1 |
The building shall be used exclusively for Residential Apartement ( MIG ) Purpose and the use shall not be changed to any other use without prior approval of this Authority.
|
05-05-2026
|
Work in Progress
|
2 |
The developement shall be undertaken strictly according to plans enclosed with necessary permission endorsement
|
05-05-2026
|
Work in Progress
|
3 |
The parking space measuring 2946.80 sqmt ( 2878.79 sqm in stilt parking+ 68.01 in open parking ) as showm in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose. this includes visitor parking of 302.63 sqmt( 241.15 sqm closed parking + 61.48 open parking) (10% of total parking requirement).
|
05-05-2026
|
Work in Progress
|
4 |
The land over which construction is proposed is accessible by an approved means of access of 9.14 mtr in width..
|
05-05-2026
|
Work in Progress
|
5 |
The land in question must be in lawful ownership and peaceful possession of the applicant.
|
05-05-2026
|
Work in Progress
|
6 |
The permission granted under these regulations shall remain valid upto three years from the date of issue.However the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year.
|
05-05-2026
|
Work in Progress
|
7 |
Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under BDA (Planning & Building Standard) Regulations, or under any other law for the time being in force.
|
05-05-2026
|
Work in Progress
|
8 |
in case of any dispute arising out of land record or in respect of right, title, interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute.
|
05-05-2026
|
Work in Progress
|
9 |
neither granting of the permit not the approval of the drawing and specifications nor inspections made by the Authority during erection of the building shall in any way relieve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBC 2005 AND THERE REGULATIONS.
|
05-05-2026
|
Work in Progress
|
10 |
Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the regulation ;
|
05-05-2026
|
Work in Progress
|
11 |
Obtain AN OCCUPANCY Certificate from the Authority prior to occupation of building in full or part.
|
05-05-2026
|
Work in Progress
|
12 |
The applicant is allowed to allot the residential flats to MIG Categoty of beneficiaries only.
|
05-05-2026
|
Work in Progress
|
13 |
the applicant shall abide by the provision of rule no.15 of ODA ( P & BS ) Rules, 2020 with regard to third party verification at plinth level, ground level & roof level any deviation to the above shall attract penalty as per the provision of the same.
|
05-05-2026
|
Work in Progress
|
14 |
The owner /applicant sahll get the structural plan and design vetted by the institutions identified by the Authority doe buildings more than 30 mtr height before commencement of constructio.
|
05-05-2026
|
Work in Progress
|
15 |
Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force, records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the authority.
|
05-05-2026
|
Work in Progress
|
16 |
The persons to whom a permit is issued during construction shall keep pasted in a conspicuous place on the property in respect of which the permit was issued
|
05-05-2026
|
Work in Progress
|
17 |
The applicant during the course of construction and till issue of occupancy certificate shall place a display board on this site with details and declaration.
|
05-05-2026
|
Work in Progress
|
18 |
other conditions to be complied by the applicant are as per the following:
|
05-05-2026
|
Work in Progress
|
19 |
The owner shall strictly adhere to the terms and conditions imposed in the NOC/Clearances given by Fire Prevention officer/National Airport Authority/ SEIAA , Ministry of Forest & Enviromrnt/ PHED etc wherever applicable.
|
05-05-2026
|
Work in Progress
|
20 |
strome water from the permises of roof tap shall be conveyed and discharged to the rain water recharging pits as per Rules 47 of ODA ( Planning & Building Strandards ) Rules 2020.
|
05-05-2026
|
Work in Progress
|
21 |
The space which is meant for parking shall not be changed to any other use and shall not be partitioned/ closed in any manner.
|
05-05-2026
|
Work in Progress
|
22 |
30% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance, fire tender, physically handicapped persons and outside visiters with sifnage as per norms under Rules 37 of ODA Rules 2020.
|
05-05-2026
|
Work in Progress
|
23 |
Plantation for one three per 80 sqm of plot area made by the applicant as per provision undre Rules 30 of ODA (planning & building standards) Rules, 2020.
|
05-05-2026
|
Work in Progress
|
24 |
The Owner/Applicant/Architect/ Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural;/ construction defects, Authority will be no way be held responsible for the same in what so ever manner.
