Generated by pacms.orera.in on date: 2024-05-10

Promoter Details
Promoter Name :
RACHITA MISHRA
Project Name :
B3 SUNRISE
Project Location :
(Construction of [B+S+4] Residential, Apartment Building, No. of Units-20)

Form- I

A. Promoter's Details

:  B3 CREATION PRIVATE LIMITED :  Private Company
:  U45201OR2022PTC038967 :View
NA :  PLOT NO-1191 , GROUND FLOOR, BIMALA BHAWAN , NAYAPALLI, BHUBANESWAR, PIN-751012
:  Plot No-1191 , Ground Floor, Bimala Bhawan, Nayapalli, Bhubaneswar, Pin-751012. :  asutosh6382@gmail.com
:  9668801200
:  AAKCB5318F :View
:  NO EXPERIENCE :  NO EXPERIENCE
NA

B. Details of Board of Directors / Partners / MC Members

:  RACHITA MISHRA :  
:  Director :  AIJPM7327B
:PAN Card :  psubhransusekhar@yahoo.com
:  Graduate :  9040162010
:  NO EXIPERENCE
:  Yes :  NA
:  SASMITA SWAIN :  
:  Director :  FXSPS1109C
:PAN Card :  sasmita.pradhanswain2011@gmail.com
:  Graduate :  9438690600
:  NO EXPERIENCE
:  Yes :  NA
:  SWATI SAMAL :  
:  Director :  FNDPS1837N
:PAN Card :  asutosh6382@gmail.com
:  GRADUATE :  9692088888
:  NO EXPERIENCE
:  Yes :  NA

Annexure-1

Details of last projects already implemented (Ongoing or Complete)

Have you implemented any project(s) previously (May be Ongoing or Completed):No

Annexure-2

Details of the project to be registered

:   New :  B3 SUNRISE
:  Residential :  (Construction of [B+S+4] Residential, Apartment Building, No. of Units-20)
:  Khordha :  Bhubaneswar
:  752054 :  Development Authority
:  BHUBANESWAR DEVELOPMENT AUTHORITY, BHUBANESWAR
:  B+S+4 :  NA

Land Details of the Project


:  343/536/821 :  132/402
:  TAMANDO :  400.78
:  No :  381.10
No :  View
:  View
:  Other Person
:  BASANTA KUMAR SAHOO :  THROUGH POA ID NO-1132203582 ON DATE 28/03/2022 THROUGH DEVELOPMENT AGREEMENT ID NO-1132203581 ON DATE 28/03/2022
: No
: Yes
:  1132203582 :  28-03-2022
:  SUB REGISTRAR KHANDAGIRI :  Attached

:  343/536 :  132/583
:  TAMANDO :  400.78
:  No :  381.10
No :  View
:  View
:  Other Person
:  BASANTA KUMAR SAHOO :  THROUGH POA ID NO-1132203582 ON DATE 28/03/2022 THROUGH DEVELOPMENT AGREEMENT ID NO-1132203581 ON DATE 28/03/2022
: No
: Yes
:  1132203582 :  28-03-2022
:  SUB REGISTRAR KHANDAGIRI :  Attached

Development Agreement

: Yes
Serial No. Particulars of the Person Land/Plot Details Share of the Person Document Attached
1 BASANTA KUMAR SAHOO,TAMANDO, KHURDA 343/536 & 343/536/821 40%   Agreement Copy

Building Plan

  View   View
  Download site plan 09-02-2026
09-02-2023

Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 The building shall be used exclusively for Apartment Building purpose and the use shall not be changed to any other use without prior approval of this Authority. 09-02-2026 NOT YET STARTED
2 The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement 09-02-2026 NOT YET STARTED
3 Total Parking space measuring 823.97 Sqm. as shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose 09-02-2026 NOT YET STARTED
4 The land over which construction is proposed is accessible by an approved means of access of 9.14 Mtr. in width. 09-02-2026 NOT YET STARTED
5 The land in question must be in lawful ownership and peaceful possession of the applicant. 09-02-2026 NOT YET STARTED
6 The applicant shall free gift 0 Sqm. wide strip of land to Bhubaneswar Development Authority for further widening of the road to the standard width as per CDP-2010, BDA. 09-02-2026 NOT YET STARTED
7 The permission granted under these regulations shall remain valid upto three years from the date of issue.However the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year 09-02-2026 NOT YET STARTED
8 Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards) Rules 2020, or under any other law for the time being in force. 09-02-2026 NOT YET STARTED
9 In case of any dispute arising out of land record or in respect of right, title, interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute 09-02-2026 NOT YET STARTED
10 Neither granting of the permit nor the approval of the drawing and specifications, nor inspections made by the Authority during erection of the building shall in any way relieve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBC 2005 and these regulations. 09-02-2026 NOT YET STARTED
11 A. B. C. D. Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards) Rules 2020, or under any other law for the time being in force. Approval of plan would mean granting of permission to construct under these regulations in force only and shall not mean among other things- The title over the land or building Easement rights Variation in area from recorded area of a plot or a building Structural stability Workmanship and soundness of materials used in the construction of the buildings Quality of building services and amenities in the construction of the building, The site/area liable to flooding as a result of not taking proper drainage arrangement as per the natural lay of the land, etc and Other requirements or licenses or clearances required to be obtained for the site /premises or activity under various other laws. In case of any dispute arising out of land record or in respect of right, title, interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute. Neither granting of the permit nor the approval of the drawing and specifications, nor inspections made by the Authority during erection of the building shall in any way relieve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBC 2005 and these regulations. The owner /applicant shall: Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the regulations; 09-02-2026 NOT YET STARTED
12 Obtain, wherever applicable, from the competent Authority permissions/clearance required in connection with the proposed work; 09-02-2026 NOT YET STARTED
13 Give written notice to the Authority before commencement of work on building site in Form- V,periodic progress report in Form-VIII, notice of completion in Form-VI and notice in case of termination of services of Technical persons engaged by him. 09-02-2026 NOT YET STARTED
14 Obtain an Occupancy Certificate from the Authority prior to occupation of building in full or Part 09-02-2026 NOT YET STARTED
15 The applicant shall abide by the provisions of Rule no.15 of ODA (P&BS) Rules, 2020 with regard to third party verification at plinth level, ground level & roof level. Any deviation to the above shall attract penalty as per the provision of the same 02-02-2026 NOT YET STARTED
16 In case the full plot or part thereof on which permission is accorded is agricultural kisam, the same may be converted to non-agricultural kisam under section- 8 of OLR Act before commencement of construction. 09-02-2026 NOT YET STARTED
17 .In case the full plot or part thereof on which permission is accorded is agricultural kisam, the same may be converted to non-agricultural kisam under section- 8 of OLR Act before commencement of construction. 09-02-2026 NOT YET STARTED
18 The owner/applicant shall get the structural plan and design vetted by the institutions identified by the Authority for buildings more than 30 mtr height before commencement of construction. 09-02-2026 NOT YET STARTED
19 Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force,records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the Authority. 09-02-2026 NOT YET STARTED
20 If the Authority finds at any stage that the construction is not being carried on according to the sanctioned plan or is in violations of any of the provisions of these regulations, it shall notify the owner and no further construction shall beallowed until necessary corrections in the plan are made and the corrected plan is approved. The applicant during the course of construction and till issue of occupancy certificate shall place a display board on his site with details and declaration. 09-02-2026 NOT YET STARTED

