Generated by pacms.orera.in on date: 2024-06-21

Promoter Details
Promoter Name :
SRI SANJIB BISWAL
Project Name :
AMULYA PLAZA
Project Location :
(Residential Project, S+4, No. of Units- 16)

Form- I

A. Promoter's Details

:  SR CONSTRUCTION :  Proprietory Firm
NA NA
Promoter Photo :  PLOT NO-98, NEAR-XAVIER SCHOOL, SATYANAGAR, BHUBANESWAR KHORDHA,ODISHA-751007
:  Plot No.- 98, Near Xavier School, Satyanagar, Bhubaneswar, Dist- Khordha, Odisha- 751007. :  sbiswal26400@gmail.com
:  234561 :  9437026400
:  ACRPB3530F :View
:  1 YEAR ( 1ST PROJECT) :  NO
NA

B. Details of Board of Directors / Partners / MC Members

Annexure-1

Details of last projects already implemented (Ongoing or Complete)

Have you implemented any project(s) previously (May be Ongoing or Completed):No

Annexure-2

Details of the project to be registered

:   New :  AMULYA PLAZA
:  Residential :  (Residential Project, S+4, No. of Units- 16)
:  Khordha :  Bhubaneswar
:  751024 :  Urban Local Body
:  BHUBANESWAR MUNICIPAL CORPORATION BHUBANESWAR
:  S+4 :  NA

Land Details of the Project


:  277 :  10
:  MOUZA-BHUBANESWAR SAHAR UNIT NO-10,SATYANAGAR, BHUBANESWAR, KHORDHA, ODISHA. :  631.53
:  Yes
Yes :  View
:  View
:  Other Person
:  AMULYA MANI GARABADU :  PADMALYA GARABADU W/O.LATE-AMULYA MANI GARABADU TO EXECUTE GPA M/S.SR CONSTRUCTION PROPITOR-SANJIB BISWAL
: No
: Yes
:  11081906104 :  25-05-2019
:  DSRO-BHUBANSWAR :  Attached

:  280/1251 :  303/55
:  MOUZA-BHUBANESWAR SAHAR UNITNO-10,SATYANAGAR, BHUBANESWAR, KHORDHA, ODISHA. :  226.70
:  Yes
Yes :  View
:  View
:  Other Person
:  ASWINE KUMAR MOHAPATRA :  ASWINE KUMAR MOHAPATRA S/O-UPENDRA MOHAPATRA, TO EXECUTE GPA M/S.SR CONSTRUCTION PROPITOR-SANJIB BISWAL
: No
: Yes
:  11081906114 :  25-05-2019
:  DSRO-BHUBANESWAR :  Attached

Development Agreement

: Yes
Serial No. Particulars of the Person Land/Plot Details Share of the Person Document Attached
1 AMULYA MANI GARABADU 277 50%   Agreement Copy
2 ASWINE KUMAR MOHAPATRA 280/1251 50%   Agreement Copy

