Promoter Name :
Anshuman Patnaik
Project Name :
Archid Pramod Retreat
Project Location :
( Residential Project, B+S+5 & S+5, No of Units - 60 )

Form- I

A. Promoter's Details

:  M/s. Archid Builders Pvt. Ltd :  Private Company
:  U45201OR2009PTC011159 :View
NA :  Plot No-315, Archid Central, District Center, Chandrashekherpur, Bhubaneswar, Pin-751016
:  Plot No. 315, Archid Central, District Center, Chandrasekharpur, Bhubaneswar- 751016. :  archidhomes@gmail.com
:  9437076631
:  AAHCA9933C :View
:  13 Year :  No Experience out side state
:  www.archidhomes.in

B. Details of Board of Directors / Partners / MC Members

:  Anshuman Patnaik :  
:  Director :  AWLPP2012N
:PAN Card :  archidhomes@gmail.com
:  MBA :  9437076631
:  Has an experience of 13 years in the real-estate sector
:  Yes :  NA
:  Simantika Mohanty :  
:  Director :  AMDPM3225G
:PAN Card :  archidhomes@gmail.com
:  B.A :  9437076631
:  Has an experience of 13 years in the real-estate sector
:  Yes :  NA
:  Bandan Mohanty :  
:  Managing Director :  AFMPM7898D
:PAN Card :  archidhomes@gmail.com
:  MBA :  9437094412
:  Has an experience of 13 years in the real-estate sector
:  Yes :  NA

Annexure-1

Details of last projects already implemented (Ongoing or Complete)

Annexure-2

Details of the project to be registered

:   New :  Archid Pramod Retreat
:  Residential :  ( Residential Project, B+S+5 & S+5, No of Units - 60 )
:  Khordha :  Bhubaneswar
:  751019 :  Urban Local Body
:  Bhubaneswar Municipal Corporation
:  B+S+5 & S+5 :  NA

Land Details of the Project


:  311/2386/3692 :  703/3381
:  Patrapada :  364.34
:  Yes
No :  View
:  View
:  Other Person
:  Pramod Kumar Swain :  Through Power Of Attorney bearing the Document No:1113200726, Dated: 14/12/2020.
: No
: Yes
:  11132007296 :  14-12-2020
:  Sub registered Bhubaneswar :  Attached

:  312/1806 :  703/2070
:  Patrapada :  461.50
:  Yes
No :  View
:  View
:  Other Person
:  Pramod Kumar Swain :  Through Power Of Attorney bearing the Document No:1113200726, Dated: 14/12/2020.
: No
: Yes
:  11132007296 :  14-12-2020
:  Sub registered Bhubaneswar :  Attached

:  312 :  703/231
:  Patrapada :  461.50
:  Yes
No :  View
:  View
:  Other Person
:  Namita Panda :  Through Power Of Attorney bearing the document no: 1132007201, Dated:10/12/2020
: No
: Yes
:  11132007201 :  10-12-2020
:  Sub registered Bhubaneswar :  Attached

:  311/2386 :  703/2593
:  Patrapada :  214.56
:  Yes
No :  View
:  View
:  Other Person
:  Bismita Mohanty :  Through Power Of Attorney bearing the document no: 11132007199, dated:10/12/2020
: No
: Yes
:  11132007199 :  10-12-2020
:  Sub registered Bhubaneswar :  Attached

:  3028 :  921
:  Sankarpur :  526.28
:  Yes
No :  View
:  View
:  Other Person
:  Pramod Kumar Swain :  Through Power Of Attorney bearing the document no: 11132007200, dated: 10/12/2020
: No
: Yes
:  11132007200 :  10-12-2020
:  Sub registered Bhubaneswar :  Attached

:  3029 :  921
:  Sankarpur :  449.36
:  Yes
No :  View
:  View
:  Other Person
:  Pramod Kumar Swain :  Through Power Of Attorney bearing the document no: 11132007200, Dated: 10/12/2020
: No
: Yes
:  11132007200 :  10-12-2020
:  Sub registered Bhubaneswar :  Attached

:  3030 :  921
:  sankarpur :  202.41
:  Yes
No :  View
:  View
:  Other Person
:  Pramod Kumar Swain :  Through Power Of Attorney bearing the document no: 11132007200, Dated: 10/12/2020
: No
: Yes
:  11132007200 :  10-12-2020
:  Sub registered Bhubaneswar :  Attached

:  3035 :  921
:  Sankarpur :  344.10
:  Yes
No :  View
:  View
:  Other Person
:  Pramod Kumar Swain :  Through Power Of Attorney bearing the document no: 11132007200, Dated: 10/12/2020
: No
: Yes
:  11132007200 :  10-12-2020
:  Sub registered Bhubaneswar :  Attached

Development Agreement

: Yes
Serial No. Particulars of the Person Land/Plot Details Share of the Person Document Attached
1 Pramod Kumar Swain 312/1806, 311/2386/3692 45%   Agreement Copy
2 Namita Panda 312 35%   Agreement Copy
3 Bismita Mohanty 311/2386 45%   Agreement Copy
4 Pramod Kumar Swain 3028,3029,3030 & 3035 45%   Agreement Copy

Building Plan

  View   View
  Download site plan 10-11-2024

Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 The building shall be used exclusively for residential purpose and the use shall not be changed to any other use without prior approval of this authority. 31-12-2026 Work in Progress
2 The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement. 31-12-2026 Work in Progress
3 The parking space measuring 2335.7sqmtr as shown in the approve plan shall be left for parking of vehicles and no part of it shall be used for any other purpose. 31-12-2026 Work in Progress
4 The land over which the construction is propsed is accessible by an approved means of access of 9.14 M (Nine point one four meter) in width. 31-12-2026 Work in Progress
5 The land in question must be in lawful ownership and peaceful possession of the applicant. 31-12-2026 Work in Progress
6 The permission granted under these regulations shall remain valid up to three years from the date of issue . However the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year. 31-12-2026 Work in Progress
7 Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under BDA (Planning & Building Standard) Regulations, or under any other law for the time being in force. 31-12-2026 Work in Progress
8 Obtain an Occupancy certificate from the authority prior to occupation of building in full or part. 31-12-2026 Work in Progress
9 Register the said apartment project over scheduled property under the Real Estate(Regulation & Development)-Act-2016. 31-12-2026 Work in Progress
10 Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force, records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the authority. 31-12-2026 Work in Progress
11 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per BDA (planning & building standards) Rule,2020. 31-12-2026 Work in Progress
12 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/ closed in any manner. 31-12-2026 Work in Progress
13 Plantation as required under the provision under Rule,30 of ODA (planning & building standards) Rules, 2020. shall be strictly adhered. 31-12-2026 Work in Progress
14 The Owner/Applicant/Architect/Structural engineer are fully and jointly responsible for any structural failure of building due to structural/construction defects or earthquake/cyclone/any other natural disaster. Authority shall be no way held responsible for the same in what so ever manner. 31-12-2026 Work in Progress
15 The applicant shall obtain the EIDP approved by the engineering wing and execute it as per the approved design and specification and shall obtain clearance with regard to development of infrastructure from BMC before occupancy. 31-12-2026 Work in Progress

Layout Plan

: Yes :  View

Location Map with geo-coordinates of bend points

Point No. Latitude Longitude
1 20°14'50.4"N 85°46'14.0"E
2 20°14'51.2"N 85°46'14.3"E
3 20°14'51.4"N 85°46'13.8"E
4 20°14'51.6"N 85°46'13.9"E
5 20°14'51.8"N 85°46'14.0"E
6 20°14'52.3"N 85°46'14.0"E
7 20°14'52.5"N 85°46'14.0"E
8 20°14'52.6"N 85°46'14.1"E
9 20°14'53.3"N 85°46'14.1"E
10 20°14'53.8"N 85°46'14.2"E
11 20°14'54.0"N 85°46'14.3"E
12 20°14'53.9"N 85°46'15.0"E
13 20°14'53.8"N 85°46'15.0"E
14 20°14'53.1"N 85°46'14.9"E
15 20°14'53.1"N 85°46'15.1"E
16 20°14'53.1"N 85°46'15.4"E
17 20°14'52.3"N 85°46'15.4"E
18 20°14'52.3"N 85°46'15.3"E
19 20°14'51.8"N 85°46'15.3"E
20 20°14'51.3"N 85°46'15.1"E
21 20°14'50.2"N 85°46'14.6"E
View

