1 |
The building shall be used exclusively for Residential Apartment purpose and the use shall not be changed to any other use without prior approval of this Authority
|
06-02-2028
|
NOT YET STARTED
|
2 |
The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement
|
06-02-2028
|
NOT YET STARTED
|
3 |
Parking space measuring 19636.495qmas shown in the approved plan shall be left for parking of vehicles and no part of it shall be used for any other purpose and shall not be partitioned/closed in any manner.
|
06-02-2028
|
NOT YET STARTED
|
4 |
The land over which construction is proposed is accessible by an approved means of access of 51.82 M (Fifty One Point Eighty Two mtr) N.H in width. 6. The land in question must be in lawful ownership and peaceful possession of the applicant.
|
02-02-2028
|
NOT YET STARTED
|
5 |
The permission granted under these regulations shall remain valid up to three years from the date of issue .However the permission shall have to be revalidated before the expiry the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year.
|
06-02-2028
|
NOT YET STARTED
|
6 |
Roof top rain water shall be conveyed and discharged to the rain water Harvesting structure in the premises as per Rule-47 of ODA (Planning & Building Standards) Rules, 2020.
|
06-02-2028
|
NOT YET STARTED
|
7 |
Provision of green building norms are to be strictly followed as per Rule-51 of ODA (Planning & Building Standards) Rules, 2020.
|
06-02-2028
|
NOT YET STARTED
|
8 |
Plantation as required under the provision under Rule 30 of ODA (Planning & Building Standards) Rules, 2020.shall be strictly adhered.
|
06-02-2028
|
NOT YET STARTED
|
9 |
At least 10% of the parking shall be ear marked for visitors and 30% of the parking space shall have facility for Electrical vehicle charging points
|
06-02-2028
|
NOT YET STARTED
|
10 |
The Owner/ Applicant/Architect/Structural Engineer/PMO are fully and jointly responsible for any structural failure of building due to any earthquake/cyclone/any other natural disaster, structural/construction defects. Authority will be no way be held responsible for the same in what so ever manner.
|
06-02-2028
|
NOT YET STARTED
|
11 |
The applicant shall get the EIDP approved towards development of External infrastructure. execute it and obtain clearance from Engineering Wing of BMC before Occupancy.
|
06-02-2028
|
NOT YET STARTED
|
12 |
Provision of public washroom to be provided as per Rule-50 of ODA (P &BS) Rules, 2020.
|
06-02-2028
|
NOT YET STARTED
|
13 |
Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards)Rules-2020, or under any other law for the time being in force.
|
06-02-2028
|
NOT YET STARTED
|
14 |
Other requirements or licenses or clearances required to be obtained for the site /premises or activity under various other laws.
|
06-02-2028
|
NOT YET STARTED
|
15 |
In case of any dispute arising out of land record or in respect of right, title, interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute.
|
06-02-2028
|
NOT YET STARTED
|
16 |
Neither granting of the permit nor the approval of the drawing and specifications, nor inspections made by the Authority during erection of the building shall in any way relleve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBC 2016 and these Rules.
|
06-02-2028
|
NOT YET STARTED
|
17 |
Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the regulations; (b) Obtain, wherever applicable, from the competent Authority permissions/clearance required in connection with the proposed work:
|
06-02-2028
|
NOT YET STARTED
|
18 |
Ensure that the PMO (Project Management Organization) engaged by him shall take up site & field verification and submit stage wise report as required under Rule 14 of ODA (P & BS) Rules-2020.
|
06-02-2028
|
NOT YET STARTED
|
19 |
Register the said Apartment project over scheduled property under the Real Estate (Regulation & Development)-Act-2016.
|
06-04-2023
|
preparing to submit application for registration before RERA .
|
20 |
Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force, records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the Authority.
|
06-02-2028
|
NOT YET STARTED
|
21 |
If the Authority finds at any stage that the construction is not being carried in accordance to the sanctioned plan or is in violation of any of the provisions of these regulations, it shall notify the owner and no further construction shall be allowed until necessary corrections in the plan are made and the corrected plan is approved.
