1 |
The building shall be used exclusively for Residential Apartment purpose and the use shall not be changed to any other use without prior approval of this Authority.
|
29-06-2028
|
not started yet
|
2 |
The development shall be undertaken strictly according to plans enclosed with this permission endorsement
|
29-06-2028
|
not started yet
|
3 |
Parking space measuring 2816.92 Sq.m (in Stilt floor) as shown in the approved plan shall be exclusively used for parking of vehicles and no part of it will be used for any other purpose.
|
29-06-2028
|
not started yet
|
4 |
The land over which construction is proposed is accessible by an approved means of access of 15.24 Mtr. in width.
|
29-06-2028
|
not started yet
|
5 |
The land in question must be in lawful ownership and peaceful possession of the applicant
|
29-06-2028
|
not started yet
|
6 |
Applicant shall submit the undertaking towards free gift the proposed road affected area.
|
29-06-2028
|
not started yet
|
7 |
The permission granted under these rules/regulations shall temain valid upto three years from the date of issue
|
06-07-2023
|
NA
|
8 |
ln case the construction of the building is not completed within the validity period, the permission shall have to be revalidated before the expiry of the above validity period on payment of fee as presoibed under ODA (CAF) Rules, 2016
|
06-07-2023
|
NA
|
9 |
lf any dispute arises with respect to right, title interest on the land on which the permission has been granted, the permission so granted shall be automatically treated as cancelled during the period of dispute.
|
06-07-2023
|
NA
|
10 |
Any construction and development made by the applicant or owner on the disputed land will be at his risk without any legal or financial liability on the Authority
|
06-07-2023
|
NA
|
11 |
Approval of plans and acceptance of any statement or document pertaining to such plan shall not absolve the owner or technical person(s) or Poect Management Organisation/Architect under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards) Rules, 2020, or under any other law for the time being in force.
|
06-07-2023
|
NA
|
12 |
The owner /applicant shall Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the provisions of the Rules/ regulations;
|
06-07-2023
|
NA
|
13 |
The owner /applicant shall Obtain, wherever applicable from the competent Authority permissions/clearance required in connection with the proposed work;
|
06-07-2023
|
NA
|
14 |
Ensure that the Completion Certificate in Form XVll (as appended to ODA (CAF) Rules, 2016) is issued by the Project Management Organisation engaged by him on completion of the building for submission of the same to the Authority for verification and issuance of Occupancy Certificate
|
29-06-2028
|
not yet started
|
15 |
The owner /applicant shall Ensure that the Completion Certificate in Form XVll (as appended to ODA (CAF) Rules, 2016) is issued by the Project Management Organisation engaged by him on completion of the building for submission of the same to the Authority for verification and issuance of Occupancy Certificate.
|
29-06-2028
|
not yet started
|
16 |
The owner /applicant shall Obtain an Occupancy Certificate from the Authority prior to occupation of building in full or part.
|
29-06-2028
|
not yet started
|
17 |
The owner /applicant shall Ensure compliance of provision of various Acts, rules, regulations and codes which control or provide for various norms governing development including but not limited to planning norms, fire safety norms, environmental norms, as applicable in each case
|
29-06-2028
|
not yet started
|
18 |
Adhere to the provisions of BDA (Planning & Building Standards) Regulation strictly and conditions thereto.
|
29-06-2028
|
not yet started
|
19 |
The owner/applicant/Technical Person shall strictly adhere to the terms and conditions imposed in the NOC/Clearances given by Fire Prevention officer/National Airport Authority/SElAA, Ministry of Forest & Environment/PHED etc wherever applicable.
|
29-06-2028
|
not yet started
|
20 |
Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Rule 47 of ODA (Planning & Building Standards) Rules 2020.
|
29-06-2028
|
not yet started
|
21 |
Th'e space which is meant for parking shall not be changed to any other use and shall not be partitioned/ closed in any manner.