Building Plan

  View   View
  Download site plan 16-12-2024

Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 THE BUILDING SHALL BE USED EXCLUSIVELY FOR RESIDENTIAL PURPOSE AND THE USE SHALL NOT BE CHANGED TO ANY OTHER USE WITHOUT PRIOR APPROVAL OF THIS AUTHORITY. 16-10-2021 UNDER PROGRESS
2 THE DEVELOPMENT SHALL BE UNDERTAKEN STRICTLY ACCORDING TO PLANS ENCLOSED WITH NECESSARY PERMISSION ENDOESEMENT. 24-11-2022 UNDER PROGRESS
3 PARKING SPACE MEASURING 485.24 SQM AS SHOWN IN THE APPROVED PLAN SHALL BE LEFT FOR PARKING OF VEDICLES AND NO PART OF IT WILL BE USED FOR ANY OTHER PURPOSE. 27-12-2022 UNDER PROGRESS
4 THE LAND OVER WHICH CONSTRUCTION IS PROPOSED IS ACCESSIBLE BY AN APPROVED MEANS OF ACCESS OF 13.41 M & 6.09 M (ONE THREE POINT FOUR NINE METER & SIX POIN ZERO NINE) IN WIATH. 26-01-2023 UNDER PROGRESS
5 THE LAND IN QUESTION MUST BE IN LAWFUL OWNERSHIP AND PEACEFUL POSSESSION OF THE APPLICANT. 16-02-2023 UNDER PROGRESS
6 THE PERMISSION GRANTED UNDER THESE REGULATIONS SHALL REMAIN VALID UPTO THREE YEARS FROM THE DATE OF ISSUE. HOWEVER THE PERMISSION SHALL HAVE TO BE REVALIDATED BEFORE THE EXPIRY OF THE ABOVE PERIOD ON PAYMENT OF SUCH FEE AS MAY BE PRESCRIBED UNDER RULES AND SUCH REVALIDATION SHALL BE VALID FOR ONE YEAR. 07-04-2023 UNDER PROGRESS
7 THE OWNER/APPLICANT/TECHNICAL PERSON SHALL STRICTLY ADHERE TO THE TERMS AND CONDITIONS IMPOSED IN THE NOC/CLEARANCES GIVEN BY PHED VIDE LETTER NO-12859 DT. 16.12.2019. 07-08-2023 UNDER PROGRESS
8 STORN WATER FROM THE PREMISES OF ROOF TOP SHALL BE CONVEYED AND DISCHARGED TO THE RAIN WATER RECHARGING PITS AS PER ODA (PLANNING & BUILDING STANDARDS) RULE, 2020. 15-02-2024 UNDER PROGRESS
9 THE SPACE WHICH IS MEANT FOR PARKING SHALL NOT BE CHANGED TO ANY OTHER USE AND SHALL NOT BE PARITITIONED/ CLOSED IN ANY MANNER. 30-04-2024 UNDER PROGRESS
10 PLANTATION AS REQUIRED UNDER THE PROVISION UNDER RULE, 30 OF ODA (FLANNING & BUILDING STANDARDS) RULES, 2020. SHALL BE STRICTLY ADHERED. 12-07-2024 UNDER PROGRESS
11 THE OWNER/ APPLICANT/ARCHITECT/STRUCTURAL ENGINEER/PMO ARE FULLY AND JOINTLY RESPONSIBLE FOR ANY STRUCTURAL FAILURE/ CONSTRUCTION DEFECTS/ EARTHQUAKE/CYCLONE/ANY OTHER NATURAL DISASTER. AUTHORITY SHALL BE NO WAY HELD RESPONSIBLE FOR THE SAME IN WHAT SO EVER MANNER. 07-07-2024 UNDER PROGRESS
12 THE APPLICANT SHALL OBTAIN THE EIDP APPROVED BY THE ENGINEERING WING AND EXECUTE IT AS PER APPROVED DESIGN AND SPECIFICATION AND SHALL OBTAIN CLEARANCE WITH REGARD TO DEVELOPMENT OF INFRASTRUCTURE FROM BMC BEFOR OCCUPANCY. 17-08-2024 UNDER PROGRESS

Layout Plan

: Yes :  View

Location Map with geo-coordinates of bend points

Point No. Latitude Longitude
1 20°16'50.3''N 85°51'12.1''E
2 20°16'50.1''N 85°51'12.7''E
3 20°16'49.4''N 85°51'12.4''E
4 20°16'49.1''N 85°51'12.3''E
5 20°16'48.8''N 85°51'12.2''E
6 20°16'49.1''N 85°51'11.5''E
7 20°16'49.4N 85°51'11.7''E
8 20°16'50.0''N 85°51'11.9''E
View

