Generated by pacms.orera.in on date: 2024-06-30

Promoter Details
Promoter Name :
Tangudu Vikram Mahesh
Project Name :
Sri Sai Venkata Ramana Enclaves
Project Location :
( Residential Project, S+G+4, No. of Units- 40

Form- I

A. Promoter's Details

:  VSP DEVELOPPERS :  Partnership
:  710/2015 :View
NA :  RAIBABU STREET, PANINALA SAHI, JEYPORE-764001,DIST-KORAPUT(ODISHA)
:  Raibabu Street, Paninala Sahi, Jeypore, Dist- Koraput, Odisha- 764001. :  vikrammahesh73@gmail.com
:  295169 :  9502595518
:  AANFV0862E :View
:  21 YEARS EXPERIENCES IN CIVIL CONSTRUCTION :  NO
NA

B. Details of Board of Directors / Partners / MC Members

:  Tangudu Vikram Mahesh :  
:  Partner :  ACFPT8814Q
:PAN Card :  vikrammahesh73@gmail.com
:  BCOM . LLB :  9502595518
:  21 YEARS EXPERIENCES IN CIVIL CONSTRUCTION
:  Yes :  NA
:  TANGUDU PADMAJA :  
:  Partner :  ADKPT5025F
:PAN Card :  vikrammahesh73@gmail.com
:  EIGHTH CLASS :  9502595518
:  HOUSE MAKER
:  Yes :  NA
:  ANDAVARAPU PRASAD RAO :  
:  Partner :  AGHPP0834A
:PAN Card :  prasad.andavarapu@yahoo.co.in
:  BCOM :  8895241090
:  6 YEARS EXPERIENCES CIVIL CONSTRUCTION
:  Yes :  NA
:  ANDAVARAPU SUKANYA :  
:  Partner :  AFJPA9315C
:PAN Card :  prasad.andavarapu@yahoo.co.in
:  TEN CLASS :  8270686040
:  HOUSE MAKER
:  Yes :  NA

Annexure-1

Details of last projects already implemented (Ongoing or Complete)

Have you implemented any project(s) previously (May be Ongoing or Completed):No

Annexure-2

Details of the project to be registered

:   Yes Copy of Permission Order
:   100000 :   No
:   Ongoing :  Sri Sai Venkata Ramana Enclaves
:  Residential :  ( Residential Project, S+G+4, No. of Units- 40
:  Koraput :  Jeypore MPL
:  764001 :  Regional Improvement Trust
:  Koraput Regional Improvement Trust Jeypore
:  S+G+4 :  NA

Land Details of the Project


:  270/2711 :  263/1336
:  JEYPORE-LR, JEYPORE TOWN :  1295.46
:  Yes
Yes :  View
:  View
:  Other Person
:  DR.DARA VENKATA RAMANA RAO :  DR.DARA VENKATA RAMANA RAO EXECUTED GPA TO M/S. VSP DEVELOPPERS , ON HIS DEATH HER WIFE SMT DARA SUBHDRA EXECUTED IRREVOCABLE GPA TO VSP DEVELOPPERS
: Yes
:  11171503208 :  01-12-2015
:  DSRO- JEYPORE,KORAPUT :  Attached
: Yes
:  11172102165 :  12-08-2021
:  DISTRIC SUB-REGISTER JEYPORE,KORAPUT :  Attached

Development Agreement

: Yes
Serial No. Particulars of the Person Land/Plot Details Share of the Person Document Attached
1 DR.DARA VENKATA RAMANA RAO,SMT-DARA SUBHADRA PLOT NO-270/2711 35%   Agreement Copy

Building Plan

  View   View
  Download site plan 20-02-2023

Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 The Building shall be exclusively used for residential Purpose 14-12-2021 JUST YET START
2 Construction of any nature shall take place beyond 10'-0" ft. from boundary of your plot and 25'-0" from the Centre of theapproach road in the south & East side & 22,-6" in the North side 15-05-2023 JUST YET START
3 The building shall be constructed strictly according to the plan approved in this licence 12-06-2023 JUST YET START
4 The licence shall be valid for 3(Three) Years from the date of issue and renwal before expire of the above period 12-07-2023 JUST YET START
5 The building plan shall be got approved by Jeypore Municipality and any restriction imposed by the said Municipality shall be strictly adhered to 15-06-2023 JUST YET START
6 :i,:°Sme:]ybybtehetrsea::e¥uans'C:Pr:I:tty ::all;se s3t:'C;i) a:fhet:eed to°d,sha Town piaor„ng & Improvement Trust Act.1956. a This does not Include any encroachment or projection in the form of [jai'c`'jiiy or otlicirwise on land not owned by you. b.ChangeofuseotherthanapprovedwiHbetreatedasun-authorjsed. cAny c]eviatlon of construction from the approved plan wlH lje trea„`d unauthorized. d Fresh licence shaH be obtained for any change of use and dimensi()n` of the buj,ding 09-11-2022 JUST YET START
7 In case the land in question is agricultural, the permitted shaH obtain necessary permission for conversion of the use to nom agricultural purpose as reqiiired under section 8 of the Orissa Land Reforms Act,1960, before started construction 21-06-2023 JUST YET START
8 In case of any dispute over ownership of land, the licence so granted w" be automatically cancelled. 20-04-2023 JUST YET START
9 The Set-backs as indicated ln the building plan shaH be strictly adhered. The set-back space around the building shau be free from any obstruction by making standby mode of any type of vehicle to provide all time clear drive way 16-08-2023 JUST YET START
10 The appllcant is required to obtain necessary permission from the G E D/Electrlcal Inspector regarding safety of electrical installation 17-05-2023 JUST YET START
11 The applicant is required to provide necessary arrangements for disposal of house hold wastes and other waste water without insisting the existing waste water disposal systems of Municipality. 13-09-2023 JUST YET START
12 The applicant is required to provide necessary arrangements for disposal of house hold wastes and other waste water without insisting the existing waste water disposal systems of Municipality 24-08-2023 JUST YET START
13 The developer shaH make an arrangement for supply of drinking water and shaH not Insist upon PHED for providing water from the city water supply system 20-09-2023 JUST YET START
14 The builder shau instaH one Electrical sub-station of required capacity in consultat`ion with SOuTHCO A`'thority. 14-11-2023 JUST YET START
15 At least 20% of the land shaH be used for plantation & the plantatlon 511aH be completed in proper landscape planning by the time of the construction of the building work is completed 10-01-2024 JUST YET START

Layout Plan

: Yes :  View

Location Map with geo-coordinates of bend points

Point No. Latitude Longitude
1 18°52'01.8''N 82°34'41.5''E
2 18°52'02.9''N 82°34'42.1''E
3 18°52'02.3''N 82°34'43.3''E
4 18°52'01.2''N 82°34'42.6''E
View

