Promoter Details
Promoter Name :
Pradeep Thacker
Project Name :
ESSEN KAILASH
Project Location :
(Residential Project, S+5, No. of Units-39)

Form- I

A. Promoter's Details

:  M/s. Essen Construction :  Partnership
:  223 of 2011 :View
NA :  S2/A-42,43,44, Mancheswar Industrial Estate, Bhubaneswar- 751010, Dist. Khordha, Odisha
:  Plot No. S2/A-42,43,44, Mancheswar Industrial Estate, Bhubaneswar-751010, Dist. Khordha,Odisha :  constructionessen@gmail.com
:  2588877 :  9439585958
:  AACFE0760H :View
:  14 year of experience in construction of building. :  NA
NA

B. Details of Board of Directors / Partners / MC Members

:  Pradeep Thacker :  
:  Partner :  AAKPT7887L
:PAN Card :  constructionessen@gmail.com
:  MBA :  9439585958
:  14 Years of experience in construction of building.
:  Yes :  NA
:  Hemant Kumar Thacker :  
:  Partner :  AAKPT7888F
:PAN Card :  constructionessen@gmail.com
:  B.Com :  7854001818
:  12 years work experience in Real Estate
:  Yes :  NA
:  Jitendra Kumar Thacker :  
:  Partner :  AAKPT7889E
:PAN Card :  constructionessen@gmail.com
:  B.Com :  9937067932
:  12 years work experience in Real Estate
:  Yes :  NA
:  Asha Thacker :  
:  Partner :  ABSPT0654J
:PAN Card :  constructionessen@gmail.com
:  B.Com :  9937067935
:  Nil
:  Yes :  NA
:  Krishna Thacker :  
:  Partner :  ABSPT0655K
:PAN Card :  constructionessen@gmail.com
:  B.Com :  9937067933
:  Nil
:  Yes :  NA
:  Anju Thacker :  
:  Partner :  ANGPT0302F
:PAN Card :  constructionessen@gmail.com
:  B.Com :  9937005578
:  Nil
:  Yes :  NA

Annexure-1

Details of last projects already implemented (Ongoing or Complete)

Have you implemented any project(s) previously (May be Ongoing or Completed):No
1. :  MM BALIANTA ENCLAVE :  Residential
:  Plot No. 1102, 1103, 1109, 1110, 1113, Mouza-Andilo, Dist-Khurda :  Completed
:  RP/19/2018/00052 NA
:  Joint Venture
:  S+4 NA NA :  S+4
:  No

:   :  
:   :  
:  
: No :  NA
: No :  NA
2. :  ESSEN CITY CENTRE :  Mixed
:  Plot No. 282, 282/3326, Mouza - Laxmisagar, Bhubaneswar, Khurda :  Completed
:  CP/19/2018/00141 NA
:  Joint Venture
:  LB+UB+G+3 :  LB+UB+G+3 :  LB+UB+G+3 :  LB+UB+G+3
:  No

:   :  
:   :  
:  
: No :  NA
: No :  NA
3. :  SASHIPRIYA ENCLAVE :  Residential
:  Plot No. 1681, 1682,1683, Mouza-Laxmisagar, Dist-Khurda :  Completed
:  RP/19/2018/00037 NA
:  Joint Venture
:  S+4 NA NA :  S+4
:  No

:   :  
:   :  
:  
: No :  NA
: No :  NA
4. :  SATYAVATI ENCLAVE :  Residential
:  Plot No. 3604, 3605, 3606, 3608 Mouza-Bargarh, Dist-Bargarh :  Completed
:  MP/04/2018/00053 NA
:  Joint Venture
:  S+4 NA NA :  S+4
:  No

:   :  
:   :  
:  
: No :  NA
: No :  NA

Annexure-2

Details of the project to be registered

:   New :  ESSEN KAILASH
:  Residential :  (Residential Project, S+5, No. of Units-39)
:  Khordha :  Bhubaneswar
:  752101 :  Urban Local Body
:  Bhubaneswar Municipal Corporation, Bhubaneswar
:  S+5 :  NA

Land Details of the Project


:  1403 :  609/1177
:  Naharakanta :  149.73
:  Yes
No :  View
:  View
:  Other Person
:  Kailash Chandra Sahoo :   Regd. Power of Attorney.
: No
: Yes
:  11082004719 :  26-06-2020
:  Office of the District Sub-Registrar, Khurda (BBSR) :  Attached

:  1404 :  609/1177
:  Naharakanta :  445.15
:  Yes
No :  View
:  View
:  Other Person
:  Kailash Chandra Sahoo :   Regd. Power of Attorney.
: No
: Yes
:  11082004719 :  26-06-2020
:  Office of the District Sub-Registrar, Khurda (BBSR) :  Attached

:  1412 :  609/1178
:  Naharakanta :  242.81
:  Yes
No :  View
:  View
:  Other Person
:  Kailash Chandra Sahoo :   Regd. Power of Attorney.
: No
: Yes
:  11082004719 :  26-06-2020
:  Office of the District Sub-Registrar, Khurda (BBSR) :  Attached

:  1413 :  609/122
:  Naharakanta :  283.27
:  Yes
No :  View
:  View
:  Other Person
:  Laxmipriya Sahoo :   Regd. Power of Attorney.
: No
: Yes
:  11082005253 :  10-07-2020
:  Office of the District Sub-Registrar, Khurda (BBSR) :  Attached

:  1414 :  609/122
:  Naharakanta :  930.77
:  Yes
No :  View
:  View
:  Other Person
:  Laxmipriya Sahoo :  Regd. Power of Attorney.
: No
: Yes
:  11082005253 :  10-07-2020
:  Office of the District Sub-Registrar, Khurda (BBSR) :  Attached

Development Agreement

: Yes
Serial No. Particulars of the Person Land/Plot Details Share of the Person Document Attached
1 Kailash Chandra Sahoo Plot No-1403,1404 & 1412 Khata No-609/1177 &609/1178 40%   Agreement Copy
2 Laxmipriya Sahoo Plot No-1413,1414 Khata No-609/122 40%   Agreement Copy

Building Plan

  View   View
  Download site plan 24-06-2024

Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 The owner/applicant /Technical Person shall strictly adhere to the terms and conditions imposed in the NOC from PHED vide Letter No 7195, Dt.18.05.2021. 24-06-2024 In Progress
2 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per ODA (Planning & Building Standards) Rules, 2020 24-06-2024 In Progress
3 he space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner. 24-06-2024 In Progress
4 Plantation as required under the provision under Rule 30 of ODA (Planning & Building Standards) Rules, 2020.shall be strictly adhered. 24-06-2024 In Progress
5 The Owner/ Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any earthquake/cyclone/any other natural disaster, structural/construction defects , Authority will be no way be held responsible for the same in what so ever manner. 24-06-2024 In Progress
6 The concerned Architect / Applicant / Developer are fully responsible for any deviations additions & alternations beyond approved plan/ defective construction etc. shall be liable for action as per the provisions of the Regulation. 24-06-2024 In Progress
7 The applicant shall comply EIDP in the Engineering wing of BMC & shall execute EIDP & obtain clearance from BMC. 24-06-2024 In Progress
8 Authority shall in no way be held responsible for any structural failure and damage due to earthquake/cyclone/any other natural disaster. 24-06-2024 In Progress
9 The number of dwelling units so approved shall not be changed in any manner 24-06-2024 In Progress

