1 |
The building shall be used exclusively for Apartment Building purpose and the use shall not be changed to any other use without prior approval of this Authority.
|
09-02-2026
|
NOT YET STARTED
|
2 |
The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement
|
09-02-2026
|
NOT YET STARTED
|
3 |
Total Parking space measuring 823.97 Sqm. as shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose
|
09-02-2026
|
NOT YET STARTED
|
4 |
The land over which construction is proposed is accessible by an approved means of access of 9.14 Mtr. in width.
|
09-02-2026
|
NOT YET STARTED
|
5 |
The land in question must be in lawful ownership and peaceful possession of the applicant.
|
09-02-2026
|
NOT YET STARTED
|
6 |
The applicant shall free gift 0 Sqm. wide strip of land to Bhubaneswar Development Authority for further widening of the road to the standard width as per CDP-2010, BDA.
|
09-02-2026
|
NOT YET STARTED
|
7 |
The permission granted under these regulations shall remain valid upto three years from the date of issue.However the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year
|
09-02-2026
|
NOT YET STARTED
|
8 |
Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards) Rules 2020, or under any other law for the time being in force.
|
09-02-2026
|
NOT YET STARTED
|
9 |
In case of any dispute arising out of land record or in respect of right, title, interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute
|
09-02-2026
|
NOT YET STARTED
|
10 |
Neither granting of the permit nor the approval of the drawing and specifications, nor inspections made by the Authority during erection of the building shall in any way relieve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBC 2005 and these regulations.
|
09-02-2026
|
NOT YET STARTED
|
11 |
A. B. C. D. Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards) Rules 2020, or under any other law for the time being in force. Approval of plan would mean granting of permission to construct under these regulations in force only and shall not mean among other things- The title over the land or building Easement rights Variation in area from recorded area of a plot or a building Structural stability Workmanship and soundness of materials used in the construction of the buildings Quality of building services and amenities in the construction of the building, The site/area liable to flooding as a result of not taking proper drainage arrangement as per the natural lay of the land, etc and Other requirements or licenses or clearances required to be obtained for the site /premises or activity under various other laws. In case of any dispute arising out of land record or in respect of right, title, interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute. Neither granting of the permit nor the approval of the drawing and specifications, nor inspections made by the Authority during erection of the building shall in any way relieve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBC 2005 and these regulations. The owner /applicant shall: Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the regulations;
|
09-02-2026
|
NOT YET STARTED
|
12 |
Obtain, wherever applicable, from the competent Authority permissions/clearance required in connection with the proposed work;
|
09-02-2026
|
NOT YET STARTED
|
13 |
Give written notice to the Authority before commencement of work on building site in Form- V,periodic progress report in Form-VIII, notice of completion in Form-VI and notice in case of termination of services of Technical persons engaged by him.
|
09-02-2026
|
NOT YET STARTED
|
14 |
Obtain an Occupancy Certificate from the Authority prior to occupation of building in full or Part
|
09-02-2026
|
NOT YET STARTED
|
15 |
The applicant shall abide by the provisions of Rule no.15 of ODA (P&BS) Rules, 2020 with regard to third party verification at plinth level, ground level & roof level. Any deviation to the above shall attract penalty as per the provision of the same
|
02-02-2026
|
NOT YET STARTED
|
16 |
In case the full plot or part thereof on which permission is accorded is agricultural kisam, the same may be converted to non-agricultural kisam under section- 8 of OLR Act before commencement of construction.
|
09-02-2026
|
NOT YET STARTED
|
17 |
.In case the full plot or part thereof on which permission is accorded is agricultural kisam, the same may be converted to non-agricultural kisam under section- 8 of OLR Act before commencement of construction.
|
09-02-2026
|
NOT YET STARTED
|
18 |
The owner/applicant shall get the structural plan and design vetted by the institutions identified by the Authority for buildings more than 30 mtr height before commencement of construction.
|
09-02-2026
|
NOT YET STARTED
|
19 |
Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force,records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the Authority.
|
09-02-2026
|
NOT YET STARTED
|
20 |
If the Authority finds at any stage that the construction is not being carried on according to the sanctioned plan or is in violations of any of the provisions of these regulations, it shall notify the owner and no further construction shall beallowed until necessary corrections in the plan are made and the corrected plan is approved. The applicant during the course of construction and till issue of occupancy certificate shall place a display board on his site with details and declaration.
|
09-02-2026
|
NOT YET STARTED
|
Updated Changes on 14-10-2023 |
21 |
The building shall be used exclusively for Apartment Building purpose and the use shall not be changed to any other use without prior approval of this Authority.