Milestone of Project Construction

Description* Scheduled date of completion Current Status Site Images
Site Development 31-05-2022 Work Not Started
Roof Casting NA NA NA
Ground Floor/Stilt Floor 31-12-2022 Work Not Started NA
1 Floor 30-04-2023 Work Not Started NA
2 Floor 31-10-2023 Work Not Started NA
3 Floor 30-04-2024 Work Not Started NA
4 Floor 31-10-2024 Work Not Started NA
5 Floor 30-04-2025 Work Not Started NA
Brick Work & Plastering NA NA NA
Ground Floor/Stilt Floor 30-04-2023 Work Not Started NA
1 Floor 31-10-2023 Work Not Started NA
2 Floor 30-04-2024 Work Not Started NA
3 Floor 31-10-2024 Work Not Started NA
4 Floor 30-04-2025 Work Not Started NA
5 Floor 30-10-2025 Work Not Started NA
Electrical Works 31-03-2026 Work Not Started NA
Concealed Cabling including Plugs & switches 31-09-2026 Work Not Started NA
Installation & Charging of Transformer 31-10-2026 Work Not Started NA
Connection to Flats/Apartments 15-11-2026 Work Not Started NA
PH works 30-04-2026 Work Not Started NA
Laying of concealed Pipes 31-06-2026 Work Not Started NA
PH Fittings 30-11-2026 Work Not Started NA
Overhead Water Tanks 30-11-2025 Work Not Started NA
Water Supply Connection to all units 30-11-2026 Work Not Started NA
STP construction and completion 31-08-2026 Work Not Started NA
Distempering & Colouring of all units and exteriors 30-09-2026 Work Not Started NA
Fixation of doors and windows 24-03-2026 Work Not Started NA
Scheduled Date of handing over possession 31-12-2026 Work Not Started NA
Development of common areas, parks, gardens etc 31-08-2026 Work Not Started NA
Site Development 31-05-2022 Work Not Started NA
NA NA NA NA
Ground Floor/Stilt Floor 31-12-2022 A Block Completed, B Block Completed, C Block Completed & D Block Completed
1 Floor 30-04-2023 A Block Completed, B Block Completed, C Block Completed & D Block Completed
2 Floor 31-10-2023 A Block Completed, B Block Completed, C Block Completed & D Block Completed
3 Floor 30-04-2024 A Block Completed, B Block Under Progress, C Block Completed & D Block Completed
4 Floor 31-10-2024 A Block Completed, B Block Not Started, C Block Completed & D Block Completed
5 Floor 30-04-2025 A Block Completed, B Block Not Started, C Block Not Started & D Block Under Progress
NA NA NA NA
Ground Floor/Stilt Floor 30-04-2023 A Block Completed, B Block Completed, C Block Completed & D Block Completed
1 Floor 30-09-2023 A Block Completed, B Block under progress, C Block Completed & D Block Completed
2 Floor 31-12-2023 A Block Completed, B Block not started, C Block under progress & D Block under progress
3 Floor 29-02-2024 A Block Completed, B Block not started, C Block Under Progress & D Block Under Progress
4 Floor 30-04-2025 A Block Completed, B Block Not started, C Block Not Started & D Block Not Started
5 Floor 30-10-2025 A Block Completed, B Block Not started, C Block Not Started & D Block Not Started
Electrical Works 31-03-2026 Under Progress NA
Concealed Cabling including Plugs & switches 31-09-2026 Work Not Started NA
Installation & Charging of Transformer 31-10-2026 Work Not Started NA
Connection to Flats/Apartments 15-11-2026 Work Not Started NA
PH works 30-04-2026 Under Progress NA
Laying of concealed Pipes 31-06-2026 Work Not Started NA
PH Fittings 30-11-2026 Work Not Started NA
Overhead Water Tanks 30-11-2025 Work Not Started NA
Water Supply Connection to all units 30-11-2026 Work Not Started NA
STP construction and completion 31-08-2026 Work Not Started NA
Distempering & Colouring of all units and exteriors 30-09-2026 Under Progress
Fixation of doors and windows 24-03-2026 Work Not Started
Scheduled Date of handing over possession 31-12-2026 Work Not Started NA
Development of common areas, parks, gardens etc 31-08-2026 Work Not Started NA
Site Development 31-03-2024 Under Progress
NA 31-03-2025 Under Progress NA
Ground Floor/Stilt Floor 31-12-2022 A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
1 Floor 30-04-2023 A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
2 Floor 31-10-2023 A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
3 Floor 30-04-2024 A Block Completed, B Block Under Progress, C Block Completed & D Block Completed NA
4 Floor 31-10-2024 A Block Completed, B Block Not Started, C Block Completed & D Block Completed NA
5 Floor 30-04-2025 A Block Completed, B Block Not Started, C Block Not Started & D Block Under Progress NA
NA 31-12-2025 Under Progress NA
Ground Floor/Stilt Floor 30-04-2023 A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
1 Floor 30-09-2023 A Block Completed, B Block under progress, C Block Completed & D Block Completed NA
2 Floor 31-12-2023 A Block Completed, B Block not started, C Block under progress & D Block under progress NA
3 Floor 29-02-2024 A Block Completed, B Block not started, C Block Under Progress & D Block Under Progress NA
4 Floor 30-04-2025 A Block Completed, B Block Not started, C Block Not Started & D Block Not Started NA
5 Floor 30-10-2025 A Block Completed, B Block Not started, C Block Not Started & D Block Not Started NA
Electrical Works 31-03-2026 Under Progress
Concealed Cabling including Plugs & switches 31-09-2026 Work Not Started NA
Installation & Charging of Transformer 31-10-2026 Work Not Started NA
Connection to Flats/Apartments 15-11-2026 Work Not Started NA
PH works 30-04-2026 Under Progress
Laying of concealed Pipes 31-06-2026 Under Progress NA
PH Fittings 30-11-2026 Work Not Started NA
Overhead Water Tanks 30-11-2025 Work Not Started NA
Water Supply Connection to all units 30-11-2026 Work Not Started NA
STP construction and completion 31-08-2026 Work Not Started NA
Distempering & Colouring of all units and exteriors 30-09-2026 Under Progress NA
Fixation of doors and windows 24-03-2026 Work Not Started NA
Scheduled Date of handing over possession 31-12-2026 Work Not Started NA
Development of common areas, parks, gardens etc 31-08-2026 Work Not Started NA
Site Development 31-03-2024 Under Progress NA
NA 31-03-2025 Under Progress NA
Ground Floor/Stilt Floor 31-12-2022 Slab Casting A Block Completed, B Block Completed, C Block Completed & D Block Completed
1 Floor 30-04-2023 Slab Casting A Block Completed, B Block Completed, C Block Completed & D Block Completed
2 Floor 31-10-2023 Slab Casting A Block Completed, B Block Completed, C Block Completed & D Block Completed
3 Floor 30-04-2024 Slab Casting A Block Completed, B Block Completed, C Block Completed & D Block Completed
4 Floor 31-10-2024 Slab Casting A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
5 Floor 30-04-2025 Slab Casting A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
NA 31-12-2025 Under Progress NA
Ground Floor/Stilt Floor 30-04-2023 Brick Work A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
1 Floor 30-09-2023 Brick Work A Block Completed, B Block Completed, C Block Completed & D Block Completed
2 Floor 31-12-2023 Brick Work A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
3 Floor 29-02-2024 Brick Work A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
4 Floor 30-04-2025 Brick Work A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
5 Floor 30-10-2025 Brick Work A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
Electrical Works 31-03-2026 Under Progress NA
Concealed Cabling including Plugs & switches 31-09-2026 Work Not Started NA
Installation & Charging of Transformer 31-10-2026 Work Not Started NA
Connection to Flats/Apartments 15-11-2026 Work Not Started NA
PH works 30-04-2026 Under Progress NA
Laying of concealed Pipes 31-06-2026 Under Progress NA
PH Fittings 30-11-2026 Work Not Started NA
Overhead Water Tanks 30-11-2025 Work Not Started NA
Water Supply Connection to all units 30-11-2026 Work Not Started NA
STP construction and completion 31-08-2026 Work Not Started NA
Distempering & Colouring of all units and exteriors 30-09-2026 Under Progress NA
Fixation of doors and windows 24-03-2026 Work Not Started NA
Scheduled Date of handing over possession 31-12-2026 Work Not Started NA
Development of common areas, parks, gardens etc 31-08-2026 Work Not Started NA
Site Development 31-03-2024 Under Progress NA
NA 31-03-2025 Under Progress NA
Ground Floor/Stilt Floor 31-12-2022 Slab Casting A Block Completed, B Block Completed, C Block Completed & D Block Completed
1 Floor 30-04-2023 Slab Casting A Block Completed, B Block Completed, C Block Completed & D Block Completed
2 Floor 31-10-2023 Slab Casting A Block Completed, B Block Completed, C Block Completed & D Block Completed
3 Floor 30-04-2024 Slab Casting A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
4 Floor 31-10-2024 Slab Casting A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
5 Floor 30-04-2025 Slab Casting A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
NA 31-12-2025 Under Progress NA
Ground Floor/Stilt Floor 30-04-2023 Brick Work A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
1 Floor 30-09-2023 Brick Work A Block Completed, B Block Completed, C Block Completed & D Block Completed
2 Floor 31-12-2023 Brick Work A Block Completed, B Block Completed, C Block Completed & D Block Completed
3 Floor 29-02-2024 Brick Work A Block Completed, B Block Completed, C Block Completed & D Block Completed
4 Floor 30-04-2025 Brick Work A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
5 Floor 30-10-2025 Brick Work A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
Electrical Works 31-03-2026 Under Progress NA
Concealed Cabling including Plugs & switches 31-09-2026 Work Not Started NA
Installation & Charging of Transformer 31-10-2026 Work Not Started NA
Connection to Flats/Apartments 15-11-2026 Work Not Started NA
PH works 30-04-2026 Under Progress NA
Laying of concealed Pipes 31-06-2026 Under Progress NA
PH Fittings 30-11-2026 Work Not Started NA
Overhead Water Tanks 30-11-2025 Work Not Started NA
Water Supply Connection to all units 30-11-2026 Work Not Started NA
STP construction and completion 31-08-2026 Work Not Started NA
Distempering & Colouring of all units and exteriors 30-09-2026 Under Progress NA
Fixation of doors and windows 24-03-2026 Work Not Started NA
Scheduled Date of handing over possession 31-12-2026 Work Not Started NA
Development of common areas, parks, gardens etc 31-08-2026 Work Not Started NA

