Generated by pacms.orera.in on date: 2024-07-22

Promoter Details
Promoter Name :
Sova Rani Pradhan
Project Name :
ISALI TOWER
Project Location :
( Residential Project, S+G+3, No. of Units- 16 )

Form- I

A. Promoter's Details

:  M/s. Isalicare Estates and Health Pvt. Ltd. :  Private Company
:  U45400OR2018PTC029815 :View
NA :  Nilakantha Nagar, 1st Lane, Gosaninuagaon , Berhampur, Pin - 760003, Dist - Ganjam, State – Odisha
:  Nilakantha Nagar, 1st Lane, Gosaninuagaon, Berhampur, Dist- Ganjam, Odisha- 760003. :  alishapradhan626@gmail.com
:  8917280313
:  AAFCI0552B :View
:  4 YEARS OF EXPERIENCE :  NO
NA

B. Details of Board of Directors / Partners / MC Members

:  Sova Rani Pradhan :  
:  Managing Director :  AKTPP7655F
:PAN Card :  sovaranipradhan@gmail.com
:  Graduate :  8917280313
:  5 years in real estate
:  Yes :  NA
:  SUREN KUMAR PRADHAN :  
:  Director :  BVQPP7562J
:PAN Card :  surenkumarpradhan8@gmail.com
:  Post Graduate :  8249340541
:  10 years experience in real estate
:  Yes :  NA

Annexure-1

Details of last projects already implemented (Ongoing or Complete)

Have you implemented any project(s) previously (May be Ongoing or Completed):No

Annexure-2

Details of the project to be registered

:   New :  ISALI TOWER
:  Residential :  ( Residential Project, S+G+3, No. of Units- 16 )
:  Ganjam :  Berhampur MC
:  760001 :  Development Authority
:  BERHAMPUR DEVELOPMENT AUTHORITY
:  S+G+3 RESIDENTIAL APARTMENT :  NA

Land Details of the Project


:  1212/10701 :  495/5002
:  LOCHAPADA :  429
:  Yes
No :  View
:  View :  View
:  Other Person
:  SANTOSH KUMAR TRIPATHY :  THE LAND OWNER HAS EXECUTED DEVELOPMENT AGREEMENT WITH THE PROMOTER AND THE PROMOTER IS THE REGISTERED GPA HOLDER OVER THE LAND BEARING PLOT NO.1212/10701 KHATA NO.495/5002
: No
: Yes
:  10612200918 :  07-02-2022
:  SUB-REGISTRAR, BERHAMPUR-I :  Attached

:  1213/13292 :  495/5126
:  LOCHAPADA :  194
:  Yes
No :  View
:  View :  View
:  Other Person
:  SANTOSH KUMAR TRIPATHY :  THE LAND OWNER HAS EXECUTED DEVELOPMENT AGREEMENT WITH THE PROMOTER AND THE PROMOTER IS THE REGISTERED GPA HOLDER OVER THE LAND BEARING PLOT NO.1213/13292 KHATA NO.495/5126
: No
: Yes
:  10612200918 :  07-02-2022
:  SUB-REGISTRAR, BERHAMPUR-I :  Attached

Development Agreement

: Yes
Serial No. Particulars of the Person Land/Plot Details Share of the Person Document Attached
1 SANTOSH KUMAR TRIPATHY PLOT NO.1212/10701 KHATA NO.495/5002 & PLOT NO.1213/13292 KHATA NO.495/5126 40%   Agreement Copy