|
09-02-2026
|
NOT YET STARTED
|
22 |
The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement
|
09-02-2026
|
NOT YET STARTED
|
23 |
Total Parking space measuring 823.97 Sqm. as shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose
|
09-02-2026
|
NOT YET STARTED
|
24 |
The land over which construction is proposed is accessible by an approved means of access of 9.14 Mtr. in width.
|
09-02-2026
|
NOT YET STARTED
|
25 |
The land in question must be in lawful ownership and peaceful possession of the applicant.
|
09-02-2026
|
NOT YET STARTED
|
26 |
The applicant shall free gift 0 Sqm. wide strip of land to Bhubaneswar Development Authority for further widening of the road to the standard width as per CDP-2010, BDA.
|
09-02-2026
|
NOT YET STARTED
|
27 |
The permission granted under these regulations shall remain valid upto three years from the date of issue.However the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year
|
09-02-2026
|
NOT YET STARTED
|
28 |
Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards) Rules 2020, or under any other law for the time being in force.
|
09-02-2026
|
NOT YET STARTED
|
29 |
In case of any dispute arising out of land record or in respect of right, title, interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute
|
09-02-2026
|
NOT YET STARTED
|
30 |
Neither granting of the permit nor the approval of the drawing and specifications, nor inspections made by the Authority during erection of the building shall in any way relieve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBC 2005 and these regulations.
|
09-02-2026
|
NOT YET STARTED
|
31 |
A. B. C. D. Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards) Rules 2020, or under any other law for the time being in force. Approval of plan would mean granting of permission to construct under these regulations in force only and shall not mean among other things- The title over the land or building Easement rights Variation in area from recorded area of a plot or a building Structural stability Workmanship and soundness of materials used in the construction of the buildings Quality of building services and amenities in the construction of the building, The site/area liable to flooding as a result of not taking proper drainage arrangement as per the natural lay of the land, etc and Other requirements or licenses or clearances required to be obtained for the site /premises or activity under various other laws. In case of any dispute arising out of land record or in respect of right, title, interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute. Neither granting of the permit nor the approval of the drawing and specifications, nor inspections made by the Authority during erection of the building shall in any way relieve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBC 2005 and these regulations. The owner /applicant shall: Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the regulations;
|
09-02-2026
|
NOT YET STARTED
|
32 |
Obtain, wherever applicable, from the competent Authority permissions/clearance required in connection with the proposed work;
|
09-02-2026
|
NOT YET STARTED
|
33 |
Give written notice to the Authority before commencement of work on building site in Form- V,periodic progress report in Form-VIII, notice of completion in Form-VI and notice in case of termination of services of Technical persons engaged by him.
|
09-02-2026
|
NOT YET STARTED
|
34 |
Obtain an Occupancy Certificate from the Authority prior to occupation of building in full or Part
|
09-02-2026
|
NOT YET STARTED
|
35 |
The applicant shall abide by the provisions of Rule no.15 of ODA (P&BS) Rules, 2020 with regard to third party verification at plinth level, ground level & roof level. Any deviation to the above shall attract penalty as per the provision of the same
|
02-02-2026
|
NOT YET STARTED
|
36 |
In case the full plot or part thereof on which permission is accorded is agricultural kisam, the same may be converted to non-agricultural kisam under section- 8 of OLR Act before commencement of construction.
|
09-02-2026
|
NOT YET STARTED
|
37 |
.In case the full plot or part thereof on which permission is accorded is agricultural kisam, the same may be converted to non-agricultural kisam under section- 8 of OLR Act before commencement of construction.
|
09-02-2026
|
NOT YET STARTED
|
38 |
The owner/applicant shall get the structural plan and design vetted by the institutions identified by the Authority for buildings more than 30 mtr height before commencement of construction.
|
09-02-2026
|
NOT YET STARTED
|
39 |
Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force,records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the Authority.
|
09-02-2026
|
NOT YET STARTED
|
40 |
If the Authority finds at any stage that the construction is not being carried on according to the sanctioned plan or is in violations of any of the provisions of these regulations, it shall notify the owner and no further construction shall beallowed until necessary corrections in the plan are made and the corrected plan is approved. The applicant during the course of construction and till issue of occupancy certificate shall place a display board on his site with details and declaration.
|
09-02-2026
|
NOT YET STARTED
|
Updated Changes on 13-01-2024 |
41 |
The building shall be used exclusively for Apartment Building purpose and the use shall not be changed to any other use without prior approval of this Authority.
