Generated by pacms.orera.in on date: 2024-07-05

Promoter Details
Promoter Name :
AMARESH PARIDA
Project Name :
LINGARAJ ENCLAVE
Project Location :
(Construction of B+S+5 Residential Apartment Building, No. of Residential Units-54)

Form- I

A. Promoter's Details

:  GK PROPERTIES :  Partnership
:  1820202200537 of 2022 :View
NA :  Flat No.-102, Sai Prasad Enclave, Canal Road, Rasulgarh, Bhubaneswar, Dist- Khordha, Odisha- 751010
:  Flat No.-102, Sai Prasad Enclave, Canal Road, Rasulgarh, Bhubaneswar, Dist-Khordha, Odisha-751010. :  gkodisha@gmail.com
:  9439639210
:  AAYFG1790R :View
:  1 year :  NA
NA

B. Details of Board of Directors / Partners / MC Members

:  AMARESH PARIDA :  
:  Partner :  AWNPP5239R
:PAN Card :  amareshnsui.odisha@gmail.com
:  B TECH :  9938212981
:  11 YEARS OF EXPERIENCE
:  Yes :  NA
:  MANAS KUMAR PAL :  
:  Partner :  BCLPP4414K
:PAN Card :  manasindus@gmail.com
:  B.TECH :  9438840739
:  3 YEARS OF EXPERIENCE
:  Yes :  NA
:  KALPANA KUMARl DEI :  
:  Partner :  AHNPD4073C
:PAN Card :  gkodisha@gmail.com
:  GRADUATE :  9439639210
:  3 YEARS
:  Yes :  NA

Annexure-1

Details of last projects already implemented (Ongoing or Complete)

Have you implemented any project(s) previously (May be Ongoing or Completed):No

Annexure-2

Details of the project to be registered

:   New :  LINGARAJ ENCLAVE
:  Residential :  (Construction of B+S+5 Residential Apartment Building, No. of Residential Units-54)
:  Khordha :  Bhubaneswar
:  751024 :  Urban Local Body
:  Bhubaneswar Municipal Corporation
:  B+S+5 Residential Apartment Building :  NA

Land Details of the Project


:  1873/3571 :  725/3090
:  KALARAHANGA :  1781.26
:  Yes
No :  View
:  View
:  Other Person
:  LALIT KUMAR PANDA & PRASANTA PANDA :  THE LAND OWNERS LALIT KUMAR PANDA & PRASANTA PANDA HAS EXECUTED DEVELOPMENT AGREEMENT WITH THE PROMOTER GK PROPERTIES. THE PROMOTER IS ALSO REGISTERED GPA HOLDER OVER THE LAND BEARING PLOT NO.1873/3571.
: No
: Yes
:  11132206783 :  03-06-2022
:  SUB-REGISTRAR, KHANDAGIRI :  Attached

Development Agreement

: Yes
Serial No. Particulars of the Person Land/Plot Details Share of the Person Document Attached
1 LALIT KUMAR PANDA & PRASANTA PANDA PLOT NO-1873/3571, KHATA NO-725/3090 50%   Agreement Copy

Building Plan

  View   View
  Download site plan 08-08-2026
09-08-2023

Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 Total Parking space measuring 2018.67 Sqm. as shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose 08-08-2026 NOT STARTED
2 The land over which construction is proposed is accessible by an approved means of access of 12.19 Mtr. in width 08-08-2026 ALREADY EXIST
3 The applicant shall free gift 0 Sqm. wide strip of land to Bhubaneswar Municipal Corporation for further widening of the road to the standard width as per CDP-2010, BDA. 08-08-2026 NOT STARTED
4 Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the regulations 08-08-2026 NOT STARTED
5 Obtain, wherever applicable, from the competent Authority permissions/clearance required in connection with the proposed work; 08-08-2026 NOT STARTED
6 Give written notice to the Authority before commencement of work on building site in Form- V,periodic progress report in Form-VIII, notice of completion in Form-VI and notice in case of termination of services of Technical persons engaged by him. 08-08-2026 COMPLETED
7 Obtain an Occupancy Certificate from the Authority prior to occupation of building in full or part 08-08-2026 NOT STARTED
8 In case the full plot or part thereof on which permission is accorded is agricultural kisam, the same may be converted to non-agricultural kisam under section- 8 of OLR Act before commencement of construction. 08-08-2026 NOT STARTED
9 The owner/applicant shall get the structural plan and design vetted by the institutions identified by the Authority for buildings more than 30 mtr height before commencement of construction. 08-08-2026 NOT STARTED
10 Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force,records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the Authority 08-08-2026 NOT STARTED
11 The owner/applicant/Technical Person shall strictly adhere to the terms and conditions imposed in the NOC from PHED vide Letter No- 17494, date 15.12.2022 & Fire Recommendation Vide Letter No-RECOMM I204130052023001260 /dt.26.05.2023. 08-08-2026 NOT STARTED
12 Storm water from the premises of roof top shall be conveyed and discharged to the rain 1st installment 498002.0 Paid 2nd installment 498002.0 To be paid before one year of issue of permission letter 3rd installment 498002.0 To be paid before two years of issue of permission letter Total payable Construction worker welfare Cess (CWWC) 1494006.0 D. Temporary Retention Fee 4000.0 Paid E. Charges for Purchasable FAR Area 1st installment 1623880.0 Paid 2nd installment 1623880.0 To be paid At the time of Plinth level 3rd installment 1623880.0 To be paid At the time of Ground Floor Roof Casting 4th installment 1623880.0 To be paid At the time of application of occupancy certificate Total payable Charges for Purchasable FAR Area 6495520.0 F. EIDP Fees 1st installment 373503.0 Paid 2nd installment 373503.0 To be paid at the time of Plinth level 3rd installment 373503.0 To be paid at the time of Ground Floor Roof Casting 4th installment 373503.0 To be paid at the time of application of occupancy certificate Total payable EIDP Fees 1494012.0 G. Other Fee 634028.0 Paid Other Fee Detail: (Regularization of sub-plot = Rs 6,29,200/- +Balance FAR = Rs 4,823/- +Balance CWWC = Rs 4/- Balance sanction fee = Rs 1/-) TOTAL FEES PAID 3598099.0 REMAINING FEES PAYABLE 6988153.0 water recharging pits as per ODA (Planning & Building Standards) Rules, 2020 08-08-2026 NOT STARTED
13 Plantation as required under the provision under regulation 30 of ODA (Planning & Building Standards) Rules, 2020.shall be strictly adhered. 08-08-2026 NOT STARTED
14 The Owner/ Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any earthquake/cyclone/any other natural disaster, structural/construction defects , Authority will be no way be held responsible for the same in what so ever manner. 08-08-2026 NOT STARTED
15 The Owner/Developer shall registered the project as per the ORERA Act. 08-08-2026 NOT STARTED
16 The applicant shall get the EIDP approved before start of Construction towards development of External infrastructure, execute it and obtain clearance from Engineering Wing of BMC before Occupancy. 08-08-2026 NOT STARTED
17 The number of dwelling units so approved shall not be changed in any manner. 08-08-2026 NOT STARTED

