Promoter Details
Promoter Name :
BASANTA KUMAR NAYAK
Project Name :
FRONT HOME HORIZON
Project Location :
(Residential Project, S+4, No. of Units. 12)

Form- I

A. Promoter's Details

:  M/s. FRONTLINE HOME CREATION PVT. LTD. :  Private Company
:  U70101OR2010PTC011463 :View
NA :  FF/75, Indradhanu Market, IRC Village, Bhubaneswar, Pin-751015
:  FF/75, Indradhanu Market, IRC Village, Bhubaneswar-751015, Dist. Khordha, Odisha :  frontlinehome1958@gmail.com
:  2360584 :  9437030815
:  AABCF5755B :View
:  10 years experience in construction field in bhubaneswar :  No experience out side the state.
NA

B. Details of Board of Directors / Partners / MC Members

:  BASANTA KUMAR NAYAK :  
:  Director :  AAMPN9091L
:PAN Card :  frontlinehome1958@gmail.com
:  Bachelor in Arts :  9437030815
:  10 years experience as Director at Frontline Home Creation Private Limited.
:  Yes :  NA
:  TEJESWAR PRUSTY :  
:  Director :  AAQPP3134J
:PAN Card :  frontlinehome1958@gmail.com
:  Master in Commerce :  9437071650
:  10 years experience as Director at Frontline Home Creation Private Limited.
:  Yes :  NA

Annexure-1

Details of last projects already implemented (Ongoing or Complete)

Have you implemented any project(s) previously (May be Ongoing or Completed):No

Annexure-2

Details of the project to be registered

:   New :  FRONT HOME HORIZON
:  Residential :  (Residential Project, S+4, No. of Units. 12)
:  Khordha :  Bhubaneswar
:  751003 :  Urban Local Body
:  BHUBANESWAR MUNICIPAL CORPORATION
:  S+4 RESIDENTIAL BUILDING :  NA

Land Details of the Project

:  863 :  443
:  GHATIKIA :  348.38
:  Yes
Yes :  View
:  View
:  Promoter
:  864 :  443
:  ghatikia :  348.38
:  Yes
Yes :  View
:  View
:  Promoter

Development Agreement

: No

Building Plan

  View   View
  Download site plan 10-11-2022

Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 PARKING SPACE MEASURING 390.305 SQM. AS SHOWN IN THE APPROVAL PLAN SHALL BE LEFT FOR PARKING OF VEHICLES AND NO PART OF IT WILL BE USED FOR ANY OTHER PURPOSE AND SHALL NOT BE PARTITIONED/CLOSED IN ANY MANNER 09-11-2022 Work not started
2 land over which construction is proposed is accessible by an approved means of access of 9.14 m. in width. 30-06-2021 Work not started
3 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per (Planning & Building Standards) Regulation'2018 09-11-2022 Work not started
4 20% of the parking space in the apartment building shall be exclusively earmarked for visitors with signage as per norms under Regulation-37(10) of BDA (Planning & Building Standards) Regulations'2018 09-11-2022 Work not started
5 Plantation as required under the provision under regulation 29 of BDA (Planning & Building Standards) Regulations'2018 shall be strictly adhered 09-11-2022 Work not started

Layout Plan

: Yes :  View

Location Map with geo-coordinates of bend points

Point No. Latitude Longitude
1 84°46'24.8''E 20°16'55.2''N
2 84°46'24.0''E 20°16'55.2''N
3 84°46'23.9''E 20°16'56.2''N
4 84°46'24.8''E 20°16'56.2''N
View

