1 |
PARKING SPACE MEASURING 297.31 SQM (STILT FLOOR) AS SHOWN IN THE APPROVED PLAN SHALL BE LEFT FOR PARKING OF VEHICLES AND NO PART OF IT WILL BE USED FOR ANY OTHER PURPOSE.
|
21-11-2025
|
IN PROGRESS
|
2 |
THE LAND OVER WHICH CONSTRUCTION IS PROPOSED IS ACCESSIBLE BY AN APPROVED MEANS OF ACCESS OF 12.20 MTR IN WIDTH.
|
21-11-2025
|
IN PROGRESS
|
3 |
PERMIT THE AUTHORITY TO ENTER THE BUILDING OR PREMISES FOR WHICH THE PERMISSION HAS BEEN GRANTED AT ANY REASONABLE TIME FOR THE PURPOSE OF ENFORCING THE REGULATIONS.
|
21-11-2025
|
IN PROGRESS
|
4 |
OBTAIN WHEREEVER APPLICABLE FROM THE COMPETENT AUTHORITY PERMISSIONS/CLEARANCE REQUIRED IN CONNECTION WITH THE PROPOSED WORK.
|
21-11-2025
|
IN PROGRESS
|
5 |
OBTAIN AN OCCUPANCY CERTIFICATE FROM THE AUTHORITY PRIOR TO OCCUPATION OF BUILDING IN FULL OR PART.
|
21-11-2025
|
IN PROGRESS
|
6 |
ENSURE COMPLIANCE OF PROVISION OF VARIOUS ACTS, RULES, REGULATIONS AND CODES WHICH CONTROL OR PROVIDE FOR VARIOUS NORMS GOVERNING DEVELOPMENT INCLUDING BUT NOT LIMITED TO PLANNING NORMS FIRE SAFTEY ENVIRONMENTAL NORMS AS APPLICABLE IN EACH CASE.
|
21-11-2025
|
IN PROGRESS
|
7 |
WHEREEVER TESTS OF ANY MATERIAL ARE MADE TO ENSURE CONFORMITY OF THE REQUIREMENTS OF THE REGULATIONS IN FORCE RECORDS OF THE TEST DATA SHALL BE KEPT AVAILABLE FOR INSPECTION DURING THE CONSTRUCTION OF BUILDING AND FOR SUCH PERIOD THEREAFTER AS REQUIRED BY THE AUTHORITY.
|
21-11-2025
|
IN PROGRESS
|
8 |
STORM WATER FROM THE PREMISES OF ROOF TOP SHALL BE CONVEYED AND DISCHARGED TO THE RAIN WATER RECHARGING PITS AS PER RULE-47 OF ODA (PLANNING & BUILDING STANDARDS) RULES 2020.
|
21-11-2025
|
IN PROGRESS
|
9 |
THE SPACE WHICH IS MEANT FOR PARKING SHALL NOT BE CHANGED TO ANY OTHER USE AND SHALL NOT BE PARTITIONED /CLOSED IN ANY MANNER.
|
21-11-2025
|
IN PROGRESS
|
10 |
AT LEAST 10% OF PARKING IN HOUSING PROJECT/APARTMENT BUILDING SHALL BE EARMARKED FOR VISITORS AND SHALL BE OPEN TO ALL VISITORS AND IN ALL OTHER CASES AS PER NORMS UNDER RULE 37 OF ODA (P&BS) RULES 2020.
|
21-11-2025
|
IN PROGRESS
|
11 |
AT LEAST 50% OF THE OPEN SPACE SHALL BE PREVIOUS AND PLANTATION @ ONE TREE PER 80 SQM OF THE PLOT AREA SHALL BE MADE BY THE APPLICANT AS PER PROVISION UNDER RULE-30 OF ODA (P&BS) RULES,2020.
|
21-11-2025
|
IN PROGRESS
|
12 |
RAIN WATER HARVESTING STRUCTURES SHALL BE PROVIDED WITHIN THE PREMISES FOR COLLECTION AND USE OF ROOFTOP RAINWATER.
|
21-11-2025
|
IN PROGRESS
|
13 |
GROUNDWATER RECHARGING PITS SHALL BE PROVIDED @6 CUBIC METERS FOR EVERY 100 SQUARE METER OF ROOF AREA.
|
21-11-2025
|
IN PROGRESS
|
14 |
ALL THE PASSAGES AROUND THE BUILDING SHALL BE DEVELOPED WITH PERMEABLE PAVERS BLOCK FOR ABSORPTION OF RAIN WATER AND SEEPAGE IN TO THE GROUND.
|
21-11-2025
|
IN PROGRESS
|
15 |
HOUSE OWNER’S SOCIETY OFFICE AND ASSEMBLY AREA AT THE RATE OF ONE SQUARE METER FLOOR SPACE PER FLAT SHALL BE PROIVDED AND THE MINIMUM AREA SHALL NOT BE LESS THAN 12 SQUARE METERS.
|
21-11-2025
|
IN PROGRESS
|
16 |
THE BUILDING SHALL NOT BE PUT TO ANY USE OTHER THAN THE PURPOSE FOR WHICH THE PERMISSION IS ACCORDED.
|
21-11-2025
|
IN PROGRESS
|
17 |
ROOFTOP SOLAR ENERGY INSTALLATION SHALL BE PROVIDED AS PER ODA (PLANNING & BUILDING STANDARDS) RULES 2020.
|
21-11-2025
|
IN PROGRESS
|
18 |
THE APPLICANT SHALL PROVIDE MICRO-COMPOSTING SITE/PLANT WITHIN THE PROJECT PREMISES TO MAKE OWN ARRANGEMENT OF SOLID WASTE MANAGEMENT.
|
21-11-2025
|
IN PROGRESS
|
19 |
THE OWNER/APPLICANT/TECHNICAL PERSON SHALL STRICTLY ADHERE TO THE TERMS AND CONDITIONS IMPOSED IN THE NOC/ CLEARANCE OF PUBLIC HEALTH ENGINEERING DIVISION (PHED) VIDE LETTER NO.13108 ON DT.25.06.2015, NOC FROM BMC VIDE LETTER NO.9111 DATED.28.05.2016,NOC CGWA VIDE LETTER NO.CGWA/NOC/INF/ORIG/2020/7414 DATED 17.02.2020, NOC FROM CESU VIDE LETTER NO.7002(4) DATED 27.05.2020.
|
21-11-2025
|
IN PROGRESS
|
20 |
ALL THE FIRE FIGHTING INSTALLATION ETC ARE TO BE ENSURED AND MAINTAINED BY THE APPLICANT AS PER NBC-2016.
|
21-11-2025
|
IN PROGRESS
|
21 |
NO STORM WATER/WATER SHALL BE DISCHARGED TO THE PUBLIC ROAD/PUBLIC PREMISES AND OTHER ADJOINING PLOTS.
|
21-11-2025
|
NOT STARTED
|
22 |
ADHERE TO THE PROVISIONS OF ODA (PLANNING & BUILDING STANDARDS) RULES 2020 STRICTLY AND CONDITIONS THERETO.
