Promoter Details
Promoter Name :
Jagat Kumar Kar
Project Name :
DHARMA SUDARSHAN
Project Location :
(Mixed Project, Basement + Stilt + 5 storied Commercial (Guest House-cum-Holiday Home Building), No. of Residential Units- 150, No. of Commercial units- 28)

Form- I

A. Promoter's Details

:  M/S. DHARMA INFRAPROJECTS PVT. LTD :  Private Company
:  U70101OR2010PTC012601 :View
NA :  Office No.- 5, 2nd floor, Block-2, BMC Bhawani Mall, Saheed Nagar, Bhubaneswar, Dist- Khordha, Odisha.
:  Office No.- 5, 2nd Floor, Block-2, BMC Bhawani Mall, Saheed Nagar, Bhubaneswar, Dist- Khordha, Odisha. :  dharma.infraprojects@gmail.com
:  2549900 :  9337119834
:  AADCD9223C :View
:  13 YEARS :  NA
NA

B. Details of Board of Directors / Partners / MC Members

:  Jagat Kumar Kar :  
:  Managing Director :  AKGPK1219F
:PAN Card :  jagat2kar@gmail.com
:  Btech :  9337119834
:  20 YEARS
:  Yes :  NA
:  MADHUSMITA DASH :  
:  Director :  AHCPD9250A
:PAN Card :  madhu4jagat@gmail.com
:  MBA :  9658199991
:   10 YEARS
:  Yes :  NA

Annexure-1

Details of last projects already implemented (Ongoing or Complete)

1. :  DHARMA ARCADE :  Residential
:  RAGHUNATHPUR BHUBANESWAR :  Completed
:  No

:   :  
:   :  
:  
: No :  NA
: No :  NA
2. :  DHARMA HEAVEN :  Residential
:  PURI :  Completed
:  RP/26/2018/00023 NA
:  Joint Venture
:  S+4 NA NA :  S+4
:  No

:   :  
:   :  
:  
: No :  NA
: No :  NA
3. :   DHARMA RESIDENCY :  Residential
:  P NO-1554/9979LOTGADAKANA :  Completed
:  RP/2021/000510 NA
:  Joint Venture
:  RESIDENTIAL BUILDING -S+4 NA NA :  RESIDENTIAL BUILDING -S+4
:  No

:   :  
:   :  
:  
: No :  NA
: No :  NA
4. :  DHARMA AALAYAM :  Mixed
:  RAGHUNATHPUR BHUBANESWAR :  Ongoing
:  Plot No. 1400/2606, Khata No. 609/671, Plot No. 1399/2605, Khata No. 609/671, Mouza –Naharakanta, Bhubaneswar, Dist. Khordha NA
:  Joint Venture
:  RESIDENTIAL BUILDING -S+4 :  Proposed S+5 Residential Apartment Cum Commercial Building :  Proposed S+5 Residential Apartment Cum Commercial Building :  RESIDENTIAL BUILDING -S+4
:  No

:   :  
:   :  
:  
: No :  NA
: No :  NA

Annexure-2

Details of the project to be registered

:   New :  DHARMA SUDARSHAN
:  Mixed :  (Mixed Project, Basement + Stilt + 5 storied Commercial (Guest House-cum-Holiday Home Building), No. of Residential Units- 150, No. of Commercial units- 28)
:  Puri :  Puri Sadar
:  752001 :  Development Authority
:  PURI KONARK DEVELOPMENT AUTHORITY
:  B+S+5 STORIED RESIDENTIAL APARTMENT :  S+5 STORIED COMMERCIAL(GUEST HOUSE-CUM-HOLIDAY HOME BUILDING)

Land Details of the Project


:  79 :  379
:  PURI SAHAR, UNIT-3, MANGALAGHATA :  854
:  Yes
No :  View
:  View
:  Other Person
:  Rabindranath Senapati & others :  General Power of Attorney
: No
: Yes
:  41482201912 :  25-03-2023
:  DSR-PURI :  Attached

:  80 :  379
:  PURI SAHAR, UNIT-3, MANGALAGHATA :  40.471
:  Yes
No :  View
:  View
:  Other Person
:  Rabindranath Senapati & others :  General Power of Attorney
: No
: Yes
:  41482201912 :  25-03-2023
:  DSR-PURI :  Attached

:  81 :  379
:  PURI SAHAR, UNIT-3, MANGALAGHATA :  2327
:  Yes
No :  View
:  View
:  Other Person
:  Rabindranath Senapati & others :  General Power of Attorney
: No
: Yes
:  41482201912 :  25-03-2023
:  DSR-PURI :  Attached

:  82 :  379
:  PURI SAHAR, UNIT-3, MANGALAGHATA :  720.38
:  Yes
No :  View
:  View
:  Other Person
:  Rabindranath Senapati & others :  General Power of Attorney
: No
: Yes
:  41482201912 :  25-03-2023
:  DSR-PURI :  Attached

Development Agreement

: Yes
Serial No. Particulars of the Person Land/Plot Details Share of the Person Document Attached
1 Rabindranath Senapati & others 79, 80, 81, & 82 40%   Agreement Copy

Building Plan

  View   View
  Download site plan 04-04-2026
05-04-2023

Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 The land/ building shall be used for Residential Apartment (MIG), Guest House/Holiday Home purpose and the use shall not be changed to any other use without prior approval of this Authority. 04-04-2026 Work Not yet Started
2 The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement. 04-04-2026 Work Not yet Started
3 Parking space measuring an area 2319.19 sq.mt.in Stilt & Basement as shown in the approved plan shall be exclusively used for parking of vehicles and no part of it shall be used for any other purpose. 04-04-2026 Work Not yet Started
4 The land over which construction is proposed is accessible by an approved means of access of 9.15 mtr.in width. 04-04-2026 Work Not yet Started
5 The land in question must be in lawful ownership and peaceful possession of the applicants. 04-04-2026 Work Not yet Started
6 Permission granted under these Rules shall remain valid up to three years from the date of issue. However, the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribed under rules. 04-04-2026 Work Not yet Started
7 Approval of plan and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards) Rules, 2020 or under any other law for the time being in force. 04-04-2026 Work Not yet Started
8 Approval of plan would mean granting of permission to construct under these Regulations in force only and shall not mean among other things 04-04-2026 Work Not yet Started
9 In case of any dispute arising out of land record or in respect of right, te & Interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute. 04-04-2026 Work Not yet Started
10 Neither granting of the permission, the approval of the drawing and specifications nor inspections made by the authority during erection of the building shall in any way rolleve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBCI-2016 and these regulations. 04-04-2026 Work Not yet Started
11 Ensure engagement of PMO and submit report on stage wise construction as required under Rule-14 of ODA (P&B.S.) Rules, 2020. 04-04-2026 Work Not yet Started
12 The persons to whom a permit is issued during construction shall keep pasted in a conspicuous place on the property in respect of which the permit was issued. 04-04-2026 Work Not yet Started
13 No storm water/water shall be discharged to the public road/public premises and other adjoining plots. 04-04-2026 Work Not yet Started
14 Adhere to the provisions of ODA (Planning & Building Standard) Rules, 2020 strictly and conditions thereto. 04-04-2026 Work Not yet Started
15 Plantation shall be provided as per Rule of 30 of ODA (P & B.S.) Rules, 2020 within the premises of the plot area without affecting vehicular movement. 04-04-2026 Work Not yet Started
16 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Rule 47 of ODA (Planning & Building Standard Rule-2020) 04-04-2026 Work Not yet Started
17 The applicant shall use fly ash based products for construction such as: cement or concrete, fly ash bricks or blocks or tiles or clay fly ash bricks, blocks or tiles or clay fly ash bricks or blocks or tiles or cement fly ash bricks or blocks or similar products or pmbination or aggregate of them, in your construction/project. 04-04-2026 Work Not yet Started
18 Toilet block not connected to sewer system shall have onsite sanitation systems like septic tanks constructed as per IS-2470(part-1)-1985 and leach Pit constructed as per IS-12314-1987. 04-04-2026 Work Not yet Started
19 The numbers of dwelling units/guest house room so approved and mentioned in the plan shall not be changed in any manner. 04-04-2026 Work Not yet Started
20 The applicant shall get the EIDP approved towards development of external infrastructure, execute it and obtain clearance from Puri Municipality before Occupancy. 04-04-2026 Work Not yet Started
21 Plot No- 82 with kisam Jalasaya-1 shall be retained as such. 04-04-2026 Work Not yet Started
22 The developer shall ensure allotment / sale of MIG dwelling units to targeted group of MIG category only. 04-04-2026 Work Not yet Started

