Generated by pacms.orera.in on date: 2024-05-09

Promoter Details
Promoter Name :
PARTHAJEET PATNAIK
Project Name :
FALCON TATVA
Project Location :
(Residential Project, 4 Blocks (2B+G+17) Residential multi storied apartment & one Block of (2B+G+2) society building, No. of Units- 268)

Form- I

A. Promoter's Details

:  FALCON REAL ESTATE PRIVATE LIMITED :  Private Company
:  15-04990, CIN-U70101OR1997PTC004990 :View
NA :  Plot No-A/22, Falcon House, 2nd Floor, Cuttack Road, Bhubaneswar-751006, Dist-Khordha, Odisha
:  Plot No.- A/22, Falcon House, 2nd Floor, Cuttack Road, Bhubaneswar, Dist- khordha, Odisha- 751006. :  frel_tatva@falconrealestate.in
:  2571976 :  7978009125
:  AAACF6408N :View
:  Promoter has got more than 25 years of experience in this field. He has completed many more multistored residential and commercial projects in and outside the state. :  The promoter has completed successfully one joint venture project named as "Malhan Falcon Plaza" at Dwaraka,New Delhi-110075
:  www.falconrealestate.in

B. Details of Board of Directors / Partners / MC Members

:  PARTHAJEET PATNAIK :  
:  Director :  ALMPP6881B
:PAN Card :  parthajeetpatnaik@falconrealestate.in
:  MBA :  9937021044
:  Promoter has got more than 25 years of experience in this field. He has completed many more multistored residential and commercial projects in and outside the state.
:  Yes :  NA
:  ADYASHA PATNAIK :  
:  Director :  AODPP5279D
:PAN Card :  fre_support@falconrealestate.in
:  MBA :  9437021040
:  She has got more than 6 years of experience in this field. under her supervision multistoried Residential project "Falcon Residency" and "Falcon Crest" have been completed successfully.
:  Yes :  NA

Annexure-1

Details of last projects already implemented (Ongoing or Complete)

1. :  FALCON CREST :  Residential
:  Plot No- 800,903,829(P), MOUZA-SAMPUR, Tahsil-Bhubaneswar, Dist- Khorda. :  Ongoing
:  RP/19/2021/00581 :  notdelayed
:  Ownership
:  B+G+ 13 NA NA :  B+G+ 13
:  No

:   :  
:   :  
:  
: Yes :  140000000
: Yes :  75000000

Annexure-2

Details of the project to be registered

:   New :  FALCON TATVA
:  Residential :  (Residential Project, 4 Blocks (2B+G+17) Residential multi storied apartment & one Block of (2B+G+2) society building, No. of Units- 268)
:  Khordha :  Bhubaneswar
:  751019 :  Urban Local Body
:  BHUBANESWAR MUNICIPAL CORPORATION
:  LB+UB+G+17 & G+2 (SOCIETY) :  NA

Land Details of the Project

:  493/5958 :  432/4870
:  DUMUDUMA :  190.213
:  Yes
No :  View
:  View
:  Promoter
:  499/6204 :  432/5085
:  DUMUDUMA :  323.768
:  No :  283.047
No :  View
:  View
:  Promoter
:  499/6202 :  432/5085
:  DUMUDUMA :  728.478
:  No :  628.260
No :  View
:  View
:  Promoter
:  499/6203 :  432/5085
:  DUMUDUMA :  364.239
:  No :  323.768
No :  View
:  View
:  Promoter
:  499/6207 :  432/5086
:  DUMUDUMA :  364.239
:  No :  315.673
No :  View
:  View
:  Promoter
:  499/6206 :  432/5086
:  DUMUDUMA :  364.239
:  No :  315.673
No :  View
:  View
:  Promoter
:  501 :  432/5190
:  DUMUDUMA :  4451.810
:  Yes
No :  View
:  View
:  Promoter
:  496/6452 :  432/5408
:  DUMUDUMA :  48.565
:  No :  40.546
No :  View
:  View
:  Promoter
:  496/6453 :  432/5408
:  DUMUDUMA :  263.061
:  No :  244.911
No :  View
:  View
:  Promoter
:  499/4493 :  432/4995
:  DUMUDUMA :  364.239
:  No :  310.046
No :  View
:  View
:  Promoter
:  496/4145 :  432/2254
:  DUMUDUMA :  6366.018
:  No :  5837.015
No :  View
:  View
:  Promoter
:  496/2534 :  2618
:  DUMUDUMA :  404.710
:  Yes
No :  View
:  View
:  Promoter
:  496/6335 :  432/5368
:  DUMUDUMA :  364.308
:  No :  364.239
No :  View
:  View
:  Promoter
:  497 :  432/5370
:  DUMUDUMA :  485.652
:  No :  289.072
No :  View
:  View
:  Promoter
:  498 :  432/5369
:  DUMUDUMA :  485.652
:  No :  365.612
No :  View
:  View
:  Promoter

:  499/4454 :  432/2465
:  DUMUDUMA :  364.239
:  No :  300.430
No :  View
:  View
:  Other Person
:  ALAKA SAMAL :  BY WAY OF GENERAL POWER OF ATTORNEY
: No
: Yes
:  1132208515 :  05-07-2022
:  SUB-REGISTRAR KHANDGIRI :  Attached

:  500 :  432/2128
:  DUMUDUMA :  1420.53
:  No :  1191.352
No :  View
:  View
:  Other Person
:  SANGHAMITRA SWAIN :  BY WAY OF GENERAL POWER OF ATTORNEY
: No
: Yes
:  1132204729 :  05-07-2022
:  SUB-REGISTRAR, KHANDAGIRI :  Attached

Development Agreement

: Yes
Serial No. Particulars of the Person Land/Plot Details Share of the Person Document Attached
1 ALAKA SAMAL 499/4454 33%   Agreement Copy
2 SANGHAMITRA SWAIN 500 33%   Agreement Copy

Building Plan

  View   View
  Download site plan 06-02-2026
07-02-2023

Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 The building shall be used exclusively for Residential Apartment purpose and the use shall not be changed to any other use without prior approval of this Authority 06-02-2028 NOT YET STARTED
2 The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement 06-02-2028 NOT YET STARTED
3 Parking space measuring 19636.495qmas shown in the approved plan shall be left for parking of vehicles and no part of it shall be used for any other purpose and shall not be partitioned/closed in any manner. 06-02-2028 NOT YET STARTED
4 The land over which construction is proposed is accessible by an approved means of access of 51.82 M (Fifty One Point Eighty Two mtr) N.H in width. 6. The land in question must be in lawful ownership and peaceful possession of the applicant. 02-02-2028 NOT YET STARTED
5 The permission granted under these regulations shall remain valid up to three years from the date of issue .However the permission shall have to be revalidated before the expiry the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year. 06-02-2028 NOT YET STARTED
6 Roof top rain water shall be conveyed and discharged to the rain water Harvesting structure in the premises as per Rule-47 of ODA (Planning & Building Standards) Rules, 2020. 06-02-2028 NOT YET STARTED
7 Provision of green building norms are to be strictly followed as per Rule-51 of ODA (Planning & Building Standards) Rules, 2020. 06-02-2028 NOT YET STARTED
8 Plantation as required under the provision under Rule 30 of ODA (Planning & Building Standards) Rules, 2020.shall be strictly adhered. 06-02-2028 NOT YET STARTED
9 At least 10% of the parking shall be ear marked for visitors and 30% of the parking space shall have facility for Electrical vehicle charging points 06-02-2028 NOT YET STARTED
10 The Owner/ Applicant/Architect/Structural Engineer/PMO are fully and jointly responsible for any structural failure of building due to any earthquake/cyclone/any other natural disaster, structural/construction defects. Authority will be no way be held responsible for the same in what so ever manner. 06-02-2028 NOT YET STARTED
11 The applicant shall get the EIDP approved towards development of External infrastructure. execute it and obtain clearance from Engineering Wing of BMC before Occupancy. 06-02-2028 NOT YET STARTED
12 Provision of public washroom to be provided as per Rule-50 of ODA (P &BS) Rules, 2020. 06-02-2028 NOT YET STARTED
13 Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards)Rules-2020, or under any other law for the time being in force. 06-02-2028 NOT YET STARTED
14 Other requirements or licenses or clearances required to be obtained for the site /premises or activity under various other laws. 06-02-2028 NOT YET STARTED
15 In case of any dispute arising out of land record or in respect of right, title, interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute. 06-02-2028 NOT YET STARTED
16 Neither granting of the permit nor the approval of the drawing and specifications, nor inspections made by the Authority during erection of the building shall in any way relleve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBC 2016 and these Rules. 06-02-2028 NOT YET STARTED
17 Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the regulations; (b) Obtain, wherever applicable, from the competent Authority permissions/clearance required in connection with the proposed work: 06-02-2028 NOT YET STARTED
18 Ensure that the PMO (Project Management Organization) engaged by him shall take up site & field verification and submit stage wise report as required under Rule 14 of ODA (P & BS) Rules-2020. 06-02-2028 NOT YET STARTED
19 Register the said Apartment project over scheduled property under the Real Estate (Regulation & Development)-Act-2016. 06-04-2023 preparing to submit application for registration before RERA .
20 Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force, records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the Authority. 06-02-2028 NOT YET STARTED
21 If the Authority finds at any stage that the construction is not being carried in accordance to the sanctioned plan or is in violation of any of the provisions of these regulations, it shall notify the owner and no further construction shall be allowed until necessary corrections in the plan are made and the corrected plan is approved. 06-02-2028 NOT YET STARTED

Layout Plan

: Yes :  View

Location Map with geo-coordinates of bend points

Point No. Latitude Longitude
1 20°15'05.1''N 85°47'07.2''E
2 20°15'05.1''N 85°47'07.5''E
3 20°15'05.4''N 85°47'07.5''E
4 20°15'05.4'''N 85°47'07.7''E
5 20°15'06.2''N 85°47'08''.2''E
6 20°15'06.2''N 85°47'08''.5''E
7 20°15'06.1''N 85°47'08''.6''E
8 20°15'06.1''N 85°47'08''.8''E
9 20°15'06.0''N 85°47'09.0''E
10 20°15'06.0''N 85°47'09.3''E
11 20°15'06.0''N 85°47'09.5''E
12 20°15'06.2''N 85°47'09.9''E
13 20°15'06.5'''N 85°47'11.7''E
14 20°15'07.0'''N 85°47'11.5''E
15 20°15'07.1'''N 85°47'12.7''E
16 20°15'07.0'''N 85°47'13.6''E
17 20°15'06.1'''N 85°47'13.6''E
18 20°15'05.7'''N 85°47'13.7''E
19 20°15'05.0'''N 85°47'13.6''E
20 20°15'04.7'''N 85°47'13.6''E
21 20°15'04.4'''N 85°47'13.5''E
22 20°15'03.5'''N 85°47'13.4''E
23 20°15'03.0'''N 85°47'13.4''E
24 20°15'03.2'''N 85°47'12.5'''E
25 20°15'03.06''N 85°47'12.5'''E
26 20°15'04.3'''N 85°47'12.7'''E
27 20°15'04.4'''N 85°47'12.2'''E
28 20°15'04.3'''N 85°47'11.4'''E
29 20°15'04.3'''N 85°47'10.3'''E
30 20°15'03.6'''N 85°47'10.3'''E
31 20°15'03.8'''N 85°47'08.3'''E
32 20°15'03.6'''N 85°47'08.3'''E
33 20°15'03.6'''N 85°47'07.3'''E
34 20°15'04.2'''N 85°47'07.2'''E
35 20°15'04.6'''N 85°47'07.2'''E
36 20°15'04.7'''N 85°47'06.8'''E
View