Milestone of Project Construction

Description* Scheduled date of completion Current Status Site Images
Site Development 23-03-2016 WORK IN PROGRESS
Roof Casting NA NA NA
Ground Floor/Stilt Floor 10-01-2018 WORK IN PROGRESS NA
1 Floor 16-03-2018 WORK IN PROGRESS NA
2 Floor 12-04-2018 WORK IN PROGRESS NA
3 Floor 18-05-2018 WORK IN PROGRESS NA
4 Floor 22-06-2018 WORK IN PROGRESS NA
Brick Work & Plastering NA NA NA
Ground Floor/Stilt Floor 30-06-2019 WORK IN PROGRESS NA
1 Floor 19-07-2019 WORK IN PROGRESS NA
2 Floor 17-08-2020 WORK IN PROGRESS NA
3 Floor 22-09-2020 WORK IN PROGRESS NA
4 Floor 18-10-2020 WORK IN PROGRESS NA
Electrical Works 23-11-2020 WORK IN PROGRESS NA
Concealed Cabling including Plugs & switches 21-12-2020 WORK IN PROGRESS NA
Installation & Charging of Transformer 27-01-2021 WORK IN PROGRESS NA
Connection to Flats/Apartments 16-02-2021 WORK IN PROGRESS NA
PH works 14-03-2021 WORK IN PROGRESS NA
Laying of concealed Pipes 24-05-2021 WORK IN PROGRESS NA
PH Fittings 21-06-2021 WORK IN PROGRESS NA
Overhead Water Tanks 28-07-2022 WORK IN PROGRESS NA
Water Supply Connection to all units 29-08-2022 WORK IN PROGRESS NA
STP construction and completion 18-10-2022 WORK IN PROGRESS NA
Distempering & Colouring of all units and exteriors 25-10-2022 WORK IN PROGRESS NA
Fixation of doors and windows 23-11-2022 WORK IN PROGRESS NA
Scheduled Date of handing over possession 31-01-2023 WORK IN PROGRESS NA
Development of common areas, parks, gardens etc 21-12-2022 WORK IN PROGRESS NA
Site Development 23-03-2016 WORK IN PROGRESS NA
NA NA NA NA
Ground Floor/Stilt Floor 10-01-2018 WORK IN PROGRESS
1 Floor 16-03-2018 WORK IN PROGRESS
2 Floor 12-04-2018 WORK IN PROGRESS
3 Floor 18-05-2018 WORK IN PROGRESS NA
4 Floor 22-06-2018 WORK IN PROGRESS NA
NA NA NA NA
Ground Floor/Stilt Floor 30-06-2019 WORK IN PROGRESS NA
1 Floor 19-07-2019 WORK IN PROGRESS NA
2 Floor 17-08-2020 WORK IN PROGRESS NA
3 Floor 22-09-2020 WORK IN PROGRESS NA
4 Floor 18-10-2020 WORK IN PROGRESS NA
Electrical Works 23-11-2020 WORK IN PROGRESS NA
Concealed Cabling including Plugs & switches 21-12-2020 WORK IN PROGRESS NA
Installation & Charging of Transformer 27-01-2021 WORK IN PROGRESS NA
Connection to Flats/Apartments 16-02-2021 WORK IN PROGRESS NA
PH works 14-03-2021 WORK IN PROGRESS NA
Laying of concealed Pipes 24-05-2021 WORK IN PROGRESS NA
PH Fittings 21-06-2021 WORK IN PROGRESS NA
Overhead Water Tanks 28-07-2022 WORK IN PROGRESS NA
Water Supply Connection to all units 29-08-2022 WORK IN PROGRESS NA
STP construction and completion 18-10-2022 WORK IN PROGRESS NA
Distempering & Colouring of all units and exteriors 25-10-2022 WORK IN PROGRESS NA
Fixation of doors and windows 23-11-2022 WORK IN PROGRESS NA
Scheduled Date of handing over possession 31-01-2023 WORK IN PROGRESS NA
Development of common areas, parks, gardens etc 21-12-2022 WORK IN PROGRESS NA
Site Development 23-03-2016 85 % COMPLETED NA
NA 09-03-2017 85 % COMPLETED NA
Ground Floor/Stilt Floor 10-01-2018 85 % COMPLETED NA
1 Floor 16-03-2018 85 % COMPLETED NA
2 Floor 12-04-2018 85 % COMPLETED NA
3 Floor 18-05-2018 85 % COMPLETED NA
4 Floor 22-06-2018 85 % COMPLETED NA
NA 05-09-2018 85 % COMPLETED NA
Ground Floor/Stilt Floor 30-06-2019 85 % COMPLETED NA
1 Floor 19-07-2019 85 % COMPLETED NA
2 Floor 17-08-2020 85 % COMPLETED NA
3 Floor 22-09-2020 85 % COMPLETED NA
4 Floor 18-10-2020 85 % COMPLETED NA
Electrical Works 23-11-2020 85 % COMPLETED NA
Concealed Cabling including Plugs & switches 21-12-2020 85 % COMPLETED NA
Installation & Charging of Transformer 27-01-2021 85 % COMPLETED NA
Connection to Flats/Apartments 16-02-2021 85 % COMPLETED NA
PH works 14-03-2021 85 % COMPLETED NA
Laying of concealed Pipes 24-05-2021 85 % COMPLETED NA
PH Fittings 21-06-2021 85 % COMPLETED NA
Overhead Water Tanks 28-07-2022 85 % COMPLETED NA
Water Supply Connection to all units 29-08-2022 85 % COMPLETED NA
STP construction and completion 18-10-2022 85 % COMPLETED NA
Distempering & Colouring of all units and exteriors 25-10-2022 85 % COMPLETED NA
Fixation of doors and windows 23-11-2022 85 % COMPLETED NA
Scheduled Date of handing over possession 31-01-2023 85 % COMPLETED NA
Development of common areas, parks, gardens etc 21-12-2022 85 % COMPLETED NA
Site Development 23-03-2016 85 % COMPLETED NA
NA 09-03-2017 85 % COMPLETED NA
Ground Floor/Stilt Floor 10-01-2018 85 % COMPLETED NA
1 Floor 16-03-2018 85 % COMPLETED NA
2 Floor 12-04-2018 85 % COMPLETED NA
3 Floor 18-05-2018 85 % COMPLETED NA
4 Floor 22-06-2018 85 % COMPLETED NA
NA 05-09-2018 85 % COMPLETED NA
Ground Floor/Stilt Floor 30-06-2019 85 % COMPLETED NA
1 Floor 19-07-2019 85 % COMPLETED NA
2 Floor 17-08-2020 85 % COMPLETED NA
3 Floor 22-09-2020 85 % COMPLETED NA
4 Floor 18-10-2020 85 % COMPLETED NA
Electrical Works 23-11-2020 85 % COMPLETED NA
Concealed Cabling including Plugs & switches 21-12-2020 85 % COMPLETED NA
Installation & Charging of Transformer 27-01-2021 85 % COMPLETED NA
Connection to Flats/Apartments 16-02-2021 85 % COMPLETED NA
PH works 14-03-2021 85 % COMPLETED NA
Laying of concealed Pipes 24-05-2021 85 % COMPLETED NA
PH Fittings 21-06-2021 85 % COMPLETED NA
Overhead Water Tanks 28-07-2022 85 % COMPLETED NA
Water Supply Connection to all units 29-08-2022 85 % COMPLETED NA
STP construction and completion 18-10-2022 85 % COMPLETED NA
Distempering & Colouring of all units and exteriors 25-10-2022 85 % COMPLETED NA
Fixation of doors and windows 23-11-2022 85 % COMPLETED NA
Scheduled Date of handing over possession 31-01-2023 85 % COMPLETED NA
Development of common areas, parks, gardens etc 21-12-2022 85 % COMPLETED NA

