Generated by pacms.orera.in on date: 2024-05-10

Promoter Details
Promoter Name :
RAKESH BHURA
Project Name :
UTKAL SAPPHIRE
Project Location :
(Residential Project, S+5, No of Units - 10)

Form- I

A. Promoter's Details

:  M/S. UTKAL BUILDERS LTD :  Private Company
:  U45202OR1990PLC002529 :View
NA :   Plot No.777, Saheed Nagar, Bhubaneswar-751007, Dist. Khordha, Odisha.
:   Plot No.777, Saheed Nagar, Bhubaneswar, Dist. Khordha, Odisha-751007. :  info@utkalbuilders.com
:  9439316958
:  AAACU5502C :View
:  In the Real Estate sector since 1989 :  No experience in outside of state
NA

B. Details of Board of Directors / Partners / MC Members

:  RAKESH BHURA :  
:  Director :  AMUPB1558Q
:PAN Card :  rakesh@utkalbuilders.com
:  MBA :  9439775555
:  9YEARS OF EXPERIENCE IN REAL ESTATE SECTOR
:  Yes :  NA
:  SHARAD BAID :  
:  Managing Director :  ADEPB3155G
:PAN Card :  sharad@utkalbuilders.com
:  MBA :  9437555111
:  22 years of experience in real estate sector
:  Yes :  NA
:  SANDEEP BAID :  
:  Director :  AHAPB1488J
:PAN Card :  info@utkalbuilders.com
:  MBA :  7504456602
:  17 years of experience in real estate sector
:  Yes :  NA
:  ANJANA DEVI BHURA :  
:  Director :  ADGPB7561C
:PAN Card :  info@utkalbuilders.com
:  B.COM :  8018676454
:  12 YEARS OF EXPERIENCE IN REAL ESTE SECTOR
:  Yes :  NA

Annexure-1

Details of last projects already implemented (Ongoing or Complete)

Annexure-2

Details of the project to be registered

:   New :  UTKAL SAPPHIRE
:  Residential :  (Residential Project, S+5, No of Units - 10)
:  Khordha :  Bhubaneswar
:  751006 :  Development Authority
:  Bhubaneswar Development Authority
:  S+5 :  NA

Land Details of the Project

:  410 :  565/639
:  LAXMISAGAR,UNIT-31 :  798.92
:  Yes
Yes :  View
:  View
:  Promoter

Development Agreement

: No

Building Plan

  View   View
  Download site plan 21-06-2024

Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 I. Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Rule of ODA (Planning & Building Standards) Rules, 2020 18-01-2024 Construction yet to be started
2 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner. 23-03-2024
3 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance, fire tender, physically handicapped persons and outside visitors with signage as per norms, ODA(Planning & Building Standards) Rules-2020. 23-03-2024
4 Atleast 80 sqm per one tree of the land area shall be developed for plantation and landscaping and maintained as per Rules-30. 18-04-2024 Construction yet to be started
5 All the passages around the building shall be developed with permeable pavers block for absorption of rain water and seepage in to the ground. 23-03-2024
6 If the construction I development are not as per the approved plan / deviated beyond permissible norms, the performance security shall be forfeited and action shall be initiated against the applicant/builder / developer as per the provisions of the ODA Act, 1982, Rules and Regularization made there under. 16-03-2024
7 The Owner/ Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/construction defects , Authority will be no way be held responsible for the same in what so ever manner. 23-03-2024
8 The concerned Architect / Applicant / Developer are fully responsible for any deviations additions & alternations beyond approved plan/ defective construction etc. shall be liable for action as per the provisions of the Rule. 23-03-2024
9 The applicant shall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/BOA before commencement of construction. 23-03-2024
10 All the stipulated conditions of the NOC/Clearances given by BMC, PHED, shall be adhered to strictly. All the fire fighting installation etc are to be ensured and maintained by the applicant as per Odisha Fire Prevention and Fire Safety Rules-2017. 22-05-2024
11 No storm water/water shall be discharged to the public road/public premises and other adjoining plots. 03-04-2024
12 The number of dwelling units so approved shall not be changed in any manner. 11-04-2024

Layout Plan

: Yes :  View

Location Map with geo-coordinates of bend points

Point No. Latitude Longitude
1 20°16'09.5 85°51'07.2
2 20°16'10.8 85°51'07.5
3 20°16'10.7 85°51'07.8
4 20°16'10.6 85°51'08.1
5 20°16'09.2 85°51'07.6
View