|
05-05-2026
|
Work in Progress
|
25 |
The Concerned Architect /Applicant/ Developer are fully responsible for any deviations additions & alternations beyond approved plan/ defective cvonstruction etc. shall be liable for action as per the provisions of the Regulation .for any deviations additions &
|
05-05-2026
|
Work in Progress
|
26 |
The applicant sahall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/ BDA before commencement of construction.
|
05-05-2026
|
Work in Progress
|
27 |
All the stipulated conditions of the NOC/Clerance given by project Director, DRDA, KRORDHA & CGWA vide NOC No- CGWA/NOC/INF/ORIG/2021/11161 Shall be adhered to strictly.
|
05-05-2026
|
Work in Progress
|
28 |
No strom water/ water shall be discharged to the public road/ public premises and other adjoining plots.
|
05-05-2026
|
Work in Progress
|
29 |
Rain water harvesting structure and recharging pits of adequate capacity shall be developed to minimize the strom water runoff to the drains. to minimize the strom water runoff to the drain.
|
05-05-2026
|
Work in Progress
|
30 |
The applicant shall register this project before the ORERA as per affidavit submitted before commencement of work.
|
05-05-2026
|
Work in Progress
|
31 |
The applicant shall install Roof tap P.V system as per BDA Regulations.
|
05-05-2026
|
Work in Progress
|
32 |
the Number of dwelling units so approved shall not be changed in any manner .
|
05-05-2026
|
Work in Progress
|
Updated Changes on 15-01-2024 |
33 |
The building shall be used exclusively for Residential Apartement ( MIG ) Purpose and the use shall not be changed to any other use without prior approval of this Authority.
|
05-05-2026
|
Work in Progress
|
34 |
The developement shall be undertaken strictly according to plans enclosed with necessary permission endorsement
|
05-05-2026
|
Work in Progress
|
35 |
The parking space measuring 2946.80 sqmt ( 2878.79 sqm in stilt parking+ 68.01 in open parking ) as showm in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose. this includes visitor parking of 302.63 sqmt( 241.15 sqm closed parking + 61.48 open parking) (10% of total parking requirement).
|
05-05-2026
|
Work in Progress
|
36 |
The land over which construction is proposed is accessible by an approved means of access of 9.14 mtr in width..
|
05-05-2026
|
Work in Progress
|
37 |
The land in question must be in lawful ownership and peaceful possession of the applicant.
|
05-05-2026
|
Work in Progress
|
38 |
The permission granted under these regulations shall remain valid upto three years from the date of issue.However the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year.
|
05-05-2026
|
Work in Progress
|
39 |
Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under BDA (Planning & Building Standard) Regulations, or under any other law for the time being in force.
|
05-05-2026
|
Work in Progress
|
40 |
in case of any dispute arising out of land record or in respect of right, title, interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute.
|
05-05-2026
|
Work in Progress
|
41 |
neither granting of the permit not the approval of the drawing and specifications nor inspections made by the Authority during erection of the building shall in any way relieve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBC 2005 AND THERE REGULATIONS.
|
05-05-2026
|
Work in Progress
|
42 |
Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the regulation ;
|
05-05-2026
|
Work in Progress
|
43 |
Obtain AN OCCUPANCY Certificate from the Authority prior to occupation of building in full or part.
|
05-05-2026
|
Work in Progress
|
44 |
The applicant is allowed to allot the residential flats to MIG Categoty of beneficiaries only.
|
05-05-2026
|
Work in Progress
|
45 |
the applicant shall abide by the provision of rule no.15 of ODA ( P & BS ) Rules, 2020 with regard to third party verification at plinth level, ground level & roof level any deviation to the above shall attract penalty as per the provision of the same.
|
05-05-2026
|
Work in Progress
|
46 |
The owner /applicant sahll get the structural plan and design vetted by the institutions identified by the Authority doe buildings more than 30 mtr height before commencement of constructio.
|
05-05-2026
|
Work in Progress
|
47 |
Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force, records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the authority.
|
05-05-2026
|
Work in Progress
|
48 |
The persons to whom a permit is issued during construction shall keep pasted in a conspicuous place on the property in respect of which the permit was issued
|
05-05-2026
|
Work in Progress
|
49 |
The applicant during the course of construction and till issue of occupancy certificate shall place a display board on this site with details and declaration.