Layout Plan

: Yes :  View

Location Map with geo-coordinates of bend points

Point No. Latitude Longitude
1 20°18'40.0''N 85°52'56.1''E
2 20°18'40.4''N 85°52'56.9''E
3 20°18'40.7''N 85°52'56.8''E
4 20°18'40.9''N 85°52'57.5''E
5 20°18'40.8''N 85°52'57.6''E
6 20°18'40.0''N 85°52'58.3''E
7 20°18'40.1''N 85°52'58.7''E
8 20°18'39.9''N 85°52'57.9''E
9 20°18'40.0''N 85°52'57.7''E
10 20°18'39.8''N 85°52'57.2''E
11 20°18'39.6''N 85°52'57.3''E
12 20°18'39.3''N 85°52'56.5''E
View

Milestone of Project Construction

Description* Scheduled date of completion Current Status Site Images
Site Development 30-09-2021 N.A
Roof Casting NA NA NA
Ground Floor/Stilt Floor 31-01-2022 N.A
1 Floor 31-03-2022 N.A
2 Floor 31-05-2022 N.A
3 Floor 31-07-2022 N.A
4 Floor 30-09-2022 N.A
5 Floor 30-11-2022 N.A
Brick Work & Plastering NA NA NA
Ground Floor/Stilt Floor 31-12-2022 N.A
1 Floor 28-02-2023 N.A
2 Floor 31-03-2023 N.A
3 Floor 30-04-2023 N.A
4 Floor 31-05-2023 N.A
5 Floor 30-06-2023 N.A
Electrical Works 31-05-2023 N.A
Concealed Cabling including Plugs & switches 31-08-2023 N.A
Installation & Charging of Transformer 31-08-2024 N.A
Connection to Flats/Apartments 31-10-2024 N.A
PH works 31-05-2024 N.A
Laying of concealed Pipes 29-02-2024 N.A
PH Fittings 31-03-2024 N.A
Overhead Water Tanks 30-04-2024 N.A
Water Supply Connection to all units 31-05-2024 N.A
STP construction and completion 30-11-2024 N.A
Distempering & Colouring of all units and exteriors 31-12-2024 N.A
Fixation of doors and windows 31-01-2025 N.A
Scheduled Date of handing over possession 31-03-2025 N.A
Development of common areas, parks, gardens etc 31-01-2025 N.A
Site Development 30-09-2021 Under Progress
NA NA NA NA
Ground Floor/Stilt Floor 31-01-2022 Not done, Plinth Level Work under Progress
1 Floor 31-03-2022 Not done, Plinth Level Work under Progress
2 Floor 31-05-2022 Not done, Plinth Level Work under Progress
3 Floor 31-07-2022 Not done, Plinth Level Work under Progress
4 Floor 30-09-2022 Not done, Plinth Level Work under Progress
5 Floor 30-11-2022 Not done, Plinth Level Work under Progress
NA NA NA NA
Ground Floor/Stilt Floor 31-12-2022 Not done, Plinth Level Work under Progress
1 Floor 28-02-2023 Not done, Plinth Level Work under Progress
2 Floor 31-03-2023 Not done, Plinth Level Work under Progress
3 Floor 30-04-2023 Not done, Plinth Level Work under Progress
4 Floor 31-05-2023 Not done, Plinth Level Work under Progress
5 Floor 30-06-2023 Not done, Plinth Level Work under Progress
Electrical Works 31-05-2023 Not done, Plinth Level Work under Progress
Concealed Cabling including Plugs & switches 31-08-2023 Not done, Plinth Level Work under Progress
Installation & Charging of Transformer 31-08-2024 Not done, Plinth Level Work under Progress
Connection to Flats/Apartments 31-10-2024 Not done, Plinth Level Work under Progress
PH works 31-05-2024 Not done, Plinth Level Work under Progress
Laying of concealed Pipes 29-02-2024 Not done, Plinth Level Work under Progress
PH Fittings 31-03-2024 Not done, Plinth Level Work under Progress
Overhead Water Tanks 30-04-2024 Not done, Plinth Level Work under Progress
Water Supply Connection to all units 31-05-2024 Not done, Plinth Level Work under Progress
STP construction and completion 30-11-2024 Yet to Start
Distempering & Colouring of all units and exteriors 31-12-2024 Not done, Plinth Level Work under Progress
Fixation of doors and windows 31-01-2025 Not done, Plinth Level Work under Progress
Scheduled Date of handing over possession 31-03-2025 Not done, Plinth Level Work under Progress
Development of common areas, parks, gardens etc 31-01-2025 Not done, Plinth Level Work under Progress
Site Development 31-01-2025 Under Progress
NA 31-01-2025 Under Progress NA
Ground Floor/Stilt Floor 30-04-2023 Stilt Floor roof casting in progress now. It will be completed by last week of April 2023
1 Floor 31-03-2022 yet to start
2 Floor 31-05-2022 yet to start
3 Floor 31-07-2022 yet to start
4 Floor 30-09-2022 yet to start
5 Floor 30-11-2022 yet to start
NA 31-01-2025 Yet to Start NA
Ground Floor/Stilt Floor 31-12-2022 yet to start
1 Floor 28-02-2023 yet to start
2 Floor 31-03-2023 yet to start
3 Floor 30-04-2023 yet to start
4 Floor 31-05-2023 yet to start
5 Floor 30-06-2023 yet to start
Electrical Works 31-05-2023 yet to start
Concealed Cabling including Plugs & switches 31-08-2023 yet to start
Installation & Charging of Transformer 31-08-2024 yet to start
Connection to Flats/Apartments 31-10-2024 yet to start
PH works 31-05-2024 yet to start
Laying of concealed Pipes 29-02-2024 yet to start
PH Fittings 31-03-2024 yet to start
Overhead Water Tanks 30-04-2024 yet to start
Water Supply Connection to all units 31-05-2024 yet to start
STP construction and completion 30-11-2024 Yet to Start
Distempering & Colouring of all units and exteriors 31-12-2024 yet to start
Fixation of doors and windows 31-01-2025 yet to start
Scheduled Date of handing over possession 31-03-2025 yet to start
Development of common areas, parks, gardens etc 31-01-2025 yet to start
Site Development 31-01-2025 Under Progress
NA 31-01-2025 Under Progress
Ground Floor/Stilt Floor 30-04-2023 Completed
1 Floor 31-03-2022 In Progress
2 Floor 31-05-2022 yet to start
3 Floor 31-07-2022 yet to start
4 Floor 30-09-2022 yet to start
5 Floor 30-11-2022 yet to start
NA 31-01-2025 Yet to Start
Ground Floor/Stilt Floor 31-12-2022 yet to start
1 Floor 28-02-2023 yet to start
2 Floor 31-03-2023 yet to start
3 Floor 30-04-2023 yet to start
4 Floor 31-05-2023 yet to start
5 Floor 30-06-2023 yet to start
Electrical Works 31-05-2023 yet to start
Concealed Cabling including Plugs & switches 31-08-2023 yet to start
Installation & Charging of Transformer 31-08-2024 yet to start
Connection to Flats/Apartments 31-10-2024 yet to start
PH works 31-05-2024 yet to start
Laying of concealed Pipes 29-02-2024 yet to start
PH Fittings 31-03-2024 yet to start
Overhead Water Tanks 30-04-2024 yet to start
Water Supply Connection to all units 31-05-2024 yet to start
STP construction and completion 30-11-2024 Yet to Start
Distempering & Colouring of all units and exteriors 31-12-2024 yet to start
Fixation of doors and windows 31-01-2025 yet to start
Scheduled Date of handing over possession 31-03-2025 yet to start
Development of common areas, parks, gardens etc 31-01-2025 yet to start
Site Development 31-01-2025 Under Progress
NA 31-01-2025 Under Progress
Ground Floor/Stilt Floor 30-04-2023 In Progress
1 Floor 31-05-2023 In Progress
2 Floor 31-06-2023 In Progress
3 Floor 31-07-2023 In Progress
4 Floor 30-12-2023 In Progress
5 Floor 30-01-2024 In Progress
NA 31-01-2025 In Progress
Ground Floor/Stilt Floor 30-10-2023 In Progress
1 Floor 30-12-2023 In Progress
2 Floor 28-02-2024 yet to start
3 Floor 30-03-2024 yet to start
4 Floor 30-04-2024 yet to start
5 Floor 30-05-2024 yet to start
Electrical Works 31-07-2024 yet to start
Concealed Cabling including Plugs & switches 30-06-2024 yet to start
Installation & Charging of Transformer 31-08-2024 yet to start
Connection to Flats/Apartments 31-10-2024 yet to start
PH works 31-05-2024 yet to start
Laying of concealed Pipes 29-02-2024 yet to start
PH Fittings 31-03-2024 yet to start
Overhead Water Tanks 30-04-2024 yet to start
Water Supply Connection to all units 31-05-2024 yet to start
STP construction and completion 30-11-2024 Yet to Start
Distempering & Colouring of all units and exteriors 31-12-2024 yet to start
Fixation of doors and windows 31-01-2025 yet to start
Scheduled Date of handing over possession 31-03-2025 yet to start
Development of common areas, parks, gardens etc 31-01-2025 yet to start
Site Development 31-01-2025 Under Progress
NA 31-01-2025 Under Progress
Ground Floor/Stilt Floor 30-04-2023 In Progress
1 Floor 31-05-2023 In Progress
2 Floor 31-06-2023 In Progress
3 Floor 31-07-2023 In Progress
4 Floor 30-12-2023 In Progress
5 Floor 30-01-2024 In Progress
NA 31-01-2025 In Progress
Ground Floor/Stilt Floor 30-10-2023 In Progress
1 Floor 30-12-2023 In Progress
2 Floor 28-02-2024 yet to start
3 Floor 30-03-2024 yet to start
4 Floor 30-04-2024 yet to start
5 Floor 30-05-2024 yet to start
Electrical Works 31-07-2024 yet to start
Concealed Cabling including Plugs & switches 30-06-2024 yet to start
Installation & Charging of Transformer 31-08-2024 yet to start
Connection to Flats/Apartments 31-10-2024 yet to start
PH works 31-05-2024 yet to start
Laying of concealed Pipes 29-02-2024 yet to start
PH Fittings 31-03-2024 yet to start
Overhead Water Tanks 30-04-2024 yet to start
Water Supply Connection to all units 31-05-2024 yet to start
STP construction and completion 30-11-2024 Yet to Start
Distempering & Colouring of all units and exteriors 31-12-2024 yet to start
Fixation of doors and windows 31-01-2025 yet to start
Scheduled Date of handing over possession 31-03-2025 yet to start
Development of common areas, parks, gardens etc 31-01-2025 yet to start
Site Development 31-01-2025 Under Progress
NA 31-01-2025 Under Progress
Ground Floor/Stilt Floor 30-04-2023 In Progress
1 Floor 31-05-2023 In Progress
2 Floor 31-06-2023 In Progress
3 Floor 31-07-2023 In Progress
4 Floor 30-12-2023 In Progress
5 Floor 30-01-2024 In Progress
NA 31-01-2025 In Progress
Ground Floor/Stilt Floor 30-10-2023 In Progress NA
1 Floor 30-12-2023 In Progress NA
2 Floor 28-02-2024 yet to start NA
3 Floor 30-03-2024 yet to start NA
4 Floor 30-04-2024 yet to start NA
5 Floor 30-05-2024 yet to start NA
Electrical Works 31-07-2024 yet to start NA
Concealed Cabling including Plugs & switches 30-06-2024 yet to start NA
Installation & Charging of Transformer 31-08-2024 yet to start NA
Connection to Flats/Apartments 31-10-2024 yet to start NA
PH works 31-05-2024 yet to start NA
Laying of concealed Pipes 29-02-2024 yet to start NA
PH Fittings 31-03-2024 yet to start NA
Overhead Water Tanks 30-04-2024 yet to start NA
Water Supply Connection to all units 31-05-2024 yet to start NA
STP construction and completion 30-11-2024 Yet to Start NA
Distempering & Colouring of all units and exteriors 31-12-2024 yet to start NA
Fixation of doors and windows 31-01-2025 yet to start NA
Scheduled Date of handing over possession 31-03-2025 yet to start NA
Development of common areas, parks, gardens etc 31-01-2025 yet to start NA