|
21-11-2025
|
NOT STARTED
|
23 |
THE NUMBER OF DWELLING UNITS SO APPROVED SHALL NOT BE CHANGED IN ANY MANNER.
|
21-11-2025
|
IN PROGRESS
|
24 |
THE APPLICANT ON ITS OWN COST SHALL DEVELOP THE EXISTING APPROACH ROAD WITH BLACK TO PUP TO THE PROJECT SITE BOOUNDARY.
|
21-11-2025
|
NOT STARTED
|
25 |
THE APPLICANT DURING THE COURSE OF CONSTRUCTION AND TILL ISSUE OF OCCUPANCY CERTIFICATE SHALL KEEP PASTED IN A CONSPICUOUS PLACE A COPY OF THE BUILDING PERMIT AND COPY OF APPROVED DRAWING AND SHALL PLACE A DISPLAY BOARD ON SITE WITH DETAILS AND DECLARATION AS GIVEN AT ANNEXURE-I.
|
21-11-2025
|
NOT STARTED
|
Updated Changes on 15-07-2023 |
26 |
PARKING SPACE MEASURING 297.31 SQM (STILT FLOOR) AS SHOWN IN THE APPROVED PLAN SHALL BE LEFT FOR PARKING OF VEHICLES AND NO PART OF IT WILL BE USED FOR ANY OTHER PURPOSE.
|
21-11-2025
|
IN PROGRESS
|
27 |
THE LAND OVER WHICH CONSTRUCTION IS PROPOSED IS ACCESSIBLE BY AN APPROVED MEANS OF ACCESS OF 12.20 MTR IN WIDTH.
|
21-11-2025
|
IN PROGRESS
|
28 |
PERMIT THE AUTHORITY TO ENTER THE BUILDING OR PREMISES FOR WHICH THE PERMISSION HAS BEEN GRANTED AT ANY REASONABLE TIME FOR THE PURPOSE OF ENFORCING THE REGULATIONS.
|
21-11-2025
|
IN PROGRESS
|
29 |
OBTAIN WHEREEVER APPLICABLE FROM THE COMPETENT AUTHORITY PERMISSIONS/CLEARANCE REQUIRED IN CONNECTION WITH THE PROPOSED WORK.
|
21-11-2025
|
IN PROGRESS
|
30 |
OBTAIN AN OCCUPANCY CERTIFICATE FROM THE AUTHORITY PRIOR TO OCCUPATION OF BUILDING IN FULL OR PART.
|
21-11-2025
|
IN PROGRESS
|
31 |
ENSURE COMPLIANCE OF PROVISION OF VARIOUS ACTS, RULES, REGULATIONS AND CODES WHICH CONTROL OR PROVIDE FOR VARIOUS NORMS GOVERNING DEVELOPMENT INCLUDING BUT NOT LIMITED TO PLANNING NORMS FIRE SAFTEY ENVIRONMENTAL NORMS AS APPLICABLE IN EACH CASE.
|
21-11-2025
|
IN PROGRESS
|
32 |
WHEREEVER TESTS OF ANY MATERIAL ARE MADE TO ENSURE CONFORMITY OF THE REQUIREMENTS OF THE REGULATIONS IN FORCE RECORDS OF THE TEST DATA SHALL BE KEPT AVAILABLE FOR INSPECTION DURING THE CONSTRUCTION OF BUILDING AND FOR SUCH PERIOD THEREAFTER AS REQUIRED BY THE AUTHORITY.
|
21-11-2025
|
IN PROGRESS
|
33 |
STORM WATER FROM THE PREMISES OF ROOF TOP SHALL BE CONVEYED AND DISCHARGED TO THE RAIN WATER RECHARGING PITS AS PER RULE-47 OF ODA (PLANNING & BUILDING STANDARDS) RULES 2020.
|
21-11-2025
|
IN PROGRESS
|
34 |
THE SPACE WHICH IS MEANT FOR PARKING SHALL NOT BE CHANGED TO ANY OTHER USE AND SHALL NOT BE PARTITIONED /CLOSED IN ANY MANNER.
|
21-11-2025
|
IN PROGRESS
|
35 |
AT LEAST 10% OF PARKING IN HOUSING PROJECT/APARTMENT BUILDING SHALL BE EARMARKED FOR VISITORS AND SHALL BE OPEN TO ALL VISITORS AND IN ALL OTHER CASES AS PER NORMS UNDER RULE 37 OF ODA (P&BS) RULES 2020.
|
21-11-2025
|
IN PROGRESS
|
36 |
AT LEAST 50% OF THE OPEN SPACE SHALL BE PREVIOUS AND PLANTATION @ ONE TREE PER 80 SQM OF THE PLOT AREA SHALL BE MADE BY THE APPLICANT AS PER PROVISION UNDER RULE-30 OF ODA (P&BS) RULES,2020.
|
21-11-2025
|
IN PROGRESS
|
37 |
RAIN WATER HARVESTING STRUCTURES SHALL BE PROVIDED WITHIN THE PREMISES FOR COLLECTION AND USE OF ROOFTOP RAINWATER.
|
21-11-2025
|
IN PROGRESS
|
38 |
GROUNDWATER RECHARGING PITS SHALL BE PROVIDED @6 CUBIC METERS FOR EVERY 100 SQUARE METER OF ROOF AREA.
|
21-11-2025
|
IN PROGRESS
|
39 |
ALL THE PASSAGES AROUND THE BUILDING SHALL BE DEVELOPED WITH PERMEABLE PAVERS BLOCK FOR ABSORPTION OF RAIN WATER AND SEEPAGE IN TO THE GROUND.
|
21-11-2025
|
IN PROGRESS
|
40 |
HOUSE OWNER’S SOCIETY OFFICE AND ASSEMBLY AREA AT THE RATE OF ONE SQUARE METER FLOOR SPACE PER FLAT SHALL BE PROIVDED AND THE MINIMUM AREA SHALL NOT BE LESS THAN 12 SQUARE METERS.
|
21-11-2025
|
IN PROGRESS
|
41 |
THE BUILDING SHALL NOT BE PUT TO ANY USE OTHER THAN THE PURPOSE FOR WHICH THE PERMISSION IS ACCORDED.
|
21-11-2025
|
IN PROGRESS
|
42 |
ROOFTOP SOLAR ENERGY INSTALLATION SHALL BE PROVIDED AS PER ODA (PLANNING & BUILDING STANDARDS) RULES 2020.
|
21-11-2025
|
IN PROGRESS
|
43 |
THE APPLICANT SHALL PROVIDE MICRO-COMPOSTING SITE/PLANT WITHIN THE PROJECT PREMISES TO MAKE OWN ARRANGEMENT OF SOLID WASTE MANAGEMENT.
|
21-11-2025
|
IN PROGRESS
|
44 |
THE OWNER/APPLICANT/TECHNICAL PERSON SHALL STRICTLY ADHERE TO THE TERMS AND CONDITIONS IMPOSED IN THE NOC/ CLEARANCE OF PUBLIC HEALTH ENGINEERING DIVISION (PHED) VIDE LETTER NO.13108 ON DT.25.06.2015, NOC FROM BMC VIDE LETTER NO.9111 DATED.28.05.2016,NOC CGWA VIDE LETTER NO.CGWA/NOC/INF/ORIG/2020/7414 DATED 17.02.2020, NOC FROM CESU VIDE LETTER NO.7002(4) DATED 27.05.2020.