|
05-05-2026
|
Work in Progress
|
50 |
other conditions to be complied by the applicant are as per the following:
|
05-05-2026
|
Work in Progress
|
51 |
The owner shall strictly adhere to the terms and conditions imposed in the NOC/Clearances given by Fire Prevention officer/National Airport Authority/ SEIAA , Ministry of Forest & Enviromrnt/ PHED etc wherever applicable.
|
05-05-2026
|
Work in Progress
|
52 |
strome water from the permises of roof tap shall be conveyed and discharged to the rain water recharging pits as per Rules 47 of ODA ( Planning & Building Strandards ) Rules 2020.
|
05-05-2026
|
Work in Progress
|
53 |
The space which is meant for parking shall not be changed to any other use and shall not be partitioned/ closed in any manner.
|
05-05-2026
|
Work in Progress
|
54 |
30% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance, fire tender, physically handicapped persons and outside visiters with sifnage as per norms under Rules 37 of ODA Rules 2020.
|
05-05-2026
|
Work in Progress
|
55 |
Plantation for one three per 80 sqm of plot area made by the applicant as per provision undre Rules 30 of ODA (planning & building standards) Rules, 2020.
|
05-05-2026
|
Work in Progress
|
56 |
The Owner/Applicant/Architect/ Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural;/ construction defects, Authority will be no way be held responsible for the same in what so ever manner.
|
05-05-2026
|
Work in Progress
|
57 |
The Concerned Architect /Applicant/ Developer are fully responsible for any deviations additions & alternations beyond approved plan/ defective cvonstruction etc. shall be liable for action as per the provisions of the Regulation .for any deviations additions &
|
05-05-2026
|
Work in Progress
|
58 |
The applicant sahall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/ BDA before commencement of construction.
|
05-05-2026
|
Work in Progress
|
59 |
All the stipulated conditions of the NOC/Clerance given by project Director, DRDA, KRORDHA & CGWA vide NOC No- CGWA/NOC/INF/ORIG/2021/11161 Shall be adhered to strictly.
|
05-05-2026
|
Work in Progress
|
60 |
No strom water/ water shall be discharged to the public road/ public premises and other adjoining plots.
|
05-05-2026
|
Work in Progress
|
61 |
Rain water harvesting structure and recharging pits of adequate capacity shall be developed to minimize the strom water runoff to the drains. to minimize the strom water runoff to the drain.
|
05-05-2026
|
Work in Progress
|
62 |
The applicant shall register this project before the ORERA as per affidavit submitted before commencement of work.
|
05-05-2026
|
Work in Progress
|
63 |
The applicant shall install Roof tap P.V system as per BDA Regulations.
|
05-05-2026
|
Work in Progress
|
64 |
the Number of dwelling units so approved shall not be changed in any manner .
|
05-05-2026
|
Work in Progress
|
Updated Changes on 15-04-2024 |
65 |
The building shall be used exclusively for Residential Apartement ( MIG ) Purpose and the use shall not be changed to any other use without prior approval of this Authority.
|
05-05-2026
|
Work in Progress
|
66 |
The developement shall be undertaken strictly according to plans enclosed with necessary permission endorsement
|
05-05-2026
|
Work in Progress
|
67 |
The parking space measuring 2946.80 sqmt ( 2878.79 sqm in stilt parking+ 68.01 in open parking ) as showm in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose. this includes visitor parking of 302.63 sqmt( 241.15 sqm closed parking + 61.48 open parking) (10% of total parking requirement).
|
05-05-2026
|
Work in Progress
|
68 |
The land over which construction is proposed is accessible by an approved means of access of 9.14 mtr in width..
|
05-05-2026
|
Work in Progress
|
69 |
The land in question must be in lawful ownership and peaceful possession of the applicant.
|
05-05-2026
|
Work in Progress
|
70 |
The permission granted under these regulations shall remain valid upto three years from the date of issue.However the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year.
|
05-05-2026
|
Work in Progress
|
71 |
Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under BDA (Planning & Building Standard) Regulations, or under any other law for the time being in force.
|
05-05-2026
|
Work in Progress
|
72 |
in case of any dispute arising out of land record or in respect of right, title, interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute.