Milestone of Project Construction

Description* Scheduled date of completion Current Status Site Images
Site Development 22-09-2022 JUST START
Roof Casting NA NA NA
Ground Floor/Stilt Floor 13-10-2022 NOT YET START
1 Floor 13-11-2022 NOT YET START
2 Floor 13-12-2022 NOT YET START NA
3 Floor 13-01-2023 NOT YET START NA
4 Floor 13-02-2023 NOT YET START NA
Brick Work & Plastering NA NA NA
Ground Floor/Stilt Floor 13-03-2023 NOT YET START NA
1 Floor 13-04-2023 NOT YET START NA
2 Floor 13-05-2023 NOT YET START NA
3 Floor 13-06-2023 NOT YET START NA
4 Floor 13-07-2023 NOT YET START NA
Electrical Works 13-08-2023 NOT YET START NA
Concealed Cabling including Plugs & switches 13-09-2023 NOT YET START NA
Installation & Charging of Transformer 13-10-2023 NOT YET START NA
Connection to Flats/Apartments 13-11-2023 NOT YET START NA
PH works 13-12-2023 NOT YET START NA
Laying of concealed Pipes 13-01-2024 NOT YET START NA
PH Fittings 13-02-2024 NOT YET START NA
Overhead Water Tanks 13-03-2024 NOT YET START NA
Water Supply Connection to all units 13-04-2024 NOT YET START NA
STP construction and completion 13-05-2024 NOT YET START NA
Distempering & Colouring of all units and exteriors 13-06-2024 NOT YET START NA
Fixation of doors and windows 13-07-2024 NOT YET START NA
Scheduled Date of handing over possession 13-08-2024 NOT YET START NA
Development of common areas, parks, gardens etc 13-09-2024 NOT YET START NA
Site Development 22-09-2022 JUST START NA
NA NA NA NA
Ground Floor/Stilt Floor 13-10-2022 NOT YET START NA
1 Floor 13-11-2022 NOT YET START NA
2 Floor 13-12-2022 NOT YET START NA
3 Floor 13-01-2023 NOT YET START NA
4 Floor 13-02-2023 NOT YET START NA
NA NA NA NA
Ground Floor/Stilt Floor 13-03-2023 NOT YET START NA
1 Floor 13-04-2023 NOT YET START NA
2 Floor 13-05-2023 NOT YET START NA
3 Floor 13-06-2023 NOT YET START NA
4 Floor 13-07-2023 NOT YET START NA
Electrical Works 13-08-2023 NOT YET START NA
Concealed Cabling including Plugs & switches 13-09-2023 NOT YET START NA
Installation & Charging of Transformer 13-10-2023 NOT YET START NA
Connection to Flats/Apartments 13-11-2023 NOT YET START NA
PH works 13-12-2023 NOT YET START NA
Laying of concealed Pipes 13-01-2024 NOT YET START NA
PH Fittings 13-02-2024 NOT YET START NA
Overhead Water Tanks 13-03-2024 NOT YET START NA
Water Supply Connection to all units 13-04-2024 NOT YET START NA
STP construction and completion 13-05-2024 NOT YET START NA
Distempering & Colouring of all units and exteriors 13-06-2024 NOT YET START NA
Fixation of doors and windows 13-07-2024 NOT YET START NA
Scheduled Date of handing over possession 13-08-2024 NOT YET START NA
Development of common areas, parks, gardens etc 13-09-2024 NOT YET START NA