Milestone of Project Construction

Description* Scheduled date of completion Current Status Site Images
Site Development 06-02-2028 NOT YET STARTED
Roof Casting NA NA NA
Ground Floor/Stilt Floor 11-10-2024 NOT YET STARTED NA
1 Floor 25-11-2024 NOT YET STARTED NA
Brick Work & Plastering NA NA NA
Ground Floor/Stilt Floor 25-12-2024 NOT YET STARTED NA
1 Floor 08-02-2025 NOT YET STARTED NA
Electrical Works 28-12-2027 NOT YET STARTED NA
Concealed Cabling including Plugs & switches 28-12-2027 NOT YET STARTED NA
Installation & Charging of Transformer 28-12-2027 NOT YET STARTED NA
Connection to Flats/Apartments 28-12-2027 NOT YET STARTED NA
PH works 28-12-2027 NOT YET STARTED NA
Laying of concealed Pipes 28-12-2027 NOT YET STARTED NA
PH Fittings 28-12-2027 NOT YET STARTED NA
Overhead Water Tanks 28-12-2027 NOT YET STARTED NA
Water Supply Connection to all units 28-12-2027 NOT YET STARTED NA
STP construction and completion 28-12-2027 NOT YET STARTED NA
Distempering & Colouring of all units and exteriors 28-12-2027 NOT YET STARTED NA
Fixation of doors and windows 28-12-2027 NOT YET STARTED NA
Scheduled Date of handing over possession 06-02-2028 NOT YET STARTED NA
Development of common areas, parks, gardens etc 28-12-2027 NOT YET STARTED NA
2 Floor 09-01-2025 NOT YET STARTED NA
3 Floor 23-02-2025 NOT YET STARTED NA
4 Floor 09-04-2025 NOT YET STARTED NA
5 Floor 24-05-2025 NOT YET STARTED NA
6 Floor 08-07-2025 NOT YET STARTED NA
7 Floor 22-08-2025 NOT YET STARTED NA
8 Floor 6-10-2025 NOT YET STARTED NA
9 Floor 20-11-2025 NOT YET STARTED NA
10 Floor 04-01-2026 NOT YET STARTED NA
11 Floor 18-02-2026 NOT YET STARTED NA
12 Floor 04-04-2026 NOT YET STARTED NA
13 Floor 19-05-2026 NOT YET STARTED NA
14 Floor 03-07-2026 NOT YET STARTED NA
15 Floor 17-08-2026 NOT YET STARTED NA
16 Floor 01-10-2026 NOT YET STARTED NA
17 Floor 15-11-2026 NOT YET STARTED NA
2 Floor 25-03-2025 NOT YET STARTED NA
3 Floor 09-05-2025 NOT YET STARTED NA
4 Floor 23-06-2025 NOT YET STARTED NA
5 Floor 07-08-2025 NOT YET STARTED NA
6 Floor 21-09-2025 NOT YET STARTED NA
7 Floor 05-11-2025 NOT YET STARTED NA
8 Floor 20-12-2025 NOT YET STARTED NA
9 Floor 03-02-2026 NOT YET STARTED NA
10 Floor 20-03-2026 NOT YET STARTED NA
11 Floor 04-05-2026 NOT YET STARTED NA
12 Floor 18-06-2026 NOT YET STARTED NA
13 Floor 02-08-2026 NOT YET STARTED NA
14 Floor 16-09-2026 NOT YET STARTED NA
15 Floor 31-10-2026 NOT YET STARTED NA
16 Floor 15-12-2026 NOT YET STARTED NA
17 Floor 29-01-2027 NOT YET STARTED NA
Site Development 06-02-2028 NOT YET STARTED NA
NA NA NA NA
Ground Floor/Stilt Floor 11-10-2024 NOT YET STARTED NA
1 Floor 25-11-2024 NOT YET STARTED NA
NA NA NA NA
Ground Floor/Stilt Floor 25-12-2024 NOT YET STARTED NA
1 Floor 08-02-2025 NOT YET STARTED NA
Electrical Works 28-12-2027 NOT YET STARTED NA
Concealed Cabling including Plugs & switches 28-12-2027 NOT YET STARTED NA
Installation & Charging of Transformer 28-12-2027 NOT YET STARTED NA
Connection to Flats/Apartments 28-12-2027 NOT YET STARTED NA
PH works 28-12-2027 NOT YET STARTED NA
Laying of concealed Pipes 28-12-2027 NOT YET STARTED NA
PH Fittings 28-12-2027 NOT YET STARTED NA
Overhead Water Tanks 28-12-2027 NOT YET STARTED NA
Water Supply Connection to all units 28-12-2027 NOT YET STARTED NA
STP construction and completion 28-12-2027 NOT YET STARTED NA
Distempering & Colouring of all units and exteriors 28-12-2027 NOT YET STARTED NA
Fixation of doors and windows 28-12-2027 NOT YET STARTED NA
Scheduled Date of handing over possession 06-02-2028 NOT YET STARTED NA
Development of common areas, parks, gardens etc 28-12-2027 NOT YET STARTED NA
2 Floor 09-01-2025 NOT YET STARTED NA
3 Floor 23-02-2025 NOT YET STARTED NA
4 Floor 09-04-2025 NOT YET STARTED NA
5 Floor 24-05-2025 NOT YET STARTED NA
6 Floor 08-07-2025 NOT YET STARTED NA
7 Floor 22-08-2025 NOT YET STARTED NA
8 Floor 6-10-2025 NOT YET STARTED NA
9 Floor 20-11-2025 NOT YET STARTED NA
10 Floor 04-01-2026 NOT YET STARTED NA
11 Floor 18-02-2026 NOT YET STARTED NA
12 Floor 04-04-2026 NOT YET STARTED NA
13 Floor 19-05-2026 NOT YET STARTED NA
14 Floor 03-07-2026 NOT YET STARTED NA
15 Floor 17-08-2026 NOT YET STARTED NA
16 Floor 01-10-2026 NOT YET STARTED NA
17 Floor 15-11-2026 NOT YET STARTED NA
2 Floor 25-03-2025 NOT YET STARTED NA
3 Floor 09-05-2025 NOT YET STARTED NA
4 Floor 23-06-2025 NOT YET STARTED NA
5 Floor 07-08-2025 NOT YET STARTED NA
6 Floor 21-09-2025 NOT YET STARTED NA
7 Floor 05-11-2025 NOT YET STARTED NA
8 Floor 20-12-2025 NOT YET STARTED NA
9 Floor 03-02-2026 NOT YET STARTED NA
10 Floor 20-03-2026 NOT YET STARTED NA
11 Floor 04-05-2026 NOT YET STARTED NA
12 Floor 18-06-2026 NOT YET STARTED NA
13 Floor 02-08-2026 NOT YET STARTED NA
14 Floor 16-09-2026 NOT YET STARTED NA
15 Floor 31-10-2026 NOT YET STARTED NA
16 Floor 15-12-2026 NOT YET STARTED NA
17 Floor 29-01-2027 NOT YET STARTED NA
Site Development 06-02-2028 NOT YET STARTED
NA 23-10-2023 Not yet started NA
Ground Floor/Stilt Floor 11-10-2024 NOT YET STARTED NA
1 Floor 25-11-2024 NOT YET STARTED NA
NA 01-10-2023 Not yet started NA
Ground Floor/Stilt Floor 25-12-2024 NOT YET STARTED NA
1 Floor 08-02-2025 NOT YET STARTED NA
Electrical Works 28-12-2027 NOT YET STARTED NA
Concealed Cabling including Plugs & switches 28-12-2027 NOT YET STARTED NA
Installation & Charging of Transformer 28-12-2027 NOT YET STARTED NA
Connection to Flats/Apartments 28-12-2027 NOT YET STARTED NA
PH works 28-12-2027 NOT YET STARTED NA
Laying of concealed Pipes 28-12-2027 NOT YET STARTED NA
PH Fittings 28-12-2027 NOT YET STARTED NA
Overhead Water Tanks 28-12-2027 NOT YET STARTED NA
Water Supply Connection to all units 28-12-2027 NOT YET STARTED NA
STP construction and completion 28-12-2027 NOT YET STARTED NA
Distempering & Colouring of all units and exteriors 28-12-2027 NOT YET STARTED NA
Fixation of doors and windows 28-12-2027 NOT YET STARTED NA
Scheduled Date of handing over possession 06-02-2028 NOT YET STARTED NA
Development of common areas, parks, gardens etc 28-12-2027 NOT YET STARTED NA
2 Floor 09-01-2025 NOT YET STARTED NA
3 Floor 23-02-2025 NOT YET STARTED NA
4 Floor 09-04-2025 NOT YET STARTED NA
5 Floor 24-05-2025 NOT YET STARTED NA
6 Floor 08-07-2025 NOT YET STARTED NA
7 Floor 22-08-2025 NOT YET STARTED NA
8 Floor 6-10-2025 NOT YET STARTED NA
9 Floor 20-11-2025 NOT YET STARTED NA
10 Floor 04-01-2026 NOT YET STARTED NA
11 Floor 18-02-2026 NOT YET STARTED NA
12 Floor 04-04-2026 NOT YET STARTED NA
13 Floor 19-05-2026 NOT YET STARTED NA
14 Floor 03-07-2026 NOT YET STARTED NA
15 Floor 17-08-2026 NOT YET STARTED NA
16 Floor 01-10-2026 NOT YET STARTED NA
17 Floor 15-11-2026 NOT YET STARTED NA
2 Floor 25-03-2025 NOT YET STARTED NA
3 Floor 09-05-2025 NOT YET STARTED NA
4 Floor 23-06-2025 NOT YET STARTED NA
5 Floor 07-08-2025 NOT YET STARTED NA
6 Floor 21-09-2025 NOT YET STARTED NA
7 Floor 05-11-2025 NOT YET STARTED NA
8 Floor 20-12-2025 NOT YET STARTED NA
9 Floor 03-02-2026 NOT YET STARTED NA
10 Floor 20-03-2026 NOT YET STARTED NA
11 Floor 04-05-2026 NOT YET STARTED NA
12 Floor 18-06-2026 NOT YET STARTED NA
13 Floor 02-08-2026 NOT YET STARTED NA
14 Floor 16-09-2026 NOT YET STARTED NA
15 Floor 31-10-2026 NOT YET STARTED NA
16 Floor 15-12-2026 NOT YET STARTED NA
17 Floor 29-01-2027 NOT YET STARTED NA
Site Development 06-02-2028 under progress NA
NA 23-10-2023 Not yet started NA
Ground Floor/Stilt Floor 11-10-2024 NOT YET STARTED NA
1 Floor 25-11-2024 NOT YET STARTED NA
NA 01-10-2023 Not yet started NA
Ground Floor/Stilt Floor 25-12-2024 NOT YET STARTED NA
1 Floor 08-02-2025 NOT YET STARTED NA
Electrical Works 28-12-2027 NOT YET STARTED NA
Concealed Cabling including Plugs & switches 28-12-2027 NOT YET STARTED NA
Installation & Charging of Transformer 28-12-2027 NOT YET STARTED NA
Connection to Flats/Apartments 28-12-2027 NOT YET STARTED NA
PH works 28-12-2027 NOT YET STARTED NA
Laying of concealed Pipes 28-12-2027 NOT YET STARTED NA
PH Fittings 28-12-2027 NOT YET STARTED NA
Overhead Water Tanks 28-12-2027 NOT YET STARTED NA
Water Supply Connection to all units 28-12-2027 NOT YET STARTED NA
STP construction and completion 28-12-2027 NOT YET STARTED NA
Distempering & Colouring of all units and exteriors 28-12-2027 NOT YET STARTED NA
Fixation of doors and windows 28-12-2027 NOT YET STARTED NA
Scheduled Date of handing over possession 06-02-2028 NOT YET STARTED NA
Development of common areas, parks, gardens etc 28-12-2027 NOT YET STARTED NA
2 Floor 09-01-2025 NOT YET STARTED NA
3 Floor 23-02-2025 NOT YET STARTED NA
4 Floor 09-04-2025 NOT YET STARTED NA
5 Floor 24-05-2025 NOT YET STARTED NA
6 Floor 08-07-2025 NOT YET STARTED NA
7 Floor 22-08-2025 NOT YET STARTED NA
8 Floor 6-10-2025 NOT YET STARTED NA
9 Floor 20-11-2025 NOT YET STARTED NA
10 Floor 04-01-2026 NOT YET STARTED NA
11 Floor 18-02-2026 NOT YET STARTED NA
12 Floor 04-04-2026 NOT YET STARTED NA
13 Floor 19-05-2026 NOT YET STARTED NA
14 Floor 03-07-2026 NOT YET STARTED NA
15 Floor 17-08-2026 NOT YET STARTED NA
16 Floor 01-10-2026 NOT YET STARTED NA
17 Floor 15-11-2026 NOT YET STARTED NA
2 Floor 25-03-2025 NOT YET STARTED NA
3 Floor 09-05-2025 NOT YET STARTED NA
4 Floor 23-06-2025 NOT YET STARTED NA
5 Floor 07-08-2025 NOT YET STARTED NA
6 Floor 21-09-2025 NOT YET STARTED NA
7 Floor 05-11-2025 NOT YET STARTED NA
8 Floor 20-12-2025 NOT YET STARTED NA
9 Floor 03-02-2026 NOT YET STARTED NA
10 Floor 20-03-2026 NOT YET STARTED NA
11 Floor 04-05-2026 NOT YET STARTED NA
12 Floor 18-06-2026 NOT YET STARTED NA
13 Floor 02-08-2026 NOT YET STARTED NA
14 Floor 16-09-2026 NOT YET STARTED NA
15 Floor 31-10-2026 NOT YET STARTED NA
16 Floor 15-12-2026 NOT YET STARTED NA
17 Floor 29-01-2027 NOT YET STARTED NA
Site Development 06-02-2028 under progress NA
NA 23-10-2023 Not yet started
Ground Floor/Stilt Floor 11-10-2024 NOT YET STARTED
1 Floor 25-11-2024 NOT YET STARTED NA
NA 01-10-2023 Not yet started NA
Ground Floor/Stilt Floor 25-12-2024 NOT YET STARTED NA
1 Floor 08-02-2025 NOT YET STARTED NA
Electrical Works 28-12-2027 NOT YET STARTED NA
Concealed Cabling including Plugs & switches 28-12-2027 NOT YET STARTED NA
Installation & Charging of Transformer 28-12-2027 NOT YET STARTED NA
Connection to Flats/Apartments 28-12-2027 NOT YET STARTED NA
PH works 28-12-2027 NOT YET STARTED NA
Laying of concealed Pipes 28-12-2027 NOT YET STARTED NA
PH Fittings 28-12-2027 NOT YET STARTED NA
Overhead Water Tanks 28-12-2027 NOT YET STARTED NA
Water Supply Connection to all units 28-12-2027 NOT YET STARTED NA
STP construction and completion 28-12-2027 NOT YET STARTED NA
Distempering & Colouring of all units and exteriors 28-12-2027 NOT YET STARTED NA
Fixation of doors and windows 28-12-2027 NOT YET STARTED NA
Scheduled Date of handing over possession 06-02-2028 NOT YET STARTED NA
Development of common areas, parks, gardens etc 28-12-2027 NOT YET STARTED NA
2 Floor 09-01-2025 NOT YET STARTED NA
3 Floor 23-02-2025 NOT YET STARTED NA
4 Floor 09-04-2025 NOT YET STARTED NA
5 Floor 24-05-2025 NOT YET STARTED NA
6 Floor 08-07-2025 NOT YET STARTED NA
7 Floor 22-08-2025 NOT YET STARTED NA
8 Floor 6-10-2025 NOT YET STARTED NA
9 Floor 20-11-2025 NOT YET STARTED NA
10 Floor 04-01-2026 NOT YET STARTED NA
11 Floor 18-02-2026 NOT YET STARTED NA
12 Floor 04-04-2026 NOT YET STARTED NA
13 Floor 19-05-2026 NOT YET STARTED NA
14 Floor 03-07-2026 NOT YET STARTED NA
15 Floor 17-08-2026 NOT YET STARTED NA
16 Floor 01-10-2026 NOT YET STARTED NA
17 Floor 15-11-2026 NOT YET STARTED NA
2 Floor 25-03-2025 NOT YET STARTED NA
3 Floor 09-05-2025 NOT YET STARTED NA
4 Floor 23-06-2025 NOT YET STARTED NA
5 Floor 07-08-2025 NOT YET STARTED NA
6 Floor 21-09-2025 NOT YET STARTED NA
7 Floor 05-11-2025 NOT YET STARTED NA
8 Floor 20-12-2025 NOT YET STARTED NA
9 Floor 03-02-2026 NOT YET STARTED NA
10 Floor 20-03-2026 NOT YET STARTED NA
11 Floor 04-05-2026 NOT YET STARTED NA
12 Floor 18-06-2026 NOT YET STARTED NA
13 Floor 02-08-2026 NOT YET STARTED NA
14 Floor 16-09-2026 NOT YET STARTED NA
15 Floor 31-10-2026 NOT YET STARTED NA
16 Floor 15-12-2026 NOT YET STARTED NA
17 Floor 29-01-2027 NOT YET STARTED NA

