Promoter Details
Promoter Name :
BINAY KRISHNA DAS
Project Name :
BIVAB ANSH
Project Location :
( Residential Project, S+4, No. of Units - 24 )

Form- I

A. Promoter's Details

:  M/S. BIVAB DEVELOPERS PVT. LTD. :  Private Company
:  U45201OR1997PTC004775 :View
NA :  4TH FLOOR,BIVAB GULMOHAR,NAYAPALI,BHUBANESWAR,DIST-KHORDHA,ODISHA
:  4th Floor, Bivab Gulmohar, Nayapali, Bhubaneswar, Dist- Khordha, Odisha. :  info@bivabdevelopers.com
:  2420288 :  9437567628
:  AABCP3274B :View
:  WE HAVE 25 YEARS EXPRIENCE IN ODISHA REAL ESTATAE MARKET.WE HAVE COMPLETED MORE THAN 5 PROJECTS IN BHUBANESWAR INCLUDING ONE RERA REGISTERED PROJECT NAME BIVAB HERITAGE SUCESSFULLY. :  NO EXPRIENCE OUT SIDE ODISHA
:  www.info@bivabdevelopers.com

B. Details of Board of Directors / Partners / MC Members

:  BINAY KRISHNA DAS :  
:  Managing Director :  ACPPB5414J
:PAN Card :  dasbinay@hotmail.com
:  B.TECH :  9437567628
:  MORE THAN 24 YEARS EXPRIENCE IN REAL ESTATE SECTOR .COMPLETED PROJECTS IN BHUBANESWAR SUCESSFULLY.
:  Yes :  NA
:  EVARANI PATTNAIK :  
:  Director :  ADYPP5339G
:PAN Card :  eva.08pattnaik@gmail.com
:  MBA :  9437485648
:  IN REAL ESTATE SECTOR SHE HAS A VAST EXPRIENCE IN ODISHA
:  Yes :  NA

Annexure-1

Details of last projects already implemented (Ongoing or Complete)

1. :  BIVAB HERITAGE :  Residential
:  KAPILAPRASAD :  Completed
:  RP/19/2018/00133 :  ontime
:  Ownership
:  IT IS S+4 BUILDING CONSISTING OF 36 FLATS OF DIFFERENT SQ.FT NA NA :  IT IS S+4 BUILDING CONSISTING OF 36 FLATS OF DIFFERENT SQ.FT
:  No

:   :  
:   :  
:  
: Yes :  1200000
: No :  NA
2. :  BIVAB NEST :  Residential
:  JAGASARPATNA :  Ongoing
:  RP/19/2021/00455 :  ontime
:  Joint Venture
:  IT IS S+4 BUILDING CONSISTING OF 58 FLATS OF DIFFERENT SQ.FT NA NA :  IT IS S+4 BUILDING CONSISTING OF 58 FLATS OF DIFFERENT SQ.FT
:  No

:   :  
:   :  
:  
: No :  1200000
: No :  NA

Annexure-2

Details of the project to be registered

:   New :  BIVAB ANSH
:  Residential :  ( Residential Project, S+4, No. of Units - 24 )
:  Khordha :  Jatni
:  752054 :  Development Authority
:  BHUBANESWAR DEVELOPMENT AUTHORITY
:  S+4 RESIDENTIAL APARTMENT :  NA

Land Details of the Project

:  93/1417 :  300/1595
:  MADANPUR :  1427.74
:  Yes
Yes :  View
:  View
:  Promoter