Building Plan

  View   View
  Download site plan 18-01-2025

Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 Parking space measuring 426.22 sqm as shown in the approved plan shall be strictly adhered. 19-06-2022 NOT STARTED
2 The land over which construction is proposed is accessble by an approved means of access of 9.75 mtr and 12.19 mtr width. 19-06-2022 NOT STARTED
3 10% of the land shall be utilized for plantation. 19-06-2022 NOT STARTED
4 The permittee shall keep the BDA brahmapur informed in writing at least one week before starting construction as per regulation No.16 of BDA Planning and Building (Standards) Regulations. 19-06-2022 NOT STARTED
5 The conditions relating to development of roads and drains shall be complied first before start of the project as suggested by block development officer, kukudahandi vide letter No.437 dated 19.8.2018 and as per affidavit dtd.07.11.2021. 19-06-2022 NOT STARTED
6 For safe discharge of effluent an inverted filter of adequate size is to be constructed and treated effluent BOD5 at 20C should be less than 30mg/l only be disposed to municipal drain to avoid contamination of sub-soil water and for proper drainage and sanitation the condtions imposed by block development officer, kukudahandi vide letter No.437 dated 19.8.2018 and as per affidavit dtd.07.11.2021 are to be strictly adhered for drainage of waste water generated by the occupants of the apartment. 19-06-2022 NOT STARTED
7 Fire safety measures and arrangement as per recommendations of the Fire officer, brahmapur circle, brahmapur are to be strictly followed. 19-06-2022 NOT STARTED
8 The conditions imposed and communicated by the executive engineer, RWSS division brahmapur vide letter No.2642 dtd 31.8.2018 as per affidavit dtd 07.11.2021 are to be followed to cater the domestic requirements of the occupants and sanitation of the proposed apartment. 19-06-2022 NOT STARTED
9 The promoter shall obtain necessary permission from the SOUTHCO regarding safety for electrical installation and connection. 19-06-2022 NOT STARTED
10 The applicant shall not occupy or permit to occupy the building or permit to use the building or any part thereof until completion certificate is submitted to this authority as per section-20 of the ODA Act and the Regulations. 19-06-2022 NOT STARTED
11 This authority shall stand indemnified and kept harmless against all proceeding in any court of before any authorities and all expenses/ losses claims which this authority may incur or become liable to pay as a result or in consequence thereof. 19-06-2022 NOT STARTED
12 Adequate safety measures shall be adopted for treatment and disposal of septic tank effluent under no circumstances untreated night soil shall be discharged into the drains inverted filters. If necessary shall be constructed and the effluent from the septic tank/soak pit shall flow through them to ensure reduction of contaminant level to the standards fixed by OPCB and CPCB before discharge into the drains. 19-06-2022 NOT STARTED
13 The developer shall make own arrangement for supply of drinking water shall not insist upon PHED for providing water from the city water supply system. 19-06-2022 NOT STARTED
14 The developer will be responsible for ensuring uninterrupted water supply to inmates and the BDA authority is no responsible on this front. 19-06-2022 NOT STARTED
15 The residential building shall not be occupied without obtaining occupancy certificate of BDA as required under building regulations. 19-06-2022 NOT STARTED
16 The set back as indicated in the building plain shall be strictly adhered. 19-06-2022 NOT STARTED
17 The space meant for parking shall not be changed to any other use and shall not be partitioned closed in any manner. 19-06-2022 NOT STARTED
18 20% area of parking space shall be earmarked for visitors. 19-06-2022 NOT STARTED
19 He has to construct garbage storage bin not less than 100sqm within his premises for smooth management of solid waste. 19-06-2022 NOT STARTED
20 The developer has to construct roof rain water harvesting structure @6 cum for 100 sqm of terrace area. 19-06-2022 NOT STARTED

Layout Plan

: Yes :  View

Location Map with geo-coordinates of bend points

Point No. Latitude Longitude
1 19°19'16.7"N 84°48'18.4"E
2 19°19'17.5"N 84°48'18.5"E
3 19°19'17.4"N 84°48'19.4"E
4 19°19'16.6"N 84°48'19.2"E
View