Category and no. of units to be developed

:  Residential
:  
:  268
:  
:  
:  
Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership
Carpet Area Balcony Area Exclusive Open Terrace Area
1 A-101 158.512 18.766 0 Promoter
2 A-102 193.049 20.017 0 Promoter
3 A-103 158.956 18.489 0 Promoter
4 A-104 141.893 16.250 0 Promoter
5 A-201 158.512 18.766 0 Promoter
6 A-202 193.049 20.017 0 Promoter
7 A-203 158.956 18.489 0 Promoter
8 A-204 141.893 16.250 0 Promoter
9 A-301 158.512 18.766 0 Promoter
10 A-302 193.049 20.017 0 Promoter
11 A-303 158.956 18.489 0 Promoter
12 A-304 141.893 16.250 0 Land Owner
13 A-401 158.512 18.766 0 Promoter
14 A-402 193.049 20.017 0 Promoter
15 A-403 158.956 18.489 0 Promoter
16 A-404 141.893 16.250 0 Promoter
17 A-501 158.512 18.766 0 Promoter
18 A-502 193.049 20.017 0 Promoter
19 A-503 158.956 18.489 0 Promoter
20 A-504 141.893 16.250 0 Promoter
21 A-601 158.512 18.766 0 Promoter
22 A-602 193.049 20.017 0 Promoter
23 A-603 158.956 18.489 0 Promoter
24 A-604 141.893 16.250 0 Promoter
25 A-701 158.512 18.766 0 Promoter
26 A-702 193.049 20.017 0 Promoter
27 A-703 158.956 18.489 0 Promoter
28 A-704 141.893 16.250 0 Promoter
29 A-801 158.512 18.766 0 Promoter
30 A-802 193.049 20.017 0 Promoter
31 A-803 158.956 18.489 0 Promoter
32 A-804 141.893 16.250 0 Promoter
33 A-901 158.512 18.766 0 Promoter
34 A-902 193.049 20.017 0 Promoter
35 A-903 158.956 18.489 0 Promoter
36 A-904 141.893 16.250 0 Promoter
37 A-1001 158.512 18.766 0 Promoter
38 A-1002 193.049 20.017 0 Promoter
39 A-1003 158.956 18.489 0 Promoter
40 A-1004 141.893 16.250 0 Promoter
41 A-1101 158.512 18.766 0 Promoter
42 A-1102 193.049 20.017 0 Promoter
43 A-1103 158.956 18.489 0 Promoter
44 A-1104 141.893 16.250 0 Promoter
45 A-1201 158.512 18.766 0 Promoter
46 A-1202 193.049 20.017 0 Promoter
47 A-1203 158.956 18.489 0 Promoter
48 A-1204 141.893 16.250 0 Promoter
49 A-1301 158.512 18.766 0 Promoter
50 A-1302 193.049 20.017 0 Promoter
51 A-1303 158.956 18.489 0 Promoter
52 A-1304 141.893 16.250 0 Promoter
53 A-1401 158.512 18.766 0 Promoter
54 A-1402 193.049 20.017 0 Promoter
55 A-1403 158.956 18.489 0 Promoter
56 A-1404 141.893 16.250 0 Promoter
57 A-1501 158.512 18.766 0 Promoter
58 A-1502 193.049 20.017 0 Promoter
59 A-1503 158.956 18.489 0 Promoter
60 A-1504 141.893 16.250 0 Promoter
61 A-1601 274.572 26.867 0 Promoter
62 A-1602 193.049 20.017 0 Promoter
63 A-1603 158.956 18.489 0 Promoter
64 A-1604 141.893 16.250 0 Promoter
65 A-1702 193.049 20.017 0 Promoter
66 A-1703 158.956 18.489 0 Promoter
67 A-1704 141.893 16.250 0 Promoter
68 B-101 158.512 18.766 0 Promoter
69 B-102 193.049 20.017 0 Promoter
70 B-103 158.956 18.489 0 Promoter
71 B-104 141.893 16.250 0 Promoter
72 B-201 158.512 18.766 0 Promoter
73 B-202 193.049 20.017 0 Promoter
74 B-203 158.956 18.489 0 Promoter
75 B-204 141.893 16.250 0 Promoter
76 B-301 158.512 18.766 0 Promoter
77 B-302 193.049 20.017 0 Land Owner
78 B-303 158.956 18.489 0 Promoter
79 B-304 141.893 16.250 0 Promoter
80 B-401 158.512 18.766 0 Promoter
81 B-402 193.049 20.017 0 Promoter
82 B-403 158.956 18.489 0 Promoter
83 B-404 141.893 16.250 0 Promoter
84 B-501 158.512 18.766 0 Promoter
85 B-502 193.049 20.017 0 Promoter
86 B-503 158.956 18.489 0 Promoter
87 B-504 141.893 16.250 0 Promoter
88 B-601 158.512 18.766 0 Land Owner
89 B-602 193.049 20.017 0 Promoter
90 B-603 158.956 18.489 0 Promoter
91 B-604 141.893 16.250 0 Land Owner
92 B-701 158.512 18.766 0 Land Owner
93 B-702 193.049 20.017 0 Promoter
94 B-703 158.956 18.489 0 Promoter
95 B-704 141.893 16.250 0 Land Owner
96 B-801 158.512 18.766 0 Promoter
97 B-802 193.049 20.017 0 Promoter
98 B-803 158.956 18.489 0 Promoter
99 B-804 141.893 16.250 0 Promoter
100 B-901 158.512 18.766 0 Promoter
101 B-902 193.049 20.017 0 Promoter
102 B-903 158.956 18.489 0 Promoter
103 B-904 141.893 16.250 0 Promoter
104 B-1001 158.512 18.766 0 Promoter
105 B-1002 193.049 20.017 0 Promoter
106 B-1003 158.956 18.489 0 Promoter
107 B-1004 141.893 16.250 0 Promoter
108 B-1101 158.512 18.766 0 Promoter
109 B-1102 193.049 20.017 0 Promoter
110 B-1103 158.956 18.489 0 Promoter
111 B-1104 141.893 16.250 0 Promoter
112 B-1201 158.512 18.766 0 Promoter
113 B-1202 193.049 20.017 0 Promoter
114 B-1203 158.956 18.489 0 Promoter
115 B-1204 141.893 16.250 0 Promoter
116 B-1301 158.512 18.766 0 Promoter
117 B-1302 193.049 20.017 0 Promoter
118 B-1303 158.956 18.489 0 Promoter
119 B-1304 141.893 16.250 0 Promoter
120 B-1401 158.512 18.766 0 Promoter
121 B-1402 193.049 20.017 0 Promoter
122 B-1403 158.956 18.489 0 Promoter
123 B-1404 141.893 16.250 0 Promoter
124 B-1501 158.512 18.766 0 Promoter
125 B-1502 193.049 20.017 0 Promoter
126 B-1503 158.956 18.489 0 Promoter
127 B-1504 141.893 16.250 0 Promoter
128 B-1601 274.572 26.867 0 Promoter
129 B-1602 193.049 20.017 0 Promoter
130 B-1603 158.956 18.489 0 Promoter
131 B-1604 141.893 16.250 0 Promoter
132 B-1702 193.049 20.017 0 Promoter
133 B-1703 158.956 18.489 0 Promoter
134 B-1704 141.893 16.250 0 Promoter
135 C-101 158.512 18.766 0 Promoter
136 C-102 193.049 20.017 0 Promoter
137 C-103 158.956 18.489 0 Promoter
138 C-104 141.893 16.250 0 Promoter
139 C-201 158.512 18.766 0 Promoter
140 C-202 193.049 20.017 0 Promoter
141 C-203 158.956 18.489 0 Promoter
142 C-204 141.893 16.250 0 Promoter
143 C-301 158.512 18.766 0 Promoter
144 C-302 193.049 20.017 0 Promoter
145 C-303 158.956 18.489 0 Promoter
146 C-304 141.893 16.250 0 Promoter
147 C-401 158.512 18.766 0 Promoter
148 C-402 193.049 20.017 0 Promoter
149 C-403 158.956 18.489 0 Promoter
150 C-404 141.893 16.250 0 Promoter
151 C-501 158.512 18.766 0 Promoter
152 C-502 193.049 20.017 0 Promoter
153 C-503 158.956 18.489 0 Promoter
154 C-504 141.893 16.250 0 Promoter
155 C-601 158.512 18.766 0 Promoter
156 C-602 193.049 20.017 0 Promoter
157 C-603 158.956 18.489 0 Promoter
158 C-604 141.893 16.250 0 Promoter
159 C-701 158.512 18.766 0 Promoter
160 C-702 193.049 20.017 0 Promoter
161 C-703 158.956 18.489 0 Promoter
162 C-704 141.893 16.250 0 Promoter
163 C-801 158.512 18.766 0 Promoter
164 C-802 193.049 20.017 0 Promoter
165 C-803 158.956 18.489 0 Promoter
166 C-804 141.893 16.250 0 Promoter
167 C-901 158.512 18.766 0 Promoter
168 C-902 193.049 20.017 0 Promoter
169 C-903 158.956 18.489 0 Promoter
170 C-904 141.893 16.250 0 Promoter
171 C-1001 158.512 18.766 0 Promoter
172 C-1002 193.049 20.017 0 Promoter
173 C-1003 158.956 18.489 0 Promoter
174 C-1004 141.893 16.250 0 Promoter
175 C-1101 158.512 18.766 0 Promoter
176 C-1102 193.049 20.017 0 Promoter
177 C-1103 158.956 18.489 0 Promoter
178 C-1104 141.893 16.250 0 Promoter
179 C-1201 158.512 18.766 0 Promoter
180 C-1202 193.049 20.017 0 Promoter
181 C-1203 158.956 18.489 0 Promoter
182 C-1204 141.893 16.250 0 Promoter
183 C-1301 158.512 18.766 0 Promoter
184 C-1302 193.049 20.017 0 Promoter
185 C-1303 158.956 18.489 0 Promoter
186 C-1304 141.893 16.250 0 Promoter
187 C-1401 158.512 18.766 0 Promoter
188 C-1402 193.049 20.017 0 Promoter
189 C-1403 158.956 18.489 0 Promoter
190 C-1404 141.893 16.250 0 Promoter
191 C-1501 158.512 18.766 0 Promoter
192 C-1502 193.049 20.017 0 Promoter
193 C-1503 158.956 18.489 0 Promoter
194 C-1504 141.893 16.250 0 Promoter
195 C-1601 274.572 26.867 0 Promoter
196 C-1602 193.049 20.017 0 Promoter
197 C-1603 158.956 18.489 0 Promoter
198 C-1604 141.893 16.250 0 Promoter
199 C-1702 193.049 20.017 0 Promoter
200 C-1703 158.956 18.489 0 Promoter
201 C-1704 141.893 16.250 0 Promoter
202 D-101 158.512 18.766 0 Promoter
203 D-102 193.049 20.017 0 Promoter
204 D-103 158.956 18.489 0 Promoter
205 D-104 141.893 16.250 0 Promoter
206 D-201 158.512 18.766 0 Promoter
207 D-202 193.049 20.017 0 Promoter
208 D-203 158.956 18.489 0 Promoter
209 D-204 141.893 16.250 0 Promoter
210 D-301 158.512 18.766 0 Promoter
211 D-302 193.049 20.017 0 Promoter
212 D-303 158.956 18.489 0 Promoter
213 D-304 141.893 16.250 0 Promoter
214 D-401 158.512 18.766 0 Promoter
215 D-402 193.049 20.017 0 Promoter
216 D-403 158.956 18.489 0 Promoter
217 D-404 141.893 16.250 0 Promoter
218 D-501 158.512 18.766 0 Promoter
219 D-502 193.049 20.017 0 Promoter
220 D-503 158.956 18.489 0 Promoter
221 D-504 141.893 16.250 0 Promoter
222 D-601 158.512 18.766 0 Land Owner
223 D-602 193.049 20.017 0 Promoter
224 D-603 158.956 18.489 0 Promoter
225 D-604 141.893 16.250 0 Land Owner
226 D-701 158.512 18.766 0 Land Owner
227 D-702 193.049 20.017 0 Promoter
228 D-703 158.956 18.489 0 Promoter
229 D-704 141.893 16.250 0 Land Owner
230 D-801 158.512 18.766 0 Promoter
231 D-802 193.049 20.017 0 Promoter
232 D-803 158.956 18.489 0 Promoter
233 D-804 141.893 16.250 0 Promoter
234 D-901 158.512 18.766 0 Promoter
235 D-902 193.049 20.017 0 Promoter
236 D-903 158.956 18.489 0 Promoter
237 D-904 141.893 16.250 0 Promoter
238 D-1001 158.512 18.766 0 Promoter
239 D-1002 193.049 20.017 0 Promoter
240 D-1003 158.956 18.489 0 Promoter
241 D-1004 141.893 16.250 0 Promoter
242 D-1101 158.512 18.766 0 Promoter
243 D-1102 193.049 20.017 0 Promoter
244 D-1103 158.956 18.489 0 Promoter
245 D-1104 141.893 16.250 0 Promoter
246 D-1201 158.512 18.766 0 Promoter
247 D-1202 193.049 20.017 0 Promoter
248 D-1203 158.956 18.489 0 Promoter
249 D-1204 141.893 16.250 0 Promoter
250 D-1301 158.512 18.766 0 Promoter
251 D-1302 193.049 20.017 0 Promoter
252 D-1303 158.956 18.489 0 Promoter
253 D-1304 141.893 16.250 0 Promoter
254 D-1401 158.512 18.766 0 Promoter
255 D-1402 193.049 20.017 0 Promoter
256 D-1403 158.956 18.489 0 Promoter
257 D-1404 141.893 16.250 0 Promoter
258 D-1501 158.512 18.766 0 Promoter
259 D-1502 193.049 20.017 0 Promoter
260 D-1503 158.956 18.489 0 Promoter
261 D-1504 141.893 16.250 0 Promoter
262 D-1601 274.572 26.867 0 Promoter
263 D-1602 193.049 20.017 0 Promoter
264 D-1603 158.956 18.489 0 Promoter
265 D-1604 141.893 16.250 0 Promoter
266 D-1702 193.049 20.017 0 Promoter
267 D-1703 158.956 18.489 0 Promoter
268 D-1704 141.893 16.250 0 Promoter
Types of garages and parking
House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
A-101 Covered Parking A-101 4.5x2.3 10.35 Included
A-102 Covered Parking A-102 4.5x2.3 10.35 Included
A-103 Covered Parking A-103 4.5x2.3 10.35 Included
A-104 Covered Parking A-104 4.5x2.3 10.35 Included
A-201 Covered Parking A-201 4.5x2.3 10.35 Included
A-202 Covered Parking A-202 4.5x2.3 10.35 Included
A-203 Covered Parking A-203 4.5x2.3 10.35 Included
A-204 Covered Parking A-204 4.5x2.3 10.35 Included
A-301 Covered Parking A-301 4.5x2.3 10.35 Included
A-302 Covered Parking A-302 4.5x2.3 10.35 Included
A-303 Covered Parking A-303 4.5x2.3 10.35 Included
A-304 Covered Parking A-304 4.5x2.3 10.35 Included
A-401 Covered Parking A-401 4.5x2.3 10.35 Included
A-402 Covered Parking A-402 4.5x2.3 10.35 Included
A-403 Covered Parking A-403 4.5x2.3 10.35 Included
A-404 Covered Parking A-404 4.5x2.3 10.35 Included
A-501 Covered Parking A-501 4.5x2.3 10.35 Included
A-502 Covered Parking A-502 4.5x2.3 10.35 Included
A-503 Covered Parking A-503 4.5x2.3 10.35 Included
A-504 Covered Parking A-504 4.5x2.3 10.35 Included
A-601 Covered Parking A-601 4.5x2.3 10.35 Included
A-602 Covered Parking A-602 4.5x2.3 10.35 Included
A-603 Covered Parking A-603 4.5x2.3 10.35 Included
A-604 Covered Parking A-604 4.5x2.3 10.35 Included
A-701 Covered Parking A-701 4.5x2.3 10.35 Included
A-702 Covered Parking A-702 4.5x2.3 10.35 Included
A-703 Covered Parking A-703 4.5x2.3 10.35 Included
A-704 Covered Parking A-704 4.5x2.3 10.35 Included
A-801 Covered Parking A-801 4.5x2.3 10.35 Included
A-802 Covered Parking A-802 4.5x2.3 10.35 Included
A-803 Covered Parking A-803 4.5x2.3 10.35 Included
A-804 Covered Parking A-804 4.5x2.3 10.35 Included
A-901 Covered Parking A-901 4.5x2.3 10.35 Included
A-902 Covered Parking A-902 4.5x2.3 10.35 Included
A-903 Covered Parking A-903 4.5x2.3 10.35 Included
A-904 Covered Parking A-904 4.5x2.3 10.35 Included
A-1001 Covered Parking A-1001 4.5x2.3 10.35 Included
A-1002 Covered Parking A-1002 4.5x2.3 10.35 Included
A-1003 Covered Parking A-1003 4.5x2.3 10.35 Included
A-1004 Covered Parking A-1004 4.5x2.3 10.35 Included
A-1101 Covered Parking A-1101 4.5x2.3 10.35 Included
A-1102 Covered Parking A-1102 4.5x2.3 10.35 Included
A-1103 Covered Parking A-1103 4.5x2.3 10.35 Included
A-1104 Covered Parking A-1104 4.5x2.3 10.35 Included
A-1201 Covered Parking A-1201 4.5x2.3 10.35 Included
A-1202 Covered Parking A-1202 4.5x2.3 10.35 Included
A-1203 Covered Parking A-1203 4.5x2.3 10.35 Included
A-1204 Covered Parking A-1204 4.5x2.3 10.35 Included
A-1301 Covered Parking A-1301 4.5x2.3 10.35 Included
A-1302 Covered Parking A-1302 4.5x2.3 10.35 Included
A-1303 Covered Parking A-1303 4.5x2.3 10.35 Included
A-1304 Covered Parking A-1304 4.5x2.3 10.35 Included
A-1401 Covered Parking A-1401 4.5x2.3 10.35 Included
A-1402 Covered Parking A-1402 4.5x2.3 10.35 Included
A-1403 Covered Parking A-1403 4.5x2.3 10.35 Included
A-1404 Covered Parking A-1404 4.5x2.3 10.35 Included
A-1501 Covered Parking A-1501 4.5x2.3 10.35 Included
A-1502 Covered Parking A-1502 4.5x2.3 10.35 Included
A-1503 Covered Parking A-1503 4.5x2.3 10.35 Included
A-1504 Covered Parking A-1504 4.5x2.3 10.35 Included
A-1601 Covered Parking A-1601 4.5x2.3 10.35 Included
A-1602 Covered Parking A-1602 4.5x2.3 10.35 Included
A-1603 Covered Parking A-1603 4.5x2.3 10.35 Included
A-1604 Covered Parking A-1604 4.5x2.3 10.35 Included
A-1702 Covered Parking A-1702 4.5x2.3 10.35 Included
A-1703 Covered Parking A-1703 4.5x2.3 10.35 Included
A-1704 Covered Parking A-1704 4.5x2.3 10.35 Included
B-101 Covered Parking B-101 4.5x2.3 10.35 Included
B-102 Covered Parking B-102 4.5x2.3 10.35 Included
B-103 Covered Parking B-103 4.5x2.3 10.35 Included
B-104 Covered Parking B-104 4.5x2.3 10.35 Included
B-201 Covered Parking B-201 4.5x2.3 10.35 Included
B-202 Covered Parking B-202 4.5x2.3 10.35 Included
B-203 Covered Parking B-203 4.5x2.3 10.35 Included
B-204 Covered Parking B-204 4.5x2.3 10.35 Included
B-301 Covered Parking B-301 4.5x2.3 10.35 Included
B-302 Covered Parking B-302 4.5x2.3 10.35 Included
B-303 Covered Parking B-303 4.5x2.3 10.35 Included
B-304 Covered Parking B-304 4.5x2.3 10.35 Included
B-401 Covered Parking B-401 4.5x2.3 10.35 Included
B-402 Covered Parking B-402 4.5x2.3 10.35 Included
B-403 Covered Parking B-403 4.5x2.3 10.35 Included
B-404 Covered Parking B-404 4.5x2.3 10.35 Included
B-501 Covered Parking B-501 4.5x2.3 10.35 Included
B-502 Covered Parking B-502 4.5x2.3 10.35 Included
B-503 Covered Parking B-503 4.5x2.3 10.35 Included
B-504 Covered Parking B-504 4.5x2.3 10.35 Included
B-601 Covered Parking B-601 4.5x2.3 10.35 Included
B-602 Covered Parking B-602 4.5x2.3 10.35 Included
B-603 Covered Parking B-603 4.5x2.3 10.35 Included
B-604 Covered Parking B-604 4.5x2.3 10.35 Included
B-701 Covered Parking B-701 4.5x2.3 10.35 Included
B-702 Covered Parking B-702 4.5x2.3 10.35 Included
B-703 Covered Parking B-703 4.5x2.3 10.35 Included
B-704 Covered Parking B-704 4.5x2.3 10.35 Included
B-801 Covered Parking B-801 4.5x2.3 10.35 Included
B-802 Covered Parking B-802 4.5x2.3 10.35 Included
B-803 Covered Parking B-803 4.5x2.3 10.35 Included
B-804 Covered Parking B-804 4.5x2.3 10.35 Included
B-901 Covered Parking B-901 4.5x2.3 10.35 Included
B-902 Covered Parking B-902 4.5x2.3 10.35 Included
B-903 Covered Parking B-903 4.5x2.3 10.35 Included
B-904 Covered Parking B-904 4.5x2.3 10.35 Included
B-1001 Covered Parking B-1001 4.5x2.3 10.35 Included
B-1002 Covered Parking B-1002 4.5x2.3 10.35 Included
B-1003 Covered Parking B-1003 4.5x2.3 10.35 Included
B-1004 Covered Parking B-1004 4.5x2.3 10.35 Included
B-1101 Covered Parking B-1101 4.5x2.3 10.35 Included
B-1102 Covered Parking B-1102 4.5x2.3 10.35 Included
B-1103 Covered Parking B-1103 4.5x2.3 10.35 Included
B-1104 Covered Parking B-1104 4.5x2.3 10.35 Included
B-1201 Covered Parking B-1201 4.5x2.3 10.35 Included
B-1202 Covered Parking B-1202 4.5x2.3 10.35 Included
B-1203 Covered Parking B-1203 4.5x2.3 10.35 Included
B-1204 Covered Parking B-1204 4.5x2.3 10.35 Included
B-1301 Covered Parking B-1301 4.5x2.3 10.35 Included
B-1302 Covered Parking B-1302 4.5x2.3 10.35 Included
B-1303 Covered Parking B-1303 4.5x2.3 10.35 Included
B-1304 Covered Parking B-1304 4.5x2.3 10.35 Included
B-1401 Covered Parking B-1401 4.5x2.3 10.35 Included
B-1402 Covered Parking B-1402 4.5x2.3 10.35 Included
B-1403 Covered Parking B-1403 4.5x2.3 10.35 Included
B-1404 Covered Parking B-1404 4.5x2.3 10.35 Included
B-1501 Covered Parking B-1501 4.5x2.3 10.35 Included
B-1502 Covered Parking B-1502 4.5x2.3 10.35 Included
B-1503 Covered Parking B-1503 4.5x2.3 10.35 Included
B-1504 Covered Parking B-1504 4.5x2.3 10.35 Included
B-1601 Covered Parking B-1601 4.5x2.3 10.35 Included
B-1602 Covered Parking B-1602 4.5x2.3 10.35 Included
B-1603 Covered Parking B-1603 4.5x2.3 10.35 Included
B-1604 Covered Parking B-1604 4.5x2.3 10.35 Included
B-1702 Covered Parking B-1702 4.5x2.3 10.35 Included
B-1703 Covered Parking B-1703 4.5x2.3 10.35 Included
B-1704 Covered Parking B-1704 4.5x2.3 10.35 Included
C-101 Covered Parking C-101 4.5x2.3 10.35 Included
C-102 Covered Parking C-102 4.5x2.3 10.35 Included
C-103 Covered Parking C-103 4.5x2.3 10.35 Included
C-104 Covered Parking C-104 4.5x2.3 10.35 Included
C-201 Covered Parking C-201 4.5x2.3 10.35 Included
C-202 Covered Parking C-202 4.5x2.3 10.35 Included
C-203 Covered Parking C-203 4.5x2.3 10.35 Included
C-204 Covered Parking C-204 4.5x2.3 10.35 Included
C-301 Covered Parking C-301 4.5x2.3 10.35 Included
C-302 Covered Parking C-302 4.5x2.3 10.35 Included
C-303 Covered Parking C-303 4.5x2.3 10.35 Included
C-304 Covered Parking C-304 4.5x2.3 10.35 Included
C-401 Covered Parking C-401 4.5x2.3 10.35 Included
C-402 Covered Parking C-402 4.5x2.3 10.35 Included
C-403 Covered Parking C-403 4.5x2.3 10.35 Included
C-404 Covered Parking C-404 4.5x2.3 10.35 Included
C-501 Covered Parking C-501 4.5x2.3 10.35 Included
C-502 Covered Parking C-502 4.5x2.3 10.35 Included
C-503 Covered Parking C-503 4.5x2.3 10.35 Included
C-504 Covered Parking C-504 4.5x2.3 10.35 Included
C-601 Covered Parking C-601 4.5x2.3 10.35 Included
C-602 Covered Parking C-602 4.5x2.3 10.35 Included
C-603 Covered Parking C-603 4.5x2.3 10.35 Included
C-604 Covered Parking C-604 4.5x2.3 10.35 Included
C-701 Covered Parking C-701 4.5x2.3 10.35 Included
C-702 Covered Parking C-702 4.5x2.3 10.35 Included
C-703 Covered Parking C-703 4.5x2.3 10.35 Included
C-704 Covered Parking C-704 4.5x2.3 10.35 Included
C-801 Covered Parking C-801 4.5x2.3 10.35 Included
C-802 Covered Parking C-802 4.5x2.3 10.35 Included
C-803 Covered Parking C-803 4.5x2.3 10.35 Included
C-804 Covered Parking C-804 4.5x2.3 10.35 Included
C-901 Covered Parking C-901 4.5x2.3 10.35 Included
C-902 Covered Parking C-902 4.5x2.3 10.35 Included
C-903 Covered Parking C-903 4.5x2.3 10.35 Included
C-904 Covered Parking C-904 4.5x2.3 10.35 Included
C-1001 Covered Parking C-1001 4.5x2.3 10.35 Included
C-1002 Covered Parking C-1002 4.5x2.3 10.35 Included
C-1003 Covered Parking C-1003 4.5x2.3 10.35 Included
C-1004 Covered Parking C-1004 4.5x2.3 10.35 Included
C-1101 Covered Parking C-1101 4.5x2.3 10.35 Included
C-1102 Covered Parking C-1102 4.5x2.3 10.35 Included
C-1103 Covered Parking C-1103 4.5x2.3 10.35 Included
C-1104 Covered Parking C-1104 4.5x2.3 10.35 Included
C-1201 Covered Parking C-1201 4.5x2.3 10.35 Included
C-1202 Covered Parking C-1202 4.5x2.3 10.35 Included
C-1203 Covered Parking C 1203 4.5x2.3 10.35 Included
C-1204 Covered Parking C-1204 4.5x2.3 10.35 Included
C-1301 Covered Parking C-1301 4.5x2.3 10.35 Included
C-1302 Covered Parking C-1302 4.5x2.3 10.35 Included
C-1303 Covered Parking C-1303 4.5x2.3 10.35 Included
C-1304 Covered Parking C-1304 4.5x2.3 10.35 Included
C-1401 Covered Parking C-1401 4.5x2.3 10.35 Included
C-1402 Covered Parking C-1402 4.5x2.3 10.35 Included
C-1403 Covered Parking C-1403 4.5x2.3 10.35 Included
C-1404 Covered Parking C-1404 4.5x2.3 10.35 Included
C-1501 Covered Parking C-1501 4.5x2.3 10.35 Included
C-1502 Covered Parking C-1502 4.5x2.3 10.35 Included
C-1503 Covered Parking C-1503 4.5x2.3 10.35 Included
C-1504 Covered Parking C-1504 4.5x2.3 10.35 Included
C-1601 Covered Parking C-1601 4.5x2.3 10.35 Included
C-1602 Covered Parking C-1602 4.5x2.3 10.35 Included
C-1603 Covered Parking C-1603 4.5x2.3 10.35 Included
C-1604 Covered Parking C-1604 4.5x2.3 10.35 Included
C-1702 Covered Parking C-1702 4.5x2.3 10.35 Included
C-1703 Covered Parking C-1703 4.5x2.3 10.35 Included
C-1704 Covered Parking C-1704 4.5x2.3 10.35 Included
D-101 Covered Parking D-101 4.5x2.3 10.35 Included
D-102 Covered Parking D-102 4.5x2.3 10.35 Included
D-103 Covered Parking D-103 4.5x2.3 10.35 Included
D-104 Covered Parking D-104 4.5x2.3 10.35 Included
D-201 Covered Parking D-201 4.5x2.3 10.35 Included
D-202 Covered Parking D-202 4.5x2.3 10.35 Included
D=-203 Covered Parking D-203 4.5x2.3 10.35 Included
D-204 Covered Parking D-204 4.5x2.3 10.35 Included
D-301 Covered Parking D-301 4.5x2.3 10.35 Included
D-302 Covered Parking D-302 4.5x2.3 10.35 Included
D-303 Covered Parking D-303 4.5x2.3 10.35 Included
D-304 Covered Parking D-304 4.5x2.3 10.35 Included
D-401 Covered Parking D-401 4.5x2.3 10.35 Included
D-402 Covered Parking D-402 4.5x2.3 10.35 Included
D-403 Covered Parking D-403 4.5x2.3 10.35 Included
D-404 Covered Parking D-404 4.5x2.3 10.35 Included
D-501 Covered Parking D-501 4.5x2.3 10.35 Included
D-502 Covered Parking D-502 4.5x2.3 10.35 Included
D-503 Covered Parking D-503 4.5x2.3 10.35 Included
D-504 Covered Parking D-504 4.5x2.3 10.35 Included
D-601 Covered Parking D-601 4.5x2.3 10.35 Included
D-602 Covered Parking D-602 4.5x2.3 10.35 Included
D-603 Covered Parking D-603 4.5x2.3 10.35 Included
D-604 Covered Parking D-604 4.5x2.3 10.35 Included
D-701 Covered Parking D-701 4.5x2.3 10.35 Included
D-702 Covered Parking D-702 4.5x2.3 10.35 Included
D-703 Covered Parking D-703 4.5x2.3 10.35 Included
D-704 Covered Parking D-704 4.5x2.3 10.35 Included
D-801 Covered Parking D-801 4.5x2.3 10.35 Included
D-802 Covered Parking D-802 4.5x2.3 10.35 Included
D-803 Covered Parking D-803 4.5x2.3 10.35 Included
D-804 Covered Parking D-804 4.5x2.3 10.35 Included
D-901 Covered Parking D-901 4.5x2.3 10.35 Included
D-902 Covered Parking D-902 4.5x2.3 10.35 Included
D-903 Covered Parking D-903 4.5x2.3 10.35 Included
D-904 Covered Parking D-904 4.5x2.3 10.35 Included
D-1001 Covered Parking D-1001 4.5x2.3 10.35 Included
D-1002 Covered Parking D-1002 4.5x2.3 10.35 Included
D-1003 Covered Parking D-1003 4.5x2.3 10.35 Included
D-1004 Covered Parking D-1004 4.5x2.3 10.35 Included
D-1101 Covered Parking D-1101 4.5x2.3 10.35 Included
D-1102 Covered Parking D-1102 4.5x2.3 10.35 Included
D-1103 Covered Parking D-1103 4.5x2.3 10.35 Included
D-1104 Covered Parking D-1104 4.5x2.3 10.35 Included
D-1201 Covered Parking D-1201 4.5x2.3 10.35 Included
D-1202 Covered Parking D-1202 4.5x2.3 10.35 Included
D-1203 Covered Parking D-1203 4.5x2.3 10.35 Included
D-1204 Covered Parking D-1204 4.5x2.3 10.35 Included
D-1301 Covered Parking D-1301 4.5x2.3 10.35 Included
D-1302 Covered Parking D-1302 4.5x2.3 10.35 Included
D-1303 Covered Parking D-1303 4.5x2.3 10.35 Included
D-1304 Covered Parking D-1304 4.5x2.3 10.35 Included
D-1401 Covered Parking D-1401 4.5x2.3 10.35 Included
D-1402 Covered Parking D-1402 4.5x2.3 10.35 Included
D-1403 Covered Parking D-1403 4.5x2.3 10.35 Included
D-1404 Covered Parking D-1404 4.5x2.3 10.35 Included
D-1501 Covered Parking D-1501 4.5x2.3 10.35 Included
D-1502 Covered Parking D-1502 4.5x2.3 10.35 Included
D-1503 Covered Parking D-1503 4.5x2.3 10.35 Included
D-1504 Covered Parking D-1504 4.5x2.3 10.35 Included
D-1601 Covered Parking D-1601 4.5x2.3 10.35 Included
D-1602 Covered Parking D-1602 4.5x2.3 10.35 Included
D-1603 Covered Parking D-1603 4.5x2.3 10.35 Included
D-1604 Covered Parking D-1604 4.5x2.3 10.35 Included
D-1702 Covered Parking D-1702 4.5x2.3 10.35 Included
D-1703 Covered Parking D-1703 4.5x2.3 10.35 Included
D-1704 Covered Parking D-1704 4.5x2.3 10.35 Included
Yes

