Generated by pacms.orera.in on date: 2024-05-10
: M/S. KHUSHI REALCON Pvt. Ltd | : Private Company |
: U45201OR2012PTC015524 | :View |
NA | : S-2/A-42,43,44, Mancheswar Industrial Estate, Bhubaneswar-751010 |
: S-2/A-42,43,44, Mancheswar Industrial Estate, Bhubaneswar- 751010. | : khushirealconbbsr@gmail.com |
: 2581919 | : 9937261000 |
: AAECK8235G | :View |
: 10 years | : 10 years |
: www.khushirealcon.com |
: New | : KHUSHI ALTAIR |
: Mixed | : ( Mixed Project, 2B+G+11, No. of Residential Units- 44, No. of Commercial Units- 3) |
: Khordha | : Bhubaneswar |
: 751006 | : Urban Local Body |
: BHUBANESWAR MUNICIPAL CORPORATION | |
: COMMERCIAL CUM RESIDENTIAL PROJECT 2B+G+11 | : COMMERCIAL CUM RESIDENTIAL PROJECT 2B+G+11 |
: Yes |
Serial No. | Particulars of the Person | Land/Plot Details | Share of the Person | Document Attached |
---|---|---|---|---|
1 | ADITYA PATRA | 622 | 50% | Agreement Copy |
2 | SANJEETA PATTNAIK | 622/2468/3436, 622/2468/4281, 710/4280 & 710/3435 | 4015 SFT | Agreement Copy |
3 | SURENDRA NATH PATTNAIK | 622/2468 & 710 | 4015 SFT | Agreement Copy |
View | View |
Download site plan | 14-01-2025 |
Sl. No. | Description of Conditions | Schedule date of compliance | Present Status |
---|---|---|---|
1 | The building shall be used exclusively for purpose and use shall not be changed to any other use without prior approval of this Authority. | 30-06-2026 | YET TO START |
2 | Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Rule - 47of ODA (Planning & Building Standards) Rules, 2020. | 30-06-2026 | YET TO START |
3 | The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner. | 30-06-2026 | YET TO START |
4 | At least 10% of parking shall be earmarked for visitors and shall be open to all visitors and in all other cases as per norms under sub- rule (12) of Rule 37 of ODA (P&BS) Rules 2020. | 30-06-2026 | YET TO START |
5 | Plantation @ one tree per 80 Sq.mtr. of the plot area shall be made by the applicant as per provision under Rule-30 of ODA (P&BS) Rules, 2020. | 30-06-2026 | YET TO START |
6 | All the passages around the building shall be developed with permeable pavers block for absorption of rain water and seepage in to the ground. | 30-06-2026 | YET TO START |
7 | No storm water/water shall be discharged to the public road/public premises and other adjoining plots. | 30-06-2026 | YET TO START |
: Yes | : View |
Point No. | Latitude | Longitude |
---|---|---|
1 | 20°16'49.2"N | 85°51'17.5"E |
2 | 20°16'50.0"N | 85°51'16.7"E |
3 | 20°16'50.4"N | 85°51'16.3"E |
4 | 20°16'51.1"N | 85°51'16.0"E |
5 | 20°16'51.5"N | 85°51'16.1"E |
6 | 20°16'50.8"N | 85°51'18.6"E |
7 | 20°16'50.5"N | 85°51'18.4"E |
8 | 20°16'49.8"N | 85°51'18.0"E |
Description* | Scheduled date of completion | Current Status | Site Images |
---|---|---|---|
Site Development | 31-03-2022 | ON-GOING | |
Roof Casting | NA | NA | NA |
Ground Floor/Stilt Floor | 30-09-2022 | YET TO START | |
1 Floor | 31-12-2022 | YET TO START | |
2 Floor | 31-01-2023 | YET TO START | |
3 Floor | 28-02-2023 | YET TO START | |
4 Floor | 31-03-2023 | YET TO START | |
5 Floor | 30-04-2023 | YET TO START | |
6 Floor | 31-05-2023 | YET TO START | |
7 Floor | 30-06-2023 | YET TO START | |
8 Floor | 31-07-2023 | YET TO START | |
9 Floor | 31-08-2023 | YET TO START | |
10 Floor | 30-09-2023 | YET TO START | |
11 Floor | 31-10-2023 | YET TO START | |
Brick Work & Plastering | NA | NA | NA |
Ground Floor/Stilt Floor | 30-04-2023 | YET TO START | |
1 Floor | 31-05-2023 | YET TO START | |