Milestone of Project Construction

Description* Scheduled date of completion Current Status Site Images
Site Development 30-11-2021 IN PROCESS
Roof Casting NA NA NA
Ground Floor/Stilt Floor 15-02-2022 Not Yet Started NA
1 Floor 30-03-2022 Not Yet Started NA
2 Floor 15-05-2022 Not Yet Started NA
3 Floor 30-06-2022 Not Yet Started NA
4 Floor 15-08-2022 Not Yet Started NA
5 Floor 30-09-2022 Not Yet Started NA
Brick Work & Plastering NA NA NA
Ground Floor/Stilt Floor 30-03-2023 Not Yet Started NA
1 Floor 15-05-2023 Not Yet Started NA
2 Floor 30-07-2023 Not Yet Started NA
3 Floor 15-09-2023 Not Yet Started NA
4 Floor 30-10-2023 Not Yet Started NA
5 Floor 15-12-2023 Not Yet Started NA
Electrical Works 30-12-2023 Not Yet Started NA
Concealed Cabling including Plugs & switches 25-12-2023 Not Yet Started NA
Installation & Charging of Transformer 30-02-2024 Not Yet Started NA
Connection to Flats/Apartments 03-03-2024 Not Yet Started NA
PH works 25-01-2024 Not Yet Started NA
Laying of concealed Pipes 15-11-2023 Not Yet Started NA
PH Fittings 15-12-2023 Not Yet Started NA
Overhead Water Tanks 20-04-2024 Not Yet Started NA
Water Supply Connection to all units 30-05-2024 Not Yet Started NA
STP construction and completion 31-05-2024 Not Yet Started NA
Distempering & Colouring of all units and exteriors 30-03-2024 Not Yet Started NA
Fixation of doors and windows 30-02-2024 Not Yet Started NA
Scheduled Date of handing over possession 05-06-2024 Not Yet Started NA
Development of common areas, parks, gardens etc 30-05-2024 Not Yet Started NA
Site Development 30-11-2021 IN PROCESS
NA NA NA NA
Ground Floor/Stilt Floor 15-02-2022 Completed
1 Floor 30-03-2022 Completed
2 Floor 15-05-2022 Completed
3 Floor 30-06-2022 Work In Progress
4 Floor 15-08-2022 Not Yet Started NA
5 Floor 30-09-2022 Not Yet Started NA
NA NA NA NA
Ground Floor/Stilt Floor 30-03-2023 Work In Progress
1 Floor 15-05-2023 Work In Progress
2 Floor 30-07-2023 Not Yet Started NA
3 Floor 15-09-2023 Not Yet Started NA
4 Floor 30-10-2023 Not Yet Started NA
5 Floor 15-12-2023 Not Yet Started NA
Electrical Works 30-12-2023 Not Yet Started NA
Concealed Cabling including Plugs & switches 25-12-2023 Not Yet Started NA
Installation & Charging of Transformer 30-02-2024 Not Yet Started NA
Connection to Flats/Apartments 03-03-2024 Not Yet Started NA
PH works 25-01-2024 Not Yet Started NA
Laying of concealed Pipes 15-11-2023 Not Yet Started NA
PH Fittings 15-12-2023 Not Yet Started NA
Overhead Water Tanks 20-04-2024 Not Yet Started NA
Water Supply Connection to all units 30-05-2024 Not Yet Started NA
STP construction and completion 31-05-2024 Not Yet Started NA
Distempering & Colouring of all units and exteriors 30-03-2024 Not Yet Started NA
Fixation of doors and windows 30-02-2024 Not Yet Started NA
Scheduled Date of handing over possession 05-06-2024 Not Yet Started NA
Development of common areas, parks, gardens etc 30-05-2024 Not Yet Started NA
Site Development 30-11-2021 IN PROCESS
NA 30-06-2023 IN PROCESS
Ground Floor/Stilt Floor 15-02-2022 Completed
1 Floor 30-03-2022 Completed
2 Floor 15-05-2022 Completed
3 Floor 30-06-2022 Completed
4 Floor 15-08-2022 Completed
5 Floor 30-09-2022 Completed
NA 30-06-2023 In process
Ground Floor/Stilt Floor 30-03-2023 Completed
1 Floor 15-05-2023 Completed
2 Floor 30-07-2023 Completed
3 Floor 15-09-2023 Completed
4 Floor 30-10-2023 Completed
5 Floor 15-12-2023 Completed
Electrical Works 30-12-2023 Not Yet Started NA
Concealed Cabling including Plugs & switches 25-12-2023 Not Yet Started NA
Installation & Charging of Transformer 30-02-2024 Not Yet Started NA
Connection to Flats/Apartments 03-03-2024 Not Yet Started NA
PH works 25-01-2024 Not Yet Started NA
Laying of concealed Pipes 15-11-2023 Not Yet Started NA
PH Fittings 15-12-2023 Not Yet Started NA
Overhead Water Tanks 20-04-2024 Not Yet Started NA
Water Supply Connection to all units 30-05-2024 Not Yet Started NA
STP construction and completion 31-05-2024 Not Yet Started NA
Distempering & Colouring of all units and exteriors 30-03-2024 Not Yet Started NA
Fixation of doors and windows 30-02-2024 Not Yet Started NA
Scheduled Date of handing over possession 05-06-2024 Not Yet Started NA
Development of common areas, parks, gardens etc 30-05-2024 Not Yet Started NA
Site Development 30-11-2021 IN PROCESS NA
NA 30-06-2023 IN PROCESS NA
Ground Floor/Stilt Floor 15-02-2022 Completed NA
1 Floor 30-03-2022 Completed NA
2 Floor 15-05-2022 Completed NA
3 Floor 30-06-2022 Completed NA
4 Floor 15-08-2022 Completed NA
5 Floor 30-09-2022 Completed NA
NA 30-06-2023 In process NA
Ground Floor/Stilt Floor 30-03-2023 Completed NA
1 Floor 15-05-2023 Completed NA
2 Floor 30-07-2023 Completed NA
3 Floor 15-09-2023 Completed NA
4 Floor 30-10-2023 Completed NA
5 Floor 15-12-2023 Completed NA
Electrical Works 30-12-2023 Not Yet Started NA
Concealed Cabling including Plugs & switches 25-12-2023 Not Yet Started NA
Installation & Charging of Transformer 30-02-2024 Not Yet Started NA
Connection to Flats/Apartments 03-03-2024 Not Yet Started NA
PH works 25-01-2024 Not Yet Started NA
Laying of concealed Pipes 15-11-2023 Not Yet Started NA
PH Fittings 15-12-2023 Not Yet Started NA
Overhead Water Tanks 20-04-2024 Not Yet Started NA
Water Supply Connection to all units 30-05-2024 Not Yet Started NA
STP construction and completion 31-05-2024 Not Yet Started NA
Distempering & Colouring of all units and exteriors 30-03-2024 Not Yet Started NA
Fixation of doors and windows 30-02-2024 Not Yet Started NA
Scheduled Date of handing over possession 05-06-2024 Not Yet Started NA
Development of common areas, parks, gardens etc 30-05-2024 Not Yet Started NA
Site Development 30-11-2021 IN PROCESS NA
NA 30-06-2023 IN PROCESS NA
Ground Floor/Stilt Floor 15-02-2022 Completed NA
1 Floor 30-03-2022 Completed NA
2 Floor 15-05-2022 Completed NA
3 Floor 30-06-2022 Completed NA
4 Floor 15-08-2022 Completed NA
5 Floor 30-09-2022 Completed NA
NA 30-06-2023 In process NA
Ground Floor/Stilt Floor 30-03-2023 Completed NA
1 Floor 15-05-2023 Completed NA
2 Floor 30-07-2023 Completed NA
3 Floor 15-09-2023 Completed NA
4 Floor 30-10-2023 Completed NA
5 Floor 15-12-2023 Completed NA
Electrical Works 30-12-2023 Work In progress NA
Concealed Cabling including Plugs & switches 25-12-2023 Work In progress NA
Installation & Charging of Transformer 30-02-2024 Work In progress NA
Connection to Flats/Apartments 03-03-2024 Work In progress NA
PH works 25-01-2024 Work In progress NA
Laying of concealed Pipes 15-11-2023 Work In progress NA
PH Fittings 15-12-2023 Work In progress NA
Overhead Water Tanks 20-04-2024 Work In progress NA
Water Supply Connection to all units 30-05-2024 Work In progress NA
STP construction and completion 31-05-2024 Work In progress NA
Distempering & Colouring of all units and exteriors 30-03-2024 Work In progress NA
Fixation of doors and windows 30-02-2024 Work In progress NA
Scheduled Date of handing over possession 05-06-2024 Work In progress NA
Development of common areas, parks, gardens etc 30-05-2024 Work In progress NA
Site Development 30-11-2021 IN PROCESS NA
NA 30-06-2023 IN PROCESS NA
Ground Floor/Stilt Floor 15-02-2022 Completed NA
1 Floor 30-03-2022 Completed NA
2 Floor 15-05-2022 Completed NA
3 Floor 30-06-2022 Completed NA
4 Floor 15-08-2022 Completed NA
5 Floor 30-09-2022 Completed NA
NA 30-06-2023 In process NA
Ground Floor/Stilt Floor 30-03-2023 Completed NA
1 Floor 15-05-2023 Completed NA
2 Floor 30-07-2023 Completed NA
3 Floor 15-09-2023 Completed NA
4 Floor 30-10-2023 Completed NA
5 Floor 15-12-2023 Completed NA
Electrical Works 30-12-2023 Completed NA
Concealed Cabling including Plugs & switches 25-12-2023 Completed NA
Installation & Charging of Transformer 30-02-2024 Work In progress NA
Connection to Flats/Apartments 03-03-2024 Completed NA
PH works 25-01-2024 Work In progress NA
Laying of concealed Pipes 15-11-2023 Work In progress NA
PH Fittings 15-12-2023 Completed NA
Overhead Water Tanks 20-04-2024 Completed NA
Water Supply Connection to all units 30-05-2024 Work In progress NA
STP construction and completion 31-05-2024 Work In progress NA
Distempering & Colouring of all units and exteriors 30-03-2024 Completed NA
Fixation of doors and windows 30-02-2024 Completed NA
Scheduled Date of handing over possession 05-06-2024 Work In progress NA
Development of common areas, parks, gardens etc 30-05-2024 Work In progress NA