Milestone of Project Construction

Description* Scheduled date of completion Current Status Site Images
Site Development 31-01-2020 NOT STARTED
Roof Casting NA NA NA
Ground Floor/Stilt Floor 31-03-2020 NOT STARTED NA
1 Floor 30-04-2020 NOT STARTED NA
2 Floor 16-06-2020 NOT STARTED NA
Brick Work & Plastering NA NA NA
Ground Floor/Stilt Floor 31-12-2020 NOT STARTED NA
1 Floor 10-02-2021 NOT STARTED NA
Electrical Works 30-06-2022 NOT STARTED NA
Concealed Cabling including Plugs & switches 30-06-2022 NOT STARTED NA
Installation & Charging of Transformer 30-06-2022 NOT STARTED NA
Connection to Flats/Apartments 30-06-2022 NOT STARTED NA
PH works 30-06-2022 NOT STARTED NA
Laying of concealed Pipes 30-06-2022 NOT STARTED NA
PH Fittings 30-09-2022 NOT STARTED NA
Overhead Water Tanks 30-09-2022 NOT STARTED NA
Water Supply Connection to all units 31-10-2022 NOT STARTED NA
STP construction and completion 31-10-2022 NOT STARTED NA
Distempering & Colouring of all units and exteriors 31-10-2022 NOT STARTED NA
Fixation of doors and windows 31-10-2022 NOT STARTED NA
Scheduled Date of handing over possession 09-11-2022 NOT STARTED NA
Development of common areas, parks, gardens etc 08-11-2022 NOT STARTED NA
3 Floor 30-08-2020 NOT STARTED NA
4 Floor 15-10-2020 NOT STARTED NA
2 Floor 30-04-2021 NOT STARTED NA
3 Floor 30-06-2021 NOT STARTED NA
4 Floor 30-08-2021 NOT STARTED NA
Site Development 28-12-2019 Completed NA
NA NA NA NA
Ground Floor/Stilt Floor 15-01-2021 Completed NA
1 Floor 30-04-2020 NOT STARTED NA
2 Floor 16-06-2020 NOT STARTED NA
NA NA NA NA
Ground Floor/Stilt Floor 31-12-2020 NOT STARTED NA
1 Floor 10-02-2021 NOT STARTED NA
Electrical Works 30-06-2022 NOT STARTED NA
Concealed Cabling including Plugs & switches 30-06-2022 NOT STARTED NA
Installation & Charging of Transformer 30-06-2022 NOT STARTED NA
Connection to Flats/Apartments 30-06-2022 NOT STARTED NA
PH works 30-06-2022 NOT STARTED NA
Laying of concealed Pipes 30-06-2022 NOT STARTED NA
PH Fittings 30-09-2022 NOT STARTED NA
Overhead Water Tanks 30-09-2022 NOT STARTED NA
Water Supply Connection to all units 31-10-2022 NOT STARTED NA
STP construction and completion 31-10-2022 NOT STARTED NA
Distempering & Colouring of all units and exteriors 31-10-2022 NOT STARTED NA
Fixation of doors and windows 31-10-2022 NOT STARTED NA
Scheduled Date of handing over possession 09-11-2022 NOT STARTED NA
Development of common areas, parks, gardens etc 08-11-2022 NOT STARTED NA
3 Floor 30-08-2020 NOT STARTED NA
4 Floor 15-10-2020 NOT STARTED NA
2 Floor 30-04-2021 NOT STARTED NA
3 Floor 30-06-2021 NOT STARTED NA
4 Floor 30-08-2021 NOT STARTED NA
Site Development 28-12-2019 Completed NA
NA 28-12-2019 Completed NA
Ground Floor/Stilt Floor 15-01-2021 Completed NA
1 Floor 30-04-2020 Completed NA
2 Floor 16-06-2020 Completed NA
NA 16-06-20 Completed NA
Ground Floor/Stilt Floor 31-12-2020 Completed NA
1 Floor 10-02-2021 Completed NA
Electrical Works 30-06-2022 NOT STARTED NA
Concealed Cabling including Plugs & switches 30-06-2022 NOT STARTED NA
Installation & Charging of Transformer 30-06-2022 NOT STARTED NA
Connection to Flats/Apartments 30-06-2022 NOT STARTED NA
PH works 30-06-2022 NOT STARTED NA
Laying of concealed Pipes 30-06-2022 NOT STARTED NA
PH Fittings 30-09-2022 NOT STARTED NA
Overhead Water Tanks 30-09-2022 NOT STARTED NA
Water Supply Connection to all units 31-10-2022 NOT STARTED NA
STP construction and completion 31-10-2022 NOT STARTED NA
Distempering & Colouring of all units and exteriors 31-10-2022 NOT STARTED NA
Fixation of doors and windows 31-10-2022 NOT STARTED NA
Scheduled Date of handing over possession 09-11-2022 NOT STARTED NA
Development of common areas, parks, gardens etc 08-11-2022 NOT STARTED NA
3 Floor 30-08-2020 Completed NA
4 Floor 15-10-2020 Completed NA
2 Floor 30-04-2021 Completed NA
3 Floor 30-06-2021 Completed NA
4 Floor 30-08-2021 Completed NA
Site Development 28-12-2019 Completed NA
NA 28-12-2019 Completed NA
Ground Floor/Stilt Floor 15-01-2021 Completed
1 Floor 30-04-2020 Completed
2 Floor 16-06-2020 Completed
NA 16-06-20 Completed NA
Ground Floor/Stilt Floor 31-12-2020 Completed NA
1 Floor 10-02-2021 Completed NA
Electrical Works 30-06-2022 NOT STARTED NA
Concealed Cabling including Plugs & switches 30-06-2022 NOT STARTED NA
Installation & Charging of Transformer 30-06-2022 NOT STARTED NA
Connection to Flats/Apartments 30-06-2022 NOT STARTED NA
PH works 30-06-2022 NOT STARTED NA
Laying of concealed Pipes 30-06-2022 NOT STARTED NA
PH Fittings 30-09-2022 NOT STARTED NA
Overhead Water Tanks 30-09-2022 NOT STARTED NA
Water Supply Connection to all units 31-10-2022 NOT STARTED NA
STP construction and completion 31-10-2022 NOT STARTED NA
Distempering & Colouring of all units and exteriors 31-10-2022 NOT STARTED NA
Fixation of doors and windows 31-10-2022 NOT STARTED NA
Scheduled Date of handing over possession 09-11-2022 NOT STARTED NA
Development of common areas, parks, gardens etc 08-11-2022 NOT STARTED NA
3 Floor 30-08-2020 Completed NA
4 Floor 15-10-2020 Completed NA
2 Floor 30-04-2021 Completed NA
3 Floor 30-06-2021 Completed NA
4 Floor 30-08-2021 Completed NA
Site Development 28-12-2019 Completed NA
NA 28-12-2019 Completed NA
Ground Floor/Stilt Floor 15-01-2021 Completed NA
1 Floor 30-04-2020 Completed NA
2 Floor 16-06-2020 Completed NA
NA 16-06-20 Completed NA
Ground Floor/Stilt Floor 31-12-2020 Completed NA
1 Floor 10-02-2021 Completed NA
Electrical Works 30-06-2022 Completed NA
Concealed Cabling including Plugs & switches 30-06-2022 Completed NA
Installation & Charging of Transformer 30-06-2022 Completed NA
Connection to Flats/Apartments 30-06-2022 Completed NA
PH works 30-06-2022 Completed NA
Laying of concealed Pipes 30-06-2022 Completed NA
PH Fittings 30-09-2022 Completed NA
Overhead Water Tanks 30-09-2022 Completed NA
Water Supply Connection to all units 31-10-2022 Completed NA
STP construction and completion 31-10-2022 Completed NA
Distempering & Colouring of all units and exteriors 31-10-2022 Completed
Fixation of doors and windows 31-10-2022 Completed NA
Scheduled Date of handing over possession 09-11-2022 Completed
Development of common areas, parks, gardens etc 08-11-2022 Completed NA
3 Floor 30-08-2020 Completed NA
4 Floor 15-10-2020 Completed NA
2 Floor 30-04-2021 Completed NA
3 Floor 30-06-2021 Completed NA
4 Floor 30-08-2021 Completed NA