Development Agreement

: No

Building Plan

  View   View
  Download site plan 22-12-2023

Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 I Storm water from the premises of roof top shall be conveyed & discharged to the rain water recharging pits as per BDA (Planniing & Building standards) Regulation 2018. 30-11-2025 Will comply 1 month before handover the flats to the customers.
2 II The space which is meant for parking shall not be changed to any other use & shall not be partitioned/closed in any manner. 30-11-2025 Will comply 1 month before handover the flats to the customers.
3 III 20% of the parking space in group housing/apartment building shall be exclusively ear marked for ambulance,fire tender, physically handicapped persons & outside visitors with signage as per norms BDA (Planning & Building Standards) Regulations 2018. 30-11-2025 Will comply 1 month before handover the flats to the customers.
4 IV Plantation @ 80 sqm per one tree of the plot area shall be made by the appliacant as per provisions of BDA(Planning & Building Standards) Regulations 2018. 30-11-2025 Will comply 1 month before handover the flats to the customers.
5 V If the construction/developement are not as per the approved plan/deviated beyond permissible norms ,action shall be initiated against the applicant/builder /developer as per the provisions of the ODA Act 1982 Rules & Regulations made there under. 30-11-2025 Will comply 1 month before handover the flats to the customers.
6 VI The owner/Applicant/Architect/Structural engineer are fully & jointly responsible for any structural failure of building due to any structural /Construction defects, Authority will be no way be held responsible for the same in what so ever manner. 30-11-2025 Will comply 1 month before handover the flats to the customers.
7 VII The concerned Architect/Applicant/Developer are fully responsible for any deviations additions & alternations beyond approved plan/defective construction etc shall be liable for action as per the provisions of the Regulation. 30-11-2025 Will comply 1 month before handover the flats to the customers.
8 VIII The applicant shall obtain infrastructural specification & subsequent clearance with regard to development of infrastructure from BDA before commencement of construction. 30-11-2025 Will comply 1 month before handover the flats to the customers.
9 IX All the fire fighting installation etc are to be ensured & maintained by the applicant as per. 30-11-2025 Will comply 1 month before handover the flats to the customers.
10 X No storm water/water shall be discharge to the public road/public premises & other adjoining plot. 30-11-2025 Will comply 1 month before handover the flats to the customers.
11 XI Adhere to provisions of BDA (Planning & Building standards) Regulation strictly & conditions there to. 30-11-2025 Will comply 1 month before handover the flats to the customers.
12 XII The authority shall in no way be held responsible for any structural failure & damage due to earth quake/cyclone/any other natural disaster. 30-11-2025 Will comply 1 month before handover the flats to the customers.
13 XII The number of dwelling units so approved shall not be changed n any manner. 30-11-2025 Will comply 1 month before handover the flats to the customers.

Layout Plan

: Yes :  View

Location Map with geo-coordinates of bend points

Point No. Latitude Longitude
1 20°14'47.0''N 85°42'41.1''E
2 20°14'48.0''N 85°42'40.2''E
3 20°14'48.6''N 85°42'41.1''E
4 20°14'47.9''N 85°42'41.7''E
5 20°14'47.4''N 85°42'42.2''E
View