Layout Plan

: Yes :  View

Location Map with geo-coordinates of bend points

Point No. Latitude Longitude
1 20°21'13.0"N 85°50'36.6"E
2 20°21'12.6"N 85°50'36.6"E
3 20°21'12.3"N 85°50'36.5"E
4 20°21'11.9"N 85°50'36.4"E
5 20°21'10.3"N 85°50'36.4"E
6 20°21'10.6"N 85°50'35.3"E
7 20°21'13.2"N 85°50'36.1"E
View

Milestone of Project Construction

Description* Scheduled date of completion Current Status Site Images
Site Development 30-09-2023 IN PROGRESS
Roof Casting NA NA NA
Ground Floor/Stilt Floor 31-12-2023 NOT STARTED NA
1 Floor 29-02-2024 NOT STARTED NA
2 Floor 30-04-2024 NOT STARTED NA
3 Floor 30-06-2024 NOT STARTED NA
4 Floor 31-08-2024 NOT STARTED NA
5 Floor 31-10-2024 NOT STARTED NA
Brick Work & Plastering NA NA NA
Ground Floor/Stilt Floor 30-04-2024 NOT STARTED NA
1 Floor 30-06-2024 NOT STARTED NA
2 Floor 31-08-2024 NOT STARTED NA
3 Floor 31-10-2024 NOT STARTED NA
4 Floor 31-12-2024 NOT STARTED NA
5 Floor 28-02-2025 NOT STARTED NA
Electrical Works 31-08-2025 NOT STARTED NA
Concealed Cabling including Plugs & switches 31-08-2025 NOT STARTED NA
Installation & Charging of Transformer 31-08-2025 NOT STARTED NA
Connection to Flats/Apartments 31-08-2025 NOT STARTED NA
PH works 28-02-2026 NOT STARTED NA
Laying of concealed Pipes 28-02-2026 NOT STARTED NA
PH Fittings 28-02-2026 NOT STARTED NA
Overhead Water Tanks 28-02-2026 NOT STARTED NA
Water Supply Connection to all units 28-02-2026 NOT STARTED NA
STP construction and completion 28-02-2026 NOT STARTED NA
Distempering & Colouring of all units and exteriors 30-04-2026 NOT STARTED NA
Fixation of doors and windows 30-06-2026 NOT STARTED NA
Scheduled Date of handing over possession 31-12-2026 NOT STARTED NA
Development of common areas, parks, gardens etc 31-08-2026 NOT STARTED NA
Site Development 30-09-2023 IN PROGRESS NA
NA NA NA NA
Ground Floor/Stilt Floor 31-12-2023 NOT STARTED NA
1 Floor 29-02-2024 NOT STARTED NA
2 Floor 30-04-2024 NOT STARTED NA
3 Floor 30-06-2024 NOT STARTED NA
4 Floor 31-08-2024 NOT STARTED NA
5 Floor 31-10-2024 NOT STARTED NA
NA NA NA NA
Ground Floor/Stilt Floor 30-04-2024 NOT STARTED NA
1 Floor 30-06-2024 NOT STARTED NA
2 Floor 31-08-2024 NOT STARTED NA
3 Floor 31-10-2024 NOT STARTED NA
4 Floor 31-12-2024 NOT STARTED NA
5 Floor 28-02-2025 NOT STARTED NA
Electrical Works 31-08-2025 NOT STARTED NA
Concealed Cabling including Plugs & switches 31-08-2025 NOT STARTED NA
Installation & Charging of Transformer 31-08-2025 NOT STARTED NA
Connection to Flats/Apartments 31-08-2025 NOT STARTED NA
PH works 28-02-2026 NOT STARTED NA
Laying of concealed Pipes 28-02-2026 NOT STARTED NA
PH Fittings 28-02-2026 NOT STARTED NA
Overhead Water Tanks 28-02-2026 NOT STARTED NA
Water Supply Connection to all units 28-02-2026 NOT STARTED NA
STP construction and completion 28-02-2026 NOT STARTED NA
Distempering & Colouring of all units and exteriors 30-04-2026 NOT STARTED NA
Fixation of doors and windows 30-06-2026 NOT STARTED NA
Scheduled Date of handing over possession 31-12-2026 NOT STARTED NA
Development of common areas, parks, gardens etc 31-08-2026 NOT STARTED NA