Milestone of Project Construction

Description* Scheduled date of completion Current Status Site Images
Site Development 31-03-2022 IN PROGRESS
Roof Casting NA NA NA
Ground Floor/Stilt Floor 31-07-2022 IN PROGRESS
1 Floor 31-10-2022 NOT STARTED NA
2 Floor 31-01-2023 NOT STARTED NA
3 Floor 30-04-2023 NOT STARTED NA
Brick Work & Plastering NA NA NA
Ground Floor/Stilt Floor 30-04-2023 NOT STARTED NA
1 Floor 30-06-2023 NOT STARTED NA
2 Floor 31-08-2023 NOT STARTED NA
3 Floor 31-10-2023 NOT STARTED NA
Electrical Works 31-03-2024 NOT STARTED NA
Concealed Cabling including Plugs & switches 31-03-2024 NOT STARTED NA
Installation & Charging of Transformer 31-03-2024 NOT STARTED NA
Connection to Flats/Apartments 31-03-2024 NOT STARTED NA
PH works 30-06-2024 NOT STARTED NA
Laying of concealed Pipes 30-06-2024 NOT STARTED NA
PH Fittings 30-06-2024 NOT STARTED NA
Overhead Water Tanks 30-06-2024 NOT STARTED NA
Water Supply Connection to all units 30-06-2024 NOT STARTED NA
STP construction and completion 30-06-2024 NOT STARTED NA
Distempering & Colouring of all units and exteriors 31-08-2024 NOT STARTED NA
Fixation of doors and windows 31-10-2024 NOT STARTED NA
Scheduled Date of handing over possession 31-01-2025 NOT STARTED NA
Development of common areas, parks, gardens etc 31-12-2024 NOT STARTED NA
Site Development 31-03-2022 IN PROGRESS NA
NA NA NA NA
Ground Floor/Stilt Floor 31-07-2022 COMPLETED NA
1 Floor 31-10-2022 COMPLETED NA
2 Floor 31-01-2023 COMPLETED NA
3 Floor 30-04-2023 COMPLETED NA
NA NA NA NA
Ground Floor/Stilt Floor 30-04-2023 COMPLETED NA
1 Floor 30-06-2023 COMPLETED NA
2 Floor 31-08-2023 COMPLETED NA
3 Floor 31-10-2023 COMPLETED NA
Electrical Works 31-03-2024 IN PROGRESS NA
Concealed Cabling including Plugs & switches 31-03-2024 COMPLETED NA
Installation & Charging of Transformer 31-03-2024 NA NA
Connection to Flats/Apartments 31-03-2024 IN PROGRESS NA
PH works 30-06-2024 IN PROGRESS NA
Laying of concealed Pipes 30-06-2024 COMPLETED NA
PH Fittings 30-06-2024 COMPLETED NA
Overhead Water Tanks 30-06-2024 COMPLETED NA
Water Supply Connection to all units 30-06-2024 COMPLETED NA
STP construction and completion 30-06-2024 IN PROGRESS NA
Distempering & Colouring of all units and exteriors 31-08-2024 COMPLETED NA
Fixation of doors and windows 31-10-2024 COMPLETED NA
Scheduled Date of handing over possession 31-01-2025 NOT STARTED NA
Development of common areas, parks, gardens etc 31-12-2024 IN PROGRESS NA
Site Development 31-03-2022 COMPLETED NA
NA NA NA NA
Ground Floor/Stilt Floor 31-07-2022 COMPLETED NA
1 Floor 31-10-2022 COMPLETED NA
2 Floor 31-01-2023 COMPLETED NA
3 Floor 30-04-2023 COMPLETED NA
NA NA NA NA
Ground Floor/Stilt Floor 30-04-2023 COMPLETED NA
1 Floor 30-06-2023 COMPLETED NA
2 Floor 31-08-2023 COMPLETED NA
3 Floor 31-10-2023 COMPLETED NA
Electrical Works 31-03-2024 COMPLETED NA
Concealed Cabling including Plugs & switches 31-03-2024 COMPLETED NA
Installation & Charging of Transformer 31-03-2024 NA NA
Connection to Flats/Apartments 31-03-2024 COMPLETED NA
PH works 30-06-2024 COMPLETED NA
Laying of concealed Pipes 30-06-2024 COMPLETED NA
PH Fittings 30-06-2024 COMPLETED NA
Overhead Water Tanks 30-06-2024 COMPLETED NA
Water Supply Connection to all units 30-06-2024 COMPLETED NA
STP construction and completion 30-06-2024 COMPLETED NA
Distempering & Colouring of all units and exteriors 31-08-2024 COMPLETED NA
Fixation of doors and windows 31-10-2024 COMPLETED NA
Scheduled Date of handing over possession 31-01-2025 NOT STARTED NA
Development of common areas, parks, gardens etc 31-12-2024 IN PROGRESS NA

