Promoter Details
Promoter Name :
Keshab Chandra Pradhan
Project Name :
OM SHREE PRIDE
Project Location :
( Residential Project, S+4, No. of Units- 32 )

Form- I

A. Promoter's Details

:  Omshree Infratech Pvt.Ltd :  Private Company
:  U45201OR2008PTC009749 :View
NA :  Om Shree Infratech Pvt. Ltd, QR No.L-1693,Hanspal, Naharakanta, Bhubaneswar-751010, Khurdha, Odisha.
:  Omshree Infratech Pvt. Ltd. QR No.- L-1693, Hanspal, Naharakanta, Bhubaneswar, Dist- Khordha, Odisha- 751010. :  ranjanswainjatni@gmail.com
:  2364458 :  9437129839
:  AAACO9941K :View
:  12 Years Experiences :  NO
:  www.omshreeinfrratech.com

B. Details of Board of Directors / Partners / MC Members

:  Keshab Chandra Pradhan :  
:  Managing Director :  APDPP0562N
:PAN Card :  omshreeinfratech@gmail.com
:  MA(LLB :  8249893040
:  12 YEARS EXPERINCES IN BUILDING LINE
:  Yes :  NA
:  Ahalya Pradhan :  
:  Director :  CJQPP0347E
:PAN Card :  omshreeinfratech@ymail.com
:  Matriculation :  7008020157
:  12 YEARS EXPERINCES IN BUILDING LINE
:  Yes :  NA

Annexure-1

Details of last projects already implemented (Ongoing or Complete)

Have you implemented any project(s) previously (May be Ongoing or Completed):No

Annexure-2

Details of the project to be registered

:   New :  OM SHREE PRIDE
:  Residential :  ( Residential Project, S+4, No. of Units- 32 )
:  Khordha :  Bhubaneswar
:  752101 :  Development Authority
:  BHUBANESWAR DEVELOPMENT AUTHORITY
:  S+4 :  NA

Land Details of the Project

:  526/1996/3099 :  704/1594
:  Mouza-Balianta,Tahsil Balianta, Bhubaneswar, Khordha, Odisha. :  85.01
:  Yes
Yes :  View
:  View
:  Promoter

:  526/1996/2407 :  704/809
:  Mouza-Balianta,Tahsil Balianta, Bhubaneswar, Khordha, Odisha. :  1121.38
:  Yes
Yes :  View
:  View
:  Other Person
:  Mina Rani Jena, Bani Priya Jena, Radhakanta Jena,& Ramakanta Jena :  Mina Rani Jena, Bani Priya Jena, Radhakanta Jena,& Ramakanta Jena to Executed General Power of Attorney M/s. Omshree Infratech Pvt.Ltd.,Managing Directer Mr. Keshab Chandra Pradhan.
: No
: Yes
:  11821703376 :  29-12-2017
:  DSR-BHUBANESWAR :  Attached

Development Agreement

: Yes
Serial No. Particulars of the Person Land/Plot Details Share of the Person Document Attached
1 Mina Rani Jena, Bani Priya Jena, Radhakanta Jena,& Ramakanta Jena 526/1996 45%   Agreement Copy

Building Plan

  View   View
  Download site plan 10-02-2025

Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 The building shall be used exclusively for residential apartment purpose and the use shall not be changed to any other use without prior approval of this Authority. 22-12-2022 UNDER PROGRESS
2 Parking space measuring 673.55 sqm as shown in the approved plans shall be left for parking of vehicles and no part of it will be used for any other purpose. 18-02-2023 UNDER PROGRESS
3 The land over which construction is proposed is accessible by an approved means of access of 9.14 mt(Nine Point one four meter)mt in width. 18-05-2023 UNDER PROGRESS
4 The permission granted under these regulation shall remain valid upto three years from the date of issue. However the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribe under rules and such revalidation shall be valid for one year. 20-07-2023 UNDER PROGRESS
5 Storm water from the permises of roof top shall be conveyed and discharged to the rain water recharging pits as per BDA (Planning & Building Standards) Regulation,2018 26-05-2023 UNDER PROGRESS
6 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner. 10-07-2023 UNDER PROGRESS
7 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulances fire tender physically handicapped persons and outside visitors with signage as per norms of BDA (Planning & Building Standards) regulation2018. 20-09-2023 UNDER PROGRESS
8 Plantation @80 sqm per one tree of the plot area shall be made by the applicant as per provision of BDA (Planning & Building Standards) Regulation 2018. 22-12-2023 UNDER PROGRESS
9 The concerned Architect/Applicant/ Developer are fully responsible for any deviations addition & alternation beyomd approved plan/defective construction etc. shall be liable for action as per the provisions of the regulation. 08-03-2024 UNDER PROGRESS
10 The Authority shall in noway be held responsible for any structural failure and damage due to earthquake/cyclone/any other natural disaster. 26-04-2024 UNDER PROGRESS