Facilities to be provided

Particulars of Facilities Status of the facility Brief description of facility
Drinking Water Facility Ground Water Copy of Consent Letter
Fire Fighting Facility Yes Equipments to be installed as per the requirment of the Fire Agency
Emergency Evacuation Services Yes Stair Case including one Lift in each tower (13 pax) with ARD facilities . Model-Mitsubishi/Kone/Hitachi/Schindlerodel-
Use of Renewable Energy Yes Solar Power
Lift Facility Yes 3 lift in each Tower (13 pax) and 1 lift in Socity/Club House( 6 pax) with ARD facilities . Model- Mitsubishi/Kone/Hitachi/Schindler/OTIS
Market Complex No
Community Hall Yes 389.96 Sq.mtr, Ground Floor
Gymnasium Yes 138.64 Sq.mtr, Second Floor
Swimming Pool Yes 5.7 M x11.4 M
Play Ground Yes 9.10 Mx 32.75 M
Park/Garden Yes 540 Sq.mtr
Plantation Area Yes 2784.61 Sq.mtr
Others(Please Specify) No
Internal Road Yes 7.5 Mx515 Paved Road
External Road Yes 110 feet width of Black Top National Highway Service Road in front of main entrance
Elecricity Supply Yes Copy of Consent Letter
Other Amenities No

Bank Particulars of the Project

  HDFC
  Jharpada Branch
  50200078903390, 5020008810555, 50200078886956
  HDFC0000630
   View
  25712978
  9937455588

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
The Architects Architect Plot No- 352/6, Bishnupriya Apartmrnt, Jaydev Vihar, Bhubaneswar – 751013 sudhansu@thearchitects.co.in Mobile-9437005550 CA/2003/30542
Bibhu Ranjan Giri Construction Engineer Plot No- 39, Saheed Nagar, Bhubaneswar-751006 bibhugiri@gmail.com Mobile- 9437214317 RTP/DTP(ST-ER)-149/2019
Viable Infrastructure & Logistics Pvt Ltd Contractor 4th Floor, OSL Tower-II, Link Road, Cuttack-753012, Odisha viableinfra@gmail.com Mobile-9338885999 U45203OR2008PTC010049
SRB & Associates Chartered Accountant 5TH FLOOR, IDCO TOWER,JANPATH, BHUBANESWAR,ODISHA. EMAILSRBBBSR@REDIFFMAIL.COM,MOBILE- 9437100308 310009E

Financial Details

:  26000 :   View
  06-02-2028 :  15000
:  11000 :  0

Documents Attached

Description of Document Option Documents
Fire Safety Certificate Certificate Attached
Affidavit in Form-A as per clause-l of sub-section-2 of section-4 of the Act Yes Attached
Allotment letter format Yes Attached
Conveyance Deed Format Yes Attached
Affidavit to adopt agreement for sale format as per Rule-8(1) of ORE (R and D) Rules, 2017 Yes Attached
Annual Report 2020-21 Attached
Annual Report 2021-22 Attached
Annual Report 2022-23 Attached
IT Return 2020-21 Attached
IT Return 2021-22 Attached
IT Return 2022-23 Attached
Audit Report 2020-21 Attached
Audit Report 2021-22 Attached
Audit Report 2022-23 Attached

Additional Documents Attached

Sl. No. Title of the document Upload Document
1 Authorization Proceeding
2 NOC- Airport Authority
3 Structural Vetting
4 Clarification on Area mismatch
5 Clarification regarding approach Road

Other documents

“I undertake that the information submitted by me in this application are correct and true to best my knowledge. I also understand that providing false or wrong information is punishable under the Section-60 of the Real Estate (Regulation & Development) Act, 2016. I also further understand that furnishing wrong or false information will lead to rejection of my application registration of the project with forfeiture of registration fee and other charges deposited by me.”
  