Category and no. of units to be developed

:  Residential
:  
:  40
:  
:  
:  
Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership
Carpet Area Balcony Area Exclusive Open Terrace Area
1 A-101 64.29 Sqmt 7.56 Sqmt 00 Promoter
2 A-102 52.70 Sqmt 3.52 Sqmt 00 Land Owner
3 A-103 52.91 Sqmt 3.30 Sqmt 00 Land Owner
4 A-104 65.76 Sqmt 4.08 Sqmt 00 Promoter
5 A-201 64.29 Sqmt 7.56 Sqmt 00 Promoter
6 A-202 52.70 Sqmt 3.52 Sqmt 00 Promoter
7 A-203 52.91 Sqmt 3.30 Sqmt 00 Promoter
8 A-204 65.76 Sqmt 4.08 Sqmt 00 Promoter
9 A-301 64.29 Sqmt 7.56 Sqmt 00 Promoter
10 A-302 52.70 Sqmt 3.52 Sqmt 00 Promoter
11 A-303 52.91 Sqmt 3.30 Sqmt 00 Land Owner
12 A-304 65.76 Sqmt 4.08 Sqmt 00 Promoter
13 A-401 64.29 Sqmt 7.56 Sqmt 00 Promoter
14 A-402 52.70 Sqmt 3.52 Sqmt 00 Land Owner
15 A-403 52.91 Sqmt 3.30 Sqmt 00 Promoter
16 A-404 65.76 Sqmt 4.08 Sqmt 00 Promoter
17 A-501 64.29 Sqmt 7.56 Sqmt 00 Promoter
18 A-502 52.70 Sqmt 3.52 Sqmt 00 Promoter
19 A-503 52.91 Sqmt 3.30 Sqmt 00 Land Owner
20 A-504 65.76 Sqmt 4.08 Sqmt 00 Promoter
21 B-101 64.29 Sqmt 7.56 Sqmt 00 Promoter
22 B-102 52.70 Sqmt 3.52 Sqmt 00 Promoter
23 B-103 52.91 Sqmt 3.30 Sqmt 00 Promoter
24 B-104 65.76 Sqmt 4.08 Sqmt 00 Land Owner
25 B-201 64.29 Sqmt 7.56 Sqmt 00 Promoter
26 B-202 52.70 Sqmt 3.52 Sqmt 00 Land Owner
27 B-203 52.91 Sqmt 3.30 Sqmt 00 Land Owner
28 B-204 65.76 Sqmt 4.08 Sqmt 00 Promoter
29 B-301 64.29 Sqmt 7.56 Sqmt 00 Promoter
30 B-302 52.70 Sqmt 3.52 Sqmt 00 Promoter
31 B-303 52.91 Sqmt 3.30 Sqmt 00 Promoter
32 B-304 65.76 Sqmt 4.08 Sqmt 00 Land Owner
33 B-401 64.29 Sqmt 7.56 Sqmt 00 Promoter
34 B-402 52.70 Sqmt 3.52 Sqmt 00 Promoter
35 B-403 52.91 Sqmt 3.30 Sqmt 00 Promoter
36 B-404 65.76 Sqmt 4.08 Sqmt 00 Land Owner
37 B-501 64.29 Sqmt 7.56 Sqmt 00 Promoter
38 B-502 52.70 Sqmt 3.52 Sqmt 00 Promoter
39 B-503 52.91 Sqmt 3.30 Sqmt 00 Promoter
40 B-504 65.76 Sqmt 4.08 Sqmt 00 Land Owner
Types of garages and parking
House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
A-101 Covered Parking A-101 3.04m X 2.44m 7.42 Sqmt Included
A-102 Covered Parking A-102 3.04m X 2.44m 7.42 Sqmt Included
A-103 Covered Parking A-103 3.04m X 2.44m 7.42 Sqmt Included
A-104 Covered Parking A-104 3.04m X 2.44m 7.42 Sqmt Included
A-201 Covered Parking A-201 3.04m X 2.44m 7.42 Sqmt Included
A-202 Covered Parking A-202 3.04m X 2.44m 7.42 Sqmt Included
A-203 Covered Parking A-203 3.04m X 2.44m 7.42 Sqmt Included
A-204 Covered Parking A-204 3.04m X 2.44m 7.42 Sqmt Included
A-301 Covered Parking A-301 3.04m X 2.44m 7.42 Sqmt Included
A-302 Covered Parking A-302 3.04m X 2.44m 7.42 Sqmt Included
A-303 Covered Parking A-303 3.04m X 2.44m 7.42 Sqmt Included
A-304 Covered Parking A-304 3.04m X 2.44m 7.42 Sqmt Included
A-401 Covered Parking A-401 3.04m X 2.44m 7.42 Sqmt Included
A-402 Covered Parking A-402 3.04m X 2.44m 7.42 Sqmt Included
A-403 Covered Parking A-403 3.04m X 2.44m 7.42 Sqmt Included
A-404 Covered Parking A-404 3.04m X 2.44m 7.42 Sqmt Included
A-501 Covered Parking A-501 3.04m X 2.44m 7.42 Sqmt Included
A-502 Covered Parking A-502 3.04m X 2.44m 7.42 Sqmt Included
A-503 Covered Parking A-503 3.04m X 2.44m 7.42 Sqmt Included
A-504 Covered Parking A-504 3.04m X 2.44m 7.42 Sqmt Included
B-101 Covered Parking B-101 3.04m X 2.44m 7.42 Sqmt Included
B-102 Covered Parking B-102 3.04m X 2.44m 7.42 Sqmt Included
B-103 Covered Parking B-103 3.04m X 2.44m 7.42 Sqmt Included
B-104 Covered Parking B-104 3.04m X 2.44m 7.42 Sqmt Included
B-201 Covered Parking B-201 3.04m X 2.44m 7.42 Sqmt Included
B-202 Covered Parking B-202 3.04m X 2.44m 7.42 Sqmt Included
B-203 Covered Parking B-203 3.04m X 2.44m 7.42 Sqmt Included
B-204 Covered Parking B-204 3.04m X 2.44m 7.42 Sqmt Included
B-301 Covered Parking B-301 3.04m X 2.44m 7.42 Sqmt Included
B-302 Covered Parking B-302 3.04m X 2.44m 7.42 Sqmt Included
B-303 Covered Parking B-303 3.04m X 2.44m 7.42 Sqmt Included
B-304 Covered Parking B-304 3.04m X 2.44m 7.42 Sqmt Included
B-401 Covered Parking B-401 3.04m X 2.44m 7.42 Sqmt Included
B-402 Covered Parking B-402 3.04m X 2.44m 7.42 Sqmt Included
B-403 Covered Parking B-403 3.04m X 2.44m 7.42 Sqmt Included
B-404 Covered Parking B-404 3.04m X 2.44m 7.42 Sqmt Included
B-501 Covered Parking B-501 3.04m X 2.44m 7.42 Sqmt Included
B-502 Covered Parking B-502 3.04m X 2.44m 7.42 Sqmt Included
B-503 Covered Parking B-503 3.04m X 2.44m 7.42 Sqmt Included
B-504 Covered Parking B-504 3.04m X 2.44m 7.42 Sqmt Included
Yes

Facilities to be provided

Particulars of Facilities Status of the facility Brief description of facility
Drinking Water Facility Ground Water Copy of Consent Letter
Fire Fighting Facility Yes UNDER TAKING
Emergency Evacuation Services Yes STAIR CASE
Use of Renewable Energy Yes 24 HOUR DG BACK UP
Lift Facility Yes TWO NO'S OF LIFT,JHONSON BRAND,6 PERSON CAPCITY WITH ARD FACILITY.
Market Complex No
Community Hall No
Gymnasium No
Swimming Pool No
Play Ground No
Park/Garden No
Plantation Area Yes 267.55 SQMT PLANTATION AREA AROUND THE BUILDING,
Others(Please Specify) Yes 24 HOURS SCRITY
Internal Road Yes 410.66 SQMT, DRIVE WAY INTERNAL ROAD.
External Road Yes 30 FT GOVT ROADS IN TWO SIDES
Elecricity Supply Yes Copy of Consent Letter
Other Amenities Yes ALL SIDE CC CAMERA WITH 24 HOURS SCURITY

Bank Particulars of the Project

  ICICI BANK
  M.G ROAD JEYPORE
  064105021823
  ICIC0000641
   View
  230130
  9937703809

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
SAMIR KUMAR PATEL Architect ARCHITECT CONSULTANCY,272,1ST FLOOR CANAL ROAD,NEAR CHANDI MANDIR,GGP COLONY RASULGARH BHUBANESWAR-751010,MAIL-samir8229@gmail.com,PHONE NO-9238490714 CA/2006/38244,AR/298/BDA
N. ANANDA RAO Chartered Accountant PATRO & CO,NEHUR NAGAR JEYPORE-764001,DIST-KORAPUT (ODISHA),E.MAIL-narao_patro@rediffmail.com,PHONE NO-9437033114 M,NO-51656
SAMBEET KUMAR PANDA Construction Engineer ENGINEERING CONSULTANCY CELL ,,H.O-7J.E.L.C SHOPPING COMPLEX ,JEYPORE (K)-764001,E,MAIL-sambeet105@gmail.com,PHONE NO-9437092992 RTP/DTP(C.ER)-148/2018

Present Status (Ongoing project) as on date of application

  90%
  23-03-2016
  31-01-2023
  Project Status Report Copy
  550
  0
  700
  150
  DUE TO COVID-19 SHUTDOWN/LOCK DOWN

Documents Attached

Description of Document Option Documents
Fire Safety Certificate Undertaking Attached
Affidavit in Form-A as per clause-l of sub-section-2 of section-4 of the Act Yes Attached
Allotment letter format Yes Attached
Conveyance Deed Format Yes Attached
Affidavit to adopt agreement for sale format as per Rule-8(1) of ORE (R and D) Rules, 2017 Yes Attached
Annual Report 2019-20 Attached
Annual Report 2020-21 Attached
Annual Report 2021-22 Attached
IT Return 2019-20 Attached
IT Return 2020-21 Attached
IT Return 2021-22 Attached
Audit Report 2019-20 Attached
Audit Report 2020-21 Attached
Audit Report 2021-22 Attached

Additional Documents Attached

Sl. No. Title of the document Upload Document
1 LEGAL HEIR CERTIFICATE
2 DEATH CERTIFICATE OF DR.DARA VENKATA RAMANA RAO
3 STATUS REPORT
4 Status Report of Construction
5 Expenditure
6 New Status Report
7 New Allotment Letter
8 Parking Space Details
9 Validity of Approval Letter
10 Legal Report

Other documents

“I undertake that the information submitted by me in this application are correct and true to best my knowledge. I also understand that providing false or wrong information is punishable under the Section-60 of the Real Estate (Regulation & Development) Act, 2016. I also further understand that furnishing wrong or false information will lead to rejection of my application registration of the project with forfeiture of registration fee and other charges deposited by me.”
  There is no option to uploaded documents in proper place so this documents uploaded in add more documents.