Layout Plan

: Yes :  View

Location Map with geo-coordinates of bend points

Point No. Latitude Longitude
1 20°17'45.8''N 85°53'48.0''E
2 20°17.45.7'N 85°53'47.5''E
3 20°17'45.1''N 85°53'47.6''E
4 20°17'45.0''N 85°53'46.3''E
5 20°17'46.0''N 85°53'46.3''E
6 20°17'46.0''N 85°53'46.9''E
7 20°17'46.1''N 85°53'47.9''E
View

Milestone of Project Construction

Description* Scheduled date of completion Current Status Site Images
Site Development 22-09-2022 UNDER PROGRESSS
Roof Casting NA NA NA
Ground Floor/Stilt Floor 12-10-2022 UNDER PROGRESSS NA
1 Floor 24-11-2022 UNDER PROGRESSS NA
2 Floor 22-12-2022 UNDER PROGRESSS NA
3 Floor 15-01-2023 UNDER PROGRESSS NA
4 Floor 30-01-2023 UNDER PROGRESSS NA
Brick Work & Plastering NA NA NA
Ground Floor/Stilt Floor 12-02-2023 UNDER PROGRESSS NA
1 Floor 28-02-2023 UNDER PROGRESSS NA
2 Floor 06-03-2023 UNDER PROGRESSS NA
3 Floor 30-03-2023 UNDER PROGRESSS NA
4 Floor 10-04-2023 UNDER PROGRESSS NA
Electrical Works 20-06-2023 UNDER PROGRESSS NA
Concealed Cabling including Plugs & switches 10-07-2023 UNDER PROGRESSS NA
Installation & Charging of Transformer 20-08-2023 UNDER PROGRESSS NA
Connection to Flats/Apartments 20-09-2023 UNDER PROGRESSS NA
PH works 10-10-2023 UNDER PROGRESSS NA
Laying of concealed Pipes 28-11-2023 UNDER PROGRESSS NA
PH Fittings 10-12-2023 UNDER PROGRESSS NA
Overhead Water Tanks 30-12-2023 UNDER PROGRESSS NA
Water Supply Connection to all units 11-02-2024 UNDER PROGRESSS NA
STP construction and completion 28-02-2024 UNDER PROGRESSS NA
Distempering & Colouring of all units and exteriors 20-03-2024 UNDER PROGRESSS NA
Fixation of doors and windows 16-04-2024 UNDER PROGRESSS NA
Scheduled Date of handing over possession 16-05-2024 UNDER PROGRESSS NA
Development of common areas, parks, gardens etc 26-07-2024 UNDER PROGRESSS NA
Site Development 22-09-2022 UNDER PROGRESSS NA
NA NA NA NA
Ground Floor/Stilt Floor 12-10-2022 UNDER PROGRESSS NA
1 Floor 24-11-2022 UNDER PROGRESSS NA
2 Floor 22-12-2022 UNDER PROGRESSS NA
3 Floor 15-01-2023 UNDER PROGRESSS NA
4 Floor 30-01-2023 UNDER PROGRESSS NA
NA NA NA NA
Ground Floor/Stilt Floor 12-02-2023 UNDER PROGRESSS NA
1 Floor 28-02-2023 UNDER PROGRESSS NA
2 Floor 06-03-2023 UNDER PROGRESSS NA
3 Floor 30-03-2023 UNDER PROGRESSS NA
4 Floor 10-04-2023 UNDER PROGRESSS NA
Electrical Works 20-06-2023 UNDER PROGRESSS NA
Concealed Cabling including Plugs & switches 10-07-2023 UNDER PROGRESSS NA
Installation & Charging of Transformer 20-08-2023 UNDER PROGRESSS NA
Connection to Flats/Apartments 20-09-2023 UNDER PROGRESSS NA
PH works 10-10-2023 UNDER PROGRESSS NA
Laying of concealed Pipes 28-11-2023 UNDER PROGRESSS NA
PH Fittings 10-12-2023 UNDER PROGRESSS NA
Overhead Water Tanks 30-12-2023 UNDER PROGRESSS NA
Water Supply Connection to all units 11-02-2024 UNDER PROGRESSS NA
STP construction and completion 28-02-2024 UNDER PROGRESSS NA
Distempering & Colouring of all units and exteriors 20-03-2024 UNDER PROGRESSS NA
Fixation of doors and windows 16-04-2024 UNDER PROGRESSS NA
Scheduled Date of handing over possession 16-05-2024 UNDER PROGRESSS NA
Development of common areas, parks, gardens etc 26-07-2024 UNDER PROGRESSS NA
Site Development 22-09-2022 UNDER PROGRESSS NA
NA 07-10-2022 UNDER PROGRESSS NA
Ground Floor/Stilt Floor 12-10-2022 UNDER PROGRESSS NA
1 Floor 24-11-2022 UNDER PROGRESSS NA
2 Floor 22-12-2022 UNDER PROGRESSS NA
3 Floor 15-01-2023 UNDER PROGRESSS NA
4 Floor 30-01-2023 UNDER PROGRESSS NA
NA 07-02-2023 UNDER PROGRESSS NA
Ground Floor/Stilt Floor 12-02-2023 UNDER PROGRESSS NA
1 Floor 28-02-2023 UNDER PROGRESSS NA
2 Floor 06-03-2023 UNDER PROGRESSS NA
3 Floor 30-03-2023 UNDER PROGRESSS NA
4 Floor 10-04-2023 UNDER PROGRESSS NA
Electrical Works 20-06-2023 UNDER PROGRESSS NA
Concealed Cabling including Plugs & switches 10-07-2023 UNDER PROGRESSS NA
Installation & Charging of Transformer 20-08-2023 UNDER PROGRESSS NA
Connection to Flats/Apartments 20-09-2023 UNDER PROGRESSS NA
PH works 10-10-2023 UNDER PROGRESSS NA
Laying of concealed Pipes 28-11-2023 UNDER PROGRESSS NA
PH Fittings 10-12-2023 UNDER PROGRESSS NA
Overhead Water Tanks 30-12-2023 UNDER PROGRESSS NA
Water Supply Connection to all units 11-02-2024 UNDER PROGRESSS NA
STP construction and completion 28-02-2024 UNDER PROGRESSS NA
Distempering & Colouring of all units and exteriors 20-03-2024 UNDER PROGRESSS NA
Fixation of doors and windows 16-04-2024 UNDER PROGRESSS NA
Scheduled Date of handing over possession 16-05-2024 UNDER PROGRESSS NA
Development of common areas, parks, gardens etc 26-07-2024 UNDER PROGRESSS NA

