Promoter Details
Promoter Name :
RUPAK PANDA
Project Name :
SKYTECH ASTHA
Project Location :
(Sub-divisional layout with one S+5 storied Residential (MlG) Apartment building and one G+2 storied Residential Building, No. of Units- 31)

Form- I

A. Promoter's Details

:  M/S. SKYTECH INFRAPROJECTS PVT. LTD :  Private Company
:   U45201OR2011PTC013811 :View
NA :  Plot No.- 241, Saheed Nagar, Bhubaneswar, Dist- Khordha, Odisha. Em
:  Plot No.-241, Saheed Nagar, Bhubaneswar, Dist- Khordha, Odisha-751007 IN. :  rupak@rpassociates.in
:  9437008609
:  AAQCS0386Q :View
:  11 years of experience in Odisha :  No experience outside Odisha
NA

B. Details of Board of Directors / Partners / MC Members

:  RUPAK PANDA :  
:  Managing Director :  AGGPP0708G
:PAN Card :  rupak@rpassociates.in
:   B. Tech :  9437008609
:  11 years
:  Yes :  NA
:  Sonali Panda :  
:  Director :  AVWPP6179N
:PAN Card :  rupak@rpassociates.in
:  M.A in Mathematics :  9437697342
:  8 years
:  Yes :  NA

Annexure-1

Details of last projects already implemented (Ongoing or Complete)

Have you implemented any project(s) previously (May be Ongoing or Completed):No

Annexure-2

Details of the project to be registered

:   New :  SKYTECH ASTHA
:  Residential :  (Sub-divisional layout with one S+5 storied Residential (MlG) Apartment building and one G+2 storied Residential Building, No. of Units- 31)
:  Khordha :  Bhubaneswar
:  754005 :  Development Authority
:  BHUBANESWAR DEVELOPMENT AUTHORITY
:  S+5 RESIDENTIAL (MIG) BUILDING & ONE G+2 RESIDENTIAL BUIDLING :  NA

Land Details of the Project


:  1415 :  511/2761
:  RAGHUNATHPURJALI :  1619
:  Yes
No :  View
:  View
:  Other Person
:  SOUMENDRA PRASAD MOHANTY & OTHERS :  THE LAND OWNER HAS EXECUTED DEVELOPMENT AGREEMENT WITH THE PROMOTER SKYTECH INFRAPROJECTS PVT LTD. THE PROMOTER IS ALSO A REGISTERED POWER HOLDER OF THE LAND
: No
: Yes
:  11082100411 :  11-01-2021
:  SUB-REGISTRAR, KHURDA :  Attached

:  1416 :  511/2761
:  RAGHUNATHPURJALI :  202
:  Yes
No :  View
:  View
:  Other Person
:  SOUMENDRA PRASAD MOHANTY & OTHERS :  THE LAND OWNER HAS EXECUTED DEVELOPMENT AGREEMENT WITH THE PROMOTER SKYTECH INFRAPROJECTS PVT LTD. THE PROMOTER IS ALSO A REGISTERED POWER HOLDER OF THE LAND
: No
: Yes
:  11082100411 :  11-01-2021
:  SUB-REGISTRAR, KHURDA :  Attached

Development Agreement

: Yes
Serial No. Particulars of the Person Land/Plot Details Share of the Person Document Attached
1 SOUMENDRA PRASAD MOHANTY & OTHERS PLOT NO. 1415 AND 1416 KHATA NO. 511/2761 42%   Agreement Copy

Building Plan

  View   View
  Download site plan 02-05-2026
02-05-2026

Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 Parking space measuring 830.81 Sq.m as shown in the approved plan shall be exclusively used for parking of vehicles and no part of it will be used for any other purpose. 30-07-2023 NOT STARTED
2 The land over which construction is proposed is accessible by an approved means of access of 9.14 Mtr in width. 31-07-2023 NOT STARTED
3 The applicant shall submit Fire Safety Gertificate before issue of the Occupancy Certificate. 31-07-2023 NOT STARTED
4 The land over which construction is proposed is accessible by an approved means of access of 9.14 Mtr in width. 31-07-2023 NOT STARTED
5 The applicant shall free gift XXX sq.mtr. of located in the XXX Municipal Corporaiion/Municipality/ NAC/Grama panchayat for the widening of the road/construction of 4. 5. b. 7. 1. AREA STATEMENT (in Sq m); Building Plan for G+2 storied Residential building over Sub-plot No.3 (Sub-Plot area: 202.41 Sq.m) G+2 storied Residential Building over Subplot no.2 Floor (A) FAR Area (in Sq.m) (B) FAR Exempted Area (in Sq.m) (C=A+B) TotalArea (in Sq.m) Ground Floor 122.32 122.32 1't Floor 122.32 122.32 2nd Floor 59.83 59.83 Total 304.47 304.47 Total Built-up Area: 304.47 Sq.m Total FAR Area: 304.47 Sq.m Total Dwelling Units 1 nos No of Trees 3 Nos Total F.A.R. 1.50 Height of the Building: 9.15 meter 31-07-2023 NOT STARTED
6 Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the provisions of the Rules/ regulations; 31-07-2023 NOT STARTED
7 Obtain, wherever applicable from the competent Authority permissions/clearance required in connection with the proposed work; 31-07-2023 NOT STARTED
8 Submit stage-wise construction report. Penalty shall be imposed as per Rule 14 of oDA (P&BS) Rules, 2020in case of non-submission of the same. 31-07-2023 NOT STARTED
9 Engage an Accredited person for third party verification at plinth and ground floor roof Ievel of the apartment buildino. Upon detection of unauthorised construction in the Third Party Verification report, the applicant shall be imposed a fine as prescribed under sub-rule (3) of Rule 15 of ODA (P&BS Rules, ZO2O. 31-07-2023 NOT STARTED
10 Ensure that the Completion Certificate in Form XVll (as appended to ODA (CAF) Rules, 2016) is issued by the Project Management Organisaiion engaged by him on completion of the building for submission of the same io the Authoriiy for verification and issuance of Occupancy Certificate. 31-07-2023 NOT STARTED
11 Obtain an occupancy Certificate from the Authority prior to occupation of building in full or part. 31-07-2023 NOT STARTED
12 Ensure compliance of provision of various Acts, rules, regulations and codes which control or provide for various norms governing developmeni including but not limited to planning norms, fire safety norms, environmehtal norms, as applicable in each case. 31-07-2023 NOT STARTED
13 The plinth level of the building shall be raised 2 ft above the High Flood Level (HFL). 31-07-2023 NOT STARTED
14 The number of dwelling units so approved shall not be changed in any manner without prior approval under section 16 of the ODA Act, 1982 31-07-2023 NOT STARTED
15 No storm water shall be discharged to the public road/public premises and other adjoining plots. 31-07-2023 NOT STARTED
16 Storm water from the premises or roof top shall be conveyed and discharged to the rain water recharging pits as per Rules-47 of ODA (Planning & Building Standards) Rules, 2O2O' 31-07-2023 NOT STARTED
17 Rooftop Solar Energy lnstallation shall be provided as per Rule 48 of ODA (Planning & Building Standards) Rules, 2020 31-07-2023 NOT STARTED
18 The space which is meant for parking shall not be changed to any other use and shall not be partitionediclosed in any manner. 31-07-2023 NOT STARTED
19 Ageast .O% ofparking in housing project/apartment building shall be earmarked for visitors and shall be open to Jil visitor. ,i'p.i norms under sub-rule (12) of Rule 37 of oDA (P&BS) Rules 2020. 31-07-2023 NOT STARTED
20 Aileast 50% of the open space shall be pervious and plantation @ one tree per 80 sq.[tl. of the plot area shail be made by the applicant as per provision under Rule-30 of ODA (P&BS) Rules, 2020. 31-07-2023 NOT STARTED
21 Rainwater harvesting structures shall be provided within the premises for collection and use of rooftop rainwater Rule 47of oDA (P&BS) Rules, 2020. 31-07-2023 NOT STARTED
22 Groundwater recharging pits shall be provided @ 6 cubic meters for every 100 square meter of roof area aJper Rule 47of ODA (P&BS) Rules, 2020. 31-07-2023 NOT STARTED
23 All the passages around the building shall be developed with permeable paver blocks for percolation of rain water to the ground' 31-07-2023 NOT STARTED
24 STp and other utilities, if provided within minimum setback area shall not be allowed above ground level and shail only be constructed below ground level; and the same shall be Ippropriately covered for movement of vehicle/people above it. 31-07-2023 NOT STARTED
25 Guard room, electric cabin, sub-station, atea for generator set, ATM, etc, if provided shall not be allowed within minimum setback area' 31-07-2023 NOT STARTED
26 The applicant shall provide micro-composting site/plant within the project premises to make own arrangement of solid waste management' 31-07-2023 NOT STARTED
27 The applicant shall obtain- rnfrastructural specification and subsequent clearance with regard to development of infrastructure for EIDP before commencemJnt Jconstruction. 31-07-2023 NOT STARTED
28 The applicant shall execute_the EIDP approved by C.E.-cum-E.M. BDA in accordance with Clause no' 3.2.4 of the- SoP for Approval of External lnfrastructure Devetopment plan (EIDP) and deposit of External lnfrastructure Development ree in case or Urban Local Bodies and Rural Local Bodies located within Bhubaneswa, oeretopm-ent Rrea issued vide no. 2360/BDA dtd 18.01.2021.After completion of the external infrastructure, the applicant shall obtain the written recommendation of the-EIDP committee regarding satisfactory "orpi"tion as per the approved or infrastructure ErDp. The appricani shal appry for iisue oi ttoc-rro, Engineer Member, BDA after recommendation of tne committl" o.;r;";y 'c;ificate issued only after obtaining shal be the Noc from Engineer Member, BDA in accordance with Clause 3.2.6. 31-07-2023 NOT STARTED
29 The applicant shall obtarn oRERA registration as per the affidavit submitted by applicant and submit the oREM Registration certificate at the time or suomission oi apptication for issue of Occupancy Certificite. 31-07-2023 NOT STARTED
30 The ..owner/applicanuTechnical Person shall stricfly adhere to the terms and conditions imposed in the Noc / crearances grven oy pubiic ie;ril Engineering organisation (PHEo) vide their letter no 14051 cate-o oe os.zozz, ceniili'crouno water Authoritv (CGWA) vide their letter no cGWA/Noc/tNF toRtct2o22l16367 dated 20 '09 2022' fire safety Recommendation no RECoMM 1204130052022000695 dated 14.07.2022. 31-07-2023 NOT STARTED
31 All the stipurated conditions of Noc given by any pubric agency required for approval shall be adhered to stricfly. 31-07-2023 NOT STARTED