Layout Plan

: Yes :  View

Location Map with geo-coordinates of bend points

Point No. Latitude Longitude
1 20°14'34.9''''N 85°44'47.5''''E
2 20°14'35.2''N 85°44'46.2''E
3 20°14'35.8''N 85°44'46.4''E
4 20°14'35.4''N 85°44'47.6''E
View

Milestone of Project Construction

Description* Scheduled date of completion Current Status Site Images
Site Development 09-02-2026 NOT YET START
Roof Casting NA NA NA
Ground Floor/Stilt Floor 09-02-2026 NOT YET START
1 Floor 09-02-2026 NOT YET START
Brick Work & Plastering NA NA NA
Ground Floor/Stilt Floor 09-02-2026 NOT YET START
1 Floor 09-02-2026 NOT YET START
Electrical Works 09-02-2026 NOT YET START
Concealed Cabling including Plugs & switches 09-02-2026 NOT YET START
Installation & Charging of Transformer 09-02-2026 NOT YET START
Connection to Flats/Apartments 09-02-2026 NOT YET START
PH works 09-02-2026 NOT YET START
Laying of concealed Pipes 09-02-2026 NOT YET START
PH Fittings 09-02-2026 NOT YET START
Overhead Water Tanks 09-02-2026 NOT YET START NA
Water Supply Connection to all units 09-02-2026 NOT YET START NA
STP construction and completion 09-02-2026 NOT YET START NA
Distempering & Colouring of all units and exteriors 09-02-2026 NOT YET START NA
Fixation of doors and windows 09-02-2026 NOT YET START NA
Scheduled Date of handing over possession 09-02-2026 NOT YET START NA
Development of common areas, parks, gardens etc 09-02-2026 NOT YET START NA
Site Development 09-02-2026 NOT YET START
NA NA NA NA
Ground Floor/Stilt Floor 09-02-2026 NOT YET START
1 Floor 09-02-2026 NOT YET START NA
NA NA NA NA
Ground Floor/Stilt Floor 09-02-2026 NOT YET START NA
1 Floor 09-02-2026 NOT YET START NA
Electrical Works 09-02-2026 NOT YET START NA
Concealed Cabling including Plugs & switches 09-02-2026 NOT YET START NA
Installation & Charging of Transformer 09-02-2026 NOT YET START NA
Connection to Flats/Apartments 09-02-2026 NOT YET START NA
PH works 09-02-2026 NOT YET START NA
Laying of concealed Pipes 09-02-2026 NOT YET START NA
PH Fittings 09-02-2026 NOT YET START NA
Overhead Water Tanks 09-02-2026 NOT YET START NA
Water Supply Connection to all units 09-02-2026 NOT YET START NA
STP construction and completion 09-02-2026 NOT YET START NA
Distempering & Colouring of all units and exteriors 09-02-2026 NOT YET START NA
Fixation of doors and windows 09-02-2026 NOT YET START NA
Scheduled Date of handing over possession 09-02-2026 NOT YET START NA
Development of common areas, parks, gardens etc 09-02-2026 NOT YET START NA
Site Development 09-02-2026 Work In Progress
NA 01-10-2024 Work In Progress
Ground Floor/Stilt Floor 09-02-2026 Work In Progress
1 Floor 09-02-2026 Work In Progress
NA 09-01-2024 Work In Progress NA
Ground Floor/Stilt Floor 09-02-2026 Work In Progress
1 Floor 09-02-2026 Work In Progress
Electrical Works 09-02-2026 NOT YET START NA
Concealed Cabling including Plugs & switches 09-02-2026 NOT YET START NA
Installation & Charging of Transformer 09-02-2026 NOT YET START NA
Connection to Flats/Apartments 09-02-2026 NOT YET START NA
PH works 09-02-2026 NOT YET START NA
Laying of concealed Pipes 09-02-2026 NOT YET START NA
PH Fittings 09-02-2026 NOT YET START NA
Overhead Water Tanks 09-02-2026 NOT YET START NA
Water Supply Connection to all units 09-02-2026 NOT YET START NA
STP construction and completion 09-02-2026 NOT YET START NA
Distempering & Colouring of all units and exteriors 09-02-2026 NOT YET START NA
Fixation of doors and windows 09-02-2026 NOT YET START NA
Scheduled Date of handing over possession 09-02-2026 NOT YET START NA
Development of common areas, parks, gardens etc 09-02-2026 NOT YET START NA
Site Development 09-02-2026 Work In Progress
NA 01-10-2024 Work In Progress
Ground Floor/Stilt Floor 09-02-2026 Work In Progress
1 Floor 09-02-2026 Work In Progress
NA 09-01-2024 Work In Progress
Ground Floor/Stilt Floor 09-02-2026 Work In Progress NA
1 Floor 09-02-2026 Work In Progress NA
Electrical Works 09-02-2026 NOT YET START NA
Concealed Cabling including Plugs & switches 09-02-2026 NOT YET START NA
Installation & Charging of Transformer 09-02-2026 NOT YET START NA
Connection to Flats/Apartments 09-02-2026 NOT YET START NA
PH works 09-02-2026 NOT YET START NA
Laying of concealed Pipes 09-02-2026 NOT YET START NA
PH Fittings 09-02-2026 NOT YET START NA
Overhead Water Tanks 09-02-2026 NOT YET START NA
Water Supply Connection to all units 09-02-2026 NOT YET START NA
STP construction and completion 09-02-2026 NOT YET START NA
Distempering & Colouring of all units and exteriors 09-02-2026 NOT YET START NA
Fixation of doors and windows 09-02-2026 NOT YET START NA
Scheduled Date of handing over possession 09-02-2026 NOT YET START NA
Development of common areas, parks, gardens etc 09-02-2026 NOT YET START NA

