Promoter Details
Promoter Name :
UPENDRA NATH SUTAR
Project Name :
"MM MENAKA TOWER"
Project Location :
(Residential Project, S+4, No. of Units- 24)

Form- I

A. Promoter's Details

:  M/S. MM ENGINEERS & CONSULTANTS :  Partnership
:  403/1997 :View
NA :  2nd floor, Sumitra Plaza, Badambadi, Cuttack 753012
:  2nd Floor, Sumitra Plaza, Badambadi, Cuttack, Odisha- 753012. :  mmeconsult.97@gmail.com
:  2955770 :  9437032088
:  AAHFM0973H :View
:  Executed Thirteen Nos of Apartments Since-2002 :  NO EXPERIENCE
:  www.mm-engineers.com

B. Details of Board of Directors / Partners / MC Members

:  UPENDRA NATH SUTAR :  
:  Partner :  AQTPS0734J
:PAN Card :  mmeconsult@yahoo.com
:  MATRICULATION :  9437120198
:  15 Years construction experience
:  Yes :  NA
:  BISHNUPRIYA MAHARANA :  
:  Partner :  AKRPM8232H
:PAN Card :  mmeconsult@yahoo.com
:  Bachelor in arts :  9437590810
:  15 Years construction experience
:  Yes :  NA

Annexure-1

Details of last projects already implemented (Ongoing or Complete)

Annexure-2

Details of the project to be registered

:   New :  "MM MENAKA TOWER"
:  Residential :  (Residential Project, S+4, No. of Units- 24)
:  Cuttack :  Cuttack Sadar
:  753008 :  Development Authority
:  CUTTACK MUNICIPAL CORPORATION
:  S+4 Storied Residential Apartment :  NA

Land Details of the Project


:  84 :  257
:  Cuttack Sahara, Unit No.7, North Tulasipur, Cuttack :  162
:  Yes
No :  View
:  View
:  Other Person
:  Smt.Menaka Behera, W/o-Late Fakir Mohan Behera, :  THE PROMOTER i.e. MM ENGINEERS & CONSULTANTS HAS BEEN EMPOWERED WITH THE DEVELOPMENT OF THE PROJECT, REGISTERED VIDE POWER OF ATTORNY NO.40391404759 - DATED 21/10/2014 & 10392200117 - DATED 05/01/2022 BY SMT. MENAKA BEHERA, LAND OWNER.
: No
: Yes
:  40391404759 & 10392200117 :  21-10-2014
:  Cuttack :  Attached

:  84/3454 :  375/493
:  Cuttack Sahara, Unit No.7, North Tulasipur, Cuttack :  323
:  Yes
No :  View
:  View
:  Other Person
:  Smt.Menaka Behera, W/o-Late Fakir Mohan Behera, :  THE PROMOTER ie. MM ENGINEERS & CONSULTANTS HAS BEEN EMPOWERED WITH THE DEVELOPMENT OF THE PROJECT REGISTERED VIDE POWER OF ATTORNY NO.40391404759 & 10392200117 ie. SMT. MENAKA BEHERA,LAND OWNER
: No
: Yes
:  40391404759 &10392200117 :  21-10-2014
:  Cuttack :  Attached

:  85 :  827
:  Cuttack Sahara, Unit No.7, North Tulasipur, Cuttack :  162
:  Yes
No :  View
:  View
:  Other Person
:  Smt.Menaka Behera, W/o-Late Fakir Mohan Behera, :  THE PROMOTER i.e. MM ENGINEERS & CONSULTANTS HAS BEEN EMPOWERED WITH HE DEVELOPMENT OF THE PROJECT REGISTERED ,VIDE POWER OF ATTORNY NO.40391404759 & 10392200117 i.e. SMT. MENAKA BEHERA- LAND OWNER
: No
: Yes
:  40391404759 & 10392200117 :  21-10-2014
:  Cuttack :  Attached

:  85/3455 :  827
:  Cuttack Sahara, Unit No.7, North Tulasipur, Cuttack :  319.74
:  Yes
No :  View
:  View
:  Other Person
:  Smt.Menaka Behera, W/o-Late Fakir Mohan Behera, :  THE PROMOTER i.e. MM ENGINEERS & CONSULTANTS HAS BEEN EMPOWERED WITH THE DEVELOPMENT OF THE PROJECT REGISTERED, VIDE POWER OF ATTORNY NO.40391404759 & 10392200117 i.e. SMT. MENAKA BEHERA - LAND OWNER
: No
: Yes
:  40391404759 & 10392200117 :  21-10-2014
:  Cuttack :  Attached

Development Agreement

: Yes
Serial No. Particulars of the Person Land/Plot Details Share of the Person Document Attached
1 Smt. Menaka Behera and MM Engineers & Consultants Represented through it's Partner Sri Upendra nath Sutar Plot No.84, 84/3454, 85, & 85/3454, in Mouza-Unit No-7 North Tulasipur, Cuttack 35% of Total Unit   Agreement Copy

Building Plan

  View   View
  Download site plan 15-11-2024

Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per ODA (Planning & Building Standards ) Rule-2020. 15-11-2026 Work In Progress
2 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner. 15-11-2026 Work In Progress
3 The entry and exit to the proposed building shall be made from the side road. 15-11-2026 Work In Progress
4 Plantation over 10%/20% of the plot area shall be made by the applicant as per the Ruleno-.30 of ODA (P&BS) Rule -2020. 15-11-2026 Work In Progress
5 The Owner/Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/construction defects, Authority will be no way be held responsible for the same in what so ever manne.r 15-11-2026 Work In Progress
6 The applicant shall obtain final infrastructure/drainage clearance from Engineering branch, CMC before applying for occupancy certificate. 15-11-2026 Work In Progress
7 The concerned Architect/Applicant/Developer are fully responsible for any deviations, additions & alternations beyond approved plan/defective construction etc. shall be liable for action as per the provisions of the regulation 15-11-2026 Work In Progress
8 No Storm water/water shall be discharged to the public road/public premises and other adjoining plots. 15-11-2026 Work In Progress
9 Adhere to the provisions of ODA (Planning & Building Standards) Rule-2020 strictly and condition thereto. 15-11-2026 Work In Progress
10 The Corporation shall in no way be held responsible for any structural failure and damage due to earthquake /cyclone/any other natural disaster. 15-11-2026 Work In Progress
11 Ensure installation of minimum fire fighting equipments and installation as per provision of NBC-2016. 15-11-2026 Work In Progress
12 Ensure storm water drainage from the premises in consultation with Local Authority. 15-11-2026 Work In Progress
13 Adhere to the stipulation given by TPCODL& PH Deptt. 15-11-2026 Work In Progress
14 The balance amount of Rs.9,24,566/- towards Purchasable FAR shall be deposited before expiry of one year of the proceeding date of deposit and in case of default in payment of instalment on right time, interest@SBI PLR shall be imposed and occupancy certificate shall not be issued without releasing the total cess amount 15-11-2026 Work In Progress
15 Obtain an Occupancy Certificate from the Authority prior to occupancy of building in full or part. 15-11-2026 Work In Progress
16 All the passages around the building shall be developed with permeable pavers block for absorption of rain water and seepage into the ground. 15-11-2026 Work In Progress
17 Rain water harvesting structure and recharging pits of adequate capacity shall be developed to minimise the storm water runoff to the drain. 15-11-2026 Work In Progress
18 The applicant shall register this project before the ORERA as per affidavit submitted before sale / Booking of apartments 15-11-2026 Work In Progress
19 The applicant shall install Rooftop P.V system as per ODA (P& BS) Rules 2020. 15-11-2026 Work In Progress
20 If any omission/commission is noticed of come under the knowledge of Authority the applicant shall comply the same immediately 15-11-2026 Work In Progress
21 The Authority shall in no way he held responsible for any structural failure and damage due to earthquake/cyclone/other natural disaster. 15-11-2026 Work In Progress
22 The number of dwelling units so approved shall not be changed in any manner 15-11-2026 Work In Progress
23 Lift shall be provided as per the provision of NBCI 2016 in pursuance with note (ii) of sub-rule (2) of Rule 42 of ODA Rule, 2020. If the same isn’t provided by the applicant appropriate action, shall be taken as per law 15-11-2026 Work In Progress
24 Obtain an Occupancy Certificate from the Authority prior to occupancy of building in full or part. 15-11-2026 Work In Progress

Layout Plan

: Yes :  View

Location Map with geo-coordinates of bend points

Point No. Latitude Longitude
1 20°29'20.1768''N 85°51'7.5492''E
2 20°29'20.9328''N 85°51'7.7538''E
3 20°29'21.1266''N 85°51'6.5556''E
4 20°29'20.4972''N 85°51'6.3966''E
View