Category and no. of units to be developed

:  Residential
:  
:  10
:  
:  
:  
Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership
Carpet Area Balcony Area Exclusive Open Terrace Area
1 101 156.66 17.59 NA Promoter
2 102 157.99 16.67 NA Promoter
3 201 156.66 17.59 NA Promoter
4 202 157.99 16.67 NA Promoter
5 301 156.66 17.59 NA Promoter
6 302 157.99 16.67 NA Promoter
7 401 156.66 17.59 NA Promoter
8 402 157.99 16.67 NA Promoter
9 501 156.66 17.59 NA Promoter
10 502 157.99 16.67 NA Promoter
Types of garages and parking
House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
101 Covered Parking 1 & 2 5.00X2.35 23.50 Included
102 Covered Parking 19 & 20 5.00X2.35 23.50 Included
201 Covered Parking 3 & 4 5.00X2.35 23.50 Included
202 Covered Parking 17 & 18 5.00X2.35 23.50 Included
301 Covered Parking 5 & 6 5.00X2.50 25.00 Included
302 Covered Parking 15 & 16 5.00X2.50 25.00 Included
401 Covered Parking 7 & 8 5.00X2.50 25.00 Included
402 Covered Parking 13 &14 5.00X2.50 25.00 Included
501 Covered Parking 9 & 10 5.00X2.50 25.00 Included
502 Covered Parking 11 & 12 5.00X2.50 25.00 Included
No
NA