Construction Progress

Updated Construction Progress

SL NO. Description Scheduled date of completion Current Status Remarks
1 Site Development 23-03-2016 WORK IN PROGRESS
2 Roof Casting NA NA NA
3 Ground Floor/Stilt Floor 10-01-2018 WORK IN PROGRESS NA
4 1 Floor 16-03-2018 WORK IN PROGRESS NA
5 2 Floor 12-04-2018 WORK IN PROGRESS NA
6 3 Floor 18-05-2018 WORK IN PROGRESS NA
7 4 Floor 22-06-2018 WORK IN PROGRESS NA
8 Brick Work & Plastering NA NA NA
9 Ground Floor/Stilt Floor 30-06-2019 WORK IN PROGRESS NA
10 1 Floor 19-07-2019 WORK IN PROGRESS NA
11 2 Floor 17-08-2020 WORK IN PROGRESS NA
12 3 Floor 22-09-2020 WORK IN PROGRESS NA
13 4 Floor 18-10-2020 WORK IN PROGRESS NA
14 Electrical Works 23-11-2020 WORK IN PROGRESS NA
15 Concealed Cabling including Plugs & switches 21-12-2020 WORK IN PROGRESS NA
16 Installation & Charging of Transformer 27-01-2021 WORK IN PROGRESS NA
17 Connection to Flats/Apartments 16-02-2021 WORK IN PROGRESS NA
18 PH works 14-03-2021 WORK IN PROGRESS NA
19 Laying of concealed Pipes 24-05-2021 WORK IN PROGRESS NA
20 PH Fittings 21-06-2021 WORK IN PROGRESS NA
21 Overhead Water Tanks 28-07-2022 WORK IN PROGRESS NA
22 Water Supply Connection to all units 29-08-2022 WORK IN PROGRESS NA
23 STP construction and completion 18-10-2022 WORK IN PROGRESS NA
24 Distempering & Colouring of all units and exteriors 25-10-2022 WORK IN PROGRESS NA
25 Fixation of doors and windows 23-11-2022 WORK IN PROGRESS NA
26 Scheduled Date of handing over possession 31-01-2023 WORK IN PROGRESS NA
27 Development of common areas, parks, gardens etc 21-12-2022 WORK IN PROGRESS NA
Updated Changes on 13-08-2023
28 Site Development 23-03-2016 WORK IN PROGRESS NA
29 NA NA NA NA
30 Ground Floor/Stilt Floor 10-01-2018 WORK IN PROGRESS
31 1 Floor 16-03-2018 WORK IN PROGRESS
32 2 Floor 12-04-2018 WORK IN PROGRESS
33 3 Floor 18-05-2018 WORK IN PROGRESS NA
34 4 Floor 22-06-2018 WORK IN PROGRESS NA
35 NA NA NA NA
36 Ground Floor/Stilt Floor 30-06-2019 WORK IN PROGRESS NA
37 1 Floor 19-07-2019 WORK IN PROGRESS NA
38 2 Floor 17-08-2020 WORK IN PROGRESS NA
39 3 Floor 22-09-2020 WORK IN PROGRESS NA
40 4 Floor 18-10-2020 WORK IN PROGRESS NA
41 Electrical Works 23-11-2020 WORK IN PROGRESS NA
42 Concealed Cabling including Plugs & switches 21-12-2020 WORK IN PROGRESS NA
43 Installation & Charging of Transformer 27-01-2021 WORK IN PROGRESS NA
44 Connection to Flats/Apartments 16-02-2021 WORK IN PROGRESS NA
45 PH works 14-03-2021 WORK IN PROGRESS NA
46 Laying of concealed Pipes 24-05-2021 WORK IN PROGRESS NA
47 PH Fittings 21-06-2021 WORK IN PROGRESS NA
48 Overhead Water Tanks 28-07-2022 WORK IN PROGRESS NA
49 Water Supply Connection to all units 29-08-2022 WORK IN PROGRESS NA
50 STP construction and completion 18-10-2022 WORK IN PROGRESS NA
51 Distempering & Colouring of all units and exteriors 25-10-2022 WORK IN PROGRESS NA
52 Fixation of doors and windows 23-11-2022 WORK IN PROGRESS NA
53 Scheduled Date of handing over possession 31-01-2023 WORK IN PROGRESS NA
54 Development of common areas, parks, gardens etc 21-12-2022 WORK IN PROGRESS NA
Updated Changes on 12-02-2024
55 Site Development 23-03-2016 85 % COMPLETED NA
56 NA 09-03-2017 85 % COMPLETED NA
57 Ground Floor/Stilt Floor 10-01-2018 85 % COMPLETED NA
58 1 Floor 16-03-2018 85 % COMPLETED NA
59 2 Floor 12-04-2018 85 % COMPLETED NA
60 3 Floor 18-05-2018 85 % COMPLETED NA
61 4 Floor 22-06-2018 85 % COMPLETED NA
62 NA 05-09-2018 85 % COMPLETED NA
63 Ground Floor/Stilt Floor 30-06-2019 85 % COMPLETED NA
64 1 Floor 19-07-2019 85 % COMPLETED NA
65 2 Floor 17-08-2020 85 % COMPLETED NA
66 3 Floor 22-09-2020 85 % COMPLETED NA
67 4 Floor 18-10-2020 85 % COMPLETED NA
68 Electrical Works 23-11-2020 85 % COMPLETED NA
69 Concealed Cabling including Plugs & switches 21-12-2020 85 % COMPLETED NA
70 Installation & Charging of Transformer 27-01-2021 85 % COMPLETED NA
71 Connection to Flats/Apartments 16-02-2021 85 % COMPLETED NA
72 PH works 14-03-2021 85 % COMPLETED NA
73 Laying of concealed Pipes 24-05-2021 85 % COMPLETED NA
74 PH Fittings 21-06-2021 85 % COMPLETED NA
75 Overhead Water Tanks 28-07-2022 85 % COMPLETED NA
76 Water Supply Connection to all units 29-08-2022 85 % COMPLETED NA
77 STP construction and completion 18-10-2022 85 % COMPLETED NA
78 Distempering & Colouring of all units and exteriors 25-10-2022 85 % COMPLETED NA
79 Fixation of doors and windows 23-11-2022 85 % COMPLETED NA
80 Scheduled Date of handing over possession 31-01-2023 85 % COMPLETED NA
81 Development of common areas, parks, gardens etc 21-12-2022 85 % COMPLETED NA
Updated Changes on 28-05-2024
82 Site Development 23-03-2016 85 % COMPLETED NA
83 NA 09-03-2017 85 % COMPLETED NA
84 Ground Floor/Stilt Floor 10-01-2018 85 % COMPLETED NA
85 1 Floor 16-03-2018 85 % COMPLETED NA
86 2 Floor 12-04-2018 85 % COMPLETED NA
87 3 Floor 18-05-2018 85 % COMPLETED NA
88 4 Floor 22-06-2018 85 % COMPLETED NA
89 NA 05-09-2018 85 % COMPLETED NA
90 Ground Floor/Stilt Floor 30-06-2019 85 % COMPLETED NA
91 1 Floor 19-07-2019 85 % COMPLETED NA
92 2 Floor 17-08-2020 85 % COMPLETED NA
93 3 Floor 22-09-2020 85 % COMPLETED NA
94 4 Floor 18-10-2020 85 % COMPLETED NA
95 Electrical Works 23-11-2020 85 % COMPLETED NA
96 Concealed Cabling including Plugs & switches 21-12-2020 85 % COMPLETED NA
97 Installation & Charging of Transformer 27-01-2021 85 % COMPLETED NA
98 Connection to Flats/Apartments 16-02-2021 85 % COMPLETED NA
99 PH works 14-03-2021 85 % COMPLETED NA
100 Laying of concealed Pipes 24-05-2021 85 % COMPLETED NA
101 PH Fittings 21-06-2021 85 % COMPLETED NA
102 Overhead Water Tanks 28-07-2022 85 % COMPLETED NA
103 Water Supply Connection to all units 29-08-2022 85 % COMPLETED NA
104 STP construction and completion 18-10-2022 85 % COMPLETED NA
105 Distempering & Colouring of all units and exteriors 25-10-2022 85 % COMPLETED NA
106 Fixation of doors and windows 23-11-2022 85 % COMPLETED NA
107 Scheduled Date of handing over possession 31-01-2023 85 % COMPLETED NA
108 Development of common areas, parks, gardens etc 21-12-2022 85 % COMPLETED NA

