1 |
Total parking space measuring 2472.34 sqm are shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose.
|
15-07-2028
|
Not Started
|
2 |
The land over which construction is proposed is accessible by an approved means of access of 9 meters in width.
|
15-07-2028
|
Not Started
|
3 |
The applicant shall comply all the stipulation of the NOC given by CGWA in respect of tapping of ground water vide NOC No. CGWA/NOC/INF/ORIG/2023/18464 dt. 11.05.2023 in pursuant to the NOC given by Superintending Engineer, RWSS Division, Cuttack vide letter no. 2884 dt. 16.05.2023.
|
15-07-2028
|
Not Started
|
4 |
Electric installation and power connection as per TPCODL vide their letter No. 1449(4) Dated 16.02.2023 in respect of supply of power.
|
15-07-2028
|
Not Started
|
5 |
The applicant shall ensure the Structural Safety of the propose building complying to the structural design given by the concern Structural Engineer, SUDHANSHU SEKHAR PANDA bearing DTP Empanelled No RTP/DTP(ELE.ER)-522/2022.
|
15-07-2028
|
Not Started
|
6 |
Applicant shall construct and connect the storm water drain up to the public disposal point at own cost as per EDIP in pursuant to the NOC given by Sarpanch, Kunheipada Gram Panchayat vide their Letter no. Nil dt 20/09/2022.
|
15-07-2028
|
Not Started
|
7 |
The applicant must ensure the electrical safety of the building in electrical connection and installation as per the electrical safety certificate given by DTP Empanelled Engineer, AJAYA KUMAR SAHOO Regd.no RTP/DTP(ST.ER)-012/2017.
|
15-07-2028
|
Not Started
|
8 |
The building shall be used exclusively for the residential purpose apartment and the use shall not be changed to any other use without prior approval of this Authority.
|
15-07-2028
|
Not Started
|
9 |
The area affected under Road widening proposal as per the CDP of Cuttack shall be left unbounded and open to Sky for future Road widening without any hindrances as per the undertaking submitted to this effect.
|
15-07-2028
|
Not Started
|
10 |
Give written notice to the Authority before commencement of work on building site in Form-VI (A), periodic progress report in Form- Annexure-IV, notice of completion in Form VI(B) and notice in case of termination of services of Technical persons engaged by him in the prescribed format as per Rule.
|
30-09-2023
|
Not Started
|
11 |
The applicant shall abide by the provisions of Rule no.15 of ODA (P&BS) Rules, 2020 with regard to third party verification at plinth level, ground level & roof level. Any deviation to above shall attract penalty as per the provision of the same.
|
30-09-2024
|
Not Started
|
12 |
Wherever tests of any material are made to ensure conformity of the requirements of the the regulations in force, records of the test data shall be kept available for Inspection during the construction of building and for such period thereafter as required by the Authority
|
15-07-2028
|
Not Started
|
13 |
The Rain water harvesting system, roof top solar energy and provision of barrier free access shall be provided as per the provision of Rules 46, 47 & 48 of ODA (P&BS) Rules 2020
|
15-07-2028
|
Not Started
|
14 |
The concerned Architect/Applicant/Developer are fully responsible for any deviations additions & alternations beyond approved plan/ defective construction etc, shall be liable for action as per the provisions of the Regulation.
|
15-07-2028
|
Not Started
|
15 |
10% of the parking space shall be exclusively earmarked for ambulance, fire tender, physically handicapped persons and outside visitors with signage as per norms under Rule 37 of ODA (Planning & Building Standards) Rules, 2020.
|
15-07-2028
|
Not Started
|
16 |
Plantation for one tree per 80 sqm of plot area made by the applicant as per provision under Rule 30 of ODA (Planning & Building Standards) Rules 2020.
|
15-07-2028
|
Not Started
|
17 |
The applicant shall construct the EIDP & submit necessary EIDP & estimate for approval of the EIDP committee of CDA in pursuant to the NOC given by Local authorities before applying for Occupancy Certificate.
|
15-07-2028
|
Not Started
|
18 |
No storm water/water shall be discharged to the public road/public premises and other adjoining plots
|
15-07-2028
|
Not Started
|
19 |
All the passages around the building shall be developed with permeable pavers block for absorption of rainwater and seepage in the ground.
|
15-07-2028
|
Not Started
|
20 |
Rain water harvesting structure and recharging pits adequate capacity shall be developed to minimize the storm water runoff to the drain.