|
29-06-2028
|
not yet started
|
22 |
30% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance, fire tender, physically handicapped persons and outside visitors with signage as per norms under Rule 37 of ODA (Planning & Building Standards) Rules 2020
|
29-06-2028
|
not yet started
|
23 |
Plantation for one tree per 80 sqm of plot area rnade by the applicant as per provision under Rule 30 of ODA (Planning & Building Standards) Rules 2020.
|
29-06-2028
|
not yet started
|
24 |
lf the construction / development are not as per the approved plan / deviated beyond permissible norms, the performance security shall be forfeited and action shall be initiated against the applicanUbuilder/developer as per the provisions of the ODA Act, 1982 Rules and Regulations made there under
|
29-06-2028
|
not yet started
|
25 |
The Owner/ ApplicanUArchitecUStructural Engineer are fully and jointly responsible for any structural failure of building due to any structural/construction defects, Authority will be no way be held responsible for the same in what so ever manner
|
29-06-2028
|
not yet started
|
26 |
The concerned Architect / Applicant Developer are fully responsible for any deviations additions & altemations beyond approved plan/ defective construction etc. shall be liable for action as per the provisions of the Regulation.
|
29-06-2028
|
not yet started
|
27 |
The applicant shall obtain infrastructural specification and subsequent clearance with regard to . development of infrastructure from BMC/BDA before commencement of construction.
|
29-06-2028
|
not yet started
|
28 |
Applicant shall allot the units to Beneficiaries pertaining to exclusively as applicant has availed special incentive w.r.t. FAR and relaxation in Parking Norms for the purpose.
|
29-06-2028
|
not yet started
|
29 |
All the stipulated conditions of the Noc/clearances given by Project Director, DRDA, Khordha & CGWA shall be adhered to strictly
|
29-06-2028
|
not yet started
|
30 |
No storm water/water shall be discharged to the public road/public premises and other adjoining plots.
|
29-06-2028
|
not yet started
|
31 |
All the passages around the building shall be developed with permeable pavers block for absorptton of rain water and seepage in to the ground.
|
29-06-2028
|
not yet started
|
32 |
Rain water harvesting structure and recharging pits of adequate capacity shall be developed to minimize the storm water runoff to the drain
|
29-06-2028
|
not yet started
|
33 |
The applicant shall make own arrangement of solid waste management through micro compost plant within the project premises.
|
29-06-2028
|
not yet started
|
34 |
The applicant shall obtain oRERA registration as per the affidavit submitted by applicant and submit the oREM Registration certificate at the time of submission ofapplicationforissueofoccupancycertificate.Further,youarerequiredto comply the provisions of Real Estate (Regulation and Development) Act, 2016
|
29-06-2028
|
not yet started
|
35 |
The applicant shall install Rooftop P.V. system as per BDA Regulations'
|
29-06-2028
|
not yet started
|
36 |
The Authority shall in no way be held responsible for any structural failure and damage due to earthquake/cyclone/any other natural disaster'
|
29-06-2028
|
not yet started
|
37 |
The number of dwelling units so approved shall not be changed in any manner
|
29-06-2028
|
not yet started
|
Updated Changes on 02-11-2023 |
38 |
The building shall be used exclusively for Residential Apartment purpose and the use shall not be changed to any other use without prior approval of this Authority.
|
29-06-2028
|
not started yet
|
39 |
The development shall be undertaken strictly according to plans enclosed with this permission endorsement
|
29-06-2028
|
not started yet
|
40 |
Parking space measuring 2816.92 Sq.m (in Stilt floor) as shown in the approved plan shall be exclusively used for parking of vehicles and no part of it will be used for any other purpose.
|
29-06-2028
|
not started yet
|
41 |
The land over which construction is proposed is accessible by an approved means of access of 15.24 Mtr. in width.
|
29-06-2028
|
not started yet
|
42 |
The land in question must be in lawful ownership and peaceful possession of the applicant
|
29-06-2028
|
not started yet
|
43 |
Applicant shall submit the undertaking towards free gift the proposed road affected area.