Category and no. of units to be developed

:  Residential
:  
:  16
:  
:  
:  
Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership
Carpet Area Balcony Area Exclusive Open Terrace Area
1 101 84.33 6.70 0 Promoter
2 102 90.64 7.65 0 Land Owner
3 103 66.28 5.87 0 Promoter
4 104 65.17 4.87 0 Promoter
5 201 84.33 6.70 0 Promoter
6 202 90.64 7.65 0 Land Owner
7 203 66.28 5.87 0 Land Owner
8 204 65.17 4.87 0 Promoter
9 301 84.33 6.70 0 Promoter
10 302 90.64 7.65 0 Land Owner
11 303 66.28 5.87 0 Promoter
12 304 65.17 4.87 0 Promoter
13 401 84.33 6.70 0 Promoter
14 402 90.64 7.65 0 Land Owner
15 403 66.28 5.87 0 Promoter
16 404 65.17 4.87 0 Land Owner
Types of garages and parking
House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
101 Covered Parking 101 5.5Mx3.5M 19.25 sqm Included
102 Covered Parking 102 5.5Mx3.5M 19.25 sqm Included
103 Covered Parking 103 5.5Mx3.5M 19.25 sqm Included
104 Covered Parking 104 5.5Mx3.5M 19.25 sqm Included
201 Covered Parking 201 5.5Mx3.5M 19.25 sqm Included
202 Covered Parking 202 5.5Mx3.5M 19.25 sqm Included
203 Covered Parking 203 5.5Mx3.5M 19.25 sqm Included
204 Covered Parking 204 5.5Mx3.5M 19.25 sqm Included
301 Covered Parking 301 5.5Mx3.5M 19.25 sqm Included
302 Covered Parking 302 5.5Mx3.5M 19.25 sqm Included
303 Covered Parking 303 5.5Mx3.5M 19.25 sqm Included
304 Covered Parking 304 5.5Mx3.5M 19.25 sqm Included
401 Covered Parking 401 5.5Mx3.5M 19.25 sqm Included
402 Covered Parking 402 5.5Mx3.5M 19.25 sqm Included
403 Covered Parking 403 5.5Mx3.5M 19.25 sqm Included
404 Covered Parking 404 5.5Mx3.5M 19.25 sqm Included
Yes

Facilities to be provided

Particulars of Facilities Status of the facility Brief description of facility
Drinking Water Facility Ground Water Copy of Consent Letter
Fire Fighting Facility Yes Staircase, Fire Extinguisher, Sprinkler
Emergency Evacuation Services Yes Staircase
Use of Renewable Energy No
Lift Facility Yes 1 No. of lift of RIDE LIFTS/KONE/ETC. brand with 4 passenger capacity with ARD facility
Market Complex No
Community Hall Yes 15.89 SQM COMMUNITY HALL WITH TILE FLOORING AND FAN
Gymnasium No
Swimming Pool No
Play Ground No
Park/Garden No
Plantation Area Yes 62.7 SQM
Others(Please Specify) No
Internal Road Yes 2.9 mtr width & 66 mtr length internal road with paver block
External Road Yes 9.14 mtr wide road adjacent to project plot which is of blacktop specification
Elecricity Supply Yes Copy of Consent Letter
Other Amenities No

Bank Particulars of the Project

  UNION BANK OF INDIA
  BERHAMPUR GIRI ROAD BRANCH
  083921010000073
  UBIN0908398
   View
  2233325
  9059473003

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
BIROJA PRASAD PATRA Architect GANDHI NAGAR, 2ND LANE, BERHAMPUR-II, GANJAM, MOB-9861878632, EMAIL-birojapatra@yahoo.co.in REGD.NO.-M118959/4 NA
SURESH KUMAR SISTA Construction Engineer GANDHI NAGAR, 5TH LANE, BERHAMPUR-II, GANJAM, MOB-9437322869, EMAIL-suresh_sista@yahoo.co.in RTP/DTP(C.ER)/003/2017 NA
RAJ KIRAN PADHI Chartered Accountant AYODHYA NAGAR, 3RD LANE, BERHAMPUR, GANJAM-10, MOB-9439634428, EMAIL-carajkiran@gmail.com M.NO.302196 NA