Category and no. of units to be developed

:  Residential
:  
:  12
:  
:  
:  
Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership
Carpet Area Balcony Area Exclusive Open Terrace Area
1 101 79.84 4.83 0 Promoter
2 102 64.94 4.52 0 Promoter
3 103 70.38 4.66 0 Promoter
4 201 79.84 4.83 0 Promoter
5 202 79.81 4.52 0 Promoter
6 203 70.38 4.66 0 Promoter
7 301 79.84 4.83 0 Promoter
8 302 79.81 4.52 0 Promoter
9 303 70.38 4.66 0 Promoter
10 401 79.84 4.83 0 Promoter
11 402 79.81 4.52 0 Promoter
12 403 70.38 4.66 0 Promoter
Types of garages and parking
House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
101 Covered Parking 101 4.93X4.68 23.05 Included
102 Covered Parking 102 4.93X4.04 19.90 Included
103 Covered Parking 103 4.93X3.25 16.02 Included
201 Covered Parking 201 4.64X4.58 21.28 Included
202 Covered Parking 202 4.64X4.71 21.87 Included
203 Covered Parking 203 4.64X3.63 16.84 Included
301 Covered Parking 301 5.19X3.75 19.46 Included
302 Covered Parking 302 5.19X3.75 19.46 Included
303 Covered Parking 303 4.64X3.63 16.84 Included
401 Covered Parking 401 4.99X4.04 20.15 Included
402 Covered Parking 402 4.99X4.68 23.35 Included
403 Covered Parking 403 4.99X3.25 16.21 Included
No
NA

