Promoter Details
Promoter Name :
Animesh Swain
Project Name :
Swarna Bhumi
Project Location :
(Residential Project, Duplex, No. of Units-24)

Form- I

A. Promoter's Details

:  M/S. SKYIES INFRAHOME(OPC) PVT. LTD. :  Private Company
:  U45500OR2017OPC027479 :View
NA :  Plot NO-89, Kharvelnagar, Bhubaneswar-751001
:  HIG-1/14, BDA Colony, Kapilaprasad, Bhubaneswar-751002, Dist. Khordha, Odisha :  skyiesinfra@gmail.com
:  239455 :  9337909110
:  AAZCS0674E :View
:   2 Years Experiences in Building line :  NO
:  www.info@skyiesinfra.com

B. Details of Board of Directors / Partners / MC Members

:  Animesh Swain :  
:  Managing Director :  BTWPS6162H
:PAN Card :  skyiesinfra@gmail.com
:   2 Years Experiences in Building line :  9337909110
:  No
:  Yes :  NA

Annexure-1

Details of last projects already implemented (Ongoing or Complete)

Have you implemented any project(s) previously (May be Ongoing or Completed):No

Annexure-2

Details of the project to be registered

:   New :  Swarna Bhumi
:  Residential :  (Residential Project, Duplex, No. of Units-24)
:  Khordha :  Jatni
:  751002 :  Development Authority
:  Bhubaneswar Development Authority
:  Duplex :  NA

Land Details of the Project


:  2057 :  469/63
:  Panchagaon, Bhubaneswar :  3056
:  Yes
Yes :  View
:  View
:  Other Person
:  Rajaniprabha Pradhan Pradyumna Kumar Pradhan :  Rajaniprtava Pradhan & Pradyumna Kumar Pradhan, to give GPA promoter Skyies Infra Home(OPC) Pvt. Ltd
: No
: Yes
:  11121802374 :  02-06-2018
:  Bhubaneswar Tahasil :  Attached

:  2056 :  469/63
:  Panchagaon, Bhubaneswar :  1093
:  Yes
Yes :  View
:  View
:  Other Person
:  Rajaniprabha Pradhan Pradyumna Kumar Pradhan :  Rajaniprtava Pradhan & Pradyumna Kumar Pradhan, to give GPA promoter Skyies Infra Home(OPC) Pvt. Ltd
: No
: Yes
:  11121801707 :  21-04-2018
:  Bhubaneswar Tahasil :  Attached

:  2055 :  469/63
:  Panchagaon, Bhubaneswar :  405
:  Yes
Yes :  View
:  View
:  Other Person
:  Rajaniprabha pradhan Pradyumna Kumar Pradhan :  Rajaniprtava Pradhan & Pradyumna Kumar Pradhan, to give GPA promoter Skyies Infra Home(OPC) Pvt. Ltd
: No
: Yes
:  11121801707 :  21-04-2018
:  Bhubaneswar Tahasil :  Attached

:  2054 :  469/63
:  Panchagaon, Bhubaneswar :  242
:  Yes
Yes :  View
:  View
:  Other Person
:  Rajaniprabha Pradhan Pradyumna Kumar Pradhan :  Rajaniprtava Pradhan & Pradyumna Kumar Pradhan, to give GPA promoter Skyies Infra Home(OPC) Pvt. Ltd
: No
: Yes
:  11121801707 :  21-04-2018
:  Bhubaneswar Tahasil :  Attached

:  2053 :  469/261
:  Panchagaon, Bhubaneswar :  1335
:  Yes
Yes :  View
:  View
:  Other Person
:  Rajaniprava Pradhan, Pradyumna Kumar Pradhan, Puspita Pradhan :  Rajaniprava Pradhan, Pradyumna Kumar Pradhan, Puspita Pradhan to give GPA promoter Skyies Infra Home(OPC) Pvt. Ltd
: No
: Yes
:  11121801708 :  21-04-2018
:  Bhubaneswar Tahasil :  Attached

Development Agreement

: Yes
Serial No. Particulars of the Person Land/Plot Details Share of the Person Document Attached
1 Rajaniprabha Pradhan Pradyumna Kumar Pradhan 2057 35   Agreement Copy
2 Rajaniprabha Pradhan Pradyumna Kumar Pradh 2056 35   Agreement Copy
3 Rajaniprabha Pradhan Pradyumna Kumar Pradh 2055 35   Agreement Copy
4 Rajaniprabha Pradhan Pradyumna Kumar Pradh 2054 35   Agreement Copy
5 Rajaniprava Pradhan, Pradyumna Kumar Pradhan, Puspita Pradhan 2053 35   Agreement Copy