Category and no. of units to be developed

:  Residential
:  
:  60
:  
:  
:  
Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership
Carpet Area Balcony Area Exclusive Open Terrace Area
1 Block-A:101 116.9 14.5 N.A Promoter
2 Block-A:102 116.9 14.5 N.A Land Owner
3 Block-A:201 116.9 14.5 N.A Land Owner
4 Block-A:202 116.9 14.5 N.A Promoter
5 Block-A:301 116.9 14.5 N.A Promoter
6 Block-A:302 116.9 14.5 N.A Land Owner
7 Block-A:401 116.9 14.5 N.A Land Owner
8 Block-A:402 116.9 14.5 N.A Land Owner
9 Block-A:501 116.9 14.5 N.A Promoter
10 Block-A:502 116.9 14.5 N.A Promoter
11 Block-B:101 114.0 14.8 N.A Land Owner
12 Block-B:102 114.0 14.7 N.A Promoter
13 Block-B:201 114.0 14.8 N.A Promoter
14 Block-B:202 114.0 14.7 N.A Promoter
15 Block-B:301 114.0 14.8 N.A Promoter
16 Block-B:302 114.0 14.7 N.A Promoter
17 Block-B:401 114.0 14.8 N.A Promoter
18 Block-B:402 114.0 14.7 N.A Land Owner
19 Block-B:501 114.0 14.8 N.A Promoter
20 Block-B:502 114.0 14.7 N.A Promoter
21 Block-C:101 85.3 8.7 N.A Land Owner
22 Block-C:102 85.5 8.0 N.A Promoter
23 Block-C:103 81.2 8.1 N.A Promoter
24 Block-C:104 80.6 8.7 N.A Land Owner
25 Block-C:201 85.3 8.7 N.A Promoter
26 Block-C:202 85.5 8.0 N.A Land Owner
27 Block-C:203 81.2 8.1 N.A Land Owner
28 Block-C:204 80.6 8.7 N.A Promoter
29 Block-C:301 85.3 8.7 N.A Land Owner
30 Block-C:302 85.5 8.0 N.A Promoter
31 Block-C:303 81.2 8.1 N.A Promoter
32 Block-C:304 80.6 8.7 N.A Land Owner
33 Block-C:401 85.3 8.7 N.A Promoter
34 Block-C:402 85.5 8.0 N.A Land Owner
35 Block-C:403 81.2 8.1 N.A Land Owner
36 Block-C:404 80.6 8.7 N.A Promoter
37 Block-C:501 85.3 8.7 N.A Land Owner
38 Block-C:502 85.5 8.0 N.A Promoter
39 Block-C:503 81.2 8.1 N.A Promoter
40 Block-C:504 80.6 8.7 N.A Land Owner
41 Block-D:101 80.1 7.8 N.A Land Owner
42 Block-D:102 60.9 11.5 N.A Land Owner
43 Block-D:103 64.0 12.0 N.A Land Owner
44 Block-D:104 97.6 16.4 N.A Promoter
45 Block-D:201 80.1 7.8 N.A Promoter
46 Block-D:202 60.9 11.5 N.A Promoter
47 Block-D:203 64.0 12.0 N.A Land Owner
48 Block-D:204 97.6 16.4 N.A Land Owner
49 Block-D:301 80.1 7.8 N.A Land Owner
50 Block-D:302 60.9 11.5 N.A Land Owner
51 Block-D:303 64.0 12.0 N.A Promoter
52 Block-D:304 97.6 16.4 N.A Promoter
53 Block-D:401 80.1 7.8 N.A Land Owner
54 Block-D:402 60.9 11.5 N.A Promoter
55 Block-D:403 64.0 12.0 N.A Land Owner
56 Block-D:404 97.6 16.4 N.A Land Owner
57 Block-D:501 80.1 7.8 N.A Land Owner
58 Block-D:502 60.9 11.5 N.A Promoter
59 Block-D:503 64.0 12.0 N.A Promoter
60 Block-D:504 97.6 16.4 N.A Promoter
Types of garages and parking
House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
Block-A:101 Covered Parking A:101 4mtr X 3Mtr 12 Sqmtr Included
Block-A:102 Covered Parking A:102 4mtr X 3Mtr 12 Sqmtr Included
Block-A:201 Covered Parking A:201 4mtr X 3Mtr 12 Sqmtr Included
Block-A:202 Covered Parking A:202 4mtr X 3Mtr 12 Sqmtr Included
Block-A:301 Covered Parking A:301 4mtr X 3Mtr 12 Sqmtr Included
Block-A:302 Covered Parking A:302 4mtr X 3Mtr 12 Sqmtr Included
Block-A:401 Covered Parking A:401 4mtr X 3Mtr 12 Sqmtr Included
Block-A:402 Covered Parking A:402 4mtr X 3Mtr 12 Sqmtr Included
Block-A:501 Covered Parking A:501 4mtr X 3Mtr 12 Sqmtr Included
Block-A:502 Covered Parking A:502 4mtr X 3Mtr 12 Sqmtr Included
Block-B:101 Covered Parking B:101 4mtr X 3Mtr 12 Sqmtr Included
Block-B:102 Covered Parking B:102 4mtr X 3Mtr 12 Sqmtr Included
Block-B:201 Covered Parking B:201 4mtr X 3Mtr 12 Sqmtr Included
Block-B:202 Covered Parking B:202 4mtr X 3Mtr 12 Sqmtr Included
Block-B:301 Covered Parking B:301 4mtr X 3Mtr 12 Sqmtr Included
Block-B:302 Covered Parking B:302 4mtr X 3Mtr 12 Sqmtr Included
Block-B:401 Covered Parking B:401 4mtr X 3Mtr 12 Sqmtr Included
Block-B:402 Covered Parking B:402 4mtr X 3Mtr 12 Sqmtr Included
Block-B:501 Covered Parking B:501 4mtr X 3Mtr 12 Sqmtr Included
Block-B:502 Covered Parking B:502 4mtr X 3Mtr 12 Sqmtr Included
Block-C:101 Covered Parking C:101 4mtr X 3Mtr 12 Sqmtr Included
Block-C:102 Covered Parking C:102 4mtr X 3Mtr 12 Sqmtr Included
Block-C:103 Covered Parking C:103 4mtr X 3Mtr 12 Sqmtr Included
Block-C:104 Covered Parking C:104 4mtr X 3Mtr 12 Sqmtr Included
Block-C:201 Covered Parking C:201 4mtr X 3Mtr 12 Sqmtr Included
Block-C:202 Covered Parking C:202 4mtr X 3Mtr 12 Sqmtr Included
Block-C:203 Covered Parking C:203 4mtr X 3Mtr 12 Sqmtr Included
Block-C:204 Covered Parking C:204 4mtr X 3Mtr 12 Sqmtr Included
Block-C:301 Covered Parking C:301 4mtr X 3Mtr 12 Sqmtr Included
Block-C:302 Covered Parking C:302 4mtr X 3Mtr 12 Sqmtr Included
Block-C:303 Covered Parking C:303 4mtr X 3Mtr 12 Sqmtr Included
Block-C:304 Covered Parking C:304 4mtr X 3Mtr 12 Sqmtr Included
Block-C:401 Covered Parking C:401 4mtr X 3Mtr 12 Sqmtr Included
Block-C:402 Covered Parking C:402 4mtr X 3Mtr 12 Sqmtr Included
Block-C:403 Covered Parking C:403 4mtr X 3Mtr 12 Sqmtr Included
Block-C:404 Covered Parking C:404 4mtr X 3Mtr 12 Sqmtr Included
Block-C:501 Covered Parking C:501 4mtr X 3Mtr 12 Sqmtr Included
Block-C:502 Covered Parking C:502 4mtr X 3Mtr 12 Sqmtr Included
Block-C:503 Covered Parking C:503 4mtr X 3Mtr 12 Sqmtr Included
Block-C:504 Covered Parking C:504 4mtr X 3Mtr 12 Sqmtr Included
Block-D:101 Covered Parking D:101 4mtr X 3Mtr 12 Sqmtr Included
Block-D:102 Covered Parking D:102 4mtr X 3Mtr 12 Sqmtr Included
Block-D:103 Covered Parking D:103 4mtr X 3Mtr 12 Sqmtr Included
Block-D:104 Covered Parking D:104 4mtr X 3Mtr 12 Sqmtr Included
Block-D:201 Covered Parking D:201 4mtr X 3Mtr 12 Sqmtr Included
Block-D:202 Covered Parking D:202 4mtr X 3Mtr 12 Sqmtr Included
Block-D:203 Covered Parking D:203 4mtr X 3Mtr 12 Sqmtr Included
Block-D:204 Covered Parking D:204 4mtr X 3Mtr 12 Sqmtr Included
Block-D:301 Covered Parking D:301 4mtr X 3Mtr 12 Sqmtr Included
Block-D:302 Covered Parking D:302 4mtr X 3Mtr 12 Sqmtr Included
Block-D:303 Covered Parking D:303 4mtr X 3Mtr 12 Sqmtr Included
Block-D:304 Covered Parking D:304 4mtr X 3Mtr 12 Sqmtr Included
Block-D:401 Covered Parking D:401 4mtr X 3Mtr 12 Sqmtr Included
Block-D:402 Covered Parking D:402 4mtr X 3Mtr 12 Sqmtr Included
Block-D:403 Covered Parking D:403 4mtr X 3Mtr 12 Sqmtr Included
Block-D:404 Covered Parking D:404 4mtr X 3Mtr 12 Sqmtr Included
Block-D:501 Covered Parking D:501 4mtr X 3Mtr 12 Sqmtr Included
Block-D:502 Covered Parking D:502 4mtr X 3Mtr 12 Sqmtr Included
Block-D:503 Covered Parking D:503 4mtr X 3Mtr 12 Sqmtr Included
Block-D:504 Covered Parking D:504 4mtr X 3Mtr 12 Sqmtr Included
Yes