|
29-06-2028
|
not started yet
|
44 |
The permission granted under these rules/regulations shall temain valid upto three years from the date of issue
|
06-07-2023
|
NA
|
45 |
ln case the construction of the building is not completed within the validity period, the permission shall have to be revalidated before the expiry of the above validity period on payment of fee as presoibed under ODA (CAF) Rules, 2016
|
06-07-2023
|
NA
|
46 |
lf any dispute arises with respect to right, title interest on the land on which the permission has been granted, the permission so granted shall be automatically treated as cancelled during the period of dispute.
|
06-07-2023
|
NA
|
47 |
Any construction and development made by the applicant or owner on the disputed land will be at his risk without any legal or financial liability on the Authority
|
06-07-2023
|
NA
|
48 |
Approval of plans and acceptance of any statement or document pertaining to such plan shall not absolve the owner or technical person(s) or Poect Management Organisation/Architect under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards) Rules, 2020, or under any other law for the time being in force.
|
06-07-2023
|
NA
|
49 |
The owner /applicant shall Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the provisions of the Rules/ regulations;
|
06-07-2023
|
NA
|
50 |
The owner /applicant shall Obtain, wherever applicable from the competent Authority permissions/clearance required in connection with the proposed work;
|
06-07-2023
|
NA
|
51 |
Ensure that the Completion Certificate in Form XVll (as appended to ODA (CAF) Rules, 2016) is issued by the Project Management Organisation engaged by him on completion of the building for submission of the same to the Authority for verification and issuance of Occupancy Certificate
|
29-06-2028
|
not yet started
|
52 |
The owner /applicant shall Ensure that the Completion Certificate in Form XVll (as appended to ODA (CAF) Rules, 2016) is issued by the Project Management Organisation engaged by him on completion of the building for submission of the same to the Authority for verification and issuance of Occupancy Certificate.
|
29-06-2028
|
not yet started
|
53 |
The owner /applicant shall Obtain an Occupancy Certificate from the Authority prior to occupation of building in full or part.
|
29-06-2028
|
not yet started
|
54 |
The owner /applicant shall Ensure compliance of provision of various Acts, rules, regulations and codes which control or provide for various norms governing development including but not limited to planning norms, fire safety norms, environmental norms, as applicable in each case
|
29-06-2028
|
not yet started
|
55 |
Adhere to the provisions of BDA (Planning & Building Standards) Regulation strictly and conditions thereto.
|
29-06-2028
|
not yet started
|
56 |
The owner/applicant/Technical Person shall strictly adhere to the terms and conditions imposed in the NOC/Clearances given by Fire Prevention officer/National Airport Authority/SElAA, Ministry of Forest & Environment/PHED etc wherever applicable.
|
29-06-2028
|
not yet started
|
57 |
Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Rule 47 of ODA (Planning & Building Standards) Rules 2020.
|
29-06-2028
|
not yet started
|
58 |
Th'e space which is meant for parking shall not be changed to any other use and shall not be partitioned/ closed in any manner.
|
29-06-2028
|
not yet started
|
59 |
30% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance, fire tender, physically handicapped persons and outside visitors with signage as per norms under Rule 37 of ODA (Planning & Building Standards) Rules 2020
|
29-06-2028
|
not yet started
|
60 |
Plantation for one tree per 80 sqm of plot area rnade by the applicant as per provision under Rule 30 of ODA (Planning & Building Standards) Rules 2020.
|
29-06-2028
|
not yet started
|
61 |
lf the construction / development are not as per the approved plan / deviated beyond permissible norms, the performance security shall be forfeited and action shall be initiated against the applicanUbuilder/developer as per the provisions of the ODA Act, 1982 Rules and Regulations made there under
|
29-06-2028
|
not yet started
|
62 |
The Owner/ ApplicanUArchitecUStructural Engineer are fully and jointly responsible for any structural failure of building due to any structural/construction defects, Authority will be no way be held responsible for the same in what so ever manner
|
29-06-2028
|
not yet started
|
63 |
The concerned Architect / Applicant Developer are fully responsible for any deviations additions & altemations beyond approved plan/ defective construction etc. shall be liable for action as per the provisions of the Regulation.
