Promoter Details
Promoter Name :
SHAMBHUNATH PATI
Project Name :
ADITYA ASHRAY
Project Location :
(Residential Project, S+4, No. of Units- 24)

Form- I

A. Promoter's Details

:  ADISMARAN LIFESTYLES PROPERTIES PVT LTD :  Private Company
:  U45309OR2021PTC036729 :View
NA :  FLAT NO-201, GOPAL RESIDENCY K-2, BJB NAGAR, BHUBANESWAR, KHORDHA, ODISHA-751014
:  Flat No.- 201, Gopal Residency K-2, BJB Nagar, Bhubaneswar, Dist- Khordha, Odisha- 751014 :  MAIL2SNPATI@GMAIL.COM
:  9937199010
:  AAVCA3409M :View
:  1.5 YEARS OF EXPERIENCE IN ODISHA :  NO EXPERIENCE
NA

B. Details of Board of Directors / Partners / MC Members

:  SHAMBHUNATH PATI :  
:  Director :  ADYPP5392D
:PAN Card :  MAIL2SNPATI@GMAIL.COM
:  M.Com LLB :  9937199010
:  10 YEARS OF EXPERIENCE
:  Yes :  NA
:  TUSHAR KANTI SAHU :  
:  Director :  ACDPS6334G
:PAN Card :  tushar_sahu@rediffmail.com
:  B.Sc(Hons), MBA :  9968605508
:  12 YEARS OF EXPERIENCE
:  Yes :  NA
:  JAYASHREE SAHU :  
:  Director :  AHQPS2803Q
:PAN Card :  thisisjayashreesahu@gmail.com
:  BA :  9178592738
:  8 YEARS OF EXPERIENCE
:  Yes :  NA

Annexure-1

Details of last projects already implemented (Ongoing or Complete)

Have you implemented any project(s) previously (May be Ongoing or Completed):No

Annexure-2

Details of the project to be registered

:   New :  ADITYA ASHRAY
:  Residential :  (Residential Project, S+4, No. of Units- 24)
:  Khordha :  Bhubaneswar
:  751016 :  Urban Local Body
:  Bhubaneswar Municipal Corporation
:  S+4 storied Residential Apartment building :  NA

Land Details of the Project


:  665/2190 :  611/1272
:  Chandrasekharpur :  1722
:  Yes
No :  View
:  View
:  Other Person
:  Tapaswini Sahu :  THE LAND OWNER HAS EXECUTED DEVELOPMENT AGREEMENT WITH THE PROMOTER. THE PROMOTER IS ALSO THE REGISTERED GPA HOLDER OVER THE LAND.
: No
: Yes
:  11132107073 :  18-08-2021
:  SUB-REGISTRAR, KHANDAGIRI :  Attached

Development Agreement

: Yes
Serial No. Particulars of the Person Land/Plot Details Share of the Person Document Attached
1 Tapaswini Sahu Plot No-665/2190 , KHATA NO.611/1272 45   Agreement Copy

Building Plan

  View   View
  Download site plan 15-07-2025

Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 Parking space measuring 1089.67 Sqm as shown in the approved plan shall be left forparking of vehicles and no part of it will be used for any other purpose and shall not bepartitioned/closed in any manner. 15-07-2025 NOT STARTED
2 The land over which construction is proposed is accessible by an approved means ofaccess of 9.15 M (Nine point One Five) in width. 15-07-2025 NOT STARTED
3 the site/area liable to flooding as a result of not taking proper drainage arrangement asper the natural lay of the land, etc and 15-07-2025 NOT STARTED
4 Other requirements or licenses or clearances required to be obtained for the site /premisesor activity under various other laws. 15-07-2025 NOT STARTED
5 Obtain, wherever applicable, from the competent Authority permissions/clearancerequired in connection with the proposed work 15-07-2025 NOT STARTED
6 Obtain an Occupancy Certificate from the Authority prior to occupation of building infull or part. 15-07-2025 NOT STARTED
7 Register the said Apartment project over scheduled property under the Real Estate(Regulation & Development)-Act-2016. 15-07-2025 NOT STARTED
8 Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force, records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the Authority. 15-07-2025 NOT STARTED
9 The persons to whom a permit is issued during construction shall keep pasted in a conspicuous place on the property in respect of which the permit was issued; 15-07-2025 NOT STARTED
10 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per ODA (Planning & Building Standards) Rules, 2020. 15-07-2025 NOT STARTED
11 Plantation as required under the provision under Rule 30 of ODA (Planning & Building Standards) Rules, 2020.shall be strictly adhered. 15-07-2025 NOT STARTED
12 The Owner/ Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any earthquake/cyclone/any other natural disaster, structural/construction defects. Authority will be no way be held responsible for the same in what so ever manner. 15-07-2025 NOT STARTED
13 The applicant shall obtain EIDP towards development of Infrastructure & clearance from Engineering Wing of BMC before obtaining Occupancy CerTIFICATE. 15-07-2025 NOT STARTED