Layout Plan

: Yes :  View

Location Map with geo-coordinates of bend points

Point No. Latitude Longitude
1 20°22'01.8"N 85°49'29.2"E
2 20°22'02.1"N 85°49'28.4"E
3 20°22'01.6"N 85°49'28.1"E
4 20°22'01.6"N 85°49'27.8"E
5 20°22'01.8"N 85°49'27.8"E
6 20°22'02.2"N 85°49'28.0"E
7 20°22'02.8"N 85°49'28.3"E
8 20°22'03.0"N 85°49'28.6"E
9 20°22'03.3"N 85°49'28.7"E
10 20°22'03.2"N 85°49'29.6"E
11 20°22'02.7"N 85°49'29.4"E
View

Milestone of Project Construction

Description* Scheduled date of completion Current Status Site Images
Site Development 31-08-2023 IN PROGRESS
Roof Casting NA NA NA
Ground Floor/Stilt Floor 30-11-2023 NOT STARTED NA
1 Floor 31-01-2024 NOT STARTED NA
2 Floor 31-03-2024 NOT STARTED NA
3 Floor 31-05-2024 NOT STARTED NA
4 Floor 31-07-2024 NOT STARTED NA
5 Floor 30-09-2024 NOT STARTED NA
Brick Work & Plastering NA NA NA
Ground Floor/Stilt Floor 31-05-2024 NOT STARTED NA
1 Floor 31-07-2024 NOT STARTED NA
2 Floor 30-09-2024 NOT STARTED NA
3 Floor 30-11-2024 NOT STARTED NA
4 Floor 31-01-2025 NOT STARTED NA
5 Floor 31-03-2025 NOT STARTED NA
Electrical Works 30-09-2025 NOT STARTED NA
Concealed Cabling including Plugs & switches 30-09-2025 NOT STARTED NA
Installation & Charging of Transformer 30-09-2025 NOT STARTED NA
Connection to Flats/Apartments 30-09-2025 NOT STARTED NA
PH works 31-03-2026 NOT STARTED NA
Laying of concealed Pipes 31-03-2026 NOT STARTED NA
PH Fittings 31-03-2026 NOT STARTED NA
Overhead Water Tanks 31-03-2026 NOT STARTED NA
Water Supply Connection to all units 31-03-2026 NOT STARTED NA
STP construction and completion 31-03-2026 NOT STARTED NA
Distempering & Colouring of all units and exteriors 30-04-2026 NOT STARTED NA
Fixation of doors and windows 31-05-2026 NOT STARTED NA
Scheduled Date of handing over possession 30-06-2026 NOT STARTED NA
Development of common areas, parks, gardens etc 31-05-2026 NOT STARTED NA
Site Development 31-08-2023 IN PROGRESS NA
NA NA NA NA
Ground Floor/Stilt Floor 30-11-2023 NOT STARTED NA
1 Floor 31-01-2024 NOT STARTED NA
2 Floor 31-03-2024 NOT STARTED NA
3 Floor 31-05-2024 NOT STARTED NA
4 Floor 31-07-2024 NOT STARTED NA
5 Floor 30-09-2024 NOT STARTED NA
NA NA NA NA
Ground Floor/Stilt Floor 31-05-2024 NOT STARTED NA
1 Floor 31-07-2024 NOT STARTED NA
2 Floor 30-09-2024 NOT STARTED NA
3 Floor 30-11-2024 NOT STARTED NA
4 Floor 31-01-2025 NOT STARTED NA
5 Floor 31-03-2025 NOT STARTED NA
Electrical Works 30-09-2025 NOT STARTED NA
Concealed Cabling including Plugs & switches 30-09-2025 NOT STARTED NA
Installation & Charging of Transformer 30-09-2025 NOT STARTED NA
Connection to Flats/Apartments 30-09-2025 NOT STARTED NA
PH works 31-03-2026 NOT STARTED NA
Laying of concealed Pipes 31-03-2026 NOT STARTED NA
PH Fittings 31-03-2026 NOT STARTED NA
Overhead Water Tanks 31-03-2026 NOT STARTED NA
Water Supply Connection to all units 31-03-2026 NOT STARTED NA
STP construction and completion 31-03-2026 NOT STARTED NA
Distempering & Colouring of all units and exteriors 30-04-2026 NOT STARTED NA
Fixation of doors and windows 31-05-2026 NOT STARTED NA
Scheduled Date of handing over possession 30-06-2026 NOT STARTED NA
Development of common areas, parks, gardens etc 31-05-2026 NOT STARTED NA
Site Development 31-08-2023 IN PROGRESS NA
NA NA NA NA
Ground Floor/Stilt Floor 30-11-2023 NOT STARTED NA
1 Floor 31-01-2024 NOT STARTED NA
2 Floor 31-03-2024 NOT STARTED NA
3 Floor 31-05-2024 NOT STARTED NA
4 Floor 31-07-2024 NOT STARTED NA
5 Floor 30-09-2024 NOT STARTED NA
NA NA NA NA
Ground Floor/Stilt Floor 31-05-2024 NOT STARTED NA
1 Floor 31-07-2024 NOT STARTED NA
2 Floor 30-09-2024 NOT STARTED NA
3 Floor 30-11-2024 NOT STARTED NA
4 Floor 31-01-2025 NOT STARTED NA
5 Floor 31-03-2025 NOT STARTED NA
Electrical Works 30-09-2025 NOT STARTED NA
Concealed Cabling including Plugs & switches 30-09-2025 NOT STARTED NA
Installation & Charging of Transformer 30-09-2025 NOT STARTED NA
Connection to Flats/Apartments 30-09-2025 NOT STARTED NA
PH works 31-03-2026 NOT STARTED NA
Laying of concealed Pipes 31-03-2026 NOT STARTED NA
PH Fittings 31-03-2026 NOT STARTED NA
Overhead Water Tanks 31-03-2026 NOT STARTED NA
Water Supply Connection to all units 31-03-2026 NOT STARTED NA
STP construction and completion 31-03-2026 NOT STARTED NA
Distempering & Colouring of all units and exteriors 30-04-2026 NOT STARTED NA
Fixation of doors and windows 31-05-2026 NOT STARTED NA
Scheduled Date of handing over possession 30-06-2026 NOT STARTED NA
Development of common areas, parks, gardens etc 31-05-2026 NOT STARTED NA