Milestone of Project Construction

Description* Scheduled date of completion Current Status Site Images
Site Development 31-09-2022 Not Started yet
Roof Casting NA NA NA
Ground Floor/Stilt Floor 31-03-2023 Not Started yet
1 Floor 31-07-2023 Not Started yet
2 Floor 31-12-2023 Not Started yet
3 Floor 28-02-2024 Not Started yet
4 Floor 31-07-2024 Not Started yet
Brick Work & Plastering NA NA NA
Ground Floor/Stilt Floor 31-08-2024 Not Started yet
1 Floor 30-11-2024 Not Started yet
2 Floor 29-02-2025 Not Started yet
3 Floor 31-05-2025 Not Started yet
4 Floor 31-07-2025 Not Started yet
Electrical Works 31-12-2025 Not Started yet
Concealed Cabling including Plugs & switches 31-07-2025 Not Started yet
Installation & Charging of Transformer 31-10-2025 Not Started yet
Connection to Flats/Apartments 31-12-2025 Not Started yet
PH works 31-10-2025 Not Started yet
Laying of concealed Pipes 30-10-2025 Not Started yet
PH Fittings 30-12-2025 Not Started yet
Overhead Water Tanks 30-12-2025 Not Started yet
Water Supply Connection to all units 31-10-2025 Not Started yet
STP construction and completion 31-10-2025 Not Started yet
Distempering & Colouring of all units and exteriors 30-10-2025 Not Started yet
Fixation of doors and windows 31-10-2025 Not Started yet
Scheduled Date of handing over possession 15-11-2026 Not Started yet
Development of common areas, parks, gardens etc 31-10-2026 Not Started yet
Site Development 31-09-2022 Started NA
NA NA NA NA
Ground Floor/Stilt Floor 31-03-2023 Not Started yet NA
1 Floor 31-07-2023 Not Started yet NA
2 Floor 31-12-2023 Not Started yet NA
3 Floor 28-02-2024 Not Started yet NA
4 Floor 31-07-2024 Not Started yet NA
NA NA NA NA
Ground Floor/Stilt Floor 31-08-2024 Not Started yet NA
1 Floor 30-11-2024 Not Started yet NA
2 Floor 29-02-2025 Not Started yet NA
3 Floor 31-05-2025 Not Started yet NA
4 Floor 31-07-2025 Not Started yet NA
Electrical Works 31-12-2025 Not Started yet NA
Concealed Cabling including Plugs & switches 31-07-2025 Not Started yet NA
Installation & Charging of Transformer 31-10-2025 Not Started yet NA
Connection to Flats/Apartments 31-12-2025 Not Started yet NA
PH works 31-10-2025 Not Started yet NA
Laying of concealed Pipes 30-10-2025 Not Started yet NA
PH Fittings 30-12-2025 Not Started yet NA
Overhead Water Tanks 30-12-2025 Not Started yet NA
Water Supply Connection to all units 31-10-2025 Not Started yet NA
STP construction and completion 31-10-2025 Not Started yet NA
Distempering & Colouring of all units and exteriors 30-10-2025 Not Started yet NA
Fixation of doors and windows 31-10-2025 Not Started yet NA
Scheduled Date of handing over possession 15-11-2026 Not Started yet NA
Development of common areas, parks, gardens etc 31-10-2026 Not Started yet NA
Site Development 31-09-2022 Started NA
NA 31-03-2023 completed NA
Ground Floor/Stilt Floor 31-03-2023 roof casted NA
1 Floor 31-07-2023 Not Started yet NA
2 Floor 31-12-2023 Not Started yet NA
3 Floor 28-02-2024 Not Started yet NA
4 Floor 31-07-2024 Not Started yet NA
NA 31-07-2024 na NA
Ground Floor/Stilt Floor 31-08-2024 Not Started yet NA
1 Floor 30-11-2024 Not Started yet NA
2 Floor 29-02-2025 Not Started yet NA
3 Floor 31-05-2025 Not Started yet NA
4 Floor 31-07-2025 Not Started yet NA
Electrical Works 31-12-2025 Not Started yet NA
Concealed Cabling including Plugs & switches 31-07-2025 Not Started yet NA
Installation & Charging of Transformer 31-10-2025 Not Started yet NA
Connection to Flats/Apartments 31-12-2025 Not Started yet NA
PH works 31-10-2025 Not Started yet NA
Laying of concealed Pipes 30-10-2025 Not Started yet NA
PH Fittings 30-12-2025 Not Started yet NA
Overhead Water Tanks 30-12-2025 Not Started yet NA
Water Supply Connection to all units 31-10-2025 Not Started yet NA
STP construction and completion 31-10-2025 Not Started yet NA
Distempering & Colouring of all units and exteriors 30-10-2025 Not Started yet NA
Fixation of doors and windows 31-10-2025 Not Started yet NA
Scheduled Date of handing over possession 15-11-2026 Not Started yet NA
Development of common areas, parks, gardens etc 31-10-2026 Not Started yet NA
Site Development 31-09-2022 Started NA
NA 31-03-2023 completed NA
Ground Floor/Stilt Floor 31-03-2023 roof casted NA
1 Floor 30-06-2023 roof casted NA
2 Floor 31-12-2023 Not Started yet NA
3 Floor 28-02-2024 Not Started yet NA
4 Floor 31-07-2024 Not Started yet NA
NA 31-07-2024 na NA
Ground Floor/Stilt Floor 31-08-2024 Not Started yet NA
1 Floor 30-11-2024 Not Started yet NA
2 Floor 29-02-2025 Not Started yet NA
3 Floor 31-05-2025 Not Started yet NA
4 Floor 31-07-2025 Not Started yet NA
Electrical Works 31-12-2025 Not Started yet NA
Concealed Cabling including Plugs & switches 31-07-2025 Not Started yet NA
Installation & Charging of Transformer 31-10-2025 Not Started yet NA
Connection to Flats/Apartments 31-12-2025 Not Started yet NA
PH works 31-10-2025 Not Started yet NA
Laying of concealed Pipes 30-10-2025 Not Started yet NA
PH Fittings 30-12-2025 Not Started yet NA
Overhead Water Tanks 30-12-2025 Not Started yet NA
Water Supply Connection to all units 31-10-2025 Not Started yet NA
STP construction and completion 31-10-2025 Not Started yet NA
Distempering & Colouring of all units and exteriors 30-10-2025 Not Started yet NA
Fixation of doors and windows 31-10-2025 Not Started yet NA
Scheduled Date of handing over possession 15-11-2026 Not Started yet NA
Development of common areas, parks, gardens etc 31-10-2026 Not Started yet NA
Site Development 31-09-2022 Started NA
NA 31-03-2023 completed NA
Ground Floor/Stilt Floor 31-03-2023 roof casted NA
1 Floor 30-06-2023 roof casted NA
2 Floor 31-12-2023 roof casted NA
3 Floor 28-02-2024 Not Started yet NA
4 Floor 31-07-2024 Not Started yet NA
NA 31-07-2024 na NA
Ground Floor/Stilt Floor 31-08-2024 Not Started yet NA
1 Floor 30-11-2024 Not Started yet NA
2 Floor 29-02-2025 Not Started yet NA
3 Floor 31-05-2025 Not Started yet NA
4 Floor 31-07-2025 Not Started yet NA
Electrical Works 31-12-2025 Not Started yet NA
Concealed Cabling including Plugs & switches 31-07-2025 Not Started yet NA
Installation & Charging of Transformer 31-10-2025 Not Started yet NA
Connection to Flats/Apartments 31-12-2025 Not Started yet NA
PH works 31-10-2025 Not Started yet NA
Laying of concealed Pipes 30-10-2025 Not Started yet NA
PH Fittings 30-12-2025 Not Started yet NA
Overhead Water Tanks 30-12-2025 Not Started yet NA
Water Supply Connection to all units 31-10-2025 Not Started yet NA
STP construction and completion 31-10-2025 Not Started yet NA
Distempering & Colouring of all units and exteriors 30-10-2025 Not Started yet NA
Fixation of doors and windows 31-10-2025 Not Started yet NA
Scheduled Date of handing over possession 15-11-2026 Not Started yet NA
Development of common areas, parks, gardens etc 31-10-2026 Not Started yet NA
Site Development 31-09-2022 Started NA
NA 31-03-2023 completed NA
Ground Floor/Stilt Floor 31-03-2023 roof casted NA
1 Floor 30-06-2023 roof casted NA
2 Floor 31-12-2023 roof casted NA
3 Floor 28-02-2024 roof casted NA
4 Floor 31-07-2024 Not Started yet NA
NA 31-07-2024 na NA
Ground Floor/Stilt Floor 31-08-2024 Not Started yet NA
1 Floor 30-11-2024 Not Started yet NA
2 Floor 29-02-2025 Not Started yet NA
3 Floor 31-05-2025 Not Started yet NA
4 Floor 31-07-2025 Not Started yet NA
Electrical Works 31-12-2025 Not Started yet NA
Concealed Cabling including Plugs & switches 31-07-2025 Not Started yet NA
Installation & Charging of Transformer 31-10-2025 Not Started yet NA
Connection to Flats/Apartments 31-12-2025 Not Started yet NA
PH works 31-10-2025 Not Started yet NA
Laying of concealed Pipes 30-10-2025 Not Started yet NA
PH Fittings 30-12-2025 Not Started yet NA
Overhead Water Tanks 30-12-2025 Not Started yet NA
Water Supply Connection to all units 31-10-2025 Not Started yet NA
STP construction and completion 31-10-2025 Not Started yet NA
Distempering & Colouring of all units and exteriors 30-10-2025 Not Started yet NA
Fixation of doors and windows 31-10-2025 Not Started yet NA
Scheduled Date of handing over possession 15-11-2026 Not Started yet NA
Development of common areas, parks, gardens etc 31-10-2026 Not Started yet NA
Site Development 31-09-2022 Started NA
NA 31-03-2023 completed NA
Ground Floor/Stilt Floor 31-03-2023 roof casted NA
1 Floor 30-06-2023 roof casted
2 Floor 31-12-2023 roof casted
3 Floor 28-02-2024 roof casted
4 Floor 31-07-2024 roof casted
NA 31-07-2024 na NA
Ground Floor/Stilt Floor 31-08-2024 Not Started yet NA
1 Floor 30-11-2024 Not Started yet NA
2 Floor 29-02-2025 Not Started yet NA
3 Floor 31-05-2025 Not Started yet NA
4 Floor 31-07-2025 Not Started yet NA
Electrical Works 31-12-2025 Not Started yet NA
Concealed Cabling including Plugs & switches 31-07-2025 Not Started yet NA
Installation & Charging of Transformer 31-10-2025 Not Started yet NA
Connection to Flats/Apartments 31-12-2025 Not Started yet NA
PH works 31-10-2025 Not Started yet NA
Laying of concealed Pipes 30-10-2025 Not Started yet NA
PH Fittings 30-12-2025 Not Started yet NA
Overhead Water Tanks 30-12-2025 Not Started yet NA
Water Supply Connection to all units 31-10-2025 Not Started yet NA
STP construction and completion 31-10-2025 Not Started yet NA
Distempering & Colouring of all units and exteriors 30-10-2025 Not Started yet NA
Fixation of doors and windows 31-10-2025 Not Started yet NA
Scheduled Date of handing over possession 15-11-2026 Not Started yet NA
Development of common areas, parks, gardens etc 31-10-2026 Not Started yet NA