Category and no. of units to be developed

:  Residential
:  
:  16
:  
:  
:  
Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership
Carpet Area Balcony Area Exclusive Open Terrace Area
1 101 93.50 SQMT 9.63 SQMT 00 Land Owner
2 102 93.50 SQMT 9.63 SQMT 00 Land Owner
3 103 93.50 SQMT 9.63 SQMT 00 Land Owner
4 104 93.50 SQMT 9.63 SQMT 00 Land Owner
5 201 93.50 SQMT 9.63 SQMT 00 Promoter
6 202 93.50 SQMT 9.63 SQMT 00 Promoter
7 203 93.50 SQMT 9.63 SQMT 00 Promoter
8 204 93.50 SQMT 9.63 SQMT 00 Promoter
9 301 93.50 SQMT 9.63 SQMT 00 Promoter
10 302 93.50 SQMT 9.63 SQMT 00 Promoter
11 303 93.50 SQMT 9.63 SQMT 00 Promoter
12 304 93.50 SQMT 9.63 SQMT 00 Promoter
13 401 93.50 SQMT 9.63 SQMT 00 Land Owner
14 402 93.50 SQMT 9.63 SQMT 00 Land Owner
15 403 93.50 SQMT 9.63 SQMT 00 Land Owner
16 404 93.50 SQMT 9.63 SQMT 00 Land Owner
Types of garages and parking
House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
101 Covered Parking 101 4.88 x 2.44 11.89 Included
102 Covered Parking 102 4.88 x 2.44 11.89 Included
103 Covered Parking 103 4.88 x 2.44 11.89 Included
104 Covered Parking 104 4.88 x 2.44 11.89 Included
201 Covered Parking 201 4.88 x 2.44 11.89 Included
202 Covered Parking 202 4.88 x 2.44 11.89 Included
203 Covered Parking 203 4.88 x 2.44 11.89 Included
204 Covered Parking 204 4.88 x 2.44 11.89 Included
301 Covered Parking 301 4.88 x 2.44 11.89 Included
302 Covered Parking 302 4.88 x 2.44 11.89 Included
303 Covered Parking 303 4.88 x 2.44 11.89 Included
304 Covered Parking 304 4.88 x 2.44 11.89 Included
401 Covered Parking 401 4.88 x 2.44 11.89 Included
402 Covered Parking 402 4.88 x 2.44 11.89 Included
403 Covered Parking 403 4.88 x 2.44 11.89 Included
404 Covered Parking 404 4.88 x 2.44 11.89 Included
Yes

Facilities to be provided

Particulars of Facilities Status of the facility Brief description of facility
Drinking Water Facility PHED Copy of NOC Letter
Fire Fighting Facility No UNDERTAKING
Emergency Evacuation Services Yes STAIR CASE
Use of Renewable Energy Yes DG BACK UP
Lift Facility Yes 2 NOS OF LIFT KONE BRAND, 6 PERSON CAPACITY, WITH ARD FACILITY
Market Complex No
Community Hall Yes 17.11 SQMT COMMUNITY HALL
Gymnasium No
Swimming Pool No
Play Ground No
Park/Garden No
Plantation Area Yes 45.07 SQMT PLANTATION AREA
Others(Please Specify) Yes CC CAMERA ALL SIDE
Internal Road Yes 22.03 SQMT INTERNAL ROAD, PATH/DRIVE WAY
External Road Yes 13.14 MT WIDE GOT OAD
Elecricity Supply Yes Copy of Consent Letter
Other Amenities Yes 24 HOURS SECURITY

Bank Particulars of the Project

  STATE BANK OF INDIA
  BAPUJINAGAR .BHUBANESWAR
  41114375159
  SBIN0006408
   View
  239475
  9437035847

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
SAGARENDRA MOHAPATRA Architect ADDRESS-PLOT NO-123,NEAR MAHARSHI COLLAGE ROAD, SAHIDNAGAR, BHUBANESWAR.,E.MAIL-sganrendramohapatra@gmail.com,Phone No-9987123456 CA/99/25469
SAGARENDRA MOHAPATRA Construction Engineer ADDRESS-PLOT NO-123,NEAR MAHARSHI COLLAGE ROAD, SAHIDNAGAR, BHUBANESWAR.,E.MAIL-sganrendramohapatra@gmail.com,Phone No-9987123456 CA/99/25469
SATYA RANJAN SWAIN Chartered Accountant ADDRESS-PLOT NO-506,SAHIDNAGAR, BHUBANESWAR,E.MAIL-satya1980@gmail.com, PHONE NO-9437432561 23456

Financial Details

:  520 :   View
  10-06-2025 :  200
:  320 :  0

Documents Attached

Description of Document Option Documents
Fire Safety Certificate Undertaking Attached
Affidavit in Form-A as per clause-l of sub-section-2 of section-4 of the Act Yes Attached
Allotment letter format Yes Attached
Conveyance Deed Format Yes Attached
Affidavit to adopt agreement for sale format as per Rule-8(1) of ORE (R and D) Rules, 2017 Yes Attached
IT Return 2020-21 Attached
IT Return 2021-22 Attached
IT Return 2022-23 Attached
Audit Report 2021-22 Attached
Audit Report 2020-21 Attached
Audit Report 2022-23 Attached

Additional Documents Attached

Sl. No. Title of the document Upload Document
1 BANK
2 BMC RECTIFY DATE LETTER
3 AFFIDAVIT UNDER TAKING
4 UNDER TAKING FOR ANNUAL REPORT/AUDIT REPORT/ IT RETURN

Other documents

“I undertake that the information submitted by me in this application are correct and true to best my knowledge. I also understand that providing false or wrong information is punishable under the Section-60 of the Real Estate (Regulation & Development) Act, 2016. I also further understand that furnishing wrong or false information will lead to rejection of my application registration of the project with forfeiture of registration fee and other charges deposited by me.”
  