2 Floor | 30-06-2023 | YET TO START | |
3 Floor | 31-07-2023 | YET TO START | |
4 Floor | 31-08-2023 | YET TO START | |
5 Floor | 30-09-2023 | YET TO START | |
6 Floor | 31-10-2023 | YET TO START | |
7 Floor | 30-11-2023 | YET TO START | |
8 Floor | 31-12-2023 | YET TO START | |
9 Floor | 31-01-2024 | YET TO START | |
10 Floor | 28-02-2024 | YET TO START | |
11 Floor | 31-03-2024 | YET TO START | |
Electrical Works | 30-06-2025 | YET TO START | |
Concealed Cabling including Plugs & switches | 30-06-2025 | YET TO START | |
Installation & Charging of Transformer | 31-10-2025 | YET TO START | |
Connection to Flats/Apartments | 31-12-2025 | YET TO START | |
PH works | 31-10-2025 | YET TO START | |
Laying of concealed Pipes | 31-10-2025 | YET TO START | |
PH Fittings | 31-10-2025 | YET TO START | |
Overhead Water Tanks | 30-06-2025 | YET TO START | |
Water Supply Connection to all units | 31-10-2025 | YET TO START | |
STP construction and completion | 31-10-2025 | YET TO START | |
Distempering & Colouring of all units and exteriors | 31-10-2025 | YET TO START | |
Fixation of doors and windows | 31-10-2025 | YET TO START | |
Scheduled Date of handing over possession | 30-06-2026 | YET TO START | |
Development of common areas, parks, gardens etc | 31-10-2025 | YET TO START | |
Site Development | 31-03-2022 | ON-GOING | |
NA | NA | NA | NA |
Ground Floor/Stilt Floor | 30-09-2022 | YET TO START | NA |
1 Floor | 31-12-2022 | YET TO START | NA |
2 Floor | 31-01-2023 | YET TO START | NA |
3 Floor | 28-02-2023 | YET TO START | NA |
4 Floor | 31-03-2023 | YET TO START | NA |
5 Floor | 30-04-2023 | YET TO START | NA |
6 Floor | 31-05-2023 | YET TO START | NA |
7 Floor | 30-06-2023 | YET TO START | NA |
8 Floor | 31-07-2023 | YET TO START | NA |
9 Floor | 31-08-2023 | YET TO START | NA |
10 Floor | 30-09-2023 | YET TO START | NA |
11 Floor | 31-10-2023 | YET TO START | NA |
NA | NA | NA | NA |
Ground Floor/Stilt Floor | 30-04-2023 | YET TO START | NA |
1 Floor | 31-05-2023 | YET TO START | NA |
2 Floor | 30-06-2023 | YET TO START | NA |
3 Floor | 31-07-2023 | YET TO START | NA |
4 Floor | 31-08-2023 | YET TO START | NA |
5 Floor | 30-09-2023 | YET TO START | NA |
6 Floor | 31-10-2023 | YET TO START | NA |
7 Floor | 30-11-2023 | YET TO START | NA |
8 Floor | 31-12-2023 | YET TO START | NA |
9 Floor | 31-01-2024 | YET TO START | NA |
10 Floor | 28-02-2024 | YET TO START | NA |
11 Floor | 31-03-2024 | YET TO START | NA |
Electrical Works | 30-06-2025 | YET TO START | NA |
Concealed Cabling including Plugs & switches | 30-06-2025 | YET TO START | NA |
Installation & Charging of Transformer | 31-10-2025 | YET TO START | NA |
Connection to Flats/Apartments | 31-12-2025 | YET TO START | NA |
PH works | 31-10-2025 | YET TO START | NA |
Laying of concealed Pipes | 31-10-2025 | YET TO START | NA |
PH Fittings | 31-10-2025 | YET TO START | NA |
Overhead Water Tanks | 30-06-2025 | YET TO START | NA |
Water Supply Connection to all units | 31-10-2025 | YET TO START | NA |
STP construction and completion | 31-10-2025 | YET TO START | NA |
Distempering & Colouring of all units and exteriors | 31-10-2025 | YET TO START | NA |
Fixation of doors and windows | 31-10-2025 | YET TO START | NA |
Scheduled Date of handing over possession | 30-06-2026 | YET TO START | NA |
Development of common areas, parks, gardens etc | 31-10-2025 | YET TO START | NA |
Site Development | 31-03-2023 | ON-GOING | |
NA | 31-03-2023 | ON-GOING | NA |