Category and no. of units to be developed

:  Residential
:  
:  24
:  
:  
:  
Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership
Carpet Area Balcony Area Exclusive Open Terrace Area
1 1/A 94.07 sqm 4.40 sqm NA Land Owner
2 1/B 97.91 sqm 2.98 sqm NA Promoter
3 1/C 96.40 sqm 6.01 sqm NA Promoter
4 1/D 67.20 sqm 2.98 sqm NA Promoter
5 1/E 69.35 sqm 2.37 sqm NA Land Owner
6 1/F 102.64 sqm 3.82 sqm NA Promoter
7 2/A 94.07 sqm 4.40 sqm NA Promoter
8 2/B 97.91 sqm 2.98 sqm NA Land Owner
9 2/C 96.40 sqm 6.01 sqm NA Promoter
10 2/D 67.20 sqm 2.98 sqm NA Land Owner
11 2/E 69.35 sqm 2.37 sqm NA Promoter
12 2/F 102.64 sqm 3.82 sqm NA Promoter
13 3/A 94.07 sqm 4.40 sqm NA Promoter
14 3/B 97.91 sqm 2.98 sqm NA Promoter
15 3/C 96.40 sqm 6.01 sqm NA Land Owner
16 3/D 67.20 sqm 2.98 sqm NA Promoter
17 3/E 69.35 sqm 2.37 sqm NA Land Owner
18 3/F 102.64 sqm 3.82 sqm NA Promoter
19 4/A 94.07 sqm 4.40 sqm NA Promoter
20 4/B 97.91 sqm 2.98 sqm NA Promoter
21 4/C 96.40 sqm 6.01 sqm NA Promoter
22 4/D 67.20 sqm 2.98 sqm NA Promoter
23 4/E 69.35 sqm 2.37 sqm NA Promoter
24 4/F 102.64 sqm 3.82 sqm NA Land Owner
Types of garages and parking
House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
1/A Covered Parking P/1 4.87X3.20 15.58 Included
1/B Covered Parking P/2 4.87X3.20 15.58 Included
1/C Covered Parking P/3 4.87X3.20 15.58 Included
1/D Covered Parking P/4 4.87X3.20 15.58 Included
1/E Covered Parking P/5 4.87X3.20 15.58 Included
1/F Covered Parking P/6 4.87X3.20 15.58 Included
2/A Covered Parking P/7 4.87X3.20 15.58 Included
2/B Covered Parking P/8 4.87X3.20 15.58 Included
2/C Covered Parking P/9 4.87X3.20 15.58 Included
2/D Covered Parking P/10 4.87X3.20 15.58 Included
2/E Covered Parking P/11 4.87X3.20 15.58 Included
2/F Covered Parking P/12 4.87X3.20 15.58 Included
3/A Covered Parking P/13 4.87X3.20 15.58 Included
3/B Covered Parking P/14 4.87X3.20 15.58 Included
3/C Covered Parking P/15 4.87X3.20 15.58 Included
3/D Covered Parking P/16 4.87X3.20 15.58 Included
3/E Covered Parking P/17 4.87X3.20 15.58 Included
3/F Covered Parking P/18 4.87X3.20 15.58 Included
4/A Covered Parking P/19 4.87X3.20 15.58 Included
4/B Covered Parking P/20 4.87X3.20 15.58 Included
4/C Covered Parking P/21 4.87X3.20 15.58 Included
4/D Covered Parking P/22 4.87X3.20 15.58 Included
4/E Covered Parking P/23 4.87X3.20 15.58 Included
4/F Covered Parking P/24 4.87X3.20 15.58 Included
Yes

Facilities to be provided

Particulars of Facilities Status of the facility Brief description of facility
Drinking Water Facility Ground Water Copy of Consent Letter
Fire Fighting Facility No Fire Extinguisher, Sprinkler
Emergency Evacuation Services No Stair case provided
Use of Renewable Energy No
Lift Facility Yes 1 Nos. of lift of 6 Passenger capacity, BIS brand with ARD facility
Market Complex No
Community Hall Yes 24.78 Sqm
Gymnasium No
Swimming Pool No
Play Ground No
Park/Garden No
Plantation Area Yes 193.46 sqm
Others(Please Specify) No
Internal Road Yes front road- 2.m to2.m,rear road - 2.m to 2.m, left side road 2.m, right side road 2.m
External Road Yes Existing govt.revenue road of 30.00 M.width.
Elecricity Supply Yes Copy of Consent Letter
Other Amenities No

Bank Particulars of the Project

  Canara Bank
  Cuttack Badambadi Branch Cuttack
  120001891244
  CNRB0002566
   View
  2512765
  7605009072

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
MINATI DAS Architect BDA COLONY C.S PUR, BHUBANESWARDIST-KHURDA E-Mail: arminati71@gmail.com Mob: 9437107998, CA/200/27100 MM MENAKA TOWER
P.MAHARANA Construction Engineer SNEHALATA HOUSE, JAGANATH LANEBADAMBADI, CUTTACK-12 E-Mail -mmeconsult@yahoo.com Mob:9437032088, BADAMBADI, CUTTACK RTP/DTP/ER-006/2017 MM MENAKA TOWER
MONIKA BAJORIA Chartered Accountant GANESH GHAT, CUTTACKDist-Cuttack E-Mail: bajoriaca@rediffmail.com Mob: 9437022103 300-062997 MM MENAKA TOWER

Financial Details

:  342.57 :   View
  15-11-2026 :  200
:  142.57 :  0

Documents Attached

Description of Document Option Documents
Fire Safety Certificate Undertaking Attached
Affidavit in Form-A as per clause-l of sub-section-2 of section-4 of the Act Yes Attached
Allotment letter format Yes Attached
Conveyance Deed Format Yes Attached
Affidavit to adopt agreement for sale format as per Rule-8(1) of ORE (R and D) Rules, 2017 Yes Attached
Annual Report 2022-23 Attached
Annual Report 2020-21 Attached
Annual Report 2021-22 Attached
IT Return 2022-23 Attached
IT Return 2020-21 Attached
IT Return 2021-22 Attached
Audit Report 2022-23 Attached
Audit Report 2020-21 Attached
Audit Report 2021-22 Attached

Additional Documents Attached

Sl. No. Title of the document Upload Document
1 Clarification Execution & Affidavit

Other documents

“I undertake that the information submitted by me in this application are correct and true to best my knowledge. I also understand that providing false or wrong information is punishable under the Section-60 of the Real Estate (Regulation & Development) Act, 2016. I also further understand that furnishing wrong or false information will lead to rejection of my application registration of the project with forfeiture of registration fee and other charges deposited by me.”
  