Category and no. of units to be developed

:  Residential
:  
:  31
:  
:  
:  
Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership
Carpet Area Balcony Area Exclusive Open Terrace Area
1 101 80.2 10.88 0 Promoter
2 102 82.99 9.2 0 Promoter
3 103 73.04 6.31 0 Promoter
4 104 94.79 13.33 0 Promoter
5 105 74.25 5 0 Promoter
6 106 108.82 11.24 0 Promoter
7 201 80.2 10.88 0 Land Owner
8 202 82.99 9.2 0 Promoter
9 203 73.04 6.31 0 Land Owner
10 204 94.79 13.33 0 Land Owner
11 205 74.25 5 0 Promoter
12 206 108.82 11.24 0 Promoter
13 301 80.2 10.88 0 Land Owner
14 302 82.99 9.2 0 Promoter
15 303 73.04 6.31 0 Land Owner
16 304 94.79 13.33 0 Land Owner
17 305 74.25 5 0 Promoter
18 306 108.82 11.24 0 Promoter
19 401 80.2 10.88 0 Promoter
20 402 82.99 9.2 0 Promoter
21 403 73.04 6.31 0 Land Owner
22 404 94.79 13.33 0 Land Owner
23 405 74.25 5 0 Land Owner
24 406 108.82 11.24 0 Land Owner
25 501 80.2 10.88 0 Land Owner
26 502 82.99 9.2 0 Promoter
27 503 73.04 6.31 0 Land Owner
28 504 94.79 13.33 0 Land Owner
29 505 74.25 5 0 Land Owner
30 506 108.82 11.24 0 Promoter
31 001-TRIPLEX 245.53 19.33 0 Promoter
Types of garages and parking
House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
101 Covered Parking 101 4 M x 3 M 12 SQM Included
102 Covered Parking 102 4 M x 3 M 12 SQM Included
103 Covered Parking 103 4 M x 3 M 12 SQM Included
104 Covered Parking 104 4 M x 3 M 12 SQM Included
105 Covered Parking 105 4 M x 3 M 12 SQM Included
106 Covered Parking 106 4 M x 3 M 12 SQM Included
201 Covered Parking 201 4 M x 3 M 12 SQM Included
202 Covered Parking 202 4 M x 3 M 12 SQM Included
203 Covered Parking 203 4 M x 3 M 12 SQM Included
204 Covered Parking 204 4 M x 3 M 12 SQM Included
205 Covered Parking 205 4 M x 3 M 12 SQM Included
206 Covered Parking 206 4 M x 3 M 12 SQM Included
301 Covered Parking 301 4 M x 3 M 12 SQM Included
302 Covered Parking 302 4 M x 3 M 12 SQM Included
303 Covered Parking 303 4 M x 3 M 12 SQM Included
304 Covered Parking 304 4 M x 3 M 12 SQM Included
305 Covered Parking 305 4 M x 3 M 12 SQM Included
306 Covered Parking 306 4 M x 3 M 12 SQM Included
401 Covered Parking 401 4 M x 3 M 12 SQM Included
402 Covered Parking 402 4 M x 3 M 12 SQM Included
403 Covered Parking 403 4 M x 3 M 12 SQM Included
404 Covered Parking 404 4 M x 3 M 12 SQM Included
405 Covered Parking 405 4 M x 3 M 12 SQM Included
406 Covered Parking 406 4 M x 3 M 12 SQM Included
501 Covered Parking 501 4 M x 3 M 12 SQM Included
502 Covered Parking 502 4 M x 3 M 12 SQM Included
503 Covered Parking 503 4 M x 3 M 12 SQM Included
504 Covered Parking 504 4 M x 3 M 12 SQM Included
505 Covered Parking 505 4 M x 3 M 12 SQM Included
506 Covered Parking 506 4 M x 3 M 12 SQM Included
001-TRIPLEX Covered Parking PARKING AT PORTICO 5 M x 3.5 M 17.5 SQM Included
Yes

Facilities to be provided

Particulars of Facilities Status of the facility Brief description of facility
Drinking Water Facility Ground Water Copy of Consent Letter
Fire Fighting Facility Yes STAIRCASE, SPRINKLER, FIRE EXTINGUISHER
Emergency Evacuation Services Yes STAIRCASE
Use of Renewable Energy No
Lift Facility Yes 2 NOS. OF LIFT OF JHONSON/OTIS/ECE/ETC BRAND WITH 6 PASSENGER CAPACITY WITH ARD FACILITY
Market Complex No
Community Hall Yes 30.40 SQM COMMUNITY HALL WITH TILE FLOORING
Gymnasium No
Swimming Pool No
Play Ground No
Park/Garden No
Plantation Area Yes 184 SQM
Others(Please Specify) No
Internal Road Yes 3.2 MTR WIDE & APPROX. 203.81 LENGTH INTERNAL ROAD WITH PAVER BLOCK FLOORING
External Road Yes 9.14 MTR WIDE EXTERNAL REVENUE ROAD ADJACENT TO THE PROJECT
Elecricity Supply Yes Copy of Consent Letter
Other Amenities No