Category and no. of units to be developed

:  Residential
:  
:  54
:  
:  
:  
Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership
Carpet Area Balcony Area Exclusive Open Terrace Area
1 101 116.98 11.05 0 Land Owner
2 102 78.52 8.74 0 Land Owner
3 103 53.19 3.91 0 Land Owner
4 104 63.10 3.58 0 Promoter
5 105 58.66 3.20 0 Promoter
6 106 77.31 6.42 0 Land Owner
7 107 81.85 6.90 0 Land Owner
8 108 70.63 3.33 0 Promoter
9 109 77.04 7.29 0 Promoter
10 110 67.89 3.51 0 Promoter
11 111 94.24 7.81 0 Promoter
12 201 116.98 11.05 0 Land Owner
13 202 78.52 8.74 0 Land Owner
14 203 53.19 3.91 0 Land Owner
15 204 63.10 3.58 0 Promoter
16 205 58.66 3.20 0 Promoter
17 206 77.31 6.42 0 Land Owner
18 207 81.85 6.90 0 Land Owner
19 208 70.63 3.33 0 Promoter
20 209 77.04 7.29 0 Promoter
21 210 67.89 3.51 0 Promoter
22 211 94.24 7.81 0 Promoter
23 301 116.98 11.05 0 Promoter
24 302 78.52 8.74 0 Promoter
25 303 53.19 3.91 0 Promoter
26 304 63.10 3.58 0 Land Owner
27 305 58.66 3.20 0 Land Owner
28 306 77.31 6.42 0 Promoter
29 307 81.85 6.90 0 Promoter
30 308 70.63 3.33 0 Land Owner
31 309 77.04 7.29 0 Land Owner
32 310 67.89 3.51 0 Land Owner
33 311 94.24 7.81 0 Land Owner
34 401 116.98 11.05 0 Promoter
35 402 78.52 8.74 0 Promoter
36 403 53.19 3.91 0 Promoter
37 404 63.10 3.58 0 Land Owner
38 405 58.66 3.20 0 Land Owner
39 406 77.31 6.42 0 Promoter
40 407 81.85 6.90 0 Promoter
41 408 70.63 3.33 0 Land Owner
42 409 77.04 7.29 0 Land Owner
43 410 67.89 3.51 0 Land Owner
44 411 94.24 7.81 0 Land Owner
45 501 116.98 11.05 0 Promoter
46 502 78.52 8.74 0 Land Owner
47 504 63.10 3.58 0 Promoter
48 505 58.66 3.20 0 Promoter
49 506 77.31 6.42 0 Promoter
50 507 81.85 6.90 0 Promoter
51 508 70.63 3.33 0 Land Owner
52 509 77.04 7.29 0 Promoter
53 510 67.89 3.51 0 Land Owner
54 511 94.24 7.81 0 Land Owner
Types of garages and parking
House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
101 Covered Parking 101 5.0 Mx 3.0M 15 SQM Included
102 Covered Parking 102 5.0 Mx 3.0M 15 SQM Included
103 Covered Parking 103 5.0 Mx 3.0M 15 SQM Included
104 Covered Parking 104 5.0 Mx 3.0M 15 SQM Included
105 Covered Parking 105 5.0 Mx 3.0M 15 SQM Included
106 Covered Parking 106 5.0 Mx 3.0M 15 SQM Included
107 Covered Parking 107 5.0 Mx 3.0M 15 SQM Included
108 Covered Parking 108 5.0 Mx 3.0M 15 SQM Included
109 Covered Parking 109 5.0 Mx 3.0M 15 SQM Included
110 Covered Parking 110 5.0 Mx 3.0M 15 SQM Included
111 Covered Parking 111 5.0 Mx 3.0M 15 SQM Included
201 Covered Parking 201 5.0 Mx 3.0M 15 SQM Included
202 Covered Parking 202 5.0 Mx 3.0M 15 SQM Included
203 Covered Parking 203 5.0 Mx 3.0M 15 SQM Included
204 Covered Parking 204 5.0 Mx 3.0M 15 SQM Included
205 Covered Parking 205 5.0 Mx 3.0M 15 SQM Included
206 Covered Parking 206 5.0 Mx 3.0M 15 SQM Included
207 Covered Parking 207 5.0 Mx 3.0M 15 SQM Included
208 Covered Parking 208 5.0 Mx 3.0M 15 SQM Included
209 Covered Parking 209 5.0 Mx 3.0M 15 SQM Included
210 Covered Parking 210 5.0 Mx 3.0M 15 SQM Included
211 Covered Parking 211 5.0 Mx 3.0M 15 SQM Included
301 Covered Parking 301 5.0 Mx 3.0M 15 SQM Included
302 Covered Parking 302 5.0 Mx 3.0M 15 SQM Included
303 Covered Parking 303 5.0 Mx 3.0M 15 SQM Included
304 Covered Parking 304 5.0 Mx 3.0M 15 SQM Included
305 Covered Parking 305 5.0 Mx 3.0M 15 SQM Included
306 Covered Parking 306 5.0 Mx 3.0M 15 SQM Included
307 Covered Parking 307 5.0 Mx 3.0M 15 SQM Included
308 Covered Parking 308 5.0 Mx 3.0M 15 SQM Included
309 Covered Parking 309 5.0 Mx 3.0M 15 SQM Included
310 Covered Parking 310 5.0 Mx 3.0M 15 SQM Included
311 Covered Parking 311 5.0 Mx 3.0M 15 SQM Included
401 Covered Parking 401 5.0 Mx 3.0M 15 SQM Included
402 Covered Parking 402 5.0 Mx 3.0M 15 SQM Included
403 Covered Parking 403 5.0 Mx 3.0M 15 SQM Included
404 Covered Parking 404 5.0 Mx 3.0M 15 SQM Included
405 Covered Parking 405 5.0 Mx 3.0M 15 SQM Included
406 Covered Parking 406 5.0 Mx 3.0M 15 SQM Included
407 Covered Parking 407 5.0 Mx 3.0M 15 SQM Included
408 Covered Parking 408 5.0 Mx 3.0M 15 SQM Included
409 Covered Parking 409 5.0 Mx 3.0M 15 SQM Included
410 Covered Parking 410 5.0 Mx 3.0M 15 SQM Included
411 Covered Parking 411 5.0 Mx 3.0M 15 SQM Included
501 Covered Parking 501 5.0 Mx 3.0M 15 SQM Included
502 Covered Parking 502 5.0 Mx 3.0M 15 SQM Included
504 Covered Parking 504 5.0 Mx 3.0M 15 SQM Included
505 Covered Parking 505 5.0 Mx 3.0M 15 SQM Included
506 Covered Parking 506 5.0 Mx 3.0M 15 SQM Included
507 Covered Parking 507 5.0 Mx 3.0M 15 SQM Included
508 Covered Parking 508 5.0 Mx 3.0M 15 SQM Included
509 Covered Parking 509 5.0 Mx 3.0M 15 SQM Included
510 Covered Parking 510 5.0 Mx 3.0M 15 SQM Included
511 Covered Parking 511 5.0 Mx 3.0M 15 SQM Included
Yes