|
15-07-2028
|
Not Started
|
21 |
Ensure Installation of minimum firefighting equipment and installation as per provision of NBC-2016/Fire recommendation and maintain the same at own cost.
|
15-07-2028
|
Not Started
|
22 |
The applicant shall register this project before the ORERA as per their Act.
|
30-09-2023
|
Not Started
|
23 |
The number of dwelling units so approved shall not be changed in any manner.
|
15-07-2028
|
Not Started
|
24 |
Lifts shall be provided as per the provision of NBCI, 2016 in pursuance with note (ii) of sub-rule(2) of Rule 42 of ODA Rules, 2020 if the same is not provided by the applicant, appropriate; action shall be taken as per law.
|
15-07-2028
|
Not Started
|
25 |
Obtain necessary Certificate from the Authority, Cuttack prior to occupation of building in full or part.
|
15-07-2028
|
Not Started
|
26 |
The applicant shall install rooftop P.V. system as per CDA Regulations
|
15-07-2028
|
Not Started
|
Updated Changes on 14-10-2023 |
27 |
Total parking space measuring 2472.34 sqm are shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose.
|
15-07-2028
|
Shall be complied
|
28 |
The land over which construction is proposed is accessible by an approved means of access of 9 meters in width.
|
15-07-2028
|
Shall be complied
|
29 |
The applicant shall comply all the stipulation of the NOC given by CGWA in respect of tapping of ground water vide NOC No. CGWA/NOC/INF/ORIG/2023/18464 dt. 11.05.2023 in pursuant to the NOC given by Superintending Engineer, RWSS Division, Cuttack vide letter no. 2884 dt. 16.05.2023.
|
15-07-2028
|
Shall be complied
|
30 |
Electric installation and power connection as per TPCODL vide their letter No. 1449(4) Dated 16.02.2023 in respect of supply of power.
|
15-07-2028
|
Shall be complied
|
31 |
The applicant shall ensure the Structural Safety of the propose building complying to the structural design given by the concern Structural Engineer, SUDHANSHU SEKHAR PANDA bearing DTP Empanelled No RTP/DTP(ELE.ER)-522/2022.
|
15-07-2028
|
Shall be complied
|
32 |
Applicant shall construct and connect the storm water drain up to the public disposal point at own cost as per EDIP in pursuant to the NOC given by Sarpanch, Kunheipada Gram Panchayat vide their Letter no. Nil dt 20/09/2022.
|
15-07-2028
|
Shall be complied
|
33 |
The applicant must ensure the electrical safety of the building in electrical connection and installation as per the electrical safety certificate given by DTP Empanelled Engineer, AJAYA KUMAR SAHOO Regd.no RTP/DTP(ST.ER)-012/2017.
|
15-07-2028
|
Shall be complied
|
34 |
The building shall be used exclusively for the residential purpose apartment and the use shall not be changed to any other use without prior approval of this Authority.
|
15-07-2028
|
Shall be complied
|
35 |
The area affected under Road widening proposal as per the CDP of Cuttack shall be left unbounded and open to Sky for future Road widening without any hindrances as per the undertaking submitted to this effect.
|
15-07-2028
|
Shall be complied
|
36 |
Give written notice to the Authority before commencement of work on building site in Form-VI (A), periodic progress report in Form- Annexure-IV, notice of completion in Form VI(B) and notice in case of termination of services of Technical persons engaged by him in the prescribed format as per Rule.
|
30-09-2023
|
Shall be complied
|
37 |
The applicant shall abide by the provisions of Rule no.15 of ODA (P&BS) Rules, 2020 with regard to third party verification at plinth level, ground level & roof level. Any deviation to above shall attract penalty as per the provision of the same.
|
30-09-2024
|
Shall be complied
|
38 |
Wherever tests of any material are made to ensure conformity of the requirements of the the regulations in force, records of the test data shall be kept available for Inspection during the construction of building and for such period thereafter as required by the Authority
|
15-07-2028
|
Shall be complied
|
39 |
The Rain water harvesting system, roof top solar energy and provision of barrier free access shall be provided as per the provision of Rules 46, 47 & 48 of ODA (P&BS) Rules 2020
|
15-07-2028
|
Shall be complied
|
40 |
The concerned Architect/Applicant/Developer are fully responsible for any deviations additions & alternations beyond approved plan/ defective construction etc, shall be liable for action as per the provisions of the Regulation.