Bank Particulars of the Project

  AXIS BANK
  SAHEED NAGAR
  923020037903587
  UTIB0003483
   View
  5005555
  8895290624

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
Rupak Panda Architect 491/2, Sahid Nagar, Bhubaneswar- 751007, rupak@rpassociates.in, Mob-9437008609, Email-office@rpassociates.in Reg.No.CA/96/20348 NA
Pitabash Panda Construction Engineer 491/2, Sahid Nagar, Bhubaneswar- 751007, Email-rupak@rpassociates.in,Mob-9437017543 RTP/DTP/S.T.E.R-155/2019 NA
Goutam Lenka Chartered Accountant Goutam & Co, Flat no-101, Vijayaramvilla, Plot no - 491, Nageswartangi, 751002, 7008207001, goutam@goutamlenka.com M.No.067906 NA

Financial Details

:  928.9654 :   View
  30-12-2026 :  200
:  728.9654 :  0

Documents Attached

Description of Document Option Documents
Fire Safety Certificate Undertaking Attached
Affidavit in Form-A as per clause-l of sub-section-2 of section-4 of the Act Yes Attached
Allotment letter format Yes Attached
Conveyance Deed Format Yes Attached
Affidavit to adopt agreement for sale format as per Rule-8(1) of ORE (R and D) Rules, 2017 Yes Attached
Annual Report 2021-22 Attached
Annual Report 2022-23 Attached
Annual Report 2023-24 Attached
IT Return 2021-22 Attached
IT Return 2022-23 Attached
IT Return 2023-24 Attached
Audit Report 2021-22 Attached
Audit Report 2022-23 Attached
Audit Report 2023-24 Attached

Additional Documents Attached

Sl. No. Title of the document Upload Document
1 CLARIFICATION ON EXECUTION OF DEVELOPMENT AGREEMENT & GPA WITH TRUPTIMAYEE SINGH WHERE AS IN ROR KANAK MANJARI MOHANTY

Other documents

“I undertake that the information submitted by me in this application are correct and true to best my knowledge. I also understand that providing false or wrong information is punishable under the Section-60 of the Real Estate (Regulation & Development) Act, 2016. I also further understand that furnishing wrong or false information will lead to rejection of my application registration of the project with forfeiture of registration fee and other charges deposited by me.”
  All the documents submitted as per the objection raised by the Authority. Request for your kind consideration & approval.

Construction Progress

Updated Construction Progress

SL NO. Description Scheduled date of completion Current Status Remarks
1 Site Development 31-08-2023 IN PROGRESS
2 Roof Casting NA NA NA
3 Ground Floor/Stilt Floor 30-11-2023 NOT STARTED NA
4 1 Floor 31-01-2024 NOT STARTED NA
5 2 Floor 31-03-2024 NOT STARTED NA
6 3 Floor 31-05-2024 NOT STARTED NA
7 4 Floor 31-07-2024 NOT STARTED NA
8 5 Floor 30-09-2024 NOT STARTED NA
9 Brick Work & Plastering NA NA NA
10 Ground Floor/Stilt Floor 31-05-2024 NOT STARTED NA
11 1 Floor 31-07-2024 NOT STARTED NA
12 2 Floor 30-09-2024 NOT STARTED NA
13 3 Floor 30-11-2024 NOT STARTED NA
14 4 Floor 31-01-2025 NOT STARTED NA
15 5 Floor 31-03-2025 NOT STARTED NA
16 Electrical Works 30-09-2025 NOT STARTED NA
17 Concealed Cabling including Plugs & switches 30-09-2025 NOT STARTED NA
18 Installation & Charging of Transformer 30-09-2025 NOT STARTED NA
19 Connection to Flats/Apartments 30-09-2025 NOT STARTED NA
20 PH works 31-03-2026 NOT STARTED NA
21 Laying of concealed Pipes 31-03-2026 NOT STARTED NA
22 PH Fittings 31-03-2026 NOT STARTED NA
23 Overhead Water Tanks 31-03-2026 NOT STARTED NA
24 Water Supply Connection to all units 31-03-2026 NOT STARTED NA
25 STP construction and completion 31-03-2026 NOT STARTED NA
26 Distempering & Colouring of all units and exteriors 30-04-2026 NOT STARTED NA
27 Fixation of doors and windows 31-05-2026 NOT STARTED NA
28 Scheduled Date of handing over possession 30-06-2026 NOT STARTED NA
29 Development of common areas, parks, gardens etc 31-05-2026 NOT STARTED NA
Updated Changes on 14-10-2023
30 Site Development 31-08-2023 IN PROGRESS NA
31 NA NA NA NA
32 Ground Floor/Stilt Floor 30-11-2023 NOT STARTED NA
33 1 Floor 31-01-2024 NOT STARTED NA
34 2 Floor 31-03-2024 NOT STARTED NA
35 3 Floor 31-05-2024 NOT STARTED NA
36 4 Floor 31-07-2024 NOT STARTED NA
37 5 Floor 30-09-2024 NOT STARTED NA
38 NA NA NA NA
39 Ground Floor/Stilt Floor 31-05-2024 NOT STARTED NA
40 1 Floor 31-07-2024 NOT STARTED NA
41 2 Floor 30-09-2024 NOT STARTED NA
42 3 Floor 30-11-2024 NOT STARTED NA
43 4 Floor 31-01-2025 NOT STARTED NA
44 5 Floor 31-03-2025 NOT STARTED NA
45 Electrical Works 30-09-2025 NOT STARTED NA
46 Concealed Cabling including Plugs & switches 30-09-2025 NOT STARTED NA
47 Installation & Charging of Transformer 30-09-2025 NOT STARTED NA
48 Connection to Flats/Apartments 30-09-2025 NOT STARTED NA
49 PH works 31-03-2026 NOT STARTED NA
50 Laying of concealed Pipes 31-03-2026 NOT STARTED NA
51 PH Fittings 31-03-2026 NOT STARTED NA
52 Overhead Water Tanks 31-03-2026 NOT STARTED NA
53 Water Supply Connection to all units 31-03-2026 NOT STARTED NA
54 STP construction and completion 31-03-2026 NOT STARTED NA
55 Distempering & Colouring of all units and exteriors 30-04-2026 NOT STARTED NA
56 Fixation of doors and windows 31-05-2026 NOT STARTED NA
57 Scheduled Date of handing over possession 30-06-2026 NOT STARTED NA
58 Development of common areas, parks, gardens etc 31-05-2026 NOT STARTED NA
Updated Changes on 14-04-2024
59 Site Development 31-08-2023 IN PROGRESS NA
60 NA NA NA NA
61 Ground Floor/Stilt Floor 30-11-2023 NOT STARTED NA
62 1 Floor 31-01-2024 NOT STARTED NA
63 2 Floor 31-03-2024 NOT STARTED NA
64 3 Floor 31-05-2024 NOT STARTED NA
65 4 Floor 31-07-2024 NOT STARTED NA
66 5 Floor 30-09-2024 NOT STARTED NA
67 NA NA NA NA
68 Ground Floor/Stilt Floor 31-05-2024 NOT STARTED NA
69 1 Floor 31-07-2024 NOT STARTED NA
70 2 Floor 30-09-2024 NOT STARTED NA
71 3 Floor 30-11-2024 NOT STARTED NA
72 4 Floor 31-01-2025 NOT STARTED NA
73 5 Floor 31-03-2025 NOT STARTED NA
74 Electrical Works 30-09-2025 NOT STARTED NA
75 Concealed Cabling including Plugs & switches 30-09-2025 NOT STARTED NA
76 Installation & Charging of Transformer 30-09-2025 NOT STARTED NA
77 Connection to Flats/Apartments 30-09-2025 NOT STARTED NA
78 PH works 31-03-2026 NOT STARTED NA
79 Laying of concealed Pipes 31-03-2026 NOT STARTED NA
80 PH Fittings 31-03-2026 NOT STARTED NA
81 Overhead Water Tanks 31-03-2026 NOT STARTED NA
82 Water Supply Connection to all units 31-03-2026 NOT STARTED NA
83 STP construction and completion 31-03-2026 NOT STARTED NA
84 Distempering & Colouring of all units and exteriors 30-04-2026 NOT STARTED NA
85 Fixation of doors and windows 31-05-2026 NOT STARTED NA
86 Scheduled Date of handing over possession 30-06-2026 NOT STARTED NA
87 Development of common areas, parks, gardens etc 31-05-2026 NOT STARTED NA