Layout Plan

: Yes :  View

Location Map with geo-coordinates of bend points

Point No. Latitude Longitude
1 19°48'24.5"°N 85°48'37.1"°E
2 19°48'25.1"°N 85°48'37.3"°E
3 19°48'25.5"°N 85°48'36.8"°E
4 19°48'26.2"°N 85°48'37.2"°E
5 19°48'25.9"°N 85°48'38.0"°E
6 19°48'26.9"°N 85°48'38.4"°E
7 19°48'26.7"°N 85°48'39.0"°E
8 19°48'25.9"°N 85°48'38.6"°E
9 19°48'25.6"°N 85°48'39.0"°E
10 19°48'25.3"°N 85°48'40.0"°E
11 19°48'24.4"°N 85°48'39.6"°E
12 19°48'24.4"°N 85°48'38.7"°E
View

Milestone of Project Construction

Description* Scheduled date of completion Current Status Site Images
Site Development 05-04-2023 Work in progress
Roof Casting NA NA NA
Ground Floor/Stilt Floor 05-05-2023 Work in progress NA
1 Floor 05-06-2023 Not started yet NA
2 Floor 05-07-2023 Not started yet NA
3 Floor 05-08-2023 Not started yet NA
4 Floor 05-09-2023 Not started yet NA
5 Floor 05-10-2023 Not started yet NA
Brick Work & Plastering NA NA NA
Ground Floor/Stilt Floor 05-07-2023 Not started yet NA
1 Floor 05-08-2023 Not started yet NA
2 Floor 05-10-2023 Not started yet NA
3 Floor 05-12-2023 Not started yet NA
4 Floor 05-01-2024 Not started yet NA
5 Floor 05-02-2024 Not started yet NA
Electrical Works 05-04-2024 Not started yet NA
Concealed Cabling including Plugs & switches 05-06-2024 Not started yet NA
Installation & Charging of Transformer 05-08-2024 Not started yet NA
Connection to Flats/Apartments 05-10-2024 Not started yet NA
PH works 05-12-2024 Not started yet NA
Laying of concealed Pipes 05-01-2025 Not started yet NA
PH Fittings 05-03-2025 Not started yet NA
Overhead Water Tanks 05-05-2025 Not started yet NA
Water Supply Connection to all units 05-06-2025 Not started yet NA
STP construction and completion 05-08-2025 Not started yet NA
Distempering & Colouring of all units and exteriors 05-10-2025 Not started yet NA
Fixation of doors and windows 05-12-2025 Not started yet NA
Scheduled Date of handing over possession 05-01-2026 Not started yet NA
Development of common areas, parks, gardens etc 04-04-2026 Not started yet NA
Site Development 05-04-2023 Work in progress
NA NA NA NA
Ground Floor/Stilt Floor 05-05-2023 Work in progress NA
1 Floor 05-06-2023 Not started yet NA
2 Floor 05-07-2023 Not started yet NA
3 Floor 05-08-2023 Not started yet NA
4 Floor 05-09-2023 Not started yet NA
5 Floor 05-10-2023 Not started yet NA
NA NA NA NA
Ground Floor/Stilt Floor 05-07-2023 Not started yet NA
1 Floor 05-08-2023 Not started yet NA
2 Floor 05-10-2023 Not started yet NA
3 Floor 05-12-2023 Not started yet NA
4 Floor 05-01-2024 Not started yet NA
5 Floor 05-02-2024 Not started yet NA
Electrical Works 05-04-2024 Not started yet NA
Concealed Cabling including Plugs & switches 05-06-2024 Not started yet NA
Installation & Charging of Transformer 05-08-2024 Not started yet NA
Connection to Flats/Apartments 05-10-2024 Not started yet NA
PH works 05-12-2024 Not started yet NA
Laying of concealed Pipes 05-01-2025 Not started yet NA
PH Fittings 05-03-2025 Not started yet NA
Overhead Water Tanks 05-05-2025 Not started yet NA
Water Supply Connection to all units 05-06-2025 Not started yet NA
STP construction and completion 05-08-2025 Not started yet NA
Distempering & Colouring of all units and exteriors 05-10-2025 Not started yet NA
Fixation of doors and windows 05-12-2025 Not started yet NA
Scheduled Date of handing over possession 05-01-2026 Not started yet NA
Development of common areas, parks, gardens etc 04-04-2026 Not started yet NA
Site Development 05-04-2023 Completed
NA 05-05-2023 Completed NA
Ground Floor/Stilt Floor 05-06-2024 Work in progress
1 Floor 05-08-2024 Not started yet NA
2 Floor 05-09-2024 Not started yet NA
3 Floor 05-10-2024 Not started yet NA
4 Floor 05-12-2024 Not started yet NA
5 Floor 05-01-2024 Not started yet NA
NA 05-02-2025 Not started yet NA
Ground Floor/Stilt Floor 05-03-2025 Not started yet NA
1 Floor 05-04-2025 Not started yet NA
2 Floor 05-06-2025 Not started yet NA
3 Floor 05-07-2025 Not started yet NA
4 Floor 05-08-2025 Not started yet NA
5 Floor 05-09-2025 Not started yet NA
Electrical Works 05-10-2025 Not started yet NA
Concealed Cabling including Plugs & switches 05-12-2025 Not started yet NA
Installation & Charging of Transformer 05-02-2026 Not started yet NA
Connection to Flats/Apartments 05-06-2026 Not started yet NA
PH works 05-09-2026 Not started yet NA
Laying of concealed Pipes 05-10-2026 Not started yet NA
PH Fittings 05-11-2026 Not started yet NA
Overhead Water Tanks 05-12-2026 Not started yet NA
Water Supply Connection to all units 05-02-2027 Not started yet NA
STP construction and completion 05-08-2027 Not started yet NA
Distempering & Colouring of all units and exteriors 05-06-2028 Not started yet NA
Fixation of doors and windows 05-09-2028 Not started yet NA
Scheduled Date of handing over possession 05-10-2028 Not started yet NA
Development of common areas, parks, gardens etc 05-12-2028 Not started yet NA