Ground Floor/Stilt Floor | 30-09-2023 | YET TO START | NA |
1 Floor | 31-12-2023 | YET TO START | NA |
2 Floor | 31-01-2023 | YET TO START | NA |
3 Floor | 28-02-2023 | YET TO START | NA |
4 Floor | 31-03-2023 | YET TO START | NA |
5 Floor | 30-04-2023 | YET TO START | NA |
6 Floor | 31-05-2023 | YET TO START | NA |
7 Floor | 30-06-2023 | YET TO START | NA |
8 Floor | 31-07-2023 | YET TO START | NA |
9 Floor | 31-08-2023 | YET TO START | NA |
10 Floor | 30-09-2023 | YET TO START | NA |
11 Floor | 31-10-2023 | YET TO START | NA |
NA | 31-10-2023 | YET TO START | NA |
Ground Floor/Stilt Floor | 30-04-2023 | YET TO START | NA |
1 Floor | 31-05-2023 | YET TO START | NA |
2 Floor | 30-06-2023 | YET TO START | NA |
3 Floor | 31-07-2023 | YET TO START | NA |
4 Floor | 31-08-2023 | YET TO START | NA |
5 Floor | 30-09-2023 | YET TO START | NA |
6 Floor | 31-10-2023 | YET TO START | NA |
7 Floor | 30-11-2023 | YET TO START | NA |
8 Floor | 31-12-2023 | YET TO START | NA |
9 Floor | 31-01-2024 | YET TO START | NA |
10 Floor | 28-02-2024 | YET TO START | NA |
11 Floor | 31-03-2024 | YET TO START | NA |
Electrical Works | 30-06-2025 | YET TO START | NA |
Concealed Cabling including Plugs & switches | 30-06-2025 | YET TO START | NA |
Installation & Charging of Transformer | 31-10-2025 | YET TO START | NA |
Connection to Flats/Apartments | 31-12-2025 | YET TO START | NA |
PH works | 31-10-2025 | YET TO START | NA |
Laying of concealed Pipes | 31-10-2025 | YET TO START | NA |
PH Fittings | 31-10-2025 | YET TO START | NA |
Overhead Water Tanks | 30-06-2025 | YET TO START | NA |
Water Supply Connection to all units | 31-10-2025 | YET TO START | NA |
STP construction and completion | 31-10-2025 | YET TO START | NA |
Distempering & Colouring of all units and exteriors | 31-10-2025 | YET TO START | NA |
Fixation of doors and windows | 31-10-2025 | YET TO START | NA |
Scheduled Date of handing over possession | 30-06-2026 | YET TO START | NA |
Development of common areas, parks, gardens etc | 31-10-2025 | YET TO START | NA |
Site Development | 31-03-2023 | ON-GOING | NA |
NA | 31-03-2023 | ON-GOING | NA |
Ground Floor/Stilt Floor | 30-09-2023 | ON GOING | |
1 Floor | 31-12-2023 | YET TO START | NA |
2 Floor | 31-01-2023 | YET TO START | NA |
3 Floor | 28-02-2023 | YET TO START | NA |
4 Floor | 31-03-2023 | YET TO START | NA |
5 Floor | 30-04-2023 | YET TO START | NA |
6 Floor | 31-05-2023 | YET TO START | NA |
7 Floor | 30-06-2023 | YET TO START | NA |
8 Floor | 31-07-2023 | YET TO START | NA |
9 Floor | 31-08-2023 | YET TO START | NA |
10 Floor | 30-09-2023 | YET TO START | NA |
11 Floor | 31-10-2023 | YET TO START | NA |
NA | 31-10-2023 | YET TO START | NA |
Ground Floor/Stilt Floor | 30-04-2023 | YET TO START | NA |
1 Floor | 31-05-2023 | YET TO START | NA |
2 Floor | 30-06-2023 | YET TO START | NA |
3 Floor | 31-07-2023 | YET TO START | NA |
4 Floor | 31-08-2023 | YET TO START | NA |
5 Floor | 30-09-2023 | YET TO START | NA |
6 Floor | 31-10-2023 | YET TO START | NA |
7 Floor | 30-11-2023 | YET TO START | NA |
8 Floor | 31-12-2023 | YET TO START | NA |
9 Floor | 31-01-2024 | YET TO START | NA |
10 Floor | 28-02-2024 | YET TO START | NA |
11 Floor | 31-03-2024 | YET TO START | NA |
Electrical Works | 30-06-2025 | YET TO START | NA |
Concealed Cabling including Plugs & switches | 30-06-2025 | YET TO START | NA |
Installation & Charging of Transformer | 31-10-2025 | YET TO START | NA |
Connection to Flats/Apartments | 31-12-2025 | YET TO START | NA |