Construction Progress

Updated Construction Progress

SL NO. Description Scheduled date of completion Current Status Remarks
1 Site Development 06-02-2028 NOT YET STARTED
2 Roof Casting NA NA NA
3 Ground Floor/Stilt Floor 11-10-2024 NOT YET STARTED NA
4 1 Floor 25-11-2024 NOT YET STARTED NA
5 Brick Work & Plastering NA NA NA
6 Ground Floor/Stilt Floor 25-12-2024 NOT YET STARTED NA
7 1 Floor 08-02-2025 NOT YET STARTED NA
8 Electrical Works 28-12-2027 NOT YET STARTED NA
9 Concealed Cabling including Plugs & switches 28-12-2027 NOT YET STARTED NA
10 Installation & Charging of Transformer 28-12-2027 NOT YET STARTED NA
11 Connection to Flats/Apartments 28-12-2027 NOT YET STARTED NA
12 PH works 28-12-2027 NOT YET STARTED NA
13 Laying of concealed Pipes 28-12-2027 NOT YET STARTED NA
14 PH Fittings 28-12-2027 NOT YET STARTED NA
15 Overhead Water Tanks 28-12-2027 NOT YET STARTED NA
16 Water Supply Connection to all units 28-12-2027 NOT YET STARTED NA
17 STP construction and completion 28-12-2027 NOT YET STARTED NA
18 Distempering & Colouring of all units and exteriors 28-12-2027 NOT YET STARTED NA
19 Fixation of doors and windows 28-12-2027 NOT YET STARTED NA
20 Scheduled Date of handing over possession 06-02-2028 NOT YET STARTED NA
21 Development of common areas, parks, gardens etc 28-12-2027 NOT YET STARTED NA
22 2 Floor 09-01-2025 NOT YET STARTED NA
23 3 Floor 23-02-2025 NOT YET STARTED NA
24 4 Floor 09-04-2025 NOT YET STARTED NA
25 5 Floor 24-05-2025 NOT YET STARTED NA
26 6 Floor 08-07-2025 NOT YET STARTED NA
27 7 Floor 22-08-2025 NOT YET STARTED NA
28 8 Floor 6-10-2025 NOT YET STARTED NA
29 9 Floor 20-11-2025 NOT YET STARTED NA
30 10 Floor 04-01-2026 NOT YET STARTED NA
31 11 Floor 18-02-2026 NOT YET STARTED NA
32 12 Floor 04-04-2026 NOT YET STARTED NA
33 13 Floor 19-05-2026 NOT YET STARTED NA
34 14 Floor 03-07-2026 NOT YET STARTED NA
35 15 Floor 17-08-2026 NOT YET STARTED NA
36 16 Floor 01-10-2026 NOT YET STARTED NA
37 17 Floor 15-11-2026 NOT YET STARTED NA
38 2 Floor 25-03-2025 NOT YET STARTED NA
39 3 Floor 09-05-2025 NOT YET STARTED NA
40 4 Floor 23-06-2025 NOT YET STARTED NA
41 5 Floor 07-08-2025 NOT YET STARTED NA
42 6 Floor 21-09-2025 NOT YET STARTED NA
43 7 Floor 05-11-2025 NOT YET STARTED NA
44 8 Floor 20-12-2025 NOT YET STARTED NA
45 9 Floor 03-02-2026 NOT YET STARTED NA
46 10 Floor 20-03-2026 NOT YET STARTED NA
47 11 Floor 04-05-2026 NOT YET STARTED NA
48 12 Floor 18-06-2026 NOT YET STARTED NA
49 13 Floor 02-08-2026 NOT YET STARTED NA
50 14 Floor 16-09-2026 NOT YET STARTED NA
51 15 Floor 31-10-2026 NOT YET STARTED NA
52 16 Floor 15-12-2026 NOT YET STARTED NA
53 17 Floor 29-01-2027 NOT YET STARTED NA
Updated Changes on 07-07-2023
54 Site Development 06-02-2028 NOT YET STARTED NA
55 NA NA NA NA
56 Ground Floor/Stilt Floor 11-10-2024 NOT YET STARTED NA
57 1 Floor 25-11-2024 NOT YET STARTED NA
58 NA NA NA NA
59 Ground Floor/Stilt Floor 25-12-2024 NOT YET STARTED NA
60 1 Floor 08-02-2025 NOT YET STARTED NA
61 Electrical Works 28-12-2027 NOT YET STARTED NA
62 Concealed Cabling including Plugs & switches 28-12-2027 NOT YET STARTED NA
63 Installation & Charging of Transformer 28-12-2027 NOT YET STARTED NA
64 Connection to Flats/Apartments 28-12-2027 NOT YET STARTED NA
65 PH works 28-12-2027 NOT YET STARTED NA
66 Laying of concealed Pipes 28-12-2027 NOT YET STARTED NA
67 PH Fittings 28-12-2027 NOT YET STARTED NA
68 Overhead Water Tanks 28-12-2027 NOT YET STARTED NA
69 Water Supply Connection to all units 28-12-2027 NOT YET STARTED NA
70 STP construction and completion 28-12-2027 NOT YET STARTED NA
71 Distempering & Colouring of all units and exteriors 28-12-2027 NOT YET STARTED NA
72 Fixation of doors and windows 28-12-2027 NOT YET STARTED NA
73 Scheduled Date of handing over possession 06-02-2028 NOT YET STARTED NA
74 Development of common areas, parks, gardens etc 28-12-2027 NOT YET STARTED NA
75 2 Floor 09-01-2025 NOT YET STARTED NA
76 3 Floor 23-02-2025 NOT YET STARTED NA
77 4 Floor 09-04-2025 NOT YET STARTED NA
78 5 Floor 24-05-2025 NOT YET STARTED NA
79 6 Floor 08-07-2025 NOT YET STARTED NA
80 7 Floor 22-08-2025 NOT YET STARTED NA
81 8 Floor 6-10-2025 NOT YET STARTED NA
82 9 Floor 20-11-2025 NOT YET STARTED NA
83 10 Floor 04-01-2026 NOT YET STARTED NA
84 11 Floor 18-02-2026 NOT YET STARTED NA
85 12 Floor 04-04-2026 NOT YET STARTED NA
86 13 Floor 19-05-2026 NOT YET STARTED NA
87 14 Floor 03-07-2026 NOT YET STARTED NA
88 15 Floor 17-08-2026 NOT YET STARTED NA
89 16 Floor 01-10-2026 NOT YET STARTED NA
90 17 Floor 15-11-2026 NOT YET STARTED NA
91 2 Floor 25-03-2025 NOT YET STARTED NA
92 3 Floor 09-05-2025 NOT YET STARTED NA
93 4 Floor 23-06-2025 NOT YET STARTED NA
94 5 Floor 07-08-2025 NOT YET STARTED NA
95 6 Floor 21-09-2025 NOT YET STARTED NA
96 7 Floor 05-11-2025 NOT YET STARTED NA
97 8 Floor 20-12-2025 NOT YET STARTED NA
98 9 Floor 03-02-2026 NOT YET STARTED NA
99 10 Floor 20-03-2026 NOT YET STARTED NA
100 11 Floor 04-05-2026 NOT YET STARTED NA
101 12 Floor 18-06-2026 NOT YET STARTED NA
102 13 Floor 02-08-2026 NOT YET STARTED NA
103 14 Floor 16-09-2026 NOT YET STARTED NA
104 15 Floor 31-10-2026 NOT YET STARTED NA
105 16 Floor 15-12-2026 NOT YET STARTED NA
106 17 Floor 29-01-2027 NOT YET STARTED NA
Updated Changes on 14-10-2023
107 Site Development 06-02-2028 NOT YET STARTED
108 NA 23-10-2023 Not yet started NA
109 Ground Floor/Stilt Floor 11-10-2024 NOT YET STARTED NA
110 1 Floor 25-11-2024 NOT YET STARTED NA
111 NA 01-10-2023 Not yet started NA
112 Ground Floor/Stilt Floor 25-12-2024 NOT YET STARTED NA
113 1 Floor 08-02-2025 NOT YET STARTED NA
114 Electrical Works 28-12-2027 NOT YET STARTED NA
115 Concealed Cabling including Plugs & switches 28-12-2027 NOT YET STARTED NA
116 Installation & Charging of Transformer 28-12-2027 NOT YET STARTED NA
117 Connection to Flats/Apartments 28-12-2027 NOT YET STARTED NA
118 PH works 28-12-2027 NOT YET STARTED NA
119 Laying of concealed Pipes 28-12-2027 NOT YET STARTED NA
120 PH Fittings 28-12-2027 NOT YET STARTED NA
121 Overhead Water Tanks 28-12-2027 NOT YET STARTED NA
122 Water Supply Connection to all units 28-12-2027 NOT YET STARTED NA
123 STP construction and completion 28-12-2027 NOT YET STARTED NA
124 Distempering & Colouring of all units and exteriors 28-12-2027 NOT YET STARTED NA
125 Fixation of doors and windows 28-12-2027 NOT YET STARTED NA
126 Scheduled Date of handing over possession 06-02-2028 NOT YET STARTED NA
127 Development of common areas, parks, gardens etc 28-12-2027 NOT YET STARTED NA
128 2 Floor 09-01-2025 NOT YET STARTED NA
129 3 Floor 23-02-2025 NOT YET STARTED NA
130 4 Floor 09-04-2025 NOT YET STARTED NA
131 5 Floor 24-05-2025 NOT YET STARTED NA
132 6 Floor 08-07-2025 NOT YET STARTED NA
133 7 Floor 22-08-2025 NOT YET STARTED NA
134 8 Floor 6-10-2025 NOT YET STARTED NA
135 9 Floor 20-11-2025 NOT YET STARTED NA
136 10 Floor 04-01-2026 NOT YET STARTED NA
137 11 Floor 18-02-2026 NOT YET STARTED NA
138 12 Floor 04-04-2026 NOT YET STARTED NA
139 13 Floor 19-05-2026 NOT YET STARTED NA
140 14 Floor 03-07-2026 NOT YET STARTED NA
141 15 Floor 17-08-2026 NOT YET STARTED NA
142 16 Floor 01-10-2026 NOT YET STARTED NA
143 17 Floor 15-11-2026 NOT YET STARTED NA
144 2 Floor 25-03-2025 NOT YET STARTED NA
145 3 Floor 09-05-2025 NOT YET STARTED NA
146 4 Floor 23-06-2025 NOT YET STARTED NA
147 5 Floor 07-08-2025 NOT YET STARTED NA
148 6 Floor 21-09-2025 NOT YET STARTED NA
149 7 Floor 05-11-2025 NOT YET STARTED NA
150 8 Floor 20-12-2025 NOT YET STARTED NA
151 9 Floor 03-02-2026 NOT YET STARTED NA
152 10 Floor 20-03-2026 NOT YET STARTED NA
153 11 Floor 04-05-2026 NOT YET STARTED NA
154 12 Floor 18-06-2026 NOT YET STARTED NA
155 13 Floor 02-08-2026 NOT YET STARTED NA
156 14 Floor 16-09-2026 NOT YET STARTED NA
157 15 Floor 31-10-2026 NOT YET STARTED NA
158 16 Floor 15-12-2026 NOT YET STARTED NA
159 17 Floor 29-01-2027 NOT YET STARTED NA
Updated Changes on 14-01-2024
160 Site Development 06-02-2028 under progress NA
161 NA 23-10-2023 Not yet started NA
162 Ground Floor/Stilt Floor 11-10-2024 NOT YET STARTED NA
163 1 Floor 25-11-2024 NOT YET STARTED NA
164 NA 01-10-2023 Not yet started NA
165 Ground Floor/Stilt Floor 25-12-2024 NOT YET STARTED NA
166 1 Floor 08-02-2025 NOT YET STARTED NA
167 Electrical Works 28-12-2027 NOT YET STARTED NA
168 Concealed Cabling including Plugs & switches 28-12-2027 NOT YET STARTED NA
169 Installation & Charging of Transformer 28-12-2027 NOT YET STARTED NA
170 Connection to Flats/Apartments 28-12-2027 NOT YET STARTED NA
171 PH works 28-12-2027 NOT YET STARTED NA
172 Laying of concealed Pipes 28-12-2027 NOT YET STARTED NA
173 PH Fittings 28-12-2027 NOT YET STARTED NA
174 Overhead Water Tanks 28-12-2027 NOT YET STARTED NA
175 Water Supply Connection to all units 28-12-2027 NOT YET STARTED NA
176 STP construction and completion 28-12-2027 NOT YET STARTED NA
177 Distempering & Colouring of all units and exteriors 28-12-2027 NOT YET STARTED NA
178 Fixation of doors and windows 28-12-2027 NOT YET STARTED NA
179 Scheduled Date of handing over possession 06-02-2028 NOT YET STARTED NA
180 Development of common areas, parks, gardens etc 28-12-2027 NOT YET STARTED NA
181 2 Floor 09-01-2025 NOT YET STARTED NA
182 3 Floor 23-02-2025 NOT YET STARTED NA
183 4 Floor 09-04-2025 NOT YET STARTED NA
184 5 Floor 24-05-2025 NOT YET STARTED NA
185 6 Floor 08-07-2025 NOT YET STARTED NA
186 7 Floor 22-08-2025 NOT YET STARTED NA
187 8 Floor 6-10-2025 NOT YET STARTED NA
188 9 Floor 20-11-2025 NOT YET STARTED NA
189 10 Floor 04-01-2026 NOT YET STARTED NA
190 11 Floor 18-02-2026 NOT YET STARTED NA
191 12 Floor 04-04-2026 NOT YET STARTED NA
192 13 Floor 19-05-2026 NOT YET STARTED NA
193 14 Floor 03-07-2026 NOT YET STARTED NA
194 15 Floor 17-08-2026 NOT YET STARTED NA
195 16 Floor 01-10-2026 NOT YET STARTED NA
196 17 Floor 15-11-2026 NOT YET STARTED NA
197 2 Floor 25-03-2025 NOT YET STARTED NA
198 3 Floor 09-05-2025 NOT YET STARTED NA
199 4 Floor 23-06-2025 NOT YET STARTED NA
200 5 Floor 07-08-2025 NOT YET STARTED NA
201 6 Floor 21-09-2025 NOT YET STARTED NA
202 7 Floor 05-11-2025 NOT YET STARTED NA
203 8 Floor 20-12-2025 NOT YET STARTED NA
204 9 Floor 03-02-2026 NOT YET STARTED NA
205 10 Floor 20-03-2026 NOT YET STARTED NA
206 11 Floor 04-05-2026 NOT YET STARTED NA
207 12 Floor 18-06-2026 NOT YET STARTED NA
208 13 Floor 02-08-2026 NOT YET STARTED NA
209 14 Floor 16-09-2026 NOT YET STARTED NA
210 15 Floor 31-10-2026 NOT YET STARTED NA
211 16 Floor 15-12-2026 NOT YET STARTED NA
212 17 Floor 29-01-2027 NOT YET STARTED NA
Updated Changes on 15-04-2024
213 Site Development 06-02-2028 under progress NA
214 NA 23-10-2023 Not yet started
215 Ground Floor/Stilt Floor 11-10-2024 NOT YET STARTED
216 1 Floor 25-11-2024 NOT YET STARTED NA
217 NA 01-10-2023 Not yet started NA
218 Ground Floor/Stilt Floor 25-12-2024 NOT YET STARTED NA
219 1 Floor 08-02-2025 NOT YET STARTED NA
220 Electrical Works 28-12-2027 NOT YET STARTED NA
221 Concealed Cabling including Plugs & switches 28-12-2027 NOT YET STARTED NA
222 Installation & Charging of Transformer 28-12-2027 NOT YET STARTED NA
223 Connection to Flats/Apartments 28-12-2027 NOT YET STARTED NA
224 PH works 28-12-2027 NOT YET STARTED NA
225 Laying of concealed Pipes 28-12-2027 NOT YET STARTED NA
226 PH Fittings 28-12-2027 NOT YET STARTED NA
227 Overhead Water Tanks 28-12-2027 NOT YET STARTED NA
228 Water Supply Connection to all units 28-12-2027 NOT YET STARTED NA
229 STP construction and completion 28-12-2027 NOT YET STARTED NA
230 Distempering & Colouring of all units and exteriors 28-12-2027 NOT YET STARTED NA
231 Fixation of doors and windows 28-12-2027 NOT YET STARTED NA
232 Scheduled Date of handing over possession 06-02-2028 NOT YET STARTED NA
233 Development of common areas, parks, gardens etc 28-12-2027 NOT YET STARTED NA
234 2 Floor 09-01-2025 NOT YET STARTED NA
235 3 Floor 23-02-2025 NOT YET STARTED NA
236 4 Floor 09-04-2025 NOT YET STARTED NA
237 5 Floor 24-05-2025 NOT YET STARTED NA
238 6 Floor 08-07-2025 NOT YET STARTED NA
239 7 Floor 22-08-2025 NOT YET STARTED NA
240 8 Floor 6-10-2025 NOT YET STARTED NA
241 9 Floor 20-11-2025 NOT YET STARTED NA
242 10 Floor 04-01-2026 NOT YET STARTED NA
243 11 Floor 18-02-2026 NOT YET STARTED NA
244 12 Floor 04-04-2026 NOT YET STARTED NA
245 13 Floor 19-05-2026 NOT YET STARTED NA
246 14 Floor 03-07-2026 NOT YET STARTED NA
247 15 Floor 17-08-2026 NOT YET STARTED NA
248 16 Floor 01-10-2026 NOT YET STARTED NA
249 17 Floor 15-11-2026 NOT YET STARTED NA
250 2 Floor 25-03-2025 NOT YET STARTED NA
251 3 Floor 09-05-2025 NOT YET STARTED NA
252 4 Floor 23-06-2025 NOT YET STARTED NA
253 5 Floor 07-08-2025 NOT YET STARTED NA
254 6 Floor 21-09-2025 NOT YET STARTED NA
255 7 Floor 05-11-2025 NOT YET STARTED NA
256 8 Floor 20-12-2025 NOT YET STARTED NA
257 9 Floor 03-02-2026 NOT YET STARTED NA
258 10 Floor 20-03-2026 NOT YET STARTED NA
259 11 Floor 04-05-2026 NOT YET STARTED NA
260 12 Floor 18-06-2026 NOT YET STARTED NA
261 13 Floor 02-08-2026 NOT YET STARTED NA
262 14 Floor 16-09-2026 NOT YET STARTED NA
263 15 Floor 31-10-2026 NOT YET STARTED NA
264 16 Floor 15-12-2026 NOT YET STARTED NA
265 17 Floor 29-01-2027 NOT YET STARTED NA