Category and no. of units to be developed

:  Mixed
:  
:  150
:  
:  28
:  
Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership
Carpet Area Balcony Area Exclusive Open Terrace Area
1 B-101 24.526 2.972 . Promoter
2 B-102 24.526 2.972 0 Promoter
3 B-103 24.526 2.972 0 Promoter
4 B-104 24.526 2.972 0 Promoter
5 B-105 24.526 2.972 0 Promoter
6 B-106 24.526 2.972 0 Promoter
7 B-107 24.526 2.972 0 Promoter
8 B-108 30.75 2.972 0 Promoter
9 B-109 34.467 2.936 0 Promoter
10 B-110 30.658 3.412 0 Promoter
11 B-111 28.335 2.972 0 Promoter
12 B-112 28.335 2.972 0 Promoter
13 B-113 28.335 2.972 0 Promoter
14 B-114 28.335 2.972 0 Promoter
15 B-201 24.526 2.972 0 Promoter
16 B-202 24.526 2.972 0 Promoter
17 B-203 24.526 2.972 0 Promoter
18 B-204 24.526 2.972 0 Promoter
19 B-205 24.526 2.972 0 Promoter
20 B-206 24.526 2.972 0 Promoter
21 B-207 24.526 2.972 0 Promoter
22 B-208 30.75 2.972 0 Promoter
23 B-209 34.467 2.936 0 Promoter
24 B-210 30.658 3.412 0 Promoter
25 B-211 28.335 2.972 0 Promoter
26 B-212 28.335 2.972 0 Promoter
27 B-213 28.335 2.972 0 Promoter
28 B-214 28.335 2.972 0 Promoter
29 B-301 24.526 2.972 0 Land Owner
30 B-302 24.526 2.972 0 Land Owner
31 B-303 24.526 2.972 0 Land Owner
32 B-304 24.526 2.972 0 Land Owner
33 B-305 24.526 2.972 0 Land Owner
34 B-306 24.526 2.972 0 Land Owner
35 B-307 24.526 2.972 0 Land Owner
36 B-308 30.75 2.972 0 Land Owner
37 B-309 34.467 2.936 0 Land Owner
38 B-310 30.658 3.412 0 Land Owner
39 B-311 28.335 2.972 0 Land Owner
40 B-312 28.335 2.972 0 Land Owner
41 B-313 28.335 2.972 0 Land Owner
42 B-314 28.335 2.972 0 Land Owner
43 B-401 24.526 2.972 0 Land Owner
44 B-402 24.526 2.972 0 Land Owner
45 B-403 24.526 2.972 0 Land Owner
46 B-404 24.526 2.972 0 Land Owner
47 B-405 24.526 2.972 0 Land Owner
48 B-406 24.526 2.972 0 Land Owner
49 B-407 24.526 2.972 0 Land Owner
50 B-408 30.75 2.972 0 Land Owner
51 B-409 34.467 2.936 0 Land Owner
52 B-410 30.658 3.412 0 Land Owner
53 B-411 28.335 2.972 0 Land Owner
54 B-412 28.335 2.972 0 Land Owner
55 B-413 28.335 2.972 0 Land Owner
56 B-414 28.335 2.972 0 Land Owner
57 B-501 24.526 2.972 0 Promoter
58 B-502 24.526 2.972 0 Promoter
59 B-503 24.526 2.972 0 Promoter
60 B-504 24.526 2.972 0 Promoter
61 B-505 24.526 2.972 0 Promoter
62 B-506 24.526 2.972 0 Promoter
63 B-507 24.526 2.972 0 Promoter
64 B-508 30.75 2.972 0 Promoter
65 B-509 34.467 2.936 0 Promoter
66 B-510 30.658 3.412 0 Promoter
67 B-511 28.335 2.972 0 Promoter
68 B-512 28.335 2.972 0 Promoter
69 B-513 28.335 2.972 0 Promoter
70 B-514 28.335 2.972 0 Promoter
71 C-101 26.662 2.972 0 Land Owner
72 C-102 26.662 2.972 0 Land Owner
73 C-103 26.662 2.972 0 Land Owner
74 C-104 26.662 2.972 0 Land Owner
75 C-105 26.662 2.972 0 Land Owner
76 C-106 26.662 2.972 0 Land Owner
77 C-107 26.662 2.972 0 Land Owner
78 C-108 26.662 2.972 0 Land Owner
79 C-109 26.662 2.972 0 Land Owner
80 C-110 26.662 2.972 0 Land Owner
81 C-111 26.662 2.972 0 Land Owner
82 C-112 26.662 2.972 0 Land Owner
83 C-113 26.662 2.972 0 Land Owner
84 C-114 26.662 2.972 0 Land Owner
85 C-115 26.662 2.972 0 Land Owner
86 C-116 26.662 2.972 0 Land Owner
87 C-201 26.662 2.972 0 Land Owner
88 C-202 26.662 2.972 0 Land Owner
89 C-203 26.662 2.972 0 Land Owner
90 C-204 26.662 2.972 0 Land Owner
91 C-205 26.662 2.972 0 Land Owner
92 C-206 26.662 2.972 0 Land Owner
93 C-207 26.662 2.972 0 Land Owner
94 C-208 26.662 2.972 0 Land Owner
95 C-209 26.662 2.972 0 Land Owner
96 C-210 26.662 2.972 00 Land Owner
97 C-211 26.662 2.972 0 Land Owner
98 C-212 26.662 2.972 00 Land Owner
99 C-213 26.662 2.972 0 Land Owner
100 C-214 26.662 2.972 0 Land Owner
101 C-215 26.662 2.972 0 Land Owner
102 C-216 26.662 2.972 0 Land Owner
103 C-301 26.662 2.972 0 Promoter
104 C-302 26.662 2.972 0 Promoter
105 C-303 26.662 2.972 0 Promoter
106 C-304 26.662 2.972 0 Promoter
107 C-305 26.662 2.972 0 Promoter
108 C-306 26.662 2.972 0 Promoter
109 C-307 26.662 2.972 0 Promoter
110 C-308 26.662 2.972 0 Promoter
111 C-309 26.662 2.972 0 Promoter
112 C-310 26.662 2.972 0 Promoter
113 C-311 26.662 2.972 0 Promoter
114 C-312 26.662 2.972 0 Promoter
115 C-313 26.662 2.972 0 Promoter
116 C-314 26.662 2.972 0 Promoter
117 C-315 26.662 2.972 0 Promoter
118 C-316 26.662 2.972 0 Promoter
119 C-401 26.662 2.972 0 Promoter
120 C-402 26.662 2.972 0 Promoter
121 C-403 26.662 2.972 0 Promoter
122 C-404 26.662 2.972 0 Promoter
123 C-405 26.662 2.972 00 Promoter
124 C-406 26.662 2.972 0 Promoter
125 C-407 26.662 2.972 0 Promoter
126 C-408 26.662 2.972 0 Promoter
127 C-409 26.662 2.972 0 Promoter
128 C-410 26.662 2.972 0 Promoter
129 C-411 26.662 2.972 0 Promoter
130 C-412 26.662 2.972 0 Promoter
131 C-413 26.662 2.972 0 Promoter
132 C-414 26.662 2.972 0 Promoter
133 C-415 26.662 2.972 0 Promoter
134 C-416 26.662 2.972 0 Promoter
135 C-501 26.662 2.972 0 Promoter
136 C-502 26.662 2.972 0 Promoter
137 C-503 26.662 2.972 0 Promoter
138 C-504 26.662 2.972 0 Promoter
139 C-505 26.662 2.972 0 Promoter
140 C-506 26.662 2.972 0 Promoter
141 C-507 26.662 2.972 0 Promoter
142 C-508 26.662 2.972 0 Promoter
143 C-509 26.662 2.972 0 Promoter
144 C-510 26.662 2.972 0 Promoter
145 C-511 26.662 2.972 0 Promoter
146 C-512 26.662 2.972 0 Promoter
147 C-513 26.662 2.972 0 Promoter
148 C-514 26.662 2.972 0 Promoter
149 C-515 26.662 2.972 0 Promoter
150 C-516 26.662 2.972 0 Promoter
Types of garages and parking
House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
A01 Covered Parking 01 4.19 X 4.29 17.97 Included
A-02 Covered Parking 02 4.19 X 4.29 17.97 Included
A-03 Covered Parking 03 4.06 X 4.29 17.41 Included
A-04 Covered Parking 04 4.06 X 4.29 17.41 Included
A-05 Covered Parking 05 4.06 X 4.29 17.41 Included
A-06 Covered Parking 06 4.06 X 4.29 17.41 Included
A-07 Covered Parking 07 4.14 X 4.29 17.76 Included
A-08 Covered Parking 08 4.14 X 4.29 17.76 Included
A-09 Covered Parking 09 3.8 X 4.14 15.73 Included
A-10 Covered Parking 10 3.8 X 4.14 15.73 Included
A-11 Covered Parking 11 3.8 X 4.14 15.73 Included
A-12 Covered Parking 12 3.8 X 4.14 15.73 Included
A-13 Covered Parking 13 3.8 X 4.14 15.73 Included
A-14 Covered Parking 14 3.8 X 4.01 15.73 Included
B-01 Covered Parking 15 3.37 X 4.26 15.73 Included
B-02 Covered Parking 16 3.37 X 4.26 14.35 Included
B-03 Covered Parking 17 3.02 X 5.22 15.76 Included
B-04 Covered Parking 18 3.02 X 5.22 16.91 Included
B-05 Covered Parking 19 3.02 X 5.22 16.91 Included
B-06 Covered Parking 20 3.01 X 5.22 15.71 Included
B-07 Covered Parking 21 2.6 X 4.26 11.07 Included
B-08 Covered Parking 22 2.61 X 4.26 11.11 Included
B-09 Covered Parking 23 2.48 X 4.26 10.56 Included
B-10 Covered Parking 24 2.73 X 4.26 11.62 Included
B-11 Covered Parking 25 3.02 X 5.21 15.73 Included
B-12 Covered Parking 26 3.24 X 5.21 16.88 Included
B-13 Covered Parking 27 3.24 X 5.46 17.69 Included
B-14 Covered Parking 28 3.59 X 5.46 19.6 Included
B-15 Covered Parking 29 2.73 X 4.95 13.51 Included
B-16 Covered Parking 30 2.73 X 4.95 13.51 Included
B-17 Covered Parking 31 5.63 X 5.17 13.59 Included
B-18 Covered Parking 32 4.59 X 4.54 20.83 Included
B-19 Covered Parking 33 3.48 X 4.26 14.82 Included
B-20 Open Parking 34 2.46 X 4.26 10.47 Included
B-21 Covered Parking 35 2.96 X 4.54 13.43 Included
B-22 Covered Parking 36 2.46 X 4.26 10.47 Included
B-23 Covered Parking 37 4.08 X 4.81 19.62 Included
B-24 Covered Parking 38 3.87 X 4.33 16.75 Included
B-25 Covered Parking 39 4.09 X 4.33 17.7 Included
B-26 Covered Parking 40 3.62 X 4.33 15.67 Included
B-27 Covered Parking 41 3.62 X 4.33 15.67 Included
B-28 Covered Parking 42 3.62 X 4.33 15.67 Included
B-29 Covered Parking 43 4.09 X 4.33 17.7 Included
B-30 Covered Parking 44 4.09 X 4.33 17.7 Included
B-31 Covered Parking 45 3.87 X 4.33 16.75 Included
B-32 Covered Parking 46 3.87 X 4.33 16.75 Included
C/01 Covered Parking 47 2.5 X 4.11 2.74 X 4.11 10.27 Included
C/02 Covered Parking 48 2.5 X 4.11 2.74 X 4.11 10.27 Included
C/03 Covered Parking 49 2.74 X 4.11 11.26 Included
C/04 Covered Parking 50 3.71 X 4.11 15.24 Included
C/05 Covered Parking 51 2.44 X 4.11 10.02 Included
C/06 Covered Parking 52 2.44 X 4.11 10.02 Included
C/07 Covered Parking 53 3.56 X 5.13 18.26 Included
C/08 Covered Parking 54 3.56 X 5.13 18.26 Included
C/09 Covered Parking 55 3.56 X 4.36 15.52 Included
C/10 Covered Parking 56 3.2 X 4.17 13.34 Included
C/11 Covered Parking 57 2.44 X 4.11 10.02 Included
C/12 Covered Parking 58 2.44 X 4.11 10.02 Included
C/13 Covered Parking 59 2.5 X 4.11 10.27 Included
C/14 Covered Parking 60 2.5 X 4.11 10.27 Included
C/15 Covered Parking 61 2.74 X 4.11 11.26 Included
C/16 Covered Parking 62 3.71 X 4.11 15.24 Included
C/17 Covered Parking 63 2.5 X 4.36 10.9 Included
C/18 Covered Parking 64 2.5 X 4.36 10.9 Included
C/19 Covered Parking 65 3.39 X 4.36 14.78 Included
C/20 Covered Parking 66 3.39 X 4.36 14.78 Included
C/21 Covered Parking 67 3.61 X 4.06 14.65 Included
C/22 Covered Parking 68 2.44 X 4.11 10.02 Included
C/23 Covered Parking 69 2.44 X 4.11 10.02 Included
C/24 Covered Parking 70 3.56 X 6.6 23.49 Included
C/25 Covered Parking 71 3.56 X 6.6 23.49 Included
C/26 Covered Parking 72 3.43 X 4.36 14.95 Included
C/27 Covered Parking 73 2.82 X 4.17 11.75 Included
C/28 Covered Parking 74 2.44 X 4.11 10.02 Included
C/29 Covered Parking 75 2.44 X 4.11 10.02 Included
C/30 Covered Parking 76 2.57 X 4.36 11.2 Included
C/31 Covered Parking 77 2.57 X 4.36 11.2 Included
C/32 Covered Parking 78 3.33 X 4.36 14.51 Included
C/33 Covered Parking 79 3.33 X 4.36 14.51 Included
C/34 Covered Parking 80 2.88 X 5.07 14.6 Included
C/35 Covered Parking 81 3.12 X 5.07 15.81 Included
Commercial Units
House Number Dimensions (Length x Width) Carpet Area in square metres Ownership
A-101 26.974 X 6.165 166.295 Promoter
A-201 5.427 X 3.886 21.089 Land Owner
A-202 5.427 X 3.886 21.089 Land Owner
A-203 5.427 X 3.886 21.089 Land Owner
A-204 5.427 X 3.886 21.089 Land Owner
A-205 6.413 X 3.81 24.433 Land Owner
A-206 6.413 X 3.81 24.433 Land Owner
A-207 6.461 X 3.81 24.619 Land Owner
A-301 5.427 X 3.886 21.089 Land Owner
A-302 5.427 X 3.886 21.089 Land Owner
A-303 5.427 X 3.886 21.089 Land Owner
A-304 5.427 X 3.886 21.089 Land Owner
A-305 6.413 X 3.81 24.433 Land Owner
A-306 6.413 X 3.81 24.433 Land Owner
A-307 6.461 X 3.81 24.619 Land Owner
A-401 5.427 X 3.886 21.089 Promoter
A-402 5.427 X 3.886 21.089 Promoter
A-403 5.427 X 3.886 21.089 Promoter
A-404 5.427 X 3.886 21.089 Promoter
A-405 6.413 X 3.81 24.433 Promoter
A-406 6.413 X 3.81 24.433 Promoter
A-407 6.461 X 3.81 24.619 Promoter
A-501 5.427 X 3.886 21.089 Promoter
A-502 5.427 X 3.886 21.089 Promoter
A-503 5.427 X 3.886 21.089 Promoter
A-504 5.427 X 3.886 21.089 Promoter
A-505 6.413 X 3.81 24.433 Promoter
A-506 6.413 X 3.81 24.433 Promoter
A-507 6.413 X 3.81 24.619 Promoter
Yes