Facilities to be provided

Particulars of Facilities Status of the facility Brief description of facility
Drinking Water Facility PHED Copy of NOC Letter
Fire Fighting Facility Yes Hose reel & Fire extinguisher
Emergency Evacuation Services Yes Staircase size-5.30x2.50
Use of Renewable Energy No
Lift Facility Yes 1 lift Will be Provided of Mitsubishi Brand(Size -1.85x1.95mtr)
Market Complex No
Community Hall No
Gymnasium No
Swimming Pool No
Play Ground No
Park/Garden Yes Terrace garden provided(170sq mtr area provided on terrace level)
Plantation Area Yes Tree plantation on the periphery of compound wall & small plants & shrubs planting on terrace level
Others(Please Specify) No
Internal Road Yes 4.00mtr wide drive way
External Road Yes 4.00mtr wide drive way(Existing black top road)
Elecricity Supply Yes Copy of Consent Letter
Other Amenities Yes Party lawn,Senior citizen's deck, Party deck with BBQ counter(These amenities provided on terrace level)

Bank Particulars of the Project

  AXIS BANK
  BHUBANESWAR MAIN BRANCH
  921020045238943
  UTIB0000024
   View
  2530240
  9439316958

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
Prabhat Machhar Architect Ekta Floral, Block-4, Flat-10 C, Kolkata, 700046, Email-prabhat.macchar@yahoo.com, Mob-9748589813 CA/2008/42983
Patitapaban Das Construction Engineer CSPUR,BHUBANESWAR,KHORDHA,ODISHA, Email-pp_structure@yahoo.com, Mob-9437167913 RTP/DTP(ST.ER)-091/2018
J.L.MALOO Chartered Accountant 3/A,Surendra Mohan Ghosh Sarani,2nd floor,kolkata,700001,Mob-9331027066,Email-malooco@yahoo.co.in, Mob-9331027066 310062E

Financial Details

:  750 :   View
  22-05-2024 :  750
:  0 :  0

Documents Attached

Description of Document Option Documents
Fire Safety Certificate Undertaking Attached
Affidavit in Form-A as per clause-l of sub-section-2 of section-4 of the Act Yes Attached
Allotment letter format Yes Attached
Conveyance Deed Format Yes Attached
Affidavit to adopt agreement for sale format as per Rule-8(1) of ORE (R and D) Rules, 2017 Yes Attached
Annual Report 2019-20 Attached
Annual Report 2020-21 Attached
Annual Report 2021-22 Attached
IT Return 2019-20 Attached
IT Return 2020-21 Attached
IT Return 2021-22 Attached
Audit Report 2019-20 Attached
Audit Report 2020-21 Attached
Audit Report 2021-22 Attached

Additional Documents Attached

Sl. No. Title of the document Upload Document
1 Subash Chand Bhura Resignation from managing director of Utkal Builders Ltd.
2 Sarad kumar Baid Joining as Managing Director of Utkal Builders Ltd.
3 Change of Name from Sarad kumar Baid to Sharad Baid
4 Affidavit relating to Change of Name from Sarad kumar Baid to Sharad Baid
5 Pancard of Sharad Baid
6 Passport of Sharad Baid
7 Sale Deed
8 MoA and AoA
9 Board Resolution on Subash Bhura Resignation
10 Board Resolution on Sarad Kumar Baid Change in Position in the company

Other documents

“I undertake that the information submitted by me in this application are correct and true to best my knowledge. I also understand that providing false or wrong information is punishable under the Section-60 of the Real Estate (Regulation & Development) Act, 2016. I also further understand that furnishing wrong or false information will lead to rejection of my application registration of the project with forfeiture of registration fee and other charges deposited by me.”
  The Land was purchased in the name of Utkal Builders Ltd. represented by Managing Director Subash Chand Bhura. After his resignation Sarad kumar Baid joined as Managing director of utkal builders ltd. He changed his name from sarad kumar baid to Sharad Baid. Fire Safety Certificate is not required for this project as the building height is below 15mtrs. We are not taking any Bank Finances for this Project. The deadline of this year IT Return is Dec 2021 so in the box of IT return we have uploaded IT return for the assessment year 2018-19, 2019-20, 2020-21 respectively.