|
06-02-2028
|
NOT YET STARTED
|
Updated Changes on 07-07-2023 |
22 |
The building shall be used exclusively for Residential Apartment purpose and the use shall not be changed to any other use without prior approval of this Authority
|
06-02-2028
|
NOT YET STARTED
|
23 |
The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement
|
06-02-2028
|
NOT YET STARTED
|
24 |
Parking space measuring 19636.495qmas shown in the approved plan shall be left for parking of vehicles and no part of it shall be used for any other purpose and shall not be partitioned/closed in any manner.
|
06-02-2028
|
NOT YET STARTED
|
25 |
The land over which construction is proposed is accessible by an approved means of access of 51.82 M (Fifty One Point Eighty Two mtr) N.H in width. 6. The land in question must be in lawful ownership and peaceful possession of the applicant.
|
02-02-2028
|
NOT YET STARTED
|
26 |
The permission granted under these regulations shall remain valid up to three years from the date of issue .However the permission shall have to be revalidated before the expiry the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year.
|
06-02-2028
|
NOT YET STARTED
|
27 |
Roof top rain water shall be conveyed and discharged to the rain water Harvesting structure in the premises as per Rule-47 of ODA (Planning & Building Standards) Rules, 2020.
|
06-02-2028
|
NOT YET STARTED
|
28 |
Provision of green building norms are to be strictly followed as per Rule-51 of ODA (Planning & Building Standards) Rules, 2020.
|
06-02-2028
|
NOT YET STARTED
|
29 |
Plantation as required under the provision under Rule 30 of ODA (Planning & Building Standards) Rules, 2020.shall be strictly adhered.
|
06-02-2028
|
NOT YET STARTED
|
30 |
At least 10% of the parking shall be ear marked for visitors and 30% of the parking space shall have facility for Electrical vehicle charging points
|
06-02-2028
|
NOT YET STARTED
|
31 |
The Owner/ Applicant/Architect/Structural Engineer/PMO are fully and jointly responsible for any structural failure of building due to any earthquake/cyclone/any other natural disaster, structural/construction defects. Authority will be no way be held responsible for the same in what so ever manner.
|
06-02-2028
|
NOT YET STARTED
|
32 |
The applicant shall get the EIDP approved towards development of External infrastructure. execute it and obtain clearance from Engineering Wing of BMC before Occupancy.
|
06-02-2028
|
NOT YET STARTED
|
33 |
Provision of public washroom to be provided as per Rule-50 of ODA (P &BS) Rules, 2020.
|
06-02-2028
|
NOT YET STARTED
|
34 |
Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards)Rules-2020, or under any other law for the time being in force.
|
06-02-2028
|
NOT YET STARTED
|
35 |
Other requirements or licenses or clearances required to be obtained for the site /premises or activity under various other laws.
|
06-02-2028
|
NOT YET STARTED
|
36 |
In case of any dispute arising out of land record or in respect of right, title, interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute.
|
06-02-2028
|
NOT YET STARTED
|
37 |
Neither granting of the permit nor the approval of the drawing and specifications, nor inspections made by the Authority during erection of the building shall in any way relleve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBC 2016 and these Rules.
|
06-02-2028
|
NOT YET STARTED
|
38 |
Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the regulations; (b) Obtain, wherever applicable, from the competent Authority permissions/clearance required in connection with the proposed work:
|
06-02-2028
|
NOT YET STARTED
|
39 |
Ensure that the PMO (Project Management Organization) engaged by him shall take up site & field verification and submit stage wise report as required under Rule 14 of ODA (P & BS) Rules-2020.
|
06-02-2028
|
NOT YET STARTED
|
40 |
Register the said Apartment project over scheduled property under the Real Estate (Regulation & Development)-Act-2016.
|
06-04-2023
|
preparing to submit application for registration before RERA .
|
41 |
Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force, records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the Authority.
|
06-02-2028
|
NOT YET STARTED
|
42 |
If the Authority finds at any stage that the construction is not being carried in accordance to the sanctioned plan or is in violation of any of the provisions of these regulations, it shall notify the owner and no further construction shall be allowed until necessary corrections in the plan are made and the corrected plan is approved.