Facilities to be provided

Particulars of Facilities Status of the facility Brief description of facility
Drinking Water Facility Ground Water Copy of Consent Letter
Fire Fighting Facility No
Emergency Evacuation Services No
Use of Renewable Energy No
Lift Facility Yes JOHNSON LIFT, 6 PASSENGER LIFT
Market Complex No
Community Hall Yes CARPET AREA =12.22 SQM. LOCATED AT FIRST FLOOR
Gymnasium No
Swimming Pool No
Play Ground No
Park/Garden No
Plantation Area Yes 34.83 SQM
Others(Please Specify) No
Internal Road No
External Road No
Elecricity Supply Yes Copy of Consent Letter
Other Amenities No

Bank Particulars of the Project

  BANK OF MAHARASHTRA
  NAYAPALLI BRANCH
  60347104963
  MAHB0001182
   View
  2564018
  8763637472

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
ARABINDA PRASAD DAS Architect ARCHITECTS COMBINE, PLOT NO-29/153, AUM GARDEN, MAITREE VIHAR, CHANDRASEKHAR PUR, BHUBANESWAR, mob. no-9437005031, mail id.- info@architectscombine.com CA/1993/16490 FRONT HOME HORIZON
JYOTI RANJAN MISHRA Chartered Accountant CHAND & CO., PLOT NO-GA-722, 2ND FLOOR, K-3-B, KALINGA NAGAR, VIA MAHALAXMI VIHAR, BHUBANESWAR, PIN-751029, MOB. NO-9437164796, MAIL ID.- chandandco@yahoo.co.in 058587 FRONT HOME HORIZON
SUDHANSHU SEKHAR PANDA Construction Engineer YANTREE, BAMPHI SAHI , NEW COLONY, CUTTACK, MOB. NO-9437092014, MAIL ID- sudhansu72_panda@yahoo.co.in IE/T09680 FRONT HOME HORIZON

Financial Details

:  234 :   View
  09-11-2022 :  0
:  234 :  0

Documents Attached

Description of Document Option Documents
Fire Safety Certificate Undertaking Attached
Affidavit in Form-A as per clause-l of sub-section-2 of section-4 of the Act Yes Attached
Allotment letter format Yes Attached
Conveyance Deed Format Yes Attached
Affidavit to adopt agreement for sale format as per Rule-8(1) of ORE (R and D) Rules, 2017 Yes Attached
Annual Report 2019-20 Attached
IT Return 2019-20 Attached
Audit Report 2019-20 Attached
Annual Report 2018-19 Attached
Annual Report 2017-18 Attached
IT Return 2018-19 Attached
IT Return 2017-18 Attached
Audit Report 2018-19 Attached
Audit Report 2017-18 Attached

Additional Documents Attached

Sl. No. Title of the document Upload Document
1 PLOT NO-864 LEASE DEED SAROJ KANT MISHRA
2 PLOT NO-864 CONVEYANCE DEED SAROJ KANT MISHRA
3 PLOT NO-864 SALE DEED SAROJ KANT MISHRA TO KABITA KUMARI PANDA
4 PLOT NO-864 SALE DEED KABITA KUMARI PANDA TO FRONTLINE HOME CREATION PVT LTD
5 PLOT NO-863 LEASE DEED BIJAYALAXMI MISHRA
6 PLOT NO-863 CONVEYANCE DEED BIJAYALAXMI MISHRA
7 PLOT NO-863 SALE DEED BIJAYALAXMI MISHRA TO FRONTLINE HOME CREATION PVT LTD

Other documents

“I undertake that the information submitted by me in this application are correct and true to best my knowledge. I also understand that providing false or wrong information is punishable under the Section-60 of the Real Estate (Regulation & Development) Act, 2016. I also further understand that furnishing wrong or false information will lead to rejection of my application registration of the project with forfeiture of registration fee and other charges deposited by me.”
  1.FLOW OF TITLE FOR PLOT NO-863, MOUZA- GHATIKIA LEASE DEED (BIJAYALAXMI MISHRA)-CONVEYANCE DEED (BIJAYALAXMI MISHRA)-SALE DEED (BIJAYALAXMI MISHRA TO FRONTLINE HOME CREATION PVT. LTD.) 2.FLOW OF TITLE FOR PLOT NO-864, MOUZA-GHATIKIA LEASE DEED (SAROJ KANT MISHRA)-CONVEYANCE DEED (SAROJ KANT MISHRA)-SALE DEED (SAROJ KANT MISHRA TO KABITA KUMARI PANDA)-SALE DEED (KABITA KUMARI PANDA- FRONTLINE HOME CREATION PVT. LTD.)