|
21-11-2025
|
IN PROGRESS
|
45 |
ALL THE FIRE FIGHTING INSTALLATION ETC ARE TO BE ENSURED AND MAINTAINED BY THE APPLICANT AS PER NBC-2016.
|
21-11-2025
|
IN PROGRESS
|
46 |
NO STORM WATER/WATER SHALL BE DISCHARGED TO THE PUBLIC ROAD/PUBLIC PREMISES AND OTHER ADJOINING PLOTS.
|
21-11-2025
|
NOT STARTED
|
47 |
ADHERE TO THE PROVISIONS OF ODA (PLANNING & BUILDING STANDARDS) RULES 2020 STRICTLY AND CONDITIONS THERETO.
|
21-11-2025
|
NOT STARTED
|
48 |
THE NUMBER OF DWELLING UNITS SO APPROVED SHALL NOT BE CHANGED IN ANY MANNER.
|
21-11-2025
|
IN PROGRESS
|
49 |
THE APPLICANT ON ITS OWN COST SHALL DEVELOP THE EXISTING APPROACH ROAD WITH BLACK TO PUP TO THE PROJECT SITE BOOUNDARY.
|
21-11-2025
|
NOT STARTED
|
50 |
THE APPLICANT DURING THE COURSE OF CONSTRUCTION AND TILL ISSUE OF OCCUPANCY CERTIFICATE SHALL KEEP PASTED IN A CONSPICUOUS PLACE A COPY OF THE BUILDING PERMIT AND COPY OF APPROVED DRAWING AND SHALL PLACE A DISPLAY BOARD ON SITE WITH DETAILS AND DECLARATION AS GIVEN AT ANNEXURE-I.
|
21-11-2025
|
NOT STARTED
|
Updated Changes on 14-10-2023 |
51 |
PARKING SPACE MEASURING 297.31 SQM (STILT FLOOR) AS SHOWN IN THE APPROVED PLAN SHALL BE LEFT FOR PARKING OF VEHICLES AND NO PART OF IT WILL BE USED FOR ANY OTHER PURPOSE.
|
21-11-2025
|
IN PROGRESS
|
52 |
THE LAND OVER WHICH CONSTRUCTION IS PROPOSED IS ACCESSIBLE BY AN APPROVED MEANS OF ACCESS OF 12.20 MTR IN WIDTH.
|
21-11-2025
|
IN PROGRESS
|
53 |
PERMIT THE AUTHORITY TO ENTER THE BUILDING OR PREMISES FOR WHICH THE PERMISSION HAS BEEN GRANTED AT ANY REASONABLE TIME FOR THE PURPOSE OF ENFORCING THE REGULATIONS.
|
21-11-2025
|
WILL BE COMPLIED AS PER THE CONDTION
|
54 |
OBTAIN WHEREEVER APPLICABLE FROM THE COMPETENT AUTHORITY PERMISSIONS/CLEARANCE REQUIRED IN CONNECTION WITH THE PROPOSED WORK.
|
21-11-2025
|
IN PROGRESS
|
55 |
OBTAIN AN OCCUPANCY CERTIFICATE FROM THE AUTHORITY PRIOR TO OCCUPATION OF BUILDING IN FULL OR PART.
|
21-11-2025
|
IN PROGRESS
|
56 |
ENSURE COMPLIANCE OF PROVISION OF VARIOUS ACTS, RULES, REGULATIONS AND CODES WHICH CONTROL OR PROVIDE FOR VARIOUS NORMS GOVERNING DEVELOPMENT INCLUDING BUT NOT LIMITED TO PLANNING NORMS FIRE SAFTEY ENVIRONMENTAL NORMS AS APPLICABLE IN EACH CASE.
|
21-11-2025
|
IN PROGRESS
|
57 |
WHEREEVER TESTS OF ANY MATERIAL ARE MADE TO ENSURE CONFORMITY OF THE REQUIREMENTS OF THE REGULATIONS IN FORCE RECORDS OF THE TEST DATA SHALL BE KEPT AVAILABLE FOR INSPECTION DURING THE CONSTRUCTION OF BUILDING AND FOR SUCH PERIOD THEREAFTER AS REQUIRED BY THE AUTHORITY.
|
21-11-2025
|
IN PROGRESS
|
58 |
STORM WATER FROM THE PREMISES OF ROOF TOP SHALL BE CONVEYED AND DISCHARGED TO THE RAIN WATER RECHARGING PITS AS PER RULE-47 OF ODA (PLANNING & BUILDING STANDARDS) RULES 2020.
|
21-11-2025
|
IN PROGRESS
|
59 |
THE SPACE WHICH IS MEANT FOR PARKING SHALL NOT BE CHANGED TO ANY OTHER USE AND SHALL NOT BE PARTITIONED /CLOSED IN ANY MANNER.
|
21-11-2025
|
IN PROGRESS
|
60 |
AT LEAST 10% OF PARKING IN HOUSING PROJECT/APARTMENT BUILDING SHALL BE EARMARKED FOR VISITORS AND SHALL BE OPEN TO ALL VISITORS AND IN ALL OTHER CASES AS PER NORMS UNDER RULE 37 OF ODA (P&BS) RULES 2020.
|
21-11-2025
|
IN PROGRESS
|
61 |
AT LEAST 50% OF THE OPEN SPACE SHALL BE PREVIOUS AND PLANTATION @ ONE TREE PER 80 SQM OF THE PLOT AREA SHALL BE MADE BY THE APPLICANT AS PER PROVISION UNDER RULE-30 OF ODA (P&BS) RULES,2020.
|
21-11-2025
|
IN PROGRESS
|
62 |
RAIN WATER HARVESTING STRUCTURES SHALL BE PROVIDED WITHIN THE PREMISES FOR COLLECTION AND USE OF ROOFTOP RAINWATER.
|
21-11-2025
|
IN PROGRESS
|
63 |
GROUNDWATER RECHARGING PITS SHALL BE PROVIDED @6 CUBIC METERS FOR EVERY 100 SQUARE METER OF ROOF AREA.
|
21-11-2025
|
IN PROGRESS
|
64 |
ALL THE PASSAGES AROUND THE BUILDING SHALL BE DEVELOPED WITH PERMEABLE PAVERS BLOCK FOR ABSORPTION OF RAIN WATER AND SEEPAGE IN TO THE GROUND.
|
21-11-2025
|
IN PROGRESS
|
65 |
HOUSE OWNER’S SOCIETY OFFICE AND ASSEMBLY AREA AT THE RATE OF ONE SQUARE METER FLOOR SPACE PER FLAT SHALL BE PROIVDED AND THE MINIMUM AREA SHALL NOT BE LESS THAN 12 SQUARE METERS.
|
21-11-2025
|
IN PROGRESS
|
66 |
THE BUILDING SHALL NOT BE PUT TO ANY USE OTHER THAN THE PURPOSE FOR WHICH THE PERMISSION IS ACCORDED.