Building Plan

  View   View
  Download site plan 08-01-2023

Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 The Sub-division of land with house shall be used exclusively for Residential purpose and the uses shall not be changed to any other use without prior approval of the Authority 10-11-2022 Not yet work
2 The Development shall be undertaking strictly according to plan(enclosed) 10-11-2022 Not yet work
3 The land over which Sub-division layout is proposed accessible by an approved means of access of 12.00 mtr in width 10-11-2022 Not yet work
4 The land in question must be in lawful ownership and peaceful possession of the applicant. 10-11-2022 Not yet work
5 The permission is valid for aperiod of three years with effect from the date of its issue. 10-11-2022 Not yet work
6 The road and open spaces civic amenties area shown in the gift deed shall be developed by the applicant at their own cost which was executed between GPA holder and BDA for public through fare. 05-12-2022 Not yet work
7 Water supply Electricity are to be provided in the layout area by the applicant at their own cost and transferred to respect Govt agencies for further maintenance.. 14-12-2022 Not yet work
8 Plantation in the open spaces and along the internal roads is to be made before delivering the sub-plots. 15-12-2022 Not yet work
9 All roadside drains are to be developed maintaining proper slope as to convey strom water to the public drain with intimation to BDA for verification. 16-12-2022 Not yet work

Layout Plan

: Yes :  View

Location Map with geo-coordinates of bend points

Point No. Latitude Longitude
1 85°47'43.8''E 20°10'31.5''N
2 85°47'44.3''E 20°10'31.2''N
3 85°47'44.5''E 20°10'31.2''N
4 85°47'44.7''E 20°10'31.1''N
5 85°47'45.0''E 20°10'31.4''N
6 85°47'45.6''E 20°10'30.9''N
7 85°47'46.7''E 20°10'30.6''N
8 85°47'46.6''E 20°10'30.1''N
9 85°47'46.5''E 20°10'29.8''N
10 85°47'46.3''E 20°10'29.2''N
11 85°47''46.4''E 20°10'29.2''N
12 85°47'46.3''E 20°10'28.7''N
13 85°47'46.1''E 20°10'28.6''N
14 85°47'45.3''E 20°1028.8'N
15 85°47'44.9''E 20°10'28.8''N
16 85°47'45.3''E 20°10'28.7''N
17 85°47'44.6''E 20°10'28.0''N
18 85°47'44.1''E 20°10'28.2''N
19 85°47'43.7''E 20°10'29.2''N
20 85°47'43.8''E 20°10'29.2''N
21 85°47'43.6''E 20°10'29.9''N
22 85°47'44.0''E 20°10'30.4''N
23 85°47'43.6''E 20°10'30.8''N
24 ''85°47'43.5''E 20°10'31.1''N
25 85°47'43.7''E 20°10'31.4''N
View