Layout Plan

: Yes :  View

Location Map with geo-coordinates of bend points

Point No. Latitude Longitude
1 20°20'17.6"N 85°49'48.0"E
2 20°20'18.7"N 85°49'48.9"E
3 20°20'18.6"N 85°49'49.1"E
4 20°20'18.0"N 85°49'49.0"E
5 20°20'17.9"N 85°49'50.1"E
6 20°20'16.6"N 85°49'49.5"E
View

Milestone of Project Construction

Description* Scheduled date of completion Current Status Site Images
Site Development 30-11-2022 IN PROGRESS
Roof Casting NA NA NA
Ground Floor/Stilt Floor 31-03-2023 NOT STARTED NA
1 Floor 31-05-2023 NOT STARTED NA
2 Floor 31-07-2023 NOT STARTED NA
3 Floor 30-09-2023 NOT STARTED NA
4 Floor 30-11-2023 NOT STARTED NA
Brick Work & Plastering NA NA NA
Ground Floor/Stilt Floor 31-05-2023 NOT STARTED NA
1 Floor 31-07-2023 NOT STARTED NA
2 Floor 30-09-2023 NOT STARTED NA
3 Floor 30-11-2023 NOT STARTED NA
4 Floor 31-01-2024 NOT STARTED NA
Electrical Works 30-06-2024 NOT STARTED NA
Concealed Cabling including Plugs & switches 30-06-2024 NOT STARTED NA
Installation & Charging of Transformer 30-06-2024 NOT STARTED NA
Connection to Flats/Apartments 30-06-2024 NOT STARTED NA
PH works 31-12-2024 NOT STARTED NA
Laying of concealed Pipes 31-12-2024 NOT STARTED NA
PH Fittings 31-12-2024 NOT STARTED NA
Overhead Water Tanks 31-12-2024 NOT STARTED NA
Water Supply Connection to all units 31-12-2024 NOT STARTED NA
STP construction and completion 31-12-2024 NOT STARTED NA
Distempering & Colouring of all units and exteriors 28-02-2025 NOT STARTED NA
Fixation of doors and windows 30-04-2025 NOT STARTED NA
Scheduled Date of handing over possession 31-08-2025 NOT STARTED NA
Development of common areas, parks, gardens etc 31-07-2025 NOT STARTED NA
Site Development 30-11-2022 IN PROGRESS NA
NA NA NA NA
Ground Floor/Stilt Floor 31-03-2023 COMPLETED NA
1 Floor 31-05-2023 COMPLETED NA
2 Floor 31-07-2023 COMPLETED NA
3 Floor 30-09-2023 COMPLETED NA
4 Floor 30-11-2023 COMPLETED NA
NA NA NA NA
Ground Floor/Stilt Floor 31-05-2023 COMPLETED NA
1 Floor 31-07-2023 COMPLETED NA
2 Floor 30-09-2023 COMPLETED NA
3 Floor 30-11-2023 NOT STARTED NA
4 Floor 31-01-2024 NOT STARTED NA
Electrical Works 30-06-2024 NOT STARTED NA
Concealed Cabling including Plugs & switches 30-06-2024 NOT STARTED NA
Installation & Charging of Transformer 30-06-2024 NOT STARTED NA
Connection to Flats/Apartments 30-06-2024 NOT STARTED NA
PH works 31-12-2024 NOT STARTED NA
Laying of concealed Pipes 31-12-2024 NOT STARTED NA
PH Fittings 31-12-2024 NOT STARTED NA
Overhead Water Tanks 31-12-2024 NOT STARTED NA
Water Supply Connection to all units 31-12-2024 NOT STARTED NA
STP construction and completion 31-12-2024 NOT STARTED NA
Distempering & Colouring of all units and exteriors 28-02-2025 NOT STARTED NA
Fixation of doors and windows 30-04-2025 NOT STARTED NA
Scheduled Date of handing over possession 31-08-2025 NOT STARTED NA
Development of common areas, parks, gardens etc 31-07-2025 NOT STARTED NA
Site Development 30-11-2022 IN PROGRESS NA
NA 10-12-2022 IN PROGRESS NA
Ground Floor/Stilt Floor 31-03-2023 COMPLETED NA
1 Floor 31-05-2023 COMPLETED NA
2 Floor 31-07-2023 COMPLETED NA
3 Floor 30-09-2023 COMPLETED NA
4 Floor 30-11-2023 COMPLETED NA
NA 10-12-2022 COMPLETED NA
Ground Floor/Stilt Floor 31-05-2023 COMPLETED NA
1 Floor 31-07-2023 COMPLETED NA
2 Floor 30-09-2023 COMPLETED NA
3 Floor 30-11-2023 NOT STARTED NA
4 Floor 31-01-2024 NOT STARTED NA
Electrical Works 30-06-2024 NOT STARTED NA
Concealed Cabling including Plugs & switches 30-06-2024 NOT STARTED NA
Installation & Charging of Transformer 30-06-2024 NOT STARTED NA
Connection to Flats/Apartments 30-06-2024 NOT STARTED NA
PH works 31-12-2024 NOT STARTED NA
Laying of concealed Pipes 31-12-2024 NOT STARTED NA
PH Fittings 31-12-2024 NOT STARTED NA
Overhead Water Tanks 31-12-2024 NOT STARTED NA
Water Supply Connection to all units 31-12-2024 NOT STARTED NA
STP construction and completion 31-12-2024 NOT STARTED NA
Distempering & Colouring of all units and exteriors 28-02-2025 NOT STARTED NA
Fixation of doors and windows 30-04-2025 NOT STARTED NA
Scheduled Date of handing over possession 31-08-2025 NOT STARTED NA
Development of common areas, parks, gardens etc 31-07-2025 NOT STARTED NA