Category and no. of units to be developed

:  Residential
:  
:  20
:  
:  
:  
Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership
Carpet Area Balcony Area Exclusive Open Terrace Area
1 101 79.78 11.65 63.63 Land Owner
2 102 80.49 11.04 63.7 Land Owner
3 103 63.56 7.18 49.23 Promoter
4 104 77.36 14.46 63.9 Promoter
5 105 102.43 14.19 57.1 Promoter
6 201 79.78 11.65 63.63 Promoter
7 202 80.49 11.04 63.7 Promoter
8 203 63.56 7.18 49.23 Land Owner
9 204 77.36 14.46 63.9 Promoter
10 205 102.43 14.19 57.1 Land Owner
11 301 79.78 11.65 63.63 Promoter
12 302 80.49 11.04 63.7 Promoter
13 303 63.56 7.18 49.23 Land Owner
14 304 77.36 14.46 63.9 Land Owner
15 305 102.43 14.19 57.1 Promoter
16 401 79.78 11.65 63.63 Promoter
17 402 80.49 11.04 63.70 Promoter
18 403 45.35 3.68 70.94 Land Owner
19 404 77.36 14.46 63.9 Promoter
20 405 83.90 12.90 67.37 Land Owner
Types of garages and parking
House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
101 Covered Parking 1 7.5 X 5.49 41.175 Included
102 Covered Parking 2 7.5 X 5.49 41.175 Included
103 Covered Parking 3 7.5 X 5.49 41.175 Included
104 Covered Parking 4 7.5 X 5.49 41.175 Included
105 Covered Parking 5 7.5 X 5.49 41.175 Included
201 Covered Parking 6 7.5 X 5.49 41.175 Included
202 Covered Parking 7 7.5 X 5.49 41.175 Included
203 Covered Parking 8 7.5 X 5.49 41.175 Included
204 Covered Parking 9 7.5 X 5.49 41.175 Included
205 Covered Parking 10 7.5 X 5.49 41.175 Included
301 Covered Parking 11 7.5 X 5.49 41.175 Included
302 Covered Parking 12 7.5 X 5.49 41.175 Included
303 Covered Parking 13 7.5 X 5.49 41.175 Included
304 Covered Parking 14 7.5 X 5.49 41.175 Included
305 Covered Parking 15 7.5 X 5.49 41.175 Included
401 Covered Parking 16 7.5 X 5.49 41.175 Included
402 Covered Parking 17 7.5 X 5.49 41.175 Included
403 Covered Parking 18 7.5 X 5.49 41.175 Included
404 Covered Parking 19 7.5 X 5.49 41.175 Included
405 Covered Parking 20 7.5 X 5.49 41.175 Included
Yes

Facilities to be provided

Particulars of Facilities Status of the facility Brief description of facility
Drinking Water Facility Ground Water Copy of Consent Letter
Fire Fighting Facility No
Emergency Evacuation Services Yes 2 NO OF STAIRCASE WITH EMERGENCY DOOR
Use of Renewable Energy No
Lift Facility Yes  ONE LIFT,BRAND VISTAR BRAND,6 PERSON CAPACITY,WITH ARD FACILITY
Market Complex No
Community Hall Yes NA 21. 11 SQM
Gymnasium No
Swimming Pool No
Play Ground No
Park/Garden No
Plantation Area Yes NO OF TREE PER 80 SQM
Others(Please Specify) Yes 24 hours Security
Internal Road No
External Road Yes 30 ' CC ROAD CONNCETED TO THE PLOT
Elecricity Supply Yes Copy of Consent Letter
Other Amenities Yes CCTV IN ALL SIDE