PH works | 31-10-2025 | YET TO START | NA |
Laying of concealed Pipes | 31-10-2025 | YET TO START | NA |
PH Fittings | 31-10-2025 | YET TO START | NA |
Overhead Water Tanks | 30-06-2025 | YET TO START | NA |
Water Supply Connection to all units | 31-10-2025 | YET TO START | NA |
STP construction and completion | 31-10-2025 | YET TO START | NA |
Distempering & Colouring of all units and exteriors | 31-10-2025 | YET TO START | NA |
Fixation of doors and windows | 31-10-2025 | YET TO START | NA |
Scheduled Date of handing over possession | 30-06-2026 | YET TO START | NA |
Development of common areas, parks, gardens etc | 31-10-2025 | YET TO START | NA |
Site Development | 31-03-2023 | completed | NA |
NA | 31-03-2023 | completed | NA |
Ground Floor/Stilt Floor | 30-09-2023 | completed | NA |
1 Floor | 31-12-2023 | completed | NA |
2 Floor | 31-01-2023 | COMPLETED | NA |
3 Floor | 28-02-2023 | ON GOING | |
4 Floor | 31-03-2023 | ON GOING | |
5 Floor | 30-04-2023 | YET TO START | NA |
6 Floor | 31-05-2023 | YET TO START | NA |
7 Floor | 30-06-2023 | YET TO START | NA |
8 Floor | 31-07-2023 | YET TO START | NA |
9 Floor | 31-08-2023 | YET TO START | NA |
10 Floor | 30-09-2023 | YET TO START | NA |
11 Floor | 31-10-2023 | YET TO START | NA |
NA | 31-10-2023 | YET TO START | NA |
Ground Floor/Stilt Floor | 30-04-2023 | YET TO START | NA |
1 Floor | 31-05-2023 | YET TO START | NA |
2 Floor | 30-06-2023 | YET TO START | NA |
3 Floor | 31-07-2023 | YET TO START | NA |
4 Floor | 31-08-2023 | YET TO START | NA |
5 Floor | 30-09-2023 | YET TO START | NA |
6 Floor | 31-10-2023 | YET TO START | NA |
7 Floor | 30-11-2023 | YET TO START | NA |
8 Floor | 31-12-2023 | YET TO START | NA |
9 Floor | 31-01-2024 | YET TO START | NA |
10 Floor | 28-02-2024 | YET TO START | NA |
11 Floor | 31-03-2024 | YET TO START | NA |
Electrical Works | 30-06-2025 | YET TO START | NA |
Concealed Cabling including Plugs & switches | 30-06-2025 | YET TO START | NA |
Installation & Charging of Transformer | 31-10-2025 | YET TO START | NA |
Connection to Flats/Apartments | 31-12-2025 | YET TO START | NA |
PH works | 31-10-2025 | YET TO START | NA |
Laying of concealed Pipes | 31-10-2025 | YET TO START | NA |
PH Fittings | 31-10-2025 | YET TO START | NA |
Overhead Water Tanks | 30-06-2025 | YET TO START | NA |
Water Supply Connection to all units | 31-10-2025 | YET TO START | NA |
STP construction and completion | 31-10-2025 | YET TO START | NA |
Distempering & Colouring of all units and exteriors | 31-10-2025 | YET TO START | NA |
Fixation of doors and windows | 31-10-2025 | YET TO START | NA |
Scheduled Date of handing over possession | 30-06-2026 | YET TO START | NA |
Development of common areas, parks, gardens etc | 31-10-2025 | YET TO START | NA |
Site Development | 31-03-2023 | completed | NA |
NA | 31-03-2023 | completed | NA |
Ground Floor/Stilt Floor | 30-09-2023 | completed | NA |
1 Floor | 31-12-2023 | completed | NA |
2 Floor | 31-01-2023 | COMPLETED | NA |
3 Floor | 28-02-2023 | COMPLETED | |
4 Floor | 31-03-2023 | ON GOING | NA |
5 Floor | 30-04-2023 | YET TO START | NA |
6 Floor | 31-05-2023 | YET TO START | NA |
7 Floor | 30-06-2023 | YET TO START | NA |
8 Floor | 31-07-2023 | YET TO START | NA |
9 Floor | 31-08-2023 | YET TO START | NA |
10 Floor | 30-09-2023 | YET TO START | NA |
11 Floor | 31-10-2023 | YET TO START | NA |
NA | 31-10-2023 | YET TO START | NA |
Ground Floor/Stilt Floor | 30-04-2023 | YET TO START | NA |
1 Floor | 31-05-2023 | YET TO START | NA |