Category and no. of units to be developed

:  Residential
:  
:  24
:  
:  
:  
Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership
Carpet Area Balcony Area Exclusive Open Terrace Area
1 101 102.04 30.86 0 Land Owner
2 102 118.03 30.81 0 Promoter
3 103 107.34 27.94 0 Land Owner
4 104 108.46 41.40 0 Land Owner
5 105 106.60 32.49 0 Land Owner
6 106 114.59 37.09 0 Land Owner
7 201 102.04 30.86 0 Promoter
8 202 118.03 30.81 0 Promoter
9 203 107.34 27.94 0 Promoter
10 204 108.46 41.40 0 Promoter
11 205 106.60 32.49 0 Promoter
12 206 114.59 37.09 0 Promoter
13 301 102.04 30.86 0 Promoter
14 302 118.03 30.81 0 Promoter
15 303 107.34 27.94 0 Promoter
16 304 108.46 41.40 0 Promoter
17 305 106.60 32.49 0 Promoter
18 306 114.59 37.09 0 Promoter
19 401 102.04 30.86 0 Land Owner
20 402 118.03 30.81 0 Land Owner
21 403 107.34 27.94 0 Land Owner
22 404 108.46 41.40 0 Land Owner
23 405 106.60 32.49 0 Land Owner
24 406 114.59 37.09 0 Land Owner
Types of garages and parking
House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
101 Covered Parking 101 4.5X3.0 13.5 Included
102 Covered Parking 102 4.5X3.0 13.5 Included
103 Covered Parking 103 4.5X3.0 13.5 Included
104 Covered Parking 104 4.5X3.0 13.5 Included
105 Covered Parking 105 4.5X3.0 13.5 Included
106 Covered Parking 106 4.5X3.0 13.5 Included
201 Covered Parking 201 4.5X3.0 13.5 Included
202 Covered Parking 202 4.5X3.0 13.5 Included
203 Covered Parking 203 4.5X3.0 13.5 Included
204 Covered Parking 204 4.5X3.0 13.5 Included
205 Covered Parking 205 4.5X3.0 13.5 Included
206 Covered Parking 206 4.5X3.0 13.5 Included
301 Covered Parking 301 4.5X3.0 13.5 Included
302 Covered Parking 302 4.5X3.0 13.5 Included
303 Covered Parking 303 4.5X3.0 13.5 Included
304 Covered Parking 304 4.5X3.0 13.5 Included
305 Covered Parking 305 4.5X3.0 13.5 Included
306 Covered Parking 306 4.5X3.0 13.5 Included
401 Covered Parking 401 4.5X3.0 13.5 Included
402 Covered Parking 402 4.5X3.0 13.5 Included
403 Covered Parking 403 4.5X3.0 13.5 Included
404 Covered Parking 404 4.5X3.0 13.5 Included
405 Covered Parking 405 4.5X3.0 13.5 Included
406 Covered Parking 406 4.5X3.0 13.5 Included
TO BE ALLOTED ON DEMAND Covered Parking E-1 4.5X3.0 13.5 Included
TO BE ALLOTED ON DEMAND Covered Parking E-2 4.5X3.0 13.5 Included
TO BE ALLOTED ON DEMAND Covered Parking E-3 4.5X3.0 13.5 Included
TO BE ALLOTED ON DEMAND Covered Parking E-4 4.5X3.0 13.5 Included
TO BE ALLOTED ON DEMAND Covered Parking E-5 4.5X3.0 13.5 Included
TO BE ALLOTED ON DEMAND Covered Parking E-6 4.5X3.0 13.5 Included
TO BE ALLOTED ON DEMAND Covered Parking E-7 4.5X3.0 13.5 Included
Yes