Facilities to be provided

Particulars of Facilities Status of the facility Brief description of facility
Drinking Water Facility PHED Copy of NOC Letter
Fire Fighting Facility Yes Fire Cylinders in each floor
Emergency Evacuation Services No
Use of Renewable Energy Yes Rain Water Harvesting
Lift Facility Yes Block-A:1,Lift, Block-B:1 Lift, Block-C:1 Lift, Block-D:2 Lifts, all lifts with ARD Facility, 6 /8Passenger of Johnson brand
Market Complex No
Community Hall Yes Ground Floor: 102.7Sqmtr, First Floor:84.7Sqmtr, Second Floor:84.7Sqmtr
Gymnasium No
Swimming Pool No
Play Ground No
Park/Garden No
Plantation Area Yes 38 Nos of trees
Others(Please Specify) No
Internal Road Yes 6.0Mtrs wide , pavers road/concrete road/blacktop road
External Road Yes 12.19Mtrs, concrete road/blacktop road
Elecricity Supply Yes Copy of Consent Letter
Other Amenities No

Bank Particulars of the Project

  HDFC BANK
  Chandrasekharpur
  50200063457507
  HDFC0001252
   View
  7573919585
  9937066942

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
SAMIR PATEL Architect Plot no- 272, 1st floor, GGP colony, canal road, Bhubaneswar, 751010/ samir8229@gmail.com / mob-9437090714 CA/2006/38244, AR/298/BDA
BIBHUDHENDU KESHARI BHOLA Construction Engineer Nayapalli, Bhubaneswar, bibhudhendubhola@gmail.com / Mob- 9437141179 319218E
LAXMIKANTA PANDA Chartered Accountant Sahid Nagar, Bhubaneswar, biswa_jit@live.com, Mob- 9338555222 Memb No: 314022

Financial Details

:  2418.12 :   View
  31-12-2026 :  500
:  1918.12 :  0

Documents Attached

Description of Document Option Documents
Fire Safety Certificate Certificate Attached
Affidavit in Form-A as per clause-l of sub-section-2 of section-4 of the Act Yes Attached
Allotment letter format Yes Attached
Conveyance Deed Format Yes Attached
Affidavit to adopt agreement for sale format as per Rule-8(1) of ORE (R and D) Rules, 2017 Yes Attached
Annual Report 2019-20 Attached
Annual Report 2020-21 Attached
Annual Report 2021-22 Attached
IT Return 2019-20 Attached
IT Return 2020-21 Attached
IT Return 2021-22 Attached
Audit Report 2019-20 Attached
Audit Report 2020-21 Attached
Audit Report 2021-22 Attached


Other documents

“I undertake that the information submitted by me in this application are correct and true to best my knowledge. I also understand that providing false or wrong information is punishable under the Section-60 of the Real Estate (Regulation & Development) Act, 2016. I also further understand that furnishing wrong or false information will lead to rejection of my application registration of the project with forfeiture of registration fee and other charges deposited by me.”
  