|
06-02-2028
|
NOT YET STARTED
|
Updated Changes on 14-10-2023 |
43 |
The building shall be used exclusively for Residential Apartment purpose and the use shall not be changed to any other use without prior approval of this Authority
|
06-02-2028
|
NOT YET STARTED
|
44 |
The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement
|
06-02-2028
|
NOT YET STARTED
|
45 |
Parking space measuring 19636.495qmas shown in the approved plan shall be left for parking of vehicles and no part of it shall be used for any other purpose and shall not be partitioned/closed in any manner.
|
06-02-2028
|
NOT YET STARTED
|
46 |
The land over which construction is proposed is accessible by an approved means of access of 51.82 M (Fifty One Point Eighty Two mtr) N.H in width. 6. The land in question must be in lawful ownership and peaceful possession of the applicant.
|
02-02-2028
|
NOT YET STARTED
|
47 |
The permission granted under these regulations shall remain valid up to three years from the date of issue .However the permission shall have to be revalidated before the expiry the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year.
|
06-02-2028
|
NOT YET STARTED
|
48 |
Roof top rain water shall be conveyed and discharged to the rain water Harvesting structure in the premises as per Rule-47 of ODA (Planning & Building Standards) Rules, 2020.
|
06-02-2028
|
NOT YET STARTED
|
49 |
Provision of green building norms are to be strictly followed as per Rule-51 of ODA (Planning & Building Standards) Rules, 2020.
|
06-02-2028
|
NOT YET STARTED
|
50 |
Plantation as required under the provision under Rule 30 of ODA (Planning & Building Standards) Rules, 2020.shall be strictly adhered.
|
06-02-2028
|
NOT YET STARTED
|
51 |
At least 10% of the parking shall be ear marked for visitors and 30% of the parking space shall have facility for Electrical vehicle charging points
|
06-02-2028
|
NOT YET STARTED
|
52 |
The Owner/ Applicant/Architect/Structural Engineer/PMO are fully and jointly responsible for any structural failure of building due to any earthquake/cyclone/any other natural disaster, structural/construction defects. Authority will be no way be held responsible for the same in what so ever manner.
|
06-02-2028
|
NOT YET STARTED
|
53 |
The applicant shall get the EIDP approved towards development of External infrastructure. execute it and obtain clearance from Engineering Wing of BMC before Occupancy.
|
06-02-2028
|
NOT YET STARTED
|
54 |
Provision of public washroom to be provided as per Rule-50 of ODA (P &BS) Rules, 2020.
|
06-02-2028
|
NOT YET STARTED
|
55 |
Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards)Rules-2020, or under any other law for the time being in force.
|
06-02-2028
|
NOT YET STARTED
|
56 |
Other requirements or licenses or clearances required to be obtained for the site /premises or activity under various other laws.
|
06-02-2028
|
NOT YET STARTED
|
57 |
In case of any dispute arising out of land record or in respect of right, title, interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute.
|
06-02-2028
|
NOT YET STARTED
|
58 |
Neither granting of the permit nor the approval of the drawing and specifications, nor inspections made by the Authority during erection of the building shall in any way relleve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBC 2016 and these Rules.
|
06-02-2028
|
NOT YET STARTED
|
59 |
Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the regulations; (b) Obtain, wherever applicable, from the competent Authority permissions/clearance required in connection with the proposed work:
|
06-02-2028
|
NOT YET STARTED
|
60 |
Ensure that the PMO (Project Management Organization) engaged by him shall take up site & field verification and submit stage wise report as required under Rule 14 of ODA (P & BS) Rules-2020.
|
06-02-2028
|
NOT YET STARTED
|
61 |
Register the said Apartment project over scheduled property under the Real Estate (Regulation & Development)-Act-2016.
|
06-04-2023
|
preparing to submit application for registration before RERA .
|
62 |
Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force, records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the Authority.
|
06-02-2028
|
NOT YET STARTED
|
63 |
If the Authority finds at any stage that the construction is not being carried in accordance to the sanctioned plan or is in violation of any of the provisions of these regulations, it shall notify the owner and no further construction shall be allowed until necessary corrections in the plan are made and the corrected plan is approved.