Construction Progress

Updated Construction Progress

SL NO. Description Scheduled date of completion Current Status Remarks
1 Site Development 30-11-2021 IN PROCESS
2 Roof Casting NA NA NA
3 Ground Floor/Stilt Floor 15-02-2022 Not Yet Started NA
4 1 Floor 30-03-2022 Not Yet Started NA
5 2 Floor 15-05-2022 Not Yet Started NA
6 3 Floor 30-06-2022 Not Yet Started NA
7 4 Floor 15-08-2022 Not Yet Started NA
8 5 Floor 30-09-2022 Not Yet Started NA
9 Brick Work & Plastering NA NA NA
10 Ground Floor/Stilt Floor 30-03-2023 Not Yet Started NA
11 1 Floor 15-05-2023 Not Yet Started NA
12 2 Floor 30-07-2023 Not Yet Started NA
13 3 Floor 15-09-2023 Not Yet Started NA
14 4 Floor 30-10-2023 Not Yet Started NA
15 5 Floor 15-12-2023 Not Yet Started NA
16 Electrical Works 30-12-2023 Not Yet Started NA
17 Concealed Cabling including Plugs & switches 25-12-2023 Not Yet Started NA
18 Installation & Charging of Transformer 30-02-2024 Not Yet Started NA
19 Connection to Flats/Apartments 03-03-2024 Not Yet Started NA
20 PH works 25-01-2024 Not Yet Started NA
21 Laying of concealed Pipes 15-11-2023 Not Yet Started NA
22 PH Fittings 15-12-2023 Not Yet Started NA
23 Overhead Water Tanks 20-04-2024 Not Yet Started NA
24 Water Supply Connection to all units 30-05-2024 Not Yet Started NA
25 STP construction and completion 31-05-2024 Not Yet Started NA
26 Distempering & Colouring of all units and exteriors 30-03-2024 Not Yet Started NA
27 Fixation of doors and windows 30-02-2024 Not Yet Started NA
28 Scheduled Date of handing over possession 05-06-2024 Not Yet Started NA
29 Development of common areas, parks, gardens etc 30-05-2024 Not Yet Started NA
Updated Changes on 30-07-2022
30 Site Development 30-11-2021 IN PROCESS
31 NA NA NA NA
32 Ground Floor/Stilt Floor 15-02-2022 Completed
33 1 Floor 30-03-2022 Completed
34 2 Floor 15-05-2022 Completed
35 3 Floor 30-06-2022 Work In Progress
36 4 Floor 15-08-2022 Not Yet Started NA
37 5 Floor 30-09-2022 Not Yet Started NA
38 NA NA NA NA
39 Ground Floor/Stilt Floor 30-03-2023 Work In Progress
40 1 Floor 15-05-2023 Work In Progress
41 2 Floor 30-07-2023 Not Yet Started NA
42 3 Floor 15-09-2023 Not Yet Started NA
43 4 Floor 30-10-2023 Not Yet Started NA
44 5 Floor 15-12-2023 Not Yet Started NA
45 Electrical Works 30-12-2023 Not Yet Started NA
46 Concealed Cabling including Plugs & switches 25-12-2023 Not Yet Started NA
47 Installation & Charging of Transformer 30-02-2024 Not Yet Started NA
48 Connection to Flats/Apartments 03-03-2024 Not Yet Started NA
49 PH works 25-01-2024 Not Yet Started NA
50 Laying of concealed Pipes 15-11-2023 Not Yet Started NA
51 PH Fittings 15-12-2023 Not Yet Started NA
52 Overhead Water Tanks 20-04-2024 Not Yet Started NA
53 Water Supply Connection to all units 30-05-2024 Not Yet Started NA
54 STP construction and completion 31-05-2024 Not Yet Started NA
55 Distempering & Colouring of all units and exteriors 30-03-2024 Not Yet Started NA
56 Fixation of doors and windows 30-02-2024 Not Yet Started NA
57 Scheduled Date of handing over possession 05-06-2024 Not Yet Started NA
58 Development of common areas, parks, gardens etc 30-05-2024 Not Yet Started NA
Updated Changes on 12-07-2023
59 Site Development 30-11-2021 IN PROCESS
60 NA 30-06-2023 IN PROCESS
61 Ground Floor/Stilt Floor 15-02-2022 Completed
62 1 Floor 30-03-2022 Completed
63 2 Floor 15-05-2022 Completed
64 3 Floor 30-06-2022 Completed
65 4 Floor 15-08-2022 Completed
66 5 Floor 30-09-2022 Completed
67 NA 30-06-2023 In process
68 Ground Floor/Stilt Floor 30-03-2023 Completed
69 1 Floor 15-05-2023 Completed
70 2 Floor 30-07-2023 Completed
71 3 Floor 15-09-2023 Completed
72 4 Floor 30-10-2023 Completed
73 5 Floor 15-12-2023 Completed
74 Electrical Works 30-12-2023 Not Yet Started NA
75 Concealed Cabling including Plugs & switches 25-12-2023 Not Yet Started NA
76 Installation & Charging of Transformer 30-02-2024 Not Yet Started NA
77 Connection to Flats/Apartments 03-03-2024 Not Yet Started NA
78 PH works 25-01-2024 Not Yet Started NA
79 Laying of concealed Pipes 15-11-2023 Not Yet Started NA
80 PH Fittings 15-12-2023 Not Yet Started NA
81 Overhead Water Tanks 20-04-2024 Not Yet Started NA
82 Water Supply Connection to all units 30-05-2024 Not Yet Started NA
83 STP construction and completion 31-05-2024 Not Yet Started NA
84 Distempering & Colouring of all units and exteriors 30-03-2024 Not Yet Started NA
85 Fixation of doors and windows 30-02-2024 Not Yet Started NA
86 Scheduled Date of handing over possession 05-06-2024 Not Yet Started NA
87 Development of common areas, parks, gardens etc 30-05-2024 Not Yet Started NA