Construction Progress

Updated Construction Progress

SL NO. Description Scheduled date of completion Current Status Remarks
1 Site Development 31-09-2022 Not Started yet
2 Roof Casting NA NA NA
3 Ground Floor/Stilt Floor 31-03-2023 Not Started yet
4 1 Floor 31-07-2023 Not Started yet
5 2 Floor 31-12-2023 Not Started yet
6 3 Floor 28-02-2024 Not Started yet
7 4 Floor 31-07-2024 Not Started yet
8 Brick Work & Plastering NA NA NA
9 Ground Floor/Stilt Floor 31-08-2024 Not Started yet
10 1 Floor 30-11-2024 Not Started yet
11 2 Floor 29-02-2025 Not Started yet
12 3 Floor 31-05-2025 Not Started yet
13 4 Floor 31-07-2025 Not Started yet
14 Electrical Works 31-12-2025 Not Started yet
15 Concealed Cabling including Plugs & switches 31-07-2025 Not Started yet
16 Installation & Charging of Transformer 31-10-2025 Not Started yet
17 Connection to Flats/Apartments 31-12-2025 Not Started yet
18 PH works 31-10-2025 Not Started yet
19 Laying of concealed Pipes 30-10-2025 Not Started yet
20 PH Fittings 30-12-2025 Not Started yet
21 Overhead Water Tanks 30-12-2025 Not Started yet
22 Water Supply Connection to all units 31-10-2025 Not Started yet
23 STP construction and completion 31-10-2025 Not Started yet
24 Distempering & Colouring of all units and exteriors 30-10-2025 Not Started yet
25 Fixation of doors and windows 31-10-2025 Not Started yet
26 Scheduled Date of handing over possession 15-11-2026 Not Started yet
27 Development of common areas, parks, gardens etc 31-10-2026 Not Started yet
Updated Changes on 14-01-2023
28 Site Development 31-09-2022 Started NA
29 NA NA NA NA
30 Ground Floor/Stilt Floor 31-03-2023 Not Started yet NA
31 1 Floor 31-07-2023 Not Started yet NA
32 2 Floor 31-12-2023 Not Started yet NA
33 3 Floor 28-02-2024 Not Started yet NA
34 4 Floor 31-07-2024 Not Started yet NA
35 NA NA NA NA
36 Ground Floor/Stilt Floor 31-08-2024 Not Started yet NA
37 1 Floor 30-11-2024 Not Started yet NA
38 2 Floor 29-02-2025 Not Started yet NA
39 3 Floor 31-05-2025 Not Started yet NA
40 4 Floor 31-07-2025 Not Started yet NA
41 Electrical Works 31-12-2025 Not Started yet NA
42 Concealed Cabling including Plugs & switches 31-07-2025 Not Started yet NA
43 Installation & Charging of Transformer 31-10-2025 Not Started yet NA
44 Connection to Flats/Apartments 31-12-2025 Not Started yet NA
45 PH works 31-10-2025 Not Started yet NA
46 Laying of concealed Pipes 30-10-2025 Not Started yet NA
47 PH Fittings 30-12-2025 Not Started yet NA
48 Overhead Water Tanks 30-12-2025 Not Started yet NA
49 Water Supply Connection to all units 31-10-2025 Not Started yet NA
50 STP construction and completion 31-10-2025 Not Started yet NA
51 Distempering & Colouring of all units and exteriors 30-10-2025 Not Started yet NA
52 Fixation of doors and windows 31-10-2025 Not Started yet NA
53 Scheduled Date of handing over possession 15-11-2026 Not Started yet NA
54 Development of common areas, parks, gardens etc 31-10-2026 Not Started yet NA
Updated Changes on 14-04-2023
55 Site Development 31-09-2022 Started NA
56 NA 31-03-2023 completed NA
57 Ground Floor/Stilt Floor 31-03-2023 roof casted NA
58 1 Floor 31-07-2023 Not Started yet NA
59 2 Floor 31-12-2023 Not Started yet NA
60 3 Floor 28-02-2024 Not Started yet NA
61 4 Floor 31-07-2024 Not Started yet NA
62 NA 31-07-2024 na NA
63 Ground Floor/Stilt Floor 31-08-2024 Not Started yet NA
64 1 Floor 30-11-2024 Not Started yet NA
65 2 Floor 29-02-2025 Not Started yet NA
66 3 Floor 31-05-2025 Not Started yet NA
67 4 Floor 31-07-2025 Not Started yet NA
68 Electrical Works 31-12-2025 Not Started yet NA
69 Concealed Cabling including Plugs & switches 31-07-2025 Not Started yet NA
70 Installation & Charging of Transformer 31-10-2025 Not Started yet NA
71 Connection to Flats/Apartments 31-12-2025 Not Started yet NA
72 PH works 31-10-2025 Not Started yet NA
73 Laying of concealed Pipes 30-10-2025 Not Started yet NA
74 PH Fittings 30-12-2025 Not Started yet NA
75 Overhead Water Tanks 30-12-2025 Not Started yet NA
76 Water Supply Connection to all units 31-10-2025 Not Started yet NA
77 STP construction and completion 31-10-2025 Not Started yet NA
78 Distempering & Colouring of all units and exteriors 30-10-2025 Not Started yet NA
79 Fixation of doors and windows 31-10-2025 Not Started yet NA
80 Scheduled Date of handing over possession 15-11-2026 Not Started yet NA
81 Development of common areas, parks, gardens etc 31-10-2026 Not Started yet NA
Updated Changes on 10-07-2023
82 Site Development 31-09-2022 Started NA
83 NA 31-03-2023 completed NA
84 Ground Floor/Stilt Floor 31-03-2023 roof casted NA
85 1 Floor 30-06-2023 roof casted NA
86 2 Floor 31-12-2023 Not Started yet NA
87 3 Floor 28-02-2024 Not Started yet NA
88 4 Floor 31-07-2024 Not Started yet NA
89 NA 31-07-2024 na NA
90 Ground Floor/Stilt Floor 31-08-2024 Not Started yet NA
91 1 Floor 30-11-2024 Not Started yet NA
92 2 Floor 29-02-2025 Not Started yet NA
93 3 Floor 31-05-2025 Not Started yet NA
94 4 Floor 31-07-2025 Not Started yet NA
95 Electrical Works 31-12-2025 Not Started yet NA
96 Concealed Cabling including Plugs & switches 31-07-2025 Not Started yet NA
97 Installation & Charging of Transformer 31-10-2025 Not Started yet NA
98 Connection to Flats/Apartments 31-12-2025 Not Started yet NA
99 PH works 31-10-2025 Not Started yet NA
100 Laying of concealed Pipes 30-10-2025 Not Started yet NA
101 PH Fittings 30-12-2025 Not Started yet NA
102 Overhead Water Tanks 30-12-2025 Not Started yet NA
103 Water Supply Connection to all units 31-10-2025 Not Started yet NA
104 STP construction and completion 31-10-2025 Not Started yet NA
105 Distempering & Colouring of all units and exteriors 30-10-2025 Not Started yet NA
106 Fixation of doors and windows 31-10-2025 Not Started yet NA
107 Scheduled Date of handing over possession 15-11-2026 Not Started yet NA
108 Development of common areas, parks, gardens etc 31-10-2026 Not Started yet NA
Updated Changes on 15-10-2023
109 Site Development 31-09-2022 Started NA
110 NA 31-03-2023 completed NA
111 Ground Floor/Stilt Floor 31-03-2023 roof casted NA
112 1 Floor 30-06-2023 roof casted NA
113 2 Floor 31-12-2023 roof casted NA
114 3 Floor 28-02-2024 Not Started yet NA
115 4 Floor 31-07-2024 Not Started yet NA
116 NA 31-07-2024 na NA
117 Ground Floor/Stilt Floor 31-08-2024 Not Started yet NA
118 1 Floor 30-11-2024 Not Started yet NA
119 2 Floor 29-02-2025 Not Started yet NA
120 3 Floor 31-05-2025 Not Started yet NA
121 4 Floor 31-07-2025 Not Started yet NA
122 Electrical Works 31-12-2025 Not Started yet NA
123 Concealed Cabling including Plugs & switches 31-07-2025 Not Started yet NA
124 Installation & Charging of Transformer 31-10-2025 Not Started yet NA
125 Connection to Flats/Apartments 31-12-2025 Not Started yet NA
126 PH works 31-10-2025 Not Started yet NA
127 Laying of concealed Pipes 30-10-2025 Not Started yet NA
128 PH Fittings 30-12-2025 Not Started yet NA
129 Overhead Water Tanks 30-12-2025 Not Started yet NA
130 Water Supply Connection to all units 31-10-2025 Not Started yet NA
131 STP construction and completion 31-10-2025 Not Started yet NA
132 Distempering & Colouring of all units and exteriors 30-10-2025 Not Started yet NA
133 Fixation of doors and windows 31-10-2025 Not Started yet NA
134 Scheduled Date of handing over possession 15-11-2026 Not Started yet NA
135 Development of common areas, parks, gardens etc 31-10-2026 Not Started yet NA
Updated Changes on 05-01-2024
136 Site Development 31-09-2022 Started NA
137 NA 31-03-2023 completed NA
138 Ground Floor/Stilt Floor 31-03-2023 roof casted NA
139 1 Floor 30-06-2023 roof casted NA
140 2 Floor 31-12-2023 roof casted NA
141 3 Floor 28-02-2024 roof casted NA
142 4 Floor 31-07-2024 Not Started yet NA
143 NA 31-07-2024 na NA
144 Ground Floor/Stilt Floor 31-08-2024 Not Started yet NA
145 1 Floor 30-11-2024 Not Started yet NA
146 2 Floor 29-02-2025 Not Started yet NA
147 3 Floor 31-05-2025 Not Started yet NA
148 4 Floor 31-07-2025 Not Started yet NA
149 Electrical Works 31-12-2025 Not Started yet NA
150 Concealed Cabling including Plugs & switches 31-07-2025 Not Started yet NA
151 Installation & Charging of Transformer 31-10-2025 Not Started yet NA
152 Connection to Flats/Apartments 31-12-2025 Not Started yet NA
153 PH works 31-10-2025 Not Started yet NA
154 Laying of concealed Pipes 30-10-2025 Not Started yet NA
155 PH Fittings 30-12-2025 Not Started yet NA
156 Overhead Water Tanks 30-12-2025 Not Started yet NA
157 Water Supply Connection to all units 31-10-2025 Not Started yet NA
158 STP construction and completion 31-10-2025 Not Started yet NA
159 Distempering & Colouring of all units and exteriors 30-10-2025 Not Started yet NA
160 Fixation of doors and windows 31-10-2025 Not Started yet NA
161 Scheduled Date of handing over possession 15-11-2026 Not Started yet NA
162 Development of common areas, parks, gardens etc 31-10-2026 Not Started yet NA
Updated Changes on 11-04-2024
163 Site Development 31-09-2022 Started NA
164 NA 31-03-2023 completed NA
165 Ground Floor/Stilt Floor 31-03-2023 roof casted NA
166 1 Floor 30-06-2023 roof casted
167 2 Floor 31-12-2023 roof casted
168 3 Floor 28-02-2024 roof casted
169 4 Floor 31-07-2024 roof casted
170 NA 31-07-2024 na NA
171 Ground Floor/Stilt Floor 31-08-2024 Not Started yet NA
172 1 Floor 30-11-2024 Not Started yet NA
173 2 Floor 29-02-2025 Not Started yet NA
174 3 Floor 31-05-2025 Not Started yet NA
175 4 Floor 31-07-2025 Not Started yet NA
176 Electrical Works 31-12-2025 Not Started yet NA
177 Concealed Cabling including Plugs & switches 31-07-2025 Not Started yet NA
178 Installation & Charging of Transformer 31-10-2025 Not Started yet NA
179 Connection to Flats/Apartments 31-12-2025 Not Started yet NA
180 PH works 31-10-2025 Not Started yet NA
181 Laying of concealed Pipes 30-10-2025 Not Started yet NA
182 PH Fittings 30-12-2025 Not Started yet NA
183 Overhead Water Tanks 30-12-2025 Not Started yet NA
184 Water Supply Connection to all units 31-10-2025 Not Started yet NA
185 STP construction and completion 31-10-2025 Not Started yet NA
186 Distempering & Colouring of all units and exteriors 30-10-2025 Not Started yet NA
187 Fixation of doors and windows 31-10-2025 Not Started yet NA
188 Scheduled Date of handing over possession 15-11-2026 Not Started yet NA
189 Development of common areas, parks, gardens etc 31-10-2026 Not Started yet NA