Booking Status

Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership Status
Carpet Area Balcony Area Exclusive Open Terrace Area
1 A-101 158.512 18.766 0 Promoter
2 A-102 193.049 20.017 0 Promoter
3 A-103 158.956 18.489 0 Promoter
4 A-104 141.893 16.250 0 Promoter
5 A-201 158.512 18.766 0 Promoter
6 A-202 193.049 20.017 0 Promoter
7 A-203 158.956 18.489 0 Promoter
8 A-204 141.893 16.250 0 Promoter
9 A-301 158.512 18.766 0 Promoter
10 A-302 193.049 20.017 0 Promoter
11 A-303 158.956 18.489 0 Promoter
12 A-304 141.893 16.250 0 Land Owner
13 A-401 158.512 18.766 0 Promoter
14 A-402 193.049 20.017 0 Promoter
15 A-403 158.956 18.489 0 Promoter
16 A-404 141.893 16.250 0 Promoter
17 A-501 158.512 18.766 0 Promoter
18 A-502 193.049 20.017 0 Promoter
19 A-503 158.956 18.489 0 Promoter
20 A-504 141.893 16.250 0 Promoter
21 A-601 158.512 18.766 0 Promoter
22 A-602 193.049 20.017 0 Promoter
23 A-603 158.956 18.489 0 Promoter
24 A-604 141.893 16.250 0 Promoter
25 A-701 158.512 18.766 0 Promoter
26 A-702 193.049 20.017 0 Promoter
27 A-703 158.956 18.489 0 Promoter
28 A-704 141.893 16.250 0 Promoter
29 A-801 158.512 18.766 0 Promoter
30 A-802 193.049 20.017 0 Promoter
31 A-803 158.956 18.489 0 Promoter
32 A-804 141.893 16.250 0 Promoter
33 A-901 158.512 18.766 0 Promoter
34 A-902 193.049 20.017 0 Promoter
35 A-903 158.956 18.489 0 Promoter
36 A-904 141.893 16.250 0 Promoter
37 A-1001 158.512 18.766 0 Promoter
38 A-1002 193.049 20.017 0 Promoter
39 A-1003 158.956 18.489 0 Promoter
40 A-1004 141.893 16.250 0 Promoter
41 A-1101 158.512 18.766 0 Promoter
42 A-1102 193.049 20.017 0 Promoter
43 A-1103 158.956 18.489 0 Promoter
44 A-1104 141.893 16.250 0 Promoter
45 A-1201 158.512 18.766 0 Promoter
46 A-1202 193.049 20.017 0 Promoter
47 A-1203 158.956 18.489 0 Promoter
48 A-1204 141.893 16.250 0 Promoter
49 A-1301 158.512 18.766 0 Promoter
50 A-1302 193.049 20.017 0 Promoter
51 A-1303 158.956 18.489 0 Promoter
52 A-1304 141.893 16.250 0 Promoter
53 A-1401 158.512 18.766 0 Promoter
54 A-1402 193.049 20.017 0 Promoter
55 A-1403 158.956 18.489 0 Promoter
56 A-1404 141.893 16.250 0 Promoter
57 A-1501 158.512 18.766 0 Promoter
58 A-1502 193.049 20.017 0 Promoter
59 A-1503 158.956 18.489 0 Promoter
60 A-1504 141.893 16.250 0 Promoter
61 A-1601 274.572 26.867 0 Promoter
62 A-1602 193.049 20.017 0 Promoter
63 A-1603 158.956 18.489 0 Promoter
64 A-1604 141.893 16.250 0 Promoter
65 A-1702 193.049 20.017 0 Promoter
66 A-1703 158.956 18.489 0 Promoter
67 A-1704 141.893 16.250 0 Promoter
68 B-101 158.512 18.766 0 Promoter
69 B-102 193.049 20.017 0 Promoter
70 B-103 158.956 18.489 0 Promoter
71 B-104 141.893 16.250 0 Promoter
72 B-201 158.512 18.766 0 Promoter
73 B-202 193.049 20.017 0 Promoter
74 B-203 158.956 18.489 0 Promoter
75 B-204 141.893 16.250 0 Promoter
76 B-301 158.512 18.766 0 Promoter
77 B-302 193.049 20.017 0 Land Owner
78 B-303 158.956 18.489 0 Promoter
79 B-304 141.893 16.250 0 Promoter
80 B-401 158.512 18.766 0 Promoter
81 B-402 193.049 20.017 0 Promoter
82 B-403 158.956 18.489 0 Promoter
83 B-404 141.893 16.250 0 Promoter
84 B-501 158.512 18.766 0 Promoter
85 B-502 193.049 20.017 0 Promoter
86 B-503 158.956 18.489 0 Promoter
87 B-504 141.893 16.250 0 Promoter
88 B-601 158.512 18.766 0 Land Owner
89 B-602 193.049 20.017 0 Promoter
90 B-603 158.956 18.489 0 Promoter
91 B-604 141.893 16.250 0 Land Owner
92 B-701 158.512 18.766 0 Land Owner
93 B-702 193.049 20.017 0 Promoter
94 B-703 158.956 18.489 0 Promoter
95 B-704 141.893 16.250 0 Land Owner
96 B-801 158.512 18.766 0 Promoter
97 B-802 193.049 20.017 0 Promoter
98 B-803 158.956 18.489 0 Promoter
99 B-804 141.893 16.250 0 Promoter
100 B-901 158.512 18.766 0 Promoter
101 B-902 193.049 20.017 0 Promoter
102 B-903 158.956 18.489 0 Promoter
103 B-904 141.893 16.250 0 Promoter
104 B-1001 158.512 18.766 0 Promoter
105 B-1002 193.049 20.017 0 Promoter
106 B-1003 158.956 18.489 0 Promoter
107 B-1004 141.893 16.250 0 Promoter
108 B-1101 158.512 18.766 0 Promoter
109 B-1102 193.049 20.017 0 Promoter
110 B-1103 158.956 18.489 0 Promoter
111 B-1104 141.893 16.250 0 Promoter
112 B-1201 158.512 18.766 0 Promoter
113 B-1202 193.049 20.017 0 Promoter
114 B-1203 158.956 18.489 0 Promoter
115 B-1204 141.893 16.250 0 Promoter
116 B-1301 158.512 18.766 0 Promoter
117 B-1302 193.049 20.017 0 Promoter
118 B-1303 158.956 18.489 0 Promoter
119 B-1304 141.893 16.250 0 Promoter
120 B-1401 158.512 18.766 0 Promoter
121 B-1402 193.049 20.017 0 Promoter
122 B-1403 158.956 18.489 0 Promoter
123 B-1404 141.893 16.250 0 Promoter
124 B-1501 158.512 18.766 0 Promoter
125 B-1502 193.049 20.017 0 Promoter
126 B-1503 158.956 18.489 0 Promoter
127 B-1504 141.893 16.250 0 Promoter
128 B-1601 274.572 26.867 0 Promoter
129 B-1602 193.049 20.017 0 Promoter
130 B-1603 158.956 18.489 0 Promoter
131 B-1604 141.893 16.250 0 Promoter
132 B-1702 193.049 20.017 0 Promoter
133 B-1703 158.956 18.489 0 Promoter
134 B-1704 141.893 16.250 0 Promoter
135 C-101 158.512 18.766 0 Promoter
136 C-102 193.049 20.017 0 Promoter
137 C-103 158.956 18.489 0 Promoter
138 C-104 141.893 16.250 0 Promoter
139 C-201 158.512 18.766 0 Promoter
140 C-202 193.049 20.017 0 Promoter
141 C-203 158.956 18.489 0 Promoter
142 C-204 141.893 16.250 0 Promoter
143 C-301 158.512 18.766 0 Promoter
144 C-302 193.049 20.017 0 Promoter
145 C-303 158.956 18.489 0 Promoter
146 C-304 141.893 16.250 0 Promoter
147 C-401 158.512 18.766 0 Promoter
148 C-402 193.049 20.017 0 Promoter
149 C-403 158.956 18.489 0 Promoter
150 C-404 141.893 16.250 0 Promoter
151 C-501 158.512 18.766 0 Promoter
152 C-502 193.049 20.017 0 Promoter
153 C-503 158.956 18.489 0 Promoter
154 C-504 141.893 16.250 0 Promoter
155 C-601 158.512 18.766 0 Promoter
156 C-602 193.049 20.017 0 Promoter
157 C-603 158.956 18.489 0 Promoter
158 C-604 141.893 16.250 0 Promoter
159 C-701 158.512 18.766 0 Promoter
160 C-702 193.049 20.017 0 Promoter
161 C-703 158.956 18.489 0 Promoter
162 C-704 141.893 16.250 0 Promoter
163 C-801 158.512 18.766 0 Promoter
164 C-802 193.049 20.017 0 Promoter
165 C-803 158.956 18.489 0 Promoter
166 C-804 141.893 16.250 0 Promoter
167 C-901 158.512 18.766 0 Promoter
168 C-902 193.049 20.017 0 Promoter
169 C-903 158.956 18.489 0 Promoter
170 C-904 141.893 16.250 0 Promoter
171 C-1001 158.512 18.766 0 Promoter
172 C-1002 193.049 20.017 0 Promoter
173 C-1003 158.956 18.489 0 Promoter
174 C-1004 141.893 16.250 0 Promoter
175 C-1101 158.512 18.766 0 Promoter
176 C-1102 193.049 20.017 0 Promoter
177 C-1103 158.956 18.489 0 Promoter
178 C-1104 141.893 16.250 0 Promoter
179 C-1201 158.512 18.766 0 Promoter
180 C-1202 193.049 20.017 0 Promoter
181 C-1203 158.956 18.489 0 Promoter
182 C-1204 141.893 16.250 0 Promoter
183 C-1301 158.512 18.766 0 Promoter
184 C-1302 193.049 20.017 0 Promoter
185 C-1303 158.956 18.489 0 Promoter
186 C-1304 141.893 16.250 0 Promoter
187 C-1401 158.512 18.766 0 Promoter
188 C-1402 193.049 20.017 0 Promoter
189 C-1403 158.956 18.489 0 Promoter
190 C-1404 141.893 16.250 0 Promoter
191 C-1501 158.512 18.766 0 Promoter
192 C-1502 193.049 20.017 0 Promoter
193 C-1503 158.956 18.489 0 Promoter
194 C-1504 141.893 16.250 0 Promoter
195 C-1601 274.572 26.867 0 Promoter
196 C-1602 193.049 20.017 0 Promoter
197 C-1603 158.956 18.489 0 Promoter
198 C-1604 141.893 16.250 0 Promoter
199 C-1702 193.049 20.017 0 Promoter
200 C-1703 158.956 18.489 0 Promoter
201 C-1704 141.893 16.250 0 Promoter
202 D-101 158.512 18.766 0 Promoter
203 D-102 193.049 20.017 0 Promoter
204 D-103 158.956 18.489 0 Promoter
205 D-104 141.893 16.250 0 Promoter
206 D-201 158.512 18.766 0 Promoter
207 D-202 193.049 20.017 0 Promoter
208 D-203 158.956 18.489 0 Promoter
209 D-204 141.893 16.250 0 Promoter
210 D-301 158.512 18.766 0 Promoter
211 D-302 193.049 20.017 0 Promoter
212 D-303 158.956 18.489 0 Promoter
213 D-304 141.893 16.250 0 Promoter
214 D-401 158.512 18.766 0 Promoter
215 D-402 193.049 20.017 0 Promoter
216 D-403 158.956 18.489 0 Promoter
217 D-404 141.893 16.250 0 Promoter
218 D-501 158.512 18.766 0 Promoter
219 D-502 193.049 20.017 0 Promoter
220 D-503 158.956 18.489 0 Promoter
221 D-504 141.893 16.250 0 Promoter
222 D-601 158.512 18.766 0 Land Owner
223 D-602 193.049 20.017 0 Promoter
224 D-603 158.956 18.489 0 Promoter
225 D-604 141.893 16.250 0 Land Owner
226 D-701 158.512 18.766 0 Land Owner
227 D-702 193.049 20.017 0 Promoter
228 D-703 158.956 18.489 0 Promoter
229 D-704 141.893 16.250 0 Land Owner
230 D-801 158.512 18.766 0 Promoter
231 D-802 193.049 20.017 0 Promoter
232 D-803 158.956 18.489 0 Promoter
233 D-804 141.893 16.250 0 Promoter
234 D-901 158.512 18.766 0 Promoter
235 D-902 193.049 20.017 0 Promoter
236 D-903 158.956 18.489 0 Promoter
237 D-904 141.893 16.250 0 Promoter
238 D-1001 158.512 18.766 0 Promoter
239 D-1002 193.049 20.017 0 Promoter
240 D-1003 158.956 18.489 0 Promoter
241 D-1004 141.893 16.250 0 Promoter
242 D-1101 158.512 18.766 0 Promoter
243 D-1102 193.049 20.017 0 Promoter
244 D-1103 158.956 18.489 0 Promoter
245 D-1104 141.893 16.250 0 Promoter
246 D-1201 158.512 18.766 0 Promoter
247 D-1202 193.049 20.017 0 Promoter
248 D-1203 158.956 18.489 0 Promoter
249 D-1204 141.893 16.250 0 Promoter
250 D-1301 158.512 18.766 0 Promoter
251 D-1302 193.049 20.017 0 Promoter
252 D-1303 158.956 18.489 0 Promoter
253 D-1304 141.893 16.250 0 Promoter
254 D-1401 158.512 18.766 0 Promoter
255 D-1402 193.049 20.017 0 Promoter
256 D-1403 158.956 18.489 0 Promoter
257 D-1404 141.893 16.250 0 Promoter
258 D-1501 158.512 18.766 0 Promoter
259 D-1502 193.049 20.017 0 Promoter
260 D-1503 158.956 18.489 0 Promoter
261 D-1504 141.893 16.250 0 Promoter
262 D-1601 274.572 26.867 0 Promoter
263 D-1602 193.049 20.017 0 Promoter
264 D-1603 158.956 18.489 0 Promoter
265 D-1604 141.893 16.250 0 Promoter
266 D-1702 193.049 20.017 0 Promoter
267 D-1703 158.956 18.489 0 Promoter
268 D-1704 141.893 16.250 0 Promoter

Financial Status

SL No. Funds Collected from the Allottees Funds Borrowed from Financial Institutions Funds Employed from Own Sources Expenditure As On Date Status
1 7890023 0 119645495 119645495 30-06-2023 In Progress
2 194076307 0 94534574 193576307 30-09-2023 UNDER PROGRESS
3 325364575 0 99740924 325582657 31-12-2023 under progrees
4 503513326 152728963 193603304 710527000 31-03-2024 Under Progress