Booking Status

Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership Status
Carpet Area Balcony Area Exclusive Open Terrace Area
1 101 80.2 10.88 0 Promoter
2 102 82.99 9.2 0 Promoter
3 103 73.04 6.31 0 Promoter
4 104 94.79 13.33 0 Promoter
5 105 74.25 5 0 Promoter
6 106 108.82 11.24 0 Promoter
7 201 80.2 10.88 0 Land Owner
8 202 82.99 9.2 0 Promoter
9 203 73.04 6.31 0 Land Owner
10 204 94.79 13.33 0 Land Owner
11 205 74.25 5 0 Promoter
12 206 108.82 11.24 0 Promoter
13 301 80.2 10.88 0 Land Owner
14 302 82.99 9.2 0 Promoter
15 303 73.04 6.31 0 Land Owner
16 304 94.79 13.33 0 Land Owner
17 305 74.25 5 0 Promoter
18 306 108.82 11.24 0 Promoter
19 401 80.2 10.88 0 Promoter
20 402 82.99 9.2 0 Promoter
21 403 73.04 6.31 0 Land Owner
22 404 94.79 13.33 0 Land Owner
23 405 74.25 5 0 Land Owner
24 406 108.82 11.24 0 Land Owner
25 501 80.2 10.88 0 Land Owner
26 502 82.99 9.2 0 Promoter
27 503 73.04 6.31 0 Land Owner
28 504 94.79 13.33 0 Land Owner
29 505 74.25 5 0 Land Owner
30 506 108.82 11.24 0 Promoter
31 001-TRIPLEX 245.53 19.33 0 Promoter

Financial Status

SL No. Funds Collected from the Allottees Funds Borrowed from Financial Institutions Funds Employed from Own Sources Expenditure As On Date Status
1 800000 0 2505264 2505264 30-09-2023 IN PROGRESS
2 2700000 0 2505264 3007264 31-03-2024 IN PROGRESS