|
21-11-2025
|
IN PROGRESS
|
67 |
ROOFTOP SOLAR ENERGY INSTALLATION SHALL BE PROVIDED AS PER ODA (PLANNING & BUILDING STANDARDS) RULES 2020.
|
21-11-2025
|
IN PROGRESS
|
68 |
THE APPLICANT SHALL PROVIDE MICRO-COMPOSTING SITE/PLANT WITHIN THE PROJECT PREMISES TO MAKE OWN ARRANGEMENT OF SOLID WASTE MANAGEMENT.
|
21-11-2025
|
IN PROGRESS
|
69 |
THE OWNER/APPLICANT/TECHNICAL PERSON SHALL STRICTLY ADHERE TO THE TERMS AND CONDITIONS IMPOSED IN THE NOC/ CLEARANCE OF PUBLIC HEALTH ENGINEERING DIVISION (PHED) VIDE LETTER NO.13108 ON DT.25.06.2015, NOC FROM BMC VIDE LETTER NO.9111 DATED.28.05.2016,NOC CGWA VIDE LETTER NO.CGWA/NOC/INF/ORIG/2020/7414 DATED 17.02.2020, NOC FROM CESU VIDE LETTER NO.7002(4) DATED 27.05.2020.
|
21-11-2025
|
IN PROGRESS
|
70 |
ALL THE FIRE FIGHTING INSTALLATION ETC ARE TO BE ENSURED AND MAINTAINED BY THE APPLICANT AS PER NBC-2016.
|
21-11-2025
|
IN PROGRESS
|
71 |
NO STORM WATER/WATER SHALL BE DISCHARGED TO THE PUBLIC ROAD/PUBLIC PREMISES AND OTHER ADJOINING PLOTS.
|
21-11-2025
|
NOT STARTED
|
72 |
ADHERE TO THE PROVISIONS OF ODA (PLANNING & BUILDING STANDARDS) RULES 2020 STRICTLY AND CONDITIONS THERETO.
|
21-11-2025
|
NOT STARTED
|
73 |
THE NUMBER OF DWELLING UNITS SO APPROVED SHALL NOT BE CHANGED IN ANY MANNER.
|
21-11-2025
|
IN PROGRESS
|
74 |
THE APPLICANT ON ITS OWN COST SHALL DEVELOP THE EXISTING APPROACH ROAD WITH BLACK TO PUP TO THE PROJECT SITE BOOUNDARY.
|
21-11-2025
|
NOT STARTED
|
75 |
THE APPLICANT DURING THE COURSE OF CONSTRUCTION AND TILL ISSUE OF OCCUPANCY CERTIFICATE SHALL KEEP PASTED IN A CONSPICUOUS PLACE A COPY OF THE BUILDING PERMIT AND COPY OF APPROVED DRAWING AND SHALL PLACE A DISPLAY BOARD ON SITE WITH DETAILS AND DECLARATION AS GIVEN AT ANNEXURE-I.
|
21-11-2025
|
NOT STARTED
|
Updated Changes on 15-01-2024 |
76 |
PARKING SPACE MEASURING 297.31 SQM (STILT FLOOR) AS SHOWN IN THE APPROVED PLAN SHALL BE LEFT FOR PARKING OF VEHICLES AND NO PART OF IT WILL BE USED FOR ANY OTHER PURPOSE.
|
21-11-2025
|
IN PROGRESS
|
77 |
THE LAND OVER WHICH CONSTRUCTION IS PROPOSED IS ACCESSIBLE BY AN APPROVED MEANS OF ACCESS OF 12.20 MTR IN WIDTH.
|
21-11-2025
|
IN PROGRESS
|
78 |
PERMIT THE AUTHORITY TO ENTER THE BUILDING OR PREMISES FOR WHICH THE PERMISSION HAS BEEN GRANTED AT ANY REASONABLE TIME FOR THE PURPOSE OF ENFORCING THE REGULATIONS.
|
21-11-2025
|
WILL BE COMPLIED AS PER THE CONDTION
|
79 |
OBTAIN WHEREEVER APPLICABLE FROM THE COMPETENT AUTHORITY PERMISSIONS/CLEARANCE REQUIRED IN CONNECTION WITH THE PROPOSED WORK.
|
21-11-2025
|
IN PROGRESS
|
80 |
OBTAIN AN OCCUPANCY CERTIFICATE FROM THE AUTHORITY PRIOR TO OCCUPATION OF BUILDING IN FULL OR PART.
|
21-11-2025
|
IN PROGRESS
|
81 |
ENSURE COMPLIANCE OF PROVISION OF VARIOUS ACTS, RULES, REGULATIONS AND CODES WHICH CONTROL OR PROVIDE FOR VARIOUS NORMS GOVERNING DEVELOPMENT INCLUDING BUT NOT LIMITED TO PLANNING NORMS FIRE SAFTEY ENVIRONMENTAL NORMS AS APPLICABLE IN EACH CASE.
|
21-11-2025
|
IN PROGRESS
|
82 |
WHEREEVER TESTS OF ANY MATERIAL ARE MADE TO ENSURE CONFORMITY OF THE REQUIREMENTS OF THE REGULATIONS IN FORCE RECORDS OF THE TEST DATA SHALL BE KEPT AVAILABLE FOR INSPECTION DURING THE CONSTRUCTION OF BUILDING AND FOR SUCH PERIOD THEREAFTER AS REQUIRED BY THE AUTHORITY.
|
21-11-2025
|
IN PROGRESS
|
83 |
STORM WATER FROM THE PREMISES OF ROOF TOP SHALL BE CONVEYED AND DISCHARGED TO THE RAIN WATER RECHARGING PITS AS PER RULE-47 OF ODA (PLANNING & BUILDING STANDARDS) RULES 2020.
|
21-11-2025
|
IN PROGRESS
|
84 |
THE SPACE WHICH IS MEANT FOR PARKING SHALL NOT BE CHANGED TO ANY OTHER USE AND SHALL NOT BE PARTITIONED /CLOSED IN ANY MANNER.
|
21-11-2025
|
IN PROGRESS
|
85 |
AT LEAST 10% OF PARKING IN HOUSING PROJECT/APARTMENT BUILDING SHALL BE EARMARKED FOR VISITORS AND SHALL BE OPEN TO ALL VISITORS AND IN ALL OTHER CASES AS PER NORMS UNDER RULE 37 OF ODA (P&BS) RULES 2020.
|
21-11-2025
|
IN PROGRESS
|
86 |
AT LEAST 50% OF THE OPEN SPACE SHALL BE PREVIOUS AND PLANTATION @ ONE TREE PER 80 SQM OF THE PLOT AREA SHALL BE MADE BY THE APPLICANT AS PER PROVISION UNDER RULE-30 OF ODA (P&BS) RULES,2020.
|
21-11-2025
|
IN PROGRESS
|
87 |
RAIN WATER HARVESTING STRUCTURES SHALL BE PROVIDED WITHIN THE PREMISES FOR COLLECTION AND USE OF ROOFTOP RAINWATER.