Financial Details

:  360 :   View
  18-01-2026 :  100
:  260 :  0

Documents Attached

Description of Document Option Documents
Fire Safety Certificate Undertaking Attached
Affidavit in Form-A as per clause-l of sub-section-2 of section-4 of the Act Yes Attached
Allotment letter format Yes Attached
Conveyance Deed Format Yes Attached
Affidavit to adopt agreement for sale format as per Rule-8(1) of ORE (R and D) Rules, 2017 Yes Attached
Annual Report 2021-22 Attached
Annual Report 2020-21 Attached
Annual Report 2022-23 Attached
IT Return 2022-23 Attached
IT Return 2020-21 Attached
IT Return 2021-22 Attached
Audit Report 2022-23 Attached
Audit Report 2020-21 Attached
Audit Report 2021-22 Attached

Additional Documents Attached

Sl. No. Title of the document Upload Document
1 Board Resolution Letter

Other documents

“I undertake that the information submitted by me in this application are correct and true to best my knowledge. I also understand that providing false or wrong information is punishable under the Section-60 of the Real Estate (Regulation & Development) Act, 2016. I also further understand that furnishing wrong or false information will lead to rejection of my application registration of the project with forfeiture of registration fee and other charges deposited by me.”
  

Construction Progress

Updated Construction Progress

SL NO. Description Scheduled date of completion Current Status Remarks
1 Site Development 31-03-2022 IN PROGRESS
2 Roof Casting NA NA NA
3 Ground Floor/Stilt Floor 31-07-2022 IN PROGRESS
4 1 Floor 31-10-2022 NOT STARTED NA
5 2 Floor 31-01-2023 NOT STARTED NA
6 3 Floor 30-04-2023 NOT STARTED NA
7 Brick Work & Plastering NA NA NA
8 Ground Floor/Stilt Floor 30-04-2023 NOT STARTED NA
9 1 Floor 30-06-2023 NOT STARTED NA
10 2 Floor 31-08-2023 NOT STARTED NA
11 3 Floor 31-10-2023 NOT STARTED NA
12 Electrical Works 31-03-2024 NOT STARTED NA
13 Concealed Cabling including Plugs & switches 31-03-2024 NOT STARTED NA
14 Installation & Charging of Transformer 31-03-2024 NOT STARTED NA
15 Connection to Flats/Apartments 31-03-2024 NOT STARTED NA
16 PH works 30-06-2024 NOT STARTED NA
17 Laying of concealed Pipes 30-06-2024 NOT STARTED NA
18 PH Fittings 30-06-2024 NOT STARTED NA
19 Overhead Water Tanks 30-06-2024 NOT STARTED NA
20 Water Supply Connection to all units 30-06-2024 NOT STARTED NA
21 STP construction and completion 30-06-2024 NOT STARTED NA
22 Distempering & Colouring of all units and exteriors 31-08-2024 NOT STARTED NA
23 Fixation of doors and windows 31-10-2024 NOT STARTED NA
24 Scheduled Date of handing over possession 31-01-2025 NOT STARTED NA
25 Development of common areas, parks, gardens etc 31-12-2024 NOT STARTED NA
Updated Changes on 24-02-2024
26 Site Development 31-03-2022 IN PROGRESS NA
27 NA NA NA NA
28 Ground Floor/Stilt Floor 31-07-2022 COMPLETED NA
29 1 Floor 31-10-2022 COMPLETED NA
30 2 Floor 31-01-2023 COMPLETED NA
31 3 Floor 30-04-2023 COMPLETED NA
32 NA NA NA NA
33 Ground Floor/Stilt Floor 30-04-2023 COMPLETED NA