Booking Status

Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership Status
Carpet Area Balcony Area Exclusive Open Terrace Area
1 1/A 94.07 sqm 4.40 sqm NA Land Owner
2 1/B 97.91 sqm 2.98 sqm NA Promoter
3 1/C 96.40 sqm 6.01 sqm NA Promoter
4 1/D 67.20 sqm 2.98 sqm NA Promoter
5 1/E 69.35 sqm 2.37 sqm NA Land Owner
6 1/F 102.64 sqm 3.82 sqm NA Promoter
7 2/A 94.07 sqm 4.40 sqm NA Promoter
8 2/B 97.91 sqm 2.98 sqm NA Land Owner
9 2/C 96.40 sqm 6.01 sqm NA Promoter
10 2/D 67.20 sqm 2.98 sqm NA Land Owner
11 2/E 69.35 sqm 2.37 sqm NA Promoter
12 2/F 102.64 sqm 3.82 sqm NA Promoter
13 3/A 94.07 sqm 4.40 sqm NA Promoter
14 3/B 97.91 sqm 2.98 sqm NA Promoter
15 3/C 96.40 sqm 6.01 sqm NA Land Owner
16 3/D 67.20 sqm 2.98 sqm NA Promoter
17 3/E 69.35 sqm 2.37 sqm NA Land Owner
18 3/F 102.64 sqm 3.82 sqm NA Promoter
19 4/A 94.07 sqm 4.40 sqm NA Promoter
20 4/B 97.91 sqm 2.98 sqm NA Promoter
21 4/C 96.40 sqm 6.01 sqm NA Promoter
22 4/D 67.20 sqm 2.98 sqm NA Promoter
23 4/E 69.35 sqm 2.37 sqm NA Promoter
24 4/F 102.64 sqm 3.82 sqm NA Land Owner

Financial Status

SL No. Funds Collected from the Allottees Funds Borrowed from Financial Institutions Funds Employed from Own Sources Expenditure As On Date Status
1 0 0 7000000 7000000 24-12-2022 just started
2 0 0 9682311 9682311 31-03-2023 ground floor roof casted
3 0 0 13661479 13761479 30-06-2023 1st roof casted
4 0 0 14838464 14838464 30-09-2023 2nd floor roof casted
5 11031500 0 13661479 17441825 31-12-2023 3rd floor roof casted
6 23554000 0 14838464 22704232 31-03-2024 4th floor roof casted

