: CSS SJ HOMES | : Partnership |
: 1820202300231 | :View |
NA | : A-306, Nirmala Plaza Commercial Complex, Forest Park, Airport Road, Bhubaneswar-751020 |
: Plot No.- 564, Phool Vatika, Vivekananda Marg, Bhubaneswar, Odisha- 751002. | : css.sjhomes@gmail.com |
: 9337227966 | |
: AAQFC3121L | :View |
: This is our first project in this firm. | : Promoters have experience in this area for more than 10 years |
NA |
: GOBIND CHANDRA SINGH | : |
: Partner | : CHWPS9896R |
:PAN Card | : contact.gcsingh@gmail.com |
: B.Tech | : 9337227966 |
: Experience of more than 10 years in real estate sector. | |
: Yes | : NA |
: SUBASH JENA | : |
: Partner | : AFZPJ9611G |
:PAN Card | : contact.sjena1@gmail.com |
: Graduate | : 8763789784 |
: Experience of more than 10 years in real estate sector. | |
: Yes | : NA |
: JAHED KHAN | : |
: Partner | : BVJPK5202P |
:PAN Card | : jahed_786@yahoo.co.in |
: B.Com | : 9937577191 |
: Experience of more than 8 years in real estate sector. | |
: Yes | : NA |
: SABYASACHI JENA | : |
: Partner | : APEPJ3316B |
:PAN Card | : sabya.lidu@gmail.com |
: B.Tech | : 9778422710 |
: Experience of more than 10 years in real estate sector. | |
: Yes | : NA |
: GOPI CHANDRA SINGH | : |
: Partner | : DTIPS7175G |
:PAN Card | : gopi.c.singh16@gmail.com |
: B.Arch | : 8763789784 |
: Experience of more than 6 years in real estate sector. | |
: Yes | : NA |
: New | : PRISTINE HEIGHTS |
: Residential | : (Residential Project, 2B+S+10 Residential multi storied Apartment Building, No. of Units- 40) |
: Khordha | : Bhubaneswar |
: 751014 | : Urban Local Body |
: BHUBANESWAR MUNICIPALITY CORPORATION | |
: 2B+S+10 FLOORS | : NA |
: 419 | : 66/320 |
: BJB NAGAR | : 1547.5 |
: Yes | |
No | : View |
: View | |
: Other Person | |
: SASWATA BANERJEE & CHINMOY BANERJEE | : PROMOTER HAS REGISTERED GENERAL POWER OF ATTORNEY WITH THE LAND OWNERS |
: Yes | |
: 1082203178 | : 04-02-2022 |
: DISTRICT SUB-REGISTRAR KHURDA (BBSR) | : Attached |
: Yes | |
: 1082205640 | : 12-04-2022 |
: DISTRICT SUB-REGISTRAR KHURDA (BBSR) | : Attached |
: Yes |
Serial No. | Particulars of the Person | Land/Plot Details | Share of the Person | Document Attached |
---|---|---|---|---|
1 | SASWATA BANERJEE & CHINMOY BANERJEE | District-Khurda, Ps: Bhubaneswar No.75, Tahasil: Bhubaneswar, Mouza- Bhubaneswar Sahara Unit No.29 BUXI JAGABANDHU NAGAR, Khata No.66/320, Plot No.419, Kissam : Gharabari-2, Area : Ac.0.380 decimals | 50% upto 2 FAR & 30% in purchased FAR | Agreement Copy |
View | View |
Download site plan | 16-02-2026 |
17-02-2023 |
Sl. No. | Description of Conditions | Schedule date of compliance | Present Status |
---|---|---|---|
1 | The owner/applicant/Technical Person shall strictly adhere to the terms and conditions imposed in the NOC from PHED vide Letter No- 12593, dt. 02/08/2022 , & NOC from CGWA vide letter No-CGWA/NOC/INF/ORIG/2022/16196, dt.01/09/2022, fire safety recommendation vide letter No-RECOMM1204130012022000472, dt.16.02.2022 , NOC from Airport Authority of India vide letter No-BHUB/EAST/B/082221/572052, dt.16.09.2021, Structural Vetting Certificate from Indian Institute of Technology, Guwahati vide letter No-IITG/CE/HS/BJB/01, dt. 9"Jan 2023. | 30-12-2025 | In process |