Category and no. of units to be developed

:  Residential
:  
:  39
:  
:  
:  
Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership
Carpet Area Balcony Area Exclusive Open Terrace Area
1 101 93.92 11.24 NA Promoter
2 102 66.98 7.43 NA Promoter
3 103 68 7.99 NA Promoter
4 104 90.95 10.40 NA Land Owner
5 105 89 10.40 NA Promoter
6 106 83.98 5.2 NA Land Owner
7 107 65.96 7.06 NA Promoter
8 108 93.92 11.24 NA Promoter
9 201 93.92 11.24 NA Promoter
10 202 66.98 7.43 NA Land Owner
11 203 68 7.99 NA Land Owner
12 204 90.95 10.40 NA Promoter
13 205 89 10.40 NA Promoter
14 206 83.98 5.2 NA Promoter
15 207 65.96 7.06 NA Promoter
16 208 93.92 11.24 NA Promoter
17 301 93.92 11.24 NA Promoter
18 302 66.98 7.43 NA Land Owner
19 303 68 7.99 NA Land Owner
20 304 90.95 10.40 NA Land Owner
21 305 89 10.40 NA Promoter
22 306 83.98 5.2 NA Land Owner
23 307 65.96 7.06 NA Promoter
24 308 93.92 11.24 NA Promoter
25 401 93.92 11.24 NA Promoter
26 402 66.98 7.43 NA Land Owner
27 403 68 7.99 NA Land Owner
28 404 90.95 10.40 NA Promoter
29 405 89 10.40 NA Promoter
30 406 83.98 5.2 NA Land Owner
31 407 65.96 7.06 NA Promoter
32 408 93.92 11.24 NA Promoter
33 501 93.92 11.24 NA Promoter
34 502 66.98 7.43 NA Land Owner
35 503 68 7.99 NA Land Owner
36 504 90.95 10.40 NA Land Owner
37 505 89 10.40 NA Promoter
38 506 83.98 5.2 NA Land Owner
39 507 65.96 7.06 NA Promoter
Types of garages and parking
House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
101 Covered Parking 1 3.04x5.0 15.2 Included
102 Covered Parking 2 2.89x5.18 14.97 Included
103 Covered Parking 3 3.47x5.48 19.02 Included
104 Covered Parking 4 3.0x5.0 15.0 Included
105 Covered Parking 5 3.0x5.1 15.3 Included
106 Covered Parking 6 4.5x4.2 18.9 Included
107 Covered Parking 7 3.24x5.2 16.85 Included
108 Covered Parking 8 4.8x3.87 18.58 Included
201 Covered Parking 9 3.04x5.0 15.2 Included
202 Covered Parking 10 2.89x5.18 14.97 Included
203 Covered Parking 11 3.47x5.48 19.02 Included
204 Covered Parking 12 3.0x5.0 15.0 Included
205 Covered Parking 13 3.0x5.1 15.3 Included
206 Covered Parking 14 4.5x4.2 18.9 Included
207 Covered Parking 15 3.24x5.2 16.85 Included
208 Covered Parking 16 4.8x3.87 18.58 Included
301 Covered Parking 17 3.04x5.0 15.2 Included
302 Covered Parking 18 2.89x5.18 14.97 Included
303 Covered Parking 19 3.47x5.48 19.02 Included
304 Covered Parking 20 3.0x5.0 15.0 Included
305 Covered Parking 21 3.0x5.1 15.3 Included
306 Covered Parking 22 4.5x4.2 18.9 Included
307 Covered Parking 23 3.24x5.2 16.85 Included
308 Covered Parking 24 4.8x3.87 18.58 Included
401 Covered Parking 25 3.04x5.0 15.2 Included
402 Covered Parking 26 2.89x5.18 14.97 Included
403 Covered Parking 27 3.47x5.48 19.02 Included
404 Covered Parking 28 3.0x5.0 15.0 Included
405 Covered Parking 29 3.0x5.1 15.3 Included
406 Covered Parking 30 4.5x4.2 18.9 Included
407 Covered Parking 31 3.24x5.2 16.85 Included
408 Covered Parking 32 4.8x3.87 18.58 Included
501 Covered Parking 33 3.04x5.0 15.2 Included
502 Covered Parking 34 2.89x5.18 14.97 Included
503 Covered Parking 35 3.47x5.48 19.02 Included
504 Covered Parking 36 3.0x5.0 15.0 Included
505 Covered Parking 37 3.0x5.1 15.3 Included
506 Covered Parking 38 4.5x4.2 18.9 Included
507 Covered Parking 39 3.24x5.2 16.85 Included
Yes

Facilities to be provided

Particulars of Facilities Status of the facility Brief description of facility
Drinking Water Facility Ground Water Copy of Consent Letter
Fire Fighting Facility No
Emergency Evacuation Services Yes Staricase
Use of Renewable Energy Yes Four Spots
Lift Facility Yes Total lifts 02, one 6 passenger lift and one stretcher lift, Brand - RLVT with ARD facility
Market Complex No
Community Hall Yes Width : 4.67mtr.Length : 6.86mtr. Area : 32.0362 Sqmtr. Specification:Well equipped community i.e. 1.Indoor game like Table Tanis,Carom,Chess/Ludo 2.Chair,Tables & furniture for official use
Gymnasium No
Swimming Pool No
Play Ground No
Park/Garden No Area 380.50 Sqmtr.
Plantation Area Yes 238.7 sq. mtr
Others(Please Specify) No
Internal Road Yes 3mtr wide & approx 159.6mtr length internal road with concrete flooring
External Road Yes Turn at hanspal square towards Balianta, the project is located on that road, 400 meters from the NH.
Elecricity Supply Yes Copy of Consent Letter
Other Amenities No

Bank Particulars of the Project

  DCB Bank Ltd.
  Bhubaneswar Branch
  16722000000426
  DCBL0000167
   View
  2570133
  8895959577

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
P.K Mohapatra Construction Engineer Plot No. 1465, Ground Floor, Binayak Complex, Nayapalli, Bhubaneswar, buildsolbbsr@gmail.com , Mob:9437214317 21AAIFB7043E1ZY Essen Kailash
SRB Associates Chartered Accountant 5TH Floor IDCO Tower Janpath, Bahubaneswar-751022, email:srbbbsr@rediffmail.com, Mob:9437079588 325899E Essen Kailash
Asit Rout Architect Plot No-610, K8 Kalinga Nagar , Ghatikia, BBSR-03, asit rout Mail : eurythmy.ad@gmail.com, Mob:9439011606 CA/2010/47734 AR/233/BDA Essen Kailash

Financial Details

:  1180.0234 :   View
  24-06-2024 :  350
:  840 :  0

Documents Attached

Description of Document Option Documents
Fire Safety Certificate Undertaking Attached
Affidavit in Form-A as per clause-l of sub-section-2 of section-4 of the Act Yes Attached
Allotment letter format Yes Attached
Conveyance Deed Format Yes Attached
Affidavit to adopt agreement for sale format as per Rule-8(1) of ORE (R and D) Rules, 2017 Yes Attached
Annual Report 2019-20 Attached
Annual Report 2020-21 Attached
Annual Report 2021-22 Attached
IT Return 2019-20 Attached
IT Return 2020-21 Attached
IT Return 2021-22 Attached
Audit Report 2019-20 Attached
Audit Report 2021-22 Attached
Audit Report 2020-21 Attached

Additional Documents Attached

Sl. No. Title of the document Upload Document
1 Cash Flow Statement of the Firm for Last 3 Years
2 Declaration for the clause Annual Report
3 IT RETURN 2018-2019
4 IT RETURN 2019-2020
5 IT RETURN 2020-2021
6 Audit Report 2018-2019
7 Audit Report 2019-2020
8 Audit Report 2020-2021
9 Affidavit for Bank Declaration

Other documents

“I undertake that the information submitted by me in this application are correct and true to best my knowledge. I also understand that providing false or wrong information is punishable under the Section-60 of the Real Estate (Regulation & Development) Act, 2016. I also further understand that furnishing wrong or false information will lead to rejection of my application registration of the project with forfeiture of registration fee and other charges deposited by me.”
  Declaration for Annual Report and IT Return and Audit Report was mistakenly uploaded wrong document and against that all the respected document uploaded at "Attachment Document" Clause.