Milestone of Project Construction

Description* Scheduled date of completion Current Status Site Images
Site Development 23-1-2022 PERIPHERIAL DEVELOPMENT
Roof Casting NA NA NA
Ground Floor/Stilt Floor 16-03-2022 YET TO BE HAPPEN NA
1 Floor 12-04-2022 YET TO BE HAPPEN NA
Brick Work & Plastering NA NA NA
Ground Floor/Stilt Floor 20-07-2022 YET TO BE HAPPEN NA
1 Floor 10-09-2022 YET TO BE HAPPEN NA
Electrical Works 05-03-2023 YET TO BE HAPPEN NA
Concealed Cabling including Plugs & switches 24-04-2024 YET TO BE HAPPEN NA
Installation & Charging of Transformer 14-01-2025 YET TO BE HAPPEN NA
Connection to Flats/Apartments 23-09-2025 YET TO BE HAPPEN NA
PH works 18-11-2025 YET TO BE HAPPEN NA
Laying of concealed Pipes 14-03-2025 YET TO BE HAPPEN NA
PH Fittings 10-06-2025 YET TO BE HAPPEN NA
Overhead Water Tanks 20-11-2024 YET TO BE HAPPEN NA
Water Supply Connection to all units 19-08-2025 YET TO BE HAPPEN NA
STP construction and completion 16-06-2025 YET TO BE HAPPEN NA
Distempering & Colouring of all units and exteriors 17-12-2025 YET TO BE HAPPEN NA
Fixation of doors and windows 25-03-2025 YET TO BE HAPPEN NA
Scheduled Date of handing over possession 31-12-2025 YET TO BE HAPPEN NA
Development of common areas, parks, gardens etc 31-12-2025 YET TO BE HAPPEN NA
2 Floor 14-06-2022 YET TO BE HAPPEN NA
3 Floor 23-08-2022 YET TO BE HAPPEN NA
4 Floor 15-02-2023 YET TO BE HAPPEN NA
2 Floor 27-10-2022 YET TO BE HAPPEN NA
3 Floor 30-11-2022 YET TO BE HAPPEN NA
4 Floor 12-03-2024 YET TO BE HAPPEN NA
Site Development 23-1-2022 PERIPHERIAL DEVELOPMENT NA
NA NA NA NA
Ground Floor/Stilt Floor 15-09-2023 YET TO BE HAPPEN NA
1 Floor 15-11-2023 YET TO BE HAPPEN NA
NA NA NA NA
Ground Floor/Stilt Floor 30-12-2023 YET TO BE HAPPEN NA
1 Floor 24-02-2024 YET TO BE HAPPEN NA
Electrical Works 20-09-2024 YET TO BE HAPPEN NA
Concealed Cabling including Plugs & switches 30-11-2024 YET TO BE HAPPEN NA
Installation & Charging of Transformer 14-01-2025 YET TO BE HAPPEN NA
Connection to Flats/Apartments 23-09-2025 YET TO BE HAPPEN NA
PH works 18-11-2025 YET TO BE HAPPEN NA
Laying of concealed Pipes 14-03-2025 YET TO BE HAPPEN NA
PH Fittings 10-06-2025 YET TO BE HAPPEN NA
Overhead Water Tanks 20-11-2024 YET TO BE HAPPEN NA
Water Supply Connection to all units 19-08-2025 YET TO BE HAPPEN NA
STP construction and completion 16-06-2025 YET TO BE HAPPEN NA
Distempering & Colouring of all units and exteriors 17-12-2025 YET TO BE HAPPEN NA
Fixation of doors and windows 25-03-2025 YET TO BE HAPPEN NA
Scheduled Date of handing over possession 31-12-2025 YET TO BE HAPPEN NA
Development of common areas, parks, gardens etc 31-12-2025 YET TO BE HAPPEN NA
2 Floor 24-01-2024 YET TO BE HAPPEN NA
3 Floor 30-03-2024 YET TO BE HAPPEN NA
4 Floor 15-05-2024 YET TO BE HAPPEN NA
2 Floor 14-02-2024 YET TO BE HAPPEN NA
3 Floor 23-08-2024 YET TO BE HAPPEN NA
4 Floor 23-10-2024 YET TO BE HAPPEN NA
Site Development 23-1-2022 PERIPHERIAL DEVELOPMENT
NA 06-04-2022 COMPLETED
Ground Floor/Stilt Floor 15-09-2023 YET TO BE HAPPEN
1 Floor 15-11-2023 YET TO BE HAPPEN NA
NA 08-01-2024 YET TO HAPPEN NA
Ground Floor/Stilt Floor 30-12-2023 YET TO BE HAPPEN
1 Floor 24-02-2024 YET TO BE HAPPEN NA
Electrical Works 20-09-2024 YET TO BE HAPPEN NA
Concealed Cabling including Plugs & switches 30-11-2024 YET TO BE HAPPEN NA
Installation & Charging of Transformer 14-01-2025 YET TO BE HAPPEN NA
Connection to Flats/Apartments 23-09-2025 YET TO BE HAPPEN NA
PH works 18-11-2025 YET TO BE HAPPEN NA
Laying of concealed Pipes 14-03-2025 YET TO BE HAPPEN NA
PH Fittings 10-06-2025 YET TO BE HAPPEN NA
Overhead Water Tanks 20-11-2024 YET TO BE HAPPEN NA
Water Supply Connection to all units 19-08-2025 YET TO BE HAPPEN NA
STP construction and completion 16-06-2025 YET TO BE HAPPEN NA
Distempering & Colouring of all units and exteriors 17-12-2025 YET TO BE HAPPEN NA
Fixation of doors and windows 25-03-2025 YET TO BE HAPPEN NA
Scheduled Date of handing over possession 31-12-2025 YET TO BE HAPPEN NA
Development of common areas, parks, gardens etc 31-12-2025 YET TO BE HAPPEN NA
2 Floor 24-01-2024 YET TO BE HAPPEN NA
3 Floor 30-03-2024 YET TO BE HAPPEN NA
4 Floor 15-05-2024 YET TO BE HAPPEN NA
2 Floor 14-02-2024 YET TO BE HAPPEN NA
3 Floor 23-08-2024 YET TO BE HAPPEN NA
4 Floor 23-10-2024 YET TO BE HAPPEN NA