Construction Progress

Updated Construction Progress

SL NO. Description Scheduled date of completion Current Status Remarks
1 Site Development 22-09-2022 JUST START
2 Roof Casting NA NA NA
3 Ground Floor/Stilt Floor 13-10-2022 NOT YET START
4 1 Floor 13-11-2022 NOT YET START
5 2 Floor 13-12-2022 NOT YET START NA
6 3 Floor 13-01-2023 NOT YET START NA
7 4 Floor 13-02-2023 NOT YET START NA
8 Brick Work & Plastering NA NA NA
9 Ground Floor/Stilt Floor 13-03-2023 NOT YET START NA
10 1 Floor 13-04-2023 NOT YET START NA
11 2 Floor 13-05-2023 NOT YET START NA
12 3 Floor 13-06-2023 NOT YET START NA
13 4 Floor 13-07-2023 NOT YET START NA
14 Electrical Works 13-08-2023 NOT YET START NA
15 Concealed Cabling including Plugs & switches 13-09-2023 NOT YET START NA
16 Installation & Charging of Transformer 13-10-2023 NOT YET START NA
17 Connection to Flats/Apartments 13-11-2023 NOT YET START NA
18 PH works 13-12-2023 NOT YET START NA
19 Laying of concealed Pipes 13-01-2024 NOT YET START NA
20 PH Fittings 13-02-2024 NOT YET START NA
21 Overhead Water Tanks 13-03-2024 NOT YET START NA
22 Water Supply Connection to all units 13-04-2024 NOT YET START NA
23 STP construction and completion 13-05-2024 NOT YET START NA
24 Distempering & Colouring of all units and exteriors 13-06-2024 NOT YET START NA
25 Fixation of doors and windows 13-07-2024 NOT YET START NA
26 Scheduled Date of handing over possession 13-08-2024 NOT YET START NA
27 Development of common areas, parks, gardens etc 13-09-2024 NOT YET START NA
Updated Changes on 16-04-2024
28 Site Development 22-09-2022 JUST START NA
29 NA NA NA NA
30 Ground Floor/Stilt Floor 13-10-2022 NOT YET START NA
31 1 Floor 13-11-2022 NOT YET START NA
32 2 Floor 13-12-2022 NOT YET START NA
33 3 Floor 13-01-2023 NOT YET START NA
34 4 Floor 13-02-2023 NOT YET START NA
35 NA NA NA NA
36 Ground Floor/Stilt Floor 13-03-2023 NOT YET START NA
37 1 Floor 13-04-2023 NOT YET START NA
38 2 Floor 13-05-2023 NOT YET START NA
39 3 Floor 13-06-2023 NOT YET START NA
40 4 Floor 13-07-2023 NOT YET START NA
41 Electrical Works 13-08-2023 NOT YET START NA
42 Concealed Cabling including Plugs & switches 13-09-2023 NOT YET START NA
43 Installation & Charging of Transformer 13-10-2023 NOT YET START NA
44 Connection to Flats/Apartments 13-11-2023 NOT YET START NA
45 PH works 13-12-2023 NOT YET START NA
46 Laying of concealed Pipes 13-01-2024 NOT YET START NA
47 PH Fittings 13-02-2024 NOT YET START NA
48 Overhead Water Tanks 13-03-2024 NOT YET START NA
49 Water Supply Connection to all units 13-04-2024 NOT YET START NA
50 STP construction and completion 13-05-2024 NOT YET START NA
51 Distempering & Colouring of all units and exteriors 13-06-2024 NOT YET START NA
52 Fixation of doors and windows 13-07-2024 NOT YET START NA
53 Scheduled Date of handing over possession 13-08-2024 NOT YET START NA
54 Development of common areas, parks, gardens etc 13-09-2024 NOT YET START NA