Updated Changes on 28-08-2023
88 Site Development 30-11-2021 IN PROCESS NA
89 NA 30-06-2023 IN PROCESS NA
90 Ground Floor/Stilt Floor 15-02-2022 Completed NA
91 1 Floor 30-03-2022 Completed NA
92 2 Floor 15-05-2022 Completed NA
93 3 Floor 30-06-2022 Completed NA
94 4 Floor 15-08-2022 Completed NA
95 5 Floor 30-09-2022 Completed NA
96 NA 30-06-2023 In process NA
97 Ground Floor/Stilt Floor 30-03-2023 Completed NA
98 1 Floor 15-05-2023 Completed NA
99 2 Floor 30-07-2023 Completed NA
100 3 Floor 15-09-2023 Completed NA
101 4 Floor 30-10-2023 Completed NA
102 5 Floor 15-12-2023 Completed NA
103 Electrical Works 30-12-2023 Not Yet Started NA
104 Concealed Cabling including Plugs & switches 25-12-2023 Not Yet Started NA
105 Installation & Charging of Transformer 30-02-2024 Not Yet Started NA
106 Connection to Flats/Apartments 03-03-2024 Not Yet Started NA
107 PH works 25-01-2024 Not Yet Started NA
108 Laying of concealed Pipes 15-11-2023 Not Yet Started NA
109 PH Fittings 15-12-2023 Not Yet Started NA
110 Overhead Water Tanks 20-04-2024 Not Yet Started NA
111 Water Supply Connection to all units 30-05-2024 Not Yet Started NA
112 STP construction and completion 31-05-2024 Not Yet Started NA
113 Distempering & Colouring of all units and exteriors 30-03-2024 Not Yet Started NA
114 Fixation of doors and windows 30-02-2024 Not Yet Started NA
115 Scheduled Date of handing over possession 05-06-2024 Not Yet Started NA
116 Development of common areas, parks, gardens etc 30-05-2024 Not Yet Started NA
Updated Changes on 15-01-2024
117 Site Development 30-11-2021 IN PROCESS NA
118 NA 30-06-2023 IN PROCESS NA
119 Ground Floor/Stilt Floor 15-02-2022 Completed NA
120 1 Floor 30-03-2022 Completed NA
121 2 Floor 15-05-2022 Completed NA
122 3 Floor 30-06-2022 Completed NA
123 4 Floor 15-08-2022 Completed NA
124 5 Floor 30-09-2022 Completed NA
125 NA 30-06-2023 In process NA
126 Ground Floor/Stilt Floor 30-03-2023 Completed NA
127 1 Floor 15-05-2023 Completed NA
128 2 Floor 30-07-2023 Completed NA
129 3 Floor 15-09-2023 Completed NA
130 4 Floor 30-10-2023 Completed NA
131 5 Floor 15-12-2023 Completed NA
132 Electrical Works 30-12-2023 Work In progress NA
133 Concealed Cabling including Plugs & switches 25-12-2023 Work In progress NA
134 Installation & Charging of Transformer 30-02-2024 Work In progress NA
135 Connection to Flats/Apartments 03-03-2024 Work In progress NA
136 PH works 25-01-2024 Work In progress NA
137 Laying of concealed Pipes 15-11-2023 Work In progress NA
138 PH Fittings 15-12-2023 Work In progress NA
139 Overhead Water Tanks 20-04-2024 Work In progress NA
140 Water Supply Connection to all units 30-05-2024 Work In progress NA
141 STP construction and completion 31-05-2024 Work In progress NA
142 Distempering & Colouring of all units and exteriors 30-03-2024 Work In progress NA
143 Fixation of doors and windows 30-02-2024 Work In progress NA
144 Scheduled Date of handing over possession 05-06-2024 Work In progress NA
145 Development of common areas, parks, gardens etc 30-05-2024 Work In progress NA
Updated Changes on 15-04-2024
146 Site Development 30-11-2021 IN PROCESS NA
147 NA 30-06-2023 IN PROCESS NA
148 Ground Floor/Stilt Floor 15-02-2022 Completed NA
149 1 Floor 30-03-2022 Completed NA
150 2 Floor 15-05-2022 Completed NA
151 3 Floor 30-06-2022 Completed NA
152 4 Floor 15-08-2022 Completed NA
153 5 Floor 30-09-2022 Completed NA
154 NA 30-06-2023 In process NA
155 Ground Floor/Stilt Floor 30-03-2023 Completed NA
156 1 Floor 15-05-2023 Completed NA
157 2 Floor 30-07-2023 Completed NA
158 3 Floor 15-09-2023 Completed NA
159 4 Floor 30-10-2023 Completed NA
160 5 Floor 15-12-2023 Completed NA
161 Electrical Works 30-12-2023 Completed NA
162 Concealed Cabling including Plugs & switches 25-12-2023 Completed NA
163 Installation & Charging of Transformer 30-02-2024 Work In progress NA
164 Connection to Flats/Apartments 03-03-2024 Completed NA
165 PH works 25-01-2024 Work In progress NA
166 Laying of concealed Pipes 15-11-2023 Work In progress NA
167 PH Fittings 15-12-2023 Completed NA
168 Overhead Water Tanks 20-04-2024 Completed NA
169 Water Supply Connection to all units 30-05-2024 Work In progress NA
170 STP construction and completion 31-05-2024 Work In progress NA
171 Distempering & Colouring of all units and exteriors 30-03-2024 Completed NA
172 Fixation of doors and windows 30-02-2024 Completed NA
173 Scheduled Date of handing over possession 05-06-2024 Work In progress NA
174 Development of common areas, parks, gardens etc 30-05-2024 Work In progress NA