Updated Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 Parking space measuring 830.81 Sq.m as shown in the approved plan shall be exclusively used for parking of vehicles and no part of it will be used for any other purpose. 30-07-2023 NOT STARTED
2 The land over which construction is proposed is accessible by an approved means of access of 9.14 Mtr in width. 31-07-2023 NOT STARTED
3 The applicant shall submit Fire Safety Gertificate before issue of the Occupancy Certificate. 31-07-2023 NOT STARTED
4 The land over which construction is proposed is accessible by an approved means of access of 9.14 Mtr in width. 31-07-2023 NOT STARTED
5 The applicant shall free gift XXX sq.mtr. of located in the XXX Municipal Corporaiion/Municipality/ NAC/Grama panchayat for the widening of the road/construction of 4. 5. b. 7. 1. AREA STATEMENT (in Sq m); Building Plan for G+2 storied Residential building over Sub-plot No.3 (Sub-Plot area: 202.41 Sq.m) G+2 storied Residential Building over Subplot no.2 Floor (A) FAR Area (in Sq.m) (B) FAR Exempted Area (in Sq.m) (C=A+B) TotalArea (in Sq.m) Ground Floor 122.32 122.32 1't Floor 122.32 122.32 2nd Floor 59.83 59.83 Total 304.47 304.47 Total Built-up Area: 304.47 Sq.m Total FAR Area: 304.47 Sq.m Total Dwelling Units 1 nos No of Trees 3 Nos Total F.A.R. 1.50 Height of the Building: 9.15 meter 31-07-2023 NOT STARTED
6 Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the provisions of the Rules/ regulations; 31-07-2023 NOT STARTED
7 Obtain, wherever applicable from the competent Authority permissions/clearance required in connection with the proposed work; 31-07-2023 NOT STARTED
8 Submit stage-wise construction report. Penalty shall be imposed as per Rule 14 of oDA (P&BS) Rules, 2020in case of non-submission of the same. 31-07-2023 NOT STARTED
9 Engage an Accredited person for third party verification at plinth and ground floor roof Ievel of the apartment buildino. Upon detection of unauthorised construction in the Third Party Verification report, the applicant shall be imposed a fine as prescribed under sub-rule (3) of Rule 15 of ODA (P&BS Rules, ZO2O. 31-07-2023 NOT STARTED
10 Ensure that the Completion Certificate in Form XVll (as appended to ODA (CAF) Rules, 2016) is issued by the Project Management Organisaiion engaged by him on completion of the building for submission of the same io the Authoriiy for verification and issuance of Occupancy Certificate. 31-07-2023 NOT STARTED
11 Obtain an occupancy Certificate from the Authority prior to occupation of building in full or part. 31-07-2023 NOT STARTED
12 Ensure compliance of provision of various Acts, rules, regulations and codes which control or provide for various norms governing developmeni including but not limited to planning norms, fire safety norms, environmehtal norms, as applicable in each case. 31-07-2023 NOT STARTED
13 The plinth level of the building shall be raised 2 ft above the High Flood Level (HFL). 31-07-2023 NOT STARTED
14 The number of dwelling units so approved shall not be changed in any manner without prior approval under section 16 of the ODA Act, 1982 31-07-2023 NOT STARTED
15 No storm water shall be discharged to the public road/public premises and other adjoining plots. 31-07-2023 NOT STARTED
16 Storm water from the premises or roof top shall be conveyed and discharged to the rain water recharging pits as per Rules-47 of ODA (Planning & Building Standards) Rules, 2O2O' 31-07-2023 NOT STARTED
17 Rooftop Solar Energy lnstallation shall be provided as per Rule 48 of ODA (Planning & Building Standards) Rules, 2020 31-07-2023 NOT STARTED
18 The space which is meant for parking shall not be changed to any other use and shall not be partitionediclosed in any manner. 31-07-2023 NOT STARTED
19 Ageast .O% ofparking in housing project/apartment building shall be earmarked for visitors and shall be open to Jil visitor. ,i'p.i norms under sub-rule (12) of Rule 37 of oDA (P&BS) Rules 2020. 31-07-2023 NOT STARTED
20 Aileast 50% of the open space shall be pervious and plantation @ one tree per 80 sq.[tl. of the plot area shail be made by the applicant as per provision under Rule-30 of ODA (P&BS) Rules, 2020. 31-07-2023 NOT STARTED
21 Rainwater harvesting structures shall be provided within the premises for collection and use of rooftop rainwater Rule 47of oDA (P&BS) Rules, 2020. 31-07-2023 NOT STARTED
22 Groundwater recharging pits shall be provided @ 6 cubic meters for every 100 square meter of roof area aJper Rule 47of ODA (P&BS) Rules, 2020. 31-07-2023 NOT STARTED
23 All the passages around the building shall be developed with permeable paver blocks for percolation of rain water to the ground' 31-07-2023 NOT STARTED
24 STp and other utilities, if provided within minimum setback area shall not be allowed above ground level and shail only be constructed below ground level; and the same shall be Ippropriately covered for movement of vehicle/people above it. 31-07-2023 NOT STARTED
25 Guard room, electric cabin, sub-station, atea for generator set, ATM, etc, if provided shall not be allowed within minimum setback area' 31-07-2023 NOT STARTED
26 The applicant shall provide micro-composting site/plant within the project premises to make own arrangement of solid waste management' 31-07-2023 NOT STARTED
27 The applicant shall obtain- rnfrastructural specification and subsequent clearance with regard to development of infrastructure for EIDP before commencemJnt Jconstruction. 31-07-2023 NOT STARTED
28 The applicant shall execute_the EIDP approved by C.E.-cum-E.M. BDA in accordance with Clause no' 3.2.4 of the- SoP for Approval of External lnfrastructure Devetopment plan (EIDP) and deposit of External lnfrastructure Development ree in case or Urban Local Bodies and Rural Local Bodies located within Bhubaneswa, oeretopm-ent Rrea issued vide no. 2360/BDA dtd 18.01.2021.After completion of the external infrastructure, the applicant shall obtain the written recommendation of the-EIDP committee regarding satisfactory "orpi"tion as per the approved or infrastructure ErDp. The appricani shal appry for iisue oi ttoc-rro, Engineer Member, BDA after recommendation of tne committl" o.;r;";y 'c;ificate issued only after obtaining shal be the Noc from Engineer Member, BDA in accordance with Clause 3.2.6. 31-07-2023 NOT STARTED
29 The applicant shall obtarn oRERA registration as per the affidavit submitted by applicant and submit the oREM Registration certificate at the time or suomission oi apptication for issue of Occupancy Certificite. 31-07-2023 NOT STARTED
30 The ..owner/applicanuTechnical Person shall stricfly adhere to the terms and conditions imposed in the Noc / crearances grven oy pubiic ie;ril Engineering organisation (PHEo) vide their letter no 14051 cate-o oe os.zozz, ceniili'crouno water Authoritv (CGWA) vide their letter no cGWA/Noc/tNF toRtct2o22l16367 dated 20 '09 2022' fire safety Recommendation no RECoMM 1204130052022000695 dated 14.07.2022. 31-07-2023 NOT STARTED
31 All the stipurated conditions of Noc given by any pubric agency required for approval shall be adhered to stricfly. 31-07-2023 NOT STARTED
Updated Changes on 14-10-2023
32 Parking space measuring 830.81 Sq.m as shown in the approved plan shall be exclusively used for parking of vehicles and no part of it will be used for any other purpose. 30-07-2023 NOT STARTED
33 The land over which construction is proposed is accessible by an approved means of access of 9.14 Mtr in width. 31-07-2023 NOT STARTED
34 The applicant shall submit Fire Safety Gertificate before issue of the Occupancy Certificate. 31-07-2023 NOT STARTED
35 The land over which construction is proposed is accessible by an approved means of access of 9.14 Mtr in width. 31-07-2023 NOT STARTED
36 The applicant shall free gift XXX sq.mtr. of located in the XXX Municipal Corporaiion/Municipality/ NAC/Grama panchayat for the widening of the road/construction of 4. 5. b. 7. 1. AREA STATEMENT (in Sq m); Building Plan for G+2 storied Residential building over Sub-plot No.3 (Sub-Plot area: 202.41 Sq.m) G+2 storied Residential Building over Subplot no.2 Floor (A) FAR Area (in Sq.m) (B) FAR Exempted Area (in Sq.m) (C=A+B) TotalArea (in Sq.m) Ground Floor 122.32 122.32 1't Floor 122.32 122.32 2nd Floor 59.83 59.83 Total 304.47 304.47 Total Built-up Area: 304.47 Sq.m Total FAR Area: 304.47 Sq.m Total Dwelling Units 1 nos No of Trees 3 Nos Total F.A.R. 1.50 Height of the Building: 9.15 meter 31-07-2023 NOT STARTED
37 Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the provisions of the Rules/ regulations; 31-07-2023 NOT STARTED
38 Obtain, wherever applicable from the competent Authority permissions/clearance required in connection with the proposed work; 31-07-2023 NOT STARTED
39 Submit stage-wise construction report. Penalty shall be imposed as per Rule 14 of oDA (P&BS) Rules, 2020in case of non-submission of the same. 31-07-2023 NOT STARTED
40 Engage an Accredited person for third party verification at plinth and ground floor roof Ievel of the apartment buildino. Upon detection of unauthorised construction in the Third Party Verification report, the applicant shall be imposed a fine as prescribed under sub-rule (3) of Rule 15 of ODA (P&BS Rules, ZO2O. 31-07-2023 NOT STARTED
41 Ensure that the Completion Certificate in Form XVll (as appended to ODA (CAF) Rules, 2016) is issued by the Project Management Organisaiion engaged by him on completion of the building for submission of the same io the Authoriiy for verification and issuance of Occupancy Certificate. 31-07-2023 NOT STARTED
42 Obtain an occupancy Certificate from the Authority prior to occupation of building in full or part. 31-07-2023 NOT STARTED
43 Ensure compliance of provision of various Acts, rules, regulations and codes which control or provide for various norms governing developmeni including but not limited to planning norms, fire safety norms, environmehtal norms, as applicable in each case. 31-07-2023 NOT STARTED
44 The plinth level of the building shall be raised 2 ft above the High Flood Level (HFL). 31-07-2023 NOT STARTED
45 The number of dwelling units so approved shall not be changed in any manner without prior approval under section 16 of the ODA Act, 1982 31-07-2023 NOT STARTED
46 No storm water shall be discharged to the public road/public premises and other adjoining plots. 31-07-2023 NOT STARTED
47 Storm water from the premises or roof top shall be conveyed and discharged to the rain water recharging pits as per Rules-47 of ODA (Planning & Building Standards) Rules, 2O2O' 31-07-2023 NOT STARTED
48 Rooftop Solar Energy lnstallation shall be provided as per Rule 48 of ODA (Planning & Building Standards) Rules, 2020 31-07-2023 NOT STARTED