|
15-07-2028
|
Shall be complied
|
41 |
10% of the parking space shall be exclusively earmarked for ambulance, fire tender, physically handicapped persons and outside visitors with signage as per norms under Rule 37 of ODA (Planning & Building Standards) Rules, 2020.
|
15-07-2028
|
Shall be complied
|
42 |
Plantation for one tree per 80 sqm of plot area made by the applicant as per provision under Rule 30 of ODA (Planning & Building Standards) Rules 2020.
|
15-07-2028
|
Shall be complied
|
43 |
The applicant shall construct the EIDP & submit necessary EIDP & estimate for approval of the EIDP committee of CDA in pursuant to the NOC given by Local authorities before applying for Occupancy Certificate.
|
15-07-2028
|
Shall be complied
|
44 |
No storm water/water shall be discharged to the public road/public premises and other adjoining plots
|
15-07-2028
|
Shall be complied
|
45 |
All the passages around the building shall be developed with permeable pavers block for absorption of rainwater and seepage in the ground.
|
15-07-2028
|
Shall be complied
|
46 |
Rain water harvesting structure and recharging pits adequate capacity shall be developed to minimize the storm water runoff to the drain.
|
15-07-2028
|
Shall be complied
|
47 |
Ensure Installation of minimum firefighting equipment and installation as per provision of NBC-2016/Fire recommendation and maintain the same at own cost.
|
15-07-2028
|
Shall be complied
|
48 |
The applicant shall register this project before the ORERA as per their Act.
|
30-09-2023
|
Shall be complied
|
49 |
The number of dwelling units so approved shall not be changed in any manner.
|
15-07-2028
|
Shall be complied
|
50 |
Lifts shall be provided as per the provision of NBCI, 2016 in pursuance with note (ii) of sub-rule(2) of Rule 42 of ODA Rules, 2020 if the same is not provided by the applicant, appropriate; action shall be taken as per law.
|
15-07-2028
|
Shall be complied
|
51 |
Obtain necessary Certificate from the Authority, Cuttack prior to occupation of building in full or part.
|
15-07-2028
|
Shall be complied
|
52 |
The applicant shall install rooftop P.V. system as per CDA Regulations
|
15-07-2028
|
Shall be complied
|
Updated Changes on 12-01-2024 |
53 |
Total parking space measuring 2472.34 sqm are shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose.
|
15-07-2028
|
Shall be complied
|
54 |
The land over which construction is proposed is accessible by an approved means of access of 9 meters in width.
|
15-07-2028
|
Shall be complied
|
55 |
The applicant shall comply all the stipulation of the NOC given by CGWA in respect of tapping of ground water vide NOC No. CGWA/NOC/INF/ORIG/2023/18464 dt. 11.05.2023 in pursuant to the NOC given by Superintending Engineer, RWSS Division, Cuttack vide letter no. 2884 dt. 16.05.2023.
|
15-07-2028
|
Shall be complied
|
56 |
Electric installation and power connection as per TPCODL vide their letter No. 1449(4) Dated 16.02.2023 in respect of supply of power.
|
15-07-2028
|
Shall be complied
|
57 |
The applicant shall ensure the Structural Safety of the propose building complying to the structural design given by the concern Structural Engineer, SUDHANSHU SEKHAR PANDA bearing DTP Empanelled No RTP/DTP(ELE.ER)-522/2022.
|
15-07-2028
|
Shall be complied
|
58 |
Applicant shall construct and connect the storm water drain up to the public disposal point at own cost as per EDIP in pursuant to the NOC given by Sarpanch, Kunheipada Gram Panchayat vide their Letter no. Nil dt 20/09/2022.
|
15-07-2028
|
Shall be complied
|
59 |
The applicant must ensure the electrical safety of the building in electrical connection and installation as per the electrical safety certificate given by DTP Empanelled Engineer, AJAYA KUMAR SAHOO Regd.no RTP/DTP(ST.ER)-012/2017.
|
15-07-2028
|
Shall be complied
|
60 |
The building shall be used exclusively for the residential purpose apartment and the use shall not be changed to any other use without prior approval of this Authority.
|
15-07-2028
|
Shall be complied
|
61 |
The area affected under Road widening proposal as per the CDP of Cuttack shall be left unbounded and open to Sky for future Road widening without any hindrances as per the undertaking submitted to this effect.
|
15-07-2028
|
Shall be complied
|
62 |
Give written notice to the Authority before commencement of work on building site in Form-VI (A), periodic progress report in Form- Annexure-IV, notice of completion in Form VI(B) and notice in case of termination of services of Technical persons engaged by him in the prescribed format as per Rule.