|
29-06-2028
|
not yet started
|
64 |
The applicant shall obtain infrastructural specification and subsequent clearance with regard to . development of infrastructure from BMC/BDA before commencement of construction.
|
29-06-2028
|
not yet started
|
65 |
Applicant shall allot the units to Beneficiaries pertaining to exclusively as applicant has availed special incentive w.r.t. FAR and relaxation in Parking Norms for the purpose.
|
29-06-2028
|
not yet started
|
66 |
All the stipulated conditions of the Noc/clearances given by Project Director, DRDA, Khordha & CGWA shall be adhered to strictly
|
29-06-2028
|
not yet started
|
67 |
No storm water/water shall be discharged to the public road/public premises and other adjoining plots.
|
29-06-2028
|
not yet started
|
68 |
All the passages around the building shall be developed with permeable pavers block for absorptton of rain water and seepage in to the ground.
|
29-06-2028
|
not yet started
|
69 |
Rain water harvesting structure and recharging pits of adequate capacity shall be developed to minimize the storm water runoff to the drain
|
29-06-2028
|
not yet started
|
70 |
The applicant shall make own arrangement of solid waste management through micro compost plant within the project premises.
|
29-06-2028
|
not yet started
|
71 |
The applicant shall obtain oRERA registration as per the affidavit submitted by applicant and submit the oREM Registration certificate at the time of submission ofapplicationforissueofoccupancycertificate.Further,youarerequiredto comply the provisions of Real Estate (Regulation and Development) Act, 2016
|
29-06-2028
|
not yet started
|
72 |
The applicant shall install Rooftop P.V. system as per BDA Regulations'
|
29-06-2028
|
not yet started
|
73 |
The Authority shall in no way be held responsible for any structural failure and damage due to earthquake/cyclone/any other natural disaster'
|
29-06-2028
|
not yet started
|
74 |
The number of dwelling units so approved shall not be changed in any manner
|
29-06-2028
|
not yet started
|
Updated Changes on 27-03-2024 |
75 |
The building shall be used exclusively for Residential Apartment purpose and the use shall not be changed to any other use without prior approval of this Authority.
|
29-06-2028
|
not started yet
|
76 |
The development shall be undertaken strictly according to plans enclosed with this permission endorsement
|
29-06-2028
|
not started yet
|
77 |
Parking space measuring 2816.92 Sq.m (in Stilt floor) as shown in the approved plan shall be exclusively used for parking of vehicles and no part of it will be used for any other purpose.
|
29-06-2028
|
not started yet
|
78 |
The land over which construction is proposed is accessible by an approved means of access of 15.24 Mtr. in width.
|
29-06-2028
|
not started yet
|
79 |
The land in question must be in lawful ownership and peaceful possession of the applicant
|
29-06-2028
|
not started yet
|
80 |
Applicant shall submit the undertaking towards free gift the proposed road affected area.
|
29-06-2028
|
not started yet
|
81 |
The permission granted under these rules/regulations shall temain valid upto three years from the date of issue
|
06-07-2023
|
NA
|
82 |
ln case the construction of the building is not completed within the validity period, the permission shall have to be revalidated before the expiry of the above validity period on payment of fee as presoibed under ODA (CAF) Rules, 2016
|
06-07-2023
|
NA
|
83 |
lf any dispute arises with respect to right, title interest on the land on which the permission has been granted, the permission so granted shall be automatically treated as cancelled during the period of dispute.
|
06-07-2023
|
NA
|
84 |
Any construction and development made by the applicant or owner on the disputed land will be at his risk without any legal or financial liability on the Authority
|
06-07-2023
|
NA
|
85 |
Approval of plans and acceptance of any statement or document pertaining to such plan shall not absolve the owner or technical person(s) or Poect Management Organisation/Architect under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards) Rules, 2020, or under any other law for the time being in force.