Booking Status

Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership Status
Carpet Area Balcony Area Exclusive Open Terrace Area
1 101 93.50 SQMT 9.63 SQMT 00 Land Owner
2 102 93.50 SQMT 9.63 SQMT 00 Land Owner
3 103 93.50 SQMT 9.63 SQMT 00 Land Owner
4 104 93.50 SQMT 9.63 SQMT 00 Land Owner
5 201 93.50 SQMT 9.63 SQMT 00 Promoter
6 202 93.50 SQMT 9.63 SQMT 00 Promoter
7 203 93.50 SQMT 9.63 SQMT 00 Promoter
8 204 93.50 SQMT 9.63 SQMT 00 Promoter
9 301 93.50 SQMT 9.63 SQMT 00 Promoter
10 302 93.50 SQMT 9.63 SQMT 00 Promoter
11 303 93.50 SQMT 9.63 SQMT 00 Promoter
12 304 93.50 SQMT 9.63 SQMT 00 Promoter
13 401 93.50 SQMT 9.63 SQMT 00 Land Owner
14 402 93.50 SQMT 9.63 SQMT 00 Land Owner
15 403 93.50 SQMT 9.63 SQMT 00 Land Owner
16 404 93.50 SQMT 9.63 SQMT 00 Land Owner

Financial Status

SL No. Funds Collected from the Allottees Funds Borrowed from Financial Institutions Funds Employed from Own Sources Expenditure As On Date Status
1 38500000 0 0 24519702 31-03-2024 UNDER PROGRESS