2 Floor | 30-06-2023 | YET TO START | NA |
3 Floor | 31-07-2023 | YET TO START | NA |
4 Floor | 31-08-2023 | YET TO START | NA |
5 Floor | 30-09-2023 | YET TO START | NA |
6 Floor | 31-10-2023 | YET TO START | NA |
7 Floor | 30-11-2023 | YET TO START | NA |
8 Floor | 31-12-2023 | YET TO START | NA |
9 Floor | 31-01-2024 | YET TO START | NA |
10 Floor | 28-02-2024 | YET TO START | NA |
11 Floor | 31-03-2024 | YET TO START | NA |
Electrical Works | 30-06-2025 | YET TO START | NA |
Concealed Cabling including Plugs & switches | 30-06-2025 | YET TO START | NA |
Installation & Charging of Transformer | 31-10-2025 | YET TO START | NA |
Connection to Flats/Apartments | 31-12-2025 | YET TO START | NA |
PH works | 31-10-2025 | YET TO START | NA |
Laying of concealed Pipes | 31-10-2025 | YET TO START | NA |
PH Fittings | 31-10-2025 | YET TO START | NA |
Overhead Water Tanks | 30-06-2025 | YET TO START | NA |
Water Supply Connection to all units | 31-10-2025 | YET TO START | NA |
STP construction and completion | 31-10-2025 | YET TO START | NA |
Distempering & Colouring of all units and exteriors | 31-10-2025 | YET TO START | NA |
Fixation of doors and windows | 31-10-2025 | YET TO START | NA |
Scheduled Date of handing over possession | 30-06-2026 | YET TO START | NA |
Development of common areas, parks, gardens etc | 31-10-2025 | YET TO START | NA |
Site Development | 31-03-2023 | completed | NA |
NA | 31-03-2023 | completed | NA |
Ground Floor/Stilt Floor | 30-09-2023 | completed | NA |
1 Floor | 31-12-2023 | completed | NA |
2 Floor | 31-01-2023 | COMPLETED | NA |
3 Floor | 28-02-2023 | COMPLETED | NA |
4 Floor | 31-03-2023 | COMPLETED | |
5 Floor | 30-04-2023 | COMPLETED | |
6 Floor | 31-05-2023 | YET TO START | NA |
7 Floor | 30-06-2023 | YET TO START | NA |
8 Floor | 31-07-2023 | YET TO START | NA |
9 Floor | 31-08-2023 | YET TO START | NA |
10 Floor | 30-09-2023 | YET TO START | NA |
11 Floor | 31-10-2023 | YET TO START | NA |
NA | 31-10-2023 | YET TO START | NA |
Ground Floor/Stilt Floor | 30-04-2023 | YET TO START | NA |
1 Floor | 31-05-2023 | YET TO START | NA |
2 Floor | 30-06-2023 | YET TO START | NA |
3 Floor | 31-07-2023 | YET TO START | NA |
4 Floor | 31-08-2023 | YET TO START | NA |
5 Floor | 30-09-2023 | YET TO START | NA |
6 Floor | 31-10-2023 | YET TO START | NA |
7 Floor | 30-11-2023 | YET TO START | NA |
8 Floor | 31-12-2023 | YET TO START | NA |
9 Floor | 31-01-2024 | YET TO START | NA |
10 Floor | 28-02-2024 | YET TO START | NA |
11 Floor | 31-03-2024 | YET TO START | NA |
Electrical Works | 30-06-2025 | YET TO START | NA |
Concealed Cabling including Plugs & switches | 30-06-2025 | YET TO START | NA |
Installation & Charging of Transformer | 31-10-2025 | YET TO START | NA |
Connection to Flats/Apartments | 31-12-2025 | YET TO START | NA |
PH works | 31-10-2025 | YET TO START | NA |
Laying of concealed Pipes | 31-10-2025 | YET TO START | NA |
PH Fittings | 31-10-2025 | YET TO START | NA |
Overhead Water Tanks | 30-06-2025 | YET TO START | NA |
Water Supply Connection to all units | 31-10-2025 | YET TO START | NA |
STP construction and completion | 31-10-2025 | YET TO START | NA |
Distempering & Colouring of all units and exteriors | 31-10-2025 | YET TO START | NA |
Fixation of doors and windows | 31-10-2025 | YET TO START | NA |
Scheduled Date of handing over possession | 30-06-2026 | YET TO START | NA |
Development of common areas, parks, gardens etc | 31-10-2025 | YET TO START | NA |
Site Development | 31-03-2023 | completed | NA |