Construction Progress

Updated Construction Progress

SL NO. Description Scheduled date of completion Current Status Remarks
1 Site Development 31-01-2020 NOT STARTED
2 Roof Casting NA NA NA
3 Ground Floor/Stilt Floor 31-03-2020 NOT STARTED NA
4 1 Floor 30-04-2020 NOT STARTED NA
5 2 Floor 16-06-2020 NOT STARTED NA
6 Brick Work & Plastering NA NA NA
7 Ground Floor/Stilt Floor 31-12-2020 NOT STARTED NA
8 1 Floor 10-02-2021 NOT STARTED NA
9 Electrical Works 30-06-2022 NOT STARTED NA
10 Concealed Cabling including Plugs & switches 30-06-2022 NOT STARTED NA
11 Installation & Charging of Transformer 30-06-2022 NOT STARTED NA
12 Connection to Flats/Apartments 30-06-2022 NOT STARTED NA
13 PH works 30-06-2022 NOT STARTED NA
14 Laying of concealed Pipes 30-06-2022 NOT STARTED NA
15 PH Fittings 30-09-2022 NOT STARTED NA
16 Overhead Water Tanks 30-09-2022 NOT STARTED NA
17 Water Supply Connection to all units 31-10-2022 NOT STARTED NA
18 STP construction and completion 31-10-2022 NOT STARTED NA
19 Distempering & Colouring of all units and exteriors 31-10-2022 NOT STARTED NA
20 Fixation of doors and windows 31-10-2022 NOT STARTED NA
21 Scheduled Date of handing over possession 09-11-2022 NOT STARTED NA
22 Development of common areas, parks, gardens etc 08-11-2022 NOT STARTED NA
23 3 Floor 30-08-2020 NOT STARTED NA
24 4 Floor 15-10-2020 NOT STARTED NA
25 2 Floor 30-04-2021 NOT STARTED NA
26 3 Floor 30-06-2021 NOT STARTED NA
27 4 Floor 30-08-2021 NOT STARTED NA
Updated Changes on 19-01-2021
28 Site Development 28-12-2019 Completed NA
29 NA NA NA NA
30 Ground Floor/Stilt Floor 15-01-2021 Completed NA
31 1 Floor 30-04-2020 NOT STARTED NA
32 2 Floor 16-06-2020 NOT STARTED NA
33 NA NA NA NA
34 Ground Floor/Stilt Floor 31-12-2020 NOT STARTED NA
35 1 Floor 10-02-2021 NOT STARTED NA
36 Electrical Works 30-06-2022 NOT STARTED NA
37 Concealed Cabling including Plugs & switches 30-06-2022 NOT STARTED NA
38 Installation & Charging of Transformer 30-06-2022 NOT STARTED NA
39 Connection to Flats/Apartments 30-06-2022 NOT STARTED NA
40 PH works 30-06-2022 NOT STARTED NA
41 Laying of concealed Pipes 30-06-2022 NOT STARTED NA
42 PH Fittings 30-09-2022 NOT STARTED NA
43 Overhead Water Tanks 30-09-2022 NOT STARTED NA
44 Water Supply Connection to all units 31-10-2022 NOT STARTED NA
45 STP construction and completion 31-10-2022 NOT STARTED NA
46 Distempering & Colouring of all units and exteriors 31-10-2022 NOT STARTED NA
47 Fixation of doors and windows 31-10-2022 NOT STARTED NA
48 Scheduled Date of handing over possession 09-11-2022 NOT STARTED NA
49 Development of common areas, parks, gardens etc 08-11-2022 NOT STARTED NA
50 3 Floor 30-08-2020 NOT STARTED NA
51 4 Floor 15-10-2020 NOT STARTED NA
52 2 Floor 30-04-2021 NOT STARTED NA
53 3 Floor 30-06-2021 NOT STARTED NA
54 4 Floor 30-08-2021 NOT STARTED NA
Updated Changes on 24-09-2021
55 Site Development 28-12-2019 Completed NA
56 NA 28-12-2019 Completed NA
57 Ground Floor/Stilt Floor 15-01-2021 Completed NA
58 1 Floor 30-04-2020 Completed NA
59 2 Floor 16-06-2020 Completed NA
60 NA 16-06-20 Completed NA
61 Ground Floor/Stilt Floor 31-12-2020 Completed NA
62 1 Floor 10-02-2021 Completed NA
63 Electrical Works 30-06-2022 NOT STARTED NA
64 Concealed Cabling including Plugs & switches 30-06-2022 NOT STARTED NA
65 Installation & Charging of Transformer 30-06-2022 NOT STARTED NA
66 Connection to Flats/Apartments 30-06-2022 NOT STARTED NA
67 PH works 30-06-2022 NOT STARTED NA
