1 |
THE SUB-DIVISION OF LAND SHALL BE USED EXCLUSIVELY FOR RESIDENTIAL PURPOSE AND THE USES SHALL NOT BE CHANGED TO ANY OTHER USE WITHOUT PRIOR APPROVAL OF THIS AUTHORITY. |
04-12-2026 |
NOT STARTED |
2 |
THE LAND OVER WHICH SUB-DIVISIONAL LAYOUT IS PROPOSED SHALL BE ACCESSIBLE BY AN APPROVED MEANS OF ACCESS OF 9.14 MTR. IN WIDTH. |
04-12-2026 |
NOT STARTED |
3 |
THE APPLICANT SHALL CONSTRUCT THE DRAIN TILL THE PUBLIC DISPOSAL POINT. |
04-12-2026 |
NOT STARTED |
4 |
INTERNAL ROAD AND AREA FOR WIDENING OF APPROACH ROAD SHALL BE IN THE NATURE OF PUBLIC THOROUGHFARE AND SHALL NOT BE BLOCKED BY ANY BOUNDARY WALL/GATE/ PHYSICAL OBSTRUCTION. |
04-12-2026 |
NOT STARTED |
5 |
THE WATER SUPPLY, ELECTRICITY, INTERNAL ROADS AND DRAINS SHALL BE DEVELOPED AND PROVIDED BY THE APPLICANT AT HIS OWN COST AND TRANSFERRED TO RESPECTIVE GOVERNMENT AGENCIES FOR FURTHER MAINTENANCE. |
04-12-2026 |
NOT STARTED |
6 |
PLANTATION ALONG THE INTERNAL ROADS IS TO BE MADE BEFORE DELIVERING THE SUB-PLOTS. |
04-12-2026 |
NOT STARTED |
7 |
ALL ROAD SIDE DRAINS ARE TO BE DEVELOPED MAINTAINING PROPER SLOPE SO AS TO CONVEY STORM WATER TO THE PUBLIC DRAIN WITH INTIMATION TO BDA FOR VERIFICATION. |
04-12-2026 |
NOT STARTED |
8 |
ALL THE LAYOUT ROADS SHALL BE DEVELOPED WITH PERMEABLE PAVERS BLOCK ALONG WITH RECHARGING PITS OF ADEQUATE CAPACITY SHALL BE DEVELOPED TO MINIMIZE THE STORM WATER RUNOFF TO THE DRAIN. |
04-12-2026 |
NOT STARTED |
9 |
ALL THE SUB-PLOTS SHALL BE DEMARCATED STRICTLY AS PER THE APPROVED PLAN. |
04-12-2026 |
NOT STARTED |
10 |
THE APPLICANT SHALL MAKE OWN ARRANGEMENT OF SOLID WASTE MANAGEMENT THROUGH MICRO COMPOSTING PLANT WITHIN THE PROJECT PREMISES AS SHOWN IN THE LAYOUT PLAN. |
04-12-2026 |
NOT STARTED |
11 |
APPROVAL OF PLANS AND ACCEPTANCE OF ANY STATEMENT OR DOCUMENT PERTAINING TO SUCH PLAN SHALL NOT ABSOLVE THE OWNER OR REGISTERED TECHNICAL PERSON OR ARCHITECT UNDER WHOSE SUPERVISION THE BUILDINGS ARE CONSTRUCTED FROM THEIR RESPONSIBILITIES IMPOSED UNDER ODA (PLANNING & BUILDING STANDARDS) RULES, 2020 OR UNDER ANY OTHER LAW FOR THE TIME BEING IN FORCE. |
04-12-2026 |
NOT STARTED |
12 |
NEITHER GRANTING OF THE PERMIT NOR THE APPROVAL OF THE DRAWINGS AND SPECIFICATIONS, NOR INSPECTIONS MADE BY THE AUTHORITY DURING ERECTION OF THE BUILDINGS SHALL IN ANY WAY RELIEVE THE OWNER OF SUCH BUILDINGS FROM FULL RESPONSIBILITY FOR CARRYING OUT THE WORK IN ACCORDANCE WITH THE REQUIREMENTS OF NBC 2005 AND THESE RULES. |
04-12-2026 |
NOT STARTED |
13 |
APPROVAL OF PLAN SHALL MEAN GRANTING OF PERMISSION TO CONSTRUCT UNDER THESE RULES IN FORCE ONLY AND SHALL NOT MEAN AMONG OTHER THINGS.-A.THE TITLE OVER THE LAND OR BUILDINGS; B.EASEMENT RIGHTS; C.VARIATION IN AREA FROM RECORDED AREA OF A PLOT OR A BUILDING; D.STRUCTURAL STABILITY; E.WORKMANSHIP AND SOUNDNESS OF MATERIALS USED IN THE CONSTRUCTION OF THE BUILDINGS; F. QUALITY OF BUILDING SERVICES AND AMENITIES IN THE CONSTRUCTION OF THE BUILDINGS; G. THE SITE/AREA LIABLE TO FLOODING AS A RESULT OF NOT TAKING ARRANGEMENT AS PER THE NATURAL LAY OF THE LAND ETC. AND PROPER DRAINAGE. H. OTHER REQUIREMENTS OR LICENSES OR CLEARANCES REQUIRED TO BE OBTAINED FOR THE SITE /PREMISES OR ACTIVITY UNDER VARIOUS OTHER LAWS. |
04-12-2026 |
NOT STARTED |
14 |