Facilities to be provided

Particulars of Facilities Status of the facility Brief description of facility
Drinking Water Facility Ground Water Copy of Consent Letter
Fire Fighting Facility Yes STAIRCASE, FIRE EXTINGUISHER, SPRINKLER
Emergency Evacuation Services Yes STAIRCASE
Use of Renewable Energy No
Lift Facility Yes 2 Nos. of lift of Jhonson/ECS/KONE brand of 6 passenger capacity with ARD facility
Market Complex No
Community Hall Yes 54.78 SQM WITH TILE FLOORING
Gymnasium No
Swimming Pool No
Play Ground No
Park/Garden No
Plantation Area Yes 184 SQM
Others(Please Specify) No
Internal Road Yes 3.04 MTR WIDTH & 209.21 MTR LENGTH INTERNAL ROAD WITH BLOCK TILE FLOORING
External Road Yes 12.19 MTR WIDE ROAD ADJACENT TO PROJECT PLOT
Elecricity Supply Yes Copy of Consent Letter
Other Amenities No

Bank Particulars of the Project

  UCO BANK
  CHANDRASEKHARPUR
  25430210002261
  UCBA0002543
   View
  2747372
  6742747372

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
RUPAK PANDA Architect PLOT NO.491/2, SAHID NAGAR, BHUBANESWAR-751007, MOB-9437017543, EMAIL-OFFICE@RPASSOCIATES.IN Reg.No.AR/013/BDA NA
PITABASH PANDA Construction Engineer PLOT NO.491/2, SAHID NAGAR, BHUBANESWAR-751007, MOB-9437017543, EMAIL-OFFICE@RPASSOCIATES.IN Reg.No.105369/4 NA
AMITABH SAHU Chartered Accountant 409/410, Forum Mart, 89, Kharabela Nagar, Bhubaneswar - 751001, MOB-9937006491, EMAIL-bsa.amit@gmail.com M.No.064676 NA

Financial Details

:  1494 :   View
  08-08-2026 :  300
:  1194 :  0

Documents Attached

Description of Document Option Documents
Fire Safety Certificate Undertaking Attached
Affidavit in Form-A as per clause-l of sub-section-2 of section-4 of the Act Yes Attached
Allotment letter format Yes Attached
Conveyance Deed Format Yes Attached
Affidavit to adopt agreement for sale format as per Rule-8(1) of ORE (R and D) Rules, 2017 Yes Attached
Annual Report 2021-22 Attached
Annual Report 2022-23 Attached
Annual Report 2023-24 Attached
IT Return 2021-22 Attached
IT Return 2022-23 Attached
IT Return 2023-24 Attached
Audit Report 2021-22 Attached
Audit Report 2022-23 Attached
Audit Report 2023-24 Attached

Additional Documents Attached

Sl. No. Title of the document Upload Document
1 Clarification to the objection raised on dtd.21.09.2023
2 Clarification to the objection raised on dtd.01.10.2023

Other documents

“I undertake that the information submitted by me in this application are correct and true to best my knowledge. I also understand that providing false or wrong information is punishable under the Section-60 of the Real Estate (Regulation & Development) Act, 2016. I also further understand that furnishing wrong or false information will lead to rejection of my application registration of the project with forfeiture of registration fee and other charges deposited by me.”
  