|
06-07-2023
|
NA
|
86 |
The owner /applicant shall Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the provisions of the Rules/ regulations;
|
06-07-2023
|
NA
|
87 |
The owner /applicant shall Obtain, wherever applicable from the competent Authority permissions/clearance required in connection with the proposed work;
|
06-07-2023
|
NA
|
88 |
Ensure that the Completion Certificate in Form XVll (as appended to ODA (CAF) Rules, 2016) is issued by the Project Management Organisation engaged by him on completion of the building for submission of the same to the Authority for verification and issuance of Occupancy Certificate
|
29-06-2028
|
not yet started
|
89 |
The owner /applicant shall Ensure that the Completion Certificate in Form XVll (as appended to ODA (CAF) Rules, 2016) is issued by the Project Management Organisation engaged by him on completion of the building for submission of the same to the Authority for verification and issuance of Occupancy Certificate.
|
29-06-2028
|
not yet started
|
90 |
The owner /applicant shall Obtain an Occupancy Certificate from the Authority prior to occupation of building in full or part.
|
29-06-2028
|
not yet started
|
91 |
The owner /applicant shall Ensure compliance of provision of various Acts, rules, regulations and codes which control or provide for various norms governing development including but not limited to planning norms, fire safety norms, environmental norms, as applicable in each case
|
29-06-2028
|
not yet started
|
92 |
Adhere to the provisions of BDA (Planning & Building Standards) Regulation strictly and conditions thereto.
|
29-06-2028
|
not yet started
|
93 |
The owner/applicant/Technical Person shall strictly adhere to the terms and conditions imposed in the NOC/Clearances given by Fire Prevention officer/National Airport Authority/SElAA, Ministry of Forest & Environment/PHED etc wherever applicable.
|
29-06-2028
|
not yet started
|
94 |
Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Rule 47 of ODA (Planning & Building Standards) Rules 2020.
|
29-06-2028
|
not yet started
|
95 |
Th'e space which is meant for parking shall not be changed to any other use and shall not be partitioned/ closed in any manner.
|
29-06-2028
|
not yet started
|
96 |
30% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance, fire tender, physically handicapped persons and outside visitors with signage as per norms under Rule 37 of ODA (Planning & Building Standards) Rules 2020
|
29-06-2028
|
not yet started
|
97 |
Plantation for one tree per 80 sqm of plot area rnade by the applicant as per provision under Rule 30 of ODA (Planning & Building Standards) Rules 2020.
|
29-06-2028
|
not yet started
|
98 |
lf the construction / development are not as per the approved plan / deviated beyond permissible norms, the performance security shall be forfeited and action shall be initiated against the applicanUbuilder/developer as per the provisions of the ODA Act, 1982 Rules and Regulations made there under
|
29-06-2028
|
not yet started
|
99 |
The Owner/ ApplicanUArchitecUStructural Engineer are fully and jointly responsible for any structural failure of building due to any structural/construction defects, Authority will be no way be held responsible for the same in what so ever manner
|
29-06-2028
|
not yet started
|
100 |
The concerned Architect / Applicant Developer are fully responsible for any deviations additions & altemations beyond approved plan/ defective construction etc. shall be liable for action as per the provisions of the Regulation.
|
29-06-2028
|
not yet started
|
101 |
The applicant shall obtain infrastructural specification and subsequent clearance with regard to . development of infrastructure from BMC/BDA before commencement of construction.
|
29-06-2028
|
not yet started
|
102 |
Applicant shall allot the units to Beneficiaries pertaining to exclusively as applicant has availed special incentive w.r.t. FAR and relaxation in Parking Norms for the purpose.
|
29-06-2028
|
not yet started
|
103 |
All the stipulated conditions of the Noc/clearances given by Project Director, DRDA, Khordha & CGWA shall be adhered to strictly
|
29-06-2028
|
not yet started
|
104 |
No storm water/water shall be discharged to the public road/public premises and other adjoining plots.
|
29-06-2028
|
not yet started
|
105 |
All the passages around the building shall be developed with permeable pavers block for absorptton of rain water and seepage in to the ground.