68 Laying of concealed Pipes 30-06-2022 NOT STARTED NA
69 PH Fittings 30-09-2022 NOT STARTED NA
70 Overhead Water Tanks 30-09-2022 NOT STARTED NA
71 Water Supply Connection to all units 31-10-2022 NOT STARTED NA
72 STP construction and completion 31-10-2022 NOT STARTED NA
73 Distempering & Colouring of all units and exteriors 31-10-2022 NOT STARTED NA
74 Fixation of doors and windows 31-10-2022 NOT STARTED NA
75 Scheduled Date of handing over possession 09-11-2022 NOT STARTED NA
76 Development of common areas, parks, gardens etc 08-11-2022 NOT STARTED NA
77 3 Floor 30-08-2020 Completed NA
78 4 Floor 15-10-2020 Completed NA
79 2 Floor 30-04-2021 Completed NA
80 3 Floor 30-06-2021 Completed NA
81 4 Floor 30-08-2021 Completed NA
Updated Changes on 24-01-2022
82 Site Development 28-12-2019 Completed NA
83 NA 28-12-2019 Completed NA
84 Ground Floor/Stilt Floor 15-01-2021 Completed
85 1 Floor 30-04-2020 Completed
86 2 Floor 16-06-2020 Completed
87 NA 16-06-20 Completed NA
88 Ground Floor/Stilt Floor 31-12-2020 Completed NA
89 1 Floor 10-02-2021 Completed NA
90 Electrical Works 30-06-2022 NOT STARTED NA
91 Concealed Cabling including Plugs & switches 30-06-2022 NOT STARTED NA
92 Installation & Charging of Transformer 30-06-2022 NOT STARTED NA
93 Connection to Flats/Apartments 30-06-2022 NOT STARTED NA
94 PH works 30-06-2022 NOT STARTED NA
95 Laying of concealed Pipes 30-06-2022 NOT STARTED NA
96 PH Fittings 30-09-2022 NOT STARTED NA
97 Overhead Water Tanks 30-09-2022 NOT STARTED NA
98 Water Supply Connection to all units 31-10-2022 NOT STARTED NA
99 STP construction and completion 31-10-2022 NOT STARTED NA
100 Distempering & Colouring of all units and exteriors 31-10-2022 NOT STARTED NA
101 Fixation of doors and windows 31-10-2022 NOT STARTED NA
102 Scheduled Date of handing over possession 09-11-2022 NOT STARTED NA
103 Development of common areas, parks, gardens etc 08-11-2022 NOT STARTED NA
104 3 Floor 30-08-2020 Completed NA
105 4 Floor 15-10-2020 Completed NA
106 2 Floor 30-04-2021 Completed NA
107 3 Floor 30-06-2021 Completed NA
108 4 Floor 30-08-2021 Completed NA
Updated Changes on 14-04-2023
109 Site Development 28-12-2019 Completed NA
110 NA 28-12-2019 Completed NA
111 Ground Floor/Stilt Floor 15-01-2021 Completed NA
112 1 Floor 30-04-2020 Completed NA
113 2 Floor 16-06-2020 Completed NA
114 NA 16-06-20 Completed NA
115 Ground Floor/Stilt Floor 31-12-2020 Completed NA
116 1 Floor 10-02-2021 Completed NA
117 Electrical Works 30-06-2022 Completed NA
118 Concealed Cabling including Plugs & switches 30-06-2022 Completed NA
119 Installation & Charging of Transformer 30-06-2022 Completed NA
120 Connection to Flats/Apartments 30-06-2022 Completed NA
121 PH works 30-06-2022 Completed NA
122 Laying of concealed Pipes 30-06-2022 Completed NA
123 PH Fittings 30-09-2022 Completed NA
124 Overhead Water Tanks 30-09-2022 Completed NA
125 Water Supply Connection to all units 31-10-2022 Completed NA
126 STP construction and completion 31-10-2022 Completed NA
127 Distempering & Colouring of all units and exteriors 31-10-2022 Completed
128 Fixation of doors and windows 31-10-2022 Completed NA
129 Scheduled Date of handing over possession 09-11-2022 Completed
130 Development of common areas, parks, gardens etc 08-11-2022 Completed NA
131 3 Floor 30-08-2020 Completed NA
132 4 Floor 15-10-2020 Completed NA
133 2 Floor 30-04-2021 Completed NA
134 3 Floor 30-06-2021 Completed NA
135 4 Floor 30-08-2021 Completed NA