Facilities to be provided

Particulars of Facilities Status of the facility Brief description of facility
Drinking Water Facility Ground Water Copy of Consent Letter
Fire Fighting Facility No
Emergency Evacuation Services Yes STAIRCASE
Use of Renewable Energy No
Lift Facility Yes 1 NO. OF LIFT OF OTIS/KONE/ETC BRAND OF 6 PASSENGER CAPACITY WITH ARD FACILITY
Market Complex No
Community Hall No
Gymnasium No
Swimming Pool No
Play Ground No
Park/Garden No
Plantation Area Yes 541.55SQM
Others(Please Specify) No
Internal Road Yes 3.70MTR WIDE & 188.7 MTR LENGTH PAVER BLOCK ROAD
External Road Yes 9.15 MTR BLACKTOP EXTERNAL ROAD ADJACENT TO PROJECT PLOT
Elecricity Supply Yes Copy of Consent Letter
Other Amenities No

Bank Particulars of the Project

  ICICI BANK
  KHANDAGIRI
  197105002661
  ICIC0001971
   View
  1207777
  9178464284

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
ALOK RANJAN SAHOO Architect PLOT NO:N1/159,IRC VILLAGEE. NAYAPALLI. BH UBANESWAR, ODISHA-751 012 PH:+91 7381051417, EMAIL: alok.dsquare@gmail.com CA/99/25512 NA
Prahallad Karan Chartered Accountant Duplex-Il Appolo Ashiyana Appartment Complex, Palasuni, Rasulgarh, Bhubaneswar,Mobile :+9937057001, E-mail:hkassociate@rediffmail.com M.NO.066621 NA
Siddharth Das Construction Engineer PLOT NO.397, 2ND FLOOR, GARAGE CHHAK, BHUBANESWAR, MOB-7978046016, EMAIL- srdesign2014@gmail.com REGD. NO.RTP/DTP(ST.ER)-183/2019 NA

Financial Details

:  903.92757 :   View
  15-07-2025 :  200
:  703.92757 :  0

Documents Attached

Description of Document Option Documents
Fire Safety Certificate Undertaking Attached
Affidavit in Form-A as per clause-l of sub-section-2 of section-4 of the Act Yes Attached
Allotment letter format Yes Attached
Conveyance Deed Format Yes Attached
Affidavit to adopt agreement for sale format as per Rule-8(1) of ORE (R and D) Rules, 2017 Yes Attached
Annual Report 2020-21 Attached
Annual Report 2021-22 Attached
Annual Report 2022-23 Attached
IT Return 2020-21 Attached
IT Return 2021-22 Attached
IT Return 2022-23 Attached
Audit Report 2020-21 Attached
Audit Report 2021-22 Attached
Audit Report 2022-23 Attached


Other documents

“I undertake that the information submitted by me in this application are correct and true to best my knowledge. I also understand that providing false or wrong information is punishable under the Section-60 of the Real Estate (Regulation & Development) Act, 2016. I also further understand that furnishing wrong or false information will lead to rejection of my application registration of the project with forfeiture of registration fee and other charges deposited by me.”
  