Milestone of Project Construction

Description* Scheduled date of completion Current Status Site Images
Site Development 20-10-2020 Not yet Work
Roof Casting NA NA NA
Ground Floor/Stilt Floor 20-10-2020 Not yet Work
1 Floor 12-02-2021 Not yet Work
2 Floor 20-08-2020 NA
3 Floor 20-08-2020 NA
Brick Work & Plastering NA NA NA
Ground Floor/Stilt Floor 20-02-2021 Not yet Work
1 Floor 15-03-2021 Not yet Work
Electrical Works 16-12-2022 Not yet Work
Concealed Cabling including Plugs & switches 18-12-2022 Not yet Work
Installation & Charging of Transformer 21-12-2022 Not yet Work
Connection to Flats/Apartments 22-12-2022 Not yet Work
PH works 12-12-2022 Not yet Work
Laying of concealed Pipes 18-12-2022 Not yet Work
PH Fittings 20-12-2022 Not yet Work
Overhead Water Tanks 20-12-2022 Not yet Work
Water Supply Connection to all units 25-12-2022 Not yet Work
STP construction and completion 25-12-2022 Not yet Work
Distempering & Colouring of all units and exteriors 26-12-2022 Not yet Work
Fixation of doors and windows 28-12-2022 Not yet Work
Scheduled Date of handing over possession 30-12-2022 Not yet Work
Development of common areas, parks, gardens etc 30-12-2022 Not yet Work
Site Development 20-10-2020 finish NA
NA NA NA NA
Ground Floor/Stilt Floor 20-10-2020 finish NA
1 Floor 12-02-2021 Not yet Work NA
2 Floor 20-08-2020 NA NA
3 Floor 20-08-2020 NA NA
NA NA NA NA
Ground Floor/Stilt Floor 20-02-2021 Not yet Work NA
1 Floor 15-03-2021 Not yet Work NA
Electrical Works 16-12-2022 Not yet Work NA
Concealed Cabling including Plugs & switches 18-12-2022 Not yet Work NA
Installation & Charging of Transformer 21-12-2022 Not yet Work NA
Connection to Flats/Apartments 22-12-2022 Not yet Work NA
PH works 12-12-2022 Not yet Work NA
Laying of concealed Pipes 18-12-2022 Not yet Work NA
PH Fittings 20-12-2022 Not yet Work NA
Overhead Water Tanks 20-12-2022 Not yet Work NA
Water Supply Connection to all units 25-12-2022 Not yet Work NA
STP construction and completion 25-12-2022 Not yet Work NA
Distempering & Colouring of all units and exteriors 26-12-2022 Not yet Work NA
Fixation of doors and windows 28-12-2022 Not yet Work NA
Scheduled Date of handing over possession 30-12-2022 Not yet Work NA
Development of common areas, parks, gardens etc 30-12-2022 Not yet Work NA
Site Development 20-10-2020 COMPLETED
NA 25-01-2024 NA
Ground Floor/Stilt Floor 20-10-2020 COMPLETED
1 Floor 12-02-2021 COMPLETED
2 Floor 20-08-2020 NA NA
3 Floor 20-08-2020 NA NA
NA 22-03-2024 NA NA
Ground Floor/Stilt Floor 20-02-2021 COMPLETED NA
1 Floor 15-03-2021 COMPLETED NA
Electrical Works 16-12-2022 COMPLETED NA
Concealed Cabling including Plugs & switches 18-12-2022 COMPLETED NA
Installation & Charging of Transformer 21-12-2022 COMPLETED NA
Connection to Flats/Apartments 22-12-2022 COMPLETED NA
PH works 12-12-2022 COMPLETED NA
Laying of concealed Pipes 18-12-2022 COMPLETED NA
PH Fittings 20-12-2022 COMPLETED NA
Overhead Water Tanks 20-12-2022 COMPLETED NA
Water Supply Connection to all units 25-12-2022 COMPLETED NA
STP construction and completion 25-12-2022 COMPLETED NA
Distempering & Colouring of all units and exteriors 26-12-2022 COMPLETED NA
Fixation of doors and windows 28-12-2022 COMPLETED NA
Scheduled Date of handing over possession 30-12-2022 COMPLETED NA
Development of common areas, parks, gardens etc 30-12-2022 COMPLETED NA
Site Development 20-10-2020 COMPLETED NA
NA 25-01-2024 NA NA
Ground Floor/Stilt Floor 20-10-2020 COMPLETED NA
1 Floor 12-02-2021 COMPLETED NA
2 Floor 20-08-2020 NA NA
3 Floor 20-08-2020 NA NA
NA 22-03-2024 NA NA
Ground Floor/Stilt Floor 20-02-2021 COMPLETED NA
1 Floor 15-03-2021 COMPLETED NA
Electrical Works 16-12-2022 COMPLETED NA
Concealed Cabling including Plugs & switches 18-12-2022 COMPLETED NA
Installation & Charging of Transformer 21-12-2022 COMPLETED NA
Connection to Flats/Apartments 22-12-2022 COMPLETED NA
PH works 12-12-2022 COMPLETED NA
Laying of concealed Pipes 18-12-2022 COMPLETED NA
PH Fittings 20-12-2022 COMPLETED NA
Overhead Water Tanks 20-12-2022 COMPLETED NA
Water Supply Connection to all units 25-12-2022 COMPLETED NA
STP construction and completion 25-12-2022 COMPLETED NA
Distempering & Colouring of all units and exteriors 26-12-2022 COMPLETED NA
Fixation of doors and windows 28-12-2022 COMPLETED NA
Scheduled Date of handing over possession 30-12-2022 COMPLETED NA
Development of common areas, parks, gardens etc 30-12-2022 COMPLETED NA