Facilities to be provided

Particulars of Facilities Status of the facility Brief description of facility
Drinking Water Facility Ground Water Copy of Consent Letter
Fire Fighting Facility Yes Fire Estinguisher, Fire Alarm, Fire Buckets etc.
Emergency Evacuation Services Yes Satire case provided
Use of Renewable Energy No
Lift Facility Yes 5 Nos of jhonson/otis/etc brand of 8 passenger capacity with ARD facility of lift & 2 nos of Stretcher lift
Market Complex No
Community Hall Yes 132.54 Sqmt
Gymnasium No
Swimming Pool No
Play Ground No
Park/Garden No
Plantation Area Yes 328.00 Sqmt
Others(Please Specify) No
Internal Road Yes 922.69 Sqmt internal road road with paver block flooring
External Road Yes 9.14 M. Wide external road connecting road adjacent to project plot
Elecricity Supply Yes Copy of Consent Letter
Other Amenities No

Bank Particulars of the Project

  ICICI Bank
  Sahid Nagar II
  006105016283
  ICIC0007287
   View
  007287
  7993326937

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
MR. AKSHAYA KUMAR MUDULI Architect A/151,SAHID NAGAR,BHUBANESWAR. MAIL ID: arpaint12@gmail.com, Mob- 9238308095 CA/97/21736 Yes
RABINDRA MOHAPTRA Construction Engineer Plot no-1272/1275,GAYATRI NAGAR,BOMIKHAL,BBSR-10 MAIL ID:srengineering462@gmail.com, Mob -7894199885 RTP/DTP(STER)-093/2018 Yes
SMARTECH REALCON PVT.LTD Contractor 914,LAXMI SAGAR,BHUBANESWAR, Mail ID: subhakantabehera.behera@gmail.com, Mob- 8917284600 CIN- U452000R2019PTC031713 Yes
PARTHA S MISHRA & CO Chartered Accountant PLOT NO - GA-140,GROUND FLOOR,NILADREE VIHAR,BBSR-21, MAIL ID:psmefiling@gmail.com, Mob-9437044824 324467E

Financial Details

:  2419.26 :   View
  31-12-2028 :  300
:  2119.26 :  0

Documents Attached

Description of Document Option Documents
Fire Safety Certificate Certificate Attached
Affidavit in Form-A as per clause-l of sub-section-2 of section-4 of the Act Yes Attached
Allotment letter format Yes Attached
Conveyance Deed Format Yes Attached
Affidavit to adopt agreement for sale format as per Rule-8(1) of ORE (R and D) Rules, 2017 Yes Attached
Annual Report 2020-21 Attached
Annual Report 2021-22 Attached
Annual Report 2022-23 Attached
IT Return 2020-21 Attached
IT Return 2021-22 Attached
IT Return 2022-23 Attached
Audit Report 2020-21 Attached
Audit Report 2021-22 Attached
Audit Report 2022-23 Attached

Additional Documents Attached

Sl. No. Title of the document Upload Document
1 Affidavit From-A Expected Completion Date will be change 31/12/28
2 Affidavit Regarding Plot no-82 Kissam- Jalasaya
3 Clarification Regarding Parking area
4 Clarification Regarding Commercial unit- A-101
5 Affidavit with NOC from Vysya Bank Ltd.
6 Request letter for field open

Other documents

“I undertake that the information submitted by me in this application are correct and true to best my knowledge. I also understand that providing false or wrong information is punishable under the Section-60 of the Real Estate (Regulation & Development) Act, 2016. I also further understand that furnishing wrong or false information will lead to rejection of my application registration of the project with forfeiture of registration fee and other charges deposited by me.”
  All documents are uploaded successfully.