Construction Progress

Updated Construction Progress

SL NO. Description Scheduled date of completion Current Status Remarks
1 Site Development 30-11-2022 IN PROGRESS
2 Roof Casting NA NA NA
3 Ground Floor/Stilt Floor 31-03-2023 NOT STARTED NA
4 1 Floor 31-05-2023 NOT STARTED NA
5 2 Floor 31-07-2023 NOT STARTED NA
6 3 Floor 30-09-2023 NOT STARTED NA
7 4 Floor 30-11-2023 NOT STARTED NA
8 Brick Work & Plastering NA NA NA
9 Ground Floor/Stilt Floor 31-05-2023 NOT STARTED NA
10 1 Floor 31-07-2023 NOT STARTED NA
11 2 Floor 30-09-2023 NOT STARTED NA
12 3 Floor 30-11-2023 NOT STARTED NA
13 4 Floor 31-01-2024 NOT STARTED NA
14 Electrical Works 30-06-2024 NOT STARTED NA
15 Concealed Cabling including Plugs & switches 30-06-2024 NOT STARTED NA
16 Installation & Charging of Transformer 30-06-2024 NOT STARTED NA
17 Connection to Flats/Apartments 30-06-2024 NOT STARTED NA
18 PH works 31-12-2024 NOT STARTED NA
19 Laying of concealed Pipes 31-12-2024 NOT STARTED NA
20 PH Fittings 31-12-2024 NOT STARTED NA
21 Overhead Water Tanks 31-12-2024 NOT STARTED NA
22 Water Supply Connection to all units 31-12-2024 NOT STARTED NA
23 STP construction and completion 31-12-2024 NOT STARTED NA
24 Distempering & Colouring of all units and exteriors 28-02-2025 NOT STARTED NA
25 Fixation of doors and windows 30-04-2025 NOT STARTED NA
26 Scheduled Date of handing over possession 31-08-2025 NOT STARTED NA
27 Development of common areas, parks, gardens etc 31-07-2025 NOT STARTED NA
Updated Changes on 15-01-2024
28 Site Development 30-11-2022 IN PROGRESS NA
29 NA NA NA NA
30 Ground Floor/Stilt Floor 31-03-2023 COMPLETED NA
31 1 Floor 31-05-2023 COMPLETED NA
32 2 Floor 31-07-2023 COMPLETED NA
33 3 Floor 30-09-2023 COMPLETED NA
34 4 Floor 30-11-2023 COMPLETED NA
35 NA NA NA NA
36 Ground Floor/Stilt Floor 31-05-2023 COMPLETED NA
37 1 Floor 31-07-2023 COMPLETED NA
38 2 Floor 30-09-2023 COMPLETED NA
39 3 Floor 30-11-2023 NOT STARTED NA
40 4 Floor 31-01-2024 NOT STARTED NA
41 Electrical Works 30-06-2024 NOT STARTED NA
42 Concealed Cabling including Plugs & switches 30-06-2024 NOT STARTED NA
43 Installation & Charging of Transformer 30-06-2024 NOT STARTED NA
44 Connection to Flats/Apartments 30-06-2024 NOT STARTED NA
45 PH works 31-12-2024 NOT STARTED NA
46 Laying of concealed Pipes 31-12-2024 NOT STARTED NA
47 PH Fittings 31-12-2024 NOT STARTED NA
48 Overhead Water Tanks 31-12-2024 NOT STARTED NA
49 Water Supply Connection to all units 31-12-2024 NOT STARTED NA
50 STP construction and completion 31-12-2024 NOT STARTED NA
51 Distempering & Colouring of all units and exteriors 28-02-2025 NOT STARTED NA
52 Fixation of doors and windows 30-04-2025 NOT STARTED NA
53 Scheduled Date of handing over possession 31-08-2025 NOT STARTED NA
54 Development of common areas, parks, gardens etc 31-07-2025 NOT STARTED NA
Updated Changes on 16-04-2024
55 Site Development 30-11-2022 IN PROGRESS NA
56 NA 10-12-2022 IN PROGRESS NA
57 Ground Floor/Stilt Floor 31-03-2023 COMPLETED NA
58 1 Floor 31-05-2023 COMPLETED NA
59 2 Floor 31-07-2023 COMPLETED NA
60 3 Floor 30-09-2023 COMPLETED NA
61 4 Floor 30-11-2023 COMPLETED NA
62 NA 10-12-2022 COMPLETED NA
63 Ground Floor/Stilt Floor 31-05-2023 COMPLETED NA
64 1 Floor 31-07-2023 COMPLETED NA
65 2 Floor 30-09-2023 COMPLETED NA
66 3 Floor 30-11-2023 NOT STARTED NA
67 4 Floor 31-01-2024 NOT STARTED NA
68 Electrical Works 30-06-2024 NOT STARTED NA
69 Concealed Cabling including Plugs & switches 30-06-2024 NOT STARTED NA
70 Installation & Charging of Transformer 30-06-2024 NOT STARTED NA
71 Connection to Flats/Apartments 30-06-2024 NOT STARTED NA
72 PH works 31-12-2024 NOT STARTED NA
73 Laying of concealed Pipes 31-12-2024 NOT STARTED NA
74 PH Fittings 31-12-2024 NOT STARTED NA
75 Overhead Water Tanks 31-12-2024 NOT STARTED NA
76 Water Supply Connection to all units 31-12-2024 NOT STARTED NA
77 STP construction and completion 31-12-2024 NOT STARTED NA
78 Distempering & Colouring of all units and exteriors 28-02-2025 NOT STARTED NA
79 Fixation of doors and windows 30-04-2025 NOT STARTED NA
80 Scheduled Date of handing over possession 31-08-2025 NOT STARTED NA
81 Development of common areas, parks, gardens etc 31-07-2025 NOT STARTED NA