PERMIT THE AUTHORITY TO ENTER THE LAYOUT OR PREMISES, FOR WHICH THE PERMISSION HAS BEEN GRANTED AT ANY REASONABLE TIME FOR THE PURPOSE OF ENFORCING THE RULES/REGULATIONS; |
04-12-2026 |
NOT STARTED |
15 |
GIVE WRITTEN NOTICE TO THE AUTHORITY BEFORE COMMENCEMENT OF WORK ON BUILDING SITE IN FORM-V, PERIODIC PROGRESS REPORT IN FORM-VII, NOTICE OF COMPLETION IN FORM-VI AND NOTICE IN CASE OF TERMINATION OF SERVICES OF TECHNICAL PERSONS ENGAGED BY HIM. |
04-12-2026 |
NOT STARTED |
16 |
OBTAIN OCCUPANCY CERTIFICATE FROM THE AUTHORITY PRIOR TO OCCUPATION OF BUILDINGS IN FULL OR PART. |
04-12-2026 |
NOT STARTED |
17 |
WHEREVER TESTS OF ANY MATERIAL ARE MADE TO ENSURE CONFORMITY OF THE REQUIREMENTS OF THE RULES/REGULATIONS IN FORCE, RECORDS OF THE TEST DATA SHALL BE KEPT AVAILABLE FOR INSPECTION DURING THE CONSTRUCTION OF BUILDINGS AND FOR SUCH PERIOD THEREAFTER AS REQUIRED BY THE AUTHORITY. |
04-12-2026 |
NOT STARTED |
18 |
ADHERE TO THE PROVISIONS OF ODA (PLANNING & BUILDING STANDARDS) RULES, 2020, STRICTLY AND CONDITIONS THERETO. |
04-12-2026 |
NOT STARTED |
19 |
THE PLINTH LEVEL OF THE BUILDING SHALL BE RAISED 2 FT ABOVE THE HIGH FLOOD LEVEL (HFL). |
04-12-2026 |
NOT STARTED |
20 |
NO STORM WATER SHALL BE DISCHARGED TO THE PUBLIC ROAD/PUBLIC PREMISES AND OTHER ADJOINING PLOTS. |
04-12-2026 |
NOT STARTED |
21 |
RAIN WATER HARVESTING STRUCTURE AND RECHARGING PITS OF ADEQUATE CAPACITY SHALL BE DEVELOPED THROUGH MICRO-COMPOST UNIT. |
04-12-2026 |
NOT STARTED |
22 |
DRAINAGE SHALL BE DISCHARGED UP TO THE PUBLIC DISPOSAL POINT THROUGH OWN ARRANGEMENT. |
04-12-2026 |
NOT STARTED |
23 |
THE APPLICANT SHALL PROVIDE MICRO-COMPOSTING SITE/PLANT WITHIN THE PROJECT PREMISES TO MAKE OWN ARRANGEMENT OF SOLID WASTE MANAGEMENT. |
04-12-2026 |
NOT STARTED |
24 |
THE SITE/AREA LIABLE TO FLOODING AS A RESULT OF NOT TAKING PROPER DRAINAGE ARRANGEMENT AS PER THE NATURAL LAY OF THE LAND, ETC AND |
04-12-2026 |
NOT STARTED |
25 |
PLANTATION @ ONE TREE PER 80 SQ.M. OF THE PLOT AREA SHALL BE MADE BY THE APPLICANT AS PER ODA (PLANNING & BUILDING STANDARDS) RULES, 2020. |
04-12-2026 |
NOT STARTED |
26 |
AFTER SUB-DIVISION PLAN HAS BEEN APPROVED, THE AUTHORITY SHALL NOT PERMIT CONSTRUCTION OF BUILDING OVER THE INDIVIDUAL SUB-PLOTS, UNLESS THE DEVELOPER HAS LAID DOWN AND MAKE STREETS ALONG WITH STORM WATER DRAINS AS PER THE APPROVED PLAN AND CONSTRUCTS THE DRAIN TILL THE PUBLIC DISPOSAL POINT. |
04-12-2026 |
NOT STARTED |
27 |
THE APPLICANT SHALL OBTAIN THE REGISTRATION FROM ORERA AS PER AFFIDAVIT SUBMITTED ON DTD.27.10.23. THE AREA UNDER COMMUNITY FACILITIES ( 332.57SQM.) IS TO BE HANDED OVER TO THE RWA FOR MAINTENANCE. |
04-12-2026 |
NOT STARTED |
28 |
THE APPLICANT SHALL FREE GIFT THE INTERNAL ROAD (3321.77 SQ.M) AND OPEN SPACE AREA (494.11 SQ.M) TO THE SECRETARY, BHUBANESWAR DEVELOPMENT AUTHORITY, BHUBANESWAR BY WAY OF GIFT DEED BEFORE SELLING OF SUB-PLOTS. |
04-12-2026 |
NOT STARTED |
29 |
THE APPLICANT SHALL DEVELOP EXTERNAL INFRASTRUCTURE AS MEMO NO.PER EXTERNAL INFRASTRUCTURE DEVELOPMENT PLAN SUBMITTED ON DT.27.10.23. IN CASE OF CONTRAVENTION OF THE AFORESAID CONDITION OF THE PERMISSION, THE LAYOUT PLAN SO APPROVED SHALL BE REVOKED AND DEEMED TO BE AN UNAUTHORIZED LAYOUT. |
04-12-2026 |
NOT STARTED |