Category and no. of units to be developed

:  Residential
:  
:  32
:  
:  
:  
Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership
Carpet Area Balcony Area Exclusive Open Terrace Area
1 101 54.46 Sqmt 4.69 Sqmt 00 Land Owner
2 102 54.83 Sqmt 4.69 Sqmt 00 Land Owner
3 103 55.06 Sqmt 4.69 Sqmt 00 Promoter
4 104 24.13 Sqmt 4.69 Sqmt 00 Land Owner
5 105 26.64 Sqmt 4.69 Sqmt 00 Promoter
6 106 60.04 Sqmt 4.69 Sqmt 00 Promoter
7 107 54.81 Sqmt 4.69 Sqmt 00 Promoter
8 108 79.61 Sqmt 4.69 Sqmt 00 Promoter
9 201 54.46 Sqmt 4.69 Sqmt 00 Promoter
10 202 54.83 Sqmt 4.69 Sqmt 00 Promoter
11 203 55.06 Sqmt 4.69 Sqmt 00 Promoter
12 204 24.13 Sqmt 4.69 Sqmt 00 Promoter
13 205 26.64 Sqmt 4.69 Sqmt 00 Promoter
14 206 60.04 Sqmt 4.69 Sqmt 00 Promoter
15 207 54.81 Sqmt 4.69 Sqmt 00 Land Owner
16 208 79.61 Sqmt 4.69 Sqmt 00 Land Owner
17 301 54.46 Sqmt 4.69 Sqmt 00 Land Owner
18 302 54.83 Sqmt 4.69 Sqmt 00 Land Owner
19 303 55.06 Sqmt 4.69 Sqmt 00 Promoter
20 304 24.13 Sqmt 4.69 Sqmt 00 Land Owner
21 305 26.64 Sqmt 4.69 Sqmt 00 Promoter
22 306 60.04 Sqmt 4.69 Sqmt 00 Promoter
23 307 54.81 Sqmt 4.69 Sqmt 00 Promoter
24 308 79.61 Sqmt 4.69 Sqmt 00 Promoter
25 401 54.46 Sqmt 4.69 Sqmt 00 Promoter
26 402 54.83 Sqmt 4.69 Sqmt 00 Promoter
27 403 55.06 Sqmt 4.69 Sqmt 00 Land Owner
28 404 24.13 Sqmt 4.69 Sqmt 00 Land Owner
29 405 26.64 Sqmt 4.69 Sqmt 00 Promoter
30 406 60.04 Sqmt 4.69 Sqmt 00 Promoter
31 407 54.81 Sqmt 4.69 Sqmt 00 Land Owner
32 408 79.61 Sqmt 4.69 Sqmt 00 Promoter
Types of garages and parking
House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
101 Covered Parking 1 6.67 Mx3.16M 21.09 Sqmt Included
102 Covered Parking 2 6.67 Mx3.16M 21.09 Sqmt Included
103 Covered Parking 3 6.67 Mx3.16M 21.09 Sqmt Included
104 Covered Parking 4 6.67 Mx3.16M 21.09 Sqmt Included
105 Covered Parking 5 6.67 Mx3.16M 21.09 Sqmt Included
106 Covered Parking 6 6.67 Mx3.16M 21.09 Sqmt Included
107 Covered Parking 7 6.67 Mx3.16M 21.09 Sqmt Included
108 Covered Parking 8 6.67 Mx3.16M 21.09 Sqmt Included
201 Covered Parking 9 6.67 Mx3.16M 21.09 Sqmt Included
202 Covered Parking 10 6.67 Mx3.16M 21.09 Sqmt Included
203 Covered Parking 11 6.67 Mx3.16M 21.09 Sqmt Included
204 Covered Parking 12 6.67 Mx3.16M 21.09 Sqmt Included
205 Covered Parking 13 6.67 Mx3.16M 21.09 Sqmt Included
206 Covered Parking 14 6.67 Mx3.16M 21.09 Sqmt Included
207 Covered Parking 15 6.67 Mx3.16M 21.09 Sqmt Included
208 Covered Parking 16 6.67 Mx3.16M 21.09 Sqmt Included
301 Covered Parking 17 6.67 Mx3.16M 21.09 Sqmt Included
302 Covered Parking 18 6.67 Mx3.16M 21.09 Sqmt Included
303 Covered Parking 19 6.67 Mx3.16M 21.09 Sqmt Included
304 Covered Parking 20 6.67 Mx3.16M 21.09 Sqmt Included
305 Covered Parking 21 6.67 Mx3.16M 21.09 Sqmt Included
306 Covered Parking 22 6.67 Mx3.16M 21.09 Sqmt Included
307 Covered Parking 23 6.67 Mx3.16M 21.09 Sqmt Included
308 Covered Parking 24 6.67 Mx3.16M 21.09 Sqmt Included
401 Covered Parking 25 6.67 Mx3.16M 21.09 Sqmt Included
402 Covered Parking 26 6.67 Mx3.16M 21.09 Sqmt Included
403 Covered Parking 27 6.67 Mx3.16M 21.09 Sqmt Included
404 Covered Parking 28 6.67 Mx3.16M 21.09 Sqmt Included
405 Covered Parking 29 6.67 Mx3.16M 21.09 Sqmt Included
406 Covered Parking 30 6.67 Mx3.16M 21.09 Sqmt Included
407 Covered Parking 31 6.67 Mx3.16M 21.09 Sqmt Included
408 Covered Parking 32 6.67 Mx3.16M 21.09 Sqmt Included
Yes