34 1 Floor 30-06-2023 COMPLETED NA
35 2 Floor 31-08-2023 COMPLETED NA
36 3 Floor 31-10-2023 COMPLETED NA
37 Electrical Works 31-03-2024 IN PROGRESS NA
38 Concealed Cabling including Plugs & switches 31-03-2024 COMPLETED NA
39 Installation & Charging of Transformer 31-03-2024 NA NA
40 Connection to Flats/Apartments 31-03-2024 IN PROGRESS NA
41 PH works 30-06-2024 IN PROGRESS NA
42 Laying of concealed Pipes 30-06-2024 COMPLETED NA
43 PH Fittings 30-06-2024 COMPLETED NA
44 Overhead Water Tanks 30-06-2024 COMPLETED NA
45 Water Supply Connection to all units 30-06-2024 COMPLETED NA
46 STP construction and completion 30-06-2024 IN PROGRESS NA
47 Distempering & Colouring of all units and exteriors 31-08-2024 COMPLETED NA
48 Fixation of doors and windows 31-10-2024 COMPLETED NA
49 Scheduled Date of handing over possession 31-01-2025 NOT STARTED NA
50 Development of common areas, parks, gardens etc 31-12-2024 IN PROGRESS NA
Updated Changes on 15-07-2024
51 Site Development 31-03-2022 COMPLETED NA
52 NA NA NA NA
53 Ground Floor/Stilt Floor 31-07-2022 COMPLETED NA
54 1 Floor 31-10-2022 COMPLETED NA
55 2 Floor 31-01-2023 COMPLETED NA
56 3 Floor 30-04-2023 COMPLETED NA
57 NA NA NA NA
58 Ground Floor/Stilt Floor 30-04-2023 COMPLETED NA
59 1 Floor 30-06-2023 COMPLETED NA
60 2 Floor 31-08-2023 COMPLETED NA
61 3 Floor 31-10-2023 COMPLETED NA
62 Electrical Works 31-03-2024 COMPLETED NA
63 Concealed Cabling including Plugs & switches 31-03-2024 COMPLETED NA
64 Installation & Charging of Transformer 31-03-2024 NA NA
65 Connection to Flats/Apartments 31-03-2024 COMPLETED NA
66 PH works 30-06-2024 COMPLETED NA
67 Laying of concealed Pipes 30-06-2024 COMPLETED NA
68 PH Fittings 30-06-2024 COMPLETED NA
69 Overhead Water Tanks 30-06-2024 COMPLETED NA
70 Water Supply Connection to all units 30-06-2024 COMPLETED NA
71 STP construction and completion 30-06-2024 COMPLETED NA
72 Distempering & Colouring of all units and exteriors 31-08-2024 COMPLETED NA
73 Fixation of doors and windows 31-10-2024 COMPLETED NA
74 Scheduled Date of handing over possession 31-01-2025 NOT STARTED NA
75 Development of common areas, parks, gardens etc 31-12-2024 IN PROGRESS NA

Booking Status

Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership Status
Carpet Area Balcony Area Exclusive Open Terrace Area
1 101 84.33 6.70 0 Promoter
2 102 90.64 7.65 0 Land Owner
3 103 66.28 5.87 0 Promoter
4 104 65.17 4.87 0 Promoter
5 201 84.33 6.70 0 Promoter
6 202 90.64 7.65 0 Land Owner
7 203 66.28 5.87 0 Land Owner
8 204 65.17 4.87 0 Promoter
9 301 84.33 6.70 0 Promoter
10 302 90.64 7.65 0 Land Owner
11 303 66.28 5.87 0 Promoter
12 304 65.17 4.87 0 Promoter
13 401 84.33 6.70 0 Promoter
14 402 90.64 7.65 0 Land Owner
15 403 66.28 5.87 0 Promoter
16 404 65.17 4.87 0 Land Owner

Financial Status

SL No. Funds Collected from the Allottees Funds Borrowed from Financial Institutions Funds Employed from Own Sources Expenditure As On Date Status
1 0 0 31925000 31925000 31-12-2023 IN PROGRESS
2 0 0 34650000 34650000 30-06-2024 IN PROGRESS