Booking Status

Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership Status
Carpet Area Balcony Area Exclusive Open Terrace Area
1 101 79.84 4.83 0 Promoter
2 102 64.94 4.52 0 Promoter
3 103 70.38 4.66 0 Promoter
4 201 79.84 4.83 0 Promoter
5 202 79.81 4.52 0 Promoter
6 203 70.38 4.66 0 Promoter
7 301 79.84 4.83 0 Promoter
8 302 79.81 4.52 0 Promoter
9 303 70.38 4.66 0 Promoter
10 401 79.84 4.83 0 Promoter
11 402 79.81 4.52 0 Promoter
12 403 70.38 4.66 0 Promoter

Financial Status

SL No. Funds Collected from the Allottees Funds Borrowed from Financial Institutions Funds Employed from Own Sources Expenditure As On Date Status
1 10058000 0 3136362 13194362 19-01-2021 Stilt floor roof casting completed
2 30704000 0 0 20967799 31-08-2021 4th Floor Brick work completed
3 37060150 0 0 23982024 31-12-2021 Flooring Completed
4 49222502 0 0 36817365 31-03-2023 Construction Completed

Updated Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 PARKING SPACE MEASURING 390.305 SQM. AS SHOWN IN THE APPROVAL PLAN SHALL BE LEFT FOR PARKING OF VEHICLES AND NO PART OF IT WILL BE USED FOR ANY OTHER PURPOSE AND SHALL NOT BE PARTITIONED/CLOSED IN ANY MANNER 09-11-2022 Work not started
2 land over which construction is proposed is accessible by an approved means of access of 9.14 m. in width. 30-06-2021 Work not started
3 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per (Planning & Building Standards) Regulation'2018 09-11-2022 Work not started
4 20% of the parking space in the apartment building shall be exclusively earmarked for visitors with signage as per norms under Regulation-37(10) of BDA (Planning & Building Standards) Regulations'2018 09-11-2022 Work not started
5 Plantation as required under the provision under regulation 29 of BDA (Planning & Building Standards) Regulations'2018 shall be strictly adhered 09-11-2022 Work not started
Updated Changes on 19-01-2021
6 PARKING SPACE MEASURING 390.305 SQM. AS SHOWN IN THE APPROVAL PLAN SHALL BE LEFT FOR PARKING OF VEHICLES AND NO PART OF IT WILL BE USED FOR ANY OTHER PURPOSE AND SHALL NOT BE PARTITIONED/CLOSED IN ANY MANNER 09-11-2022 Work not started
7 land over which construction is proposed is accessible by an approved means of access of 9.14 m. in width. 30-06-2021 Work not started
8 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per (Planning & Building Standards) Regulation'2018 09-11-2022 Work not started
9 20% of the parking space in the apartment building shall be exclusively earmarked for visitors with signage as per norms under Regulation-37(10) of BDA (Planning & Building Standards) Regulations'2018 09-11-2022 Work not started
10 Plantation as required under the provision under regulation 29 of BDA (Planning & Building Standards) Regulations'2018 shall be strictly adhered 09-11-2022 Work not started
Updated Changes on 24-01-2022
11 PARKING SPACE MEASURING 390.305 SQM. AS SHOWN IN THE APPROVAL PLAN SHALL BE LEFT FOR PARKING OF VEHICLES AND NO PART OF IT WILL BE USED FOR ANY OTHER PURPOSE AND SHALL NOT BE PARTITIONED/CLOSED IN ANY MANNER 09-11-2022 Work not started
12 land over which construction is proposed is accessible by an approved means of access of 9.14 m. in width. 30-06-2021 WORK IN PROGRESS
13 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per (Planning & Building Standards) Regulation'2018 09-11-2022 Work not started
14 20% of the parking space in the apartment building shall be exclusively earmarked for visitors with signage as per norms under Regulation-37(10) of BDA (Planning & Building Standards) Regulations'2018 09-11-2022 Work not started
15 Plantation as required under the provision under regulation 29 of BDA (Planning & Building Standards) Regulations'2018 shall be strictly adhered 09-11-2022 Work not started
Updated Changes on 14-04-2023
16 PARKING SPACE MEASURING 390.305 SQM. AS SHOWN IN THE APPROVAL PLAN SHALL BE LEFT FOR PARKING OF VEHICLES AND NO PART OF IT WILL BE USED FOR ANY OTHER PURPOSE AND SHALL NOT BE PARTITIONED/CLOSED IN ANY MANNER 09-11-2022 Completed
17 land over which construction is proposed is accessible by an approved means of access of 9.14 m. in width. 30-06-2021 Completed
18 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per (Planning & Building Standards) Regulation'2018 09-11-2022 Completed
19 20% of the parking space in the apartment building shall be exclusively earmarked for visitors with signage as per norms under Regulation-37(10) of BDA (Planning & Building Standards) Regulations'2018 09-11-2022 Completed
20 Plantation as required under the provision under regulation 29 of BDA (Planning & Building Standards) Regulations'2018 shall be strictly adhered 09-11-2022 Completed