|
21-11-2025
|
IN PROGRESS
|
88 |
GROUNDWATER RECHARGING PITS SHALL BE PROVIDED @6 CUBIC METERS FOR EVERY 100 SQUARE METER OF ROOF AREA.
|
21-11-2025
|
IN PROGRESS
|
89 |
ALL THE PASSAGES AROUND THE BUILDING SHALL BE DEVELOPED WITH PERMEABLE PAVERS BLOCK FOR ABSORPTION OF RAIN WATER AND SEEPAGE IN TO THE GROUND.
|
21-11-2025
|
IN PROGRESS
|
90 |
HOUSE OWNER’S SOCIETY OFFICE AND ASSEMBLY AREA AT THE RATE OF ONE SQUARE METER FLOOR SPACE PER FLAT SHALL BE PROIVDED AND THE MINIMUM AREA SHALL NOT BE LESS THAN 12 SQUARE METERS.
|
21-11-2025
|
IN PROGRESS
|
91 |
THE BUILDING SHALL NOT BE PUT TO ANY USE OTHER THAN THE PURPOSE FOR WHICH THE PERMISSION IS ACCORDED.
|
21-11-2025
|
IN PROGRESS
|
92 |
ROOFTOP SOLAR ENERGY INSTALLATION SHALL BE PROVIDED AS PER ODA (PLANNING & BUILDING STANDARDS) RULES 2020.
|
21-11-2025
|
IN PROGRESS
|
93 |
THE APPLICANT SHALL PROVIDE MICRO-COMPOSTING SITE/PLANT WITHIN THE PROJECT PREMISES TO MAKE OWN ARRANGEMENT OF SOLID WASTE MANAGEMENT.
|
21-11-2025
|
IN PROGRESS
|
94 |
THE OWNER/APPLICANT/TECHNICAL PERSON SHALL STRICTLY ADHERE TO THE TERMS AND CONDITIONS IMPOSED IN THE NOC/ CLEARANCE OF PUBLIC HEALTH ENGINEERING DIVISION (PHED) VIDE LETTER NO.13108 ON DT.25.06.2015, NOC FROM BMC VIDE LETTER NO.9111 DATED.28.05.2016,NOC CGWA VIDE LETTER NO.CGWA/NOC/INF/ORIG/2020/7414 DATED 17.02.2020, NOC FROM CESU VIDE LETTER NO.7002(4) DATED 27.05.2020.
|
21-11-2025
|
IN PROGRESS
|
95 |
ALL THE FIRE FIGHTING INSTALLATION ETC ARE TO BE ENSURED AND MAINTAINED BY THE APPLICANT AS PER NBC-2016.
|
21-11-2025
|
IN PROGRESS
|
96 |
NO STORM WATER/WATER SHALL BE DISCHARGED TO THE PUBLIC ROAD/PUBLIC PREMISES AND OTHER ADJOINING PLOTS.
|
21-11-2025
|
NOT STARTED
|
97 |
ADHERE TO THE PROVISIONS OF ODA (PLANNING & BUILDING STANDARDS) RULES 2020 STRICTLY AND CONDITIONS THERETO.
|
21-11-2025
|
NOT STARTED
|
98 |
THE NUMBER OF DWELLING UNITS SO APPROVED SHALL NOT BE CHANGED IN ANY MANNER.
|
21-11-2025
|
IN PROGRESS
|
99 |
THE APPLICANT ON ITS OWN COST SHALL DEVELOP THE EXISTING APPROACH ROAD WITH BLACK TO PUP TO THE PROJECT SITE BOOUNDARY.
|
21-11-2025
|
NOT STARTED
|
100 |
THE APPLICANT DURING THE COURSE OF CONSTRUCTION AND TILL ISSUE OF OCCUPANCY CERTIFICATE SHALL KEEP PASTED IN A CONSPICUOUS PLACE A COPY OF THE BUILDING PERMIT AND COPY OF APPROVED DRAWING AND SHALL PLACE A DISPLAY BOARD ON SITE WITH DETAILS AND DECLARATION AS GIVEN AT ANNEXURE-I.
|
21-11-2025
|
NOT STARTED
|
Updated Changes on 15-04-2024 |
101 |
PARKING SPACE MEASURING 297.31 SQM (STILT FLOOR) AS SHOWN IN THE APPROVED PLAN SHALL BE LEFT FOR PARKING OF VEHICLES AND NO PART OF IT WILL BE USED FOR ANY OTHER PURPOSE.
|
21-11-2025
|
IN PROGRESS
|
102 |
THE LAND OVER WHICH CONSTRUCTION IS PROPOSED IS ACCESSIBLE BY AN APPROVED MEANS OF ACCESS OF 12.20 MTR IN WIDTH.
|
21-11-2025
|
IN PROGRESS
|
103 |
PERMIT THE AUTHORITY TO ENTER THE BUILDING OR PREMISES FOR WHICH THE PERMISSION HAS BEEN GRANTED AT ANY REASONABLE TIME FOR THE PURPOSE OF ENFORCING THE REGULATIONS.
|
21-11-2025
|
WILL BE COMPLIED AS PER THE CONDTION
|
104 |
OBTAIN WHEREEVER APPLICABLE FROM THE COMPETENT AUTHORITY PERMISSIONS/CLEARANCE REQUIRED IN CONNECTION WITH THE PROPOSED WORK.
|
21-11-2025
|
IN PROGRESS
|
105 |
OBTAIN AN OCCUPANCY CERTIFICATE FROM THE AUTHORITY PRIOR TO OCCUPATION OF BUILDING IN FULL OR PART.
|
21-11-2025
|
IN PROGRESS
|
106 |
ENSURE COMPLIANCE OF PROVISION OF VARIOUS ACTS, RULES, REGULATIONS AND CODES WHICH CONTROL OR PROVIDE FOR VARIOUS NORMS GOVERNING DEVELOPMENT INCLUDING BUT NOT LIMITED TO PLANNING NORMS FIRE SAFTEY ENVIRONMENTAL NORMS AS APPLICABLE IN EACH CASE.
|
21-11-2025
|
IN PROGRESS
|
107 |
WHEREEVER TESTS OF ANY MATERIAL ARE MADE TO ENSURE CONFORMITY OF THE REQUIREMENTS OF THE REGULATIONS IN FORCE RECORDS OF THE TEST DATA SHALL BE KEPT AVAILABLE FOR INSPECTION DURING THE CONSTRUCTION OF BUILDING AND FOR SUCH PERIOD THEREAFTER AS REQUIRED BY THE AUTHORITY.
|
21-11-2025
|
IN PROGRESS
|
108 |
STORM WATER FROM THE PREMISES OF ROOF TOP SHALL BE CONVEYED AND DISCHARGED TO THE RAIN WATER RECHARGING PITS AS PER RULE-47 OF ODA (PLANNING & BUILDING STANDARDS) RULES 2020.
|
21-11-2025
|
IN PROGRESS
|
109 |
THE SPACE WHICH IS MEANT FOR PARKING SHALL NOT BE CHANGED TO ANY OTHER USE AND SHALL NOT BE PARTITIONED /CLOSED IN ANY MANNER.