Construction Progress

Updated Construction Progress

SL NO. Description Scheduled date of completion Current Status Remarks
1 Site Development 30-09-2023 IN PROGRESS
2 Roof Casting NA NA NA
3 Ground Floor/Stilt Floor 31-12-2023 NOT STARTED NA
4 1 Floor 29-02-2024 NOT STARTED NA
5 2 Floor 30-04-2024 NOT STARTED NA
6 3 Floor 30-06-2024 NOT STARTED NA
7 4 Floor 31-08-2024 NOT STARTED NA
8 5 Floor 31-10-2024 NOT STARTED NA
9 Brick Work & Plastering NA NA NA
10 Ground Floor/Stilt Floor 30-04-2024 NOT STARTED NA
11 1 Floor 30-06-2024 NOT STARTED NA
12 2 Floor 31-08-2024 NOT STARTED NA
13 3 Floor 31-10-2024 NOT STARTED NA
14 4 Floor 31-12-2024 NOT STARTED NA
15 5 Floor 28-02-2025 NOT STARTED NA
16 Electrical Works 31-08-2025 NOT STARTED NA
17 Concealed Cabling including Plugs & switches 31-08-2025 NOT STARTED NA
18 Installation & Charging of Transformer 31-08-2025 NOT STARTED NA
19 Connection to Flats/Apartments 31-08-2025 NOT STARTED NA
20 PH works 28-02-2026 NOT STARTED NA
21 Laying of concealed Pipes 28-02-2026 NOT STARTED NA
22 PH Fittings 28-02-2026 NOT STARTED NA
23 Overhead Water Tanks 28-02-2026 NOT STARTED NA
24 Water Supply Connection to all units 28-02-2026 NOT STARTED NA
25 STP construction and completion 28-02-2026 NOT STARTED NA
26 Distempering & Colouring of all units and exteriors 30-04-2026 NOT STARTED NA
27 Fixation of doors and windows 30-06-2026 NOT STARTED NA
28 Scheduled Date of handing over possession 31-12-2026 NOT STARTED NA
29 Development of common areas, parks, gardens etc 31-08-2026 NOT STARTED NA
Updated Changes on 06-01-2024
30 Site Development 30-09-2023 IN PROGRESS NA
31 NA NA NA NA
32 Ground Floor/Stilt Floor 31-12-2023 NOT STARTED NA
33 1 Floor 29-02-2024 NOT STARTED NA
34 2 Floor 30-04-2024 NOT STARTED NA
35 3 Floor 30-06-2024 NOT STARTED NA
36 4 Floor 31-08-2024 NOT STARTED NA
37 5 Floor 31-10-2024 NOT STARTED NA
38 NA NA NA NA
39 Ground Floor/Stilt Floor 30-04-2024 NOT STARTED NA
40 1 Floor 30-06-2024 NOT STARTED NA
41 2 Floor 31-08-2024 NOT STARTED NA
42 3 Floor 31-10-2024 NOT STARTED NA
43 4 Floor 31-12-2024 NOT STARTED NA
44 5 Floor 28-02-2025 NOT STARTED NA
45 Electrical Works 31-08-2025 NOT STARTED NA
46 Concealed Cabling including Plugs & switches 31-08-2025 NOT STARTED NA
47 Installation & Charging of Transformer 31-08-2025 NOT STARTED NA
48 Connection to Flats/Apartments 31-08-2025 NOT STARTED NA
49 PH works 28-02-2026 NOT STARTED NA
50 Laying of concealed Pipes 28-02-2026 NOT STARTED NA
51 PH Fittings 28-02-2026 NOT STARTED NA
52 Overhead Water Tanks 28-02-2026 NOT STARTED NA
53 Water Supply Connection to all units 28-02-2026 NOT STARTED NA
54 STP construction and completion 28-02-2026 NOT STARTED NA
55 Distempering & Colouring of all units and exteriors 30-04-2026 NOT STARTED NA
56 Fixation of doors and windows 30-06-2026 NOT STARTED NA
57 Scheduled Date of handing over possession 31-12-2026 NOT STARTED NA
58 Development of common areas, parks, gardens etc 31-08-2026 NOT STARTED NA