|
29-06-2028
|
not yet started
|
106 |
Rain water harvesting structure and recharging pits of adequate capacity shall be developed to minimize the storm water runoff to the drain
|
29-06-2028
|
not yet started
|
107 |
The applicant shall make own arrangement of solid waste management through micro compost plant within the project premises.
|
29-06-2028
|
not yet started
|
108 |
The applicant shall obtain oRERA registration as per the affidavit submitted by applicant and submit the oREM Registration certificate at the time of submission ofapplicationforissueofoccupancycertificate.Further,youarerequiredto comply the provisions of Real Estate (Regulation and Development) Act, 2016
|
29-06-2028
|
not yet started
|
109 |
The applicant shall install Rooftop P.V. system as per BDA Regulations'
|
29-06-2028
|
not yet started
|
110 |
The Authority shall in no way be held responsible for any structural failure and damage due to earthquake/cyclone/any other natural disaster'
|
29-06-2028
|
not yet started
|
111 |
The number of dwelling units so approved shall not be changed in any manner
|
29-06-2028
|
not yet started
|
Updated Changes on 30-04-2024 |
112 |
The building shall be used exclusively for Residential Apartment purpose and the use shall not be changed to any other use without prior approval of this Authority.
|
29-06-2028
|
not started yet
|
113 |
The development shall be undertaken strictly according to plans enclosed with this permission endorsement
|
29-06-2028
|
not started yet
|
114 |
Parking space measuring 2816.92 Sq.m (in Stilt floor) as shown in the approved plan shall be exclusively used for parking of vehicles and no part of it will be used for any other purpose.
|
29-06-2028
|
not started yet
|
115 |
The land over which construction is proposed is accessible by an approved means of access of 15.24 Mtr. in width.
|
29-06-2028
|
not started yet
|
116 |
The land in question must be in lawful ownership and peaceful possession of the applicant
|
29-06-2028
|
not started yet
|
117 |
Applicant shall submit the undertaking towards free gift the proposed road affected area.
|
29-06-2028
|
not started yet
|
118 |
The permission granted under these rules/regulations shall temain valid upto three years from the date of issue
|
06-07-2023
|
NA
|
119 |
ln case the construction of the building is not completed within the validity period, the permission shall have to be revalidated before the expiry of the above validity period on payment of fee as presoibed under ODA (CAF) Rules, 2016
|
06-07-2023
|
NA
|
120 |
lf any dispute arises with respect to right, title interest on the land on which the permission has been granted, the permission so granted shall be automatically treated as cancelled during the period of dispute.
|
06-07-2023
|
NA
|
121 |
Any construction and development made by the applicant or owner on the disputed land will be at his risk without any legal or financial liability on the Authority
|
06-07-2023
|
NA
|
122 |
Approval of plans and acceptance of any statement or document pertaining to such plan shall not absolve the owner or technical person(s) or Poect Management Organisation/Architect under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards) Rules, 2020, or under any other law for the time being in force.
|
06-07-2023
|
NA
|
123 |
The owner /applicant shall Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the provisions of the Rules/ regulations;
|
06-07-2023
|
NA
|
124 |
The owner /applicant shall Obtain, wherever applicable from the competent Authority permissions/clearance required in connection with the proposed work;
|
06-07-2023
|
NA
|
125 |
Ensure that the Completion Certificate in Form XVll (as appended to ODA (CAF) Rules, 2016) is issued by the Project Management Organisation engaged by him on completion of the building for submission of the same to the Authority for verification and issuance of Occupancy Certificate
|
29-06-2028
|
not yet started
|
126 |
The owner /applicant shall Ensure that the Completion Certificate in Form XVll (as appended to ODA (CAF) Rules, 2016) is issued by the Project Management Organisation engaged by him on completion of the building for submission of the same to the Authority for verification and issuance of Occupancy Certificate.
|
29-06-2028
|
not yet started
|
127 |
The owner /applicant shall Obtain an Occupancy Certificate from the Authority prior to occupation of building in full or part.