NA | 31-03-2023 | completed | NA |
Ground Floor/Stilt Floor | 30-09-2023 | completed | NA |
1 Floor | 31-12-2023 | completed | NA |
2 Floor | 31-01-2023 | COMPLETED | NA |
3 Floor | 28-02-2023 | COMPLETED | NA |
4 Floor | 31-03-2023 | COMPLETED | NA |
5 Floor | 30-04-2023 | COMPLETED | NA |
6 Floor | 02-11-2023 | COMPLETED | |
7 Floor | 30-11-2023 | COMPLETED | |
8 Floor | 13-12-2023 | COMPLETED | |
9 Floor | 31-12-2023 | COMPLETED | |
10 Floor | 30-09-2023 | YET TO START | NA |
11 Floor | 31-10-2023 | YET TO START | NA |
NA | 31-10-2023 | YET TO START | NA |
Ground Floor/Stilt Floor | 30-04-2023 | YET TO START | NA |
1 Floor | 31-05-2023 | YET TO START | NA |
2 Floor | 30-06-2023 | YET TO START | NA |
3 Floor | 31-07-2023 | YET TO START | NA |
4 Floor | 31-08-2023 | YET TO START | NA |
5 Floor | 30-09-2023 | YET TO START | NA |
6 Floor | 31-10-2023 | YET TO START | NA |
7 Floor | 30-11-2023 | YET TO START | NA |
8 Floor | 31-12-2023 | YET TO START | NA |
9 Floor | 31-01-2024 | YET TO START | NA |
10 Floor | 28-02-2024 | YET TO START | NA |
11 Floor | 31-03-2024 | YET TO START | NA |
Electrical Works | 30-06-2025 | YET TO START | NA |
Concealed Cabling including Plugs & switches | 30-06-2025 | YET TO START | NA |
Installation & Charging of Transformer | 31-10-2025 | YET TO START | NA |
Connection to Flats/Apartments | 31-12-2025 | YET TO START | NA |
PH works | 31-10-2025 | YET TO START | NA |
Laying of concealed Pipes | 31-10-2025 | YET TO START | NA |
PH Fittings | 31-10-2025 | YET TO START | NA |
Overhead Water Tanks | 30-06-2025 | YET TO START | NA |
Water Supply Connection to all units | 31-10-2025 | YET TO START | NA |
STP construction and completion | 31-10-2025 | YET TO START | NA |
Distempering & Colouring of all units and exteriors | 31-10-2025 | YET TO START | NA |
Fixation of doors and windows | 31-10-2025 | YET TO START | NA |
Scheduled Date of handing over possession | 30-06-2026 | YET TO START | NA |
Development of common areas, parks, gardens etc | 31-10-2025 | YET TO START | NA |
Site Development | 31-03-2023 | completed | NA |
NA | 31-03-2023 | completed | NA |
Ground Floor/Stilt Floor | 30-09-2023 | completed | NA |
1 Floor | 31-12-2023 | completed | NA |
2 Floor | 31-01-2023 | COMPLETED | NA |
3 Floor | 28-02-2023 | COMPLETED | NA |
4 Floor | 31-03-2023 | COMPLETED | NA |
5 Floor | 30-04-2023 | COMPLETED | NA |
6 Floor | 02-11-2023 | COMPLETED | NA |
7 Floor | 30-11-2023 | COMPLETED | NA |
8 Floor | 13-12-2023 | COMPLETED | NA |
9 Floor | 31-12-2023 | COMPLETED | NA |
10 Floor | 30-09-2023 | YET TO START | NA |
11 Floor | 31-10-2023 | YET TO START | NA |
NA | 31-10-2023 | YET TO START | NA |
Ground Floor/Stilt Floor | 30-04-2023 | YET TO START | NA |
1 Floor | 31-05-2023 | YET TO START | NA |
2 Floor | 30-06-2023 | YET TO START | NA |
3 Floor | 31-07-2023 | YET TO START | NA |
4 Floor | 31-08-2023 | YET TO START | NA |
5 Floor | 30-09-2023 | YET TO START | NA |
6 Floor | 31-10-2023 | YET TO START | NA |
7 Floor | 30-11-2023 | YET TO START | NA |
8 Floor | 31-12-2023 | YET TO START | NA |
9 Floor | 31-01-2024 | YET TO START | NA |
10 Floor | 28-02-2024 | YET TO START | NA |
11 Floor | 31-03-2024 | YET TO START | NA |
Electrical Works | 30-06-2025 | YET TO START | NA |
Concealed Cabling including Plugs & switches | 30-06-2025 | YET TO START | NA |
Installation & Charging of Transformer | 31-10-2025 | YET TO START | NA |
Connection to Flats/Apartments | 31-12-2025 | YET TO START | NA |