2 | Roof top rain water shall be conveyed and discharged to the rain water Harvesting structure in the premises as per Rule-47 of ODA (Planning & Building Standards) Rules, 2020. | 30-12-2025 | In process |
3 | Provision of green building norms are to be strictly followed as per Rule-51 of ODA (Planning & Building Standards) Rules, 2020. | 30-12-2025 | In process |
4 | Plantation as required under the provision under Rule 30 of ODA (Planning & Building Standards) Rules, 2020.shall be strictly adhered. | 30-12-2025 | In process |
5 | Atleast 10% of the parking shall be ear marked for visitors and 30% of the parking space shall have facility for Electrical vehicle charging points | 30-12-2025 | In process |
6 | The applicant shall get the EIDP approved towards development of External infrastructure, execute it and obtain clearance from Engineering wing of BMC before Occupancy. | 30-12-2025 | In process |
7 | All the passages around the building shall be developed with permeable pavers block for absorption of rain water and seepage in to the ground. | 30-12-2025 | In process |
: Yes | : View |
Point No. | Latitude | Longitude |
---|---|---|
1 | 20°14'56.9'' | 85°50'40.3'' |
2 | 20°14'56.9'' | 85°50'39.1'' |
3 | 20°14'58.3'' | 85°50'39.1'' |
4 | 20°14'58.4'' | 85°50'40.3'' |
5 | 20°14'57.5'' | 85°50'40.3'' |
Description* | Scheduled date of completion | Current Status | Site Images |
---|---|---|---|
Site Development | 01-03-2023 | Completed | |
Roof Casting | NA | NA | NA |
Ground Floor/Stilt Floor | 15-06-2023 | In process | NA |
1 Floor | 15-07-2023 | In process | NA |
Brick Work & Plastering | NA | NA | NA |
Ground Floor/Stilt Floor | 15-08-2023 | In process | NA |
1 Floor | 15-09-2023 | In process | NA |
Electrical Works | 30-12-2025 | In process | NA |
Concealed Cabling including Plugs & switches | 30-12-2025 | In process | NA |
Installation & Charging of Transformer | 30-12-2025 | In process | NA |
Connection to Flats/Apartments | 30-12-2025 | In process | NA |
PH works | 30-12-2025 | In process | NA |
Laying of concealed Pipes | 30-12-2025 | In process | NA |
PH Fittings | 30-12-2025 | In process | NA |
Overhead Water Tanks | 30-12-2025 | In process | NA |
Water Supply Connection to all units | 30-12-2025 | In process | NA |
STP construction and completion | 30-12-2025 | In process | NA |
Distempering & Colouring of all units and exteriors | 30-12-2025 | In process | NA |
Fixation of doors and windows | 30-12-2025 | In process | NA |
Scheduled Date of handing over possession | 15-01-2026 | In process | NA |
Development of common areas, parks, gardens etc | 30-12-2025 | In process | NA |
Site Development | 01-03-2023 | Completed | NA |
NA | NA | NA | NA |
Ground Floor/Stilt Floor | 15-06-2023 | In process | NA |
1 Floor | 15-07-2023 | In process | NA |
NA | NA | NA | NA |
Ground Floor/Stilt Floor | 15-08-2023 | In process | NA |
1 Floor | 15-09-2023 | In process | NA |
Electrical Works | 30-12-2025 | In process | NA |
Concealed Cabling including Plugs & switches | 30-12-2025 | In process | NA |
Installation & Charging of Transformer | 30-12-2025 | In process | NA |
Connection to Flats/Apartments | 30-12-2025 | In process | NA |
PH works | 30-12-2025 | In process | NA |