|
29-06-2028
|
not yet started
|
128 |
The owner /applicant shall Ensure compliance of provision of various Acts, rules, regulations and codes which control or provide for various norms governing development including but not limited to planning norms, fire safety norms, environmental norms, as applicable in each case
|
29-06-2028
|
not yet started
|
129 |
Adhere to the provisions of BDA (Planning & Building Standards) Regulation strictly and conditions thereto.
|
29-06-2028
|
not yet started
|
130 |
The owner/applicant/Technical Person shall strictly adhere to the terms and conditions imposed in the NOC/Clearances given by Fire Prevention officer/National Airport Authority/SElAA, Ministry of Forest & Environment/PHED etc wherever applicable.
|
29-06-2028
|
not yet started
|
131 |
Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Rule 47 of ODA (Planning & Building Standards) Rules 2020.
|
29-06-2028
|
not yet started
|
132 |
Th'e space which is meant for parking shall not be changed to any other use and shall not be partitioned/ closed in any manner.
|
29-06-2028
|
not yet started
|
133 |
30% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance, fire tender, physically handicapped persons and outside visitors with signage as per norms under Rule 37 of ODA (Planning & Building Standards) Rules 2020
|
29-06-2028
|
not yet started
|
134 |
Plantation for one tree per 80 sqm of plot area rnade by the applicant as per provision under Rule 30 of ODA (Planning & Building Standards) Rules 2020.
|
29-06-2028
|
not yet started
|
135 |
lf the construction / development are not as per the approved plan / deviated beyond permissible norms, the performance security shall be forfeited and action shall be initiated against the applicanUbuilder/developer as per the provisions of the ODA Act, 1982 Rules and Regulations made there under
|
29-06-2028
|
not yet started
|
136 |
The Owner/ ApplicanUArchitecUStructural Engineer are fully and jointly responsible for any structural failure of building due to any structural/construction defects, Authority will be no way be held responsible for the same in what so ever manner
|
29-06-2028
|
not yet started
|
137 |
The concerned Architect / Applicant Developer are fully responsible for any deviations additions & altemations beyond approved plan/ defective construction etc. shall be liable for action as per the provisions of the Regulation.
|
29-06-2028
|
not yet started
|
138 |
The applicant shall obtain infrastructural specification and subsequent clearance with regard to . development of infrastructure from BMC/BDA before commencement of construction.
|
29-06-2028
|
not yet started
|
139 |
Applicant shall allot the units to Beneficiaries pertaining to exclusively as applicant has availed special incentive w.r.t. FAR and relaxation in Parking Norms for the purpose.
|
29-06-2028
|
not yet started
|
140 |
All the stipulated conditions of the Noc/clearances given by Project Director, DRDA, Khordha & CGWA shall be adhered to strictly
|
29-06-2028
|
not yet started
|
141 |
No storm water/water shall be discharged to the public road/public premises and other adjoining plots.
|
29-06-2028
|
not yet started
|
142 |
All the passages around the building shall be developed with permeable pavers block for absorptton of rain water and seepage in to the ground.
|
29-06-2028
|
not yet started
|
143 |
Rain water harvesting structure and recharging pits of adequate capacity shall be developed to minimize the storm water runoff to the drain
|
29-06-2028
|
not yet started
|
144 |
The applicant shall make own arrangement of solid waste management through micro compost plant within the project premises.
|
29-06-2028
|
not yet started
|
145 |
The applicant shall obtain oRERA registration as per the affidavit submitted by applicant and submit the oREM Registration certificate at the time of submission ofapplicationforissueofoccupancycertificate.Further,youarerequiredto comply the provisions of Real Estate (Regulation and Development) Act, 2016
|
29-06-2028
|
not yet started
|
146 |
The applicant shall install Rooftop P.V. system as per BDA Regulations'
|
29-06-2028
|
not yet started
|
147 |
The Authority shall in no way be held responsible for any structural failure and damage due to earthquake/cyclone/any other natural disaster'
|
29-06-2028
|
not yet started
|
148 |
The number of dwelling units so approved shall not be changed in any manner
|
29-06-2028
|
not yet started
|