Category and no. of units to be developed

:  Residential
:  
:  24
:  
:  
:  
Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership
Carpet Area Balcony Area Exclusive Open Terrace Area
1 1 51.29 13.56 22.77 Promoter
2 2 51.29 13.56 22.77 Promoter
3 3 51.29 13.56 22.77 Promoter
4 4 51.29 13.56 22.77 Land Owner
5 5 51.29 13.56 22.77 Land Owner
6 6 51.29 13.56 22.77 Promoter
7 7 51.29 13.56 22.77 Promoter
8 8 64.63 15.96 4.12 Promoter
9 9 51.29 13.56 22.77 Promoter
10 10 51.29 13.56 22.77 Promoter
11 11 51.29 13.56 22.77 Promoter
12 12 51.29 13.56 22.77 Promoter
13 13 51.29 13.56 22.77 Promoter
14 14 51.29 13.56 22.77 Promoter
15 15 51.29 13.56 22.77 Promoter
16 16 51.29 13.56 22.77 Land Owner
17 17 51.29 13.56 22.77 Land Owner
18 18 51.29 13.56 22.77 Land Owner
19 19 51.29 13.56 22.77 Land Owner
20 20 51.29 13.56 22.77 Land Owner
21 21 64.63 15.96 4.12 Land Owner
22 22 64.63 15.96 4.12 Promoter
23 23 51.29 13.56 22.77 Promoter
24 24 51.29 13.56 22.77 Promoter
Types of garages and parking
House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
1 Covered Parking 1 12.3*3.21 36.36 Included
2 Covered Parking 2 12.3*3.21 36.36 Included
3 Covered Parking 3 12.3*3.21 36.36 Included
4 Covered Parking 4 12.3*3.21 36.36 Included
5 Covered Parking 5 12.3*3.21 36.36 Included
6 Covered Parking 6 12.3*3.21 36.36 Included
7 Covered Parking 7 12.3*3.21 36.36 Included
8 Covered Parking 8 12.3*3.21 36.36 Included
9 Covered Parking 9 12.3*3.21 36.36 Included
10 Covered Parking 10 12.3*3.21 36.36 Included
11 Covered Parking 11 12.3*3.21 36.36 Included
12 Covered Parking 12 12.3*3.21 36.36 Included
13 Covered Parking 13 12.3*3.21 36.36 Included
14 Covered Parking 14 12.3*3.21 36.36 Included
15 Covered Parking 15 12.3*3.21 36.36 Included
16 Covered Parking 16 12.3*3.21 36.36 Included
17 Covered Parking 17 12.3*3.21 36.36 Included
18 Covered Parking 18 12.3*3.21 36.36 Included
19 Covered Parking 19 12.3*3.21 36.36 Included
20 Covered Parking 20 12.3*3.21 36.36 Included
21 Covered Parking 21 12.3*3.21 36.36 Included
22 Covered Parking 22 12.3*3.21 36.36 Included
23 Covered Parking 23 12.3*3.21 36.36 Included
24 Covered Parking 24 12.3*3.21 36.36 Included
Yes

Facilities to be provided

Particulars of Facilities Status of the facility Brief description of facility
Drinking Water Facility Ground Water Copy of Consent Letter
Fire Fighting Facility No all side
Emergency Evacuation Services No
Use of Renewable Energy No
Lift Facility No
Market Complex No
Community Hall No yes
Gymnasium No
Swimming Pool No
Play Ground No
Park/Garden No
Plantation Area Yes Both side
Others(Please Specify) Yes DG Backup
Internal Road Yes Internal road for the above project 9.14 mt wide and the development of the road is to be done by the promoter by inter lucking paver tiles,
External Road Yes Eternal road of the above project 9.14 mt wide public road the development of the road by the concert Authority.
Elecricity Supply Yes Copy of Consent Letter
Other Amenities Yes Dg Back up

Bank Particulars of the Project

  State Bank of India
  PBB Branch Bapujinagar Bhubaneswar
  39592531084
  SBIN0004256
   View
  2597490
  9437665421

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
Nisanta Suman Architect Bhubaneswar,- CA/2001/28081
Suvendra Achirya Construction Engineer Bhubaneswar SER/42/BDA
P Anil Kumar Patra Chartered Accountant Bhubaneswar 324601E

Financial Details

:  721 :   View
  31-12-2023 :  721
:  0 :  0

Documents Attached

Description of Document Option Documents
Fire Safety Certificate Undertaking Attached
Affidavit in Form-A as per clause-l of sub-section-2 of section-4 of the Act Yes Attached
Allotment letter format Yes Attached
Conveyance Deed Format Yes Attached
Affidavit to adopt agreement for sale format as per Rule-8(1) of ORE (R and D) Rules, 2017 Yes Attached
Annual Report 2018-19 Attached
Annual Report 2019-20 Attached
Annual Report 2020-21 Attached
IT Return 2018-19 Attached
IT Return 2019-20 Attached
IT Return 2020-21 Attached
Audit Report 2018-19 Attached
Audit Report 2019-20 Attached
Audit Report 2020-21 Attached

Additional Documents Attached

Sl. No. Title of the document Upload Document
1 Undertaking
2 Old & New ROR of PLot No-2056,2055,2054,&2057
3 Old & New ROR of PLot No-2053
4 18 years Ec of all over plot
5 Conveyance deed format
6 Fire Safty Undertaking
7 Rectified Allotment Letter
8 Rectified Caradastral Map
9 Area composition chart of sub plot corresponding to different revenue plot (Referring building plan drawing)s
10 Rectified Colour Lay out Plan
11 BDA Approval Letter with Clarification affidavit

Other documents

“I undertake that the information submitted by me in this application are correct and true to best my knowledge. I also understand that providing false or wrong information is punishable under the Section-60 of the Real Estate (Regulation & Development) Act, 2016. I also further understand that furnishing wrong or false information will lead to rejection of my application registration of the project with forfeiture of registration fee and other charges deposited by me.”
  All objected documents are uploaded but There is no Option to change the IFCS Coad the IFCS Coad Is-SBIN0004256.with all objected documents uploaded in add more option Kindly excuse it. 2) All objection has been complied with clarification affidavit kindly process my file.