Updated Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 The building shall be used exclusively for Residential Apartment purpose and the use shall not be changed to any other use without prior approval of this Authority 06-02-2028 NOT YET STARTED
2 The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement 06-02-2028 NOT YET STARTED
3 Parking space measuring 19636.495qmas shown in the approved plan shall be left for parking of vehicles and no part of it shall be used for any other purpose and shall not be partitioned/closed in any manner. 06-02-2028 NOT YET STARTED
4 The land over which construction is proposed is accessible by an approved means of access of 51.82 M (Fifty One Point Eighty Two mtr) N.H in width. 6. The land in question must be in lawful ownership and peaceful possession of the applicant. 02-02-2028 NOT YET STARTED
5 The permission granted under these regulations shall remain valid up to three years from the date of issue .However the permission shall have to be revalidated before the expiry the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year. 06-02-2028 NOT YET STARTED
6 Roof top rain water shall be conveyed and discharged to the rain water Harvesting structure in the premises as per Rule-47 of ODA (Planning & Building Standards) Rules, 2020. 06-02-2028 NOT YET STARTED
7 Provision of green building norms are to be strictly followed as per Rule-51 of ODA (Planning & Building Standards) Rules, 2020. 06-02-2028 NOT YET STARTED
8 Plantation as required under the provision under Rule 30 of ODA (Planning & Building Standards) Rules, 2020.shall be strictly adhered. 06-02-2028 NOT YET STARTED
9 At least 10% of the parking shall be ear marked for visitors and 30% of the parking space shall have facility for Electrical vehicle charging points 06-02-2028 NOT YET STARTED
10 The Owner/ Applicant/Architect/Structural Engineer/PMO are fully and jointly responsible for any structural failure of building due to any earthquake/cyclone/any other natural disaster, structural/construction defects. Authority will be no way be held responsible for the same in what so ever manner. 06-02-2028 NOT YET STARTED
11 The applicant shall get the EIDP approved towards development of External infrastructure. execute it and obtain clearance from Engineering Wing of BMC before Occupancy. 06-02-2028 NOT YET STARTED
12 Provision of public washroom to be provided as per Rule-50 of ODA (P &BS) Rules, 2020. 06-02-2028 NOT YET STARTED
13 Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards)Rules-2020, or under any other law for the time being in force. 06-02-2028 NOT YET STARTED
14 Other requirements or licenses or clearances required to be obtained for the site /premises or activity under various other laws. 06-02-2028 NOT YET STARTED
15 In case of any dispute arising out of land record or in respect of right, title, interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute. 06-02-2028 NOT YET STARTED
16 Neither granting of the permit nor the approval of the drawing and specifications, nor inspections made by the Authority during erection of the building shall in any way relleve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBC 2016 and these Rules. 06-02-2028 NOT YET STARTED
17 Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the regulations; (b) Obtain, wherever applicable, from the competent Authority permissions/clearance required in connection with the proposed work: 06-02-2028 NOT YET STARTED
18 Ensure that the PMO (Project Management Organization) engaged by him shall take up site & field verification and submit stage wise report as required under Rule 14 of ODA (P & BS) Rules-2020. 06-02-2028 NOT YET STARTED
19 Register the said Apartment project over scheduled property under the Real Estate (Regulation & Development)-Act-2016. 06-04-2023 preparing to submit application for registration before RERA .
20 Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force, records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the Authority. 06-02-2028 NOT YET STARTED
21 If the Authority finds at any stage that the construction is not being carried in accordance to the sanctioned plan or is in violation of any of the provisions of these regulations, it shall notify the owner and no further construction shall be allowed until necessary corrections in the plan are made and the corrected plan is approved. 06-02-2028 NOT YET STARTED
Updated Changes on 07-07-2023
22 The building shall be used exclusively for Residential Apartment purpose and the use shall not be changed to any other use without prior approval of this Authority 06-02-2028 NOT YET STARTED
23 The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement 06-02-2028 NOT YET STARTED
24 Parking space measuring 19636.495qmas shown in the approved plan shall be left for parking of vehicles and no part of it shall be used for any other purpose and shall not be partitioned/closed in any manner. 06-02-2028 NOT YET STARTED
25 The land over which construction is proposed is accessible by an approved means of access of 51.82 M (Fifty One Point Eighty Two mtr) N.H in width. 6. The land in question must be in lawful ownership and peaceful possession of the applicant. 02-02-2028 NOT YET STARTED
26 The permission granted under these regulations shall remain valid up to three years from the date of issue .However the permission shall have to be revalidated before the expiry the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year. 06-02-2028 NOT YET STARTED
27 Roof top rain water shall be conveyed and discharged to the rain water Harvesting structure in the premises as per Rule-47 of ODA (Planning & Building Standards) Rules, 2020. 06-02-2028 NOT YET STARTED
28 Provision of green building norms are to be strictly followed as per Rule-51 of ODA (Planning & Building Standards) Rules, 2020. 06-02-2028 NOT YET STARTED
29 Plantation as required under the provision under Rule 30 of ODA (Planning & Building Standards) Rules, 2020.shall be strictly adhered. 06-02-2028 NOT YET STARTED
30 At least 10% of the parking shall be ear marked for visitors and 30% of the parking space shall have facility for Electrical vehicle charging points 06-02-2028 NOT YET STARTED
31 The Owner/ Applicant/Architect/Structural Engineer/PMO are fully and jointly responsible for any structural failure of building due to any earthquake/cyclone/any other natural disaster, structural/construction defects. Authority will be no way be held responsible for the same in what so ever manner. 06-02-2028 NOT YET STARTED
32 The applicant shall get the EIDP approved towards development of External infrastructure. execute it and obtain clearance from Engineering Wing of BMC before Occupancy. 06-02-2028 NOT YET STARTED
33 Provision of public washroom to be provided as per Rule-50 of ODA (P &BS) Rules, 2020. 06-02-2028 NOT YET STARTED
34 Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards)Rules-2020, or under any other law for the time being in force. 06-02-2028 NOT YET STARTED
35 Other requirements or licenses or clearances required to be obtained for the site /premises or activity under various other laws. 06-02-2028 NOT YET STARTED
36 In case of any dispute arising out of land record or in respect of right, title, interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute. 06-02-2028 NOT YET STARTED
37 Neither granting of the permit nor the approval of the drawing and specifications, nor inspections made by the Authority during erection of the building shall in any way relleve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBC 2016 and these Rules. 06-02-2028 NOT YET STARTED
38 Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the regulations; (b) Obtain, wherever applicable, from the competent Authority permissions/clearance required in connection with the proposed work: 06-02-2028 NOT YET STARTED
39 Ensure that the PMO (Project Management Organization) engaged by him shall take up site & field verification and submit stage wise report as required under Rule 14 of ODA (P & BS) Rules-2020. 06-02-2028 NOT YET STARTED
40 Register the said Apartment project over scheduled property under the Real Estate (Regulation & Development)-Act-2016. 06-04-2023 preparing to submit application for registration before RERA .
41 Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force, records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the Authority. 06-02-2028 NOT YET STARTED
42 If the Authority finds at any stage that the construction is not being carried in accordance to the sanctioned plan or is in violation of any of the provisions of these regulations, it shall notify the owner and no further construction shall be allowed until necessary corrections in the plan are made and the corrected plan is approved. 06-02-2028 NOT YET STARTED
Updated Changes on 14-10-2023
43 The building shall be used exclusively for Residential Apartment purpose and the use shall not be changed to any other use without prior approval of this Authority 06-02-2028 NOT YET STARTED
44 The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement 06-02-2028 NOT YET STARTED
45 Parking space measuring 19636.495qmas shown in the approved plan shall be left for parking of vehicles and no part of it shall be used for any other purpose and shall not be partitioned/closed in any manner. 06-02-2028 NOT YET STARTED
46 The land over which construction is proposed is accessible by an approved means of access of 51.82 M (Fifty One Point Eighty Two mtr) N.H in width. 6. The land in question must be in lawful ownership and peaceful possession of the applicant. 02-02-2028 NOT YET STARTED
47 The permission granted under these regulations shall remain valid up to three years from the date of issue .However the permission shall have to be revalidated before the expiry the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year. 06-02-2028 NOT YET STARTED
48 Roof top rain water shall be conveyed and discharged to the rain water Harvesting structure in the premises as per Rule-47 of ODA (Planning & Building Standards) Rules, 2020. 06-02-2028 NOT YET STARTED
49 Provision of green building norms are to be strictly followed as per Rule-51 of ODA (Planning & Building Standards) Rules, 2020. 06-02-2028 NOT YET STARTED
50 Plantation as required under the provision under Rule 30 of ODA (Planning & Building Standards) Rules, 2020.shall be strictly adhered. 06-02-2028 NOT YET STARTED
51 At least 10% of the parking shall be ear marked for visitors and 30% of the parking space shall have facility for Electrical vehicle charging points 06-02-2028 NOT YET STARTED
52 The Owner/ Applicant/Architect/Structural Engineer/PMO are fully and jointly responsible for any structural failure of building due to any earthquake/cyclone/any other natural disaster, structural/construction defects. Authority will be no way be held responsible for the same in what so ever manner. 06-02-2028 NOT YET STARTED
53 The applicant shall get the EIDP approved towards development of External infrastructure. execute it and obtain clearance from Engineering Wing of BMC before Occupancy. 06-02-2028 NOT YET STARTED
54 Provision of public washroom to be provided as per Rule-50 of ODA (P &BS) Rules, 2020. 06-02-2028 NOT YET STARTED
55 Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards)Rules-2020, or under any other law for the time being in force. 06-02-2028 NOT YET STARTED
56 Other requirements or licenses or clearances required to be obtained for the site /premises or activity under various other laws. 06-02-2028 NOT YET STARTED
57 In case of any dispute arising out of land record or in respect of right, title, interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute. 06-02-2028 NOT YET STARTED
58 Neither granting of the permit nor the approval of the drawing and specifications, nor inspections made by the Authority during erection of the building shall in any way relleve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBC 2016 and these Rules. 06-02-2028 NOT YET STARTED
59 Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the regulations; (b) Obtain, wherever applicable, from the competent Authority permissions/clearance required in connection with the proposed work: 06-02-2028 NOT YET STARTED
60 Ensure that the PMO (Project Management Organization) engaged by him shall take up site & field verification and submit stage wise report as required under Rule 14 of ODA (P & BS) Rules-2020. 06-02-2028 NOT YET STARTED
61 Register the said Apartment project over scheduled property under the Real Estate (Regulation & Development)-Act-2016. 06-04-2023 preparing to submit application for registration before RERA .
62 Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force, records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the Authority. 06-02-2028 NOT YET STARTED
63 If the Authority finds at any stage that the construction is not being carried in accordance to the sanctioned plan or is in violation of any of the provisions of these regulations, it shall notify the owner and no further construction shall be allowed until necessary corrections in the plan are made and the corrected plan is approved. 06-02-2028 NOT YET STARTED
Updated Changes on 14-01-2024
64 The building shall be used exclusively for Residential Apartment purpose and the use shall not be changed to any other use without prior approval of this Authority 06-02-2028 NOT YET STARTED
65 The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement 06-02-2028 NOT YET STARTED
66 Parking space measuring 19636.495qmas shown in the approved plan shall be left for parking of vehicles and no part of it shall be used for any other purpose and shall not be partitioned/closed in any manner. 06-02-2028 NOT YET STARTED
67 The land over which construction is proposed is accessible by an approved means of access of 51.82 M (Fifty One Point Eighty Two mtr) N.H in width. 6. The land in question must be in lawful ownership and peaceful possession of the applicant. 02-02-2028 NOT YET STARTED
68 The permission granted under these regulations shall remain valid up to three years from the date of issue .However the permission shall have to be revalidated before the expiry the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year. 06-02-2028 NOT YET STARTED
69 Roof top rain water shall be conveyed and discharged to the rain water Harvesting structure in the premises as per Rule-47 of ODA (Planning & Building Standards) Rules, 2020. 06-02-2028 NOT YET STARTED
70 Provision of green building norms are to be strictly followed as per Rule-51 of ODA (Planning & Building Standards) Rules, 2020. 06-02-2028 NOT YET STARTED
71 Plantation as required under the provision under Rule 30 of ODA (Planning & Building Standards) Rules, 2020.shall be strictly adhered. 06-02-2028 NOT YET STARTED
72 At least 10% of the parking shall be ear marked for visitors and 30% of the parking space shall have facility for Electrical vehicle charging points 06-02-2028 NOT YET STARTED
73 The Owner/ Applicant/Architect/Structural Engineer/PMO are fully and jointly responsible for any structural failure of building due to any earthquake/cyclone/any other natural disaster, structural/construction defects. Authority will be no way be held responsible for the same in what so ever manner. 06-02-2028 NOT YET STARTED
74 The applicant shall get the EIDP approved towards development of External infrastructure. execute it and obtain clearance from Engineering Wing of BMC before Occupancy. 06-02-2028 NOT YET STARTED
75 Provision of public washroom to be provided as per Rule-50 of ODA (P &BS) Rules, 2020. 06-02-2028 NOT YET STARTED
76 Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards)Rules-2020, or under any other law for the time being in force. 06-02-2028 NOT YET STARTED
77 Other requirements or licenses or clearances required to be obtained for the site /premises or activity under various other laws. 06-02-2028 NOT YET STARTED
78 In case of any dispute arising out of land record or in respect of right, title, interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute. 06-02-2028 NOT YET STARTED
79 Neither granting of the permit nor the approval of the drawing and specifications, nor inspections made by the Authority during erection of the building shall in any way relleve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBC 2016 and these Rules. 06-02-2028 NOT YET STARTED
80 Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the regulations; (b) Obtain, wherever applicable, from the competent Authority permissions/clearance required in connection with the proposed work: 06-02-2028 NOT YET STARTED
81 Ensure that the PMO (Project Management Organization) engaged by him shall take up site & field verification and submit stage wise report as required under Rule 14 of ODA (P & BS) Rules-2020. 06-02-2028 NOT YET STARTED
82 Register the said Apartment project over scheduled property under the Real Estate (Regulation & Development)-Act-2016. 06-04-2023 preparing to submit application for registration before RERA .
83 Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force, records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the Authority. 06-02-2028 NOT YET STARTED
84 If the Authority finds at any stage that the construction is not being carried in accordance to the sanctioned plan or is in violation of any of the provisions of these regulations, it shall notify the owner and no further construction shall be allowed until necessary corrections in the plan are made and the corrected plan is approved. 06-02-2028 NOT YET STARTED
Updated Changes on 15-04-2024
85 The building shall be used exclusively for Residential Apartment purpose and the use shall not be changed to any other use without prior approval of this Authority 06-02-2028 NOT YET STARTED
86 The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement 06-02-2028 NOT YET STARTED
87 Parking space measuring 19636.495qmas shown in the approved plan shall be left for parking of vehicles and no part of it shall be used for any other purpose and shall not be partitioned/closed in any manner. 06-02-2028 NOT YET STARTED
88 The land over which construction is proposed is accessible by an approved means of access of 51.82 M (Fifty One Point Eighty Two mtr) N.H in width. 6. The land in question must be in lawful ownership and peaceful possession of the applicant. 02-02-2028 NOT YET STARTED
89 The permission granted under these regulations shall remain valid up to three years from the date of issue .However the permission shall have to be revalidated before the expiry the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year. 06-02-2028 NOT YET STARTED
90 Roof top rain water shall be conveyed and discharged to the rain water Harvesting structure in the premises as per Rule-47 of ODA (Planning & Building Standards) Rules, 2020. 06-02-2028 NOT YET STARTED
91 Provision of green building norms are to be strictly followed as per Rule-51 of ODA (Planning & Building Standards) Rules, 2020. 06-02-2028 NOT YET STARTED
92 Plantation as required under the provision under Rule 30 of ODA (Planning & Building Standards) Rules, 2020.shall be strictly adhered. 06-02-2028 NOT YET STARTED
93 At least 10% of the parking shall be ear marked for visitors and 30% of the parking space shall have facility for Electrical vehicle charging points 06-02-2028 NOT YET STARTED
94 The Owner/ Applicant/Architect/Structural Engineer/PMO are fully and jointly responsible for any structural failure of building due to any earthquake/cyclone/any other natural disaster, structural/construction defects. Authority will be no way be held responsible for the same in what so ever manner. 06-02-2028 NOT YET STARTED
95 The applicant shall get the EIDP approved towards development of External infrastructure. execute it and obtain clearance from Engineering Wing of BMC before Occupancy. 06-02-2028 NOT YET STARTED
96 Provision of public washroom to be provided as per Rule-50 of ODA (P &BS) Rules, 2020. 06-02-2028 NOT YET STARTED
97 Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards)Rules-2020, or under any other law for the time being in force. 06-02-2028 NOT YET STARTED
98 Other requirements or licenses or clearances required to be obtained for the site /premises or activity under various other laws. 06-02-2028 NOT YET STARTED
99 In case of any dispute arising out of land record or in respect of right, title, interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute. 06-02-2028 NOT YET STARTED
100 Neither granting of the permit nor the approval of the drawing and specifications, nor inspections made by the Authority during erection of the building shall in any way relleve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBC 2016 and these Rules. 06-02-2028 NOT YET STARTED
101 Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the regulations; (b) Obtain, wherever applicable, from the competent Authority permissions/clearance required in connection with the proposed work: 06-02-2028 NOT YET STARTED
102 Ensure that the PMO (Project Management Organization) engaged by him shall take up site & field verification and submit stage wise report as required under Rule 14 of ODA (P & BS) Rules-2020. 06-02-2028 NOT YET STARTED
103 Register the said Apartment project over scheduled property under the Real Estate (Regulation & Development)-Act-2016. 06-04-2023 preparing to submit application for registration before RERA .
104 Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force, records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the Authority. 06-02-2028 NOT YET STARTED
105 If the Authority finds at any stage that the construction is not being carried in accordance to the sanctioned plan or is in violation of any of the provisions of these regulations, it shall notify the owner and no further construction shall be allowed until necessary corrections in the plan are made and the corrected plan is approved. 06-02-2028 NOT YET STARTED

Updated Project Documents

Sl. No. Title of the document Upload Document
1 Proforma-I
2 NOC-CGWA
3 Proforma-I
4 Proforma-II
5 Proforma-I 4th Qr.
6 Proforma-II for withdrawal of Funds
7 Agreement to Sale -Format
8 Proforma-I
9 Proforma-II
:  PARTHAJEET PATNAIK :  
NA :  ALMPP6881B
:PAN Card :  parthajeetpatnaik@falconrealestate.in
:  MBA :  9937021044
:  Promoter has got more than 25 years of experience in this field. He has completed many more multistored residential and commercial projects in and outside the state.
:  Yes :  NA
:  ADYASHA PATNAIK :  
NA :  AODPP5279D
:PAN Card :  fre_support@falconrealestate.in
:  MBA :  9437021040
:  She has got more than 6 years of experience in this field. under her supervision multistoried Residential project "Falcon Residency" and "Falcon Crest" have been completed successfully.
:  Yes :  NA

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
The Architects Architect Plot No- 352/6, Bishnupriya Apartmrnt, Jaydev Vihar, Bhubaneswar – 751013 sudhansu@thearchitects.co.in Mobile-9437005550 CA/2003/30542
Bibhu Ranjan Giri Construction Engineer Plot No- 39, Saheed Nagar, Bhubaneswar-751006 bibhugiri@gmail.com Mobile- 9437214317 RTP/DTP(ST-ER)-149/2019
Viable Infrastructure & Logistics Pvt Ltd Contractor 4th Floor, OSL Tower-II, Link Road, Cuttack-753012, Odisha viableinfra@gmail.com Mobile-9338885999 U45203OR2008PTC010049
SRB & Associates Chartered Accountant 5TH FLOOR, IDCO TOWER,JANPATH, BHUBANESWAR,ODISHA. EMAILSRBBBSR@REDIFFMAIL.COM,MOBILE- 9437100308 310009E