Construction Progress

Updated Construction Progress

SL NO. Description Scheduled date of completion Current Status Remarks
1 Site Development 30-09-2021 N.A
2 Roof Casting NA NA NA
3 Ground Floor/Stilt Floor 31-01-2022 N.A
4 1 Floor 31-03-2022 N.A
5 2 Floor 31-05-2022 N.A
6 3 Floor 31-07-2022 N.A
7 4 Floor 30-09-2022 N.A
8 5 Floor 30-11-2022 N.A
9 Brick Work & Plastering NA NA NA
10 Ground Floor/Stilt Floor 31-12-2022 N.A
11 1 Floor 28-02-2023 N.A
12 2 Floor 31-03-2023 N.A
13 3 Floor 30-04-2023 N.A
14 4 Floor 31-05-2023 N.A
15 5 Floor 30-06-2023 N.A
16 Electrical Works 31-05-2023 N.A
17 Concealed Cabling including Plugs & switches 31-08-2023 N.A
18 Installation & Charging of Transformer 31-08-2024 N.A
19 Connection to Flats/Apartments 31-10-2024 N.A
20 PH works 31-05-2024 N.A
21 Laying of concealed Pipes 29-02-2024 N.A
22 PH Fittings 31-03-2024 N.A
23 Overhead Water Tanks 30-04-2024 N.A
24 Water Supply Connection to all units 31-05-2024 N.A
25 STP construction and completion 30-11-2024 N.A
26 Distempering & Colouring of all units and exteriors 31-12-2024 N.A
27 Fixation of doors and windows 31-01-2025 N.A
28 Scheduled Date of handing over possession 31-03-2025 N.A
29 Development of common areas, parks, gardens etc 31-01-2025 N.A
Updated Changes on 12-10-2022
30 Site Development 30-09-2021 Under Progress
31 NA NA NA NA
32 Ground Floor/Stilt Floor 31-01-2022 Not done, Plinth Level Work under Progress
33 1 Floor 31-03-2022 Not done, Plinth Level Work under Progress
34 2 Floor 31-05-2022 Not done, Plinth Level Work under Progress
35 3 Floor 31-07-2022 Not done, Plinth Level Work under Progress
36 4 Floor 30-09-2022 Not done, Plinth Level Work under Progress
37 5 Floor 30-11-2022 Not done, Plinth Level Work under Progress
38 NA NA NA NA
39 Ground Floor/Stilt Floor 31-12-2022 Not done, Plinth Level Work under Progress
40 1 Floor 28-02-2023 Not done, Plinth Level Work under Progress
41 2 Floor 31-03-2023 Not done, Plinth Level Work under Progress
42 3 Floor 30-04-2023 Not done, Plinth Level Work under Progress
43 4 Floor 31-05-2023 Not done, Plinth Level Work under Progress
44 5 Floor 30-06-2023 Not done, Plinth Level Work under Progress
45 Electrical Works 31-05-2023 Not done, Plinth Level Work under Progress
46 Concealed Cabling including Plugs & switches 31-08-2023 Not done, Plinth Level Work under Progress
47 Installation & Charging of Transformer 31-08-2024 Not done, Plinth Level Work under Progress
48 Connection to Flats/Apartments 31-10-2024 Not done, Plinth Level Work under Progress
49 PH works 31-05-2024 Not done, Plinth Level Work under Progress
50 Laying of concealed Pipes 29-02-2024 Not done, Plinth Level Work under Progress
51 PH Fittings 31-03-2024 Not done, Plinth Level Work under Progress
52 Overhead Water Tanks 30-04-2024 Not done, Plinth Level Work under Progress
53 Water Supply Connection to all units 31-05-2024 Not done, Plinth Level Work under Progress
54 STP construction and completion 30-11-2024 Yet to Start
55 Distempering & Colouring of all units and exteriors 31-12-2024 Not done, Plinth Level Work under Progress
56 Fixation of doors and windows 31-01-2025 Not done, Plinth Level Work under Progress
57 Scheduled Date of handing over possession 31-03-2025 Not done, Plinth Level Work under Progress
58 Development of common areas, parks, gardens etc 31-01-2025 Not done, Plinth Level Work under Progress
Updated Changes on 03-04-2023
59 Site Development 31-01-2025 Under Progress
60 NA 31-01-2025 Under Progress NA
61 Ground Floor/Stilt Floor 30-04-2023 Stilt Floor roof casting in progress now. It will be completed by last week of April 2023
62 1 Floor 31-03-2022 yet to start
63 2 Floor 31-05-2022 yet to start
64 3 Floor 31-07-2022 yet to start
65 4 Floor 30-09-2022 yet to start
66 5 Floor 30-11-2022 yet to start
67 NA 31-01-2025 Yet to Start NA
68 Ground Floor/Stilt Floor 31-12-2022 yet to start
69 1 Floor 28-02-2023 yet to start
70 2 Floor 31-03-2023 yet to start
71 3 Floor 30-04-2023 yet to start
72 4 Floor 31-05-2023 yet to start
73 5 Floor 30-06-2023 yet to start
74 Electrical Works 31-05-2023 yet to start
75 Concealed Cabling including Plugs & switches 31-08-2023 yet to start
76 Installation & Charging of Transformer 31-08-2024 yet to start
77 Connection to Flats/Apartments 31-10-2024 yet to start
78 PH works 31-05-2024 yet to start
79 Laying of concealed Pipes 29-02-2024 yet to start
80 PH Fittings 31-03-2024 yet to start
81 Overhead Water Tanks 30-04-2024 yet to start
82 Water Supply Connection to all units 31-05-2024 yet to start
83 STP construction and completion 30-11-2024 Yet to Start
84 Distempering & Colouring of all units and exteriors 31-12-2024 yet to start
85 Fixation of doors and windows 31-01-2025 yet to start
86 Scheduled Date of handing over possession 31-03-2025 yet to start
87 Development of common areas, parks, gardens etc 31-01-2025 yet to start
Updated Changes on 08-07-2023
88 Site Development 31-01-2025 Under Progress
89 NA 31-01-2025 Under Progress
90 Ground Floor/Stilt Floor 30-04-2023 Completed
91 1 Floor 31-03-2022 In Progress
92 2 Floor 31-05-2022 yet to start
93 3 Floor 31-07-2022 yet to start
94 4 Floor 30-09-2022 yet to start
95 5 Floor 30-11-2022 yet to start
96 NA 31-01-2025 Yet to Start
97 Ground Floor/Stilt Floor 31-12-2022 yet to start
98 1 Floor 28-02-2023 yet to start