Bank Particulars of the Project

  UNION BANK OF INDIA
  NAYAPALLY BHUBANESWAR
  054121010000055
  UBIN0905411
   View
  2538522
  8356805412

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
SUGYAN KUMAR SAHOO Chartered Accountant Beharasahi, nayapally, bhubaneswar-751012, Mail id-casugyan@gmail.com, MOB NO-9040071246 314219E
NARAYAN TRIPATHY Architect 55, Surya nagar, Bhubaneswar mob no-9437000406 emial id-info@nesters.org CA/2002/29919
BIBHU RANJAN GIRI Construction Engineer the nest appartment, jagamara, bhubaneswar, mob no-784408797 email id-bibhugiri@gmail.com RTP/DTP/ST.ER)149/2019

Financial Details

:  637 :   View
  09-02-2026 :  542
:  85 :  10

Documents Attached

Description of Document Option Documents
Fire Safety Certificate Undertaking Attached
Affidavit in Form-A as per clause-l of sub-section-2 of section-4 of the Act Yes Attached
Allotment letter format Yes Attached
Conveyance Deed Format Yes Attached
Affidavit to adopt agreement for sale format as per Rule-8(1) of ORE (R and D) Rules, 2017 Yes Attached
Annual Report 2022-23 Attached
Annual Report 2020-21 Attached
Annual Report 2021-22 Attached
IT Return 2020-21 Attached
IT Return 2021-22 Attached
IT Return 2022-23 Attached
Audit Report 2020-21 Attached
Audit Report 2021-22 Attached
Audit Report 2022-23 Attached

Additional Documents Attached

Sl. No. Title of the document Upload Document
1 CLARIFICACTION AFFIDAVIT NOT DELINEATING
2 Declaration for Loan Availing

Other documents

“I undertake that the information submitted by me in this application are correct and true to best my knowledge. I also understand that providing false or wrong information is punishable under the Section-60 of the Real Estate (Regulation & Development) Act, 2016. I also further understand that furnishing wrong or false information will lead to rejection of my application registration of the project with forfeiture of registration fee and other charges deposited by me.”
  Dear Sir, Our Company strating from 17.02.2022 so that we dont have any finacial report till date, so kindly consider my request.

Construction Progress

Updated Construction Progress

SL NO. Description Scheduled date of completion Current Status Remarks
1 Site Development 09-02-2026 NOT YET START
2 Roof Casting NA NA NA
3 Ground Floor/Stilt Floor 09-02-2026 NOT YET START
4 1 Floor 09-02-2026 NOT YET START
5 Brick Work & Plastering NA NA NA
6 Ground Floor/Stilt Floor 09-02-2026 NOT YET START
7 1 Floor 09-02-2026 NOT YET START
8 Electrical Works 09-02-2026 NOT YET START
9 Concealed Cabling including Plugs & switches 09-02-2026 NOT YET START
10 Installation & Charging of Transformer 09-02-2026 NOT YET START
11 Connection to Flats/Apartments 09-02-2026 NOT YET START
12 PH works 09-02-2026 NOT YET START
13 Laying of concealed Pipes 09-02-2026 NOT YET START
14 PH Fittings 09-02-2026 NOT YET START
15 Overhead Water Tanks 09-02-2026 NOT YET START NA
16 Water Supply Connection to all units 09-02-2026 NOT YET START NA
17 STP construction and completion 09-02-2026 NOT YET START NA
18 Distempering & Colouring of all units and exteriors 09-02-2026 NOT YET START NA
19 Fixation of doors and windows 09-02-2026 NOT YET START NA
20 Scheduled Date of handing over possession 09-02-2026 NOT YET START NA
21 Development of common areas, parks, gardens etc 09-02-2026 NOT YET START NA
Updated Changes on 14-10-2023
22 Site Development 09-02-2026 NOT YET START
23 NA NA NA NA
24 Ground Floor/Stilt Floor 09-02-2026 NOT YET START
25 1 Floor 09-02-2026 NOT YET START NA
26 NA NA NA NA
27 Ground Floor/Stilt Floor 09-02-2026 NOT YET START NA
28 1 Floor 09-02-2026 NOT YET START NA
29 Electrical Works 09-02-2026 NOT YET START NA
30 Concealed Cabling including Plugs & switches 09-02-2026 NOT YET START NA
31 Installation & Charging of Transformer 09-02-2026 NOT YET START NA
32 Connection to Flats/Apartments 09-02-2026 NOT YET START NA
33 PH works 09-02-2026 NOT YET START NA
34 Laying of concealed Pipes 09-02-2026 NOT YET START NA
35 PH Fittings 09-02-2026 NOT YET START NA
36 Overhead Water Tanks 09-02-2026 NOT YET START NA
37 Water Supply Connection to all units 09-02-2026 NOT YET START NA
38 STP construction and completion 09-02-2026 NOT YET START NA
39 Distempering & Colouring of all units and exteriors 09-02-2026 NOT YET START NA
40 Fixation of doors and windows 09-02-2026 NOT YET START NA
41 Scheduled Date of handing over possession 09-02-2026 NOT YET START NA
42 Development of common areas, parks, gardens etc 09-02-2026 NOT YET START NA
Updated Changes on 13-01-2024
43 Site Development 09-02-2026 Work In Progress
44 NA 01-10-2024 Work In Progress
45 Ground Floor/Stilt Floor 09-02-2026 Work In Progress
46 1 Floor 09-02-2026 Work In Progress
47 NA 09-01-2024 Work In Progress NA
48 Ground Floor/Stilt Floor 09-02-2026 Work In Progress
49 1 Floor 09-02-2026 Work In Progress
50 Electrical Works 09-02-2026 NOT YET START NA
51 Concealed Cabling including Plugs & switches 09-02-2026 NOT YET START NA
52 Installation & Charging of Transformer 09-02-2026 NOT YET START NA
53 Connection to Flats/Apartments 09-02-2026 NOT YET START NA
54 PH works 09-02-2026 NOT YET START NA
55 Laying of concealed Pipes 09-02-2026 NOT YET START NA
56 PH Fittings 09-02-2026 NOT YET START NA
57 Overhead Water Tanks 09-02-2026 NOT YET START NA
58 Water Supply Connection to all units 09-02-2026 NOT YET START NA
59 STP construction and completion 09-02-2026 NOT YET START NA
60 Distempering & Colouring of all units and exteriors 09-02-2026 NOT YET START NA
61 Fixation of doors and windows 09-02-2026 NOT YET START NA
62 Scheduled Date of handing over possession 09-02-2026 NOT YET START NA
63 Development of common areas, parks, gardens etc 09-02-2026 NOT YET START NA
Updated Changes on 13-04-2024
64 Site Development 09-02-2026 Work In Progress
65 NA 01-10-2024 Work In Progress
66 Ground Floor/Stilt Floor 09-02-2026 Work In Progress
67 1 Floor 09-02-2026 Work In Progress
68 NA 09-01-2024 Work In Progress
69 Ground Floor/Stilt Floor 09-02-2026 Work In Progress NA
70 1 Floor 09-02-2026 Work In Progress NA
71 Electrical Works 09-02-2026 NOT YET START NA
72 Concealed Cabling including Plugs & switches 09-02-2026 NOT YET START NA
73 Installation & Charging of Transformer 09-02-2026 NOT YET START NA
74 Connection to Flats/Apartments 09-02-2026 NOT YET START NA
75 PH works 09-02-2026 NOT YET START NA
76 Laying of concealed Pipes 09-02-2026 NOT YET START NA
77 PH Fittings 09-02-2026 NOT YET START NA
78 Overhead Water Tanks 09-02-2026 NOT YET START NA
79 Water Supply Connection to all units 09-02-2026 NOT YET START NA
80 STP construction and completion 09-02-2026 NOT YET START NA
81 Distempering & Colouring of all units and exteriors 09-02-2026 NOT YET START NA
82 Fixation of doors and windows 09-02-2026 NOT YET START NA
83 Scheduled Date of handing over possession 09-02-2026 NOT YET START NA
84 Development of common areas, parks, gardens etc 09-02-2026 NOT YET START NA