Category and no. of units to be developed

:  Residential
:  
:  24
:  
:  
:  
Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership
Carpet Area Balcony Area Exclusive Open Terrace Area
1 101 89.25 7.2 0 Promoter
2 102 89.32 7.2 0 Promoter
3 103 74.92 7.74 0 Promoter
4 104 74.98 7.74 0 Promoter
5 105 74.98 7.74 0 Promoter
6 106 74.96 7.74 0 Promoter
7 201 89.25 7.2 0 Promoter
8 202 89.32 7.2 0 Promoter
9 203 74.92 7.74 0 Promoter
10 204 74.98 7.74 0 Promoter
11 205 74.98 7.74 0 Promoter
12 206 74.96 7.74 0 Promoter
13 301 89.25 7.2 0 Promoter
14 302 89.32 7.2 0 Promoter
15 303 74.92 7.74 0 Promoter
16 304 74.98 7.74 0 Promoter
17 305 74.98 7.74 0 Promoter
18 306 74.96 7.74 0 Promoter
19 401 89.25 7.2 0 Promoter
20 402 89.32 7.2 0 Promoter
21 403 74.92 7.74 0 Promoter
22 404 74.98 7.74 0 Promoter
23 405 74.98 7.74 0 Promoter
24 406 74.96 7.74 0 Promoter
Types of garages and parking
House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
101 Covered Parking 1 3.04*3.04 9.24 Included
102 Covered Parking 2 3.04*3.04 9.24 Included
103 Covered Parking 3 3.04*3.04 9.24 Included
104 Covered Parking 4 3.04*3.04 9.24 Included
105 Covered Parking 5 3.04*3.04 9.24 Included
106 Covered Parking 6 3.04*3.04 9.24 Included
201 Covered Parking 7 3.04*3.04 9.24 Included
202 Covered Parking 8 3.04*3.04 9.24 Included
203 Covered Parking 9 3.04*3.04 9.24 Included
204 Covered Parking 10 3.04*3.04 9.24 Included
205 Covered Parking 11 3.04*3.04 9.24 Included
206 Covered Parking 12 3.04*3.04 9.24 Included
301 Covered Parking 13 3.04*3.04 9.24 Included
302 Covered Parking 14 3.04*3.04 9.24 Included
303 Covered Parking 15 3.04*3.04 9.24 Included
304 Covered Parking 16 3.04*3.04 9.24 Included
305 Covered Parking 17 3.04*3.04 9.24 Included
306 Covered Parking 18 3.04*3.04 9.24 Included
401 Covered Parking 19 3.04*3.04 9.24 Included
402 Covered Parking 20 3.04*3.04 9.24 Included
403 Covered Parking 21 3.04*3.04 9.24 Included
404 Covered Parking 22 3.04*3.04 9.24 Included
405 Covered Parking 23 3.04*3.04 9.24 Included
406 Covered Parking 24 3.04*3.04 9.24 Included
No
NA

Facilities to be provided

Particulars of Facilities Status of the facility Brief description of facility
Drinking Water Facility Ground Water Copy of Consent Letter
Fire Fighting Facility No
Emergency Evacuation Services Yes 2 NOS OF STAIR CASE OF DIMENSION (3.45X5.61)SQM PROVIDED FOR EMERGENCY EVACUATION SERVICES. FOR EMERGENCY EVACUATION SERVICES.
Use of Renewable Energy No
Lift Facility Yes 2 NOS OF LIFT OF 6 PERSONS CAPACITY,BRAN OTIS,OR SIMILAR BRAND WITH ARD FACILITY(Elevator emergency automatic rescue device)with ARD.
Market Complex No
Community Hall Yes WE ARE HAVING 1 NO OF COMMUNITY HALL OF 24 285 SQM CARPET AREA
Gymnasium No
Swimming Pool No
Play Ground No
Park/Garden No
Plantation Area Yes 285.55 SQM AREA HAVR RESERVED FOR PLANTATION
Others(Please Specify) No
Internal Road Yes 4 MT. WIDE CONCRETE INTERNAL ROAD
External Road Yes 9.14 MT. WIDE MURRAM ROAD CONNECTED TO DURGAPUR ROAD
Elecricity Supply Yes Copy of Consent Letter
Other Amenities No

Bank Particulars of the Project

  BANK OF BARODA
  NAYAPALI
  27650200000733
  BARB0SAVNAY
   View
  2360707
  9437567628

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
DEBRAJ BEHERA Architect PLOT NO-65 ,SATYA NAGAR ,BHUBANESWAR,751007,Email-alcoveconsultancy1@gmail.com,m-9338203332 AR/037/BDA
PRITAM BALIARSINGH Construction Engineer PLOT NO-1079,SHASTRI NAGAR,BHUBANESWAR,751001,Email-pritam.bapi03@gmail.com,M-9040605055 AM183383-1
M.K NANDA & CO Chartered Accountant PLOT NO-66, KUSUM RESIDENCY,1ST FLOOR,SAHEED NAGAR,BHUBANESWAR,751007,Email-mkn_ca@yahoo.co.in,M-9437249096 M.NO-053130