|
30-09-2023
|
Shall be complied
|
63 |
The applicant shall abide by the provisions of Rule no.15 of ODA (P&BS) Rules, 2020 with regard to third party verification at plinth level, ground level & roof level. Any deviation to above shall attract penalty as per the provision of the same.
|
30-09-2024
|
Shall be complied
|
64 |
Wherever tests of any material are made to ensure conformity of the requirements of the the regulations in force, records of the test data shall be kept available for Inspection during the construction of building and for such period thereafter as required by the Authority
|
15-07-2028
|
Shall be complied
|
65 |
The Rain water harvesting system, roof top solar energy and provision of barrier free access shall be provided as per the provision of Rules 46, 47 & 48 of ODA (P&BS) Rules 2020
|
15-07-2028
|
Shall be complied
|
66 |
The concerned Architect/Applicant/Developer are fully responsible for any deviations additions & alternations beyond approved plan/ defective construction etc, shall be liable for action as per the provisions of the Regulation.
|
15-07-2028
|
Shall be complied
|
67 |
10% of the parking space shall be exclusively earmarked for ambulance, fire tender, physically handicapped persons and outside visitors with signage as per norms under Rule 37 of ODA (Planning & Building Standards) Rules, 2020.
|
15-07-2028
|
Shall be complied
|
68 |
Plantation for one tree per 80 sqm of plot area made by the applicant as per provision under Rule 30 of ODA (Planning & Building Standards) Rules 2020.
|
15-07-2028
|
Shall be complied
|
69 |
The applicant shall construct the EIDP & submit necessary EIDP & estimate for approval of the EIDP committee of CDA in pursuant to the NOC given by Local authorities before applying for Occupancy Certificate.
|
15-07-2028
|
Shall be complied
|
70 |
No storm water/water shall be discharged to the public road/public premises and other adjoining plots
|
15-07-2028
|
Shall be complied
|
71 |
All the passages around the building shall be developed with permeable pavers block for absorption of rainwater and seepage in the ground.
|
15-07-2028
|
Shall be complied
|
72 |
Rain water harvesting structure and recharging pits adequate capacity shall be developed to minimize the storm water runoff to the drain.
|
15-07-2028
|
Shall be complied
|
73 |
Ensure Installation of minimum firefighting equipment and installation as per provision of NBC-2016/Fire recommendation and maintain the same at own cost.
|
15-07-2028
|
Shall be complied
|
74 |
The applicant shall register this project before the ORERA as per their Act.
|
30-09-2023
|
Completed
|
75 |
The number of dwelling units so approved shall not be changed in any manner.
|
15-07-2028
|
Shall be complied
|
76 |
Lifts shall be provided as per the provision of NBCI, 2016 in pursuance with note (ii) of sub-rule(2) of Rule 42 of ODA Rules, 2020 if the same is not provided by the applicant, appropriate; action shall be taken as per law.
|
15-07-2028
|
Shall be complied
|
77 |
Obtain necessary Certificate from the Authority, Cuttack prior to occupation of building in full or part.
|
15-07-2028
|
Shall be complied
|
78 |
The applicant shall install rooftop P.V. system as per CDA Regulations
|
15-07-2028
|
Shall be complied
|
Updated Changes on 14-04-2024 |
79 |
Total parking space measuring 2472.34 sqm are shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose.
|
15-07-2028
|
Shall be complied
|
80 |
The land over which construction is proposed is accessible by an approved means of access of 9 meters in width.
|
15-07-2028
|
Shall be complied
|
81 |
The applicant shall comply all the stipulation of the NOC given by CGWA in respect of tapping of ground water vide NOC No. CGWA/NOC/INF/ORIG/2023/18464 dt. 11.05.2023 in pursuant to the NOC given by Superintending Engineer, RWSS Division, Cuttack vide letter no. 2884 dt. 16.05.2023.
|
15-07-2028
|
Shall be complied
|
82 |
Electric installation and power connection as per TPCODL vide their letter No. 1449(4) Dated 16.02.2023 in respect of supply of power.
|
15-07-2028
|
Shall be complied
|
83 |
The applicant shall ensure the Structural Safety of the propose building complying to the structural design given by the concern Structural Engineer, SUDHANSHU SEKHAR PANDA bearing DTP Empanelled No RTP/DTP(ELE.ER)-522/2022.