PH works | 31-10-2025 | YET TO START | NA |
Laying of concealed Pipes | 31-10-2025 | YET TO START | NA |
PH Fittings | 31-10-2025 | YET TO START | NA |
Overhead Water Tanks | 30-06-2025 | YET TO START | NA |
Water Supply Connection to all units | 31-10-2025 | YET TO START | NA |
STP construction and completion | 31-10-2025 | YET TO START | NA |
Distempering & Colouring of all units and exteriors | 31-10-2025 | YET TO START | NA |
Fixation of doors and windows | 31-10-2025 | YET TO START | NA |
Scheduled Date of handing over possession | 30-06-2026 | YET TO START | NA |
Development of common areas, parks, gardens etc | 31-10-2025 | YET TO START | NA |
: Mixed | |
: 44
|
|
: 3
|
Residential Flats/ House | |||||
---|---|---|---|---|---|
S. No. | Flat No./ House No. | ||||
Area in square metres |
Ownership | ||||
Carpet Area | Balcony Area | Exclusive Open Terrace Area | |||
1 | 11 | 175.33 | 14.40 | 23.87 | Land Owner |
2 | 21 | 175.33 | 14.40 | 0.00 | Promoter |
3 | 31 | 175.33 | 14.40 | 0.00 | Land Owner |
4 | 41 | 175.33 | 14.40 | 0.00 | Promoter |
5 | 51 | 175.33 | 14.40 | 0.00 | Promoter |
6 | 61 | 175.33 | 14.40 | 0.00 | Promoter |
7 | 71 | 175.33 | 14.40 | 0.00 | Land Owner |
8 | 81 | 175.33 | 14.40 | 0.00 | Land Owner |
9 | 91 | 175.33 | 14.40 | 0.00 | Promoter |
10 | 101 | 175.33 | 14.40 | 0.00 | Promoter |
11 | 111 | 175.33 | 14.40 | 0.00 | Land Owner |
12 | 12 | 146.45 | 12.26 | 47.72 | Promoter |
13 | 22 | 146.45 | 12.26 | 0.00 | Promoter |
14 | 32 | 146.45 | 12.26 | 0.00 | Land Owner |
15 | 42 | 146.45 | 12.26 | 0.00 | Promoter |
16 | 52 | 146.45 | 12.26 | 0.00 | Promoter |
17 | 62 | 146.45 | 12.26 | 0.00 | Promoter |
18 | 72 | 146.45 | 12.26 | 0.00 | Land Owner |
19 | 82 | 146.45 | 12.26 | 0.00 | Land Owner |
20 | 92 | 146.45 | 12.26 | 0.00 | Promoter |
21 | 102 | 146.45 | 12.26 | 0.00 | Promoter |
22 | 112 | 146.45 | 12.26 | 0.00 | Promoter |
23 | 13 | 141.60 | 12.37 | 0.00 | Promoter |
24 | 23 | 141.60 | 12.37 | 0.00 | Promoter |
25 | 33 | 141.60 | 12.37 | 0.00 | Land Owner |
26 | 43 | 141.60 | 12.37 | 0.00 | Promoter |
27 | 53 | 141.60 | 12.37 | 0.00 | Promoter |
28 | 63 | 141.60 | 12.37 | 0.00 | Promoter |
29 | 73 | 141.60 | 12.37 | 0.00 | Land Owner |
30 | 83 | 141.60 | 12.37 | 0.00 | Land Owner |
31 | 93 | 141.60 | 12.37 | 0.00 | Promoter |
32 | 103 | 141.60 | 12.37 | 0.00 | Promoter |
33 | 113 | 141.60 | 12.37 | 0.00 | Promoter |
34 | 14 | 169.73 | 14.63 | 0.00 | Promoter |
35 | 24 | 169.73 | 14.63 | 0.00 | Promoter |
36 | 34 | 169.73 | 14.63 | 0.00 | Land Owner |
37 | 44 | 169.73 | 14.63 | 0.00 | Promoter |
38 | 54 | 169.73 | 14.63 | 0.00 | Promoter |
39 | 64 | 169.73 | 14.63 | 0.00 | Promoter |
40 | 74 | 169.73 | 14.63 | 0.00 | Land Owner |
41 | 84 | 169.73 | 14.63 | 0.00 | Land Owner |
42 | 94 | 169.73 | 14.63 | 0.00 | Promoter |
43 | 104 | 169.73 | 14.63 | 0.00 | Promoter |
44 | 114 | 169.73 | 14.63 | 0.00 | Promoter |
Types of garages and parking | ||||||
---|---|---|---|---|---|---|
House No. | Type of Garage/ Parking allotted | Serial No., if any | Dimension (Length x Width) in Metres | Floor area in sq. metres | Garage/Parking area cost is included or additional | |