|
21-11-2025
|
IN PROGRESS
|
110 |
AT LEAST 10% OF PARKING IN HOUSING PROJECT/APARTMENT BUILDING SHALL BE EARMARKED FOR VISITORS AND SHALL BE OPEN TO ALL VISITORS AND IN ALL OTHER CASES AS PER NORMS UNDER RULE 37 OF ODA (P&BS) RULES 2020.
|
21-11-2025
|
IN PROGRESS
|
111 |
AT LEAST 50% OF THE OPEN SPACE SHALL BE PREVIOUS AND PLANTATION @ ONE TREE PER 80 SQM OF THE PLOT AREA SHALL BE MADE BY THE APPLICANT AS PER PROVISION UNDER RULE-30 OF ODA (P&BS) RULES,2020.
|
21-11-2025
|
IN PROGRESS
|
112 |
RAIN WATER HARVESTING STRUCTURES SHALL BE PROVIDED WITHIN THE PREMISES FOR COLLECTION AND USE OF ROOFTOP RAINWATER.
|
21-11-2025
|
IN PROGRESS
|
113 |
GROUNDWATER RECHARGING PITS SHALL BE PROVIDED @6 CUBIC METERS FOR EVERY 100 SQUARE METER OF ROOF AREA.
|
21-11-2025
|
IN PROGRESS
|
114 |
ALL THE PASSAGES AROUND THE BUILDING SHALL BE DEVELOPED WITH PERMEABLE PAVERS BLOCK FOR ABSORPTION OF RAIN WATER AND SEEPAGE IN TO THE GROUND.
|
21-11-2025
|
IN PROGRESS
|
115 |
HOUSE OWNER’S SOCIETY OFFICE AND ASSEMBLY AREA AT THE RATE OF ONE SQUARE METER FLOOR SPACE PER FLAT SHALL BE PROIVDED AND THE MINIMUM AREA SHALL NOT BE LESS THAN 12 SQUARE METERS.
|
21-11-2025
|
IN PROGRESS
|
116 |
THE BUILDING SHALL NOT BE PUT TO ANY USE OTHER THAN THE PURPOSE FOR WHICH THE PERMISSION IS ACCORDED.
|
21-11-2025
|
IN PROGRESS
|
117 |
ROOFTOP SOLAR ENERGY INSTALLATION SHALL BE PROVIDED AS PER ODA (PLANNING & BUILDING STANDARDS) RULES 2020.
|
21-11-2025
|
IN PROGRESS
|
118 |
THE APPLICANT SHALL PROVIDE MICRO-COMPOSTING SITE/PLANT WITHIN THE PROJECT PREMISES TO MAKE OWN ARRANGEMENT OF SOLID WASTE MANAGEMENT.
|
21-11-2025
|
IN PROGRESS
|
119 |
THE OWNER/APPLICANT/TECHNICAL PERSON SHALL STRICTLY ADHERE TO THE TERMS AND CONDITIONS IMPOSED IN THE NOC/ CLEARANCE OF PUBLIC HEALTH ENGINEERING DIVISION (PHED) VIDE LETTER NO.13108 ON DT.25.06.2015, NOC FROM BMC VIDE LETTER NO.9111 DATED.28.05.2016,NOC CGWA VIDE LETTER NO.CGWA/NOC/INF/ORIG/2020/7414 DATED 17.02.2020, NOC FROM CESU VIDE LETTER NO.7002(4) DATED 27.05.2020.
|
21-11-2025
|
IN PROGRESS
|
120 |
ALL THE FIRE FIGHTING INSTALLATION ETC ARE TO BE ENSURED AND MAINTAINED BY THE APPLICANT AS PER NBC-2016.
|
21-11-2025
|
IN PROGRESS
|
121 |
NO STORM WATER/WATER SHALL BE DISCHARGED TO THE PUBLIC ROAD/PUBLIC PREMISES AND OTHER ADJOINING PLOTS.
|
21-11-2025
|
NOT STARTED
|
122 |
ADHERE TO THE PROVISIONS OF ODA (PLANNING & BUILDING STANDARDS) RULES 2020 STRICTLY AND CONDITIONS THERETO.
|
21-11-2025
|
NOT STARTED
|
123 |
THE NUMBER OF DWELLING UNITS SO APPROVED SHALL NOT BE CHANGED IN ANY MANNER.
|
21-11-2025
|
IN PROGRESS
|
124 |
THE APPLICANT ON ITS OWN COST SHALL DEVELOP THE EXISTING APPROACH ROAD WITH BLACK TO PUP TO THE PROJECT SITE BOOUNDARY.
|
21-11-2025
|
NOT STARTED
|
125 |
THE APPLICANT DURING THE COURSE OF CONSTRUCTION AND TILL ISSUE OF OCCUPANCY CERTIFICATE SHALL KEEP PASTED IN A CONSPICUOUS PLACE A COPY OF THE BUILDING PERMIT AND COPY OF APPROVED DRAWING AND SHALL PLACE A DISPLAY BOARD ON SITE WITH DETAILS AND DECLARATION AS GIVEN AT ANNEXURE-I.
|
21-11-2025
|
NOT STARTED
|
Updated Changes on 14-07-2024 |
126 |
PARKING SPACE MEASURING 297.31 SQM (STILT FLOOR) AS SHOWN IN THE APPROVED PLAN SHALL BE LEFT FOR PARKING OF VEHICLES AND NO PART OF IT WILL BE USED FOR ANY OTHER PURPOSE.
|
21-11-2025
|
IN PROGRESS
|
127 |
THE LAND OVER WHICH CONSTRUCTION IS PROPOSED IS ACCESSIBLE BY AN APPROVED MEANS OF ACCESS OF 12.20 MTR IN WIDTH.
|
21-11-2025
|
IN PROGRESS
|
128 |
PERMIT THE AUTHORITY TO ENTER THE BUILDING OR PREMISES FOR WHICH THE PERMISSION HAS BEEN GRANTED AT ANY REASONABLE TIME FOR THE PURPOSE OF ENFORCING THE REGULATIONS.
|
21-11-2025
|
WILL BE COMPLIED AS PER THE CONDTION
|
129 |
OBTAIN WHEREEVER APPLICABLE FROM THE COMPETENT AUTHORITY PERMISSIONS/CLEARANCE REQUIRED IN CONNECTION WITH THE PROPOSED WORK.
|
21-11-2025
|
IN PROGRESS
|
130 |
OBTAIN AN OCCUPANCY CERTIFICATE FROM THE AUTHORITY PRIOR TO OCCUPATION OF BUILDING IN FULL OR PART.
|
21-11-2025
|
IN PROGRESS
|
131 |
ENSURE COMPLIANCE OF PROVISION OF VARIOUS ACTS, RULES, REGULATIONS AND CODES WHICH CONTROL OR PROVIDE FOR VARIOUS NORMS GOVERNING DEVELOPMENT INCLUDING BUT NOT LIMITED TO PLANNING NORMS FIRE SAFTEY ENVIRONMENTAL NORMS AS APPLICABLE IN EACH CASE.