|
15-07-2028
|
Shall be complied
|
84 |
Applicant shall construct and connect the storm water drain up to the public disposal point at own cost as per EDIP in pursuant to the NOC given by Sarpanch, Kunheipada Gram Panchayat vide their Letter no. Nil dt 20/09/2022.
|
15-07-2028
|
Shall be complied
|
85 |
The applicant must ensure the electrical safety of the building in electrical connection and installation as per the electrical safety certificate given by DTP Empanelled Engineer, AJAYA KUMAR SAHOO Regd.no RTP/DTP(ST.ER)-012/2017.
|
15-07-2028
|
Shall be complied
|
86 |
The building shall be used exclusively for the residential purpose apartment and the use shall not be changed to any other use without prior approval of this Authority.
|
15-07-2028
|
Shall be complied
|
87 |
The area affected under Road widening proposal as per the CDP of Cuttack shall be left unbounded and open to Sky for future Road widening without any hindrances as per the undertaking submitted to this effect.
|
15-07-2028
|
Shall be complied
|
88 |
Give written notice to the Authority before commencement of work on building site in Form-VI (A), periodic progress report in Form- Annexure-IV, notice of completion in Form VI(B) and notice in case of termination of services of Technical persons engaged by him in the prescribed format as per Rule.
|
30-09-2023
|
Shall be complied
|
89 |
The applicant shall abide by the provisions of Rule no.15 of ODA (P&BS) Rules, 2020 with regard to third party verification at plinth level, ground level & roof level. Any deviation to above shall attract penalty as per the provision of the same.
|
30-09-2024
|
Shall be complied
|
90 |
Wherever tests of any material are made to ensure conformity of the requirements of the the regulations in force, records of the test data shall be kept available for Inspection during the construction of building and for such period thereafter as required by the Authority
|
15-07-2028
|
Shall be complied
|
91 |
The Rain water harvesting system, roof top solar energy and provision of barrier free access shall be provided as per the provision of Rules 46, 47 & 48 of ODA (P&BS) Rules 2020
|
15-07-2028
|
Shall be complied
|
92 |
The concerned Architect/Applicant/Developer are fully responsible for any deviations additions & alternations beyond approved plan/ defective construction etc, shall be liable for action as per the provisions of the Regulation.
|
15-07-2028
|
Shall be complied
|
93 |
10% of the parking space shall be exclusively earmarked for ambulance, fire tender, physically handicapped persons and outside visitors with signage as per norms under Rule 37 of ODA (Planning & Building Standards) Rules, 2020.
|
15-07-2028
|
Shall be complied
|
94 |
Plantation for one tree per 80 sqm of plot area made by the applicant as per provision under Rule 30 of ODA (Planning & Building Standards) Rules 2020.
|
15-07-2028
|
Shall be complied
|
95 |
The applicant shall construct the EIDP & submit necessary EIDP & estimate for approval of the EIDP committee of CDA in pursuant to the NOC given by Local authorities before applying for Occupancy Certificate.
|
15-07-2028
|
Shall be complied
|
96 |
No storm water/water shall be discharged to the public road/public premises and other adjoining plots
|
15-07-2028
|
Shall be complied
|
97 |
All the passages around the building shall be developed with permeable pavers block for absorption of rainwater and seepage in the ground.
|
15-07-2028
|
Shall be complied
|
98 |
Rain water harvesting structure and recharging pits adequate capacity shall be developed to minimize the storm water runoff to the drain.
|
15-07-2028
|
Shall be complied
|
99 |
Ensure Installation of minimum firefighting equipment and installation as per provision of NBC-2016/Fire recommendation and maintain the same at own cost.
|
15-07-2028
|
Shall be complied
|
100 |
The applicant shall register this project before the ORERA as per their Act.
|
30-09-2023
|
Completed
|
101 |
The number of dwelling units so approved shall not be changed in any manner.
|
15-07-2028
|
Shall be complied
|
102 |
Lifts shall be provided as per the provision of NBCI, 2016 in pursuance with note (ii) of sub-rule(2) of Rule 42 of ODA Rules, 2020 if the same is not provided by the applicant, appropriate; action shall be taken as per law.
|
15-07-2028
|
Shall be complied
|
103 |
Obtain necessary Certificate from the Authority, Cuttack prior to occupation of building in full or part.
|
15-07-2028
|
Shall be complied
|
104 |
The applicant shall install rooftop P.V. system as per CDA Regulations
|
15-07-2028
|
Shall be complied
|