|
06-02-2028
|
NOT YET STARTED
|
Updated Changes on 14-01-2024 |
64 |
The building shall be used exclusively for Residential Apartment purpose and the use shall not be changed to any other use without prior approval of this Authority
|
06-02-2028
|
NOT YET STARTED
|
65 |
The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement
|
06-02-2028
|
NOT YET STARTED
|
66 |
Parking space measuring 19636.495qmas shown in the approved plan shall be left for parking of vehicles and no part of it shall be used for any other purpose and shall not be partitioned/closed in any manner.
|
06-02-2028
|
NOT YET STARTED
|
67 |
The land over which construction is proposed is accessible by an approved means of access of 51.82 M (Fifty One Point Eighty Two mtr) N.H in width. 6. The land in question must be in lawful ownership and peaceful possession of the applicant.
|
02-02-2028
|
NOT YET STARTED
|
68 |
The permission granted under these regulations shall remain valid up to three years from the date of issue .However the permission shall have to be revalidated before the expiry the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year.
|
06-02-2028
|
NOT YET STARTED
|
69 |
Roof top rain water shall be conveyed and discharged to the rain water Harvesting structure in the premises as per Rule-47 of ODA (Planning & Building Standards) Rules, 2020.
|
06-02-2028
|
NOT YET STARTED
|
70 |
Provision of green building norms are to be strictly followed as per Rule-51 of ODA (Planning & Building Standards) Rules, 2020.
|
06-02-2028
|
NOT YET STARTED
|
71 |
Plantation as required under the provision under Rule 30 of ODA (Planning & Building Standards) Rules, 2020.shall be strictly adhered.
|
06-02-2028
|
NOT YET STARTED
|
72 |
At least 10% of the parking shall be ear marked for visitors and 30% of the parking space shall have facility for Electrical vehicle charging points
|
06-02-2028
|
NOT YET STARTED
|
73 |
The Owner/ Applicant/Architect/Structural Engineer/PMO are fully and jointly responsible for any structural failure of building due to any earthquake/cyclone/any other natural disaster, structural/construction defects. Authority will be no way be held responsible for the same in what so ever manner.
|
06-02-2028
|
NOT YET STARTED
|
74 |
The applicant shall get the EIDP approved towards development of External infrastructure. execute it and obtain clearance from Engineering Wing of BMC before Occupancy.
|
06-02-2028
|
NOT YET STARTED
|
75 |
Provision of public washroom to be provided as per Rule-50 of ODA (P &BS) Rules, 2020.
|
06-02-2028
|
NOT YET STARTED
|
76 |
Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards)Rules-2020, or under any other law for the time being in force.
|
06-02-2028
|
NOT YET STARTED
|
77 |
Other requirements or licenses or clearances required to be obtained for the site /premises or activity under various other laws.
|
06-02-2028
|
NOT YET STARTED
|
78 |
In case of any dispute arising out of land record or in respect of right, title, interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute.
|
06-02-2028
|
NOT YET STARTED
|
79 |
Neither granting of the permit nor the approval of the drawing and specifications, nor inspections made by the Authority during erection of the building shall in any way relleve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBC 2016 and these Rules.
|
06-02-2028
|
NOT YET STARTED
|
80 |
Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the regulations; (b) Obtain, wherever applicable, from the competent Authority permissions/clearance required in connection with the proposed work:
|
06-02-2028
|
NOT YET STARTED
|
81 |
Ensure that the PMO (Project Management Organization) engaged by him shall take up site & field verification and submit stage wise report as required under Rule 14 of ODA (P & BS) Rules-2020.
|
06-02-2028
|
NOT YET STARTED
|
82 |
Register the said Apartment project over scheduled property under the Real Estate (Regulation & Development)-Act-2016.
|
06-04-2023
|
preparing to submit application for registration before RERA .
|
83 |
Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force, records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the Authority.
|
06-02-2028
|
NOT YET STARTED
|
84 |
If the Authority finds at any stage that the construction is not being carried in accordance to the sanctioned plan or is in violation of any of the provisions of these regulations, it shall notify the owner and no further construction shall be allowed until necessary corrections in the plan are made and the corrected plan is approved.