Updated Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 THE BUILDING SHALL BE USED EXCLUSIVELY FOR RESIDENTIAL PURPOSE AND THE USE SHALL NOT BE CHANGED TO ANY OTHER USE WITHOUT PRIOR APPROVAL OF THIS AUTHORITY. 16-10-2021 UNDER PROGRESS
2 THE DEVELOPMENT SHALL BE UNDERTAKEN STRICTLY ACCORDING TO PLANS ENCLOSED WITH NECESSARY PERMISSION ENDOESEMENT. 24-11-2022 UNDER PROGRESS
3 PARKING SPACE MEASURING 485.24 SQM AS SHOWN IN THE APPROVED PLAN SHALL BE LEFT FOR PARKING OF VEDICLES AND NO PART OF IT WILL BE USED FOR ANY OTHER PURPOSE. 27-12-2022 UNDER PROGRESS
4 THE LAND OVER WHICH CONSTRUCTION IS PROPOSED IS ACCESSIBLE BY AN APPROVED MEANS OF ACCESS OF 13.41 M & 6.09 M (ONE THREE POINT FOUR NINE METER & SIX POIN ZERO NINE) IN WIATH. 26-01-2023 UNDER PROGRESS
5 THE LAND IN QUESTION MUST BE IN LAWFUL OWNERSHIP AND PEACEFUL POSSESSION OF THE APPLICANT. 16-02-2023 UNDER PROGRESS
6 THE PERMISSION GRANTED UNDER THESE REGULATIONS SHALL REMAIN VALID UPTO THREE YEARS FROM THE DATE OF ISSUE. HOWEVER THE PERMISSION SHALL HAVE TO BE REVALIDATED BEFORE THE EXPIRY OF THE ABOVE PERIOD ON PAYMENT OF SUCH FEE AS MAY BE PRESCRIBED UNDER RULES AND SUCH REVALIDATION SHALL BE VALID FOR ONE YEAR. 07-04-2023 UNDER PROGRESS
7 THE OWNER/APPLICANT/TECHNICAL PERSON SHALL STRICTLY ADHERE TO THE TERMS AND CONDITIONS IMPOSED IN THE NOC/CLEARANCES GIVEN BY PHED VIDE LETTER NO-12859 DT. 16.12.2019. 07-08-2023 UNDER PROGRESS
8 STORN WATER FROM THE PREMISES OF ROOF TOP SHALL BE CONVEYED AND DISCHARGED TO THE RAIN WATER RECHARGING PITS AS PER ODA (PLANNING & BUILDING STANDARDS) RULE, 2020. 15-02-2024 UNDER PROGRESS
9 THE SPACE WHICH IS MEANT FOR PARKING SHALL NOT BE CHANGED TO ANY OTHER USE AND SHALL NOT BE PARITITIONED/ CLOSED IN ANY MANNER. 30-04-2024 UNDER PROGRESS
10 PLANTATION AS REQUIRED UNDER THE PROVISION UNDER RULE, 30 OF ODA (FLANNING & BUILDING STANDARDS) RULES, 2020. SHALL BE STRICTLY ADHERED. 12-07-2024 UNDER PROGRESS
11 THE OWNER/ APPLICANT/ARCHITECT/STRUCTURAL ENGINEER/PMO ARE FULLY AND JOINTLY RESPONSIBLE FOR ANY STRUCTURAL FAILURE/ CONSTRUCTION DEFECTS/ EARTHQUAKE/CYCLONE/ANY OTHER NATURAL DISASTER. AUTHORITY SHALL BE NO WAY HELD RESPONSIBLE FOR THE SAME IN WHAT SO EVER MANNER. 07-07-2024 UNDER PROGRESS
12 THE APPLICANT SHALL OBTAIN THE EIDP APPROVED BY THE ENGINEERING WING AND EXECUTE IT AS PER APPROVED DESIGN AND SPECIFICATION AND SHALL OBTAIN CLEARANCE WITH REGARD TO DEVELOPMENT OF INFRASTRUCTURE FROM BMC BEFOR OCCUPANCY. 17-08-2024 UNDER PROGRESS
Updated Changes on 16-04-2024
13 THE BUILDING SHALL BE USED EXCLUSIVELY FOR RESIDENTIAL PURPOSE AND THE USE SHALL NOT BE CHANGED TO ANY OTHER USE WITHOUT PRIOR APPROVAL OF THIS AUTHORITY. 16-10-2021 UNDER PROGRESS
14 THE DEVELOPMENT SHALL BE UNDERTAKEN STRICTLY ACCORDING TO PLANS ENCLOSED WITH NECESSARY PERMISSION ENDOESEMENT. 24-11-2022 UNDER PROGRESS
15 PARKING SPACE MEASURING 485.24 SQM AS SHOWN IN THE APPROVED PLAN SHALL BE LEFT FOR PARKING OF VEDICLES AND NO PART OF IT WILL BE USED FOR ANY OTHER PURPOSE. 27-12-2022 UNDER PROGRESS
16 THE LAND OVER WHICH CONSTRUCTION IS PROPOSED IS ACCESSIBLE BY AN APPROVED MEANS OF ACCESS OF 13.41 M & 6.09 M (ONE THREE POINT FOUR NINE METER & SIX POIN ZERO NINE) IN WIATH. 26-01-2023 UNDER PROGRESS
17 THE LAND IN QUESTION MUST BE IN LAWFUL OWNERSHIP AND PEACEFUL POSSESSION OF THE APPLICANT. 16-02-2023 UNDER PROGRESS
18 THE PERMISSION GRANTED UNDER THESE REGULATIONS SHALL REMAIN VALID UPTO THREE YEARS FROM THE DATE OF ISSUE. HOWEVER THE PERMISSION SHALL HAVE TO BE REVALIDATED BEFORE THE EXPIRY OF THE ABOVE PERIOD ON PAYMENT OF SUCH FEE AS MAY BE PRESCRIBED UNDER RULES AND SUCH REVALIDATION SHALL BE VALID FOR ONE YEAR. 07-04-2023 UNDER PROGRESS
19 THE OWNER/APPLICANT/TECHNICAL PERSON SHALL STRICTLY ADHERE TO THE TERMS AND CONDITIONS IMPOSED IN THE NOC/CLEARANCES GIVEN BY PHED VIDE LETTER NO-12859 DT. 16.12.2019. 07-08-2023 UNDER PROGRESS
20 STORN WATER FROM THE PREMISES OF ROOF TOP SHALL BE CONVEYED AND DISCHARGED TO THE RAIN WATER RECHARGING PITS AS PER ODA (PLANNING & BUILDING STANDARDS) RULE, 2020. 15-02-2024 UNDER PROGRESS
21 THE SPACE WHICH IS MEANT FOR PARKING SHALL NOT BE CHANGED TO ANY OTHER USE AND SHALL NOT BE PARITITIONED/ CLOSED IN ANY MANNER. 30-04-2024 UNDER PROGRESS
22 PLANTATION AS REQUIRED UNDER THE PROVISION UNDER RULE, 30 OF ODA (FLANNING & BUILDING STANDARDS) RULES, 2020. SHALL BE STRICTLY ADHERED. 12-07-2024 UNDER PROGRESS
23 THE OWNER/ APPLICANT/ARCHITECT/STRUCTURAL ENGINEER/PMO ARE FULLY AND JOINTLY RESPONSIBLE FOR ANY STRUCTURAL FAILURE/ CONSTRUCTION DEFECTS/ EARTHQUAKE/CYCLONE/ANY OTHER NATURAL DISASTER. AUTHORITY SHALL BE NO WAY HELD RESPONSIBLE FOR THE SAME IN WHAT SO EVER MANNER. 07-07-2024 UNDER PROGRESS
24 THE APPLICANT SHALL OBTAIN THE EIDP APPROVED BY THE ENGINEERING WING AND EXECUTE IT AS PER APPROVED DESIGN AND SPECIFICATION AND SHALL OBTAIN CLEARANCE WITH REGARD TO DEVELOPMENT OF INFRASTRUCTURE FROM BMC BEFOR OCCUPANCY. 17-08-2024 UNDER PROGRESS