Construction Progress

Updated Construction Progress

SL NO. Description Scheduled date of completion Current Status Remarks
1 Site Development 05-04-2023 Work in progress
2 Roof Casting NA NA NA
3 Ground Floor/Stilt Floor 05-05-2023 Work in progress NA
4 1 Floor 05-06-2023 Not started yet NA
5 2 Floor 05-07-2023 Not started yet NA
6 3 Floor 05-08-2023 Not started yet NA
7 4 Floor 05-09-2023 Not started yet NA
8 5 Floor 05-10-2023 Not started yet NA
9 Brick Work & Plastering NA NA NA
10 Ground Floor/Stilt Floor 05-07-2023 Not started yet NA
11 1 Floor 05-08-2023 Not started yet NA
12 2 Floor 05-10-2023 Not started yet NA
13 3 Floor 05-12-2023 Not started yet NA
14 4 Floor 05-01-2024 Not started yet NA
15 5 Floor 05-02-2024 Not started yet NA
16 Electrical Works 05-04-2024 Not started yet NA
17 Concealed Cabling including Plugs & switches 05-06-2024 Not started yet NA
18 Installation & Charging of Transformer 05-08-2024 Not started yet NA
19 Connection to Flats/Apartments 05-10-2024 Not started yet NA
20 PH works 05-12-2024 Not started yet NA
21 Laying of concealed Pipes 05-01-2025 Not started yet NA
22 PH Fittings 05-03-2025 Not started yet NA
23 Overhead Water Tanks 05-05-2025 Not started yet NA
24 Water Supply Connection to all units 05-06-2025 Not started yet NA
25 STP construction and completion 05-08-2025 Not started yet NA
26 Distempering & Colouring of all units and exteriors 05-10-2025 Not started yet NA
27 Fixation of doors and windows 05-12-2025 Not started yet NA
28 Scheduled Date of handing over possession 05-01-2026 Not started yet NA
29 Development of common areas, parks, gardens etc 04-04-2026 Not started yet NA
Updated Changes on 15-01-2024
30 Site Development 05-04-2023 Work in progress
31 NA NA NA NA
32 Ground Floor/Stilt Floor 05-05-2023 Work in progress NA
33 1 Floor 05-06-2023 Not started yet NA
34 2 Floor 05-07-2023 Not started yet NA
35 3 Floor 05-08-2023 Not started yet NA
36 4 Floor 05-09-2023 Not started yet NA
37 5 Floor 05-10-2023 Not started yet NA
38 NA NA NA NA
39 Ground Floor/Stilt Floor 05-07-2023 Not started yet NA
40 1 Floor 05-08-2023 Not started yet NA
41 2 Floor 05-10-2023 Not started yet NA
42 3 Floor 05-12-2023 Not started yet NA
43 4 Floor 05-01-2024 Not started yet NA
44 5 Floor 05-02-2024 Not started yet NA
45 Electrical Works 05-04-2024 Not started yet NA
46 Concealed Cabling including Plugs & switches 05-06-2024 Not started yet NA
47 Installation & Charging of Transformer 05-08-2024 Not started yet NA
48 Connection to Flats/Apartments 05-10-2024 Not started yet NA
49 PH works 05-12-2024 Not started yet NA
50 Laying of concealed Pipes 05-01-2025 Not started yet NA
51 PH Fittings 05-03-2025 Not started yet NA
52 Overhead Water Tanks 05-05-2025 Not started yet NA
53 Water Supply Connection to all units 05-06-2025 Not started yet NA
54 STP construction and completion 05-08-2025 Not started yet NA
55 Distempering & Colouring of all units and exteriors 05-10-2025 Not started yet NA
56 Fixation of doors and windows 05-12-2025 Not started yet NA
57 Scheduled Date of handing over possession 05-01-2026 Not started yet NA
58 Development of common areas, parks, gardens etc 04-04-2026 Not started yet NA
Updated Changes on 13-04-2024
59 Site Development 05-04-2023 Completed
60 NA 05-05-2023 Completed NA
61 Ground Floor/Stilt Floor 05-06-2024 Work in progress
62 1 Floor 05-08-2024 Not started yet NA
63 2 Floor 05-09-2024 Not started yet NA
64 3 Floor 05-10-2024 Not started yet NA
65 4 Floor 05-12-2024 Not started yet NA
66 5 Floor 05-01-2024 Not started yet NA
67 NA 05-02-2025 Not started yet NA
68 Ground Floor/Stilt Floor 05-03-2025 Not started yet NA
69 1 Floor 05-04-2025 Not started yet NA
70 2 Floor 05-06-2025 Not started yet NA
71 3 Floor 05-07-2025 Not started yet NA
72 4 Floor 05-08-2025 Not started yet NA
73 5 Floor 05-09-2025 Not started yet NA
74 Electrical Works 05-10-2025 Not started yet NA
75 Concealed Cabling including Plugs & switches 05-12-2025 Not started yet NA
76 Installation & Charging of Transformer 05-02-2026 Not started yet NA
77 Connection to Flats/Apartments 05-06-2026 Not started yet NA
78 PH works 05-09-2026 Not started yet NA
79 Laying of concealed Pipes 05-10-2026 Not started yet NA
80 PH Fittings 05-11-2026 Not started yet NA
81 Overhead Water Tanks 05-12-2026 Not started yet NA
82 Water Supply Connection to all units 05-02-2027 Not started yet NA
83 STP construction and completion 05-08-2027 Not started yet NA
84 Distempering & Colouring of all units and exteriors 05-06-2028 Not started yet NA
85 Fixation of doors and windows 05-09-2028 Not started yet NA
86 Scheduled Date of handing over possession 05-10-2028 Not started yet NA
87 Development of common areas, parks, gardens etc 05-12-2028 Not started yet NA