Booking Status

Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership Status
Carpet Area Balcony Area Exclusive Open Terrace Area
1 101 156.66 17.59 NA Promoter
2 102 157.99 16.67 NA Promoter
3 201 156.66 17.59 NA Promoter
4 202 157.99 16.67 NA Promoter
5 301 156.66 17.59 NA Promoter
6 302 157.99 16.67 NA Promoter
7 401 156.66 17.59 NA Promoter
8 402 157.99 16.67 NA Promoter
9 501 156.66 17.59 NA Promoter
10 502 157.99 16.67 NA Promoter

Financial Status

SL No. Funds Collected from the Allottees Funds Borrowed from Financial Institutions Funds Employed from Own Sources Expenditure As On Date Status
1 3400000 0 12040987 15440987 30-06-2022 work in progress
2 7852377 50000000 7006964 64859341 31-01-2023 Work in Progress
3 7523806 50000000 11424163 68947969 30-06-2023 WORK IN PROGRESS
4 8952377.74 50000000 13245657.7 72198035 30-09-2023 Work in progress
5 9428568 50000000 21074500 80503068 31-12-2023 Work In Progrss

Updated Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 I. Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Rule of ODA (Planning & Building Standards) Rules, 2020 18-01-2024 Construction yet to be started
2 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner. 23-03-2024 NA
3 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance, fire tender, physically handicapped persons and outside visitors with signage as per norms, ODA(Planning & Building Standards) Rules-2020. 23-03-2024 NA
4 Atleast 80 sqm per one tree of the land area shall be developed for plantation and landscaping and maintained as per Rules-30. 18-04-2024 Construction yet to be started
5 All the passages around the building shall be developed with permeable pavers block for absorption of rain water and seepage in to the ground. 23-03-2024 NA
6 If the construction I development are not as per the approved plan / deviated beyond permissible norms, the performance security shall be forfeited and action shall be initiated against the applicant/builder / developer as per the provisions of the ODA Act, 1982, Rules and Regularization made there under. 16-03-2024 NA
7 The Owner/ Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/construction defects , Authority will be no way be held responsible for the same in what so ever manner. 23-03-2024 NA
8 The concerned Architect / Applicant / Developer are fully responsible for any deviations additions & alternations beyond approved plan/ defective construction etc. shall be liable for action as per the provisions of the Rule. 23-03-2024 NA
9 The applicant shall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/BOA before commencement of construction. 23-03-2024 NA
10 All the stipulated conditions of the NOC/Clearances given by BMC, PHED, shall be adhered to strictly. All the fire fighting installation etc are to be ensured and maintained by the applicant as per Odisha Fire Prevention and Fire Safety Rules-2017. 22-05-2024 NA
11 No storm water/water shall be discharged to the public road/public premises and other adjoining plots. 03-04-2024 NA
12 The number of dwelling units so approved shall not be changed in any manner. 11-04-2024 NA
Updated Changes on 28-08-2023
13 I. Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Rule of ODA (Planning & Building Standards) Rules, 2020 18-01-2024 Construction yet to be started
14 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner. 23-03-2024 NA
15 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance, fire tender, physically handicapped persons and outside visitors with signage as per norms, ODA(Planning & Building Standards) Rules-2020. 23-03-2024 NA
16 Atleast 80 sqm per one tree of the land area shall be developed for plantation and landscaping and maintained as per Rules-30. 18-04-2024 Construction yet to be started
17 All the passages around the building shall be developed with permeable pavers block for absorption of rain water and seepage in to the ground. 23-03-2024 NA
18 If the construction I development are not as per the approved plan / deviated beyond permissible norms, the performance security shall be forfeited and action shall be initiated against the applicant/builder / developer as per the provisions of the ODA Act, 1982, Rules and Regularization made there under. 16-03-2024 NA
19 The Owner/ Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/construction defects , Authority will be no way be held responsible for the same in what so ever manner. 23-03-2024 NA
20 The concerned Architect / Applicant / Developer are fully responsible for any deviations additions & alternations beyond approved plan/ defective construction etc. shall be liable for action as per the provisions of the Rule. 23-03-2024 NA
21 The applicant shall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/BOA before commencement of construction. 23-03-2024 NA
22 All the stipulated conditions of the NOC/Clearances given by BMC, PHED, shall be adhered to strictly. All the fire fighting installation etc are to be ensured and maintained by the applicant as per Odisha Fire Prevention and Fire Safety Rules-2017. 22-05-2024 NA
23 No storm water/water shall be discharged to the public road/public premises and other adjoining plots. 03-04-2024 NA
24 The number of dwelling units so approved shall not be changed in any manner. 11-04-2024 NA
Updated Changes on 15-01-2024
25 I. Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Rule of ODA (Planning & Building Standards) Rules, 2020 18-01-2024 Construction yet to be started
26 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner. 23-03-2024 Construction yet to be started
27 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance, fire tender, physically handicapped persons and outside visitors with signage as per norms, ODA(Planning & Building Standards) Rules-2020. 23-03-2024 Work In Progress
28 Atleast 80 sqm per one tree of the land area shall be developed for plantation and landscaping and maintained as per Rules-30. 18-04-2024 CoWork In Progress
29 All the passages around the building shall be developed with permeable pavers block for absorption of rain water and seepage in to the ground. 23-03-2024 Work In Progress
30 If the construction I development are not as per the approved plan / deviated beyond permissible norms, the performance security shall be forfeited and action shall be initiated against the applicant/builder / developer as per the provisions of the ODA Act, 1982, Rules and Regularization made there under. 16-03-2024 Work In Progress
31 The Owner/ Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/construction defects , Authority will be no way be held responsible for the same in what so ever manner. 23-03-2024 Work In Progress
32 The concerned Architect / Applicant / Developer are fully responsible for any deviations additions & alternations beyond approved plan/ defective construction etc. shall be liable for action as per the provisions of the Rule. 23-03-2024 Work In Progress
33 The applicant shall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/BOA before commencement of construction. 23-03-2024 Work In Progress
34 All the stipulated conditions of the NOC/Clearances given by BMC, PHED, shall be adhered to strictly. All the fire fighting installation etc are to be ensured and maintained by the applicant as per Odisha Fire Prevention and Fire Safety Rules-2017. 22-05-2024 Work In Progress
35 No storm water/water shall be discharged to the public road/public premises and other adjoining plots. 03-04-2024 Work In Progress
36 The number of dwelling units so approved shall not be changed in any manner. 11-04-2024 Work In Progress
Updated Changes on 15-04-2024
37 I. Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Rule of ODA (Planning & Building Standards) Rules, 2020 18-01-2024 Work In Progress
38 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner. 23-03-2024 Work In Progress
39 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance, fire tender, physically handicapped persons and outside visitors with signage as per norms, ODA(Planning & Building Standards) Rules-2020. 23-03-2024 Completed
40 Atleast 80 sqm per one tree of the land area shall be developed for plantation and landscaping and maintained as per Rules-30. 18-04-2024 Completed
41 All the passages around the building shall be developed with permeable pavers block for absorption of rain water and seepage in to the ground. 23-03-2024 Completed
42 If the construction I development are not as per the approved plan / deviated beyond permissible norms, the performance security shall be forfeited and action shall be initiated against the applicant/builder / developer as per the provisions of the ODA Act, 1982, Rules and Regularization made there under. 16-03-2024 Work In Progress
43 The Owner/ Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/construction defects , Authority will be no way be held responsible for the same in what so ever manner. 23-03-2024 Work In Progress
44 The concerned Architect / Applicant / Developer are fully responsible for any deviations additions & alternations beyond approved plan/ defective construction etc. shall be liable for action as per the provisions of the Rule. 23-03-2024 Work In Progress
45 The applicant shall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/BOA before commencement of construction. 23-03-2024 Work In Progress
46 All the stipulated conditions of the NOC/Clearances given by BMC, PHED, shall be adhered to strictly. All the fire fighting installation etc are to be ensured and maintained by the applicant as per Odisha Fire Prevention and Fire Safety Rules-2017. 22-05-2024 Work In Progress
47 No storm water/water shall be discharged to the public road/public premises and other adjoining plots. 03-04-2024 Completed
48 The number of dwelling units so approved shall not be changed in any manner. 11-04-2024 Completed