Facilities to be provided

Particulars of Facilities Status of the facility Brief description of facility
Drinking Water Facility Ground Water Copy of Consent Letter
Fire Fighting Facility Yes Affidavit/Under taking
Emergency Evacuation Services Yes Stair Case
Use of Renewable Energy Yes DG BACK UP
Lift Facility Yes Jhonson Brand, 6 Person Capacity with ARD Facility
Market Complex No
Community Hall Yes 32.40 Sqmt Community hall with one door and two windows
Gymnasium No
Swimming Pool No
Play Ground No
Park/Garden No
Plantation Area Yes Both side Plantation with 113.02 Sqmt (80 sqm per one tree)
Others(Please Specify) No
Internal Road Yes Black top Road 381.06 sqm with drive way
External Road Yes Black top Road 30 ft wide BDA Road
Elecricity Supply Yes Copy of Consent Letter
Other Amenities Yes CC Camera all side

Bank Particulars of the Project

  State Bank Of India
  FORTUNE TOWER CHANDRASEKHARPUR BHUBANESWAR.
  41051458546
  SBIN0004414
   View
  2474018
  9438671234

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
Sudhansu Sekhar Panda Architect Plot No-329, Sahidnagar,Bhubaneswar, Khordha -751019 , Mobile No-9861015726, E,mail-sudhansusekhar2011@gmail.com RTP/DTP(C.ER)011/2017
Sudhansu Sekhar Panda Construction Engineer Plot No-329, Sahidnagar,Bhubaneswar, Khordha -751019 , Mobile No-9861015726, E,mail-sudhansusekhar2011@gmail.com RTP/DTP(STER)012/2017
Mahesprasad Singhsamant Chartered Accountant Plot No-A/705, Bhoinagar, Kharvelanagar, Back side of Padarsani Padia,Bhubaneswar, Khordha-751021,Mobile No-,9437092014,Email-mpsinghsamanta2014@rediffmail,com 054472

Financial Details

:  657 :   View
  10-02-2025 :  200
:  457 :  0

Documents Attached

Description of Document Option Documents
Fire Safety Certificate Undertaking Attached
Affidavit in Form-A as per clause-l of sub-section-2 of section-4 of the Act Yes Attached
Allotment letter format Yes Attached
Conveyance Deed Format Yes Attached
Affidavit to adopt agreement for sale format as per Rule-8(1) of ORE (R and D) Rules, 2017 Yes Attached
Annual Report 2019-20 Attached
Annual Report 2020-21 Attached
Annual Report 2021-22 Attached
IT Return 2019-20 Attached
IT Return 2020-21 Attached
IT Return 2021-22 Attached
Audit Report 2019-20 Attached
Audit Report 2020-21 Attached
Audit Report 2021-22 Attached

Additional Documents Attached

Sl. No. Title of the document Upload Document
1 AFFIDAVIT FOR MISS MATCH OF PLOT NO & KHATA NO
2 ANNUAL REPORT-2017-18
3 ESCROW ACCOUNT
4 SURROUNDING PLOTS
5 APPROACH ROAD FOR PROJECT