Construction Progress

Updated Construction Progress

SL NO. Description Scheduled date of completion Current Status Remarks
1 Site Development 20-10-2020 Not yet Work
2 Roof Casting NA NA NA
3 Ground Floor/Stilt Floor 20-10-2020 Not yet Work
4 1 Floor 12-02-2021 Not yet Work
5 2 Floor 20-08-2020 NA
6 3 Floor 20-08-2020 NA
7 Brick Work & Plastering NA NA NA
8 Ground Floor/Stilt Floor 20-02-2021 Not yet Work
9 1 Floor 15-03-2021 Not yet Work
10 Electrical Works 16-12-2022 Not yet Work
11 Concealed Cabling including Plugs & switches 18-12-2022 Not yet Work
12 Installation & Charging of Transformer 21-12-2022 Not yet Work
13 Connection to Flats/Apartments 22-12-2022 Not yet Work
14 PH works 12-12-2022 Not yet Work
15 Laying of concealed Pipes 18-12-2022 Not yet Work
16 PH Fittings 20-12-2022 Not yet Work
17 Overhead Water Tanks 20-12-2022 Not yet Work
18 Water Supply Connection to all units 25-12-2022 Not yet Work
19 STP construction and completion 25-12-2022 Not yet Work
20 Distempering & Colouring of all units and exteriors 26-12-2022 Not yet Work
21 Fixation of doors and windows 28-12-2022 Not yet Work
22 Scheduled Date of handing over possession 30-12-2022 Not yet Work
23 Development of common areas, parks, gardens etc 30-12-2022 Not yet Work
Updated Changes on 28-03-2022
24 Site Development 20-10-2020 finish NA
25 NA NA NA NA
26 Ground Floor/Stilt Floor 20-10-2020 finish NA
27 1 Floor 12-02-2021 Not yet Work NA
28 2 Floor 20-08-2020 NA NA
29 3 Floor 20-08-2020 NA NA
30 NA NA NA NA
31 Ground Floor/Stilt Floor 20-02-2021 Not yet Work NA
32 1 Floor 15-03-2021 Not yet Work NA
33 Electrical Works 16-12-2022 Not yet Work NA
34 Concealed Cabling including Plugs & switches 18-12-2022 Not yet Work NA
35 Installation & Charging of Transformer 21-12-2022 Not yet Work NA
36 Connection to Flats/Apartments 22-12-2022 Not yet Work NA
37 PH works 12-12-2022 Not yet Work NA
38 Laying of concealed Pipes 18-12-2022 Not yet Work NA
39 PH Fittings 20-12-2022 Not yet Work NA
40 Overhead Water Tanks 20-12-2022 Not yet Work NA
41 Water Supply Connection to all units 25-12-2022 Not yet Work NA
42 STP construction and completion 25-12-2022 Not yet Work NA
43 Distempering & Colouring of all units and exteriors 26-12-2022 Not yet Work NA
44 Fixation of doors and windows 28-12-2022 Not yet Work NA
45 Scheduled Date of handing over possession 30-12-2022 Not yet Work NA
46 Development of common areas, parks, gardens etc 30-12-2022 Not yet Work NA
Updated Changes on 17-10-2023
47 Site Development 20-10-2020 COMPLETED
48 NA 25-01-2024 NA
49 Ground Floor/Stilt Floor 20-10-2020 COMPLETED
50 1 Floor 12-02-2021 COMPLETED
51 2 Floor 20-08-2020 NA NA
52 3 Floor 20-08-2020 NA NA
53 NA 22-03-2024 NA NA
54 Ground Floor/Stilt Floor 20-02-2021 COMPLETED NA
55 1 Floor 15-03-2021 COMPLETED NA
56 Electrical Works 16-12-2022 COMPLETED NA
57 Concealed Cabling including Plugs & switches 18-12-2022 COMPLETED NA
58 Installation & Charging of Transformer 21-12-2022 COMPLETED NA
59 Connection to Flats/Apartments 22-12-2022 COMPLETED NA
60 PH works 12-12-2022 COMPLETED NA
61 Laying of concealed Pipes 18-12-2022 COMPLETED NA
62 PH Fittings 20-12-2022 COMPLETED NA
63 Overhead Water Tanks 20-12-2022 COMPLETED NA
64 Water Supply Connection to all units 25-12-2022 COMPLETED NA
65 STP construction and completion 25-12-2022 COMPLETED NA
66 Distempering & Colouring of all units and exteriors 26-12-2022 COMPLETED NA
67 Fixation of doors and windows 28-12-2022 COMPLETED NA
68 Scheduled Date of handing over possession 30-12-2022 COMPLETED NA
69 Development of common areas, parks, gardens etc 30-12-2022 COMPLETED NA
Updated Changes on 24-01-2024
70 Site Development 20-10-2020 COMPLETED NA
71 NA 25-01-2024 NA NA
72 Ground Floor/Stilt Floor 20-10-2020 COMPLETED NA
73 1 Floor 12-02-2021 COMPLETED NA
74 2 Floor 20-08-2020 NA NA
75 3 Floor 20-08-2020 NA NA
76 NA 22-03-2024 NA NA
77 Ground Floor/Stilt Floor 20-02-2021 COMPLETED NA
78 1 Floor 15-03-2021 COMPLETED NA
79 Electrical Works 16-12-2022 COMPLETED NA
80 Concealed Cabling including Plugs & switches 18-12-2022 COMPLETED NA
81 Installation & Charging of Transformer 21-12-2022 COMPLETED NA
82 Connection to Flats/Apartments 22-12-2022 COMPLETED NA
83 PH works 12-12-2022 COMPLETED NA
84 Laying of concealed Pipes 18-12-2022 COMPLETED NA
85 PH Fittings 20-12-2022 COMPLETED NA
86 Overhead Water Tanks 20-12-2022 COMPLETED NA
87 Water Supply Connection to all units 25-12-2022 COMPLETED NA
88 STP construction and completion 25-12-2022 COMPLETED NA
89 Distempering & Colouring of all units and exteriors 26-12-2022 COMPLETED NA
90 Fixation of doors and windows 28-12-2022 COMPLETED NA
91 Scheduled Date of handing over possession 30-12-2022 COMPLETED NA
92 Development of common areas, parks, gardens etc 30-12-2022 COMPLETED NA