Booking Status

Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership Status
Carpet Area Balcony Area Exclusive Open Terrace Area
1 101 79.78 11.65 63.63 Land Owner
2 102 80.49 11.04 63.7 Land Owner
3 103 63.56 7.18 49.23 Promoter
4 104 77.36 14.46 63.9 Promoter
5 105 102.43 14.19 57.1 Promoter
6 201 79.78 11.65 63.63 Promoter
7 202 80.49 11.04 63.7 Promoter
8 203 63.56 7.18 49.23 Land Owner
9 204 77.36 14.46 63.9 Promoter
10 205 102.43 14.19 57.1 Land Owner
11 301 79.78 11.65 63.63 Promoter
12 302 80.49 11.04 63.7 Promoter
13 303 63.56 7.18 49.23 Land Owner
14 304 77.36 14.46 63.9 Land Owner
15 305 102.43 14.19 57.1 Promoter
16 401 79.78 11.65 63.63 Promoter
17 402 80.49 11.04 63.70 Promoter
18 403 45.35 3.68 70.94 Land Owner
19 404 77.36 14.46 63.9 Promoter
20 405 83.90 12.90 67.37 Land Owner

Financial Status

SL No. Funds Collected from the Allottees Funds Borrowed from Financial Institutions Funds Employed from Own Sources Expenditure As On Date Status
1 500000 0 13000000 13350000 30-09-2023 ON GOING
2 700000 0 13000000 15500000 31-12-2023 Work In Progress
3 4730000 5000000 24870000 34600000 31-03-2024 Work in Progress