Booking Status

Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership Status
Carpet Area Balcony Area Exclusive Open Terrace Area
1 A-101 64.29 Sqmt 7.56 Sqmt 00 Promoter
2 A-102 52.70 Sqmt 3.52 Sqmt 00 Land Owner
3 A-103 52.91 Sqmt 3.30 Sqmt 00 Land Owner
4 A-104 65.76 Sqmt 4.08 Sqmt 00 Promoter
5 A-201 64.29 Sqmt 7.56 Sqmt 00 Promoter
6 A-202 52.70 Sqmt 3.52 Sqmt 00 Promoter
7 A-203 52.91 Sqmt 3.30 Sqmt 00 Promoter
8 A-204 65.76 Sqmt 4.08 Sqmt 00 Promoter
9 A-301 64.29 Sqmt 7.56 Sqmt 00 Promoter
10 A-302 52.70 Sqmt 3.52 Sqmt 00 Promoter
11 A-303 52.91 Sqmt 3.30 Sqmt 00 Land Owner
12 A-304 65.76 Sqmt 4.08 Sqmt 00 Promoter
13 A-401 64.29 Sqmt 7.56 Sqmt 00 Promoter
14 A-402 52.70 Sqmt 3.52 Sqmt 00 Land Owner
15 A-403 52.91 Sqmt 3.30 Sqmt 00 Promoter
16 A-404 65.76 Sqmt 4.08 Sqmt 00 Promoter
17 A-501 64.29 Sqmt 7.56 Sqmt 00 Promoter
18 A-502 52.70 Sqmt 3.52 Sqmt 00 Promoter
19 A-503 52.91 Sqmt 3.30 Sqmt 00 Land Owner
20 A-504 65.76 Sqmt 4.08 Sqmt 00 Promoter
21 B-101 64.29 Sqmt 7.56 Sqmt 00 Promoter
22 B-102 52.70 Sqmt 3.52 Sqmt 00 Promoter
23 B-103 52.91 Sqmt 3.30 Sqmt 00 Promoter
24 B-104 65.76 Sqmt 4.08 Sqmt 00 Land Owner
25 B-201 64.29 Sqmt 7.56 Sqmt 00 Promoter
26 B-202 52.70 Sqmt 3.52 Sqmt 00 Land Owner
27 B-203 52.91 Sqmt 3.30 Sqmt 00 Land Owner
28 B-204 65.76 Sqmt 4.08 Sqmt 00 Promoter
29 B-301 64.29 Sqmt 7.56 Sqmt 00 Promoter
30 B-302 52.70 Sqmt 3.52 Sqmt 00 Promoter
31 B-303 52.91 Sqmt 3.30 Sqmt 00 Promoter
32 B-304 65.76 Sqmt 4.08 Sqmt 00 Land Owner
33 B-401 64.29 Sqmt 7.56 Sqmt 00 Promoter
34 B-402 52.70 Sqmt 3.52 Sqmt 00 Promoter
35 B-403 52.91 Sqmt 3.30 Sqmt 00 Promoter
36 B-404 65.76 Sqmt 4.08 Sqmt 00 Land Owner
37 B-501 64.29 Sqmt 7.56 Sqmt 00 Promoter
38 B-502 52.70 Sqmt 3.52 Sqmt 00 Promoter
39 B-503 52.91 Sqmt 3.30 Sqmt 00 Promoter
40 B-504 65.76 Sqmt 4.08 Sqmt 00 Land Owner

Financial Status

SL No. Funds Collected from the Allottees Funds Borrowed from Financial Institutions Funds Employed from Own Sources Expenditure As On Date Status
1 1155000 0 550000 1705000 30-06-2022 75%
2 1275000 2600000 2600000 3875000 31-12-2022 UNDER PROGRESS
3 65000 0 750000 815000 15-07-2023 85 % WORK COMPLETED IN BLOCK-B
4 4951200 0 250000 5383949 12-01-2024 85% completed
5 500000 0 789217 789217 28-04-2024 UNDER PROGRESS