Construction Progress

Updated Construction Progress

SL NO. Description Scheduled date of completion Current Status Remarks
1 Site Development 31-05-2022 Work Not Started
2 Roof Casting NA NA NA
3 Ground Floor/Stilt Floor 31-12-2022 Work Not Started NA
4 1 Floor 30-04-2023 Work Not Started NA
5 2 Floor 31-10-2023 Work Not Started NA
6 3 Floor 30-04-2024 Work Not Started NA
7 4 Floor 31-10-2024 Work Not Started NA
8 5 Floor 30-04-2025 Work Not Started NA
9 Brick Work & Plastering NA NA NA
10 Ground Floor/Stilt Floor 30-04-2023 Work Not Started NA
11 1 Floor 31-10-2023 Work Not Started NA
12 2 Floor 30-04-2024 Work Not Started NA
13 3 Floor 31-10-2024 Work Not Started NA
14 4 Floor 30-04-2025 Work Not Started NA
15 5 Floor 30-10-2025 Work Not Started NA
16 Electrical Works 31-03-2026 Work Not Started NA
17 Concealed Cabling including Plugs & switches 31-09-2026 Work Not Started NA
18 Installation & Charging of Transformer 31-10-2026 Work Not Started NA
19 Connection to Flats/Apartments 15-11-2026 Work Not Started NA
20 PH works 30-04-2026 Work Not Started NA
21 Laying of concealed Pipes 31-06-2026 Work Not Started NA
22 PH Fittings 30-11-2026 Work Not Started NA
23 Overhead Water Tanks 30-11-2025 Work Not Started NA
24 Water Supply Connection to all units 30-11-2026 Work Not Started NA
25 STP construction and completion 31-08-2026 Work Not Started NA
26 Distempering & Colouring of all units and exteriors 30-09-2026 Work Not Started NA
27 Fixation of doors and windows 24-03-2026 Work Not Started NA
28 Scheduled Date of handing over possession 31-12-2026 Work Not Started NA
29 Development of common areas, parks, gardens etc 31-08-2026 Work Not Started NA
Updated Changes on 14-07-2023
30 Site Development 31-05-2022 Work Not Started NA
31 NA NA NA NA
32 Ground Floor/Stilt Floor 31-12-2022 A Block Completed, B Block Completed, C Block Completed & D Block Completed
33 1 Floor 30-04-2023 A Block Completed, B Block Completed, C Block Completed & D Block Completed
34 2 Floor 31-10-2023 A Block Completed, B Block Completed, C Block Completed & D Block Completed
35 3 Floor 30-04-2024 A Block Completed, B Block Under Progress, C Block Completed & D Block Completed
36 4 Floor 31-10-2024 A Block Completed, B Block Not Started, C Block Completed & D Block Completed
37 5 Floor 30-04-2025 A Block Completed, B Block Not Started, C Block Not Started & D Block Under Progress
38 NA NA NA NA
39 Ground Floor/Stilt Floor 30-04-2023 A Block Completed, B Block Completed, C Block Completed & D Block Completed
40 1 Floor 30-09-2023 A Block Completed, B Block under progress, C Block Completed & D Block Completed
41 2 Floor 31-12-2023 A Block Completed, B Block not started, C Block under progress & D Block under progress
42 3 Floor 29-02-2024 A Block Completed, B Block not started, C Block Under Progress & D Block Under Progress
43 4 Floor 30-04-2025 A Block Completed, B Block Not started, C Block Not Started & D Block Not Started
44 5 Floor 30-10-2025 A Block Completed, B Block Not started, C Block Not Started & D Block Not Started
45 Electrical Works 31-03-2026 Under Progress NA
46 Concealed Cabling including Plugs & switches 31-09-2026 Work Not Started NA
47 Installation & Charging of Transformer 31-10-2026 Work Not Started NA
48 Connection to Flats/Apartments 15-11-2026 Work Not Started NA
49 PH works 30-04-2026 Under Progress NA
50 Laying of concealed Pipes 31-06-2026 Work Not Started NA
51 PH Fittings 30-11-2026 Work Not Started NA
52 Overhead Water Tanks 30-11-2025 Work Not Started NA
53 Water Supply Connection to all units 30-11-2026 Work Not Started NA
54 STP construction and completion 31-08-2026 Work Not Started NA
55 Distempering & Colouring of all units and exteriors 30-09-2026 Under Progress
56 Fixation of doors and windows 24-03-2026 Work Not Started
57 Scheduled Date of handing over possession 31-12-2026 Work Not Started NA
58 Development of common areas, parks, gardens etc 31-08-2026 Work Not Started NA
Updated Changes on 14-10-2023
59 Site Development 31-03-2024 Under Progress
60 NA 31-03-2025 Under Progress NA
61 Ground Floor/Stilt Floor 31-12-2022 A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
62 1 Floor 30-04-2023 A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
63 2 Floor 31-10-2023 A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
64 3 Floor 30-04-2024 A Block Completed, B Block Under Progress, C Block Completed & D Block Completed NA
65 4 Floor 31-10-2024 A Block Completed, B Block Not Started, C Block Completed & D Block Completed NA
66 5 Floor 30-04-2025 A Block Completed, B Block Not Started, C Block Not Started & D Block Under Progress NA
67 NA 31-12-2025 Under Progress NA
68 Ground Floor/Stilt Floor 30-04-2023 A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
69 1 Floor 30-09-2023 A Block Completed, B Block under progress, C Block Completed & D Block Completed NA
70 2 Floor 31-12-2023 A Block Completed, B Block not started, C Block under progress & D Block under progress NA
71 3 Floor 29-02-2024 A Block Completed, B Block not started, C Block Under Progress & D Block Under Progress NA
72 4 Floor 30-04-2025 A Block Completed, B Block Not started, C Block Not Started & D Block Not Started NA
73 5 Floor 30-10-2025 A Block Completed, B Block Not started, C Block Not Started & D Block Not Started NA
74 Electrical Works 31-03-2026 Under Progress
75 Concealed Cabling including Plugs & switches 31-09-2026 Work Not Started NA
76 Installation & Charging of Transformer 31-10-2026 Work Not Started NA
77 Connection to Flats/Apartments 15-11-2026 Work Not Started NA
78 PH works 30-04-2026 Under Progress
79 Laying of concealed Pipes 31-06-2026 Under Progress NA
80 PH Fittings 30-11-2026 Work Not Started NA
81 Overhead Water Tanks 30-11-2025 Work Not Started NA
82 Water Supply Connection to all units 30-11-2026 Work Not Started NA
83 STP construction and completion 31-08-2026 Work Not Started NA
84 Distempering & Colouring of all units and exteriors 30-09-2026 Under Progress NA
85 Fixation of doors and windows 24-03-2026 Work Not Started NA
86 Scheduled Date of handing over possession 31-12-2026 Work Not Started NA
87 Development of common areas, parks, gardens etc 31-08-2026 Work Not Started NA
Updated Changes on 12-01-2024
88 Site Development 31-03-2024 Under Progress NA
89 NA 31-03-2025 Under Progress NA
90 Ground Floor/Stilt Floor 31-12-2022 Slab Casting A Block Completed, B Block Completed, C Block Completed & D Block Completed
91 1 Floor 30-04-2023 Slab Casting A Block Completed, B Block Completed, C Block Completed & D Block Completed
92 2 Floor 31-10-2023 Slab Casting A Block Completed, B Block Completed, C Block Completed & D Block Completed
93 3 Floor 30-04-2024 Slab Casting A Block Completed, B Block Completed, C Block Completed & D Block Completed
94 4 Floor 31-10-2024 Slab Casting A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
95 5 Floor 30-04-2025 Slab Casting A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
96 NA 31-12-2025 Under Progress NA
97 Ground Floor/Stilt Floor 30-04-2023 Brick Work A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
98 1 Floor 30-09-2023 Brick Work A Block Completed, B Block Completed, C Block Completed & D Block Completed
99 2 Floor 31-12-2023 Brick Work A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
100 3 Floor 29-02-2024 Brick Work A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
101 4 Floor 30-04-2025 Brick Work A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
102 5 Floor 30-10-2025 Brick Work A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
103 Electrical Works 31-03-2026 Under Progress NA
104 Concealed Cabling including Plugs & switches 31-09-2026 Work Not Started NA
105 Installation & Charging of Transformer 31-10-2026 Work Not Started NA
106 Connection to Flats/Apartments 15-11-2026 Work Not Started NA
107 PH works 30-04-2026 Under Progress NA
108 Laying of concealed Pipes 31-06-2026 Under Progress NA
109 PH Fittings 30-11-2026 Work Not Started NA
110 Overhead Water Tanks 30-11-2025 Work Not Started NA
111 Water Supply Connection to all units 30-11-2026 Work Not Started NA
112 STP construction and completion 31-08-2026 Work Not Started NA
113 Distempering & Colouring of all units and exteriors 30-09-2026 Under Progress NA
114 Fixation of doors and windows 24-03-2026 Work Not Started NA
115 Scheduled Date of handing over possession 31-12-2026 Work Not Started NA
116 Development of common areas, parks, gardens etc 31-08-2026 Work Not Started NA
Updated Changes on 11-04-2024
117 Site Development 31-03-2024 Under Progress NA
118 NA 31-03-2025 Under Progress NA
119 Ground Floor/Stilt Floor 31-12-2022 Slab Casting A Block Completed, B Block Completed, C Block Completed & D Block Completed
120 1 Floor 30-04-2023 Slab Casting A Block Completed, B Block Completed, C Block Completed & D Block Completed
121 2 Floor 31-10-2023 Slab Casting A Block Completed, B Block Completed, C Block Completed & D Block Completed
122 3 Floor 30-04-2024 Slab Casting A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
123 4 Floor 31-10-2024 Slab Casting A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
124 5 Floor 30-04-2025 Slab Casting A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
125 NA 31-12-2025 Under Progress NA
126 Ground Floor/Stilt Floor 30-04-2023 Brick Work A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
127 1 Floor 30-09-2023 Brick Work A Block Completed, B Block Completed, C Block Completed & D Block Completed
128 2 Floor 31-12-2023 Brick Work A Block Completed, B Block Completed, C Block Completed & D Block Completed
129 3 Floor 29-02-2024 Brick Work A Block Completed, B Block Completed, C Block Completed & D Block Completed
130 4 Floor 30-04-2025 Brick Work A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
131 5 Floor 30-10-2025 Brick Work A Block Completed, B Block Completed, C Block Completed & D Block Completed NA
132 Electrical Works 31-03-2026 Under Progress NA
133 Concealed Cabling including Plugs & switches 31-09-2026 Work Not Started NA
134 Installation & Charging of Transformer 31-10-2026 Work Not Started NA
135 Connection to Flats/Apartments 15-11-2026 Work Not Started NA
136 PH works 30-04-2026 Under Progress NA
137 Laying of concealed Pipes 31-06-2026 Under Progress NA
138 PH Fittings 30-11-2026 Work Not Started NA
139 Overhead Water Tanks 30-11-2025 Work Not Started NA
140 Water Supply Connection to all units 30-11-2026 Work Not Started NA
141 STP construction and completion 31-08-2026 Work Not Started NA
142 Distempering & Colouring of all units and exteriors 30-09-2026 Under Progress NA
143 Fixation of doors and windows 24-03-2026 Work Not Started NA
144 Scheduled Date of handing over possession 31-12-2026 Work Not Started NA
145 Development of common areas, parks, gardens etc 31-08-2026 Work Not Started NA