Updated Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per ODA (Planning & Building Standards ) Rule-2020. 15-11-2026 Work In Progress
2 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner. 15-11-2026 Work In Progress
3 The entry and exit to the proposed building shall be made from the side road. 15-11-2026 Work In Progress
4 Plantation over 10%/20% of the plot area shall be made by the applicant as per the Ruleno-.30 of ODA (P&BS) Rule -2020. 15-11-2026 Work In Progress
5 The Owner/Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/construction defects, Authority will be no way be held responsible for the same in what so ever manne.r 15-11-2026 Work In Progress
6 The applicant shall obtain final infrastructure/drainage clearance from Engineering branch, CMC before applying for occupancy certificate. 15-11-2026 Work In Progress
7 The concerned Architect/Applicant/Developer are fully responsible for any deviations, additions & alternations beyond approved plan/defective construction etc. shall be liable for action as per the provisions of the regulation 15-11-2026 Work In Progress
8 No Storm water/water shall be discharged to the public road/public premises and other adjoining plots. 15-11-2026 Work In Progress
9 Adhere to the provisions of ODA (Planning & Building Standards) Rule-2020 strictly and condition thereto. 15-11-2026 Work In Progress
10 The Corporation shall in no way be held responsible for any structural failure and damage due to earthquake /cyclone/any other natural disaster. 15-11-2026 Work In Progress
11 Ensure installation of minimum fire fighting equipments and installation as per provision of NBC-2016. 15-11-2026 Work In Progress
12 Ensure storm water drainage from the premises in consultation with Local Authority. 15-11-2026 Work In Progress
13 Adhere to the stipulation given by TPCODL& PH Deptt. 15-11-2026 Work In Progress
14 The balance amount of Rs.9,24,566/- towards Purchasable FAR shall be deposited before expiry of one year of the proceeding date of deposit and in case of default in payment of instalment on right time, interest@SBI PLR shall be imposed and occupancy certificate shall not be issued without releasing the total cess amount 15-11-2026 Work In Progress
15 Obtain an Occupancy Certificate from the Authority prior to occupancy of building in full or part. 15-11-2026 Work In Progress
16 All the passages around the building shall be developed with permeable pavers block for absorption of rain water and seepage into the ground. 15-11-2026 Work In Progress
17 Rain water harvesting structure and recharging pits of adequate capacity shall be developed to minimise the storm water runoff to the drain. 15-11-2026 Work In Progress
18 The applicant shall register this project before the ORERA as per affidavit submitted before sale / Booking of apartments 15-11-2026 Work In Progress
19 The applicant shall install Rooftop P.V system as per ODA (P& BS) Rules 2020. 15-11-2026 Work In Progress
20 If any omission/commission is noticed of come under the knowledge of Authority the applicant shall comply the same immediately 15-11-2026 Work In Progress
21 The Authority shall in no way he held responsible for any structural failure and damage due to earthquake/cyclone/other natural disaster. 15-11-2026 Work In Progress
22 The number of dwelling units so approved shall not be changed in any manner 15-11-2026 Work In Progress
23 Lift shall be provided as per the provision of NBCI 2016 in pursuance with note (ii) of sub-rule (2) of Rule 42 of ODA Rule, 2020. If the same isn’t provided by the applicant appropriate action, shall be taken as per law 15-11-2026 Work In Progress
24 Obtain an Occupancy Certificate from the Authority prior to occupancy of building in full or part. 15-11-2026 Work In Progress
Updated Changes on 14-01-2023
25 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per ODA (Planning & Building Standards ) Rule-2020. 15-11-2026 Work In Progress
26 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner. 15-11-2026 Work In Progress
27 The entry and exit to the proposed building shall be made from the side road. 15-11-2026 Work In Progress
28 Plantation over 10%/20% of the plot area shall be made by the applicant as per the Ruleno-.30 of ODA (P&BS) Rule -2020. 15-11-2026 Work In Progress
29 The Owner/Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/construction defects, Authority will be no way be held responsible for the same in what so ever manne.r 15-11-2026 Work In Progress
30 The applicant shall obtain final infrastructure/drainage clearance from Engineering branch, CMC before applying for occupancy certificate. 15-11-2026 Work In Progress
31 The concerned Architect/Applicant/Developer are fully responsible for any deviations, additions & alternations beyond approved plan/defective construction etc. shall be liable for action as per the provisions of the regulation 15-11-2026 Work In Progress
32 No Storm water/water shall be discharged to the public road/public premises and other adjoining plots. 15-11-2026 Work In Progress
33 Adhere to the provisions of ODA (Planning & Building Standards) Rule-2020 strictly and condition thereto. 15-11-2026 Work In Progress
34 The Corporation shall in no way be held responsible for any structural failure and damage due to earthquake /cyclone/any other natural disaster. 15-11-2026 Work In Progress
35 Ensure installation of minimum fire fighting equipments and installation as per provision of NBC-2016. 15-11-2026 Work In Progress
36 Ensure storm water drainage from the premises in consultation with Local Authority. 15-11-2026 Work In Progress
37 Adhere to the stipulation given by TPCODL& PH Deptt. 15-11-2026 Work In Progress
38 The balance amount of Rs.9,24,566/- towards Purchasable FAR shall be deposited before expiry of one year of the proceeding date of deposit and in case of default in payment of instalment on right time, interest@SBI PLR shall be imposed and occupancy certificate shall not be issued without releasing the total cess amount 15-11-2026 Work In Progress
39 Obtain an Occupancy Certificate from the Authority prior to occupancy of building in full or part. 15-11-2026 Work In Progress
40 All the passages around the building shall be developed with permeable pavers block for absorption of rain water and seepage into the ground. 15-11-2026 Work In Progress
41 Rain water harvesting structure and recharging pits of adequate capacity shall be developed to minimise the storm water runoff to the drain. 15-11-2026 Work In Progress
42 The applicant shall register this project before the ORERA as per affidavit submitted before sale / Booking of apartments 15-11-2026 Work In Progress
43 The applicant shall install Rooftop P.V system as per ODA (P& BS) Rules 2020. 15-11-2026 Work In Progress
44 If any omission/commission is noticed of come under the knowledge of Authority the applicant shall comply the same immediately 15-11-2026 Work In Progress
45 The Authority shall in no way he held responsible for any structural failure and damage due to earthquake/cyclone/other natural disaster. 15-11-2026 Work In Progress
46 The number of dwelling units so approved shall not be changed in any manner 15-11-2026 Work In Progress
47 Lift shall be provided as per the provision of NBCI 2016 in pursuance with note (ii) of sub-rule (2) of Rule 42 of ODA Rule, 2020. If the same isn’t provided by the applicant appropriate action, shall be taken as per law 15-11-2026 Work In Progress
48 Obtain an Occupancy Certificate from the Authority prior to occupancy of building in full or part. 15-11-2026 Work In Progress
Updated Changes on 14-04-2023
49 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per ODA (Planning & Building Standards ) Rule-2020. 15-11-2026 Work In Progress
50 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner. 15-11-2026 Work In Progress
51 The entry and exit to the proposed building shall be made from the side road. 15-11-2026 Work In Progress
52 Plantation over 10%/20% of the plot area shall be made by the applicant as per the Ruleno-.30 of ODA (P&BS) Rule -2020. 15-11-2026 Work In Progress
53 The Owner/Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/construction defects, Authority will be no way be held responsible for the same in what so ever manne.r 15-11-2026 Work In Progress
54 The applicant shall obtain final infrastructure/drainage clearance from Engineering branch, CMC before applying for occupancy certificate. 15-11-2026 Work In Progress
55 The concerned Architect/Applicant/Developer are fully responsible for any deviations, additions & alternations beyond approved plan/defective construction etc. shall be liable for action as per the provisions of the regulation 15-11-2026 Work In Progress
56 No Storm water/water shall be discharged to the public road/public premises and other adjoining plots. 15-11-2026 Work In Progress
57 Adhere to the provisions of ODA (Planning & Building Standards) Rule-2020 strictly and condition thereto. 15-11-2026 Work In Progress
58 The Corporation shall in no way be held responsible for any structural failure and damage due to earthquake /cyclone/any other natural disaster. 15-11-2026 Work In Progress
59 Ensure installation of minimum fire fighting equipments and installation as per provision of NBC-2016. 15-11-2026 Work In Progress
60 Ensure storm water drainage from the premises in consultation with Local Authority. 15-11-2026 Work In Progress
61 Adhere to the stipulation given by TPCODL& PH Deptt. 15-11-2026 Work In Progress
62 The balance amount of Rs.9,24,566/- towards Purchasable FAR shall be deposited before expiry of one year of the proceeding date of deposit and in case of default in payment of instalment on right time, interest@SBI PLR shall be imposed and occupancy certificate shall not be issued without releasing the total cess amount 15-11-2026 Work In Progress
63 Obtain an Occupancy Certificate from the Authority prior to occupancy of building in full or part. 15-11-2026 Work In Progress
64 All the passages around the building shall be developed with permeable pavers block for absorption of rain water and seepage into the ground. 15-11-2026 Work In Progress
65 Rain water harvesting structure and recharging pits of adequate capacity shall be developed to minimise the storm water runoff to the drain. 15-11-2026 Work In Progress
66 The applicant shall register this project before the ORERA as per affidavit submitted before sale / Booking of apartments 15-11-2026 Work In Progress
67 The applicant shall install Rooftop P.V system as per ODA (P& BS) Rules 2020. 15-11-2026 Work In Progress
68 If any omission/commission is noticed of come under the knowledge of Authority the applicant shall comply the same immediately 15-11-2026 Work In Progress
69 The Authority shall in no way he held responsible for any structural failure and damage due to earthquake/cyclone/other natural disaster. 15-11-2026 Work In Progress
70 The number of dwelling units so approved shall not be changed in any manner 15-11-2026 Work In Progress
71 Lift shall be provided as per the provision of NBCI 2016 in pursuance with note (ii) of sub-rule (2) of Rule 42 of ODA Rule, 2020. If the same isn’t provided by the applicant appropriate action, shall be taken as per law 15-11-2026 Work In Progress
72 Obtain an Occupancy Certificate from the Authority prior to occupancy of building in full or part. 15-11-2026 Work In Progress
Updated Changes on 10-07-2023
73 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per ODA (Planning & Building Standards ) Rule-2020. 15-11-2026 Work In Progress
74 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner. 15-11-2026 Work In Progress
75 The entry and exit to the proposed building shall be made from the side road. 15-11-2026 Work In Progress
76 Plantation over 10%/20% of the plot area shall be made by the applicant as per the Ruleno-.30 of ODA (P&BS) Rule -2020. 15-11-2026 Work In Progress
77 The Owner/Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/construction defects, Authority will be no way be held responsible for the same in what so ever manne.r 15-11-2026 Work In Progress
78 The applicant shall obtain final infrastructure/drainage clearance from Engineering branch, CMC before applying for occupancy certificate. 15-11-2026 Work In Progress
79 The concerned Architect/Applicant/Developer are fully responsible for any deviations, additions & alternations beyond approved plan/defective construction etc. shall be liable for action as per the provisions of the regulation 15-11-2026 Work In Progress
80 No Storm water/water shall be discharged to the public road/public premises and other adjoining plots. 15-11-2026 Work In Progress
81 Adhere to the provisions of ODA (Planning & Building Standards) Rule-2020 strictly and condition thereto. 15-11-2026 Work In Progress
82 The Corporation shall in no way be held responsible for any structural failure and damage due to earthquake /cyclone/any other natural disaster. 15-11-2026 Work In Progress
83 Ensure installation of minimum fire fighting equipments and installation as per provision of NBC-2016. 15-11-2026 Work In Progress
84 Ensure storm water drainage from the premises in consultation with Local Authority. 15-11-2026 Work In Progress
85 Adhere to the stipulation given by TPCODL& PH Deptt. 15-11-2026 Work In Progress