Updated Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 The Building shall be exclusively used for residential Purpose 14-12-2021 JUST YET START
2 Construction of any nature shall take place beyond 10'-0" ft. from boundary of your plot and 25'-0" from the Centre of theapproach road in the south & East side & 22,-6" in the North side 15-05-2023 JUST YET START
3 The building shall be constructed strictly according to the plan approved in this licence 12-06-2023 JUST YET START
4 The licence shall be valid for 3(Three) Years from the date of issue and renwal before expire of the above period 12-07-2023 JUST YET START
5 The building plan shall be got approved by Jeypore Municipality and any restriction imposed by the said Municipality shall be strictly adhered to 15-06-2023 JUST YET START
6 :i,:°Sme:]ybybtehetrsea::e¥uans'C:Pr:I:tty ::all;se s3t:'C;i) a:fhet:eed to°d,sha Town piaor„ng & Improvement Trust Act.1956. a This does not Include any encroachment or projection in the form of [jai'c`'jiiy or otlicirwise on land not owned by you. b.ChangeofuseotherthanapprovedwiHbetreatedasun-authorjsed. cAny c]eviatlon of construction from the approved plan wlH lje trea„`d unauthorized. d Fresh licence shaH be obtained for any change of use and dimensi()n` of the buj,ding 09-11-2022 JUST YET START
7 In case the land in question is agricultural, the permitted shaH obtain necessary permission for conversion of the use to nom agricultural purpose as reqiiired under section 8 of the Orissa Land Reforms Act,1960, before started construction 21-06-2023 JUST YET START
8 In case of any dispute over ownership of land, the licence so granted w" be automatically cancelled. 20-04-2023 JUST YET START
9 The Set-backs as indicated ln the building plan shaH be strictly adhered. The set-back space around the building shau be free from any obstruction by making standby mode of any type of vehicle to provide all time clear drive way 16-08-2023 JUST YET START
10 The appllcant is required to obtain necessary permission from the G E D/Electrlcal Inspector regarding safety of electrical installation 17-05-2023 JUST YET START
11 The applicant is required to provide necessary arrangements for disposal of house hold wastes and other waste water without insisting the existing waste water disposal systems of Municipality. 13-09-2023 JUST YET START
12 The applicant is required to provide necessary arrangements for disposal of house hold wastes and other waste water without insisting the existing waste water disposal systems of Municipality 24-08-2023 JUST YET START
13 The developer shaH make an arrangement for supply of drinking water and shaH not Insist upon PHED for providing water from the city water supply system 20-09-2023 JUST YET START
14 The builder shau instaH one Electrical sub-station of required capacity in consultat`ion with SOuTHCO A`'thority. 14-11-2023 JUST YET START
15 At least 20% of the land shaH be used for plantation & the plantatlon 511aH be completed in proper landscape planning by the time of the construction of the building work is completed 10-01-2024 JUST YET START
Updated Changes on 10-06-2022
16 The Building shall be exclusively used for residential Purpose 14-12-2021 JUST YET START
17 Construction of any nature shall take place beyond 10'-0" ft. from boundary of your plot and 25'-0" from the Centre of theapproach road in the south & East side & 22,-6" in the North side 15-05-2023 JUST YET START
18 The building shall be constructed strictly according to the plan approved in this licence 12-06-2023 JUST YET START
19 The licence shall be valid for 3(Three) Years from the date of issue and renwal before expire of the above period 12-07-2023 JUST YET START
20 The building plan shall be got approved by Jeypore Municipality and any restriction imposed by the said Municipality shall be strictly adhered to 15-06-2023 JUST YET START
21 :i,:°Sme:]ybybtehetrsea::e¥uans'C:Pr:I:tty ::all;se s3t:'C;i) a:fhet:eed to°d,sha Town piaor„ng & Improvement Trust Act.1956. a This does not Include any encroachment or projection in the form of [jai'c`'jiiy or otlicirwise on land not owned by you. b.ChangeofuseotherthanapprovedwiHbetreatedasun-authorjsed. cAny c]eviatlon of construction from the approved plan wlH lje trea„`d unauthorized. d Fresh licence shaH be obtained for any change of use and dimensi()n` of the buj,ding 09-11-2022 JUST YET START
22 In case the land in question is agricultural, the permitted shaH obtain necessary permission for conversion of the use to nom agricultural purpose as reqiiired under section 8 of the Orissa Land Reforms Act,1960, before started construction 21-06-2023 JUST YET START
23 In case of any dispute over ownership of land, the licence so granted w" be automatically cancelled. 20-04-2023 JUST YET START
24 The Set-backs as indicated ln the building plan shaH be strictly adhered. The set-back space around the building shau be free from any obstruction by making standby mode of any type of vehicle to provide all time clear drive way 16-08-2023 JUST YET START
25 The appllcant is required to obtain necessary permission from the G E D/Electrlcal Inspector regarding safety of electrical installation 17-05-2023 JUST YET START
26 The applicant is required to provide necessary arrangements for disposal of house hold wastes and other waste water without insisting the existing waste water disposal systems of Municipality. 13-09-2023 JUST YET START
27 The applicant is required to provide necessary arrangements for disposal of house hold wastes and other waste water without insisting the existing waste water disposal systems of Municipality 24-08-2023 JUST YET START
28 The developer shaH make an arrangement for supply of drinking water and shaH not Insist upon PHED for providing water from the city water supply system 20-09-2023 JUST YET START
29 The builder shau instaH one Electrical sub-station of required capacity in consultat`ion with SOuTHCO A`'thority. 14-11-2023 JUST YET START
30 At least 20% of the land shaH be used for plantation & the plantatlon 511aH be completed in proper landscape planning by the time of the construction of the building work is completed 10-01-2024 JUST YET START
Updated Changes on 11-07-2022
31 The Building shall be exclusively used for residential Purpose 14-12-2021 JUST YET START
32 Construction of any nature shall take place beyond 10'-0" ft. from boundary of your plot and 25'-0" from the Centre of theapproach road in the south & East side & 22,-6" in the North side 15-05-2023 JUST YET START
33 The building shall be constructed strictly according to the plan approved in this licence 12-06-2023 JUST YET START
34 The licence shall be valid for 3(Three) Years from the date of issue and renwal before expire of the above period 12-07-2023 JUST YET START
35 The building plan shall be got approved by Jeypore Municipality and any restriction imposed by the said Municipality shall be strictly adhered to 15-06-2023 JUST YET START
36 :i,:°Sme:]ybybtehetrsea::e¥uans'C:Pr:I:tty ::all;se s3t:'C;i) a:fhet:eed to°d,sha Town piaor„ng & Improvement Trust Act.1956. a This does not Include any encroachment or projection in the form of [jai'c`'jiiy or otlicirwise on land not owned by you. b.ChangeofuseotherthanapprovedwiHbetreatedasun-authorjsed. cAny c]eviatlon of construction from the approved plan wlH lje trea„`d unauthorized. d Fresh licence shaH be obtained for any change of use and dimensi()n` of the buj,ding 09-11-2022 JUST YET START
37 In case the land in question is agricultural, the permitted shaH obtain necessary permission for conversion of the use to nom agricultural purpose as reqiiired under section 8 of the Orissa Land Reforms Act,1960, before started construction 21-06-2023 JUST YET START
38 In case of any dispute over ownership of land, the licence so granted w" be automatically cancelled. 20-04-2023 JUST YET START
39 The Set-backs as indicated ln the building plan shaH be strictly adhered. The set-back space around the building shau be free from any obstruction by making standby mode of any type of vehicle to provide all time clear drive way 16-08-2023 JUST YET START
40 The appllcant is required to obtain necessary permission from the G E D/Electrlcal Inspector regarding safety of electrical installation 17-05-2023 JUST YET START
41 The applicant is required to provide necessary arrangements for disposal of house hold wastes and other waste water without insisting the existing waste water disposal systems of Municipality. 13-09-2023 JUST YET START
42 The applicant is required to provide necessary arrangements for disposal of house hold wastes and other waste water without insisting the existing waste water disposal systems of Municipality 24-08-2023 JUST YET START
43 The developer shaH make an arrangement for supply of drinking water and shaH not Insist upon PHED for providing water from the city water supply system 20-09-2023 JUST YET START
44 The builder shau instaH one Electrical sub-station of required capacity in consultat`ion with SOuTHCO A`'thority. 14-11-2023 JUST YET START
45 At least 20% of the land shaH be used for plantation & the plantatlon 511aH be completed in proper landscape planning by the time of the construction of the building work is completed 10-01-2024 JUST YET START
Updated Changes on 12-01-2023
46 The Building shall be exclusively used for residential Purpose 14-12-2021 JUST YET START
47 Construction of any nature shall take place beyond 10'-0" ft. from boundary of your plot and 25'-0" from the Centre of theapproach road in the south & East side & 22,-6" in the North side 15-05-2023 JUST YET START
48 The building shall be constructed strictly according to the plan approved in this licence 12-06-2023 JUST YET START
49 The licence shall be valid for 3(Three) Years from the date of issue and renwal before expire of the above period 12-07-2023 JUST YET START
50 The building plan shall be got approved by Jeypore Municipality and any restriction imposed by the said Municipality shall be strictly adhered to 15-06-2023 JUST YET START
51 :i,:°Sme:]ybybtehetrsea::e¥uans'C:Pr:I:tty ::all;se s3t:'C;i) a:fhet:eed to°d,sha Town piaor„ng & Improvement Trust Act.1956. a This does not Include any encroachment or projection in the form of [jai'c`'jiiy or otlicirwise on land not owned by you. b.ChangeofuseotherthanapprovedwiHbetreatedasun-authorjsed. cAny c]eviatlon of construction from the approved plan wlH lje trea„`d unauthorized. d Fresh licence shaH be obtained for any change of use and dimensi()n` of the buj,ding 09-11-2022 JUST YET START
52 In case the land in question is agricultural, the permitted shaH obtain necessary permission for conversion of the use to nom agricultural purpose as reqiiired under section 8 of the Orissa Land Reforms Act,1960, before started construction 21-06-2023 JUST YET START
53 In case of any dispute over ownership of land, the licence so granted w" be automatically cancelled. 20-04-2023 JUST YET START
54 The Set-backs as indicated ln the building plan shaH be strictly adhered. The set-back space around the building shau be free from any obstruction by making standby mode of any type of vehicle to provide all time clear drive way 16-08-2023 JUST YET START