Booking Status

Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership Status
Carpet Area Balcony Area Exclusive Open Terrace Area
1 101 116.98 11.05 0 Land Owner
2 102 78.52 8.74 0 Land Owner
3 103 53.19 3.91 0 Land Owner
4 104 63.10 3.58 0 Promoter
5 105 58.66 3.20 0 Promoter
6 106 77.31 6.42 0 Land Owner
7 107 81.85 6.90 0 Land Owner
8 108 70.63 3.33 0 Promoter
9 109 77.04 7.29 0 Promoter
10 110 67.89 3.51 0 Promoter
11 111 94.24 7.81 0 Promoter
12 201 116.98 11.05 0 Land Owner
13 202 78.52 8.74 0 Land Owner
14 203 53.19 3.91 0 Land Owner
15 204 63.10 3.58 0 Promoter
16 205 58.66 3.20 0 Promoter
17 206 77.31 6.42 0 Land Owner
18 207 81.85 6.90 0 Land Owner
19 208 70.63 3.33 0 Promoter
20 209 77.04 7.29 0 Promoter
21 210 67.89 3.51 0 Promoter
22 211 94.24 7.81 0 Promoter
23 301 116.98 11.05 0 Promoter
24 302 78.52 8.74 0 Promoter
25 303 53.19 3.91 0 Promoter
26 304 63.10 3.58 0 Land Owner
27 305 58.66 3.20 0 Land Owner
28 306 77.31 6.42 0 Promoter
29 307 81.85 6.90 0 Promoter
30 308 70.63 3.33 0 Land Owner
31 309 77.04 7.29 0 Land Owner
32 310 67.89 3.51 0 Land Owner
33 311 94.24 7.81 0 Land Owner
34 401 116.98 11.05 0 Promoter
35 402 78.52 8.74 0 Promoter
36 403 53.19 3.91 0 Promoter
37 404 63.10 3.58 0 Land Owner
38 405 58.66 3.20 0 Land Owner
39 406 77.31 6.42 0 Promoter
40 407 81.85 6.90 0 Promoter
41 408 70.63 3.33 0 Land Owner
42 409 77.04 7.29 0 Land Owner
43 410 67.89 3.51 0 Land Owner
44 411 94.24 7.81 0 Land Owner
45 501 116.98 11.05 0 Promoter
46 502 78.52 8.74 0 Land Owner
47 504 63.10 3.58 0 Promoter
48 505 58.66 3.20 0 Promoter
49 506 77.31 6.42 0 Promoter
50 507 81.85 6.90 0 Promoter
51 508 70.63 3.33 0 Land Owner
52 509 77.04 7.29 0 Promoter
53 510 67.89 3.51 0 Land Owner
54 511 94.24 7.81 0 Land Owner

Financial Status

SL No. Funds Collected from the Allottees Funds Borrowed from Financial Institutions Funds Employed from Own Sources Expenditure As On Date Status
1 7981100 0 13053202 18630785 31-12-2023 IN PROGRESS