86 The balance amount of Rs.9,24,566/- towards Purchasable FAR shall be deposited before expiry of one year of the proceeding date of deposit and in case of default in payment of instalment on right time, interest@SBI PLR shall be imposed and occupancy certificate shall not be issued without releasing the total cess amount 15-11-2026 Work In Progress
87 Obtain an Occupancy Certificate from the Authority prior to occupancy of building in full or part. 15-11-2026 Work In Progress
88 All the passages around the building shall be developed with permeable pavers block for absorption of rain water and seepage into the ground. 15-11-2026 Work In Progress
89 Rain water harvesting structure and recharging pits of adequate capacity shall be developed to minimise the storm water runoff to the drain. 15-11-2026 Work In Progress
90 The applicant shall register this project before the ORERA as per affidavit submitted before sale / Booking of apartments 15-11-2026 Work In Progress
91 The applicant shall install Rooftop P.V system as per ODA (P& BS) Rules 2020. 15-11-2026 Work In Progress
92 If any omission/commission is noticed of come under the knowledge of Authority the applicant shall comply the same immediately 15-11-2026 Work In Progress
93 The Authority shall in no way he held responsible for any structural failure and damage due to earthquake/cyclone/other natural disaster. 15-11-2026 Work In Progress
94 The number of dwelling units so approved shall not be changed in any manner 15-11-2026 Work In Progress
95 Lift shall be provided as per the provision of NBCI 2016 in pursuance with note (ii) of sub-rule (2) of Rule 42 of ODA Rule, 2020. If the same isn’t provided by the applicant appropriate action, shall be taken as per law 15-11-2026 Work In Progress
96 Obtain an Occupancy Certificate from the Authority prior to occupancy of building in full or part. 15-11-2026 Work In Progress
Updated Changes on 15-10-2023
97 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per ODA (Planning & Building Standards ) Rule-2020. 15-11-2026 Work In Progress
98 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner. 15-11-2026 Work In Progress
99 The entry and exit to the proposed building shall be made from the side road. 15-11-2026 Work In Progress
100 Plantation over 10%/20% of the plot area shall be made by the applicant as per the Ruleno-.30 of ODA (P&BS) Rule -2020. 15-11-2026 Work In Progress
101 The Owner/Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/construction defects, Authority will be no way be held responsible for the same in what so ever manne.r 15-11-2026 Work In Progress
102 The applicant shall obtain final infrastructure/drainage clearance from Engineering branch, CMC before applying for occupancy certificate. 15-11-2026 Work In Progress
103 The concerned Architect/Applicant/Developer are fully responsible for any deviations, additions & alternations beyond approved plan/defective construction etc. shall be liable for action as per the provisions of the regulation 15-11-2026 Work In Progress
104 No Storm water/water shall be discharged to the public road/public premises and other adjoining plots. 15-11-2026 Work In Progress
105 Adhere to the provisions of ODA (Planning & Building Standards) Rule-2020 strictly and condition thereto. 15-11-2026 Work In Progress
106 The Corporation shall in no way be held responsible for any structural failure and damage due to earthquake /cyclone/any other natural disaster. 15-11-2026 Work In Progress
107 Ensure installation of minimum fire fighting equipments and installation as per provision of NBC-2016. 15-11-2026 Work In Progress
108 Ensure storm water drainage from the premises in consultation with Local Authority. 15-11-2026 Work In Progress
109 Adhere to the stipulation given by TPCODL& PH Deptt. 15-11-2026 Work In Progress
110 The balance amount of Rs.9,24,566/- towards Purchasable FAR shall be deposited before expiry of one year of the proceeding date of deposit and in case of default in payment of instalment on right time, interest@SBI PLR shall be imposed and occupancy certificate shall not be issued without releasing the total cess amount 15-11-2026 Work In Progress
111 Obtain an Occupancy Certificate from the Authority prior to occupancy of building in full or part. 15-11-2026 Work In Progress
112 All the passages around the building shall be developed with permeable pavers block for absorption of rain water and seepage into the ground. 15-11-2026 Work In Progress
113 Rain water harvesting structure and recharging pits of adequate capacity shall be developed to minimise the storm water runoff to the drain. 15-11-2026 Work In Progress
114 The applicant shall register this project before the ORERA as per affidavit submitted before sale / Booking of apartments 15-11-2026 Work In Progress
115 The applicant shall install Rooftop P.V system as per ODA (P& BS) Rules 2020. 15-11-2026 Work In Progress
116 If any omission/commission is noticed of come under the knowledge of Authority the applicant shall comply the same immediately 15-11-2026 Work In Progress
117 The Authority shall in no way he held responsible for any structural failure and damage due to earthquake/cyclone/other natural disaster. 15-11-2026 Work In Progress
118 The number of dwelling units so approved shall not be changed in any manner 15-11-2026 Work In Progress
119 Lift shall be provided as per the provision of NBCI 2016 in pursuance with note (ii) of sub-rule (2) of Rule 42 of ODA Rule, 2020. If the same isn’t provided by the applicant appropriate action, shall be taken as per law 15-11-2026 Work In Progress
120 Obtain an Occupancy Certificate from the Authority prior to occupancy of building in full or part. 15-11-2026 Work In Progress
Updated Changes on 05-01-2024
121 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per ODA (Planning & Building Standards ) Rule-2020. 15-11-2026 Work In Progress
122 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner. 15-11-2026 Work In Progress
123 The entry and exit to the proposed building shall be made from the side road. 15-11-2026 Work In Progress
124 Plantation over 10%/20% of the plot area shall be made by the applicant as per the Ruleno-.30 of ODA (P&BS) Rule -2020. 15-11-2026 Work In Progress
125 The Owner/Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/construction defects, Authority will be no way be held responsible for the same in what so ever manne.r 15-11-2026 Work In Progress
126 The applicant shall obtain final infrastructure/drainage clearance from Engineering branch, CMC before applying for occupancy certificate. 15-11-2026 Work In Progress
127 The concerned Architect/Applicant/Developer are fully responsible for any deviations, additions & alternations beyond approved plan/defective construction etc. shall be liable for action as per the provisions of the regulation 15-11-2026 Work In Progress
128 No Storm water/water shall be discharged to the public road/public premises and other adjoining plots. 15-11-2026 Work In Progress
129 Adhere to the provisions of ODA (Planning & Building Standards) Rule-2020 strictly and condition thereto. 15-11-2026 Work In Progress
130 The Corporation shall in no way be held responsible for any structural failure and damage due to earthquake /cyclone/any other natural disaster. 15-11-2026 Work In Progress
131 Ensure installation of minimum fire fighting equipments and installation as per provision of NBC-2016. 15-11-2026 Work In Progress
132 Ensure storm water drainage from the premises in consultation with Local Authority. 15-11-2026 Work In Progress
133 Adhere to the stipulation given by TPCODL& PH Deptt. 15-11-2026 Work In Progress
134 The balance amount of Rs.9,24,566/- towards Purchasable FAR shall be deposited before expiry of one year of the proceeding date of deposit and in case of default in payment of instalment on right time, interest@SBI PLR shall be imposed and occupancy certificate shall not be issued without releasing the total cess amount 15-11-2026 Work In Progress
135 Obtain an Occupancy Certificate from the Authority prior to occupancy of building in full or part. 15-11-2026 Work In Progress
136 All the passages around the building shall be developed with permeable pavers block for absorption of rain water and seepage into the ground. 15-11-2026 Work In Progress
137 Rain water harvesting structure and recharging pits of adequate capacity shall be developed to minimise the storm water runoff to the drain. 15-11-2026 Work In Progress
138 The applicant shall register this project before the ORERA as per affidavit submitted before sale / Booking of apartments 15-11-2026 Work In Progress
139 The applicant shall install Rooftop P.V system as per ODA (P& BS) Rules 2020. 15-11-2026 Work In Progress
140 If any omission/commission is noticed of come under the knowledge of Authority the applicant shall comply the same immediately 15-11-2026 Work In Progress
141 The Authority shall in no way he held responsible for any structural failure and damage due to earthquake/cyclone/other natural disaster. 15-11-2026 Work In Progress
142 The number of dwelling units so approved shall not be changed in any manner 15-11-2026 Work In Progress
143 Lift shall be provided as per the provision of NBCI 2016 in pursuance with note (ii) of sub-rule (2) of Rule 42 of ODA Rule, 2020. If the same isn’t provided by the applicant appropriate action, shall be taken as per law 15-11-2026 Work In Progress
144 Obtain an Occupancy Certificate from the Authority prior to occupancy of building in full or part. 15-11-2026 Work In Progress
Updated Changes on 11-04-2024
145 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per ODA (Planning & Building Standards ) Rule-2020. 15-11-2026 Work In Progress
146 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner. 15-11-2026 Work In Progress
147 The entry and exit to the proposed building shall be made from the side road. 15-11-2026 Work In Progress
148 Plantation over 10%/20% of the plot area shall be made by the applicant as per the Ruleno-.30 of ODA (P&BS) Rule -2020. 15-11-2026 Work In Progress
149 The Owner/Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/construction defects, Authority will be no way be held responsible for the same in what so ever manne.r 15-11-2026 Work In Progress
150 The applicant shall obtain final infrastructure/drainage clearance from Engineering branch, CMC before applying for occupancy certificate. 15-11-2026 Work In Progress
151 The concerned Architect/Applicant/Developer are fully responsible for any deviations, additions & alternations beyond approved plan/defective construction etc. shall be liable for action as per the provisions of the regulation 15-11-2026 Work In Progress
152 No Storm water/water shall be discharged to the public road/public premises and other adjoining plots. 15-11-2026 Work In Progress
153 Adhere to the provisions of ODA (Planning & Building Standards) Rule-2020 strictly and condition thereto. 15-11-2026 Work In Progress
154 The Corporation shall in no way be held responsible for any structural failure and damage due to earthquake /cyclone/any other natural disaster. 15-11-2026 Work In Progress
155 Ensure installation of minimum fire fighting equipments and installation as per provision of NBC-2016. 15-11-2026 Work In Progress
156 Ensure storm water drainage from the premises in consultation with Local Authority. 15-11-2026 Work In Progress
157 Adhere to the stipulation given by TPCODL& PH Deptt. 15-11-2026 Work In Progress
158 The balance amount of Rs.9,24,566/- towards Purchasable FAR shall be deposited before expiry of one year of the proceeding date of deposit and in case of default in payment of instalment on right time, interest@SBI PLR shall be imposed and occupancy certificate shall not be issued without releasing the total cess amount 15-11-2026 Work In Progress
159 Obtain an Occupancy Certificate from the Authority prior to occupancy of building in full or part. 15-11-2026 Work In Progress
160 All the passages around the building shall be developed with permeable pavers block for absorption of rain water and seepage into the ground. 15-11-2026 Work In Progress
161 Rain water harvesting structure and recharging pits of adequate capacity shall be developed to minimise the storm water runoff to the drain. 15-11-2026 Work In Progress
162 The applicant shall register this project before the ORERA as per affidavit submitted before sale / Booking of apartments 15-11-2026 Work In Progress
163 The applicant shall install Rooftop P.V system as per ODA (P& BS) Rules 2020. 15-11-2026 Work In Progress
164 If any omission/commission is noticed of come under the knowledge of Authority the applicant shall comply the same immediately 15-11-2026 Work In Progress
165 The Authority shall in no way he held responsible for any structural failure and damage due to earthquake/cyclone/other natural disaster. 15-11-2026 Work In Progress
166 The number of dwelling units so approved shall not be changed in any manner 15-11-2026 Work In Progress
167 Lift shall be provided as per the provision of NBCI 2016 in pursuance with note (ii) of sub-rule (2) of Rule 42 of ODA Rule, 2020. If the same isn’t provided by the applicant appropriate action, shall be taken as per law 15-11-2026 Work In Progress
168 Obtain an Occupancy Certificate from the Authority prior to occupancy of building in full or part. 15-11-2026 Work In Progress