55 The appllcant is required to obtain necessary permission from the G E D/Electrlcal Inspector regarding safety of electrical installation 17-05-2023 JUST YET START
56 The applicant is required to provide necessary arrangements for disposal of house hold wastes and other waste water without insisting the existing waste water disposal systems of Municipality. 13-09-2023 JUST YET START
57 The applicant is required to provide necessary arrangements for disposal of house hold wastes and other waste water without insisting the existing waste water disposal systems of Municipality 24-08-2023 JUST YET START
58 The developer shaH make an arrangement for supply of drinking water and shaH not Insist upon PHED for providing water from the city water supply system 20-09-2023 JUST YET START
59 The builder shau instaH one Electrical sub-station of required capacity in consultat`ion with SOuTHCO A`'thority. 14-11-2023 JUST YET START
60 At least 20% of the land shaH be used for plantation & the plantatlon 511aH be completed in proper landscape planning by the time of the construction of the building work is completed 10-01-2024 JUST YET START
Updated Changes on 13-08-2023
61 The Building shall be exclusively used for residential Purpose 14-12-2021 85 % WORK COMPLETED IN BLOCK-B
62 Construction of any nature shall take place beyond 10'-0" ft. from boundary of your plot and 25'-0" from the Centre of theapproach road in the south & East side & 22,-6" in the North side 15-05-2023 85 % WORK COMPLETED IN BLOCK-B
63 The building shall be constructed strictly according to the plan approved in this licence 12-06-2023 85 % WORK COMPLETED IN BLOCK-B
64 The licence shall be valid for 3(Three) Years from the date of issue and renwal before expire of the above period 12-07-2023 85 % WORK COMPLETED IN BLOCK-B
65 The building plan shall be got approved by Jeypore Municipality and any restriction imposed by the said Municipality shall be strictly adhered to 15-06-2023 85 % WORK COMPLETED IN BLOCK-B
66 :i,:°Sme:]ybybtehetrsea::e¥uans'C:Pr:I:tty ::all;se s3t:'C;i) a:fhet:eed to°d,sha Town piaor„ng & Improvement Trust Act.1956. a This does not Include any encroachment or projection in the form of [jai'c`'jiiy or otlicirwise on land not owned by you. b.ChangeofuseotherthanapprovedwiHbetreatedasun-authorjsed. cAny c]eviatlon of construction from the approved plan wlH lje trea„`d unauthorized. d Fresh licence shaH be obtained for any change of use and dimensi()n` of the buj,ding 09-11-2022 85 % WORK COMPLETED IN BLOCK-B
67 In case the land in question is agricultural, the permitted shaH obtain necessary permission for conversion of the use to nom agricultural purpose as reqiiired under section 8 of the Orissa Land Reforms Act,1960, before started construction 21-06-2023 85 % WORK COMPLETED IN BLOCK-B
68 In case of any dispute over ownership of land, the licence so granted w" be automatically cancelled. 20-04-2023 85 % WORK COMPLETED IN BLOCK-B
69 The Set-backs as indicated ln the building plan shaH be strictly adhered. The set-back space around the building shau be free from any obstruction by making standby mode of any type of vehicle to provide all time clear drive way 16-08-2023 85 % WORK COMPLETED IN BLOCK-B
70 The appllcant is required to obtain necessary permission from the G E D/Electrlcal Inspector regarding safety of electrical installation 17-05-2023 85 % WORK COMPLETED IN BLOCK-B
71 The applicant is required to provide necessary arrangements for disposal of house hold wastes and other waste water without insisting the existing waste water disposal systems of Municipality. 13-09-2023 85 % WORK COMPLETED IN BLOCK-B
72 The applicant is required to provide necessary arrangements for disposal of house hold wastes and other waste water without insisting the existing waste water disposal systems of Municipality 24-08-2023 85 % WORK COMPLETED IN BLOCK-B
73 The developer shaH make an arrangement for supply of drinking water and shaH not Insist upon PHED for providing water from the city water supply system 20-09-2023 85 % WORK COMPLETED IN BLOCK-B
74 The builder shau instaH one Electrical sub-station of required capacity in consultat`ion with SOuTHCO A`'thority. 14-11-2023 85 % WORK COMPLETED IN BLOCK-B
75 At least 20% of the land shaH be used for plantation & the plantatlon 511aH be completed in proper landscape planning by the time of the construction of the building work is completed 10-01-2024 85 % WORK COMPLETED IN BLOCK-B
Updated Changes on 12-02-2024
76 The Building shall be exclusively used for residential Purpose 14-12-2021 85 % WORK COMPLETED IN BLOCK-B
77 Construction of any nature shall take place beyond 10'-0" ft. from boundary of your plot and 25'-0" from the Centre of theapproach road in the south & East side & 22,-6" in the North side 15-05-2023 85 % WORK COMPLETED IN BLOCK-B
78 The building shall be constructed strictly according to the plan approved in this licence 12-06-2023 85 % WORK COMPLETED IN BLOCK-B
79 The licence shall be valid for 3(Three) Years from the date of issue and renwal before expire of the above period 12-07-2023 85 % WORK COMPLETED IN BLOCK-B
80 The building plan shall be got approved by Jeypore Municipality and any restriction imposed by the said Municipality shall be strictly adhered to 15-06-2023 85 % WORK COMPLETED IN BLOCK-B
81 :i,:°Sme:]ybybtehetrsea::e¥uans'C:Pr:I:tty ::all;se s3t:'C;i) a:fhet:eed to°d,sha Town piaor„ng & Improvement Trust Act.1956. a This does not Include any encroachment or projection in the form of [jai'c`'jiiy or otlicirwise on land not owned by you. b.ChangeofuseotherthanapprovedwiHbetreatedasun-authorjsed. cAny c]eviatlon of construction from the approved plan wlH lje trea„`d unauthorized. d Fresh licence shaH be obtained for any change of use and dimensi()n` of the buj,ding 09-11-2022 85 % WORK COMPLETED IN BLOCK-B
82 In case the land in question is agricultural, the permitted shaH obtain necessary permission for conversion of the use to nom agricultural purpose as reqiiired under section 8 of the Orissa Land Reforms Act,1960, before started construction 21-06-2023 85 % WORK COMPLETED IN BLOCK-B
83 In case of any dispute over ownership of land, the licence so granted w" be automatically cancelled. 20-04-2023 85 % WORK COMPLETED IN BLOCK-B
84 The Set-backs as indicated ln the building plan shaH be strictly adhered. The set-back space around the building shau be free from any obstruction by making standby mode of any type of vehicle to provide all time clear drive way 16-08-2023 85 % WORK COMPLETED IN BLOCK-B
85 The appllcant is required to obtain necessary permission from the G E D/Electrlcal Inspector regarding safety of electrical installation 17-05-2023 85 % WORK COMPLETED IN BLOCK-B
86 The applicant is required to provide necessary arrangements for disposal of house hold wastes and other waste water without insisting the existing waste water disposal systems of Municipality. 13-09-2023 85 % WORK COMPLETED IN BLOCK-B
87 The applicant is required to provide necessary arrangements for disposal of house hold wastes and other waste water without insisting the existing waste water disposal systems of Municipality 24-08-2023 85 % WORK COMPLETED IN BLOCK-B
88 The developer shaH make an arrangement for supply of drinking water and shaH not Insist upon PHED for providing water from the city water supply system 20-09-2023 85 % WORK COMPLETED IN BLOCK-B
89 The builder shau instaH one Electrical sub-station of required capacity in consultat`ion with SOuTHCO A`'thority. 14-11-2023 85 % WORK COMPLETED IN BLOCK-B
90 At least 20% of the land shaH be used for plantation & the plantatlon 511aH be completed in proper landscape planning by the time of the construction of the building work is completed 10-01-2024 85 % WORK COMPLETED IN BLOCK-B
Updated Changes on 28-05-2024
91 The Building shall be exclusively used for residential Purpose 14-12-2021 85 % WORK COMPLETED IN BLOCK-B
92 Construction of any nature shall take place beyond 10'-0" ft. from boundary of your plot and 25'-0" from the Centre of theapproach road in the south & East side & 22,-6" in the North side 15-05-2023 85 % WORK COMPLETED IN BLOCK-B
93 The building shall be constructed strictly according to the plan approved in this licence 12-06-2023 85 % WORK COMPLETED IN BLOCK-B
94 The licence shall be valid for 3(Three) Years from the date of issue and renwal before expire of the above period 12-07-2023 85 % WORK COMPLETED IN BLOCK-B
95 The building plan shall be got approved by Jeypore Municipality and any restriction imposed by the said Municipality shall be strictly adhered to 15-06-2023 85 % WORK COMPLETED IN BLOCK-B
96 :i,:°Sme:]ybybtehetrsea::e¥uans'C:Pr:I:tty ::all;se s3t:'C;i) a:fhet:eed to°d,sha Town piaor„ng & Improvement Trust Act.1956. a This does not Include any encroachment or projection in the form of [jai'c`'jiiy or otlicirwise on land not owned by you. b.ChangeofuseotherthanapprovedwiHbetreatedasun-authorjsed. cAny c]eviatlon of construction from the approved plan wlH lje trea„`d unauthorized. d Fresh licence shaH be obtained for any change of use and dimensi()n` of the buj,ding 09-11-2022 85 % WORK COMPLETED IN BLOCK-B
97 In case the land in question is agricultural, the permitted shaH obtain necessary permission for conversion of the use to nom agricultural purpose as reqiiired under section 8 of the Orissa Land Reforms Act,1960, before started construction 21-06-2023 85 % WORK COMPLETED IN BLOCK-B
98 In case of any dispute over ownership of land, the licence so granted w" be automatically cancelled. 20-04-2023 85 % WORK COMPLETED IN BLOCK-B
99 The Set-backs as indicated ln the building plan shaH be strictly adhered. The set-back space around the building shau be free from any obstruction by making standby mode of any type of vehicle to provide all time clear drive way 16-08-2023 85 % WORK COMPLETED IN BLOCK-B
100 The appllcant is required to obtain necessary permission from the G E D/Electrlcal Inspector regarding safety of electrical installation 17-05-2023 85 % WORK COMPLETED IN BLOCK-B
101 The applicant is required to provide necessary arrangements for disposal of house hold wastes and other waste water without insisting the existing waste water disposal systems of Municipality. 13-09-2023 85 % WORK COMPLETED IN BLOCK-B
102 The applicant is required to provide necessary arrangements for disposal of house hold wastes and other waste water without insisting the existing waste water disposal systems of Municipality 24-08-2023 85 % WORK COMPLETED IN BLOCK-B
103 The developer shaH make an arrangement for supply of drinking water and shaH not Insist upon PHED for providing water from the city water supply system 20-09-2023 85 % WORK COMPLETED IN BLOCK-B
104 The builder shau instaH one Electrical sub-station of required capacity in consultat`ion with SOuTHCO A`'thority. 14-11-2023 85 % WORK COMPLETED IN BLOCK-B
105 At least 20% of the land shaH be used for plantation & the plantatlon 511aH be completed in proper landscape planning by the time of the construction of the building work is completed 10-01-2024 85 % WORK COMPLETED IN BLOCK-B