Other documents

“I undertake that the information submitted by me in this application are correct and true to best my knowledge. I also understand that providing false or wrong information is punishable under the Section-60 of the Real Estate (Regulation & Development) Act, 2016. I also further understand that furnishing wrong or false information will lead to rejection of my application registration of the project with forfeiture of registration fee and other charges deposited by me.”
  TO SUBMIT ALL DOCUMENT, THE ESCROW ACCOUNT NO-41051458546,41051419641,41051467742, THERE IS NO OPTION TO CHANGE THE ACCOUNT NO IN PROPER PLACE. 2) In objection-2- i) Corrected cadstral map in proper place ,with an under taking for key map to uploaded in additional document No-4. ii) The Escrow Account-No-41051458546,41051419641, & 41051467742, IFSC Coad- SBIN0004414, is uploaded. ii) An undertaking uploaded for approach road. in sl No-5

Construction Progress

Updated Construction Progress

SL NO. Description Scheduled date of completion Current Status Remarks
1 Site Development 22-09-2022 UNDER PROGRESSS
2 Roof Casting NA NA NA
3 Ground Floor/Stilt Floor 12-10-2022 UNDER PROGRESSS NA
4 1 Floor 24-11-2022 UNDER PROGRESSS NA
5 2 Floor 22-12-2022 UNDER PROGRESSS NA
6 3 Floor 15-01-2023 UNDER PROGRESSS NA
7 4 Floor 30-01-2023 UNDER PROGRESSS NA
8 Brick Work & Plastering NA NA NA
9 Ground Floor/Stilt Floor 12-02-2023 UNDER PROGRESSS NA
10 1 Floor 28-02-2023 UNDER PROGRESSS NA
11 2 Floor 06-03-2023 UNDER PROGRESSS NA
12 3 Floor 30-03-2023 UNDER PROGRESSS NA
13 4 Floor 10-04-2023 UNDER PROGRESSS NA
14 Electrical Works 20-06-2023 UNDER PROGRESSS NA
15 Concealed Cabling including Plugs & switches 10-07-2023 UNDER PROGRESSS NA
16 Installation & Charging of Transformer 20-08-2023 UNDER PROGRESSS NA
17 Connection to Flats/Apartments 20-09-2023 UNDER PROGRESSS NA
18 PH works 10-10-2023 UNDER PROGRESSS NA
19 Laying of concealed Pipes 28-11-2023 UNDER PROGRESSS NA
20 PH Fittings 10-12-2023 UNDER PROGRESSS NA
21 Overhead Water Tanks 30-12-2023 UNDER PROGRESSS NA
22 Water Supply Connection to all units 11-02-2024 UNDER PROGRESSS NA
23 STP construction and completion 28-02-2024 UNDER PROGRESSS NA
24 Distempering & Colouring of all units and exteriors 20-03-2024 UNDER PROGRESSS NA
25 Fixation of doors and windows 16-04-2024 UNDER PROGRESSS NA
26 Scheduled Date of handing over possession 16-05-2024 UNDER PROGRESSS NA
27 Development of common areas, parks, gardens etc 26-07-2024 UNDER PROGRESSS NA
Updated Changes on 07-11-2023
28 Site Development 22-09-2022 UNDER PROGRESSS NA
29 NA NA NA NA
30 Ground Floor/Stilt Floor 12-10-2022 UNDER PROGRESSS NA
31 1 Floor 24-11-2022 UNDER PROGRESSS NA
32 2 Floor 22-12-2022 UNDER PROGRESSS NA
33 3 Floor 15-01-2023 UNDER PROGRESSS NA
34 4 Floor 30-01-2023 UNDER PROGRESSS NA
35 NA NA NA NA
36 Ground Floor/Stilt Floor 12-02-2023 UNDER PROGRESSS NA
37 1 Floor 28-02-2023 UNDER PROGRESSS NA
38 2 Floor 06-03-2023 UNDER PROGRESSS NA
39 3 Floor 30-03-2023 UNDER PROGRESSS NA
40 4 Floor 10-04-2023 UNDER PROGRESSS NA
41 Electrical Works 20-06-2023 UNDER PROGRESSS NA
42 Concealed Cabling including Plugs & switches 10-07-2023 UNDER PROGRESSS NA
43 Installation & Charging of Transformer 20-08-2023 UNDER PROGRESSS NA
44 Connection to Flats/Apartments 20-09-2023 UNDER PROGRESSS NA
45 PH works 10-10-2023 UNDER PROGRESSS NA
46 Laying of concealed Pipes 28-11-2023 UNDER PROGRESSS NA
47 PH Fittings 10-12-2023 UNDER PROGRESSS NA
48 Overhead Water Tanks 30-12-2023 UNDER PROGRESSS NA
49 Water Supply Connection to all units 11-02-2024 UNDER PROGRESSS NA
50 STP construction and completion 28-02-2024 UNDER PROGRESSS NA
51 Distempering & Colouring of all units and exteriors 20-03-2024 UNDER PROGRESSS NA
52 Fixation of doors and windows 16-04-2024 UNDER PROGRESSS NA
53 Scheduled Date of handing over possession 16-05-2024 UNDER PROGRESSS NA
54 Development of common areas, parks, gardens etc 26-07-2024 UNDER PROGRESSS NA
Updated Changes on 13-05-2024
55 Site Development 22-09-2022 UNDER PROGRESSS NA
56 NA 07-10-2022 UNDER PROGRESSS NA
57 Ground Floor/Stilt Floor 12-10-2022 UNDER PROGRESSS NA
58 1 Floor 24-11-2022 UNDER PROGRESSS NA
59 2 Floor 22-12-2022 UNDER PROGRESSS NA
60 3 Floor 15-01-2023 UNDER PROGRESSS NA
61 4 Floor 30-01-2023 UNDER PROGRESSS NA
62 NA 07-02-2023 UNDER PROGRESSS NA
63 Ground Floor/Stilt Floor 12-02-2023 UNDER PROGRESSS NA
64 1 Floor 28-02-2023 UNDER PROGRESSS NA
65 2 Floor 06-03-2023 UNDER PROGRESSS NA
66 3 Floor 30-03-2023 UNDER PROGRESSS NA
67 4 Floor 10-04-2023 UNDER PROGRESSS NA
68 Electrical Works 20-06-2023 UNDER PROGRESSS NA
69 Concealed Cabling including Plugs & switches 10-07-2023 UNDER PROGRESSS NA
70 Installation & Charging of Transformer 20-08-2023 UNDER PROGRESSS NA
71 Connection to Flats/Apartments 20-09-2023 UNDER PROGRESSS NA
72 PH works 10-10-2023 UNDER PROGRESSS NA
73 Laying of concealed Pipes 28-11-2023 UNDER PROGRESSS NA
74 PH Fittings 10-12-2023 UNDER PROGRESSS NA
75 Overhead Water Tanks 30-12-2023 UNDER PROGRESSS NA
76 Water Supply Connection to all units 11-02-2024 UNDER PROGRESSS NA
77 STP construction and completion 28-02-2024 UNDER PROGRESSS NA
78 Distempering & Colouring of all units and exteriors 20-03-2024 UNDER PROGRESSS NA
79 Fixation of doors and windows 16-04-2024 UNDER PROGRESSS NA
80 Scheduled Date of handing over possession 16-05-2024 UNDER PROGRESSS NA
81 Development of common areas, parks, gardens etc 26-07-2024 UNDER PROGRESSS NA