Financial Details

:  498.19 :   View
  31-12-2025 :  498.19
:  0 :  0

Documents Attached

Description of Document Option Documents
Fire Safety Certificate Undertaking Attached
Affidavit in Form-A as per clause-l of sub-section-2 of section-4 of the Act Yes Attached
Allotment letter format Yes Attached
Conveyance Deed Format Yes Attached
Affidavit to adopt agreement for sale format as per Rule-8(1) of ORE (R and D) Rules, 2017 Yes Attached
Annual Report 2019-20 Attached
Annual Report 2020-21 Attached
Annual Report 2021-22 Attached
IT Return 2019-20 Attached
IT Return 2020-21 Attached
IT Return 2021-22 Attached
Audit Report 2019-20 Attached
Audit Report 2020-21 Attached
Audit Report 2021-22 Attached

Additional Documents Attached

Sl. No. Title of the document Upload Document
1 AUDIT REPORT 19-20
2 AUDIT REPORT 20-21

Other documents

“I undertake that the information submitted by me in this application are correct and true to best my knowledge. I also understand that providing false or wrong information is punishable under the Section-60 of the Real Estate (Regulation & Development) Act, 2016. I also further understand that furnishing wrong or false information will lead to rejection of my application registration of the project with forfeiture of registration fee and other charges deposited by me.”
  Audit report 0f 2018-19 ,2019-20 is attached in separate field.