|
05-05-2026
|
Work in Progress
|
73 |
neither granting of the permit not the approval of the drawing and specifications nor inspections made by the Authority during erection of the building shall in any way relieve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBC 2005 AND THERE REGULATIONS.
|
05-05-2026
|
Work in Progress
|
74 |
Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the regulation ;
|
05-05-2026
|
Work in Progress
|
75 |
Obtain AN OCCUPANCY Certificate from the Authority prior to occupation of building in full or part.
|
05-05-2026
|
Work in Progress
|
76 |
The applicant is allowed to allot the residential flats to MIG Categoty of beneficiaries only.
|
05-05-2026
|
Work in Progress
|
77 |
the applicant shall abide by the provision of rule no.15 of ODA ( P & BS ) Rules, 2020 with regard to third party verification at plinth level, ground level & roof level any deviation to the above shall attract penalty as per the provision of the same.
|
05-05-2026
|
Work in Progress
|
78 |
The owner /applicant sahll get the structural plan and design vetted by the institutions identified by the Authority doe buildings more than 30 mtr height before commencement of constructio.
|
05-05-2026
|
Work in Progress
|
79 |
Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force, records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the authority.
|
05-05-2026
|
Work in Progress
|
80 |
The persons to whom a permit is issued during construction shall keep pasted in a conspicuous place on the property in respect of which the permit was issued
|
05-05-2026
|
Work in Progress
|
81 |
The applicant during the course of construction and till issue of occupancy certificate shall place a display board on this site with details and declaration.
|
05-05-2026
|
Work in Progress
|
82 |
other conditions to be complied by the applicant are as per the following:
|
05-05-2026
|
Work in Progress
|
83 |
The owner shall strictly adhere to the terms and conditions imposed in the NOC/Clearances given by Fire Prevention officer/National Airport Authority/ SEIAA , Ministry of Forest & Enviromrnt/ PHED etc wherever applicable.
|
05-05-2026
|
Work in Progress
|
84 |
strome water from the permises of roof tap shall be conveyed and discharged to the rain water recharging pits as per Rules 47 of ODA ( Planning & Building Strandards ) Rules 2020.
|
05-05-2026
|
Work in Progress
|
85 |
The space which is meant for parking shall not be changed to any other use and shall not be partitioned/ closed in any manner.
|
05-05-2026
|
Work in Progress
|
86 |
30% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance, fire tender, physically handicapped persons and outside visiters with sifnage as per norms under Rules 37 of ODA Rules 2020.
|
05-05-2026
|
Work in Progress
|
87 |
Plantation for one three per 80 sqm of plot area made by the applicant as per provision undre Rules 30 of ODA (planning & building standards) Rules, 2020.
|
05-05-2026
|
Work in Progress
|
88 |
The Owner/Applicant/Architect/ Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural;/ construction defects, Authority will be no way be held responsible for the same in what so ever manner.
|
05-05-2026
|
Work in Progress
|
89 |
The Concerned Architect /Applicant/ Developer are fully responsible for any deviations additions & alternations beyond approved plan/ defective cvonstruction etc. shall be liable for action as per the provisions of the Regulation .for any deviations additions &
|
05-05-2026
|
Work in Progress
|
90 |
The applicant sahall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/ BDA before commencement of construction.
|
05-05-2026
|
Work in Progress
|
91 |
All the stipulated conditions of the NOC/Clerance given by project Director, DRDA, KRORDHA & CGWA vide NOC No- CGWA/NOC/INF/ORIG/2021/11161 Shall be adhered to strictly.
|
05-05-2026
|
Work in Progress
|
92 |
No strom water/ water shall be discharged to the public road/ public premises and other adjoining plots.
|
05-05-2026
|
Work in Progress
|
93 |
Rain water harvesting structure and recharging pits of adequate capacity shall be developed to minimize the strom water runoff to the drains. to minimize the strom water runoff to the drain.
|
05-05-2026
|
Work in Progress
|
94 |
The applicant shall register this project before the ORERA as per affidavit submitted before commencement of work.
|
05-05-2026
|
Work in Progress
|
95 |
The applicant shall install Roof tap P.V system as per BDA Regulations.
|
05-05-2026
|
Work in Progress
|
96 |
the Number of dwelling units so approved shall not be changed in any manner .
|
05-05-2026
|
Work in Progress
|