Booking Status

Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership Status
Carpet Area Balcony Area Exclusive Open Terrace Area
1 101 102.04 30.86 0 Land Owner
2 102 118.03 30.81 0 Promoter
3 103 107.34 27.94 0 Land Owner
4 104 108.46 41.40 0 Land Owner
5 105 106.60 32.49 0 Land Owner
6 106 114.59 37.09 0 Land Owner
7 201 102.04 30.86 0 Promoter
8 202 118.03 30.81 0 Promoter
9 203 107.34 27.94 0 Promoter
10 204 108.46 41.40 0 Promoter
11 205 106.60 32.49 0 Promoter
12 206 114.59 37.09 0 Promoter
13 301 102.04 30.86 0 Promoter
14 302 118.03 30.81 0 Promoter
15 303 107.34 27.94 0 Promoter
16 304 108.46 41.40 0 Promoter
17 305 106.60 32.49 0 Promoter
18 306 114.59 37.09 0 Promoter
19 401 102.04 30.86 0 Land Owner
20 402 118.03 30.81 0 Land Owner
21 403 107.34 27.94 0 Land Owner
22 404 108.46 41.40 0 Land Owner
23 405 106.60 32.49 0 Land Owner
24 406 114.59 37.09 0 Land Owner

Financial Status

SL No. Funds Collected from the Allottees Funds Borrowed from Financial Institutions Funds Employed from Own Sources Expenditure As On Date Status
1 0 0 27586237 27586237 31-12-2023 UNDER CONSTUCTION
2 50000 0 34511515 33727237 31-03-2024 UNDER PROGRESS