Updated Project Documents

Sl. No. Title of the document Upload Document
1 PROFORM-I ,II & III (JULY TO SEPTEMBER-2023)
2 PROFORM-I ,II & III (OCT-DEC--2023)
3 PROFORM-I ,II & III (JANUARY TO DECEMBER-2024)
No Record Found

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
SAGARENDRA MOHAPATRA Architect ADDRESS-PLOT NO-123,NEAR MAHARSHI COLLAGE ROAD, SAHIDNAGAR, BHUBANESWAR.,E.MAIL-sganrendramohapatra@gmail.com,Phone No-9987123456 CA/99/25469
SAGARENDRA MOHAPATRA Construction Engineer ADDRESS-PLOT NO-123,NEAR MAHARSHI COLLAGE ROAD, SAHIDNAGAR, BHUBANESWAR.,E.MAIL-sganrendramohapatra@gmail.com,Phone No-9987123456 CA/99/25469
SATYA RANJAN SWAIN Chartered Accountant ADDRESS-PLOT NO-506,SAHIDNAGAR, BHUBANESWAR,E.MAIL-satya1980@gmail.com, PHONE NO-9437432561 23456

Updated Units

House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
Updated Changes
101 Covered Parking 101 4.88 x 2.44 11.89 Included
102 Covered Parking 102 4.88 x 2.44 11.89 Included
103 Covered Parking 103 4.88 x 2.44 11.89 Included
104 Covered Parking 104 4.88 x 2.44 11.89 Included
201 Covered Parking 201 4.88 x 2.44 11.89 Included
202 Covered Parking 202 4.88 x 2.44 11.89 Included
203 Covered Parking 203 4.88 x 2.44 11.89 Included
204 Covered Parking 204 4.88 x 2.44 11.89 Included
301 Covered Parking 301 4.88 x 2.44 11.89 Included
302 Covered Parking 302 4.88 x 2.44 11.89 Included
303 Covered Parking 303 4.88 x 2.44 11.89 Included
304 Covered Parking 304 4.88 x 2.44 11.89 Included
401 Covered Parking 401 4.88 x 2.44 11.89 Included
402 Covered Parking 402 4.88 x 2.44 11.89 Included
403 Covered Parking 403 4.88 x 2.44 11.89 Included
404 Covered Parking 404 4.88 x 2.44 11.89 Included

Generated by pacms.orera.in on date: 2024-06-21