49 The space which is meant for parking shall not be changed to any other use and shall not be partitionediclosed in any manner. 31-07-2023 NOT STARTED
50 Ageast .O% ofparking in housing project/apartment building shall be earmarked for visitors and shall be open to Jil visitor. ,i'p.i norms under sub-rule (12) of Rule 37 of oDA (P&BS) Rules 2020. 31-07-2023 NOT STARTED
51 Aileast 50% of the open space shall be pervious and plantation @ one tree per 80 sq.[tl. of the plot area shail be made by the applicant as per provision under Rule-30 of ODA (P&BS) Rules, 2020. 31-07-2023 NOT STARTED
52 Rainwater harvesting structures shall be provided within the premises for collection and use of rooftop rainwater Rule 47of oDA (P&BS) Rules, 2020. 31-07-2023 NOT STARTED
53 Groundwater recharging pits shall be provided @ 6 cubic meters for every 100 square meter of roof area aJper Rule 47of ODA (P&BS) Rules, 2020. 31-07-2023 NOT STARTED
54 All the passages around the building shall be developed with permeable paver blocks for percolation of rain water to the ground' 31-07-2023 NOT STARTED
55 STp and other utilities, if provided within minimum setback area shall not be allowed above ground level and shail only be constructed below ground level; and the same shall be Ippropriately covered for movement of vehicle/people above it. 31-07-2023 NOT STARTED
56 Guard room, electric cabin, sub-station, atea for generator set, ATM, etc, if provided shall not be allowed within minimum setback area' 31-07-2023 NOT STARTED
57 The applicant shall provide micro-composting site/plant within the project premises to make own arrangement of solid waste management' 31-07-2023 NOT STARTED
58 The applicant shall obtain- rnfrastructural specification and subsequent clearance with regard to development of infrastructure for EIDP before commencemJnt Jconstruction. 31-07-2023 NOT STARTED
59 The applicant shall execute_the EIDP approved by C.E.-cum-E.M. BDA in accordance with Clause no' 3.2.4 of the- SoP for Approval of External lnfrastructure Devetopment plan (EIDP) and deposit of External lnfrastructure Development ree in case or Urban Local Bodies and Rural Local Bodies located within Bhubaneswa, oeretopm-ent Rrea issued vide no. 2360/BDA dtd 18.01.2021.After completion of the external infrastructure, the applicant shall obtain the written recommendation of the-EIDP committee regarding satisfactory "orpi"tion as per the approved or infrastructure ErDp. The appricani shal appry for iisue oi ttoc-rro, Engineer Member, BDA after recommendation of tne committl" o.;r;";y 'c;ificate issued only after obtaining shal be the Noc from Engineer Member, BDA in accordance with Clause 3.2.6. 31-07-2023 NOT STARTED
60 The applicant shall obtarn oRERA registration as per the affidavit submitted by applicant and submit the oREM Registration certificate at the time or suomission oi apptication for issue of Occupancy Certificite. 31-07-2023 COMPLETED
61 The ..owner/applicanuTechnical Person shall stricfly adhere to the terms and conditions imposed in the Noc / crearances grven oy pubiic ie;ril Engineering organisation (PHEo) vide their letter no 14051 cate-o oe os.zozz, ceniili'crouno water Authoritv (CGWA) vide their letter no cGWA/Noc/tNF toRtct2o22l16367 dated 20 '09 2022' fire safety Recommendation no RECoMM 1204130052022000695 dated 14.07.2022. 31-07-2023 NOT STARTED
62 All the stipurated conditions of Noc given by any pubric agency required for approval shall be adhered to stricfly. 31-07-2023 NOT STARTED
Updated Changes on 14-04-2024
63 Parking space measuring 830.81 Sq.m as shown in the approved plan shall be exclusively used for parking of vehicles and no part of it will be used for any other purpose. 30-07-2023 NOT STARTED
64 The land over which construction is proposed is accessible by an approved means of access of 9.14 Mtr in width. 31-07-2023 ROAD ALREADY AVAILABLE
65 The applicant shall submit Fire Safety Gertificate before issue of the Occupancy Certificate. 31-07-2023 NOT STARTED
66 The land over which construction is proposed is accessible by an approved means of access of 9.14 Mtr in width. 31-07-2023 ROAD ALREADY AVAILABLE
67 The applicant shall free gift XXX sq.mtr. of located in the XXX Municipal Corporaiion/Municipality/ NAC/Grama panchayat for the widening of the road/construction of 4. 5. b. 7. 1. AREA STATEMENT (in Sq m); Building Plan for G+2 storied Residential building over Sub-plot No.3 (Sub-Plot area: 202.41 Sq.m) G+2 storied Residential Building over Subplot no.2 Floor (A) FAR Area (in Sq.m) (B) FAR Exempted Area (in Sq.m) (C=A+B) TotalArea (in Sq.m) Ground Floor 122.32 122.32 1't Floor 122.32 122.32 2nd Floor 59.83 59.83 Total 304.47 304.47 Total Built-up Area: 304.47 Sq.m Total FAR Area: 304.47 Sq.m Total Dwelling Units 1 nos No of Trees 3 Nos Total F.A.R. 1.50 Height of the Building: 9.15 meter 31-07-2023 COMPLETED
68 Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the provisions of the Rules/ regulations; 31-07-2023 COMPLY AS PER CONDITION
69 Obtain, wherever applicable from the competent Authority permissions/clearance required in connection with the proposed work; 31-07-2023 COMPLY AS PER CONDITION
70 Submit stage-wise construction report. Penalty shall be imposed as per Rule 14 of oDA (P&BS) Rules, 2020in case of non-submission of the same. 31-07-2023 NOT STARTED
71 Engage an Accredited person for third party verification at plinth and ground floor roof Ievel of the apartment buildino. Upon detection of unauthorised construction in the Third Party Verification report, the applicant shall be imposed a fine as prescribed under sub-rule (3) of Rule 15 of ODA (P&BS Rules, ZO2O. 31-07-2023 NOT STARTED
72 Ensure that the Completion Certificate in Form XVll (as appended to ODA (CAF) Rules, 2016) is issued by the Project Management Organisaiion engaged by him on completion of the building for submission of the same io the Authoriiy for verification and issuance of Occupancy Certificate. 31-07-2023 NOT STARTED
73 Obtain an occupancy Certificate from the Authority prior to occupation of building in full or part. 31-07-2023 NOT STARTED
74 Ensure compliance of provision of various Acts, rules, regulations and codes which control or provide for various norms governing developmeni including but not limited to planning norms, fire safety norms, environmehtal norms, as applicable in each case. 31-07-2023 NOT STARTED
75 The plinth level of the building shall be raised 2 ft above the High Flood Level (HFL). 31-07-2023 NOT STARTED
76 The number of dwelling units so approved shall not be changed in any manner without prior approval under section 16 of the ODA Act, 1982 31-07-2023 COMPLY AS PER CONDITION
77 No storm water shall be discharged to the public road/public premises and other adjoining plots. 31-07-2023 NOT STARTED
78 Storm water from the premises or roof top shall be conveyed and discharged to the rain water recharging pits as per Rules-47 of ODA (Planning & Building Standards) Rules, 2O2O' 31-07-2023 NOT STARTED
79 Rooftop Solar Energy lnstallation shall be provided as per Rule 48 of ODA (Planning & Building Standards) Rules, 2020 31-07-2023 NOT STARTED
80 The space which is meant for parking shall not be changed to any other use and shall not be partitionediclosed in any manner. 31-07-2023 NOT STARTED
81 Ageast .O% ofparking in housing project/apartment building shall be earmarked for visitors and shall be open to Jil visitor. ,i'p.i norms under sub-rule (12) of Rule 37 of oDA (P&BS) Rules 2020. 31-07-2023 NOT STARTED
82 Aileast 50% of the open space shall be pervious and plantation @ one tree per 80 sq.[tl. of the plot area shail be made by the applicant as per provision under Rule-30 of ODA (P&BS) Rules, 2020. 31-07-2023 NOT STARTED
83 Rainwater harvesting structures shall be provided within the premises for collection and use of rooftop rainwater Rule 47of oDA (P&BS) Rules, 2020. 31-07-2023 NOT STARTED
84 Groundwater recharging pits shall be provided @ 6 cubic meters for every 100 square meter of roof area aJper Rule 47of ODA (P&BS) Rules, 2020. 31-07-2023 NOT STARTED
85 All the passages around the building shall be developed with permeable paver blocks for percolation of rain water to the ground' 31-07-2023 NOT STARTED
86 STp and other utilities, if provided within minimum setback area shall not be allowed above ground level and shail only be constructed below ground level; and the same shall be Ippropriately covered for movement of vehicle/people above it. 31-07-2023 NOT STARTED
87 Guard room, electric cabin, sub-station, atea for generator set, ATM, etc, if provided shall not be allowed within minimum setback area' 31-07-2023 NOT STARTED
88 The applicant shall provide micro-composting site/plant within the project premises to make own arrangement of solid waste management' 31-07-2023 NOT STARTED
89 The applicant shall obtain- rnfrastructural specification and subsequent clearance with regard to development of infrastructure for EIDP before commencemJnt Jconstruction. 31-07-2023 NOT STARTED
90 The applicant shall execute_the EIDP approved by C.E.-cum-E.M. BDA in accordance with Clause no' 3.2.4 of the- SoP for Approval of External lnfrastructure Devetopment plan (EIDP) and deposit of External lnfrastructure Development ree in case or Urban Local Bodies and Rural Local Bodies located within Bhubaneswa, oeretopm-ent Rrea issued vide no. 2360/BDA dtd 18.01.2021.After completion of the external infrastructure, the applicant shall obtain the written recommendation of the-EIDP committee regarding satisfactory "orpi"tion as per the approved or infrastructure ErDp. The appricani shal appry for iisue oi ttoc-rro, Engineer Member, BDA after recommendation of tne committl" o.;r;";y 'c;ificate issued only after obtaining shal be the Noc from Engineer Member, BDA in accordance with Clause 3.2.6. 31-07-2023 NOT STARTED
91 The applicant shall obtarn oRERA registration as per the affidavit submitted by applicant and submit the oREM Registration certificate at the time or suomission oi apptication for issue of Occupancy Certificite. 31-07-2023 COMPLETED
92 The ..owner/applicanuTechnical Person shall stricfly adhere to the terms and conditions imposed in the Noc / crearances grven oy pubiic ie;ril Engineering organisation (PHEo) vide their letter no 14051 cate-o oe os.zozz, ceniili'crouno water Authoritv (CGWA) vide their letter no cGWA/Noc/tNF toRtct2o22l16367 dated 20 '09 2022' fire safety Recommendation no RECoMM 1204130052022000695 dated 14.07.2022. 31-07-2023 NOT STARTED
93 All the stipurated conditions of Noc given by any pubric agency required for approval shall be adhered to stricfly. 31-07-2023 NOT STARTED