Updated Project Documents

Sl. No. Title of the document Upload Document
1 Permorma-1
2 Permorma-2
3 Proforma-I
4 Proforma-II
5 Proforma-III
6 CGWA NOC
:  RAKESH BHURA :  
NA :  AMUPB1558Q
:PAN Card :  rakesh@utkalbuilders.com
:  MBA :  9439775555
:  9YEARS OF EXPERIENCE IN REAL ESTATE SECTOR
:  Yes :  NA
:  SHARAD BAID :  
NA :  ADEPB3155G
:PAN Card :  sharad@utkalbuilders.com
:  MBA :  9437555111
:  22 years of experience in real estate sector
:  Yes :  NA
:  SANDEEP BAID :  
NA :  AHAPB1488J
:PAN Card :  info@utkalbuilders.com
:  MBA :  7504456602
:  17 years of experience in real estate sector
:  Yes :  NA
:  ANJANA DEVI BHURA :  
NA :  ADGPB7561C
:PAN Card :  info@utkalbuilders.com
:  B.COM :  8018676454
:  12 YEARS OF EXPERIENCE IN REAL ESTE SECTOR
:  Yes :  NA

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
Prabhat Machhar Architect Ekta Floral, Block-4, Flat-10 C, Kolkata, 700046, Email-prabhat.macchar@yahoo.com, Mob-9748589813 CA/2008/42983
Patitapaban Das Construction Engineer CSPUR,BHUBANESWAR,KHORDHA,ODISHA, Email-pp_structure@yahoo.com, Mob-9437167913 RTP/DTP(ST.ER)-091/2018
J.L.MALOO Chartered Accountant 3/A,Surendra Mohan Ghosh Sarani,2nd floor,kolkata,700001,Mob-9331027066,Email-malooco@yahoo.co.in, Mob-9331027066 310062E

Updated Units

House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
Updated Changes
101 Covered Parking 1 & 2 5.00X2.35 23.50 Included
102 Covered Parking 19 & 20 5.00X2.35 23.50 Included
201 Covered Parking 3 & 4 5.00X2.35 23.50 Included
202 Covered Parking 17 & 18 5.00X2.35 23.50 Included
301 Covered Parking 5 & 6 5.00X2.50 25.00 Included
302 Covered Parking 15 & 16 5.00X2.50 25.00 Included
401 Covered Parking 7 & 8 5.00X2.50 25.00 Included
402 Covered Parking 13 &14 5.00X2.50 25.00 Included
501 Covered Parking 9 & 10 5.00X2.50 25.00 Included
502 Covered Parking 11 & 12 5.00X2.50 25.00 Included

Generated by pacms.orera.in on date: 2024-05-10