Booking Status

Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership Status
Carpet Area Balcony Area Exclusive Open Terrace Area
1 Block-A:101 116.9 14.5 N.A Promoter
2 Block-A:102 116.9 14.5 N.A Land Owner
3 Block-A:201 116.9 14.5 N.A Land Owner
4 Block-A:202 116.9 14.5 N.A Promoter
5 Block-A:301 116.9 14.5 N.A Promoter
6 Block-A:302 116.9 14.5 N.A Land Owner
7 Block-A:401 116.9 14.5 N.A Land Owner
8 Block-A:402 116.9 14.5 N.A Land Owner
9 Block-A:501 116.9 14.5 N.A Promoter
10 Block-A:502 116.9 14.5 N.A Promoter
11 Block-B:101 114.0 14.8 N.A Land Owner
12 Block-B:102 114.0 14.7 N.A Promoter
13 Block-B:201 114.0 14.8 N.A Promoter
14 Block-B:202 114.0 14.7 N.A Promoter
15 Block-B:301 114.0 14.8 N.A Promoter
16 Block-B:302 114.0 14.7 N.A Promoter
17 Block-B:401 114.0 14.8 N.A Promoter
18 Block-B:402 114.0 14.7 N.A Land Owner
19 Block-B:501 114.0 14.8 N.A Promoter
20 Block-B:502 114.0 14.7 N.A Promoter
21 Block-C:101 85.3 8.7 N.A Land Owner
22 Block-C:102 85.5 8.0 N.A Promoter
23 Block-C:103 81.2 8.1 N.A Promoter
24 Block-C:104 80.6 8.7 N.A Land Owner
25 Block-C:201 85.3 8.7 N.A Promoter
26 Block-C:202 85.5 8.0 N.A Land Owner
27 Block-C:203 81.2 8.1 N.A Land Owner
28 Block-C:204 80.6 8.7 N.A Promoter
29 Block-C:301 85.3 8.7 N.A Land Owner
30 Block-C:302 85.5 8.0 N.A Promoter
31 Block-C:303 81.2 8.1 N.A Promoter
32 Block-C:304 80.6 8.7 N.A Land Owner
33 Block-C:401 85.3 8.7 N.A Promoter
34 Block-C:402 85.5 8.0 N.A Land Owner
35 Block-C:403 81.2 8.1 N.A Land Owner
36 Block-C:404 80.6 8.7 N.A Promoter
37 Block-C:501 85.3 8.7 N.A Land Owner
38 Block-C:502 85.5 8.0 N.A Promoter
39 Block-C:503 81.2 8.1 N.A Promoter
40 Block-C:504 80.6 8.7 N.A Land Owner
41 Block-D:101 80.1 7.8 N.A Land Owner
42 Block-D:102 60.9 11.5 N.A Land Owner
43 Block-D:103 64.0 12.0 N.A Land Owner
44 Block-D:104 97.6 16.4 N.A Promoter
45 Block-D:201 80.1 7.8 N.A Promoter
46 Block-D:202 60.9 11.5 N.A Promoter
47 Block-D:203 64.0 12.0 N.A Land Owner
48 Block-D:204 97.6 16.4 N.A Land Owner
49 Block-D:301 80.1 7.8 N.A Land Owner
50 Block-D:302 60.9 11.5 N.A Land Owner
51 Block-D:303 64.0 12.0 N.A Promoter
52 Block-D:304 97.6 16.4 N.A Promoter
53 Block-D:401 80.1 7.8 N.A Land Owner
54 Block-D:402 60.9 11.5 N.A Promoter
55 Block-D:403 64.0 12.0 N.A Land Owner
56 Block-D:404 97.6 16.4 N.A Land Owner
57 Block-D:501 80.1 7.8 N.A Land Owner
58 Block-D:502 60.9 11.5 N.A Promoter
59 Block-D:503 64.0 12.0 N.A Promoter
60 Block-D:504 97.6 16.4 N.A Promoter

Financial Status

SL No. Funds Collected from the Allottees Funds Borrowed from Financial Institutions Funds Employed from Own Sources Expenditure As On Date Status
1 47253342 42907500 0 87361658 14-07-2023 A Block roof & Brick work completed, B Block 2nd floor roof casting completed & 1st floor brick work in progress, C Block 4th Floor Roof Casting done & 1 st floor brick work completed, 2nd floor brick work in progress, D Block 4th Floor casting done
2 62940383 56600000 36259616 155800000 14-10-2023 Under Construction
3 75592358 54460933 42522947 171983880 31-12-2023 BLOCK- A, B, C & D all roof casting, brick work completed Block-A & D Inside & Outside Plastering work completed Block- C & B Inside Plaster Completed Outside Plaster work Under Progress
4 100156684 61280650 22435866 182808200 31-03-2024 ONGOING

Updated Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 The building shall be used exclusively for residential purpose and the use shall not be changed to any other use without prior approval of this authority. 31-12-2026 Work in Progress
2 The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement. 31-12-2026 Work in Progress
3 The parking space measuring 2335.7sqmtr as shown in the approve plan shall be left for parking of vehicles and no part of it shall be used for any other purpose. 31-12-2026 Work in Progress
4 The land over which the construction is propsed is accessible by an approved means of access of 9.14 M (Nine point one four meter) in width. 31-12-2026 Work in Progress
5 The land in question must be in lawful ownership and peaceful possession of the applicant. 31-12-2026 Work in Progress
6 The permission granted under these regulations shall remain valid up to three years from the date of issue . However the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year. 31-12-2026 Work in Progress
7 Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under BDA (Planning & Building Standard) Regulations, or under any other law for the time being in force. 31-12-2026 Work in Progress
8 Obtain an Occupancy certificate from the authority prior to occupation of building in full or part. 31-12-2026 Work in Progress
9 Register the said apartment project over scheduled property under the Real Estate(Regulation & Development)-Act-2016. 31-12-2026 Work in Progress
10 Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force, records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the authority. 31-12-2026 Work in Progress
11 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per BDA (planning & building standards) Rule,2020. 31-12-2026 Work in Progress
12 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/ closed in any manner. 31-12-2026 Work in Progress
13 Plantation as required under the provision under Rule,30 of ODA (planning & building standards) Rules, 2020. shall be strictly adhered. 31-12-2026 Work in Progress
14 The Owner/Applicant/Architect/Structural engineer are fully and jointly responsible for any structural failure of building due to structural/construction defects or earthquake/cyclone/any other natural disaster. Authority shall be no way held responsible for the same in what so ever manner. 31-12-2026 Work in Progress
15 The applicant shall obtain the EIDP approved by the engineering wing and execute it as per the approved design and specification and shall obtain clearance with regard to development of infrastructure from BMC before occupancy. 31-12-2026 Work in Progress
Updated Changes on 13-07-2023
16 The building shall be used exclusively for residential purpose and the use shall not be changed to any other use without prior approval of this authority. 31-12-2026 Work in Progress
17 The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement. 31-12-2026 Work in Progress
18 The parking space measuring 2335.7sqmtr as shown in the approve plan shall be left for parking of vehicles and no part of it shall be used for any other purpose. 31-12-2026 Work in Progress
19 The land over which the construction is propsed is accessible by an approved means of access of 9.14 M (Nine point one four meter) in width. 31-12-2026 Work in Progress
20 The land in question must be in lawful ownership and peaceful possession of the applicant. 31-12-2026 Work in Progress
21 The permission granted under these regulations shall remain valid up to three years from the date of issue . However the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year. 31-12-2026 Work in Progress
22 Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under BDA (Planning & Building Standard) Regulations, or under any other law for the time being in force. 31-12-2026 Work in Progress
23 Obtain an Occupancy certificate from the authority prior to occupation of building in full or part. 31-12-2026 Work in Progress
24 Register the said apartment project over scheduled property under the Real Estate(Regulation & Development)-Act-2016. 31-12-2026 Work in Progress
25 Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force, records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the authority. 31-12-2026 Work in Progress
26 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per BDA (planning & building standards) Rule,2020. 31-12-2026 Work in Progress
27 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/ closed in any manner. 31-12-2026 Work in Progress
28 Plantation as required under the provision under Rule,30 of ODA (planning & building standards) Rules, 2020. shall be strictly adhered. 31-12-2026 Work in Progress
29 The Owner/Applicant/Architect/Structural engineer are fully and jointly responsible for any structural failure of building due to structural/construction defects or earthquake/cyclone/any other natural disaster. Authority shall be no way held responsible for the same in what so ever manner. 31-12-2026 Work in Progress
30 The applicant shall obtain the EIDP approved by the engineering wing and execute it as per the approved design and specification and shall obtain clearance with regard to development of infrastructure from BMC before occupancy. 31-12-2026 Work in Progress
Updated Changes on 14-10-2023
31 The building shall be used exclusively for residential purpose and the use shall not be changed to any other use without prior approval of this authority. 31-12-2026 Work in Progress
32 The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement. 31-12-2026 Work in Progress
33 The parking space measuring 2335.7sqmtr as shown in the approve plan shall be left for parking of vehicles and no part of it shall be used for any other purpose. 31-12-2026 Work in Progress
34 The land over which the construction is propsed is accessible by an approved means of access of 9.14 M (Nine point one four meter) in width. 31-12-2026 Work in Progress
35 The land in question must be in lawful ownership and peaceful possession of the applicant. 31-12-2026 Work in Progress
36 The permission granted under these regulations shall remain valid up to three years from the date of issue . However the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year. 31-12-2026 Work in Progress
37 Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under BDA (Planning & Building Standard) Regulations, or under any other law for the time being in force. 31-12-2026 Work in Progress
38 Obtain an Occupancy certificate from the authority prior to occupation of building in full or part. 31-12-2026 Work in Progress
39 Register the said apartment project over scheduled property under the Real Estate(Regulation & Development)-Act-2016. 31-12-2026 Work in Progress
40 Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force, records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the authority. 31-12-2026 Work in Progress
41 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per BDA (planning & building standards) Rule,2020. 31-12-2026 Work in Progress
42 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/ closed in any manner. 31-12-2026 Work in Progress
43 Plantation as required under the provision under Rule,30 of ODA (planning & building standards) Rules, 2020. shall be strictly adhered. 31-12-2026 Work in Progress
44 The Owner/Applicant/Architect/Structural engineer are fully and jointly responsible for any structural failure of building due to structural/construction defects or earthquake/cyclone/any other natural disaster. Authority shall be no way held responsible for the same in what so ever manner. 31-12-2026 Work in Progress
45 The applicant shall obtain the EIDP approved by the engineering wing and execute it as per the approved design and specification and shall obtain clearance with regard to development of infrastructure from BMC before occupancy. 31-12-2026 Work in Progress
Updated Changes on 12-01-2024
46 The building shall be used exclusively for residential purpose and the use shall not be changed to any other use without prior approval of this authority. 31-12-2026 Work in Progress
47 The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement. 31-12-2026 Work in Progress
48 The parking space measuring 2335.7sqmtr as shown in the approve plan shall be left for parking of vehicles and no part of it shall be used for any other purpose. 31-12-2026 Work in Progress
49 The land over which the construction is propsed is accessible by an approved means of access of 9.14 M (Nine point one four meter) in width. 31-12-2026 Work in Progress
50 The land in question must be in lawful ownership and peaceful possession of the applicant. 31-12-2026 Work in Progress
51 The permission granted under these regulations shall remain valid up to three years from the date of issue . However the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year. 31-12-2026 Work in Progress
52 Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under BDA (Planning & Building Standard) Regulations, or under any other law for the time being in force. 31-12-2026 Work in Progress
53 Obtain an Occupancy certificate from the authority prior to occupation of building in full or part. 31-12-2026 Work in Progress
54 Register the said apartment project over scheduled property under the Real Estate(Regulation & Development)-Act-2016. 31-12-2026 Work in Progress
55 Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force, records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the authority. 31-12-2026 Work in Progress
56 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per BDA (planning & building standards) Rule,2020. 31-12-2026 Work in Progress
57 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/ closed in any manner. 31-12-2026 Work in Progress
58 Plantation as required under the provision under Rule,30 of ODA (planning & building standards) Rules, 2020. shall be strictly adhered. 31-12-2026 Work in Progress
59 The Owner/Applicant/Architect/Structural engineer are fully and jointly responsible for any structural failure of building due to structural/construction defects or earthquake/cyclone/any other natural disaster. Authority shall be no way held responsible for the same in what so ever manner. 31-12-2026 Work in Progress
60 The applicant shall obtain the EIDP approved by the engineering wing and execute it as per the approved design and specification and shall obtain clearance with regard to development of infrastructure from BMC before occupancy. 31-12-2026 Work in Progress
Updated Changes on 11-04-2024
61 The building shall be used exclusively for residential purpose and the use shall not be changed to any other use without prior approval of this authority. 31-12-2026 Work in Progress
62 The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement. 31-12-2026 Work in Progress
63 The parking space measuring 2335.7sqmtr as shown in the approve plan shall be left for parking of vehicles and no part of it shall be used for any other purpose. 31-12-2026 Work in Progress
64 The land over which the construction is propsed is accessible by an approved means of access of 9.14 M (Nine point one four meter) in width. 31-12-2026 Work in Progress
65 The land in question must be in lawful ownership and peaceful possession of the applicant. 31-12-2026 Work in Progress
66 The permission granted under these regulations shall remain valid up to three years from the date of issue . However the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year. 31-12-2026 Work in Progress
67 Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under BDA (Planning & Building Standard) Regulations, or under any other law for the time being in force. 31-12-2026 Work in Progress
68 Obtain an Occupancy certificate from the authority prior to occupation of building in full or part. 31-12-2026 Work in Progress
69 Register the said apartment project over scheduled property under the Real Estate(Regulation & Development)-Act-2016. 31-12-2026 Work in Progress
70 Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force, records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the authority. 31-12-2026 Work in Progress
71 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per BDA (planning & building standards) Rule,2020. 31-12-2026 Work in Progress
72 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/ closed in any manner. 31-12-2026 Work in Progress
73 Plantation as required under the provision under Rule,30 of ODA (planning & building standards) Rules, 2020. shall be strictly adhered. 31-12-2026 Work in Progress
74 The Owner/Applicant/Architect/Structural engineer are fully and jointly responsible for any structural failure of building due to structural/construction defects or earthquake/cyclone/any other natural disaster. Authority shall be no way held responsible for the same in what so ever manner. 31-12-2026 Work in Progress
75 The applicant shall obtain the EIDP approved by the engineering wing and execute it as per the approved design and specification and shall obtain clearance with regard to development of infrastructure from BMC before occupancy. 31-12-2026 Work in Progress

