
B403 Covered Parking EW27 2.00 x 1.00 2 Included
B404 Covered Parking EW28 2.00 x 1.00 2 Included
B405 Covered Parking EW29 2.00 x 1.00 2 Included
B406 Covered Parking EW30 2.00 x 1.00 2 Included
B001 Covered Parking EW01 2.00 x 1.00 2 Included
Updated Changes
A415 Covered Parking 56 3.50 x 3.45 12.08 Included
A416 Covered Parking 106 5.82 x 1.53 8.90 Included
A417 Covered Parking 89 4.81 x 3.12 15.01 Included
A418 Covered Parking 61 4.77 x 4.80 22.90 Included
A419 Covered Parking 95 5.28 x 2.29 12.09 Included
C101 Covered Parking 116 4.00 x 2.89 11.56 Included
C102 Covered Parking 108 4.29 x 3.00 12.87 Included
C103 Covered Parking 109 4.29 x 3.32 14.24 Included
C201 Covered Parking 117 4.00 x 3.79 15.16 Included
C202 Covered Parking 110 4.29 x 3.19 13.69 Included
C203 Covered Parking 111 4.29 x 3.00 12.87 Included
C301 Covered Parking 118 4.38 x 3.37 14.76 Included
C302 Covered Parking 113 4.00 x 2.87 11.48 Included
C303 Covered Parking 114 4.00 x 3.10 12.40 Included
C401 Covered Parking 119 4.38 x 3.00 13.14 Included
C402 Covered Parking 115 4.00 x 3.25 13.00 Included
C403 Covered Parking 107 4.29 x 1.57 6.74 Included
D001 Covered Parking 121 4.00 x 3.38 13.52 Included
D101 Covered Parking 121 4.00 x 3.38 13.52 Included
D201 Covered Parking 123 4.38 x 1.80 7.88 Included
B002 Covered Parking EW02 2.00 x 1.00 2 Included
B003 Covered Parking EW03 2.00 x 1.00 2 Included
B004 Covered Parking EW04 2.00 x 1.00 2 Included
B005 Covered Parking EW05 2.00 x 1.00 2 Included
B006 Covered Parking EW06 2.00 x 1.00 2 Included
B101 Covered Parking EW07 2.00 x 1.00 2 Included
B102 Covered Parking EW08 2.00 x 1.00 2 Included
B103 Covered Parking EW09 2.00 x 1.00 2 Included
B104 Covered Parking EW10 2.00 x 1.00 2 Included
B105 Covered Parking EW11 2.00 x 1.00 2 Included
B106 Covered Parking EW12 2.00 x 1.00 2 Included
B201 Covered Parking EW13 2.00 x 1.00 2 Included
B202 Covered Parking EW14 2.00 x 1.00 2 Included
B203 Covered Parking EW15 2.00 x 1.00 2 Included
B204 Covered Parking EW16 2.00 x 1.00 2 Included
B205 Covered Parking EW17 2.00 x 1.00 2 Included
B206 Covered Parking EW18 2.00 x 1.00 2 Included
B301 Covered Parking EW19 2.00 x 1.00 2 Included
B302 Covered Parking EW20 2.00 x 1.00 2 Included
B303 Covered Parking EW21 2.00 x 1.00 2 Included
B304 Covered Parking EW22 2.00 x 1.00 2 Included
B305 Covered Parking EW23 2.00 x 1.00 2 Included
B306 Covered Parking EW24 2.00 x 1.00 2 Included
B401 Covered Parking EW25 2.00 x 1.00 2 Included
B402 Covered Parking EW26 2.00 x 1.00 2 Included
B403 Covered Parking EW27 2.00 x 1.00 2 Included
B404 Covered Parking EW28 2.00 x 1.00 2 Included
B405 Covered Parking EW29 2.00 x 1.00 2 Included
B406 Covered Parking EW30 2.00 x 1.00 2 Included
B001 Covered Parking EW01 2.00 x 1.00 2 Included

Generated by pacms.orera.in on date: 2024-05-19