Booking Status

Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership Status
Carpet Area Balcony Area Exclusive Open Terrace Area
1 101 54.46 Sqmt 4.69 Sqmt 00 Land Owner
2 102 54.83 Sqmt 4.69 Sqmt 00 Land Owner
3 103 55.06 Sqmt 4.69 Sqmt 00 Promoter
4 104 24.13 Sqmt 4.69 Sqmt 00 Land Owner
5 105 26.64 Sqmt 4.69 Sqmt 00 Promoter
6 106 60.04 Sqmt 4.69 Sqmt 00 Promoter
7 107 54.81 Sqmt 4.69 Sqmt 00 Promoter
8 108 79.61 Sqmt 4.69 Sqmt 00 Promoter
9 201 54.46 Sqmt 4.69 Sqmt 00 Promoter
10 202 54.83 Sqmt 4.69 Sqmt 00 Promoter
11 203 55.06 Sqmt 4.69 Sqmt 00 Promoter
12 204 24.13 Sqmt 4.69 Sqmt 00 Promoter
13 205 26.64 Sqmt 4.69 Sqmt 00 Promoter
14 206 60.04 Sqmt 4.69 Sqmt 00 Promoter
15 207 54.81 Sqmt 4.69 Sqmt 00 Land Owner
16 208 79.61 Sqmt 4.69 Sqmt 00 Land Owner
17 301 54.46 Sqmt 4.69 Sqmt 00 Land Owner
18 302 54.83 Sqmt 4.69 Sqmt 00 Land Owner
19 303 55.06 Sqmt 4.69 Sqmt 00 Promoter
20 304 24.13 Sqmt 4.69 Sqmt 00 Land Owner
21 305 26.64 Sqmt 4.69 Sqmt 00 Promoter
22 306 60.04 Sqmt 4.69 Sqmt 00 Promoter
23 307 54.81 Sqmt 4.69 Sqmt 00 Promoter
24 308 79.61 Sqmt 4.69 Sqmt 00 Promoter
25 401 54.46 Sqmt 4.69 Sqmt 00 Promoter
26 402 54.83 Sqmt 4.69 Sqmt 00 Promoter
27 403 55.06 Sqmt 4.69 Sqmt 00 Land Owner
28 404 24.13 Sqmt 4.69 Sqmt 00 Land Owner
29 405 26.64 Sqmt 4.69 Sqmt 00 Promoter
30 406 60.04 Sqmt 4.69 Sqmt 00 Promoter
31 407 54.81 Sqmt 4.69 Sqmt 00 Land Owner
32 408 79.61 Sqmt 4.69 Sqmt 00 Promoter