Updated Project Documents

Sl. No. Title of the document Upload Document
1 0
2 0
3 0
4 0
5 0
6 0
7 annual audit certificate
8 0
9 0
10 0
11 proforma-1 q1,q2,q3,q4 of 2023,q1of 2024
12 proforma-2 q1,q2,q3,q4 of 2023,q1of 2024
:  UPENDRA NATH SUTAR :  
NA :  AQTPS0734J
:PAN Card :  mmeconsult@yahoo.com
:  MATRICULATION :  9437120198
:  15 Years construction experience
:  Yes :  NA
:  BISHNUPRIYA MAHARANA :  
NA :  AKRPM8232H
:PAN Card :  mmeconsult@yahoo.com
:  Bachelor in arts :  9437590810
:  15 Years construction experience
:  Yes :  NA

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
MINATI DAS Architect BDA COLONY C.S PUR, BHUBANESWARDIST-KHURDA E-Mail: arminati71@gmail.com Mob: 9437107998, CA/200/27100 MM MENAKA TOWER
P.MAHARANA Construction Engineer SNEHALATA HOUSE, JAGANATH LANEBADAMBADI, CUTTACK-12 E-Mail -mmeconsult@yahoo.com Mob:9437032088, BADAMBADI, CUTTACK RTP/DTP/ER-006/2017 MM MENAKA TOWER
MONIKA BAJORIA Chartered Accountant GANESH GHAT, CUTTACKDist-Cuttack E-Mail: bajoriaca@rediffmail.com Mob: 9437022103 300-062997 MM MENAKA TOWER

Updated Units

House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
Updated Changes
1/A Covered Parking P/1 4.87X3.20 15.58 Included
1/B Covered Parking P/2 4.87X3.20 15.58 Included
1/C Covered Parking P/3 4.87X3.20 15.58 Included
1/D Covered Parking P/4 4.87X3.20 15.58 Included
1/E Covered Parking P/5 4.87X3.20 15.58 Included
1/F Covered Parking P/6 4.87X3.20 15.58 Included
2/A Covered Parking P/7 4.87X3.20 15.58 Included
2/B Covered Parking P/8 4.87X3.20 15.58 Included
2/C Covered Parking P/9 4.87X3.20 15.58 Included
2/D Covered Parking P/10 4.87X3.20 15.58 Included
2/E Covered Parking P/11 4.87X3.20 15.58 Included
2/F Covered Parking P/12 4.87X3.20 15.58 Included
3/A Covered Parking P/13 4.87X3.20 15.58 Included
3/B Covered Parking P/14 4.87X3.20 15.58 Included
3/C Covered Parking P/15 4.87X3.20 15.58 Included
3/D Covered Parking P/16 4.87X3.20 15.58 Included
3/E Covered Parking P/17 4.87X3.20 15.58 Included
3/F Covered Parking P/18 4.87X3.20 15.58 Included
4/A Covered Parking P/19 4.87X3.20 15.58 Included
4/B Covered Parking P/20 4.87X3.20 15.58 Included
4/C Covered Parking P/21 4.87X3.20 15.58 Included
4/D Covered Parking P/22 4.87X3.20 15.58 Included
4/E Covered Parking P/23 4.87X3.20 15.58 Included
4/F Covered Parking P/24 4.87X3.20 15.58 Included
Updated Changes
1/A Covered Parking P/1 4.87X3.20 15.58 Included
1/B Covered Parking P/2 4.87X3.20 15.58 Included
1/C Covered Parking P/3 4.87X3.20 15.58 Included
1/D Covered Parking P/4 4.87X3.20 15.58 Included
1/E Covered Parking P/5 4.87X3.20 15.58 Included
1/F Covered Parking P/6 4.87X3.20 15.58 Included
2/A Covered Parking P/7 4.87X3.20 15.58 Included
2/B Covered Parking P/8 4.87X3.20 15.58 Included
2/C Covered Parking P/9 4.87X3.20 15.58 Included
2/D Covered Parking P/10 4.87X3.20 15.58 Included
2/E Covered Parking P/11 4.87X3.20 15.58 Included
2/F Covered Parking P/12 4.87X3.20 15.58 Included
3/A Covered Parking P/13 4.87X3.20 15.58 Included
3/B Covered Parking P/14 4.87X3.20 15.58 Included
3/C Covered Parking P/15 4.87X3.20 15.58 Included
3/D Covered Parking P/16 4.87X3.20 15.58 Included
3/E Covered Parking P/17 4.87X3.20 15.58 Included
3/F Covered Parking P/18 4.87X3.20 15.58 Included
4/A Covered Parking P/19 4.87X3.20 15.58 Included
4/B Covered Parking P/20 4.87X3.20 15.58 Included
4/C Covered Parking P/21 4.87X3.20 15.58 Included
4/D Covered Parking P/22 4.87X3.20 15.58 Included
4/E Covered Parking P/23 4.87X3.20 15.58 Included
4/F Covered Parking P/24 4.87X3.20 15.58 Included