Laying of concealed Pipes | 30-12-2025 | In process | NA |
PH Fittings | 30-12-2025 | In process | NA |
Overhead Water Tanks | 30-12-2025 | In process | NA |
Water Supply Connection to all units | 30-12-2025 | In process | NA |
STP construction and completion | 30-12-2025 | In process | NA |
Distempering & Colouring of all units and exteriors | 30-12-2025 | In process | NA |
Fixation of doors and windows | 30-12-2025 | In process | NA |
Scheduled Date of handing over possession | 15-01-2026 | In process | NA |
Development of common areas, parks, gardens etc | 30-12-2025 | In process | NA |
Site Development | 01-03-2023 | Completed | NA |
NA | 01-03-2023 | Completed | NA |
Ground Floor/Stilt Floor | 15-06-2023 | Completed | NA |
1 Floor | 15-07-2023 | In process | NA |
NA | 15-07-2023 | In process | NA |
Ground Floor/Stilt Floor | 15-08-2023 | Completed | NA |
1 Floor | 15-09-2023 | In process | NA |
Electrical Works | 30-12-2025 | In process | NA |
Concealed Cabling including Plugs & switches | 30-12-2025 | In process | NA |
Installation & Charging of Transformer | 30-12-2025 | In process | NA |
Connection to Flats/Apartments | 30-12-2025 | In process | NA |
PH works | 30-12-2025 | In process | NA |
Laying of concealed Pipes | 30-12-2025 | In process | NA |
PH Fittings | 30-12-2025 | In process | NA |
Overhead Water Tanks | 30-12-2025 | In process | NA |
Water Supply Connection to all units | 30-12-2025 | In process | NA |
STP construction and completion | 30-12-2025 | In process | NA |
Distempering & Colouring of all units and exteriors | 30-12-2025 | In process | NA |
Fixation of doors and windows | 30-12-2025 | In process | NA |
Scheduled Date of handing over possession | 15-01-2026 | In process | NA |
Development of common areas, parks, gardens etc | 30-12-2025 | In process | NA |
Site Development | 30-12-2024 | On going | |
NA | 30-12-2024 | On going | NA |
Ground Floor/Stilt Floor | 15-11-2023 | Completed | |
1 Floor | 22-12-2023 | Completed | |
NA | 20-01-2024 | Completed | NA |
Ground Floor/Stilt Floor | 01-05-2024 | In process | NA |
1 Floor | 01-06-2024 | In process | NA |
Electrical Works | 30-12-2025 | In process | NA |
Concealed Cabling including Plugs & switches | 30-12-2025 | In process | NA |
Installation & Charging of Transformer | 30-12-2025 | In process | NA |
Connection to Flats/Apartments | 30-12-2025 | In process | NA |
PH works | 30-12-2025 | In process | NA |
Laying of concealed Pipes | 30-12-2025 | In process | NA |
PH Fittings | 30-12-2025 | In process | NA |
Overhead Water Tanks | 30-12-2025 | In process | NA |
Water Supply Connection to all units | 30-12-2025 | In process | NA |
STP construction and completion | 30-12-2025 | In process | NA |
Distempering & Colouring of all units and exteriors | 30-12-2025 | In process | NA |
Fixation of doors and windows | 30-12-2025 | In process | NA |
Scheduled Date of handing over possession | 15-01-2026 | In process | NA |
Development of common areas, parks, gardens etc | 30-12-2025 | In process | NA |
: Residential | |
: 40
|
|
Residential Flats/ House | |||||
---|---|---|---|---|---|
S. No. | Flat No./ House No. | ||||
Area in square metres |
Ownership | ||||