Updated Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 The building shall be used exclusively for Apartment Building purpose and the use shall not be changed to any other use without prior approval of this Authority. 09-02-2026 NOT YET STARTED
2 The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement 09-02-2026 NOT YET STARTED
3 Total Parking space measuring 823.97 Sqm. as shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose 09-02-2026 NOT YET STARTED
4 The land over which construction is proposed is accessible by an approved means of access of 9.14 Mtr. in width. 09-02-2026 NOT YET STARTED
5 The land in question must be in lawful ownership and peaceful possession of the applicant. 09-02-2026 NOT YET STARTED
6 The applicant shall free gift 0 Sqm. wide strip of land to Bhubaneswar Development Authority for further widening of the road to the standard width as per CDP-2010, BDA. 09-02-2026 NOT YET STARTED
7 The permission granted under these regulations shall remain valid upto three years from the date of issue.However the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year 09-02-2026 NOT YET STARTED
8 Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards) Rules 2020, or under any other law for the time being in force. 09-02-2026 NOT YET STARTED
9 In case of any dispute arising out of land record or in respect of right, title, interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute 09-02-2026 NOT YET STARTED
10 Neither granting of the permit nor the approval of the drawing and specifications, nor inspections made by the Authority during erection of the building shall in any way relieve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBC 2005 and these regulations. 09-02-2026 NOT YET STARTED
11 A. B. C. D. Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards) Rules 2020, or under any other law for the time being in force. Approval of plan would mean granting of permission to construct under these regulations in force only and shall not mean among other things- The title over the land or building Easement rights Variation in area from recorded area of a plot or a building Structural stability Workmanship and soundness of materials used in the construction of the buildings Quality of building services and amenities in the construction of the building, The site/area liable to flooding as a result of not taking proper drainage arrangement as per the natural lay of the land, etc and Other requirements or licenses or clearances required to be obtained for the site /premises or activity under various other laws. In case of any dispute arising out of land record or in respect of right, title, interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute. Neither granting of the permit nor the approval of the drawing and specifications, nor inspections made by the Authority during erection of the building shall in any way relieve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBC 2005 and these regulations. The owner /applicant shall: Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the regulations; 09-02-2026 NOT YET STARTED
12 Obtain, wherever applicable, from the competent Authority permissions/clearance required in connection with the proposed work; 09-02-2026 NOT YET STARTED
13 Give written notice to the Authority before commencement of work on building site in Form- V,periodic progress report in Form-VIII, notice of completion in Form-VI and notice in case of termination of services of Technical persons engaged by him. 09-02-2026 NOT YET STARTED
14 Obtain an Occupancy Certificate from the Authority prior to occupation of building in full or Part 09-02-2026 NOT YET STARTED
15 The applicant shall abide by the provisions of Rule no.15 of ODA (P&BS) Rules, 2020 with regard to third party verification at plinth level, ground level & roof level. Any deviation to the above shall attract penalty as per the provision of the same 02-02-2026 NOT YET STARTED
16 In case the full plot or part thereof on which permission is accorded is agricultural kisam, the same may be converted to non-agricultural kisam under section- 8 of OLR Act before commencement of construction. 09-02-2026 NOT YET STARTED
17 .In case the full plot or part thereof on which permission is accorded is agricultural kisam, the same may be converted to non-agricultural kisam under section- 8 of OLR Act before commencement of construction. 09-02-2026 NOT YET STARTED
18 The owner/applicant shall get the structural plan and design vetted by the institutions identified by the Authority for buildings more than 30 mtr height before commencement of construction. 09-02-2026 NOT YET STARTED
19 Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force,records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the Authority. 09-02-2026 NOT YET STARTED
20 If the Authority finds at any stage that the construction is not being carried on according to the sanctioned plan or is in violations of any of the provisions of these regulations, it shall notify the owner and no further construction shall beallowed until necessary corrections in the plan are made and the corrected plan is approved. The applicant during the course of construction and till issue of occupancy certificate shall place a display board on his site with details and declaration. 09-02-2026 NOT YET STARTED
Updated Changes on 14-10-2023
21 The building shall be used exclusively for Apartment Building purpose and the use shall not be changed to any other use without prior approval of this Authority. 09-02-2026 NOT YET STARTED
22 The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement 09-02-2026 NOT YET STARTED
23 Total Parking space measuring 823.97 Sqm. as shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose 09-02-2026 NOT YET STARTED
24 The land over which construction is proposed is accessible by an approved means of access of 9.14 Mtr. in width. 09-02-2026 NOT YET STARTED
25 The land in question must be in lawful ownership and peaceful possession of the applicant. 09-02-2026 NOT YET STARTED
26 The applicant shall free gift 0 Sqm. wide strip of land to Bhubaneswar Development Authority for further widening of the road to the standard width as per CDP-2010, BDA. 09-02-2026 NOT YET STARTED
27 The permission granted under these regulations shall remain valid upto three years from the date of issue.However the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year 09-02-2026 NOT YET STARTED
28 Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards) Rules 2020, or under any other law for the time being in force. 09-02-2026 NOT YET STARTED
29 In case of any dispute arising out of land record or in respect of right, title, interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute 09-02-2026 NOT YET STARTED
30 Neither granting of the permit nor the approval of the drawing and specifications, nor inspections made by the Authority during erection of the building shall in any way relieve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBC 2005 and these regulations. 09-02-2026 NOT YET STARTED
31 A. B. C. D. Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards) Rules 2020, or under any other law for the time being in force. Approval of plan would mean granting of permission to construct under these regulations in force only and shall not mean among other things- The title over the land or building Easement rights Variation in area from recorded area of a plot or a building Structural stability Workmanship and soundness of materials used in the construction of the buildings Quality of building services and amenities in the construction of the building, The site/area liable to flooding as a result of not taking proper drainage arrangement as per the natural lay of the land, etc and Other requirements or licenses or clearances required to be obtained for the site /premises or activity under various other laws. In case of any dispute arising out of land record or in respect of right, title, interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute. Neither granting of the permit nor the approval of the drawing and specifications, nor inspections made by the Authority during erection of the building shall in any way relieve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBC 2005 and these regulations. The owner /applicant shall: Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the regulations; 09-02-2026 NOT YET STARTED
32 Obtain, wherever applicable, from the competent Authority permissions/clearance required in connection with the proposed work; 09-02-2026 NOT YET STARTED
33 Give written notice to the Authority before commencement of work on building site in Form- V,periodic progress report in Form-VIII, notice of completion in Form-VI and notice in case of termination of services of Technical persons engaged by him. 09-02-2026 NOT YET STARTED
34 Obtain an Occupancy Certificate from the Authority prior to occupation of building in full or Part 09-02-2026 NOT YET STARTED
35 The applicant shall abide by the provisions of Rule no.15 of ODA (P&BS) Rules, 2020 with regard to third party verification at plinth level, ground level & roof level. Any deviation to the above shall attract penalty as per the provision of the same 02-02-2026 NOT YET STARTED
36 In case the full plot or part thereof on which permission is accorded is agricultural kisam, the same may be converted to non-agricultural kisam under section- 8 of OLR Act before commencement of construction. 09-02-2026 NOT YET STARTED
37 .In case the full plot or part thereof on which permission is accorded is agricultural kisam, the same may be converted to non-agricultural kisam under section- 8 of OLR Act before commencement of construction. 09-02-2026 NOT YET STARTED
38 The owner/applicant shall get the structural plan and design vetted by the institutions identified by the Authority for buildings more than 30 mtr height before commencement of construction. 09-02-2026 NOT YET STARTED
39 Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force,records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the Authority. 09-02-2026 NOT YET STARTED
40 If the Authority finds at any stage that the construction is not being carried on according to the sanctioned plan or is in violations of any of the provisions of these regulations, it shall notify the owner and no further construction shall beallowed until necessary corrections in the plan are made and the corrected plan is approved. The applicant during the course of construction and till issue of occupancy certificate shall place a display board on his site with details and declaration. 09-02-2026 NOT YET STARTED