99 2 Floor 31-03-2023 yet to start
100 3 Floor 30-04-2023 yet to start
101 4 Floor 31-05-2023 yet to start
102 5 Floor 30-06-2023 yet to start
103 Electrical Works 31-05-2023 yet to start
104 Concealed Cabling including Plugs & switches 31-08-2023 yet to start
105 Installation & Charging of Transformer 31-08-2024 yet to start
106 Connection to Flats/Apartments 31-10-2024 yet to start
107 PH works 31-05-2024 yet to start
108 Laying of concealed Pipes 29-02-2024 yet to start
109 PH Fittings 31-03-2024 yet to start
110 Overhead Water Tanks 30-04-2024 yet to start
111 Water Supply Connection to all units 31-05-2024 yet to start
112 STP construction and completion 30-11-2024 Yet to Start
113 Distempering & Colouring of all units and exteriors 31-12-2024 yet to start
114 Fixation of doors and windows 31-01-2025 yet to start
115 Scheduled Date of handing over possession 31-03-2025 yet to start
116 Development of common areas, parks, gardens etc 31-01-2025 yet to start
Updated Changes on 07-10-2023
117 Site Development 31-01-2025 Under Progress
118 NA 31-01-2025 Under Progress
119 Ground Floor/Stilt Floor 30-04-2023 In Progress
120 1 Floor 31-05-2023 In Progress
121 2 Floor 31-06-2023 In Progress
122 3 Floor 31-07-2023 In Progress
123 4 Floor 30-12-2023 In Progress
124 5 Floor 30-01-2024 In Progress
125 NA 31-01-2025 In Progress
126 Ground Floor/Stilt Floor 30-10-2023 In Progress
127 1 Floor 30-12-2023 In Progress
128 2 Floor 28-02-2024 yet to start
129 3 Floor 30-03-2024 yet to start
130 4 Floor 30-04-2024 yet to start
131 5 Floor 30-05-2024 yet to start
132 Electrical Works 31-07-2024 yet to start
133 Concealed Cabling including Plugs & switches 30-06-2024 yet to start
134 Installation & Charging of Transformer 31-08-2024 yet to start
135 Connection to Flats/Apartments 31-10-2024 yet to start
136 PH works 31-05-2024 yet to start
137 Laying of concealed Pipes 29-02-2024 yet to start
138 PH Fittings 31-03-2024 yet to start
139 Overhead Water Tanks 30-04-2024 yet to start
140 Water Supply Connection to all units 31-05-2024 yet to start
141 STP construction and completion 30-11-2024 Yet to Start
142 Distempering & Colouring of all units and exteriors 31-12-2024 yet to start
143 Fixation of doors and windows 31-01-2025 yet to start
144 Scheduled Date of handing over possession 31-03-2025 yet to start
145 Development of common areas, parks, gardens etc 31-01-2025 yet to start
Updated Changes on 22-11-2023
146 Site Development 31-01-2025 Under Progress
147 NA 31-01-2025 Under Progress
148 Ground Floor/Stilt Floor 30-04-2023 In Progress
149 1 Floor 31-05-2023 In Progress
150 2 Floor 31-06-2023 In Progress
151 3 Floor 31-07-2023 In Progress
152 4 Floor 30-12-2023 In Progress
153 5 Floor 30-01-2024 In Progress
154 NA 31-01-2025 In Progress
155 Ground Floor/Stilt Floor 30-10-2023 In Progress
156 1 Floor 30-12-2023 In Progress
157 2 Floor 28-02-2024 yet to start
158 3 Floor 30-03-2024 yet to start
159 4 Floor 30-04-2024 yet to start
160 5 Floor 30-05-2024 yet to start
161 Electrical Works 31-07-2024 yet to start
162 Concealed Cabling including Plugs & switches 30-06-2024 yet to start
163 Installation & Charging of Transformer 31-08-2024 yet to start
164 Connection to Flats/Apartments 31-10-2024 yet to start
165 PH works 31-05-2024 yet to start
166 Laying of concealed Pipes 29-02-2024 yet to start
167 PH Fittings 31-03-2024 yet to start
168 Overhead Water Tanks 30-04-2024 yet to start
169 Water Supply Connection to all units 31-05-2024 yet to start
170 STP construction and completion 30-11-2024 Yet to Start
171 Distempering & Colouring of all units and exteriors 31-12-2024 yet to start
172 Fixation of doors and windows 31-01-2025 yet to start
173 Scheduled Date of handing over possession 31-03-2025 yet to start
174 Development of common areas, parks, gardens etc 31-01-2025 yet to start
Updated Changes on 15-04-2024
175 Site Development 31-01-2025 Under Progress
176 NA 31-01-2025 Under Progress
177 Ground Floor/Stilt Floor 30-04-2023 In Progress
178 1 Floor 31-05-2023 In Progress
179 2 Floor 31-06-2023 In Progress
180 3 Floor 31-07-2023 In Progress
181 4 Floor 30-12-2023 In Progress
182 5 Floor 30-01-2024 In Progress
183 NA 31-01-2025 In Progress
184 Ground Floor/Stilt Floor 30-10-2023 In Progress NA
185 1 Floor 30-12-2023 In Progress NA
186 2 Floor 28-02-2024 yet to start NA
187 3 Floor 30-03-2024 yet to start NA
188 4 Floor 30-04-2024 yet to start NA
189 5 Floor 30-05-2024 yet to start NA
190 Electrical Works 31-07-2024 yet to start NA
191 Concealed Cabling including Plugs & switches 30-06-2024 yet to start NA
192 Installation & Charging of Transformer 31-08-2024 yet to start NA
193 Connection to Flats/Apartments 31-10-2024 yet to start NA
194 PH works 31-05-2024 yet to start NA
195 Laying of concealed Pipes 29-02-2024 yet to start NA
196 PH Fittings 31-03-2024 yet to start NA
197 Overhead Water Tanks 30-04-2024 yet to start NA
198 Water Supply Connection to all units 31-05-2024 yet to start NA
199 STP construction and completion 30-11-2024 Yet to Start NA
200 Distempering & Colouring of all units and exteriors 31-12-2024 yet to start NA
201 Fixation of doors and windows 31-01-2025 yet to start NA
202 Scheduled Date of handing over possession 31-03-2025 yet to start NA
203 Development of common areas, parks, gardens etc 31-01-2025 yet to start NA