Financial Status

SL No. Funds Collected from the Allottees Funds Borrowed from Financial Institutions Funds Employed from Own Sources Expenditure As On Date Status
1 38695361 0 33346789 64536594 12-04-2024 UNDER PROGRESS

Updated Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 The building shall be used exclusively for residential apartment purpose and the use shall not be changed to any other use without prior approval of this Authority. 22-12-2022 UNDER PROGRESS
2 Parking space measuring 673.55 sqm as shown in the approved plans shall be left for parking of vehicles and no part of it will be used for any other purpose. 18-02-2023 UNDER PROGRESS
3 The land over which construction is proposed is accessible by an approved means of access of 9.14 mt(Nine Point one four meter)mt in width. 18-05-2023 UNDER PROGRESS
4 The permission granted under these regulation shall remain valid upto three years from the date of issue. However the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribe under rules and such revalidation shall be valid for one year. 20-07-2023 UNDER PROGRESS
5 Storm water from the permises of roof top shall be conveyed and discharged to the rain water recharging pits as per BDA (Planning & Building Standards) Regulation,2018 26-05-2023 UNDER PROGRESS
6 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner. 10-07-2023 UNDER PROGRESS
7 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulances fire tender physically handicapped persons and outside visitors with signage as per norms of BDA (Planning & Building Standards) regulation2018. 20-09-2023 UNDER PROGRESS
8 Plantation @80 sqm per one tree of the plot area shall be made by the applicant as per provision of BDA (Planning & Building Standards) Regulation 2018. 22-12-2023 UNDER PROGRESS
9 The concerned Architect/Applicant/ Developer are fully responsible for any deviations addition & alternation beyomd approved plan/defective construction etc. shall be liable for action as per the provisions of the regulation. 08-03-2024 UNDER PROGRESS
10 The Authority shall in noway be held responsible for any structural failure and damage due to earthquake/cyclone/any other natural disaster. 26-04-2024 UNDER PROGRESS
Updated Changes on 07-11-2023
11 The building shall be used exclusively for residential apartment purpose and the use shall not be changed to any other use without prior approval of this Authority. 22-12-2022 UNDER PROGRESS
12 Parking space measuring 673.55 sqm as shown in the approved plans shall be left for parking of vehicles and no part of it will be used for any other purpose. 18-02-2023 UNDER PROGRESS
13 The land over which construction is proposed is accessible by an approved means of access of 9.14 mt(Nine Point one four meter)mt in width. 18-05-2023 UNDER PROGRESS
14 The permission granted under these regulation shall remain valid upto three years from the date of issue. However the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribe under rules and such revalidation shall be valid for one year. 20-07-2023 UNDER PROGRESS
15 Storm water from the permises of roof top shall be conveyed and discharged to the rain water recharging pits as per BDA (Planning & Building Standards) Regulation,2018 26-05-2023 UNDER PROGRESS
16 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner. 10-07-2023 UNDER PROGRESS
17 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulances fire tender physically handicapped persons and outside visitors with signage as per norms of BDA (Planning & Building Standards) regulation2018. 20-09-2023 UNDER PROGRESS
18 Plantation @80 sqm per one tree of the plot area shall be made by the applicant as per provision of BDA (Planning & Building Standards) Regulation 2018. 22-12-2023 UNDER PROGRESS
19 The concerned Architect/Applicant/ Developer are fully responsible for any deviations addition & alternation beyomd approved plan/defective construction etc. shall be liable for action as per the provisions of the regulation. 08-03-2024 UNDER PROGRESS
20 The Authority shall in noway be held responsible for any structural failure and damage due to earthquake/cyclone/any other natural disaster. 26-04-2024 UNDER PROGRESS
Updated Changes on 12-05-2024
21 The building shall be used exclusively for residential apartment purpose and the use shall not be changed to any other use without prior approval of this Authority. 22-12-2022 UNDER PROGRESS
22 Parking space measuring 673.55 sqm as shown in the approved plans shall be left for parking of vehicles and no part of it will be used for any other purpose. 18-02-2023 UNDER PROGRESS
23 The land over which construction is proposed is accessible by an approved means of access of 9.14 mt(Nine Point one four meter)mt in width. 18-05-2023 UNDER PROGRESS
24 The permission granted under these regulation shall remain valid upto three years from the date of issue. However the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribe under rules and such revalidation shall be valid for one year. 20-07-2023 UNDER PROGRESS
25 Storm water from the permises of roof top shall be conveyed and discharged to the rain water recharging pits as per BDA (Planning & Building Standards) Regulation,2018 26-05-2023 UNDER PROGRESS
26 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner. 10-07-2023 UNDER PROGRESS
27 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulances fire tender physically handicapped persons and outside visitors with signage as per norms of BDA (Planning & Building Standards) regulation2018. 20-09-2023 UNDER PROGRESS
28 Plantation @80 sqm per one tree of the plot area shall be made by the applicant as per provision of BDA (Planning & Building Standards) Regulation 2018. 22-12-2023 UNDER PROGRESS
29 The concerned Architect/Applicant/ Developer are fully responsible for any deviations addition & alternation beyomd approved plan/defective construction etc. shall be liable for action as per the provisions of the regulation. 08-03-2024 UNDER PROGRESS
30 The Authority shall in noway be held responsible for any structural failure and damage due to earthquake/cyclone/any other natural disaster. 26-04-2024 UNDER PROGRESS