Booking Status

Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership Status
Carpet Area Balcony Area Exclusive Open Terrace Area
1 1 51.29 13.56 22.77 Promoter
2 2 51.29 13.56 22.77 Promoter
3 3 51.29 13.56 22.77 Promoter
4 4 51.29 13.56 22.77 Land Owner
5 5 51.29 13.56 22.77 Land Owner
6 6 51.29 13.56 22.77 Promoter
7 7 51.29 13.56 22.77 Promoter
8 8 64.63 15.96 4.12 Promoter
9 9 51.29 13.56 22.77 Promoter
10 10 51.29 13.56 22.77 Promoter
11 11 51.29 13.56 22.77 Promoter
12 12 51.29 13.56 22.77 Promoter
13 13 51.29 13.56 22.77 Promoter
14 14 51.29 13.56 22.77 Promoter
15 15 51.29 13.56 22.77 Promoter
16 16 51.29 13.56 22.77 Land Owner
17 17 51.29 13.56 22.77 Land Owner
18 18 51.29 13.56 22.77 Land Owner
19 19 51.29 13.56 22.77 Land Owner
20 20 51.29 13.56 22.77 Land Owner
21 21 64.63 15.96 4.12 Land Owner
22 22 64.63 15.96 4.12 Promoter
23 23 51.29 13.56 22.77 Promoter
24 24 51.29 13.56 22.77 Promoter

Financial Status

SL No. Funds Collected from the Allottees Funds Borrowed from Financial Institutions Funds Employed from Own Sources Expenditure As On Date Status
1 28846375 0 16864566 20818379 26-03-2022 under construction
2 91403660 0 0 65905110 30-09-2023 COMPLETED
3 900000 0 20992421 4791093 31-12-2023 completed