Booking Status

Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership Status
Carpet Area Balcony Area Exclusive Open Terrace Area
1 101 93.92 11.24 NA Promoter
2 102 66.98 7.43 NA Promoter
3 103 68 7.99 NA Promoter
4 104 90.95 10.40 NA Land Owner
5 105 89 10.40 NA Promoter
6 106 83.98 5.2 NA Land Owner
7 107 65.96 7.06 NA Promoter
8 108 93.92 11.24 NA Promoter
9 201 93.92 11.24 NA Promoter
10 202 66.98 7.43 NA Land Owner
11 203 68 7.99 NA Land Owner
12 204 90.95 10.40 NA Promoter
13 205 89 10.40 NA Promoter
14 206 83.98 5.2 NA Promoter
15 207 65.96 7.06 NA Promoter
16 208 93.92 11.24 NA Promoter
17 301 93.92 11.24 NA Promoter
18 302 66.98 7.43 NA Land Owner
19 303 68 7.99 NA Land Owner
20 304 90.95 10.40 NA Land Owner
21 305 89 10.40 NA Promoter
22 306 83.98 5.2 NA Land Owner
23 307 65.96 7.06 NA Promoter
24 308 93.92 11.24 NA Promoter
25 401 93.92 11.24 NA Promoter
26 402 66.98 7.43 NA Land Owner
27 403 68 7.99 NA Land Owner
28 404 90.95 10.40 NA Promoter
29 405 89 10.40 NA Promoter
30 406 83.98 5.2 NA Land Owner
31 407 65.96 7.06 NA Promoter
32 408 93.92 11.24 NA Promoter
33 501 93.92 11.24 NA Promoter
34 502 66.98 7.43 NA Land Owner
35 503 68 7.99 NA Land Owner
36 504 90.95 10.40 NA Land Owner
37 505 89 10.40 NA Promoter
38 506 83.98 5.2 NA Land Owner
39 507 65.96 7.06 NA Promoter

Financial Status

SL No. Funds Collected from the Allottees Funds Borrowed from Financial Institutions Funds Employed from Own Sources Expenditure As On Date Status
1 4761800 0 20193935 24955736 30-09-2022 Excess Expenditure Incurred
2 6097890 0 21927155 28025045 31-03-2023 25% of the building is completed
3 6666390 0 24539824 31206214 30-06-2023 26% of the building is completed
4 18180249 0 36195422 54375671 22-11-2023 50% of the project has been
5 30213992 0 27629085 57843077 31-03-2024 75% of the project has been completed