Carpet Area | Balcony Area | Exclusive Open Terrace Area | |||
1 | 101 | 114.47 | 16.42 | 0 | Promoter |
2 | 201 | 114.47 | 16.42 | 0 | Land Owner |
3 | 301 | 114.47 | 16.42 | 0 | Promoter |
4 | 401 | 114.47 | 16.42 | 0 | Land Owner |
5 | 501 | 114.47 | 16.42 | 0 | Promoter |
6 | 601 | 114.47 | 16.42 | 0 | Land Owner |
7 | 701 | 114.47 | 16.42 | 0 | Land Owner |
8 | 801 | 114.47 | 16.42 | 0 | Land Owner |
9 | 901 | 114.47 | 16.42 | 0 | Promoter |
10 | 1001 | 114.47 | 16.42 | 0 | Promoter |
11 | 102 | 114.47 | 16.42 | 0 | Promoter |
12 | 202 | 114.47 | 16.42 | 0 | Promoter |
13 | 302 | 114.47 | 16.42 | 0 | Promoter |
14 | 402 | 114.47 | 16.42 | 0 | Land Owner |
15 | 502 | 114.47 | 16.42 | 0 | Promoter |
16 | 602 | 114.47 | 16.42 | 0 | Land Owner |
17 | 702 | 114.47 | 16.42 | 0 | Land Owner |
18 | 802 | 114.47 | 16.42 | 0 | Promoter |
19 | 902 | 114.47 | 16.42 | 0 | Promoter |
20 | 1002 | 114.47 | 16.42 | 0 | Promoter |
21 | 103 | 106.33 | 16.42 | 0 | Promoter |
22 | 203 | 106.33 | 16.42 | 0 | Promoter |
23 | 303 | 106.33 | 16.42 | 0 | Land Owner |
24 | 403 | 106.33 | 16.42 | 0 | Promoter |
25 | 503 | 106.33 | 16.42 | 0 | Land Owner |
26 | 603 | 106.33 | 16.42 | 0 | Land Owner |
27 | 703 | 106.33 | 16.42 | 0 | Promoter |
28 | 803 | 106.33 | 16.42 | 0 | Promoter |
29 | 903 | 106.33 | 16.42 | 0 | Promoter |
30 | 1003 | 106.33 | 16.42 | 0 | Promoter |
31 | 104 | 106.33 | 16.42 | 0 | Promoter |
32 | 204 | 106.33 | 16.42 | 0 | Land Owner |
33 | 304 | 106.33 | 16.42 | 0 | Land Owner |
34 | 404 | 106.33 | 16.42 | 0 | Promoter |
35 | 504 | 106.33 | 16.42 | 0 | Land Owner |
36 | 604 | 106.33 | 16.42 | 0 | Land Owner |
37 | 704 | 106.33 | 16.42 | 0 | Promoter |
38 | 804 | 106.33 | 16.42 | 0 | Land Owner |
39 | 904 | 106.33 | 16.42 | 0 | Promoter |
40 | 1004 | 106.33 | 16.42 | 0 | Promoter |
Types of garages and parking | ||||||
---|---|---|---|---|---|---|
House No. | Type of Garage/ Parking allotted | Serial No., if any | Dimension (Length x Width) in Metres | Floor area in sq. metres | Garage/Parking area cost is included or additional | |
101 | Covered Parking | LB-08 | 2.44 x 4.58 | 11.17 | Included | 201 | Covered Parking | LB-02 | 2.44 x 4.58 | 11.17 | Included | 301 | Covered Parking | LB-11 | 2.44 x 4.58 | 11.17 | Included | 401 | Covered Parking | LB-06 | 2.44 x 4.58 | 11.17 | Included | 501 | Covered Parking | LB-13 | 2.44 x 4.58 | 11.17 | Included | 601 | Covered Parking | UB-13 | 2.44 x 4.58 | 11.17 | Included | 701 | Covered Parking | UB-11 | 2.44 x 4.58 | 11.17 | Included | 801 | Covered Parking | UB-16 | 2.44 x 4.58 | 11.17 | Included | 901 | Covered Parking | ST-02 | 2.44 x 4.58 | 11.17 | Included | 1001 | Covered Parking | ST-01 | 2.44 x 4.58 | 11.17 | Included | 102 | Covered Parking | UB-01 | 2.44 x 4.58 | 11.17 | Included | 202 | Covered Parking | UB-03 | 2.44 x 4.58 | 11.17 | Included | 302 | Covered Parking | UB-05 | 2.44 x 4.58 | 11.17 | Included | 402 | Covered Parking | LB-07 | 2.44 x 4.58 | 11.17 | Included | 502 | Covered Parking | LB-14 | 2.44 x 4.58 | 11.17 | Included | 602 | Covered Parking | UB-14 | 2.44 x 4.58 | 11.17 | Included | 702 | Covered Parking | UB-12 | 2.44 x 4.58 | 11.17 | Included | 802 | Covered Parking | UB-17 | 2.44 x 4.58 | 11.17 | Included | 902 | Covered Parking | UB-06 | 2.44 x 4.58 | 11.17 | Included | 1002 | Covered Parking | LB-09 | 2.44 x 4.58 | 11.17 | Included | 103 | Covered Parking | UB-02 | 2.44 x 4.58 | 11.17 | Included | 203 | Covered Parking | UB-04 | 2.44 x 4.58 | 11.17 | Included | 303 | Covered Parking | ST-03 | 2.44 x 4.58 | 11.17 | Included | 403 | Covered Parking | UB-07 | 2.44 x 4.58 | 11.17 | Included | 503 | Covered Parking | ST-04 | 2.44 x 4.58 | 11.17 | Included | 603 | Covered Parking | UB-09 | 2.44 x 4.58 | 11.17 | Included | 703 | Covered Parking | UB-08 | 2.44 x 4.58 | 11.17 | Included | 803 | Covered Parking | UB-18 | 2.44 x 4.58 | 11.17 | Included | 903 | Covered Parking | LB-16 | 2.44 x 4.58 | 11.17 | Included | 1003 | Covered Parking | LB-18 | 2.44 x 4.58 | 11.17 | Included | 104 | Covered Parking | LB-10 | 2.44 x 4.58 | 11.17 | Included | 204 | Covered Parking | LB-03 | 2.44 x 4.58 | 11.17 | Included | 304 | Covered Parking | LB-05 | 2.44 x 4.58 | 11.17 | Included | 404 | Covered Parking | LB-12 | 2.44 x 4.58 | 11.17 | Included | 504 | Covered Parking | LB-01 | 2.44 x 4.58 | 11.17 | Included | 604 | Covered Parking | UB-10 | 2.44 x 4.58 | 11.17 | Included | 704 | Covered Parking | LB-15 | 2.44 x 4.58 | 11.17 | Included | 804 | Covered Parking | UB-15 | 2.44 x 4.58 | 11.17 | Included | 904 | Covered Parking | LB-17 | 2.44 x 4.58 | 11.17 | Included | 1004 | Covered Parking | LB-04 | 2.44 x 4.58 | 11.17 | Included | Additional | Covered Parking | ST-05 | 2.44 X 4.58 | 11.17 | Additional | Additional | Covered Parking | ST-06 | 2.44 X 4.58 | 11.17 | Additional | Additional | Covered Parking | ST-07 | 2.44 X 4.58 | 11.17 | Additional | Additional | Covered Parking | ST-08 | 2.44 X 4.58 | 11.17 | Additional | Additional | Covered Parking | ST-09 | 2.44 X 4.58 | 11.17 | Additional | Additional | Covered Parking | ST-10 | 2.44 X 4.58 | 11.17 | Additional | Additional | Covered Parking | ST-11 | 2.44 X 4.58 | 11.17 | Additional | Additional | Covered Parking | ST-12 | 2.44 X 4.58 | 11.17 | Additional | Additional | Covered Parking | ST-13 | 2.44 X 4.58 | 11.17 | Additional |
Particulars of Facilities | Status of the facility | Brief description of facility |
---|---|---|
Drinking Water Facility | Ground Water | Copy of Consent Letter |
Fire Fighting Facility | Yes | Fire Extinguisher, First- Aid Hose Reel, Down Comer, Automatic Sprinkler System, Manually Operated Electronic Fire Alarm System, Terrace Tank, Pump At Terrace Tank Level |
Emergency Evacuation Services | No | Fire Fighting system |
Use of Renewable Energy | Yes | Solar panels to be installed on roof top |
Lift Facility | Yes | 2 no. of Lifts (Fire Lift, Stretcher Lift) . Make will be of OTIS, SCHINDLER, KONE or similar. |
Market Complex | No | |
Community Hall | Yes | Community hall area : 44.27 square meters |
Gymnasium | Yes | Area of Gymnasium : 31.66 square meters |
Swimming Pool | No | |
Play Ground | No | |
Park/Garden | No | |
Plantation Area | Yes | 160 square meters |
Others(Please Specify) | No | |
Internal Road | Yes | 653.30 square meters |
External Road | No | |
Elecricity Supply | Yes | Copy of Consent Letter |
Other Amenities | Yes | 30% of car parking will have provisions for EV charging |