Updated Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 Total Parking space measuring 2018.67 Sqm. as shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose 08-08-2026 NOT STARTED
2 The land over which construction is proposed is accessible by an approved means of access of 12.19 Mtr. in width 08-08-2026 ALREADY EXIST
3 The applicant shall free gift 0 Sqm. wide strip of land to Bhubaneswar Municipal Corporation for further widening of the road to the standard width as per CDP-2010, BDA. 08-08-2026 NOT STARTED
4 Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the regulations 08-08-2026 NOT STARTED
5 Obtain, wherever applicable, from the competent Authority permissions/clearance required in connection with the proposed work; 08-08-2026 NOT STARTED
6 Give written notice to the Authority before commencement of work on building site in Form- V,periodic progress report in Form-VIII, notice of completion in Form-VI and notice in case of termination of services of Technical persons engaged by him. 08-08-2026 COMPLETED
7 Obtain an Occupancy Certificate from the Authority prior to occupation of building in full or part 08-08-2026 NOT STARTED
8 In case the full plot or part thereof on which permission is accorded is agricultural kisam, the same may be converted to non-agricultural kisam under section- 8 of OLR Act before commencement of construction. 08-08-2026 NOT STARTED
9 The owner/applicant shall get the structural plan and design vetted by the institutions identified by the Authority for buildings more than 30 mtr height before commencement of construction. 08-08-2026 NOT STARTED
10 Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force,records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the Authority 08-08-2026 NOT STARTED
11 The owner/applicant/Technical Person shall strictly adhere to the terms and conditions imposed in the NOC from PHED vide Letter No- 17494, date 15.12.2022 & Fire Recommendation Vide Letter No-RECOMM I204130052023001260 /dt.26.05.2023. 08-08-2026 NOT STARTED
12 Storm water from the premises of roof top shall be conveyed and discharged to the rain 1st installment 498002.0 Paid 2nd installment 498002.0 To be paid before one year of issue of permission letter 3rd installment 498002.0 To be paid before two years of issue of permission letter Total payable Construction worker welfare Cess (CWWC) 1494006.0 D. Temporary Retention Fee 4000.0 Paid E. Charges for Purchasable FAR Area 1st installment 1623880.0 Paid 2nd installment 1623880.0 To be paid At the time of Plinth level 3rd installment 1623880.0 To be paid At the time of Ground Floor Roof Casting 4th installment 1623880.0 To be paid At the time of application of occupancy certificate Total payable Charges for Purchasable FAR Area 6495520.0 F. EIDP Fees 1st installment 373503.0 Paid 2nd installment 373503.0 To be paid at the time of Plinth level 3rd installment 373503.0 To be paid at the time of Ground Floor Roof Casting 4th installment 373503.0 To be paid at the time of application of occupancy certificate Total payable EIDP Fees 1494012.0 G. Other Fee 634028.0 Paid Other Fee Detail: (Regularization of sub-plot = Rs 6,29,200/- +Balance FAR = Rs 4,823/- +Balance CWWC = Rs 4/- Balance sanction fee = Rs 1/-) TOTAL FEES PAID 3598099.0 REMAINING FEES PAYABLE 6988153.0 water recharging pits as per ODA (Planning & Building Standards) Rules, 2020 08-08-2026 NOT STARTED
13 Plantation as required under the provision under regulation 30 of ODA (Planning & Building Standards) Rules, 2020.shall be strictly adhered. 08-08-2026 NOT STARTED
14 The Owner/ Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any earthquake/cyclone/any other natural disaster, structural/construction defects , Authority will be no way be held responsible for the same in what so ever manner. 08-08-2026 NOT STARTED
15 The Owner/Developer shall registered the project as per the ORERA Act. 08-08-2026 NOT STARTED
16 The applicant shall get the EIDP approved before start of Construction towards development of External infrastructure, execute it and obtain clearance from Engineering Wing of BMC before Occupancy. 08-08-2026 NOT STARTED
17 The number of dwelling units so approved shall not be changed in any manner. 08-08-2026 NOT STARTED
Updated Changes on 06-01-2024
18 Total Parking space measuring 2018.67 Sqm. as shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose 08-08-2026 NOT STARTED
19 The land over which construction is proposed is accessible by an approved means of access of 12.19 Mtr. in width 08-08-2026 ALREADY EXIST
20 The applicant shall free gift 0 Sqm. wide strip of land to Bhubaneswar Municipal Corporation for further widening of the road to the standard width as per CDP-2010, BDA. 08-08-2026 COMPLIED
21 Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the regulations 08-08-2026 WILL COMPLY AS PER THE CONDITION
22 Obtain, wherever applicable, from the competent Authority permissions/clearance required in connection with the proposed work; 08-08-2026 NOT STARTED
23 Give written notice to the Authority before commencement of work on building site in Form- V,periodic progress report in Form-VIII, notice of completion in Form-VI and notice in case of termination of services of Technical persons engaged by him. 08-08-2026 COMPLETED
24 Obtain an Occupancy Certificate from the Authority prior to occupation of building in full or part 08-08-2026 NOT STARTED
25 In case the full plot or part thereof on which permission is accorded is agricultural kisam, the same may be converted to non-agricultural kisam under section- 8 of OLR Act before commencement of construction. 08-08-2026 COMPLETED
26 The owner/applicant shall get the structural plan and design vetted by the institutions identified by the Authority for buildings more than 30 mtr height before commencement of construction. 08-08-2026 NOT STARTED
27 Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force,records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the Authority 08-08-2026 NOT STARTED
28 The owner/applicant/Technical Person shall strictly adhere to the terms and conditions imposed in the NOC from PHED vide Letter No- 17494, date 15.12.2022 & Fire Recommendation Vide Letter No-RECOMM I204130052023001260 /dt.26.05.2023. 08-08-2026 NOT STARTED
29 Storm water from the premises of roof top shall be conveyed and discharged to the rain 1st installment 498002.0 Paid 2nd installment 498002.0 To be paid before one year of issue of permission letter 3rd installment 498002.0 To be paid before two years of issue of permission letter Total payable Construction worker welfare Cess (CWWC) 1494006.0 D. Temporary Retention Fee 4000.0 Paid E. Charges for Purchasable FAR Area 1st installment 1623880.0 Paid 2nd installment 1623880.0 To be paid At the time of Plinth level 3rd installment 1623880.0 To be paid At the time of Ground Floor Roof Casting 4th installment 1623880.0 To be paid At the time of application of occupancy certificate Total payable Charges for Purchasable FAR Area 6495520.0 F. EIDP Fees 1st installment 373503.0 Paid 2nd installment 373503.0 To be paid at the time of Plinth level 3rd installment 373503.0 To be paid at the time of Ground Floor Roof Casting 4th installment 373503.0 To be paid at the time of application of occupancy certificate Total payable EIDP Fees 1494012.0 G. Other Fee 634028.0 Paid Other Fee Detail: (Regularization of sub-plot = Rs 6,29,200/- +Balance FAR = Rs 4,823/- +Balance CWWC = Rs 4/- Balance sanction fee = Rs 1/-) TOTAL FEES PAID 3598099.0 REMAINING FEES PAYABLE 6988153.0 water recharging pits as per ODA (Planning & Building Standards) Rules, 2020 08-08-2026 NOT STARTED
30 Plantation as required under the provision under regulation 30 of ODA (Planning & Building Standards) Rules, 2020.shall be strictly adhered. 08-08-2026 NOT STARTED
31 The Owner/ Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any earthquake/cyclone/any other natural disaster, structural/construction defects , Authority will be no way be held responsible for the same in what so ever manner. 08-08-2026 NOT STARTED
32 The Owner/Developer shall registered the project as per the ORERA Act. 08-08-2026 NOT STARTED
33 The applicant shall get the EIDP approved before start of Construction towards development of External infrastructure, execute it and obtain clearance from Engineering Wing of BMC before Occupancy. 08-08-2026 NOT STARTED
34 The number of dwelling units so approved shall not be changed in any manner. 08-08-2026 NOT STARTED

Updated Project Documents

Sl. No. Title of the document Upload Document
1 PROFORMA-I (OCT, 2023 - DEC, 2023)
2 PROFORMA-II (OCT, 2023 - DEC, 2023)
3 BANK STATEMENT (OCT, 2023 - DEC, 2023)
:  AMARESH PARIDA :  
NA :  AWNPP5239R
:PAN Card :  amareshnsui.odisha@gmail.com
:  B TECH :  9938212981
:  11 YEARS OF EXPERIENCE
:  Yes :  NA
:  MANAS KUMAR PAL :  
NA :  BCLPP4414K
:PAN Card :  manasindus@gmail.com
:  B.TECH :  9438840739
:  3 YEARS OF EXPERIENCE
:  Yes :  NA
:  KALPANA KUMARl DEI :  
NA :  AHNPD4073C
:PAN Card :  gkodisha@gmail.com
:  GRADUATE :  9439639210
:  3 YEARS
:  Yes :  NA