Updated Project Documents

Sl. No. Title of the document Upload Document
1 PROFORMA-I (1ST JUL 2023 TO 30TH SEPT 2023)
2 PROFORMA-II (1ST JUL 2023 TO 30TH SEPT 2023)
3 PROFORMA-I & II (JAN, 2024 TO MAR, 2024)
4 ANNUAL AUDIR CERTIFICATE FY 2023-24
:  RUPAK PANDA :  
NA :  AGGPP0708G
:PAN Card :  rupak@rpassociates.in
:   B. Tech :  9437008609
:  11 years
:  Yes :  NA
:  Sonali Panda :  
NA :  AVWPP6179N
:PAN Card :  rupak@rpassociates.in
:  M.A in Mathematics :  9437697342
:  8 years
:  Yes :  NA

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
Rupak Panda Architect 491/2, Sahid Nagar, Bhubaneswar- 751007, rupak@rpassociates.in, Mob-9437008609, Email-office@rpassociates.in Reg.No.CA/96/20348 NA
Pitabash Panda Construction Engineer 491/2, Sahid Nagar, Bhubaneswar- 751007, Email-rupak@rpassociates.in,Mob-9437017543 RTP/DTP/S.T.E.R-155/2019 NA
Goutam Lenka Chartered Accountant Goutam & Co, Flat no-101, Vijayaramvilla, Plot no - 491, Nageswartangi, 751002, 7008207001, goutam@goutamlenka.com M.No.067906 NA

Updated Units

House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
Updated Changes
101 Covered Parking 101 4 M x 3 M 12 SQM Included
102 Covered Parking 102 4 M x 3 M 12 SQM Included
103 Covered Parking 103 4 M x 3 M 12 SQM Included
104 Covered Parking 104 4 M x 3 M 12 SQM Included
105 Covered Parking 105 4 M x 3 M 12 SQM Included
106 Covered Parking 106 4 M x 3 M 12 SQM Included
201 Covered Parking 201 4 M x 3 M 12 SQM Included
202 Covered Parking 202 4 M x 3 M 12 SQM Included
203 Covered Parking 203 4 M x 3 M 12 SQM Included
204 Covered Parking 204 4 M x 3 M 12 SQM Included
205 Covered Parking 205 4 M x 3 M 12 SQM Included
206 Covered Parking 206 4 M x 3 M 12 SQM Included
301 Covered Parking 301 4 M x 3 M 12 SQM Included
302 Covered Parking 302 4 M x 3 M 12 SQM Included
303 Covered Parking 303 4 M x 3 M 12 SQM Included
304 Covered Parking 304 4 M x 3 M 12 SQM Included
305 Covered Parking 305 4 M x 3 M 12 SQM Included
306 Covered Parking 306 4 M x 3 M 12 SQM Included
401 Covered Parking 401 4 M x 3 M 12 SQM Included
402 Covered Parking 402 4 M x 3 M 12 SQM Included
403 Covered Parking 403 4 M x 3 M 12 SQM Included
404 Covered Parking 404 4 M x 3 M 12 SQM Included
405 Covered Parking 405 4 M x 3 M 12 SQM Included
406 Covered Parking 406 4 M x 3 M 12 SQM Included
501 Covered Parking 501 4 M x 3 M 12 SQM Included
502 Covered Parking 502 4 M x 3 M 12 SQM Included
503 Covered Parking 503 4 M x 3 M 12 SQM Included
504 Covered Parking 504 4 M x 3 M 12 SQM Included
505 Covered Parking 505 4 M x 3 M 12 SQM Included
506 Covered Parking 506 4 M x 3 M 12 SQM Included
001-TRIPLEX Covered Parking PARKING AT PORTICO 5 M x 3.5 M 17.5 SQM Included