Updated Project Documents

Sl. No. Title of the document Upload Document
1 AGREEMENT TO SALE
2 PERFORMA I-II
3 PERFORMA III
4 PERFORMA-I
5 PERFORMA-II
6 PERFORMA-III
7 PERFORMA-I 01.10.2023 to 31.12.2023
8 PERFORMA-II 01.10.2023 to 31.12.2023
9 PERFORMA-III 01.10.2023 to 31.12.2023
10 BANK STATEMENT NOVEMBER
11 BANK STATEMENT DECEMBER
12 PERFORMA-I JAN-MAR 2024
13 PERFORMA-II JAN-MAR 2024
14 PERFORMA-III JAN-MAR 2024
:  Anshuman Patnaik :  
NA :  AWLPP2012N
:PAN Card :  archidhomes@gmail.com
:  MBA :  9437076631
:  Has an experience of 13 years in the real-estate sector
:  Yes :  NA
:  Simantika Mohanty :  
NA :  AMDPM3225G
:PAN Card :  archidhomes@gmail.com
:  B.A :  9437076631
:  Has an experience of 13 years in the real-estate sector
:  Yes :  NA
:  Bandan Mohanty :  
NA :  AFMPM7898D
:PAN Card :  archidhomes@gmail.com
:  MBA :  9437094412
:  Has an experience of 13 years in the real-estate sector
:  Yes :  NA

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
SAMIR PATEL Architect Plot no- 272, 1st floor, GGP colony, canal road, Bhubaneswar, 751010/ samir8229@gmail.com / mob-9437090714 CA/2006/38244, AR/298/BDA
BIBHUDHENDU KESHARI BHOLA Construction Engineer Nayapalli, Bhubaneswar, bibhudhendubhola@gmail.com / Mob- 9437141179 319218E
LAXMIKANTA PANDA Chartered Accountant Sahid Nagar, Bhubaneswar, biswa_jit@live.com, Mob- 9338555222 Memb No: 314022