Updated Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 Parking space measuring 1089.67 Sqm as shown in the approved plan shall be left forparking of vehicles and no part of it will be used for any other purpose and shall not bepartitioned/closed in any manner. 15-07-2025 NOT STARTED
2 The land over which construction is proposed is accessible by an approved means ofaccess of 9.15 M (Nine point One Five) in width. 15-07-2025 NOT STARTED
3 the site/area liable to flooding as a result of not taking proper drainage arrangement asper the natural lay of the land, etc and 15-07-2025 NOT STARTED
4 Other requirements or licenses or clearances required to be obtained for the site /premisesor activity under various other laws. 15-07-2025 NOT STARTED
5 Obtain, wherever applicable, from the competent Authority permissions/clearancerequired in connection with the proposed work 15-07-2025 NOT STARTED
6 Obtain an Occupancy Certificate from the Authority prior to occupation of building infull or part. 15-07-2025 NOT STARTED
7 Register the said Apartment project over scheduled property under the Real Estate(Regulation & Development)-Act-2016. 15-07-2025 NOT STARTED
8 Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force, records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the Authority. 15-07-2025 NOT STARTED
9 The persons to whom a permit is issued during construction shall keep pasted in a conspicuous place on the property in respect of which the permit was issued; 15-07-2025 NOT STARTED
10 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per ODA (Planning & Building Standards) Rules, 2020. 15-07-2025 NOT STARTED
11 Plantation as required under the provision under Rule 30 of ODA (Planning & Building Standards) Rules, 2020.shall be strictly adhered. 15-07-2025 NOT STARTED
12 The Owner/ Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any earthquake/cyclone/any other natural disaster, structural/construction defects. Authority will be no way be held responsible for the same in what so ever manner. 15-07-2025 NOT STARTED
13 The applicant shall obtain EIDP towards development of Infrastructure & clearance from Engineering Wing of BMC before obtaining Occupancy CerTIFICATE. 15-07-2025 NOT STARTED
Updated Changes on 15-01-2024
14 Parking space measuring 1089.67 Sqm as shown in the approved plan shall be left forparking of vehicles and no part of it will be used for any other purpose and shall not bepartitioned/closed in any manner. 15-07-2025 NOT STARTED
15 The land over which construction is proposed is accessible by an approved means ofaccess of 9.15 M (Nine point One Five) in width. 15-07-2025 COMPLETED
16 the site/area liable to flooding as a result of not taking proper drainage arrangement asper the natural lay of the land, etc and 15-07-2025 NOT STARTED
17 Other requirements or licenses or clearances required to be obtained for the site /premisesor activity under various other laws. 15-07-2025 COMPLY AS PER APPROVAL
18 Obtain, wherever applicable, from the competent Authority permissions/clearancerequired in connection with the proposed work 15-07-2025 NOT STARTED
19 Obtain an Occupancy Certificate from the Authority prior to occupation of building infull or part. 15-07-2025 NOT STARTED
20 Register the said Apartment project over scheduled property under the Real Estate(Regulation & Development)-Act-2016. 15-07-2025 COMPLETED
21 Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force, records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the Authority. 15-07-2025 COMPLY AS PER APPROVAL
22 The persons to whom a permit is issued during construction shall keep pasted in a conspicuous place on the property in respect of which the permit was issued; 15-07-2025 NOT STARTED
23 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per ODA (Planning & Building Standards) Rules, 2020. 15-07-2025 NOT STARTED
24 Plantation as required under the provision under Rule 30 of ODA (Planning & Building Standards) Rules, 2020.shall be strictly adhered. 15-07-2025 NOT STARTED
25 The Owner/ Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any earthquake/cyclone/any other natural disaster, structural/construction defects. Authority will be no way be held responsible for the same in what so ever manner. 15-07-2025 NOT STARTED
26 The applicant shall obtain EIDP towards development of Infrastructure & clearance from Engineering Wing of BMC before obtaining Occupancy CerTIFICATE. 15-07-2025 NOT STARTED
Updated Changes on 16-04-2024
27 Parking space measuring 1089.67 Sqm as shown in the approved plan shall be left forparking of vehicles and no part of it will be used for any other purpose and shall not bepartitioned/closed in any manner. 15-07-2025 NOT STARTED
28 The land over which construction is proposed is accessible by an approved means ofaccess of 9.15 M (Nine point One Five) in width. 15-07-2025 COMPLETED
29 the site/area liable to flooding as a result of not taking proper drainage arrangement asper the natural lay of the land, etc and 15-07-2025 NOT STARTED
30 Other requirements or licenses or clearances required to be obtained for the site /premisesor activity under various other laws. 15-07-2025 COMPLY AS PER APPROVAL
31 Obtain, wherever applicable, from the competent Authority permissions/clearancerequired in connection with the proposed work 15-07-2025 NOT STARTED
32 Obtain an Occupancy Certificate from the Authority prior to occupation of building infull or part. 15-07-2025 NOT STARTED
33 Register the said Apartment project over scheduled property under the Real Estate(Regulation & Development)-Act-2016. 15-07-2025 COMPLETED
34 Wherever tests of any material are made to ensure conformity of the requirements of the regulations in force, records of the test data shall be kept available for inspection during the construction of building and for such period thereafter as required by the Authority. 15-07-2025 COMPLY AS PER APPROVAL
35 The persons to whom a permit is issued during construction shall keep pasted in a conspicuous place on the property in respect of which the permit was issued; 15-07-2025 NOT STARTED
36 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per ODA (Planning & Building Standards) Rules, 2020. 15-07-2025 NOT STARTED
37 Plantation as required under the provision under Rule 30 of ODA (Planning & Building Standards) Rules, 2020.shall be strictly adhered. 15-07-2025 NOT STARTED
38 The Owner/ Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any earthquake/cyclone/any other natural disaster, structural/construction defects. Authority will be no way be held responsible for the same in what so ever manner. 15-07-2025 NOT STARTED
39 The applicant shall obtain EIDP towards development of Infrastructure & clearance from Engineering Wing of BMC before obtaining Occupancy CerTIFICATE. 15-07-2025 NOT STARTED