Booking Status

Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership Status
Carpet Area Balcony Area Exclusive Open Terrace Area
1 B-101 24.526 2.972 . Promoter
2 B-102 24.526 2.972 0 Promoter
3 B-103 24.526 2.972 0 Promoter
4 B-104 24.526 2.972 0 Promoter
5 B-105 24.526 2.972 0 Promoter
6 B-106 24.526 2.972 0 Promoter
7 B-107 24.526 2.972 0 Promoter
8 B-108 30.75 2.972 0 Promoter
9 B-109 34.467 2.936 0 Promoter
10 B-110 30.658 3.412 0 Promoter
11 B-111 28.335 2.972 0 Promoter
12 B-112 28.335 2.972 0 Promoter
13 B-113 28.335 2.972 0 Promoter
14 B-114 28.335 2.972 0 Promoter
15 B-201 24.526 2.972 0 Promoter
16 B-202 24.526 2.972 0 Promoter
17 B-203 24.526 2.972 0 Promoter
18 B-204 24.526 2.972 0 Promoter
19 B-205 24.526 2.972 0 Promoter
20 B-206 24.526 2.972 0 Promoter
21 B-207 24.526 2.972 0 Promoter
22 B-208 30.75 2.972 0 Promoter
23 B-209 34.467 2.936 0 Promoter
24 B-210 30.658 3.412 0 Promoter
25 B-211 28.335 2.972 0 Promoter
26 B-212 28.335 2.972 0 Promoter
27 B-213 28.335 2.972 0 Promoter
28 B-214 28.335 2.972 0 Promoter
29 B-301 24.526 2.972 0 Land Owner
30 B-302 24.526 2.972 0 Land Owner
31 B-303 24.526 2.972 0 Land Owner
32 B-304 24.526 2.972 0 Land Owner
33 B-305 24.526 2.972 0 Land Owner
34 B-306 24.526 2.972 0 Land Owner
35 B-307 24.526 2.972 0 Land Owner
36 B-308 30.75 2.972 0 Land Owner
37 B-309 34.467 2.936 0 Land Owner
38 B-310 30.658 3.412 0 Land Owner
39 B-311 28.335 2.972 0 Land Owner
40 B-312 28.335 2.972 0 Land Owner
41 B-313 28.335 2.972 0 Land Owner
42 B-314 28.335 2.972 0 Land Owner
43 B-401 24.526 2.972 0 Land Owner
44 B-402 24.526 2.972 0 Land Owner
45 B-403 24.526 2.972 0 Land Owner
46 B-404 24.526 2.972 0 Land Owner
47 B-405 24.526 2.972 0 Land Owner
48 B-406 24.526 2.972 0 Land Owner
49 B-407 24.526 2.972 0 Land Owner
50 B-408 30.75 2.972 0 Land Owner
51 B-409 34.467 2.936 0 Land Owner
52 B-410 30.658 3.412 0 Land Owner
53 B-411 28.335 2.972 0 Land Owner
54 B-412 28.335 2.972 0 Land Owner
55 B-413 28.335 2.972 0 Land Owner
56 B-414 28.335 2.972 0 Land Owner
57 B-501 24.526 2.972 0 Promoter
58 B-502 24.526 2.972 0 Promoter
59 B-503 24.526 2.972 0 Promoter
60 B-504 24.526 2.972 0 Promoter
61 B-505 24.526 2.972 0 Promoter
62 B-506 24.526 2.972 0 Promoter
63 B-507 24.526 2.972 0 Promoter
64 B-508 30.75 2.972 0 Promoter
65 B-509 34.467 2.936 0 Promoter
66 B-510 30.658 3.412 0 Promoter
67 B-511 28.335 2.972 0 Promoter
68 B-512 28.335 2.972 0 Promoter
69 B-513 28.335 2.972 0 Promoter
70 B-514 28.335 2.972 0 Promoter
71 C-101 26.662 2.972 0 Land Owner
72 C-102 26.662 2.972 0 Land Owner
73 C-103 26.662 2.972 0 Land Owner
74 C-104 26.662 2.972 0 Land Owner
75 C-105 26.662 2.972 0 Land Owner
76 C-106 26.662 2.972 0 Land Owner
77 C-107 26.662 2.972 0 Land Owner
78 C-108 26.662 2.972 0 Land Owner
79 C-109 26.662 2.972 0 Land Owner
80 C-110 26.662 2.972 0 Land Owner
81 C-111 26.662 2.972 0 Land Owner
82 C-112 26.662 2.972 0 Land Owner
83 C-113 26.662 2.972 0 Land Owner
84 C-114 26.662 2.972 0 Land Owner
85 C-115 26.662 2.972 0 Land Owner
86 C-116 26.662 2.972 0 Land Owner
87 C-201 26.662 2.972 0 Land Owner
88 C-202 26.662 2.972 0 Land Owner
89 C-203 26.662 2.972 0 Land Owner
90 C-204 26.662 2.972 0 Land Owner
91 C-205 26.662 2.972 0 Land Owner
92 C-206 26.662 2.972 0 Land Owner
93 C-207 26.662 2.972 0 Land Owner
94 C-208 26.662 2.972 0 Land Owner
95 C-209 26.662 2.972 0 Land Owner
96 C-210 26.662 2.972 00 Land Owner
97 C-211 26.662 2.972 0 Land Owner
98 C-212 26.662 2.972 00 Land Owner
99 C-213 26.662 2.972 0 Land Owner
100 C-214 26.662 2.972 0 Land Owner
101 C-215 26.662 2.972 0 Land Owner
102 C-216 26.662 2.972 0 Land Owner
103 C-301 26.662 2.972 0 Promoter
104 C-302 26.662 2.972 0 Promoter
105 C-303 26.662 2.972 0 Promoter
106 C-304 26.662 2.972 0 Promoter
107 C-305 26.662 2.972 0 Promoter
108 C-306 26.662 2.972 0 Promoter
109 C-307 26.662 2.972 0 Promoter
110 C-308 26.662 2.972 0 Promoter
111 C-309 26.662 2.972 0 Promoter
112 C-310 26.662 2.972 0 Promoter
113 C-311 26.662 2.972 0 Promoter
114 C-312 26.662 2.972 0 Promoter
115 C-313 26.662 2.972 0 Promoter
116 C-314 26.662 2.972 0 Promoter
117 C-315 26.662 2.972 0 Promoter
118 C-316 26.662 2.972 0 Promoter
119 C-401 26.662 2.972 0 Promoter
120 C-402 26.662 2.972 0 Promoter
121 C-403 26.662 2.972 0 Promoter
122 C-404 26.662 2.972 0 Promoter
123 C-405 26.662 2.972 00 Promoter
124 C-406 26.662 2.972 0 Promoter
125 C-407 26.662 2.972 0 Promoter
126 C-408 26.662 2.972 0 Promoter
127 C-409 26.662 2.972 0 Promoter
128 C-410 26.662 2.972 0 Promoter
129 C-411 26.662 2.972 0 Promoter
130 C-412 26.662 2.972 0 Promoter
131 C-413 26.662 2.972 0 Promoter
132 C-414 26.662 2.972 0 Promoter
133 C-415 26.662 2.972 0 Promoter
134 C-416 26.662 2.972 0 Promoter
135 C-501 26.662 2.972 0 Promoter
136 C-502 26.662 2.972 0 Promoter
137 C-503 26.662 2.972 0 Promoter
138 C-504 26.662 2.972 0 Promoter
139 C-505 26.662 2.972 0 Promoter
140 C-506 26.662 2.972 0 Promoter
141 C-507 26.662 2.972 0 Promoter
142 C-508 26.662 2.972 0 Promoter
143 C-509 26.662 2.972 0 Promoter
144 C-510 26.662 2.972 0 Promoter
145 C-511 26.662 2.972 0 Promoter
146 C-512 26.662 2.972 0 Promoter
147 C-513 26.662 2.972 0 Promoter
148 C-514 26.662 2.972 0 Promoter
149 C-515 26.662 2.972 0 Promoter
150 C-516 26.662 2.972 0 Promoter

Booking Status

Commercial Units
House Number Dimensions (Length x Width) Carpet Area in square metres Ownership Status
A-101 26.974 X 6.165 166.295 Promoter
A-201 5.427 X 3.886 21.089 Land Owner
A-202 5.427 X 3.886 21.089 Land Owner
A-203 5.427 X 3.886 21.089 Land Owner
A-204 5.427 X 3.886 21.089 Land Owner
A-205 6.413 X 3.81 24.433 Land Owner
A-206 6.413 X 3.81 24.433 Land Owner
A-207 6.461 X 3.81 24.619 Land Owner
A-301 5.427 X 3.886 21.089 Land Owner
A-302 5.427 X 3.886 21.089 Land Owner
A-303 5.427 X 3.886 21.089 Land Owner
A-304 5.427 X 3.886 21.089 Land Owner
A-305 6.413 X 3.81 24.433 Land Owner
A-306 6.413 X 3.81 24.433 Land Owner
A-307 6.461 X 3.81 24.619 Land Owner
A-401 5.427 X 3.886 21.089 Promoter
A-402 5.427 X 3.886 21.089 Promoter
A-403 5.427 X 3.886 21.089 Promoter
A-404 5.427 X 3.886 21.089 Promoter
A-405 6.413 X 3.81 24.433 Promoter
A-406 6.413 X 3.81 24.433 Promoter
A-407 6.461 X 3.81 24.619 Promoter
A-501 5.427 X 3.886 21.089 Promoter
A-502 5.427 X 3.886 21.089 Promoter
A-503 5.427 X 3.886 21.089 Promoter
A-504 5.427 X 3.886 21.089 Promoter
A-505 6.413 X 3.81 24.433 Promoter
A-506 6.413 X 3.81 24.433 Promoter
A-507 6.413 X 3.81 24.619 Promoter

Financial Status

SL No. Funds Collected from the Allottees Funds Borrowed from Financial Institutions Funds Employed from Own Sources Expenditure As On Date Status
1 0 0 9432013 9432013 31-12-2023 ONGOING
2 775000 0 11908329 12140829 31-03-2024 on going