Updated Changes on 13-01-2024
41 The building shall be used exclusively for Apartment Building purpose and the use shall not be changed to any other use without prior approval of this Authority. 09-02-2026 Work in Progress
42 The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement 09-02-2026 Work in Progress
43 Total Parking space measuring 823.97 Sqm. as shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose 09-02-2026 Work in Progress
44 The land over which construction is proposed is accessible by an approved means of access of 9.14 Mtr. in width. 09-02-2026 Work in Progress
45 The land in question must be in lawful ownership and peaceful possession of the applicant. 09-02-2026 Work in Progress
46 The applicant shall free gift 0 Sqm. wide strip of land to Bhubaneswar Development Authority for further widening of the road to the standard width as per CDP-2010, BDA. 09-02-2026 Work in Progress
47 The permission granted under these regulations shall remain valid upto three years from the date of issue.However the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year 09-02-2026 Work in Progress
48 Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards) Rules 2020, or under any other law for the time being in force. 09-02-2026 Work in Progress
49 In case of any dispute arising out of land record or in respect of right, title, interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute 09-02-2026 Work in Progress
50 Neither granting of the permit nor the approval of the drawing and specifications, nor inspections made by the Authority during erection of the building shall in any way relieve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBC 2005 and these regulations. 09-02-2026 Work in Progress
51 A. B. C. D. Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards) Rules 2020, or under any other law for the time being in force. Approval of plan would mean granting of permission to construct under these regulations in force only and shall not mean among other things- The title over the land or building Easement rights Variation in area from recorded area of a plot or a building Structural stability Workmanship and soundness of materials used in the construction of the buildings Quality of building services and amenities in the construction of the building, The site/area liable to flooding as a result of not taking proper drainage arrangement as per the natural lay of the land, etc and Other requirements or licenses or clearances required to be obtained for the site /premises or activity under various other laws. In case of any dispute arising out of land record or in respect of right, title, interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute. Neither granting of the permit nor the approval of the drawing and specifications, nor inspections made by the Authority during erection of the building shall in any way relieve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBC 2005 and these regulations. The owner /applicant shall: Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the regulations; 09-02-2026 Work in Progress
52 Obtain, wherever applicable, from the competent Authority permissions/clearance required in connection with the proposed work; 09-02-2026 Work in Progress
53 Give written notice to the Authority before commencement of work on building site in Form- V,periodic progress report in Form-VIII, notice of completion in Form-VI and notice in case of termination of services of Technical persons engaged by him. 09-02-2026 Work in Progress
54 Obtain an Occupancy Certificate from the Authority prior to occupation of building in full or Part 09-02-2026 Work in Progress
55 The applicant shall abide by the provisions of Rule no.15 of ODA (P&BS) Rules, 2020 with regard to third party verification at plinth level, ground level & roof level. Any deviation to the above shall attract penalty as per the provision of the same 02-02-2026 Work in Progress
56 In case the full plot or part thereof on which permission is accorded is agricultural kisam, the same may be converted to non-agricultural kisam under section- 8 of OLR Act before commencement of construction. 09-02-2026 Work in Progress
57 .In case the full plot or part thereof on which permission is accorded is agricultural kisam, the same may be converted to non-agricultural kisam under section- 8 of OLR Act before commencement of construction. 09-02-2026 Work in Progress
58 The owner/applicant shall get the structural plan and design vetted by the institutions identified by the Authority for buildings more than 30 mtr height before commencement of construction. 09-02-2026 Work in Progress
59 Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force,records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the Authority. 09-02-2026 Work in Progress
60 If the Authority finds at any stage that the construction is not being carried on according to the sanctioned plan or is in violations of any of the provisions of these regulations, it shall notify the owner and no further construction shall beallowed until necessary corrections in the plan are made and the corrected plan is approved. The applicant during the course of construction and till issue of occupancy certificate shall place a display board on his site with details and declaration. 09-02-2026 Work in Progress
Updated Changes on 13-04-2024
61 The building shall be used exclusively for Apartment Building purpose and the use shall not be changed to any other use without prior approval of this Authority. 09-02-2026 Work in Progress
62 The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement 09-02-2026 Work in Progress
63 Total Parking space measuring 823.97 Sqm. as shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose 09-02-2026 Work in Progress
64 The land over which construction is proposed is accessible by an approved means of access of 9.14 Mtr. in width. 09-02-2026 Work in Progress
65 The land in question must be in lawful ownership and peaceful possession of the applicant. 09-02-2026 Work in Progress
66 The applicant shall free gift 0 Sqm. wide strip of land to Bhubaneswar Development Authority for further widening of the road to the standard width as per CDP-2010, BDA. 09-02-2026 Work in Progress
67 The permission granted under these regulations shall remain valid upto three years from the date of issue.However the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year 09-02-2026 Work in Progress
68 Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards) Rules 2020, or under any other law for the time being in force. 09-02-2026 Work in Progress
69 In case of any dispute arising out of land record or in respect of right, title, interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute 09-02-2026 Work in Progress
70 Neither granting of the permit nor the approval of the drawing and specifications, nor inspections made by the Authority during erection of the building shall in any way relieve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBC 2005 and these regulations. 09-02-2026 Work in Progress
71 A. B. C. D. Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards) Rules 2020, or under any other law for the time being in force. Approval of plan would mean granting of permission to construct under these regulations in force only and shall not mean among other things- The title over the land or building Easement rights Variation in area from recorded area of a plot or a building Structural stability Workmanship and soundness of materials used in the construction of the buildings Quality of building services and amenities in the construction of the building, The site/area liable to flooding as a result of not taking proper drainage arrangement as per the natural lay of the land, etc and Other requirements or licenses or clearances required to be obtained for the site /premises or activity under various other laws. In case of any dispute arising out of land record or in respect of right, title, interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute. Neither granting of the permit nor the approval of the drawing and specifications, nor inspections made by the Authority during erection of the building shall in any way relieve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBC 2005 and these regulations. The owner /applicant shall: Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the regulations; 09-02-2026 Work in Progress
72 Obtain, wherever applicable, from the competent Authority permissions/clearance required in connection with the proposed work; 09-02-2026 Work in Progress
73 Give written notice to the Authority before commencement of work on building site in Form- V,periodic progress report in Form-VIII, notice of completion in Form-VI and notice in case of termination of services of Technical persons engaged by him. 09-02-2026 Work in Progress
74 Obtain an Occupancy Certificate from the Authority prior to occupation of building in full or Part 09-02-2026 Work in Progress
75 The applicant shall abide by the provisions of Rule no.15 of ODA (P&BS) Rules, 2020 with regard to third party verification at plinth level, ground level & roof level. Any deviation to the above shall attract penalty as per the provision of the same 02-02-2026 Work in Progress
76 In case the full plot or part thereof on which permission is accorded is agricultural kisam, the same may be converted to non-agricultural kisam under section- 8 of OLR Act before commencement of construction. 09-02-2026 Work in Progress
77 .In case the full plot or part thereof on which permission is accorded is agricultural kisam, the same may be converted to non-agricultural kisam under section- 8 of OLR Act before commencement of construction. 09-02-2026 Work in Progress
78 The owner/applicant shall get the structural plan and design vetted by the institutions identified by the Authority for buildings more than 30 mtr height before commencement of construction. 09-02-2026 Work in Progress
79 Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force,records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the Authority. 09-02-2026 Work in Progress
80 If the Authority finds at any stage that the construction is not being carried on according to the sanctioned plan or is in violations of any of the provisions of these regulations, it shall notify the owner and no further construction shall beallowed until necessary corrections in the plan are made and the corrected plan is approved. The applicant during the course of construction and till issue of occupancy certificate shall place a display board on his site with details and declaration. 09-02-2026 Work in Progress