Updated Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 The owner/applicant /Technical Person shall strictly adhere to the terms and conditions imposed in the NOC from PHED vide Letter No 7195, Dt.18.05.2021. 24-06-2024 In Progress
2 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per ODA (Planning & Building Standards) Rules, 2020 24-06-2024 In Progress
3 he space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner. 24-06-2024 In Progress
4 Plantation as required under the provision under Rule 30 of ODA (Planning & Building Standards) Rules, 2020.shall be strictly adhered. 24-06-2024 In Progress
5 The Owner/ Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any earthquake/cyclone/any other natural disaster, structural/construction defects , Authority will be no way be held responsible for the same in what so ever manner. 24-06-2024 In Progress
6 The concerned Architect / Applicant / Developer are fully responsible for any deviations additions & alternations beyond approved plan/ defective construction etc. shall be liable for action as per the provisions of the Regulation. 24-06-2024 In Progress
7 The applicant shall comply EIDP in the Engineering wing of BMC & shall execute EIDP & obtain clearance from BMC. 24-06-2024 In Progress
8 Authority shall in no way be held responsible for any structural failure and damage due to earthquake/cyclone/any other natural disaster. 24-06-2024 In Progress
9 The number of dwelling units so approved shall not be changed in any manner 24-06-2024 In Progress
Updated Changes on 12-10-2022
10 The owner/applicant /Technical Person shall strictly adhere to the terms and conditions imposed in the NOC from PHED vide Letter No 7195, Dt.18.05.2021. 24-06-2024 In Progress
11 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per ODA (Planning & Building Standards) Rules, 2020 24-06-2024 In Progress
12 he space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner. 24-06-2024 In Progress
13 Plantation as required under the provision under Rule 30 of ODA (Planning & Building Standards) Rules, 2020.shall be strictly adhered. 24-06-2024 In Progress
14 The Owner/ Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any earthquake/cyclone/any other natural disaster, structural/construction defects , Authority will be no way be held responsible for the same in what so ever manner. 24-06-2024 In Progress
15 The concerned Architect / Applicant / Developer are fully responsible for any deviations additions & alternations beyond approved plan/ defective construction etc. shall be liable for action as per the provisions of the Regulation. 24-06-2024 In Progress
16 The applicant shall comply EIDP in the Engineering wing of BMC & shall execute EIDP & obtain clearance from BMC. 24-06-2024 In Progress
17 Authority shall in no way be held responsible for any structural failure and damage due to earthquake/cyclone/any other natural disaster. 24-06-2024 In Progress
18 The number of dwelling units so approved shall not be changed in any manner 24-06-2024 In Progress
Updated Changes on 03-04-2023
19 The owner/applicant /Technical Person shall strictly adhere to the terms and conditions imposed in the NOC from PHED vide Letter No 7195, Dt.18.05.2021. 24-06-2024 In Progress
20 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per ODA (Planning & Building Standards) Rules, 2020 24-06-2024 In Progress
21 he space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner. 24-06-2024 In Progress
22 Plantation as required under the provision under Rule 30 of ODA (Planning & Building Standards) Rules, 2020.shall be strictly adhered. 24-06-2024 In Progress
23 The Owner/ Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any earthquake/cyclone/any other natural disaster, structural/construction defects , Authority will be no way be held responsible for the same in what so ever manner. 24-06-2024 In Progress
24 The concerned Architect / Applicant / Developer are fully responsible for any deviations additions & alternations beyond approved plan/ defective construction etc. shall be liable for action as per the provisions of the Regulation. 24-06-2024 In Progress
25 The applicant shall comply EIDP in the Engineering wing of BMC & shall execute EIDP & obtain clearance from BMC. 24-06-2024 In Progress
26 Authority shall in no way be held responsible for any structural failure and damage due to earthquake/cyclone/any other natural disaster. 24-06-2024 In Progress
27 The number of dwelling units so approved shall not be changed in any manner 24-06-2024 In Progress
Updated Changes on 08-07-2023
28 The owner/applicant /Technical Person shall strictly adhere to the terms and conditions imposed in the NOC from PHED vide Letter No 7195, Dt.18.05.2021. 24-06-2024 In Progress
29 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per ODA (Planning & Building Standards) Rules, 2020 24-06-2024 In Progress
30 he space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner. 24-06-2024 In Progress
31 Plantation as required under the provision under Rule 30 of ODA (Planning & Building Standards) Rules, 2020.shall be strictly adhered. 24-06-2024 In Progress
32 The Owner/ Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any earthquake/cyclone/any other natural disaster, structural/construction defects , Authority will be no way be held responsible for the same in what so ever manner. 24-06-2024 In Progress
33 The concerned Architect / Applicant / Developer are fully responsible for any deviations additions & alternations beyond approved plan/ defective construction etc. shall be liable for action as per the provisions of the Regulation. 24-06-2024 In Progress
34 The applicant shall comply EIDP in the Engineering wing of BMC & shall execute EIDP & obtain clearance from BMC. 24-06-2024 In Progress
35 Authority shall in no way be held responsible for any structural failure and damage due to earthquake/cyclone/any other natural disaster. 24-06-2024 In Progress
36 The number of dwelling units so approved shall not be changed in any manner 24-06-2024 In Progress
Updated Changes on 06-10-2023
37 The owner/applicant /Technical Person shall strictly adhere to the terms and conditions imposed in the NOC from PHED vide Letter No 7195, Dt.18.05.2021. 24-06-2024 In Progress
38 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per ODA (Planning & Building Standards) Rules, 2020 24-06-2024 In Progress
39 he space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner. 24-06-2024 In Progress
40 Plantation as required under the provision under Rule 30 of ODA (Planning & Building Standards) Rules, 2020.shall be strictly adhered. 24-06-2024 In Progress
41 The Owner/ Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any earthquake/cyclone/any other natural disaster, structural/construction defects , Authority will be no way be held responsible for the same in what so ever manner. 24-06-2024 In Progress
42 The concerned Architect / Applicant / Developer are fully responsible for any deviations additions & alternations beyond approved plan/ defective construction etc. shall be liable for action as per the provisions of the Regulation. 24-06-2024 In Progress
43 The applicant shall comply EIDP in the Engineering wing of BMC & shall execute EIDP & obtain clearance from BMC. 24-06-2024 In Progress
44 Authority shall in no way be held responsible for any structural failure and damage due to earthquake/cyclone/any other natural disaster. 24-06-2024 In Progress
45 The number of dwelling units so approved shall not be changed in any manner 24-06-2024 In Progress
Updated Changes on 22-11-2023
46 The owner/applicant /Technical Person shall strictly adhere to the terms and conditions imposed in the NOC from PHED vide Letter No 7195, Dt.18.05.2021. 24-06-2024 In Progress
47 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per ODA (Planning & Building Standards) Rules, 2020 24-06-2024 In Progress
48 he space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner. 24-06-2024 In Progress
49 Plantation as required under the provision under Rule 30 of ODA (Planning & Building Standards) Rules, 2020.shall be strictly adhered. 24-06-2024 In Progress
50 The Owner/ Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any earthquake/cyclone/any other natural disaster, structural/construction defects , Authority will be no way be held responsible for the same in what so ever manner. 24-06-2024 In Progress
51 The concerned Architect / Applicant / Developer are fully responsible for any deviations additions & alternations beyond approved plan/ defective construction etc. shall be liable for action as per the provisions of the Regulation. 24-06-2024 In Progress
52 The applicant shall comply EIDP in the Engineering wing of BMC & shall execute EIDP & obtain clearance from BMC. 24-06-2024 In Progress
53 Authority shall in no way be held responsible for any structural failure and damage due to earthquake/cyclone/any other natural disaster. 24-06-2024 In Progress
54 The number of dwelling units so approved shall not be changed in any manner 24-06-2024 In Progress
Updated Changes on 10-04-2024
55 The owner/applicant /Technical Person shall strictly adhere to the terms and conditions imposed in the NOC from PHED vide Letter No 7195, Dt.18.05.2021. 24-06-2024 To be complied as mentioned in the approval letter
56 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per ODA (Planning & Building Standards) Rules, 2020 24-06-2024 To be complied as mentioned in the approval letter
57 he space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner. 24-06-2024 To be complied as mentioned in the approval letter
58 Plantation as required under the provision under Rule 30 of ODA (Planning & Building Standards) Rules, 2020.shall be strictly adhered. 24-06-2024 To be complied as mentioned in the approval letter
59 The Owner/ Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any earthquake/cyclone/any other natural disaster, structural/construction defects , Authority will be no way be held responsible for the same in what so ever manner. 24-06-2024 To be complied as mentioned in the approval letter
60 The concerned Architect / Applicant / Developer are fully responsible for any deviations additions & alternations beyond approved plan/ defective construction etc. shall be liable for action as per the provisions of the Regulation. 24-06-2024 To be complied as mentioned in the approval letter
61 The applicant shall comply EIDP in the Engineering wing of BMC & shall execute EIDP & obtain clearance from BMC. 24-06-2024 To be complied as mentioned in the approval letter
62 Authority shall in no way be held responsible for any structural failure and damage due to earthquake/cyclone/any other natural disaster. 24-06-2024 To be complied as mentioned in the approval letter
63 The number of dwelling units so approved shall not be changed in any manner 24-06-2024 To be complied as mentioned in the approval letter