Updated Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 The land/ building shall be used for Residential Apartment (MIG), Guest House/Holiday Home purpose and the use shall not be changed to any other use without prior approval of this Authority. 04-04-2026 Work Not yet Started
2 The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement. 04-04-2026 Work Not yet Started
3 Parking space measuring an area 2319.19 sq.mt.in Stilt & Basement as shown in the approved plan shall be exclusively used for parking of vehicles and no part of it shall be used for any other purpose. 04-04-2026 Work Not yet Started
4 The land over which construction is proposed is accessible by an approved means of access of 9.15 mtr.in width. 04-04-2026 Work Not yet Started
5 The land in question must be in lawful ownership and peaceful possession of the applicants. 04-04-2026 Work Not yet Started
6 Permission granted under these Rules shall remain valid up to three years from the date of issue. However, the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribed under rules. 04-04-2026 Work Not yet Started
7 Approval of plan and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards) Rules, 2020 or under any other law for the time being in force. 04-04-2026 Work Not yet Started
8 Approval of plan would mean granting of permission to construct under these Regulations in force only and shall not mean among other things 04-04-2026 Work Not yet Started
9 In case of any dispute arising out of land record or in respect of right, te & Interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute. 04-04-2026 Work Not yet Started
10 Neither granting of the permission, the approval of the drawing and specifications nor inspections made by the authority during erection of the building shall in any way rolleve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBCI-2016 and these regulations. 04-04-2026 Work Not yet Started
11 Ensure engagement of PMO and submit report on stage wise construction as required under Rule-14 of ODA (P&B.S.) Rules, 2020. 04-04-2026 Work Not yet Started
12 The persons to whom a permit is issued during construction shall keep pasted in a conspicuous place on the property in respect of which the permit was issued. 04-04-2026 Work Not yet Started
13 No storm water/water shall be discharged to the public road/public premises and other adjoining plots. 04-04-2026 Work Not yet Started
14 Adhere to the provisions of ODA (Planning & Building Standard) Rules, 2020 strictly and conditions thereto. 04-04-2026 Work Not yet Started
15 Plantation shall be provided as per Rule of 30 of ODA (P & B.S.) Rules, 2020 within the premises of the plot area without affecting vehicular movement. 04-04-2026 Work Not yet Started
16 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Rule 47 of ODA (Planning & Building Standard Rule-2020) 04-04-2026 Work Not yet Started
17 The applicant shall use fly ash based products for construction such as: cement or concrete, fly ash bricks or blocks or tiles or clay fly ash bricks, blocks or tiles or clay fly ash bricks or blocks or tiles or cement fly ash bricks or blocks or similar products or pmbination or aggregate of them, in your construction/project. 04-04-2026 Work Not yet Started
18 Toilet block not connected to sewer system shall have onsite sanitation systems like septic tanks constructed as per IS-2470(part-1)-1985 and leach Pit constructed as per IS-12314-1987. 04-04-2026 Work Not yet Started
19 The numbers of dwelling units/guest house room so approved and mentioned in the plan shall not be changed in any manner. 04-04-2026 Work Not yet Started
20 The applicant shall get the EIDP approved towards development of external infrastructure, execute it and obtain clearance from Puri Municipality before Occupancy. 04-04-2026 Work Not yet Started
21 Plot No- 82 with kisam Jalasaya-1 shall be retained as such. 04-04-2026 Work Not yet Started
22 The developer shall ensure allotment / sale of MIG dwelling units to targeted group of MIG category only. 04-04-2026 Work Not yet Started
Updated Changes on 15-01-2024
23 The land/ building shall be used for Residential Apartment (MIG), Guest House/Holiday Home purpose and the use shall not be changed to any other use without prior approval of this Authority. 04-04-2026 Work Not yet Started
24 The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement. 04-04-2026 Work Not yet Started
25 Parking space measuring an area 2319.19 sq.mt.in Stilt & Basement as shown in the approved plan shall be exclusively used for parking of vehicles and no part of it shall be used for any other purpose. 04-04-2026 Work Not yet Started
26 The land over which construction is proposed is accessible by an approved means of access of 9.15 mtr.in width. 04-04-2026 Work Not yet Started
27 The land in question must be in lawful ownership and peaceful possession of the applicants. 04-04-2026 Work Not yet Started
28 Permission granted under these Rules shall remain valid up to three years from the date of issue. However, the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribed under rules. 04-04-2026 Work Not yet Started
29 Approval of plan and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards) Rules, 2020 or under any other law for the time being in force. 04-04-2026 Work Not yet Started
30 Approval of plan would mean granting of permission to construct under these Regulations in force only and shall not mean among other things 04-04-2026 Work Not yet Started
31 In case of any dispute arising out of land record or in respect of right, te & Interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute. 04-04-2026 Work Not yet Started
32 Neither granting of the permission, the approval of the drawing and specifications nor inspections made by the authority during erection of the building shall in any way rolleve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBCI-2016 and these regulations. 04-04-2026 Work Not yet Started
33 Ensure engagement of PMO and submit report on stage wise construction as required under Rule-14 of ODA (P&B.S.) Rules, 2020. 04-04-2026 Work Not yet Started
34 The persons to whom a permit is issued during construction shall keep pasted in a conspicuous place on the property in respect of which the permit was issued. 04-04-2026 Work Not yet Started
35 No storm water/water shall be discharged to the public road/public premises and other adjoining plots. 04-04-2026 Work Not yet Started
36 Adhere to the provisions of ODA (Planning & Building Standard) Rules, 2020 strictly and conditions thereto. 04-04-2026 Work Not yet Started
37 Plantation shall be provided as per Rule of 30 of ODA (P & B.S.) Rules, 2020 within the premises of the plot area without affecting vehicular movement. 04-04-2026 Work Not yet Started
38 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Rule 47 of ODA (Planning & Building Standard Rule-2020) 04-04-2026 Work Not yet Started
39 The applicant shall use fly ash based products for construction such as: cement or concrete, fly ash bricks or blocks or tiles or clay fly ash bricks, blocks or tiles or clay fly ash bricks or blocks or tiles or cement fly ash bricks or blocks or similar products or pmbination or aggregate of them, in your construction/project. 04-04-2026 Work Not yet Started
40 Toilet block not connected to sewer system shall have onsite sanitation systems like septic tanks constructed as per IS-2470(part-1)-1985 and leach Pit constructed as per IS-12314-1987. 04-04-2026 Work Not yet Started
41 The numbers of dwelling units/guest house room so approved and mentioned in the plan shall not be changed in any manner. 04-04-2026 Work Not yet Started
42 The applicant shall get the EIDP approved towards development of external infrastructure, execute it and obtain clearance from Puri Municipality before Occupancy. 04-04-2026 Work Not yet Started
43 Plot No- 82 with kisam Jalasaya-1 shall be retained as such. 04-04-2026 Work Not yet Started
44 The developer shall ensure allotment / sale of MIG dwelling units to targeted group of MIG category only. 04-04-2026 Work Not yet Started
Updated Changes on 13-04-2024
45 The land/ building shall be used for Residential Apartment (MIG), Guest House/Holiday Home purpose and the use shall not be changed to any other use without prior approval of this Authority. 04-04-2026 Work in progress
46 The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement. 04-04-2026 Work in progress
47 Parking space measuring an area 2319.19 sq.mt.in Stilt & Basement as shown in the approved plan shall be exclusively used for parking of vehicles and no part of it shall be used for any other purpose. 04-04-2026 Work in progress
48 The land over which construction is proposed is accessible by an approved means of access of 9.15 mtr.in width. 04-04-2026 Work in progress
49 The land in question must be in lawful ownership and peaceful possession of the applicants. 04-04-2026 Work in progress
50 Permission granted under these Rules shall remain valid up to three years from the date of issue. However, the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribed under rules. 04-04-2026 Work in progress
51 Approval of plan and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards) Rules, 2020 or under any other law for the time being in force. 04-04-2026 Work in progress
52 Approval of plan would mean granting of permission to construct under these Regulations in force only and shall not mean among other things 04-04-2026 Work Not yet Started
53 In case of any dispute arising out of land record or in respect of right, te & Interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute. 04-04-2026 Work Not yet Started
54 Neither granting of the permission, the approval of the drawing and specifications nor inspections made by the authority during erection of the building shall in any way rolleve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBCI-2016 and these regulations. 04-04-2026 Work in progress
55 Ensure engagement of PMO and submit report on stage wise construction as required under Rule-14 of ODA (P&B.S.) Rules, 2020. 04-04-2026 Work in progress
56 The persons to whom a permit is issued during construction shall keep pasted in a conspicuous place on the property in respect of which the permit was issued. 04-04-2026 Work in progress
57 No storm water/water shall be discharged to the public road/public premises and other adjoining plots. 04-04-2026 Work in progress
58 Adhere to the provisions of ODA (Planning & Building Standard) Rules, 2020 strictly and conditions thereto. 04-04-2026 Work in progress
59 Plantation shall be provided as per Rule of 30 of ODA (P & B.S.) Rules, 2020 within the premises of the plot area without affecting vehicular movement. 04-04-2026 Work in progress
60 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Rule 47 of ODA (Planning & Building Standard Rule-2020) 04-04-2026 Work in progress
61 The applicant shall use fly ash based products for construction such as: cement or concrete, fly ash bricks or blocks or tiles or clay fly ash bricks, blocks or tiles or clay fly ash bricks or blocks or tiles or cement fly ash bricks or blocks or similar products or pmbination or aggregate of them, in your construction/project. 04-04-2026 Work in progress
62 Toilet block not connected to sewer system shall have onsite sanitation systems like septic tanks constructed as per IS-2470(part-1)-1985 and leach Pit constructed as per IS-12314-1987. 04-04-2026 Work Not yet Started
63 The numbers of dwelling units/guest house room so approved and mentioned in the plan shall not be changed in any manner. 04-04-2026 Work in progress
64 The applicant shall get the EIDP approved towards development of external infrastructure, execute it and obtain clearance from Puri Municipality before Occupancy. 04-04-2026 Work in progress
65 Plot No- 82 with kisam Jalasaya-1 shall be retained as such. 04-04-2026 Work in progress
66 The developer shall ensure allotment / sale of MIG dwelling units to targeted group of MIG category only. 04-04-2026 Work in progress