|
21-11-2025
|
IN PROGRESS
|
132 |
WHEREEVER TESTS OF ANY MATERIAL ARE MADE TO ENSURE CONFORMITY OF THE REQUIREMENTS OF THE REGULATIONS IN FORCE RECORDS OF THE TEST DATA SHALL BE KEPT AVAILABLE FOR INSPECTION DURING THE CONSTRUCTION OF BUILDING AND FOR SUCH PERIOD THEREAFTER AS REQUIRED BY THE AUTHORITY.
|
21-11-2025
|
IN PROGRESS
|
133 |
STORM WATER FROM THE PREMISES OF ROOF TOP SHALL BE CONVEYED AND DISCHARGED TO THE RAIN WATER RECHARGING PITS AS PER RULE-47 OF ODA (PLANNING & BUILDING STANDARDS) RULES 2020.
|
21-11-2025
|
IN PROGRESS
|
134 |
THE SPACE WHICH IS MEANT FOR PARKING SHALL NOT BE CHANGED TO ANY OTHER USE AND SHALL NOT BE PARTITIONED /CLOSED IN ANY MANNER.
|
21-11-2025
|
IN PROGRESS
|
135 |
AT LEAST 10% OF PARKING IN HOUSING PROJECT/APARTMENT BUILDING SHALL BE EARMARKED FOR VISITORS AND SHALL BE OPEN TO ALL VISITORS AND IN ALL OTHER CASES AS PER NORMS UNDER RULE 37 OF ODA (P&BS) RULES 2020.
|
21-11-2025
|
IN PROGRESS
|
136 |
AT LEAST 50% OF THE OPEN SPACE SHALL BE PREVIOUS AND PLANTATION @ ONE TREE PER 80 SQM OF THE PLOT AREA SHALL BE MADE BY THE APPLICANT AS PER PROVISION UNDER RULE-30 OF ODA (P&BS) RULES,2020.
|
21-11-2025
|
IN PROGRESS
|
137 |
RAIN WATER HARVESTING STRUCTURES SHALL BE PROVIDED WITHIN THE PREMISES FOR COLLECTION AND USE OF ROOFTOP RAINWATER.
|
21-11-2025
|
IN PROGRESS
|
138 |
GROUNDWATER RECHARGING PITS SHALL BE PROVIDED @6 CUBIC METERS FOR EVERY 100 SQUARE METER OF ROOF AREA.
|
21-11-2025
|
IN PROGRESS
|
139 |
ALL THE PASSAGES AROUND THE BUILDING SHALL BE DEVELOPED WITH PERMEABLE PAVERS BLOCK FOR ABSORPTION OF RAIN WATER AND SEEPAGE IN TO THE GROUND.
|
21-11-2025
|
IN PROGRESS
|
140 |
HOUSE OWNER’S SOCIETY OFFICE AND ASSEMBLY AREA AT THE RATE OF ONE SQUARE METER FLOOR SPACE PER FLAT SHALL BE PROIVDED AND THE MINIMUM AREA SHALL NOT BE LESS THAN 12 SQUARE METERS.
|
21-11-2025
|
IN PROGRESS
|
141 |
THE BUILDING SHALL NOT BE PUT TO ANY USE OTHER THAN THE PURPOSE FOR WHICH THE PERMISSION IS ACCORDED.
|
21-11-2025
|
IN PROGRESS
|
142 |
ROOFTOP SOLAR ENERGY INSTALLATION SHALL BE PROVIDED AS PER ODA (PLANNING & BUILDING STANDARDS) RULES 2020.
|
21-11-2025
|
IN PROGRESS
|
143 |
THE APPLICANT SHALL PROVIDE MICRO-COMPOSTING SITE/PLANT WITHIN THE PROJECT PREMISES TO MAKE OWN ARRANGEMENT OF SOLID WASTE MANAGEMENT.
|
21-11-2025
|
IN PROGRESS
|
144 |
THE OWNER/APPLICANT/TECHNICAL PERSON SHALL STRICTLY ADHERE TO THE TERMS AND CONDITIONS IMPOSED IN THE NOC/ CLEARANCE OF PUBLIC HEALTH ENGINEERING DIVISION (PHED) VIDE LETTER NO.13108 ON DT.25.06.2015, NOC FROM BMC VIDE LETTER NO.9111 DATED.28.05.2016,NOC CGWA VIDE LETTER NO.CGWA/NOC/INF/ORIG/2020/7414 DATED 17.02.2020, NOC FROM CESU VIDE LETTER NO.7002(4) DATED 27.05.2020.
|
21-11-2025
|
IN PROGRESS
|
145 |
ALL THE FIRE FIGHTING INSTALLATION ETC ARE TO BE ENSURED AND MAINTAINED BY THE APPLICANT AS PER NBC-2016.
|
21-11-2025
|
IN PROGRESS
|
146 |
NO STORM WATER/WATER SHALL BE DISCHARGED TO THE PUBLIC ROAD/PUBLIC PREMISES AND OTHER ADJOINING PLOTS.
|
21-11-2025
|
NOT STARTED
|
147 |
ADHERE TO THE PROVISIONS OF ODA (PLANNING & BUILDING STANDARDS) RULES 2020 STRICTLY AND CONDITIONS THERETO.
|
21-11-2025
|
NOT STARTED
|
148 |
THE NUMBER OF DWELLING UNITS SO APPROVED SHALL NOT BE CHANGED IN ANY MANNER.
|
21-11-2025
|
IN PROGRESS
|
149 |
THE APPLICANT ON ITS OWN COST SHALL DEVELOP THE EXISTING APPROACH ROAD WITH BLACK TO PUP TO THE PROJECT SITE BOOUNDARY.
|
21-11-2025
|
NOT STARTED
|
150 |
THE APPLICANT DURING THE COURSE OF CONSTRUCTION AND TILL ISSUE OF OCCUPANCY CERTIFICATE SHALL KEEP PASTED IN A CONSPICUOUS PLACE A COPY OF THE BUILDING PERMIT AND COPY OF APPROVED DRAWING AND SHALL PLACE A DISPLAY BOARD ON SITE WITH DETAILS AND DECLARATION AS GIVEN AT ANNEXURE-I.
|
21-11-2025
|
NOT STARTED
|
Updated Changes on 14-07-2024 |
151 |
PARKING SPACE MEASURING 297.31 SQM (STILT FLOOR) AS SHOWN IN THE APPROVED PLAN SHALL BE LEFT FOR PARKING OF VEHICLES AND NO PART OF IT WILL BE USED FOR ANY OTHER PURPOSE.
|
21-11-2025
|
IN PROGRESS
|
152 |
THE LAND OVER WHICH CONSTRUCTION IS PROPOSED IS ACCESSIBLE BY AN APPROVED MEANS OF ACCESS OF 12.20 MTR IN WIDTH.
|
21-11-2025
|
IN PROGRESS
|
153 |
PERMIT THE AUTHORITY TO ENTER THE BUILDING OR PREMISES FOR WHICH THE PERMISSION HAS BEEN GRANTED AT ANY REASONABLE TIME FOR THE PURPOSE OF ENFORCING THE REGULATIONS.