|
09-02-2026
|
Work in Progress
|
42 |
The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement
|
09-02-2026
|
Work in Progress
|
43 |
Total Parking space measuring 823.97 Sqm. as shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose
|
09-02-2026
|
Work in Progress
|
44 |
The land over which construction is proposed is accessible by an approved means of access of 9.14 Mtr. in width.
|
09-02-2026
|
Work in Progress
|
45 |
The land in question must be in lawful ownership and peaceful possession of the applicant.
|
09-02-2026
|
Work in Progress
|
46 |
The applicant shall free gift 0 Sqm. wide strip of land to Bhubaneswar Development Authority for further widening of the road to the standard width as per CDP-2010, BDA.
|
09-02-2026
|
Work in Progress
|
47 |
The permission granted under these regulations shall remain valid upto three years from the date of issue.However the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year
|
09-02-2026
|
Work in Progress
|
48 |
Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards) Rules 2020, or under any other law for the time being in force.
|
09-02-2026
|
Work in Progress
|
49 |
In case of any dispute arising out of land record or in respect of right, title, interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute
|
09-02-2026
|
Work in Progress
|
50 |
Neither granting of the permit nor the approval of the drawing and specifications, nor inspections made by the Authority during erection of the building shall in any way relieve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBC 2005 and these regulations.
|
09-02-2026
|
Work in Progress
|
51 |
A. B. C. D. Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards) Rules 2020, or under any other law for the time being in force. Approval of plan would mean granting of permission to construct under these regulations in force only and shall not mean among other things- The title over the land or building Easement rights Variation in area from recorded area of a plot or a building Structural stability Workmanship and soundness of materials used in the construction of the buildings Quality of building services and amenities in the construction of the building, The site/area liable to flooding as a result of not taking proper drainage arrangement as per the natural lay of the land, etc and Other requirements or licenses or clearances required to be obtained for the site /premises or activity under various other laws. In case of any dispute arising out of land record or in respect of right, title, interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute. Neither granting of the permit nor the approval of the drawing and specifications, nor inspections made by the Authority during erection of the building shall in any way relieve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBC 2005 and these regulations. The owner /applicant shall: Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the regulations;
|
09-02-2026
|
Work in Progress
|
52 |
Obtain, wherever applicable, from the competent Authority permissions/clearance required in connection with the proposed work;
|
09-02-2026
|
Work in Progress
|
53 |
Give written notice to the Authority before commencement of work on building site in Form- V,periodic progress report in Form-VIII, notice of completion in Form-VI and notice in case of termination of services of Technical persons engaged by him.
|
09-02-2026
|
Work in Progress
|
54 |
Obtain an Occupancy Certificate from the Authority prior to occupation of building in full or Part
|
09-02-2026
|
Work in Progress
|
55 |
The applicant shall abide by the provisions of Rule no.15 of ODA (P&BS) Rules, 2020 with regard to third party verification at plinth level, ground level & roof level. Any deviation to the above shall attract penalty as per the provision of the same
|
02-02-2026
|
Work in Progress
|
56 |
In case the full plot or part thereof on which permission is accorded is agricultural kisam, the same may be converted to non-agricultural kisam under section- 8 of OLR Act before commencement of construction.
|
09-02-2026
|
Work in Progress
|
57 |
.In case the full plot or part thereof on which permission is accorded is agricultural kisam, the same may be converted to non-agricultural kisam under section- 8 of OLR Act before commencement of construction.
|
09-02-2026
|
Work in Progress
|
58 |
The owner/applicant shall get the structural plan and design vetted by the institutions identified by the Authority for buildings more than 30 mtr height before commencement of construction.
|
09-02-2026
|
Work in Progress
|
59 |
Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force,records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the Authority.
|
09-02-2026
|
Work in Progress
|
60 |
If the Authority finds at any stage that the construction is not being carried on according to the sanctioned plan or is in violations of any of the provisions of these regulations, it shall notify the owner and no further construction shall beallowed until necessary corrections in the plan are made and the corrected plan is approved. The applicant during the course of construction and till issue of occupancy certificate shall place a display board on his site with details and declaration.
|
09-02-2026
|
Work in Progress
|
Updated Changes on 13-04-2024 |
61 |
The building shall be used exclusively for Apartment Building purpose and the use shall not be changed to any other use without prior approval of this Authority.