11 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 21 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 31 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 41 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 51 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 61 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 71 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 81 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 91 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 101 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 111 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 12 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 22 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 32 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 42 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 52 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 62 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 72 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 82 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 92 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 102 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 112 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 13 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 23 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 33 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 43 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 53 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 63 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 73 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 83 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 93 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 103 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 113 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 14 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 24 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 34 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 54 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 64 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 74 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 84 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 94 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 104 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 114 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 1 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 2 | Covered Parking | NA | 5*2.5 | 12.50 | Included | 3 | Covered Parking | NA | 5*2.5 | 12.50 | Included |
Commercial Units | |||
---|---|---|---|
House Number | Dimensions (Length x Width) | Carpet Area in square metres | Ownership |
1 | 41'10'X43'10' | 170.35 | Promoter |
2 | 25'5'X53'3' | 125.97 | Land Owner |
3 | 20'11'X29'2' | 57.63 | Promoter |
Particulars of Facilities | Status of the facility | Brief description of facility |
---|---|---|
Drinking Water Facility | Ground Water | Copy of Consent Letter |
Fire Fighting Facility | Yes | SPRINKLERS AT BASEMENT AND WET RISER AT EACH FLOOR |
Emergency Evacuation Services | Yes | STAIRCASE |
Use of Renewable Energy | Yes | SOLAR WATER HEATER & PV CELLS |
Lift Facility | Yes | OTIS 3 NOS WITH ARD |
Market Complex | Yes | 3 Nos of shop at Ground floor |
Community Hall | Yes | 68.87 SQM HALL AT GROUND FLOOR |
Gymnasium | Yes | 64.19 SQM FITNESS CENTRE AT GROUND FLOOR |
Swimming Pool | Yes | Roof top swimming pool 93 SQM |
Play Ground | No | |
Park/Garden | No | |
Plantation Area | Yes | 1 TREE PER 80 SQM OF PLOT |
Others(Please Specify) | No | |
Internal Road | Yes | 6M WIDE PAVERS BLOCK |
External Road | Yes | EXISTING BLACK TOP ROAD 30.48M WIDTH |
Elecricity Supply | Yes | Copy of Consent Letter |
Other Amenities | No |
Generated by pacms.orera.in on date: 2024-05-10