Construction Progress

Updated Construction Progress

SL NO. Description Scheduled date of completion Current Status Remarks
1 Site Development 23-1-2022 PERIPHERIAL DEVELOPMENT
2 Roof Casting NA NA NA
3 Ground Floor/Stilt Floor 16-03-2022 YET TO BE HAPPEN NA
4 1 Floor 12-04-2022 YET TO BE HAPPEN NA
5 Brick Work & Plastering NA NA NA
6 Ground Floor/Stilt Floor 20-07-2022 YET TO BE HAPPEN NA
7 1 Floor 10-09-2022 YET TO BE HAPPEN NA
8 Electrical Works 05-03-2023 YET TO BE HAPPEN NA
9 Concealed Cabling including Plugs & switches 24-04-2024 YET TO BE HAPPEN NA
10 Installation & Charging of Transformer 14-01-2025 YET TO BE HAPPEN NA
11 Connection to Flats/Apartments 23-09-2025 YET TO BE HAPPEN NA
12 PH works 18-11-2025 YET TO BE HAPPEN NA
13 Laying of concealed Pipes 14-03-2025 YET TO BE HAPPEN NA
14 PH Fittings 10-06-2025 YET TO BE HAPPEN NA
15 Overhead Water Tanks 20-11-2024 YET TO BE HAPPEN NA
16 Water Supply Connection to all units 19-08-2025 YET TO BE HAPPEN NA
17 STP construction and completion 16-06-2025 YET TO BE HAPPEN NA
18 Distempering & Colouring of all units and exteriors 17-12-2025 YET TO BE HAPPEN NA
19 Fixation of doors and windows 25-03-2025 YET TO BE HAPPEN NA
20 Scheduled Date of handing over possession 31-12-2025 YET TO BE HAPPEN NA
21 Development of common areas, parks, gardens etc 31-12-2025 YET TO BE HAPPEN NA
22 2 Floor 14-06-2022 YET TO BE HAPPEN NA
23 3 Floor 23-08-2022 YET TO BE HAPPEN NA
24 4 Floor 15-02-2023 YET TO BE HAPPEN NA
25 2 Floor 27-10-2022 YET TO BE HAPPEN NA
26 3 Floor 30-11-2022 YET TO BE HAPPEN NA
27 4 Floor 12-03-2024 YET TO BE HAPPEN NA
Updated Changes on 07-07-2023
28 Site Development 23-1-2022 PERIPHERIAL DEVELOPMENT NA
29 NA NA NA NA
30 Ground Floor/Stilt Floor 15-09-2023 YET TO BE HAPPEN NA
31 1 Floor 15-11-2023 YET TO BE HAPPEN NA
32 NA NA NA NA
33 Ground Floor/Stilt Floor 30-12-2023 YET TO BE HAPPEN NA
34 1 Floor 24-02-2024 YET TO BE HAPPEN NA
35 Electrical Works 20-09-2024 YET TO BE HAPPEN NA
36 Concealed Cabling including Plugs & switches 30-11-2024 YET TO BE HAPPEN NA
37 Installation & Charging of Transformer 14-01-2025 YET TO BE HAPPEN NA
38 Connection to Flats/Apartments 23-09-2025 YET TO BE HAPPEN NA
39 PH works 18-11-2025 YET TO BE HAPPEN NA
40 Laying of concealed Pipes 14-03-2025 YET TO BE HAPPEN NA
41 PH Fittings 10-06-2025 YET TO BE HAPPEN NA
42 Overhead Water Tanks 20-11-2024 YET TO BE HAPPEN NA
43 Water Supply Connection to all units 19-08-2025 YET TO BE HAPPEN NA
44 STP construction and completion 16-06-2025 YET TO BE HAPPEN NA
45 Distempering & Colouring of all units and exteriors 17-12-2025 YET TO BE HAPPEN NA
46 Fixation of doors and windows 25-03-2025 YET TO BE HAPPEN NA
47 Scheduled Date of handing over possession 31-12-2025 YET TO BE HAPPEN NA
48 Development of common areas, parks, gardens etc 31-12-2025 YET TO BE HAPPEN NA
49 2 Floor 24-01-2024 YET TO BE HAPPEN NA
50 3 Floor 30-03-2024 YET TO BE HAPPEN NA
51 4 Floor 15-05-2024 YET TO BE HAPPEN NA
52 2 Floor 14-02-2024 YET TO BE HAPPEN NA
53 3 Floor 23-08-2024 YET TO BE HAPPEN NA
54 4 Floor 23-10-2024 YET TO BE HAPPEN NA
Updated Changes on 08-01-2024
55 Site Development 23-1-2022 PERIPHERIAL DEVELOPMENT
56 NA 06-04-2022 COMPLETED
57 Ground Floor/Stilt Floor 15-09-2023 YET TO BE HAPPEN
58 1 Floor 15-11-2023 YET TO BE HAPPEN NA
59 NA 08-01-2024 YET TO HAPPEN NA
60 Ground Floor/Stilt Floor 30-12-2023 YET TO BE HAPPEN
61 1 Floor 24-02-2024 YET TO BE HAPPEN NA
62 Electrical Works 20-09-2024 YET TO BE HAPPEN NA
63 Concealed Cabling including Plugs & switches 30-11-2024 YET TO BE HAPPEN NA
64 Installation & Charging of Transformer 14-01-2025 YET TO BE HAPPEN NA
65 Connection to Flats/Apartments 23-09-2025 YET TO BE HAPPEN NA
66 PH works 18-11-2025 YET TO BE HAPPEN NA
67 Laying of concealed Pipes 14-03-2025 YET TO BE HAPPEN NA
68 PH Fittings 10-06-2025 YET TO BE HAPPEN NA
69 Overhead Water Tanks 20-11-2024 YET TO BE HAPPEN NA
70 Water Supply Connection to all units 19-08-2025 YET TO BE HAPPEN NA
71 STP construction and completion 16-06-2025 YET TO BE HAPPEN NA
72 Distempering & Colouring of all units and exteriors 17-12-2025 YET TO BE HAPPEN NA
73 Fixation of doors and windows 25-03-2025 YET TO BE HAPPEN NA
74 Scheduled Date of handing over possession 31-12-2025 YET TO BE HAPPEN NA
75 Development of common areas, parks, gardens etc 31-12-2025 YET TO BE HAPPEN NA
76 2 Floor 24-01-2024 YET TO BE HAPPEN NA
77 3 Floor 30-03-2024 YET TO BE HAPPEN NA
78 4 Floor 15-05-2024 YET TO BE HAPPEN NA
79 2 Floor 14-02-2024 YET TO BE HAPPEN NA
80 3 Floor 23-08-2024 YET TO BE HAPPEN NA
81 4 Floor 23-10-2024 YET TO BE HAPPEN NA

Booking Status

Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership Status
Carpet Area Balcony Area Exclusive Open Terrace Area
1 101 89.25 7.2 0 Promoter
2 102 89.32 7.2 0 Promoter
3 103 74.92 7.74 0 Promoter
4 104 74.98 7.74 0 Promoter
5 105 74.98 7.74 0 Promoter
6 106 74.96 7.74 0 Promoter
7 201 89.25 7.2 0 Promoter
8 202 89.32 7.2 0 Promoter
9 203 74.92 7.74 0 Promoter
10 204 74.98 7.74 0 Promoter
11 205 74.98 7.74 0 Promoter
12 206 74.96 7.74 0 Promoter
13 301 89.25 7.2 0 Promoter
14 302 89.32 7.2 0 Promoter
15 303 74.92 7.74 0 Promoter
16 304 74.98 7.74 0 Promoter
17 305 74.98 7.74 0 Promoter
18 306 74.96 7.74 0 Promoter
19 401 89.25 7.2 0 Promoter
20 402 89.32 7.2 0 Promoter
21 403 74.92 7.74 0 Promoter
22 404 74.98 7.74 0 Promoter
23 405 74.98 7.74 0 Promoter
24 406 74.96 7.74 0 Promoter