Updated Units

House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
Updated Changes
Block-A:101 Covered Parking A:101 4mtr X 3Mtr 12 Sqmtr Included
Block-A:102 Covered Parking A:102 4mtr X 3Mtr 12 Sqmtr Included
Block-A:201 Covered Parking A:201 4mtr X 3Mtr 12 Sqmtr Included
Block-A:202 Covered Parking A:202 4mtr X 3Mtr 12 Sqmtr Included
Block-A:301 Covered Parking A:301 4mtr X 3Mtr 12 Sqmtr Included
Block-A:302 Covered Parking A:302 4mtr X 3Mtr 12 Sqmtr Included
Block-A:401 Covered Parking A:401 4mtr X 3Mtr 12 Sqmtr Included
Block-A:402 Covered Parking A:402 4mtr X 3Mtr 12 Sqmtr Included
Block-A:501 Covered Parking A:501 4mtr X 3Mtr 12 Sqmtr Included
Block-A:502 Covered Parking A:502 4mtr X 3Mtr 12 Sqmtr Included
Block-B:101 Covered Parking B:101 4mtr X 3Mtr 12 Sqmtr Included
Block-B:102 Covered Parking B:102 4mtr X 3Mtr 12 Sqmtr Included
Block-B:201 Covered Parking B:201 4mtr X 3Mtr 12 Sqmtr Included
Block-B:202 Covered Parking B:202 4mtr X 3Mtr 12 Sqmtr Included
Block-B:301 Covered Parking B:301 4mtr X 3Mtr 12 Sqmtr Included
Block-B:302 Covered Parking B:302 4mtr X 3Mtr 12 Sqmtr Included
Block-B:401 Covered Parking B:401 4mtr X 3Mtr 12 Sqmtr Included
Block-B:402 Covered Parking B:402 4mtr X 3Mtr 12 Sqmtr Included
Block-B:501 Covered Parking B:501 4mtr X 3Mtr 12 Sqmtr Included
Block-B:502 Covered Parking B:502 4mtr X 3Mtr 12 Sqmtr Included
Block-C:101 Covered Parking C:101 4mtr X 3Mtr 12 Sqmtr Included
Block-C:102 Covered Parking C:102 4mtr X 3Mtr 12 Sqmtr Included
Block-C:103 Covered Parking C:103 4mtr X 3Mtr 12 Sqmtr Included
Block-C:104 Covered Parking C:104 4mtr X 3Mtr 12 Sqmtr Included
Block-C:201 Covered Parking C:201 4mtr X 3Mtr 12 Sqmtr Included
Block-C:202 Covered Parking C:202 4mtr X 3Mtr 12 Sqmtr Included
Block-C:203 Covered Parking C:203 4mtr X 3Mtr 12 Sqmtr Included
Block-C:204 Covered Parking C:204 4mtr X 3Mtr 12 Sqmtr Included
Block-C:301 Covered Parking C:301 4mtr X 3Mtr 12 Sqmtr Included
Block-C:302 Covered Parking C:302 4mtr X 3Mtr 12 Sqmtr Included
Block-C:303 Covered Parking C:303 4mtr X 3Mtr 12 Sqmtr Included
Block-C:304 Covered Parking C:304 4mtr X 3Mtr 12 Sqmtr Included
Block-C:401 Covered Parking C:401 4mtr X 3Mtr 12 Sqmtr Included
Block-C:402 Covered Parking C:402 4mtr X 3Mtr 12 Sqmtr Included
Block-C:403 Covered Parking C:403 4mtr X 3Mtr 12 Sqmtr Included
Block-C:404 Covered Parking C:404 4mtr X 3Mtr 12 Sqmtr Included
Block-C:501 Covered Parking C:501 4mtr X 3Mtr 12 Sqmtr Included
Block-C:502 Covered Parking C:502 4mtr X 3Mtr 12 Sqmtr Included
Block-C:503 Covered Parking C:503 4mtr X 3Mtr 12 Sqmtr Included
Block-C:504 Covered Parking C:504 4mtr X 3Mtr 12 Sqmtr Included
Block-D:101 Covered Parking D:101 4mtr X 3Mtr 12 Sqmtr Included
Block-D:102 Covered Parking D:102 4mtr X 3Mtr 12 Sqmtr Included
Block-D:103 Covered Parking D:103 4mtr X 3Mtr 12 Sqmtr Included
Block-D:104 Covered Parking D:104 4mtr X 3Mtr 12 Sqmtr Included
Block-D:201 Covered Parking D:201 4mtr X 3Mtr 12 Sqmtr Included
Block-D:202 Covered Parking D:202 4mtr X 3Mtr 12 Sqmtr Included
Block-D:203 Covered Parking D:203 4mtr X 3Mtr 12 Sqmtr Included
Block-D:204 Covered Parking D:204 4mtr X 3Mtr 12 Sqmtr Included
Block-D:301 Covered Parking D:301 4mtr X 3Mtr 12 Sqmtr Included
Block-D:302 Covered Parking D:302 4mtr X 3Mtr 12 Sqmtr Included
Block-D:303 Covered Parking D:303 4mtr X 3Mtr 12 Sqmtr Included
Block-D:304 Covered Parking D:304 4mtr X 3Mtr 12 Sqmtr Included
Block-D:401 Covered Parking D:401 4mtr X 3Mtr 12 Sqmtr Included
Block-D:402 Covered Parking D:402 4mtr X 3Mtr 12 Sqmtr Included
Block-D:403 Covered Parking D:403 4mtr X 3Mtr 12 Sqmtr Included
Block-D:404 Covered Parking D:404 4mtr X 3Mtr 12 Sqmtr Included
Block-D:501 Covered Parking D:501 4mtr X 3Mtr 12 Sqmtr Included
Block-D:502 Covered Parking D:502 4mtr X 3Mtr 12 Sqmtr Included
Block-D:503 Covered Parking D:503 4mtr X 3Mtr 12 Sqmtr Included
Block-D:504 Covered Parking D:504 4mtr X 3Mtr 12 Sqmtr Included
Updated Changes
Block-A:101 Covered Parking A:101 4mtr X 3Mtr 12 Sqmtr Included
Block-A:102 Covered Parking A:102 4mtr X 3Mtr 12 Sqmtr Included
Block-A:201 Covered Parking A:201 4mtr X 3Mtr 12 Sqmtr Included
Block-A:202 Covered Parking A:202 4mtr X 3Mtr 12 Sqmtr Included
Block-A:301 Covered Parking A:301 4mtr X 3Mtr 12 Sqmtr Included
Block-A:302 Covered Parking A:302 4mtr X 3Mtr 12 Sqmtr Included
Block-A:401 Covered Parking A:401 4mtr X 3Mtr 12 Sqmtr Included
Block-A:402 Covered Parking A:402 4mtr X 3Mtr 12 Sqmtr Included
Block-A:501 Covered Parking A:501 4mtr X 3Mtr 12 Sqmtr Included
Block-A:502 Covered Parking A:502 4mtr X 3Mtr 12 Sqmtr Included
Block-B:101 Covered Parking B:101 4mtr X 3Mtr 12 Sqmtr Included
Block-B:102 Covered Parking B:102 4mtr X 3Mtr 12 Sqmtr Included
Block-B:201 Covered Parking B:201 4mtr X 3Mtr 12 Sqmtr Included
Block-B:202 Covered Parking B:202 4mtr X 3Mtr 12 Sqmtr Included
Block-B:301 Covered Parking B:301 4mtr X 3Mtr 12 Sqmtr Included
Block-B:302 Covered Parking B:302 4mtr X 3Mtr 12 Sqmtr Included
Block-B:401 Covered Parking B:401 4mtr X 3Mtr 12 Sqmtr Included
Block-B:402 Covered Parking B:402 4mtr X 3Mtr 12 Sqmtr Included
Block-B:501 Covered Parking B:501 4mtr X 3Mtr 12 Sqmtr Included
Block-B:502 Covered Parking B:502 4mtr X 3Mtr 12 Sqmtr Included
Block-C:101 Covered Parking C:101 4mtr X 3Mtr 12 Sqmtr Included
Block-C:102 Covered Parking C:102 4mtr X 3Mtr 12 Sqmtr Included
Block-C:103 Covered Parking C:103 4mtr X 3Mtr 12 Sqmtr Included
Block-C:104 Covered Parking C:104 4mtr X 3Mtr 12 Sqmtr Included
Block-C:201 Covered Parking C:201 4mtr X 3Mtr 12 Sqmtr Included
Block-C:202 Covered Parking C:202 4mtr X 3Mtr 12 Sqmtr Included
Block-C:203 Covered Parking C:203 4mtr X 3Mtr 12 Sqmtr Included
Block-C:204 Covered Parking C:204 4mtr X 3Mtr 12 Sqmtr Included
Block-C:301 Covered Parking C:301 4mtr X 3Mtr 12 Sqmtr Included
Block-C:302 Covered Parking C:302 4mtr X 3Mtr 12 Sqmtr Included
Block-C:303 Covered Parking C:303 4mtr X 3Mtr 12 Sqmtr Included
Block-C:304 Covered Parking C:304 4mtr X 3Mtr 12 Sqmtr Included
Block-C:401 Covered Parking C:401 4mtr X 3Mtr 12 Sqmtr Included
Block-C:402 Covered Parking C:402 4mtr X 3Mtr 12 Sqmtr Included
Block-C:403 Covered Parking C:403 4mtr X 3Mtr 12 Sqmtr Included
Block-C:404 Covered Parking C:404 4mtr X 3Mtr 12 Sqmtr Included
Block-C:501 Covered Parking C:501 4mtr X 3Mtr 12 Sqmtr Included
Block-C:502 Covered Parking C:502 4mtr X 3Mtr 12 Sqmtr Included
Block-C:503 Covered Parking C:503 4mtr X 3Mtr 12 Sqmtr Included
Block-C:504 Covered Parking C:504 4mtr X 3Mtr 12 Sqmtr Included
Block-D:101 Covered Parking D:101 4mtr X 3Mtr 12 Sqmtr Included
Block-D:102 Covered Parking D:102 4mtr X 3Mtr 12 Sqmtr Included
Block-D:103 Covered Parking D:103 4mtr X 3Mtr 12 Sqmtr Included
Block-D:104 Covered Parking D:104 4mtr X 3Mtr 12 Sqmtr Included
Block-D:201 Covered Parking D:201 4mtr X 3Mtr 12 Sqmtr Included
Block-D:202 Covered Parking D:202 4mtr X 3Mtr 12 Sqmtr Included
Block-D:203 Covered Parking D:203 4mtr X 3Mtr 12 Sqmtr Included
Block-D:204 Covered Parking D:204 4mtr X 3Mtr 12 Sqmtr Included
Block-D:301 Covered Parking D:301 4mtr X 3Mtr 12 Sqmtr Included
Block-D:302 Covered Parking D:302 4mtr X 3Mtr 12 Sqmtr Included
Block-D:303 Covered Parking D:303 4mtr X 3Mtr 12 Sqmtr Included
Block-D:304 Covered Parking D:304 4mtr X 3Mtr 12 Sqmtr Included
Block-D:401 Covered Parking D:401 4mtr X 3Mtr 12 Sqmtr Included
Block-D:402 Covered Parking D:402 4mtr X 3Mtr 12 Sqmtr Included
Block-D:403 Covered Parking D:403 4mtr X 3Mtr 12 Sqmtr Included
Block-D:404 Covered Parking D:404 4mtr X 3Mtr 12 Sqmtr Included
Block-D:501 Covered Parking D:501 4mtr X 3Mtr 12 Sqmtr Included
Block-D:502 Covered Parking D:502 4mtr X 3Mtr 12 Sqmtr Included