Updated Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 The Sub-division of land with house shall be used exclusively for Residential purpose and the uses shall not be changed to any other use without prior approval of the Authority 10-11-2022 Not yet work
2 The Development shall be undertaking strictly according to plan(enclosed) 10-11-2022 Not yet work
3 The land over which Sub-division layout is proposed accessible by an approved means of access of 12.00 mtr in width 10-11-2022 Not yet work
4 The land in question must be in lawful ownership and peaceful possession of the applicant. 10-11-2022 Not yet work
5 The permission is valid for aperiod of three years with effect from the date of its issue. 10-11-2022 Not yet work
6 The road and open spaces civic amenties area shown in the gift deed shall be developed by the applicant at their own cost which was executed between GPA holder and BDA for public through fare. 05-12-2022 Not yet work
7 Water supply Electricity are to be provided in the layout area by the applicant at their own cost and transferred to respect Govt agencies for further maintenance.. 14-12-2022 Not yet work
8 Plantation in the open spaces and along the internal roads is to be made before delivering the sub-plots. 15-12-2022 Not yet work
9 All roadside drains are to be developed maintaining proper slope as to convey strom water to the public drain with intimation to BDA for verification. 16-12-2022 Not yet work
Updated Changes on 28-03-2022
10 The Sub-division of land with house shall be used exclusively for Residential purpose and the uses shall not be changed to any other use without prior approval of the Authority 10-11-2022 Not yet work
11 The Development shall be undertaking strictly according to plan(enclosed) 10-11-2022 Not yet work
12 The land over which Sub-division layout is proposed accessible by an approved means of access of 12.00 mtr in width 10-11-2022 Not yet work
13 The land in question must be in lawful ownership and peaceful possession of the applicant. 10-11-2022 Not yet work
14 The permission is valid for aperiod of three years with effect from the date of its issue. 10-11-2022 Not yet work
15 The road and open spaces civic amenties area shown in the gift deed shall be developed by the applicant at their own cost which was executed between GPA holder and BDA for public through fare. 05-12-2022 Not yet work
16 Water supply Electricity are to be provided in the layout area by the applicant at their own cost and transferred to respect Govt agencies for further maintenance.. 14-12-2022 Not yet work
17 Plantation in the open spaces and along the internal roads is to be made before delivering the sub-plots. 15-12-2022 Not yet work
18 All roadside drains are to be developed maintaining proper slope as to convey strom water to the public drain with intimation to BDA for verification. 16-12-2022 Not yet work
Updated Changes on 17-10-2023
19 The Sub-division of land with house shall be used exclusively for Residential purpose and the uses shall not be changed to any other use without prior approval of the Authority 10-11-2022 COMPLETED
20 The Development shall be undertaking strictly according to plan(enclosed) 10-11-2022 COMPLETED
21 The land over which Sub-division layout is proposed accessible by an approved means of access of 12.00 mtr in width 10-11-2022 COMPLETED
22 The land in question must be in lawful ownership and peaceful possession of the applicant. 10-11-2022 COMPLETED
23 The permission is valid for aperiod of three years with effect from the date of its issue. 10-11-2022 COMPLETED
24 The road and open spaces civic amenties area shown in the gift deed shall be developed by the applicant at their own cost which was executed between GPA holder and BDA for public through fare. 05-12-2022 COMPLETED
25 Water supply Electricity are to be provided in the layout area by the applicant at their own cost and transferred to respect Govt agencies for further maintenance.. 14-12-2022 COMPLETED
26 Plantation in the open spaces and along the internal roads is to be made before delivering the sub-plots. 15-12-2022 COMPLETED
27 All roadside drains are to be developed maintaining proper slope as to convey strom water to the public drain with intimation to BDA for verification. 16-12-2022 COMPLETED
Updated Changes on 24-01-2024
28 The Sub-division of land with house shall be used exclusively for Residential purpose and the uses shall not be changed to any other use without prior approval of the Authority 10-11-2022 COMPLETED
29 The Development shall be undertaking strictly according to plan(enclosed) 10-11-2022 COMPLETED
30 The land over which Sub-division layout is proposed accessible by an approved means of access of 12.00 mtr in width 10-11-2022 COMPLETED
31 The land in question must be in lawful ownership and peaceful possession of the applicant. 10-11-2022 COMPLETED
32 The permission is valid for aperiod of three years with effect from the date of its issue. 10-11-2022 COMPLETED
33 The road and open spaces civic amenties area shown in the gift deed shall be developed by the applicant at their own cost which was executed between GPA holder and BDA for public through fare. 05-12-2022 COMPLETED
34 Water supply Electricity are to be provided in the layout area by the applicant at their own cost and transferred to respect Govt agencies for further maintenance.. 14-12-2022 COMPLETED
35 Plantation in the open spaces and along the internal roads is to be made before delivering the sub-plots. 15-12-2022 COMPLETED
36 All roadside drains are to be developed maintaining proper slope as to convey strom water to the public drain with intimation to BDA for verification. 16-12-2022 COMPLETED

Updated Project Documents

Sl. No. Title of the document Upload Document
1 PROFORMA MONTH OF JUNE
2 PROFORMA MONTH OF SEPTEMBER
3 PHOTO COPY/ SITE DEVELOPMENT-1
4 PHOTO COPY/ SITE DEVELOPMENT-2
5 PHOTO COPY/ SITE DEVELOPMENT-3
6 PHOTO COPY/ SITE DEVELOPMENT-4
7 PROFORMA-I DEC-2023
8 PROFORMA-II DEC-2023
9 PROFORMA-III DEC-2023
10 PERFORMA I MAR-2024
11 PERFORMA II MAR-2024
:  Animesh Swain :  
NA :  BTWPS6162H
:PAN Card :  skyiesinfra@gmail.com
:   2 Years Experiences in Building line :  9337909110
:  No
:  Yes :  NA

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
Nisanta Suman Architect Bhubaneswar,- CA/2001/28081
Suvendra Achirya Construction Engineer Bhubaneswar SER/42/BDA
P Anil Kumar Patra Chartered Accountant Bhubaneswar 324601E