Financial Status

SL No. Funds Collected from the Allottees Funds Borrowed from Financial Institutions Funds Employed from Own Sources Expenditure As On Date Status
1 0 1000000 38400000 167586 31-12-2023 30% Completed

Updated Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 I Storm water from the premises of roof top shall be conveyed & discharged to the rain water recharging pits as per BDA (Planniing & Building standards) Regulation 2018. 30-11-2025 Will comply 1 month before handover the flats to the customers.
2 II The space which is meant for parking shall not be changed to any other use & shall not be partitioned/closed in any manner. 30-11-2025 Will comply 1 month before handover the flats to the customers.
3 III 20% of the parking space in group housing/apartment building shall be exclusively ear marked for ambulance,fire tender, physically handicapped persons & outside visitors with signage as per norms BDA (Planning & Building Standards) Regulations 2018. 30-11-2025 Will comply 1 month before handover the flats to the customers.
4 IV Plantation @ 80 sqm per one tree of the plot area shall be made by the appliacant as per provisions of BDA(Planning & Building Standards) Regulations 2018. 30-11-2025 Will comply 1 month before handover the flats to the customers.
5 V If the construction/developement are not as per the approved plan/deviated beyond permissible norms ,action shall be initiated against the applicant/builder /developer as per the provisions of the ODA Act 1982 Rules & Regulations made there under. 30-11-2025 Will comply 1 month before handover the flats to the customers.
6 VI The owner/Applicant/Architect/Structural engineer are fully & jointly responsible for any structural failure of building due to any structural /Construction defects, Authority will be no way be held responsible for the same in what so ever manner. 30-11-2025 Will comply 1 month before handover the flats to the customers.
7 VII The concerned Architect/Applicant/Developer are fully responsible for any deviations additions & alternations beyond approved plan/defective construction etc shall be liable for action as per the provisions of the Regulation. 30-11-2025 Will comply 1 month before handover the flats to the customers.
8 VIII The applicant shall obtain infrastructural specification & subsequent clearance with regard to development of infrastructure from BDA before commencement of construction. 30-11-2025 Will comply 1 month before handover the flats to the customers.
9 IX All the fire fighting installation etc are to be ensured & maintained by the applicant as per. 30-11-2025 Will comply 1 month before handover the flats to the customers.
10 X No storm water/water shall be discharge to the public road/public premises & other adjoining plot. 30-11-2025 Will comply 1 month before handover the flats to the customers.
11 XI Adhere to provisions of BDA (Planning & Building standards) Regulation strictly & conditions there to. 30-11-2025 Will comply 1 month before handover the flats to the customers.
12 XII The authority shall in no way be held responsible for any structural failure & damage due to earth quake/cyclone/any other natural disaster. 30-11-2025 Will comply 1 month before handover the flats to the customers.
13 XII The number of dwelling units so approved shall not be changed n any manner. 30-11-2025 Will comply 1 month before handover the flats to the customers.
Updated Changes on 08-01-2024
14 I Storm water from the premises of roof top shall be conveyed & discharged to the rain water recharging pits as per BDA (Planniing & Building standards) Regulation 2018. 30-11-2025 Will comply 1 month before handover the flats to the customers.
15 II The space which is meant for parking shall not be changed to any other use & shall not be partitioned/closed in any manner. 30-11-2025 Will comply 1 month before handover the flats to the customers.
16 III 20% of the parking space in group housing/apartment building shall be exclusively ear marked for ambulance,fire tender, physically handicapped persons & outside visitors with signage as per norms BDA (Planning & Building Standards) Regulations 2018. 30-11-2025 Will comply 1 month before handover the flats to the customers.
17 IV Plantation @ 80 sqm per one tree of the plot area shall be made by the appliacant as per provisions of BDA(Planning & Building Standards) Regulations 2018. 30-11-2025 Will comply 1 month before handover the flats to the customers.
18 V If the construction/developement are not as per the approved plan/deviated beyond permissible norms ,action shall be initiated against the applicant/builder /developer as per the provisions of the ODA Act 1982 Rules & Regulations made there under. 30-11-2025 Will comply 1 month before handover the flats to the customers.
19 VI The owner/Applicant/Architect/Structural engineer are fully & jointly responsible for any structural failure of building due to any structural /Construction defects, Authority will be no way be held responsible for the same in what so ever manner. 30-11-2025 Will comply 1 month before handover the flats to the customers.
20 VII The concerned Architect/Applicant/Developer are fully responsible for any deviations additions & alternations beyond approved plan/defective construction etc shall be liable for action as per the provisions of the Regulation. 30-11-2025 Will comply 1 month before handover the flats to the customers.
21 VIII The applicant shall obtain infrastructural specification & subsequent clearance with regard to development of infrastructure from BDA before commencement of construction. 30-11-2025 Will comply 1 month before handover the flats to the customers.
22 IX All the fire fighting installation etc are to be ensured & maintained by the applicant as per. 30-11-2025 Will comply 1 month before handover the flats to the customers.
23 X No storm water/water shall be discharge to the public road/public premises & other adjoining plot. 30-11-2025 Will comply 1 month before handover the flats to the customers.
24 XI Adhere to provisions of BDA (Planning & Building standards) Regulation strictly & conditions there to. 30-11-2025 Will comply 1 month before handover the flats to the customers.
25 XII The authority shall in no way be held responsible for any structural failure & damage due to earth quake/cyclone/any other natural disaster. 30-11-2025 Will comply 1 month before handover the flats to the customers.
26 XII The number of dwelling units so approved shall not be changed n any manner. 30-11-2025 Will comply 1 month before handover the flats to the customers.