Updated Project Documents

Sl. No. Title of the document Upload Document
1 BANK STATMENT -100%
2 BANK STATEMENT-70%
3 Bank Noc
4 BS
5 Bank statement
6 Bank statement
:  RACHITA MISHRA :  
NA :  AIJPM7327B
:PAN Card :  psubhransusekhar@yahoo.com
:  Graduate :  9040162010
:  NO EXIPERENCE
:  Yes :  NA
:  SASMITA SWAIN :  
NA :  FXSPS1109C
:PAN Card :  sasmita.pradhanswain2011@gmail.com
:  Graduate :  9438690600
:  NO EXPERIENCE
:  Yes :  NA
:  SWATI SAMAL :  
NA :  FNDPS1837N
:PAN Card :  asutosh6382@gmail.com
:  GRADUATE :  9692088888
:  NO EXPERIENCE
:  Yes :  NA

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
SUGYAN KUMAR SAHOO Chartered Accountant Beharasahi, nayapally, bhubaneswar-751012, Mail id-casugyan@gmail.com, MOB NO-9040071246 314219E
NARAYAN TRIPATHY Architect 55, Surya nagar, Bhubaneswar mob no-9437000406 emial id-info@nesters.org CA/2002/29919
BIBHU RANJAN GIRI Construction Engineer the nest appartment, jagamara, bhubaneswar, mob no-784408797 email id-bibhugiri@gmail.com RTP/DTP/ST.ER)149/2019

Updated Units

House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
Updated Changes
101 Covered Parking 1 7.5 X 5.49 41.175 Included
102 Covered Parking 2 7.5 X 5.49 41.175 Included
103 Covered Parking 3 7.5 X 5.49 41.175 Included
104 Covered Parking 4 7.5 X 5.49 41.175 Included
105 Covered Parking 5 7.5 X 5.49 41.175 Included
201 Covered Parking 6 7.5 X 5.49 41.175 Included
202 Covered Parking 7 7.5 X 5.49 41.175 Included
203 Covered Parking 8 7.5 X 5.49 41.175 Included
204 Covered Parking 9 7.5 X 5.49 41.175 Included
205 Covered Parking 10 7.5 X 5.49 41.175 Included
301 Covered Parking 11 7.5 X 5.49 41.175 Included
302 Covered Parking 12 7.5 X 5.49 41.175 Included
303 Covered Parking 13 7.5 X 5.49 41.175 Included
304 Covered Parking 14 7.5 X 5.49 41.175 Included
305 Covered Parking 15 7.5 X 5.49 41.175 Included
401 Covered Parking 16 7.5 X 5.49 41.175 Included
402 Covered Parking 17 7.5 X 5.49 41.175 Included
403 Covered Parking 18 7.5 X 5.49 41.175 Included
404 Covered Parking 19 7.5 X 5.49 41.175 Included
405 Covered Parking 20 7.5 X 5.49 41.175 Included

Generated by pacms.orera.in on date: 2024-05-10