Updated Project Documents

Sl. No. Title of the document Upload Document
1 PROFORMA-I AND II (OCT,2022 - DEC,2022)
2 PROFORMA-I AND II (APR,2023 - JUN,2023)
3 PROFORMA-I AND II (JUL,2023 - SEPT,2023)
4 PROFORMA-I AND II (OCT,2023 - DEC,2023)
5 PROFORMA-III (FY-2022-23)
6 BANK STATEMENT FROM OCT,2022 TO DEC, 2023
7 REQUEST LETTER
8 PROFORMA-I ( JANUARY-MARCH-2024 )
9 PROFORMA-II ( JANUARY-MARCH-2024 )
:  SHAMBHUNATH PATI :  
NA :  ADYPP5392D
:PAN Card :  MAIL2SNPATI@GMAIL.COM
:  M.Com LLB :  9937199010
:  10 YEARS OF EXPERIENCE
:  Yes :  NA
:  TUSHAR KANTI SAHU :  
NA :  ACDPS6334G
:PAN Card :  tushar_sahu@rediffmail.com
:  B.Sc(Hons), MBA :  9968605508
:  12 YEARS OF EXPERIENCE
:  Yes :  NA
:  JAYASHREE SAHU :  
NA :  AHQPS2803Q
:PAN Card :  thisisjayashreesahu@gmail.com
:  BA :  9178592738
:  8 YEARS OF EXPERIENCE
:  Yes :  NA

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
ALOK RANJAN SAHOO Architect PLOT NO:N1/159,IRC VILLAGEE. NAYAPALLI. BH UBANESWAR, ODISHA-751 012 PH:+91 7381051417, EMAIL: alok.dsquare@gmail.com CA/99/25512 NA
Prahallad Karan Chartered Accountant Duplex-Il Appolo Ashiyana Appartment Complex, Palasuni, Rasulgarh, Bhubaneswar,Mobile :+9937057001, E-mail:hkassociate@rediffmail.com M.NO.066621 NA
Siddharth Das Construction Engineer PLOT NO.397, 2ND FLOOR, GARAGE CHHAK, BHUBANESWAR, MOB-7978046016, EMAIL- srdesign2014@gmail.com REGD. NO.RTP/DTP(ST.ER)-183/2019 NA

Updated Units

House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
Updated Changes
101 Covered Parking 101 4.5X3.0 13.5 Included
102 Covered Parking 102 4.5X3.0 13.5 Included
103 Covered Parking 103 4.5X3.0 13.5 Included
104 Covered Parking 104 4.5X3.0 13.5 Included
105 Covered Parking 105 4.5X3.0 13.5 Included
106 Covered Parking 106 4.5X3.0 13.5 Included
201 Covered Parking 201 4.5X3.0 13.5 Included
202 Covered Parking 202 4.5X3.0 13.5 Included
203 Covered Parking 203 4.5X3.0 13.5 Included
204 Covered Parking 204 4.5X3.0 13.5 Included
205 Covered Parking 205 4.5X3.0 13.5 Included
206 Covered Parking 206 4.5X3.0 13.5 Included
301 Covered Parking 301 4.5X3.0 13.5 Included
302 Covered Parking 302 4.5X3.0 13.5 Included
303 Covered Parking 303 4.5X3.0 13.5 Included
304 Covered Parking 304 4.5X3.0 13.5 Included
305 Covered Parking 305 4.5X3.0 13.5 Included
306 Covered Parking 306 4.5X3.0 13.5 Included
401 Covered Parking 401 4.5X3.0 13.5 Included
402 Covered Parking 402 4.5X3.0 13.5 Included
403 Covered Parking 403 4.5X3.0 13.5 Included
404 Covered Parking 404 4.5X3.0 13.5 Included
405 Covered Parking 405 4.5X3.0 13.5 Included
406 Covered Parking 406 4.5X3.0 13.5 Included
TO BE ALLOTED ON DEMAND Covered Parking E-1 4.5X3.0 13.5 Included
TO BE ALLOTED ON DEMAND Covered Parking E-2 4.5X3.0 13.5 Included
TO BE ALLOTED ON DEMAND Covered Parking E-3 4.5X3.0 13.5 Included
TO BE ALLOTED ON DEMAND Covered Parking E-4 4.5X3.0 13.5 Included
TO BE ALLOTED ON DEMAND Covered Parking E-5 4.5X3.0 13.5 Included
TO BE ALLOTED ON DEMAND Covered Parking E-6 4.5X3.0 13.5 Included
TO BE ALLOTED ON DEMAND Covered Parking E-7 4.5X3.0 13.5 Included