Updated Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 Parking space measuring 426.22 sqm as shown in the approved plan shall be strictly adhered. 19-06-2022 NOT STARTED
2 The land over which construction is proposed is accessble by an approved means of access of 9.75 mtr and 12.19 mtr width. 19-06-2022 NOT STARTED
3 10% of the land shall be utilized for plantation. 19-06-2022 NOT STARTED
4 The permittee shall keep the BDA brahmapur informed in writing at least one week before starting construction as per regulation No.16 of BDA Planning and Building (Standards) Regulations. 19-06-2022 NOT STARTED
5 The conditions relating to development of roads and drains shall be complied first before start of the project as suggested by block development officer, kukudahandi vide letter No.437 dated 19.8.2018 and as per affidavit dtd.07.11.2021. 19-06-2022 NOT STARTED
6 For safe discharge of effluent an inverted filter of adequate size is to be constructed and treated effluent BOD5 at 20C should be less than 30mg/l only be disposed to municipal drain to avoid contamination of sub-soil water and for proper drainage and sanitation the condtions imposed by block development officer, kukudahandi vide letter No.437 dated 19.8.2018 and as per affidavit dtd.07.11.2021 are to be strictly adhered for drainage of waste water generated by the occupants of the apartment. 19-06-2022 NOT STARTED
7 Fire safety measures and arrangement as per recommendations of the Fire officer, brahmapur circle, brahmapur are to be strictly followed. 19-06-2022 NOT STARTED
8 The conditions imposed and communicated by the executive engineer, RWSS division brahmapur vide letter No.2642 dtd 31.8.2018 as per affidavit dtd 07.11.2021 are to be followed to cater the domestic requirements of the occupants and sanitation of the proposed apartment. 19-06-2022 NOT STARTED
9 The promoter shall obtain necessary permission from the SOUTHCO regarding safety for electrical installation and connection. 19-06-2022 NOT STARTED
10 The applicant shall not occupy or permit to occupy the building or permit to use the building or any part thereof until completion certificate is submitted to this authority as per section-20 of the ODA Act and the Regulations. 19-06-2022 NOT STARTED
11 This authority shall stand indemnified and kept harmless against all proceeding in any court of before any authorities and all expenses/ losses claims which this authority may incur or become liable to pay as a result or in consequence thereof. 19-06-2022 NOT STARTED
12 Adequate safety measures shall be adopted for treatment and disposal of septic tank effluent under no circumstances untreated night soil shall be discharged into the drains inverted filters. If necessary shall be constructed and the effluent from the septic tank/soak pit shall flow through them to ensure reduction of contaminant level to the standards fixed by OPCB and CPCB before discharge into the drains. 19-06-2022 NOT STARTED
13 The developer shall make own arrangement for supply of drinking water shall not insist upon PHED for providing water from the city water supply system. 19-06-2022 NOT STARTED
14 The developer will be responsible for ensuring uninterrupted water supply to inmates and the BDA authority is no responsible on this front. 19-06-2022 NOT STARTED
15 The residential building shall not be occupied without obtaining occupancy certificate of BDA as required under building regulations. 19-06-2022 NOT STARTED
16 The set back as indicated in the building plain shall be strictly adhered. 19-06-2022 NOT STARTED
17 The space meant for parking shall not be changed to any other use and shall not be partitioned closed in any manner. 19-06-2022 NOT STARTED
18 20% area of parking space shall be earmarked for visitors. 19-06-2022 NOT STARTED
19 He has to construct garbage storage bin not less than 100sqm within his premises for smooth management of solid waste. 19-06-2022 NOT STARTED
20 The developer has to construct roof rain water harvesting structure @6 cum for 100 sqm of terrace area. 19-06-2022 NOT STARTED
Updated Changes on 24-02-2024
21 Parking space measuring 426.22 sqm as shown in the approved plan shall be strictly adhered. 19-06-2022 COMPLETED
22 The land over which construction is proposed is accessble by an approved means of access of 9.75 mtr and 12.19 mtr width. 19-06-2022 COMPLETED
23 10% of the land shall be utilized for plantation. 19-06-2022 INPROGRESS