Updated Project Documents

Sl. No. Title of the document Upload Document
1 PROFORMA-I
2 PROFORMA-I
3 PROFORMA-III
4 PROFORMA-I (DEC-2023)
5 PROFORMA-II (DEC-2023)
6 PROFORMA-III (DEC-2023)
7 PROFORMA-I (MARCH-2023)
8 PROFORMA-II (MARCH-2023)
9 PROFORMA-III (MARCH-2023)
:  Keshab Chandra Pradhan :  
NA :  APDPP0562N
:PAN Card :  omshreeinfratech@gmail.com
:  MA(LLB :  8249893040
:  12 YEARS EXPERINCES IN BUILDING LINE
:  Yes :  NA
:  Ahalya Pradhan :  
NA :  CJQPP0347E
:PAN Card :  omshreeinfratech@ymail.com
:  Matriculation :  7008020157
:  12 YEARS EXPERINCES IN BUILDING LINE
:  Yes :  NA

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
Sudhansu Sekhar Panda Architect Plot No-329, Sahidnagar,Bhubaneswar, Khordha -751019 , Mobile No-9861015726, E,mail-sudhansusekhar2011@gmail.com RTP/DTP(C.ER)011/2017
Sudhansu Sekhar Panda Construction Engineer Plot No-329, Sahidnagar,Bhubaneswar, Khordha -751019 , Mobile No-9861015726, E,mail-sudhansusekhar2011@gmail.com RTP/DTP(STER)012/2017
Mahesprasad Singhsamant Chartered Accountant Plot No-A/705, Bhoinagar, Kharvelanagar, Back side of Padarsani Padia,Bhubaneswar, Khordha-751021,Mobile No-,9437092014,Email-mpsinghsamanta2014@rediffmail,com 054472

Updated Units

House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
Updated Changes
101 Covered Parking 1 6.67 Mx3.16M 21.09 Sqmt Included
102 Covered Parking 2 6.67 Mx3.16M 21.09 Sqmt Included
103 Covered Parking 3 6.67 Mx3.16M 21.09 Sqmt Included
104 Covered Parking 4 6.67 Mx3.16M 21.09 Sqmt Included
105 Covered Parking 5 6.67 Mx3.16M 21.09 Sqmt Included
106 Covered Parking 6 6.67 Mx3.16M 21.09 Sqmt Included
107 Covered Parking 7 6.67 Mx3.16M 21.09 Sqmt Included
108 Covered Parking 8 6.67 Mx3.16M 21.09 Sqmt Included
201 Covered Parking 9 6.67 Mx3.16M 21.09 Sqmt Included
202 Covered Parking 10 6.67 Mx3.16M 21.09 Sqmt Included
203 Covered Parking 11 6.67 Mx3.16M 21.09 Sqmt Included
204 Covered Parking 12 6.67 Mx3.16M 21.09 Sqmt Included
205 Covered Parking 13 6.67 Mx3.16M 21.09 Sqmt Included
206 Covered Parking 14 6.67 Mx3.16M 21.09 Sqmt Included
207 Covered Parking 15 6.67 Mx3.16M 21.09 Sqmt Included
208 Covered Parking 16 6.67 Mx3.16M 21.09 Sqmt Included
301 Covered Parking 17 6.67 Mx3.16M 21.09 Sqmt Included
302 Covered Parking 18 6.67 Mx3.16M 21.09 Sqmt Included
303 Covered Parking 19 6.67 Mx3.16M 21.09 Sqmt Included
304 Covered Parking 20 6.67 Mx3.16M 21.09 Sqmt Included
305 Covered Parking 21 6.67 Mx3.16M 21.09 Sqmt Included
306 Covered Parking 22 6.67 Mx3.16M 21.09 Sqmt Included
307 Covered Parking 23 6.67 Mx3.16M 21.09 Sqmt Included
308 Covered Parking 24 6.67 Mx3.16M 21.09 Sqmt Included
401 Covered Parking 25 6.67 Mx3.16M 21.09 Sqmt Included
402 Covered Parking 26 6.67 Mx3.16M 21.09 Sqmt Included
403 Covered Parking 27 6.67 Mx3.16M 21.09 Sqmt Included
404 Covered Parking 28 6.67 Mx3.16M 21.09 Sqmt Included
405 Covered Parking 29 6.67 Mx3.16M 21.09 Sqmt Included
406 Covered Parking 30 6.67 Mx3.16M 21.09 Sqmt Included
407 Covered Parking 31 6.67 Mx3.16M 21.09 Sqmt Included
408 Covered Parking 32 6.67 Mx3.16M 21.09 Sqmt Included