Updated Project Documents

Sl. No. Title of the document Upload Document
1 BANK STATEMENT-1
2 BANK STATEMENT-2
3 BANK STATEMENT-3
4 BANK STATEMENT-4
5 BANK STATEMENT-5
6 BANK STATEMENT-6
7 BUILDING WORK PROGRESS PHOTO COPY-1
8 BUILDING WORK PROGRESS PHOTO COPY-2
9 ALL BANK DETAILS
10 ALL COMPLITED IMAGE OF THE PROJECT
11 BANK STATEMENT 70 % ACCOUNT
12 BANK STATEMENT COLLECTION ACCOUNT
13 BANK STATEMENT 30 % ACCOUNT
14 BANK DETAILS-I
15 BANK DETAILS-II
16 BANK DETAILS-III
17 PROFORMA-I
18 PROFORMA-II
19 PROFORMA-III
20 PROFORMA-I (01.01.2024 TO 31.03.2024)
21 PROFORMA-II (01.01.2024 TO 31.03.2024)
22 PROFORMA-III (01.01.2024 TO 31.03.2024)
23 BANK DETAILS-1
24 BANK DETAILS-2
25 BANK DETAILS-3
:  Tangudu Vikram Mahesh :  
NA :  ACFPT8814Q
:PAN Card :  vikrammahesh73@gmail.com
:  BCOM . LLB :  9502595518
:  21 YEARS EXPERIENCES IN CIVIL CONSTRUCTION
:  Yes :  NA
:  TANGUDU PADMAJA :  
NA :  ADKPT5025F
:PAN Card :  vikrammahesh73@gmail.com
:  EIGHTH CLASS :  9502595518
:  HOUSE MAKER
:  Yes :  NA
:  ANDAVARAPU PRASAD RAO :  
NA :  AGHPP0834A
:PAN Card :  prasad.andavarapu@yahoo.co.in
:  BCOM :  8895241090
:  6 YEARS EXPERIENCES CIVIL CONSTRUCTION
:  Yes :  NA
:  ANDAVARAPU SUKANYA :  
NA :  AFJPA9315C
:PAN Card :  prasad.andavarapu@yahoo.co.in
:  TEN CLASS :  8270686040
:  HOUSE MAKER
:  Yes :  NA

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
SAMIR KUMAR PATEL Architect ARCHITECT CONSULTANCY,272,1ST FLOOR CANAL ROAD,NEAR CHANDI MANDIR,GGP COLONY RASULGARH BHUBANESWAR-751010,MAIL-samir8229@gmail.com,PHONE NO-9238490714 CA/2006/38244,AR/298/BDA
N. ANANDA RAO Chartered Accountant PATRO & CO,NEHUR NAGAR JEYPORE-764001,DIST-KORAPUT (ODISHA),E.MAIL-narao_patro@rediffmail.com,PHONE NO-9437033114 M,NO-51656
SAMBEET KUMAR PANDA Construction Engineer ENGINEERING CONSULTANCY CELL ,,H.O-7J.E.L.C SHOPPING COMPLEX ,JEYPORE (K)-764001,E,MAIL-sambeet105@gmail.com,PHONE NO-9437092992 RTP/DTP(C.ER)-148/2018

Updated Units

House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
Updated Changes
A-101 Covered Parking A-101 3.04m X 2.44m 7.42 Sqmt Included
A-102 Covered Parking A-102 3.04m X 2.44m 7.42 Sqmt Included
A-103 Covered Parking A-103 3.04m X 2.44m 7.42 Sqmt Included
A-104 Covered Parking A-104 3.04m X 2.44m 7.42 Sqmt Included
A-201 Covered Parking A-201 3.04m X 2.44m 7.42 Sqmt Included
A-202 Covered Parking A-202 3.04m X 2.44m 7.42 Sqmt Included
A-203 Covered Parking A-203 3.04m X 2.44m 7.42 Sqmt Included
A-204 Covered Parking A-204 3.04m X 2.44m 7.42 Sqmt Included
A-301 Covered Parking A-301 3.04m X 2.44m 7.42 Sqmt Included
A-302 Covered Parking A-302 3.04m X 2.44m 7.42 Sqmt Included
A-303 Covered Parking A-303 3.04m X 2.44m 7.42 Sqmt Included
A-304 Covered Parking A-304 3.04m X 2.44m 7.42 Sqmt Included
A-401 Covered Parking A-401 3.04m X 2.44m 7.42 Sqmt Included
A-402 Covered Parking A-402 3.04m X 2.44m 7.42 Sqmt Included
A-403 Covered Parking A-403 3.04m X 2.44m 7.42 Sqmt Included
A-404 Covered Parking A-404 3.04m X 2.44m 7.42 Sqmt Included
A-501 Covered Parking A-501 3.04m X 2.44m 7.42 Sqmt Included
A-502 Covered Parking A-502 3.04m X 2.44m 7.42 Sqmt Included
A-503 Covered Parking A-503 3.04m X 2.44m 7.42 Sqmt Included
A-504 Covered Parking A-504 3.04m X 2.44m 7.42 Sqmt Included
B-101 Covered Parking B-101 3.04m X 2.44m 7.42 Sqmt Included
B-102 Covered Parking B-102 3.04m X 2.44m 7.42 Sqmt Included
B-103 Covered Parking B-103 3.04m X 2.44m 7.42 Sqmt Included
B-104 Covered Parking B-104 3.04m X 2.44m 7.42 Sqmt Included
B-201 Covered Parking B-201 3.04m X 2.44m 7.42 Sqmt Included
B-202 Covered Parking B-202 3.04m X 2.44m 7.42 Sqmt Included
B-203 Covered Parking B-203 3.04m X 2.44m 7.42 Sqmt Included
B-204 Covered Parking B-204 3.04m X 2.44m 7.42 Sqmt Included
B-301 Covered Parking B-301 3.04m X 2.44m 7.42 Sqmt Included
B-302 Covered Parking B-302 3.04m X 2.44m 7.42 Sqmt Included
B-303 Covered Parking B-303 3.04m X 2.44m 7.42 Sqmt Included
B-304 Covered Parking B-304 3.04m X 2.44m 7.42 Sqmt Included
B-401 Covered Parking B-401 3.04m X 2.44m 7.42 Sqmt Included
B-402 Covered Parking B-402 3.04m X 2.44m 7.42 Sqmt Included
B-403 Covered Parking B-403 3.04m X 2.44m 7.42 Sqmt Included
B-404 Covered Parking B-404 3.04m X 2.44m 7.42 Sqmt Included
B-501 Covered Parking B-501 3.04m X 2.44m 7.42 Sqmt Included
B-502 Covered Parking B-502 3.04m X 2.44m 7.42 Sqmt Included
B-503 Covered Parking B-503 3.04m X 2.44m 7.42 Sqmt Included
B-504 Covered Parking B-504 3.04m X 2.44m 7.42 Sqmt Included

Generated by pacms.orera.in on date: 2024-06-30