Updated Units

House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
Updated Changes
1 Covered Parking 1 12.3*3.21 36.36 Included
2 Covered Parking 2 12.3*3.21 36.36 Included
3 Covered Parking 3 12.3*3.21 36.36 Included
4 Covered Parking 4 12.3*3.21 36.36 Included
5 Covered Parking 5 12.3*3.21 36.36 Included
6 Covered Parking 6 12.3*3.21 36.36 Included
7 Covered Parking 7 12.3*3.21 36.36 Included
8 Covered Parking 8 12.3*3.21 36.36 Included
9 Covered Parking 9 12.3*3.21 36.36 Included
10 Covered Parking 10 12.3*3.21 36.36 Included
11 Covered Parking 11 12.3*3.21 36.36 Included
12 Covered Parking 12 12.3*3.21 36.36 Included
13 Covered Parking 13 12.3*3.21 36.36 Included
14 Covered Parking 14 12.3*3.21 36.36 Included
15 Covered Parking 15 12.3*3.21 36.36 Included
16 Covered Parking 16 12.3*3.21 36.36 Included
17 Covered Parking 17 12.3*3.21 36.36 Included
18 Covered Parking 18 12.3*3.21 36.36 Included
19 Covered Parking 19 12.3*3.21 36.36 Included
20 Covered Parking 20 12.3*3.21 36.36 Included
21 Covered Parking 21 12.3*3.21 36.36 Included
22 Covered Parking 22 12.3*3.21 36.36 Included
23 Covered Parking 23 12.3*3.21 36.36 Included
24 Covered Parking 24 12.3*3.21 36.36 Included
Updated Changes
1 Covered Parking 1 12.3*3.21 36.36 Included
2 Covered Parking 2 12.3*3.21 36.36 Included
3 Covered Parking 3 12.3*3.21 36.36 Included
4 Covered Parking 4 12.3*3.21 36.36 Included
5 Covered Parking 5 12.3*3.21 36.36 Included
6 Covered Parking 6 12.3*3.21 36.36 Included
7 Covered Parking 7 12.3*3.21 36.36 Included
8 Covered Parking 8 12.3*3.21 36.36 Included
9 Covered Parking 9 12.3*3.21 36.36 Included
10 Covered Parking 10 12.3*3.21 36.36 Included
11 Covered Parking 11 12.3*3.21 36.36 Included
12 Covered Parking 12 12.3*3.21 36.36 Included
13 Covered Parking 13 12.3*3.21 36.36 Included
14 Covered Parking 14 12.3*3.21 36.36 Included
15 Covered Parking 15 12.3*3.21 36.36 Included
16 Covered Parking 16 12.3*3.21 36.36 Included
17 Covered Parking 17 12.3*3.21 36.36 Included
18 Covered Parking 18 12.3*3.21 36.36 Included
19 Covered Parking 19 12.3*3.21 36.36 Included
20 Covered Parking 20 12.3*3.21 36.36 Included
21 Covered Parking 21 12.3*3.21 36.36 Included
22 Covered Parking 22 12.3*3.21 36.36 Included
23 Covered Parking 23 12.3*3.21 36.36 Included
24 Covered Parking 24 12.3*3.21 36.36 Included
1 Covered Parking 1 12.3*3.21 36.36 Included
2 Covered Parking 2 12.3*3.21 36.36 Included
3 Covered Parking 3 12.3*3.21 36.36 Included
4 Covered Parking 4 12.3*3.21 36.36 Included
5 Covered Parking 5 12.3*3.21 36.36 Included
6 Covered Parking 6 12.3*3.21 36.36 Included
7 Covered Parking 7 12.3*3.21 36.36 Included
8 Covered Parking 8 12.3*3.21 36.36 Included
9 Covered Parking 9 12.3*3.21 36.36 Included
10 Covered Parking 10 12.3*3.21 36.36 Included
11 Covered Parking 11 12.3*3.21 36.36 Included
12 Covered Parking 12 12.3*3.21 36.36 Included
13 Covered Parking 13 12.3*3.21 36.36 Included
14 Covered Parking 14 12.3*3.21 36.36 Included
15 Covered Parking 15 12.3*3.21 36.36 Included
16 Covered Parking 16 12.3*3.21 36.36 Included
17 Covered Parking 17 12.3*3.21 36.36 Included
18 Covered Parking 18 12.3*3.21 36.36 Included
19 Covered Parking 19 12.3*3.21 36.36 Included
20 Covered Parking 20 12.3*3.21 36.36 Included
21 Covered Parking 21 12.3*3.21 36.36 Included
22 Covered Parking 22 12.3*3.21 36.36 Included
23 Covered Parking 23 12.3*3.21 36.36 Included
24 Covered Parking 24 12.3*3.21 36.36 Included