Updated Units

House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
Updated Changes
A-101 Covered Parking A-101 4.5x2.3 10.35 Included
A-102 Covered Parking A-102 4.5x2.3 10.35 Included
A-103 Covered Parking A-103 4.5x2.3 10.35 Included
A-104 Covered Parking A-104 4.5x2.3 10.35 Included
A-201 Covered Parking A-201 4.5x2.3 10.35 Included
A-202 Covered Parking A-202 4.5x2.3 10.35 Included
A-203 Covered Parking A-203 4.5x2.3 10.35 Included
A-204 Covered Parking A-204 4.5x2.3 10.35 Included
A-301 Covered Parking A-301 4.5x2.3 10.35 Included
A-302 Covered Parking A-302 4.5x2.3 10.35 Included
A-303 Covered Parking A-303 4.5x2.3 10.35 Included
A-304 Covered Parking A-304 4.5x2.3 10.35 Included
A-401 Covered Parking A-401 4.5x2.3 10.35 Included
A-402 Covered Parking A-402 4.5x2.3 10.35 Included
A-403 Covered Parking A-403 4.5x2.3 10.35 Included
A-404 Covered Parking A-404 4.5x2.3 10.35 Included
A-501 Covered Parking A-501 4.5x2.3 10.35 Included
A-502 Covered Parking A-502 4.5x2.3 10.35 Included
A-503 Covered Parking A-503 4.5x2.3 10.35 Included
A-504 Covered Parking A-504 4.5x2.3 10.35 Included
A-601 Covered Parking A-601 4.5x2.3 10.35 Included
A-602 Covered Parking A-602 4.5x2.3 10.35 Included
A-603 Covered Parking A-603 4.5x2.3 10.35 Included
A-604 Covered Parking A-604 4.5x2.3 10.35 Included
A-701 Covered Parking A-701 4.5x2.3 10.35 Included
A-702 Covered Parking A-702 4.5x2.3 10.35 Included
A-703 Covered Parking A-703 4.5x2.3 10.35 Included
A-704 Covered Parking A-704 4.5x2.3 10.35 Included
A-801 Covered Parking A-801 4.5x2.3 10.35 Included
A-802 Covered Parking A-802 4.5x2.3 10.35 Included
A-803 Covered Parking A-803 4.5x2.3 10.35 Included
A-804 Covered Parking A-804 4.5x2.3 10.35 Included
A-901 Covered Parking A-901 4.5x2.3 10.35 Included
A-902 Covered Parking A-902 4.5x2.3 10.35 Included
A-903 Covered Parking A-903 4.5x2.3 10.35 Included
A-904 Covered Parking A-904 4.5x2.3 10.35 Included
A-1001 Covered Parking A-1001 4.5x2.3 10.35 Included
A-1002 Covered Parking A-1002 4.5x2.3 10.35 Included
A-1003 Covered Parking A-1003 4.5x2.3 10.35 Included
A-1004 Covered Parking A-1004 4.5x2.3 10.35 Included
A-1101 Covered Parking A-1101 4.5x2.3 10.35 Included
A-1102 Covered Parking A-1102 4.5x2.3 10.35 Included
A-1103 Covered Parking A-1103 4.5x2.3 10.35 Included
A-1104 Covered Parking A-1104 4.5x2.3 10.35 Included
A-1201 Covered Parking A-1201 4.5x2.3 10.35 Included
A-1202 Covered Parking A-1202 4.5x2.3 10.35 Included
A-1203 Covered Parking A-1203 4.5x2.3 10.35 Included
A-1204 Covered Parking A-1204 4.5x2.3 10.35 Included
A-1301 Covered Parking A-1301 4.5x2.3 10.35 Included
A-1302 Covered Parking A-1302 4.5x2.3 10.35 Included
A-1303 Covered Parking A-1303 4.5x2.3 10.35 Included
A-1304 Covered Parking A-1304 4.5x2.3 10.35 Included
A-1401 Covered Parking A-1401 4.5x2.3 10.35 Included
A-1402 Covered Parking A-1402 4.5x2.3 10.35 Included
A-1403 Covered Parking A-1403 4.5x2.3 10.35 Included
A-1404 Covered Parking A-1404 4.5x2.3 10.35 Included
A-1501 Covered Parking A-1501 4.5x2.3 10.35 Included
A-1502 Covered Parking A-1502 4.5x2.3 10.35 Included
A-1503 Covered Parking A-1503 4.5x2.3 10.35 Included
A-1504 Covered Parking A-1504 4.5x2.3 10.35 Included
A-1601 Covered Parking A-1601 4.5x2.3 10.35 Included
A-1602 Covered Parking A-1602 4.5x2.3 10.35 Included
A-1603 Covered Parking A-1603 4.5x2.3 10.35 Included
A-1604 Covered Parking A-1604 4.5x2.3 10.35 Included
A-1702 Covered Parking A-1702 4.5x2.3 10.35 Included
A-1703 Covered Parking A-1703 4.5x2.3 10.35 Included
A-1704 Covered Parking A-1704 4.5x2.3 10.35 Included
B-101 Covered Parking B-101 4.5x2.3 10.35 Included
B-102 Covered Parking B-102 4.5x2.3 10.35 Included
B-103 Covered Parking B-103 4.5x2.3 10.35 Included
B-104 Covered Parking B-104 4.5x2.3 10.35 Included
B-201 Covered Parking B-201 4.5x2.3 10.35 Included
B-202 Covered Parking B-202 4.5x2.3 10.35 Included
B-203 Covered Parking B-203 4.5x2.3 10.35 Included
B-204 Covered Parking B-204 4.5x2.3 10.35 Included
B-301 Covered Parking B-301 4.5x2.3 10.35 Included
B-302 Covered Parking B-302 4.5x2.3 10.35 Included
B-303 Covered Parking B-303 4.5x2.3 10.35 Included
B-304 Covered Parking B-304 4.5x2.3 10.35 Included
B-401 Covered Parking B-401 4.5x2.3 10.35 Included
B-402 Covered Parking B-402 4.5x2.3 10.35 Included
B-403 Covered Parking B-403 4.5x2.3 10.35 Included
B-404 Covered Parking B-404 4.5x2.3 10.35 Included
B-501 Covered Parking B-501 4.5x2.3 10.35 Included
B-502 Covered Parking B-502 4.5x2.3 10.35 Included
B-503 Covered Parking B-503 4.5x2.3 10.35 Included
B-504 Covered Parking B-504 4.5x2.3 10.35 Included
B-601 Covered Parking B-601 4.5x2.3 10.35 Included
B-602 Covered Parking B-602 4.5x2.3 10.35 Included
B-603 Covered Parking B-603 4.5x2.3 10.35 Included
B-604 Covered Parking B-604 4.5x2.3 10.35 Included
B-701 Covered Parking B-701 4.5x2.3 10.35 Included
B-702 Covered Parking B-702 4.5x2.3 10.35 Included
B-703 Covered Parking B-703 4.5x2.3 10.35 Included
B-704 Covered Parking B-704 4.5x2.3 10.35 Included
B-801 Covered Parking B-801 4.5x2.3 10.35 Included
B-802 Covered Parking B-802 4.5x2.3 10.35 Included
B-803 Covered Parking B-803 4.5x2.3 10.35 Included
B-804 Covered Parking B-804 4.5x2.3 10.35 Included
B-901 Covered Parking B-901 4.5x2.3 10.35 Included
B-902 Covered Parking B-902 4.5x2.3 10.35 Included
B-903 Covered Parking B-903 4.5x2.3 10.35 Included
B-904 Covered Parking B-904 4.5x2.3 10.35 Included
B-1001 Covered Parking B-1001 4.5x2.3 10.35 Included
B-1002 Covered Parking B-1002 4.5x2.3 10.35 Included
B-1003 Covered Parking B-1003 4.5x2.3 10.35 Included
B-1004 Covered Parking B-1004 4.5x2.3 10.35 Included
B-1101 Covered Parking B-1101 4.5x2.3 10.35 Included
B-1102 Covered Parking B-1102 4.5x2.3 10.35 Included
B-1103 Covered Parking B-1103 4.5x2.3 10.35 Included
B-1104 Covered Parking B-1104 4.5x2.3 10.35 Included
B-1201 Covered Parking B-1201 4.5x2.3 10.35 Included
B-1202 Covered Parking B-1202 4.5x2.3 10.35 Included
B-1203 Covered Parking B-1203 4.5x2.3 10.35 Included
B-1204 Covered Parking B-1204 4.5x2.3 10.35 Included
B-1301 Covered Parking B-1301 4.5x2.3 10.35 Included
B-1302 Covered Parking B-1302 4.5x2.3 10.35 Included
B-1303 Covered Parking B-1303 4.5x2.3 10.35 Included
B-1304 Covered Parking B-1304 4.5x2.3 10.35 Included
B-1401 Covered Parking B-1401 4.5x2.3 10.35 Included
B-1402 Covered Parking B-1402 4.5x2.3 10.35 Included
B-1403 Covered Parking B-1403 4.5x2.3 10.35 Included
B-1404 Covered Parking B-1404 4.5x2.3 10.35 Included
B-1501 Covered Parking B-1501 4.5x2.3 10.35 Included
B-1502 Covered Parking B-1502 4.5x2.3 10.35 Included
B-1503 Covered Parking B-1503 4.5x2.3 10.35 Included
B-1504 Covered Parking B-1504 4.5x2.3 10.35 Included
B-1601 Covered Parking B-1601 4.5x2.3 10.35 Included
B-1602 Covered Parking B-1602 4.5x2.3 10.35 Included
B-1603 Covered Parking B-1603 4.5x2.3 10.35 Included
B-1604 Covered Parking B-1604 4.5x2.3 10.35 Included
B-1702 Covered Parking B-1702 4.5x2.3 10.35 Included
B-1703 Covered Parking B-1703 4.5x2.3 10.35 Included
B-1704 Covered Parking B-1704 4.5x2.3 10.35 Included
C-101 Covered Parking C-101 4.5x2.3 10.35 Included
C-102 Covered Parking C-102 4.5x2.3 10.35 Included
C-103 Covered Parking C-103 4.5x2.3 10.35 Included
C-104 Covered Parking C-104 4.5x2.3 10.35 Included
C-201 Covered Parking C-201 4.5x2.3 10.35 Included
C-202 Covered Parking C-202 4.5x2.3 10.35 Included
C-203 Covered Parking C-203 4.5x2.3 10.35 Included
C-204 Covered Parking C-204 4.5x2.3 10.35 Included
C-301 Covered Parking C-301 4.5x2.3 10.35 Included
C-302 Covered Parking C-302 4.5x2.3 10.35 Included
C-303 Covered Parking C-303 4.5x2.3 10.35 Included
C-304 Covered Parking C-304 4.5x2.3 10.35 Included
C-401 Covered Parking C-401 4.5x2.3 10.35 Included
C-402 Covered Parking C-402 4.5x2.3 10.35 Included
C-403 Covered Parking C-403 4.5x2.3 10.35 Included
C-404 Covered Parking C-404 4.5x2.3 10.35 Included
C-501 Covered Parking C-501 4.5x2.3 10.35 Included
C-502 Covered Parking C-502 4.5x2.3 10.35 Included
C-503 Covered Parking C-503 4.5x2.3 10.35 Included
C-504 Covered Parking C-504 4.5x2.3 10.35 Included
C-601 Covered Parking C-601 4.5x2.3 10.35 Included
C-602 Covered Parking C-602 4.5x2.3 10.35 Included
C-603 Covered Parking C-603 4.5x2.3 10.35 Included
C-604 Covered Parking C-604 4.5x2.3 10.35 Included
C-701 Covered Parking C-701 4.5x2.3 10.35 Included
C-702 Covered Parking C-702 4.5x2.3 10.35 Included
C-703 Covered Parking C-703 4.5x2.3 10.35 Included
C-704 Covered Parking C-704 4.5x2.3 10.35 Included
C-801 Covered Parking C-801 4.5x2.3 10.35 Included
C-802 Covered Parking C-802 4.5x2.3 10.35 Included
C-803 Covered Parking C-803 4.5x2.3 10.35 Included
C-804 Covered Parking C-804 4.5x2.3 10.35 Included
C-901 Covered Parking C-901 4.5x2.3 10.35 Included
C-902 Covered Parking C-902 4.5x2.3 10.35 Included
C-903 Covered Parking C-903 4.5x2.3 10.35 Included
C-904 Covered Parking C-904 4.5x2.3 10.35 Included
C-1001 Covered Parking C-1001 4.5x2.3 10.35 Included
C-1002 Covered Parking C-1002 4.5x2.3 10.35 Included
C-1003 Covered Parking C-1003 4.5x2.3 10.35 Included
C-1004 Covered Parking C-1004 4.5x2.3 10.35 Included
C-1101 Covered Parking C-1101 4.5x2.3 10.35 Included
C-1102 Covered Parking C-1102 4.5x2.3 10.35 Included
C-1103 Covered Parking C-1103 4.5x2.3 10.35 Included
C-1104 Covered Parking C-1104 4.5x2.3 10.35 Included
C-1201 Covered Parking C-1201 4.5x2.3 10.35 Included
C-1202 Covered Parking C-1202 4.5x2.3 10.35 Included
C-1203 Covered Parking C 1203 4.5x2.3 10.35 Included
C-1204 Covered Parking C-1204 4.5x2.3 10.35 Included
C-1301 Covered Parking C-1301 4.5x2.3 10.35 Included
C-1302 Covered Parking C-1302 4.5x2.3 10.35 Included
C-1303 Covered Parking C-1303 4.5x2.3 10.35 Included
C-1304 Covered Parking C-1304 4.5x2.3 10.35 Included
C-1401 Covered Parking C-1401 4.5x2.3 10.35 Included
C-1402 Covered Parking C-1402 4.5x2.3 10.35 Included
C-1403 Covered Parking C-1403 4.5x2.3 10.35 Included
C-1404 Covered Parking C-1404 4.5x2.3 10.35 Included
C-1501 Covered Parking C-1501 4.5x2.3 10.35 Included
C-1502 Covered Parking C-1502 4.5x2.3 10.35 Included
C-1503 Covered Parking C-1503 4.5x2.3 10.35 Included
C-1504 Covered Parking C-1504 4.5x2.3 10.35 Included
C-1601 Covered Parking C-1601 4.5x2.3 10.35 Included
C-1602 Covered Parking C-1602 4.5x2.3 10.35 Included
C-1603 Covered Parking C-1603 4.5x2.3 10.35 Included
C-1604 Covered Parking C-1604 4.5x2.3 10.35 Included
C-1702 Covered Parking C-1702 4.5x2.3 10.35 Included
C-1703 Covered Parking C-1703 4.5x2.3 10.35 Included
C-1704 Covered Parking C-1704 4.5x2.3 10.35 Included
D-101 Covered Parking D-101 4.5x2.3 10.35 Included
D-102 Covered Parking D-102 4.5x2.3 10.35 Included
D-103 Covered Parking D-103 4.5x2.3 10.35 Included
D-104 Covered Parking D-104 4.5x2.3 10.35 Included
D-201 Covered Parking D-201 4.5x2.3 10.35 Included
D-202 Covered Parking D-202 4.5x2.3 10.35 Included
D=-203 Covered Parking D-203 4.5x2.3 10.35 Included
D-204 Covered Parking D-204 4.5x2.3 10.35 Included
D-301 Covered Parking D-301 4.5x2.3 10.35 Included
D-302 Covered Parking D-302 4.5x2.3 10.35 Included
D-303 Covered Parking D-303 4.5x2.3 10.35 Included
D-304 Covered Parking D-304 4.5x2.3 10.35 Included
D-401 Covered Parking D-401 4.5x2.3 10.35 Included
D-402 Covered Parking D-402 4.5x2.3 10.35 Included
D-403 Covered Parking D-403 4.5x2.3 10.35 Included
D-404 Covered Parking D-404 4.5x2.3 10.35 Included
D-501 Covered Parking D-501 4.5x2.3 10.35 Included
D-502 Covered Parking D-502 4.5x2.3 10.35 Included
D-503 Covered Parking D-503 4.5x2.3 10.35 Included
D-504 Covered Parking D-504 4.5x2.3 10.35 Included
D-601 Covered Parking D-601 4.5x2.3 10.35 Included
D-602 Covered Parking D-602 4.5x2.3 10.35 Included
D-603 Covered Parking D-603 4.5x2.3 10.35 Included
D-604 Covered Parking D-604 4.5x2.3 10.35 Included
D-701 Covered Parking D-701 4.5x2.3 10.35 Included
D-702 Covered Parking D-702 4.5x2.3 10.35 Included
D-703 Covered Parking D-703 4.5x2.3 10.35 Included
D-704 Covered Parking D-704 4.5x2.3 10.35 Included
D-801 Covered Parking D-801 4.5x2.3 10.35 Included
D-802 Covered Parking D-802 4.5x2.3 10.35 Included
D-803 Covered Parking D-803 4.5x2.3 10.35 Included
D-804 Covered Parking D-804 4.5x2.3 10.35 Included
D-901 Covered Parking D-901 4.5x2.3 10.35 Included
D-902 Covered Parking D-902 4.5x2.3 10.35 Included
D-903 Covered Parking D-903 4.5x2.3 10.35 Included
D-904 Covered Parking D-904 4.5x2.3 10.35 Included
D-1001 Covered Parking D-1001 4.5x2.3 10.35 Included
D-1002 Covered Parking D-1002 4.5x2.3 10.35 Included
D-1003 Covered Parking D-1003 4.5x2.3 10.35 Included
D-1004 Covered Parking D-1004 4.5x2.3 10.35 Included
D-1101 Covered Parking D-1101 4.5x2.3 10.35 Included
D-1102 Covered Parking D-1102 4.5x2.3 10.35 Included
D-1103 Covered Parking D-1103 4.5x2.3 10.35 Included
D-1104 Covered Parking D-1104 4.5x2.3 10.35 Included
D-1201 Covered Parking D-1201 4.5x2.3 10.35 Included
D-1202 Covered Parking D-1202 4.5x2.3 10.35 Included
D-1203 Covered Parking D-1203 4.5x2.3 10.35 Included
D-1204 Covered Parking D-1204 4.5x2.3 10.35 Included
D-1301 Covered Parking D-1301 4.5x2.3 10.35 Included
D-1302 Covered Parking D-1302 4.5x2.3 10.35 Included
D-1303 Covered Parking D-1303 4.5x2.3 10.35 Included
D-1304 Covered Parking D-1304 4.5x2.3 10.35 Included
D-1401 Covered Parking D-1401 4.5x2.3 10.35 Included
D-1402 Covered Parking D-1402 4.5x2.3 10.35 Included
D-1403 Covered Parking D-1403 4.5x2.3 10.35 Included
D-1404 Covered Parking D-1404 4.5x2.3 10.35 Included
D-1501 Covered Parking D-1501 4.5x2.3 10.35 Included
D-1502 Covered Parking D-1502 4.5x2.3 10.35 Included
D-1503 Covered Parking D-1503 4.5x2.3 10.35 Included
D-1504 Covered Parking D-1504 4.5x2.3 10.35 Included
D-1601 Covered Parking D-1601 4.5x2.3 10.35 Included
D-1602 Covered Parking D-1602 4.5x2.3 10.35 Included
D-1603 Covered Parking D-1603 4.5x2.3 10.35 Included
D-1604 Covered Parking D-1604 4.5x2.3 10.35 Included
D-1702 Covered Parking D-1702 4.5x2.3 10.35 Included
D-1703 Covered Parking D-1703 4.5x2.3 10.35 Included
D-1704 Covered Parking D-1704 4.5x2.3 10.35 Included

Generated by pacms.orera.in on date: 2024-05-09