Updated Project Documents

Sl. No. Title of the document Upload Document
1 QPR - 1,2,3, June 23
2 QPR - 1,2,3, JSeptember 23
3 Sale agreement Proforma
4 QPR _March 2024
5 QPR _March 2024
:  BINAY KRISHNA DAS :  
NA :  ACPPB5414J
:PAN Card :  dasbinay@hotmail.com
:  B.TECH :  9437567628
:  MORE THAN 24 YEARS EXPRIENCE IN REAL ESTATE SECTOR .COMPLETED PROJECTS IN BHUBANESWAR SUCESSFULLY.
:  Yes :  NA
:  EVARANI PATTNAIK :  
NA :  ADYPP5339G
:PAN Card :  eva.08pattnaik@gmail.com
:  MBA :  9437485648
:  IN REAL ESTATE SECTOR SHE HAS A VAST EXPRIENCE IN ODISHA
:  Yes :  NA

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
DEBRAJ BEHERA Architect PLOT NO-65 ,SATYA NAGAR ,BHUBANESWAR,751007,Email-alcoveconsultancy1@gmail.com,m-9338203332 AR/037/BDA
PRITAM BALIARSINGH Construction Engineer PLOT NO-1079,SHASTRI NAGAR,BHUBANESWAR,751001,Email-pritam.bapi03@gmail.com,M-9040605055 AM183383-1
M.K NANDA & CO Chartered Accountant PLOT NO-66, KUSUM RESIDENCY,1ST FLOOR,SAHEED NAGAR,BHUBANESWAR,751007,Email-mkn_ca@yahoo.co.in,M-9437249096 M.NO-053130

Updated Units

House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
Updated Changes
101 Covered Parking 1 3.04*3.04 9.24 Included
102 Covered Parking 2 3.04*3.04 9.24 Included
103 Covered Parking 3 3.04*3.04 9.24 Included
104 Covered Parking 4 3.04*3.04 9.24 Included
105 Covered Parking 5 3.04*3.04 9.24 Included
106 Covered Parking 6 3.04*3.04 9.24 Included
201 Covered Parking 7 3.04*3.04 9.24 Included
202 Covered Parking 8 3.04*3.04 9.24 Included
203 Covered Parking 9 3.04*3.04 9.24 Included
204 Covered Parking 10 3.04*3.04 9.24 Included
205 Covered Parking 11 3.04*3.04 9.24 Included
206 Covered Parking 12 3.04*3.04 9.24 Included
301 Covered Parking 13 3.04*3.04 9.24 Included
302 Covered Parking 14 3.04*3.04 9.24 Included
303 Covered Parking 15 3.04*3.04 9.24 Included
304 Covered Parking 16 3.04*3.04 9.24 Included
305 Covered Parking 17 3.04*3.04 9.24 Included
306 Covered Parking 18 3.04*3.04 9.24 Included
401 Covered Parking 19 3.04*3.04 9.24 Included
402 Covered Parking 20 3.04*3.04 9.24 Included
403 Covered Parking 21 3.04*3.04 9.24 Included
404 Covered Parking 22 3.04*3.04 9.24 Included
405 Covered Parking 23 3.04*3.04 9.24 Included
406 Covered Parking 24 3.04*3.04 9.24 Included