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
RUPAK PANDA Architect PLOT NO.491/2, SAHID NAGAR, BHUBANESWAR-751007, MOB-9437017543, EMAIL-OFFICE@RPASSOCIATES.IN Reg.No.AR/013/BDA NA
PITABASH PANDA Construction Engineer PLOT NO.491/2, SAHID NAGAR, BHUBANESWAR-751007, MOB-9437017543, EMAIL-OFFICE@RPASSOCIATES.IN Reg.No.105369/4 NA
AMITABH SAHU Chartered Accountant 409/410, Forum Mart, 89, Kharabela Nagar, Bhubaneswar - 751001, MOB-9937006491, EMAIL-bsa.amit@gmail.com M.No.064676 NA

Updated Units

House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
Updated Changes
101 Covered Parking 101 5.0 Mx 3.0M 15 SQM Included
102 Covered Parking 102 5.0 Mx 3.0M 15 SQM Included
103 Covered Parking 103 5.0 Mx 3.0M 15 SQM Included
104 Covered Parking 104 5.0 Mx 3.0M 15 SQM Included
105 Covered Parking 105 5.0 Mx 3.0M 15 SQM Included
106 Covered Parking 106 5.0 Mx 3.0M 15 SQM Included
107 Covered Parking 107 5.0 Mx 3.0M 15 SQM Included
108 Covered Parking 108 5.0 Mx 3.0M 15 SQM Included
109 Covered Parking 109 5.0 Mx 3.0M 15 SQM Included
110 Covered Parking 110 5.0 Mx 3.0M 15 SQM Included
111 Covered Parking 111 5.0 Mx 3.0M 15 SQM Included
201 Covered Parking 201 5.0 Mx 3.0M 15 SQM Included
202 Covered Parking 202 5.0 Mx 3.0M 15 SQM Included
203 Covered Parking 203 5.0 Mx 3.0M 15 SQM Included
204 Covered Parking 204 5.0 Mx 3.0M 15 SQM Included
205 Covered Parking 205 5.0 Mx 3.0M 15 SQM Included
206 Covered Parking 206 5.0 Mx 3.0M 15 SQM Included
207 Covered Parking 207 5.0 Mx 3.0M 15 SQM Included
208 Covered Parking 208 5.0 Mx 3.0M 15 SQM Included
209 Covered Parking 209 5.0 Mx 3.0M 15 SQM Included
210 Covered Parking 210 5.0 Mx 3.0M 15 SQM Included
211 Covered Parking 211 5.0 Mx 3.0M 15 SQM Included
301 Covered Parking 301 5.0 Mx 3.0M 15 SQM Included
302 Covered Parking 302 5.0 Mx 3.0M 15 SQM Included
303 Covered Parking 303 5.0 Mx 3.0M 15 SQM Included
304 Covered Parking 304 5.0 Mx 3.0M 15 SQM Included
305 Covered Parking 305 5.0 Mx 3.0M 15 SQM Included
306 Covered Parking 306 5.0 Mx 3.0M 15 SQM Included
307 Covered Parking 307 5.0 Mx 3.0M 15 SQM Included
308 Covered Parking 308 5.0 Mx 3.0M 15 SQM Included
309 Covered Parking 309 5.0 Mx 3.0M 15 SQM Included
310 Covered Parking 310 5.0 Mx 3.0M 15 SQM Included
311 Covered Parking 311 5.0 Mx 3.0M 15 SQM Included
401 Covered Parking 401 5.0 Mx 3.0M 15 SQM Included
402 Covered Parking 402 5.0 Mx 3.0M 15 SQM Included
403 Covered Parking 403 5.0 Mx 3.0M 15 SQM Included
404 Covered Parking 404 5.0 Mx 3.0M 15 SQM Included
405 Covered Parking 405 5.0 Mx 3.0M 15 SQM Included
406 Covered Parking 406 5.0 Mx 3.0M 15 SQM Included
407 Covered Parking 407 5.0 Mx 3.0M 15 SQM Included
408 Covered Parking 408 5.0 Mx 3.0M 15 SQM Included
409 Covered Parking 409 5.0 Mx 3.0M 15 SQM Included
410 Covered Parking 410 5.0 Mx 3.0M 15 SQM Included
411 Covered Parking 411 5.0 Mx 3.0M 15 SQM Included
501 Covered Parking 501 5.0 Mx 3.0M 15 SQM Included
502 Covered Parking 502 5.0 Mx 3.0M 15 SQM Included
504 Covered Parking 504 5.0 Mx 3.0M 15 SQM Included
505 Covered Parking 505 5.0 Mx 3.0M 15 SQM Included
506 Covered Parking 506 5.0 Mx 3.0M 15 SQM Included
507 Covered Parking 507 5.0 Mx 3.0M 15 SQM Included
508 Covered Parking 508 5.0 Mx 3.0M 15 SQM Included
509 Covered Parking 509 5.0 Mx 3.0M 15 SQM Included
510 Covered Parking 510 5.0 Mx 3.0M 15 SQM Included
511 Covered Parking 511 5.0 Mx 3.0M 15 SQM Included

Generated by pacms.orera.in on date: 2024-07-05