|
09-02-2026
|
Work in Progress
|
62 |
The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement
|
09-02-2026
|
Work in Progress
|
63 |
Total Parking space measuring 823.97 Sqm. as shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose
|
09-02-2026
|
Work in Progress
|
64 |
The land over which construction is proposed is accessible by an approved means of access of 9.14 Mtr. in width.
|
09-02-2026
|
Work in Progress
|
65 |
The land in question must be in lawful ownership and peaceful possession of the applicant.
|
09-02-2026
|
Work in Progress
|
66 |
The applicant shall free gift 0 Sqm. wide strip of land to Bhubaneswar Development Authority for further widening of the road to the standard width as per CDP-2010, BDA.
|
09-02-2026
|
Work in Progress
|
67 |
The permission granted under these regulations shall remain valid upto three years from the date of issue.However the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year
|
09-02-2026
|
Work in Progress
|
68 |
Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards) Rules 2020, or under any other law for the time being in force.
|
09-02-2026
|
Work in Progress
|
69 |
In case of any dispute arising out of land record or in respect of right, title, interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute
|
09-02-2026
|
Work in Progress
|
70 |
Neither granting of the permit nor the approval of the drawing and specifications, nor inspections made by the Authority during erection of the building shall in any way relieve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBC 2005 and these regulations.
|
09-02-2026
|
Work in Progress
|
71 |
A. B. C. D. Approval of plans and acceptance of any statement or document pertaining to such plan shall not exempt the owner or person or persons under whose supervision the building is constructed from their responsibilities imposed under ODA (Planning & Building Standards) Rules 2020, or under any other law for the time being in force. Approval of plan would mean granting of permission to construct under these regulations in force only and shall not mean among other things- The title over the land or building Easement rights Variation in area from recorded area of a plot or a building Structural stability Workmanship and soundness of materials used in the construction of the buildings Quality of building services and amenities in the construction of the building, The site/area liable to flooding as a result of not taking proper drainage arrangement as per the natural lay of the land, etc and Other requirements or licenses or clearances required to be obtained for the site /premises or activity under various other laws. In case of any dispute arising out of land record or in respect of right, title, interest after this permission is granted, the permission so granted shall be treated as automatically cancelled during the period of dispute. Neither granting of the permit nor the approval of the drawing and specifications, nor inspections made by the Authority during erection of the building shall in any way relieve the owner of such building from full responsibility for carrying out the work in accordance with the requirements of NBC 2005 and these regulations. The owner /applicant shall: Permit the Authority to enter the building or premises, for which the permission has been granted at any reasonable time for the purpose of enforcing the regulations;
|
09-02-2026
|
Work in Progress
|
72 |
Obtain, wherever applicable, from the competent Authority permissions/clearance required in connection with the proposed work;
|
09-02-2026
|
Work in Progress
|
73 |
Give written notice to the Authority before commencement of work on building site in Form- V,periodic progress report in Form-VIII, notice of completion in Form-VI and notice in case of termination of services of Technical persons engaged by him.
|
09-02-2026
|
Work in Progress
|
74 |
Obtain an Occupancy Certificate from the Authority prior to occupation of building in full or Part
|
09-02-2026
|
Work in Progress
|
75 |
The applicant shall abide by the provisions of Rule no.15 of ODA (P&BS) Rules, 2020 with regard to third party verification at plinth level, ground level & roof level. Any deviation to the above shall attract penalty as per the provision of the same
|
02-02-2026
|
Work in Progress
|
76 |
In case the full plot or part thereof on which permission is accorded is agricultural kisam, the same may be converted to non-agricultural kisam under section- 8 of OLR Act before commencement of construction.
|
09-02-2026
|
Work in Progress
|
77 |
.In case the full plot or part thereof on which permission is accorded is agricultural kisam, the same may be converted to non-agricultural kisam under section- 8 of OLR Act before commencement of construction.
|
09-02-2026
|
Work in Progress
|
78 |
The owner/applicant shall get the structural plan and design vetted by the institutions identified by the Authority for buildings more than 30 mtr height before commencement of construction.
|
09-02-2026
|
Work in Progress
|
79 |
Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force,records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the Authority.
|
09-02-2026
|
Work in Progress
|
80 |
If the Authority finds at any stage that the construction is not being carried on according to the sanctioned plan or is in violations of any of the provisions of these regulations, it shall notify the owner and no further construction shall beallowed until necessary corrections in the plan are made and the corrected plan is approved. The applicant during the course of construction and till issue of occupancy certificate shall place a display board on his site with details and declaration.
|
09-02-2026
|
Work in Progress
|