Updated Project Documents

Sl. No. Title of the document Upload Document
1 Soil Testing Report
2 Draft of Rera Agreement Sale
3 Opening of Project Account
4 Project Approval of Essen Kailash from SBI
5 Electry Consent Letter
6 Project Bank account Details
7 AUDITOR REPORT for the year 2021-2022
8 ITR for the year 21-22
9 New Development Agreement with Legal Heirs
10 New General Power of Attorney with Legal Heirs
11 New Share Allocation Agreement with Legal Heirs
12 Proforma I Quarter Oct to Dec 2021
13 Proforma I, II and Bank Statement Quarter January to March 2022
14 Proforma I, II and Bank Statement Quarter April to June 2022
15 Proforma I, II and Bank Statement Quarter July to September 2022
16 Proforma I, II and Bank Statement Quarter Oct to Dec 2022
17 Proforma I, II and Bank Statement Quarter January to March 2023
18 Proforma I, II and Bank Statement Quarter April to June 2023
19 Proforma I, II and Bank Statement Quarter July to September 2023
20 Proforma I, II and Bank Statement Quarter Oct to Dec 2023
:  Pradeep Thacker :  
NA :  AAKPT7887L
:PAN Card :  constructionessen@gmail.com
:  MBA :  9439585958
:  14 Years of experience in construction of building.
:  Yes :  NA
:  Hemant Kumar Thacker :  
NA :  AAKPT7888F
:PAN Card :  constructionessen@gmail.com
:  B.Com :  7854001818
:  12 years work experience in Real Estate
:  Yes :  NA
:  Jitendra Kumar Thacker :  
NA :  AAKPT7889E
:PAN Card :  constructionessen@gmail.com
:  B.Com :  9937067932
:  12 years work experience in Real Estate
:  Yes :  NA
:  Asha Thacker :  
NA :  ABSPT0654J
:PAN Card :  constructionessen@gmail.com
:  B.Com :  9937067935
:  Nil
:  Yes :  NA
:  Krishna Thacker :  
NA :  ABSPT0655K
:PAN Card :  constructionessen@gmail.com
:  B.Com :  9937067933
:  Nil
:  Yes :  NA
:  Anju Thacker :  
NA :  ANGPT0302F
:PAN Card :  constructionessen@gmail.com
:  B.Com :  9937005578
:  Nil
:  Yes :  NA

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
P.K Mohapatra Construction Engineer Plot No. 1465, Ground Floor, Binayak Complex, Nayapalli, Bhubaneswar, buildsolbbsr@gmail.com , Mob:9437214317 21AAIFB7043E1ZY Essen Kailash
SRB Associates Chartered Accountant 5TH Floor IDCO Tower Janpath, Bahubaneswar-751022, email:srbbbsr@rediffmail.com, Mob:9437079588 325899E Essen Kailash
Asit Rout Architect Plot No-610, K8 Kalinga Nagar , Ghatikia, BBSR-03, asit rout Mail : eurythmy.ad@gmail.com, Mob:9439011606 CA/2010/47734 AR/233/BDA Essen Kailash

Updated Units

House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
Updated Changes
101 Covered Parking 1 3.04x5.0 15.2 Included
102 Covered Parking 2 2.89x5.18 14.97 Included
103 Covered Parking 3 3.47x5.48 19.02 Included
104 Covered Parking 4 3.0x5.0 15.0 Included
105 Covered Parking 5 3.0x5.1 15.3 Included
106 Covered Parking 6 4.5x4.2 18.9 Included
107 Covered Parking 7 3.24x5.2 16.85 Included
108 Covered Parking 8 4.8x3.87 18.58 Included
201 Covered Parking 9 3.04x5.0 15.2 Included
202 Covered Parking 10 2.89x5.18 14.97 Included
203 Covered Parking 11 3.47x5.48 19.02 Included
204 Covered Parking 12 3.0x5.0 15.0 Included
205 Covered Parking 13 3.0x5.1 15.3 Included
206 Covered Parking 14 4.5x4.2 18.9 Included
207 Covered Parking 15 3.24x5.2 16.85 Included
208 Covered Parking 16 4.8x3.87 18.58 Included
301 Covered Parking 17 3.04x5.0 15.2 Included
302 Covered Parking 18 2.89x5.18 14.97 Included
303 Covered Parking 19 3.47x5.48 19.02 Included
304 Covered Parking 20 3.0x5.0 15.0 Included
305 Covered Parking 21 3.0x5.1 15.3 Included
306 Covered Parking 22 4.5x4.2 18.9 Included
307 Covered Parking 23 3.24x5.2 16.85 Included
308 Covered Parking 24 4.8x3.87 18.58 Included
401 Covered Parking 25 3.04x5.0 15.2 Included
402 Covered Parking 26 2.89x5.18 14.97 Included
403 Covered Parking 27 3.47x5.48 19.02 Included
404 Covered Parking 28 3.0x5.0 15.0 Included
405 Covered Parking 29 3.0x5.1 15.3 Included
406 Covered Parking 30 4.5x4.2 18.9 Included
407 Covered Parking 31 3.24x5.2 16.85 Included
408 Covered Parking 32 4.8x3.87 18.58 Included
501 Covered Parking 33 3.04x5.0 15.2 Included
502 Covered Parking 34 2.89x5.18 14.97 Included
503 Covered Parking 35 3.47x5.48 19.02 Included
504 Covered Parking 36 3.0x5.0 15.0 Included
505 Covered Parking 37 3.0x5.1 15.3 Included
506 Covered Parking 38 4.5x4.2 18.9 Included
507 Covered Parking 39 3.24x5.2 16.85 Included