|
06-02-2028
|
NOT YET STARTED
|
Updated Changes on 15-04-2024 |
85 |
The building shall be used exclusively for Residential Apartment purpose and the use shall not be changed to any other use without prior approval of this Authority
|
06-02-2028
|
NOT YET STARTED
|
86 |
The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement
|
06-02-2028
|
NOT YET STARTED
|
87 |
Parking space measuring 19636.495qmas shown in the approved plan shall be left for parking of vehicles and no part of it shall be used for any other purpose and shall not be partitioned/closed in any manner.
|
06-02-2028
|
NOT YET STARTED
|
88 |
The land over which construction is proposed is accessible by an approved means of access of 51.82 M (Fifty One Point Eighty Two mtr) N.H in width. 6. The land in question must be in lawful ownership and peaceful possession of the applicant.
|
02-02-2028
|
NOT YET STARTED
|
89 |
The permission granted under these regulations shall remain valid up to three years from the date of issue .However the permission shall have to be revalidated before the expiry the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year.
|
06-02-2028
|
NOT YET STARTED
|
90 |
Roof top rain water shall be conveyed and discharged to the rain water Harvesting structure in the premises as per Rule-47 of ODA (Planning & Building Standards) Rules, 2020.
|
06-02-2028
|
NOT YET STARTED
|
91 |
Provision of green building norms are to be strictly followed as per Rule-51 of ODA (Planning & Building Standards) Rules, 2020.
|
06-02-2028
|
NOT YET STARTED
|
92 |
Plantation as required under the provision under Rule 30 of ODA (Planning & Building Standards) Rules, 2020.shall be strictly adhered.
|
06-02-2028
|
NOT YET STARTED
|
93 |
At least 10% of the parking shall be ear marked for visitors and 30% of the parking space shall have facility for Electrical vehicle charging points
|
06-02-2028
|
NOT YET STARTED
|
94 |
The Owner/ Applicant/Architect/Structural Engineer/PMO are fully and jointly responsible for any structural failure of building due to any earthquake/cyclone/any other natural disaster, structural/construction defects. Authority will be no way be held responsible for the same in what so ever manner.
|
06-02-2028
|
NOT YET STARTED
|
95 |
The applicant shall get the EIDP approved towards development of External infrastructure. execute it and obtain clearance from Engineering Wing of BMC before Occupancy.
|
06-02-2028
|
NOT YET STARTED
|
96 |
Provision of public washroom to be provided as per Rule-50 of ODA (P &BS) Rules, 2020.
|
06-02-2028
|
NOT YET STARTED
|
97 |
Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards)Rules-2020, or under any other law for the time being in force.
|
06-02-2028
|
NOT YET STARTED
|
98 |
Other requirements or licenses or clearances required to be obtained for the site /premises or activity under various other laws.
|
06-02-2028
|
NOT YET STARTED
|
99 |
In case of any dispute arising out of land record or in respect of right, title, interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute.
|
06-02-2028
|
NOT YET STARTED
|
100 |
Neither granting of the permit nor the approval of the drawing and specifications, nor inspections made by the Authority during erection of the building shall in any way relleve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBC 2016 and these Rules.
|
06-02-2028
|
NOT YET STARTED
|
101 |
Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the regulations; (b) Obtain, wherever applicable, from the competent Authority permissions/clearance required in connection with the proposed work:
|
06-02-2028
|
NOT YET STARTED
|
102 |
Ensure that the PMO (Project Management Organization) engaged by him shall take up site & field verification and submit stage wise report as required under Rule 14 of ODA (P & BS) Rules-2020.
|
06-02-2028
|
NOT YET STARTED
|
103 |
Register the said Apartment project over scheduled property under the Real Estate (Regulation & Development)-Act-2016.
|
06-04-2023
|
preparing to submit application for registration before RERA .
|
104 |
Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force, records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the Authority.
|
06-02-2028
|
NOT YET STARTED
|
105 |
If the Authority finds at any stage that the construction is not being carried in accordance to the sanctioned plan or is in violation of any of the provisions of these regulations, it shall notify the owner and no further construction shall be allowed until necessary corrections in the plan are made and the corrected plan is approved.
|
06-02-2028
|
NOT YET STARTED
|