Updated Project Documents

Sl. No. Title of the document Upload Document
1 PROFORMA-I
2 PROFORMA-II
3 PROFORMA-III
4 BOOKING DETAILS
5 PROFORMA-I
6 PROFORMA-II
7 PROFORMA-III
8 BOOKING DETAILS
:  Jagat Kumar Kar :  
NA :  AKGPK1219F
:PAN Card :  jagat2kar@gmail.com
:  Btech :  9337119834
:  20 YEARS
:  Yes :  NA
:  MADHUSMITA DASH :  
NA :  AHCPD9250A
:PAN Card :  madhu4jagat@gmail.com
:  MBA :  9658199991
:   10 YEARS
:  Yes :  NA

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
MR. AKSHAYA KUMAR MUDULI Architect A/151,SAHID NAGAR,BHUBANESWAR. MAIL ID: arpaint12@gmail.com, Mob- 9238308095 CA/97/21736 Yes
RABINDRA MOHAPTRA Construction Engineer Plot no-1272/1275,GAYATRI NAGAR,BOMIKHAL,BBSR-10 MAIL ID:srengineering462@gmail.com, Mob -7894199885 RTP/DTP(STER)-093/2018 Yes
SMARTECH REALCON PVT.LTD Contractor 914,LAXMI SAGAR,BHUBANESWAR, Mail ID: subhakantabehera.behera@gmail.com, Mob- 8917284600 CIN- U452000R2019PTC031713 Yes
PARTHA S MISHRA & CO Chartered Accountant PLOT NO - GA-140,GROUND FLOOR,NILADREE VIHAR,BBSR-21, MAIL ID:psmefiling@gmail.com, Mob-9437044824 324467E

Updated Units

House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
Updated Changes
A01 Covered Parking 01 4.19 X 4.29 17.97 Included
A-02 Covered Parking 02 4.19 X 4.29 17.97 Included
A-03 Covered Parking 03 4.06 X 4.29 17.41 Included
A-04 Covered Parking 04 4.06 X 4.29 17.41 Included
A-05 Covered Parking 05 4.06 X 4.29 17.41 Included
A-06 Covered Parking 06 4.06 X 4.29 17.41 Included
A-07 Covered Parking 07 4.14 X 4.29 17.76 Included
A-08 Covered Parking 08 4.14 X 4.29 17.76 Included
A-09 Covered Parking 09 3.8 X 4.14 15.73 Included
A-10 Covered Parking 10 3.8 X 4.14 15.73 Included
A-11 Covered Parking 11 3.8 X 4.14 15.73 Included
A-12 Covered Parking 12 3.8 X 4.14 15.73 Included
A-13 Covered Parking 13 3.8 X 4.14 15.73 Included
A-14 Covered Parking 14 3.8 X 4.01 15.73 Included
B-01 Covered Parking 15 3.37 X 4.26 15.73 Included
B-02 Covered Parking 16 3.37 X 4.26 14.35 Included
B-03 Covered Parking 17 3.02 X 5.22 15.76 Included
B-04 Covered Parking 18 3.02 X 5.22 16.91 Included
B-05 Covered Parking 19 3.02 X 5.22 16.91 Included
B-06 Covered Parking 20 3.01 X 5.22 15.71 Included
B-07 Covered Parking 21 2.6 X 4.26 11.07 Included
B-08 Covered Parking 22 2.61 X 4.26 11.11 Included
B-09 Covered Parking 23 2.48 X 4.26 10.56 Included
B-10 Covered Parking 24 2.73 X 4.26 11.62 Included
B-11 Covered Parking 25 3.02 X 5.21 15.73 Included
B-12 Covered Parking 26 3.24 X 5.21 16.88 Included
B-13 Covered Parking 27 3.24 X 5.46 17.69 Included
B-14 Covered Parking 28 3.59 X 5.46 19.6 Included
B-15 Covered Parking 29 2.73 X 4.95 13.51 Included
B-16 Covered Parking 30 2.73 X 4.95 13.51 Included
B-17 Covered Parking 31 5.63 X 5.17 13.59 Included
B-18 Covered Parking 32 4.59 X 4.54 20.83 Included
B-19 Covered Parking 33 3.48 X 4.26 14.82 Included
B-20 Open Parking 34 2.46 X 4.26 10.47 Included
B-21 Covered Parking 35 2.96 X 4.54 13.43 Included
B-22 Covered Parking 36 2.46 X 4.26 10.47 Included
B-23 Covered Parking 37 4.08 X 4.81 19.62 Included
B-24 Covered Parking 38 3.87 X 4.33 16.75 Included
B-25 Covered Parking 39 4.09 X 4.33 17.7 Included
B-26 Covered Parking 40 3.62 X 4.33 15.67 Included
B-27 Covered Parking 41 3.62 X 4.33 15.67 Included
B-28 Covered Parking 42 3.62 X 4.33 15.67 Included
B-29 Covered Parking 43 4.09 X 4.33 17.7 Included
B-30 Covered Parking 44 4.09 X 4.33 17.7 Included
B-31 Covered Parking 45 3.87 X 4.33 16.75 Included
B-32 Covered Parking 46 3.87 X 4.33 16.75 Included
C/01 Covered Parking 47 2.5 X 4.11 2.74 X 4.11 10.27 Included
C/02 Covered Parking 48 2.5 X 4.11 2.74 X 4.11 10.27 Included
C/03 Covered Parking 49 2.74 X 4.11 11.26 Included
C/04 Covered Parking 50 3.71 X 4.11 15.24 Included
C/05 Covered Parking 51 2.44 X 4.11 10.02 Included
C/06 Covered Parking 52 2.44 X 4.11 10.02 Included
C/07 Covered Parking 53 3.56 X 5.13 18.26 Included
C/08 Covered Parking 54 3.56 X 5.13 18.26 Included
C/09 Covered Parking 55 3.56 X 4.36 15.52 Included
C/10 Covered Parking 56 3.2 X 4.17 13.34 Included
C/11 Covered Parking 57 2.44 X 4.11 10.02 Included
C/12 Covered Parking 58 2.44 X 4.11 10.02 Included
C/13 Covered Parking 59 2.5 X 4.11 10.27 Included
C/14 Covered Parking 60 2.5 X 4.11 10.27 Included
C/15 Covered Parking 61 2.74 X 4.11 11.26 Included
C/16 Covered Parking 62 3.71 X 4.11 15.24 Included
C/17 Covered Parking 63 2.5 X 4.36 10.9 Included
C/18 Covered Parking 64 2.5 X 4.36 10.9 Included
C/19 Covered Parking 65 3.39 X 4.36 14.78 Included
C/20 Covered Parking 66 3.39 X 4.36 14.78 Included
C/21 Covered Parking 67 3.61 X 4.06 14.65 Included
C/22 Covered Parking 68 2.44 X 4.11 10.02 Included
C/23 Covered Parking 69 2.44 X 4.11 10.02 Included
C/24 Covered Parking 70 3.56 X 6.6 23.49 Included
C/25 Covered Parking 71 3.56 X 6.6 23.49 Included
C/26 Covered Parking 72 3.43 X 4.36 14.95 Included
C/27 Covered Parking 73 2.82 X 4.17 11.75 Included
C/28 Covered Parking 74 2.44 X 4.11 10.02 Included
C/29 Covered Parking 75 2.44 X 4.11 10.02 Included
C/30 Covered Parking 76 2.57 X 4.36 11.2 Included
C/31 Covered Parking 77 2.57 X 4.36 11.2 Included
C/32 Covered Parking 78 3.33 X 4.36 14.51 Included
C/33 Covered Parking 79 3.33 X 4.36 14.51 Included
C/34 Covered Parking 80 2.88 X 5.07 14.6 Included
C/35 Covered Parking 81 3.12 X 5.07 15.81 Included