Updated Project Documents

Sl. No. Title of the document Upload Document
1 CGWA NOC
2 CGWA NOC
3 CGWA NOC
4 CGWA NOC
:  BASANTA KUMAR NAYAK :  
NA :  AAMPN9091L
:PAN Card :  frontlinehome1958@gmail.com
:  Bachelor in Arts :  9437030815
:  10 years experience as Director at Frontline Home Creation Private Limited.
:  Yes :  NA
:  TEJESWAR PRUSTY :  
NA :  AAQPP3134J
:PAN Card :  frontlinehome1958@gmail.com
:  Master in Commerce :  9437071650
:  10 years experience as Director at Frontline Home Creation Private Limited.
:  Yes :  NA

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
ARABINDA PRASAD DAS Architect ARCHITECTS COMBINE, PLOT NO-29/153, AUM GARDEN, MAITREE VIHAR, CHANDRASEKHAR PUR, BHUBANESWAR, mob. no-9437005031, mail id.- info@architectscombine.com CA/1993/16490 FRONT HOME HORIZON
JYOTI RANJAN MISHRA Chartered Accountant CHAND & CO., PLOT NO-GA-722, 2ND FLOOR, K-3-B, KALINGA NAGAR, VIA MAHALAXMI VIHAR, BHUBANESWAR, PIN-751029, MOB. NO-9437164796, MAIL ID.- chandandco@yahoo.co.in 058587 FRONT HOME HORIZON
SUDHANSHU SEKHAR PANDA Construction Engineer YANTREE, BAMPHI SAHI , NEW COLONY, CUTTACK, MOB. NO-9437092014, MAIL ID- sudhansu72_panda@yahoo.co.in IE/T09680 FRONT HOME HORIZON

Updated Units

House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
101 Covered Parking 101 4.93X4.68 23.05 Included
102 Covered Parking 102 4.93X4.04 19.90 Included
103 Covered Parking 103 4.93X3.25 16.02 Included
201 Covered Parking 201 4.64X4.58 21.28 Included
202 Covered Parking 202 4.64X4.71 21.87 Included
203 Covered Parking 203 4.64X3.63 16.84 Included
301 Covered Parking 301 5.19X3.75 19.46 Included
302 Covered Parking 302 5.19X3.75 19.46 Included
303 Covered Parking 303 4.64X3.63 16.84 Included
401 Covered Parking 401 4.99X4.04 20.15 Included
402 Covered Parking 402 4.99X4.68 23.35 Included
403 Covered Parking 403 4.99X3.25 16.21 Included