|
21-11-2025
|
WILL BE COMPLIED AS PER THE CONDTION
|
154 |
OBTAIN WHEREEVER APPLICABLE FROM THE COMPETENT AUTHORITY PERMISSIONS/CLEARANCE REQUIRED IN CONNECTION WITH THE PROPOSED WORK.
|
21-11-2025
|
IN PROGRESS
|
155 |
OBTAIN AN OCCUPANCY CERTIFICATE FROM THE AUTHORITY PRIOR TO OCCUPATION OF BUILDING IN FULL OR PART.
|
21-11-2025
|
IN PROGRESS
|
156 |
ENSURE COMPLIANCE OF PROVISION OF VARIOUS ACTS, RULES, REGULATIONS AND CODES WHICH CONTROL OR PROVIDE FOR VARIOUS NORMS GOVERNING DEVELOPMENT INCLUDING BUT NOT LIMITED TO PLANNING NORMS FIRE SAFTEY ENVIRONMENTAL NORMS AS APPLICABLE IN EACH CASE.
|
21-11-2025
|
IN PROGRESS
|
157 |
WHEREEVER TESTS OF ANY MATERIAL ARE MADE TO ENSURE CONFORMITY OF THE REQUIREMENTS OF THE REGULATIONS IN FORCE RECORDS OF THE TEST DATA SHALL BE KEPT AVAILABLE FOR INSPECTION DURING THE CONSTRUCTION OF BUILDING AND FOR SUCH PERIOD THEREAFTER AS REQUIRED BY THE AUTHORITY.
|
21-11-2025
|
IN PROGRESS
|
158 |
STORM WATER FROM THE PREMISES OF ROOF TOP SHALL BE CONVEYED AND DISCHARGED TO THE RAIN WATER RECHARGING PITS AS PER RULE-47 OF ODA (PLANNING & BUILDING STANDARDS) RULES 2020.
|
21-11-2025
|
IN PROGRESS
|
159 |
THE SPACE WHICH IS MEANT FOR PARKING SHALL NOT BE CHANGED TO ANY OTHER USE AND SHALL NOT BE PARTITIONED /CLOSED IN ANY MANNER.
|
21-11-2025
|
IN PROGRESS
|
160 |
AT LEAST 10% OF PARKING IN HOUSING PROJECT/APARTMENT BUILDING SHALL BE EARMARKED FOR VISITORS AND SHALL BE OPEN TO ALL VISITORS AND IN ALL OTHER CASES AS PER NORMS UNDER RULE 37 OF ODA (P&BS) RULES 2020.
|
21-11-2025
|
IN PROGRESS
|
161 |
AT LEAST 50% OF THE OPEN SPACE SHALL BE PREVIOUS AND PLANTATION @ ONE TREE PER 80 SQM OF THE PLOT AREA SHALL BE MADE BY THE APPLICANT AS PER PROVISION UNDER RULE-30 OF ODA (P&BS) RULES,2020.
|
21-11-2025
|
IN PROGRESS
|
162 |
RAIN WATER HARVESTING STRUCTURES SHALL BE PROVIDED WITHIN THE PREMISES FOR COLLECTION AND USE OF ROOFTOP RAINWATER.
|
21-11-2025
|
IN PROGRESS
|
163 |
GROUNDWATER RECHARGING PITS SHALL BE PROVIDED @6 CUBIC METERS FOR EVERY 100 SQUARE METER OF ROOF AREA.
|
21-11-2025
|
IN PROGRESS
|
164 |
ALL THE PASSAGES AROUND THE BUILDING SHALL BE DEVELOPED WITH PERMEABLE PAVERS BLOCK FOR ABSORPTION OF RAIN WATER AND SEEPAGE IN TO THE GROUND.
|
21-11-2025
|
IN PROGRESS
|
165 |
HOUSE OWNER’S SOCIETY OFFICE AND ASSEMBLY AREA AT THE RATE OF ONE SQUARE METER FLOOR SPACE PER FLAT SHALL BE PROIVDED AND THE MINIMUM AREA SHALL NOT BE LESS THAN 12 SQUARE METERS.
|
21-11-2025
|
IN PROGRESS
|
166 |
THE BUILDING SHALL NOT BE PUT TO ANY USE OTHER THAN THE PURPOSE FOR WHICH THE PERMISSION IS ACCORDED.
|
21-11-2025
|
IN PROGRESS
|
167 |
ROOFTOP SOLAR ENERGY INSTALLATION SHALL BE PROVIDED AS PER ODA (PLANNING & BUILDING STANDARDS) RULES 2020.
|
21-11-2025
|
IN PROGRESS
|
168 |
THE APPLICANT SHALL PROVIDE MICRO-COMPOSTING SITE/PLANT WITHIN THE PROJECT PREMISES TO MAKE OWN ARRANGEMENT OF SOLID WASTE MANAGEMENT.
|
21-11-2025
|
IN PROGRESS
|
169 |
THE OWNER/APPLICANT/TECHNICAL PERSON SHALL STRICTLY ADHERE TO THE TERMS AND CONDITIONS IMPOSED IN THE NOC/ CLEARANCE OF PUBLIC HEALTH ENGINEERING DIVISION (PHED) VIDE LETTER NO.13108 ON DT.25.06.2015, NOC FROM BMC VIDE LETTER NO.9111 DATED.28.05.2016,NOC CGWA VIDE LETTER NO.CGWA/NOC/INF/ORIG/2020/7414 DATED 17.02.2020, NOC FROM CESU VIDE LETTER NO.7002(4) DATED 27.05.2020.
|
21-11-2025
|
IN PROGRESS
|
170 |
ALL THE FIRE FIGHTING INSTALLATION ETC ARE TO BE ENSURED AND MAINTAINED BY THE APPLICANT AS PER NBC-2016.
|
21-11-2025
|
IN PROGRESS
|
171 |
NO STORM WATER/WATER SHALL BE DISCHARGED TO THE PUBLIC ROAD/PUBLIC PREMISES AND OTHER ADJOINING PLOTS.
|
21-11-2025
|
NOT STARTED
|
172 |
ADHERE TO THE PROVISIONS OF ODA (PLANNING & BUILDING STANDARDS) RULES 2020 STRICTLY AND CONDITIONS THERETO.
|
21-11-2025
|
NOT STARTED
|
173 |
THE NUMBER OF DWELLING UNITS SO APPROVED SHALL NOT BE CHANGED IN ANY MANNER.
|
21-11-2025
|
IN PROGRESS
|
174 |
THE APPLICANT ON ITS OWN COST SHALL DEVELOP THE EXISTING APPROACH ROAD WITH BLACK TO PUP TO THE PROJECT SITE BOOUNDARY.
|
21-11-2025
|
NOT STARTED
|
175 |
THE APPLICANT DURING THE COURSE OF CONSTRUCTION AND TILL ISSUE OF OCCUPANCY CERTIFICATE SHALL KEEP PASTED IN A CONSPICUOUS PLACE A COPY OF THE BUILDING PERMIT AND COPY OF APPROVED DRAWING AND SHALL PLACE A DISPLAY BOARD ON SITE WITH DETAILS AND DECLARATION AS GIVEN AT ANNEXURE-I.
|
21-11-2025
|
NOT STARTED
|