24 The permittee shall keep the BDA brahmapur informed in writing at least one week before starting construction as per regulation No.16 of BDA Planning and Building (Standards) Regulations. 19-06-2022 COMPLETED
25 The conditions relating to development of roads and drains shall be complied first before start of the project as suggested by block development officer, kukudahandi vide letter No.437 dated 19.8.2018 and as per affidavit dtd.07.11.2021. 19-06-2022 COMPLETED
26 For safe discharge of effluent an inverted filter of adequate size is to be constructed and treated effluent BOD5 at 20C should be less than 30mg/l only be disposed to municipal drain to avoid contamination of sub-soil water and for proper drainage and sanitation the condtions imposed by block development officer, kukudahandi vide letter No.437 dated 19.8.2018 and as per affidavit dtd.07.11.2021 are to be strictly adhered for drainage of waste water generated by the occupants of the apartment. 19-06-2022 COMPLETED
27 Fire safety measures and arrangement as per recommendations of the Fire officer, brahmapur circle, brahmapur are to be strictly followed. 19-06-2022 COMPLETED
28 The conditions imposed and communicated by the executive engineer, RWSS division brahmapur vide letter No.2642 dtd 31.8.2018 as per affidavit dtd 07.11.2021 are to be followed to cater the domestic requirements of the occupants and sanitation of the proposed apartment. 19-06-2022 COMPLETED
29 The promoter shall obtain necessary permission from the SOUTHCO regarding safety for electrical installation and connection. 19-06-2022 COMPLETED
30 The applicant shall not occupy or permit to occupy the building or permit to use the building or any part thereof until completion certificate is submitted to this authority as per section-20 of the ODA Act and the Regulations. 19-06-2022 IN PROGRESS
31 This authority shall stand indemnified and kept harmless against all proceeding in any court of before any authorities and all expenses/ losses claims which this authority may incur or become liable to pay as a result or in consequence thereof. 19-06-2022 COMPLETED
32 Adequate safety measures shall be adopted for treatment and disposal of septic tank effluent under no circumstances untreated night soil shall be discharged into the drains inverted filters. If necessary shall be constructed and the effluent from the septic tank/soak pit shall flow through them to ensure reduction of contaminant level to the standards fixed by OPCB and CPCB before discharge into the drains. 19-06-2022 COMPLETED
33 The developer shall make own arrangement for supply of drinking water shall not insist upon PHED for providing water from the city water supply system. 19-06-2022 COMPLETED
34 The developer will be responsible for ensuring uninterrupted water supply to inmates and the BDA authority is no responsible on this front. 19-06-2022 COMPLETED
35 The residential building shall not be occupied without obtaining occupancy certificate of BDA as required under building regulations. 19-06-2022 IN PROGRESS
36 The set back as indicated in the building plain shall be strictly adhered. 19-06-2022 COMPLETED
37 The space meant for parking shall not be changed to any other use and shall not be partitioned closed in any manner. 19-06-2022 COMPLETED
38 20% area of parking space shall be earmarked for visitors. 19-06-2022 COMPLETED
39 He has to construct garbage storage bin not less than 100sqm within his premises for smooth management of solid waste. 19-06-2022 COMPLETED
40 The developer has to construct roof rain water harvesting structure @6 cum for 100 sqm of terrace area. 19-06-2022 COMPLETED
Updated Changes on 15-07-2024
41 Parking space measuring 426.22 sqm as shown in the approved plan shall be strictly adhered. 19-06-2022 COMPLETED
42 The land over which construction is proposed is accessble by an approved means of access of 9.75 mtr and 12.19 mtr width. 19-06-2022 COMPLETED
43 10% of the land shall be utilized for plantation. 19-06-2022 INPROGRESS
44 The permittee shall keep the BDA brahmapur informed in writing at least one week before starting construction as per regulation No.16 of BDA Planning and Building (Standards) Regulations. 19-06-2022 COMPLETED
45 The conditions relating to development of roads and drains shall be complied first before start of the project as suggested by block development officer, kukudahandi vide letter No.437 dated 19.8.2018 and as per affidavit dtd.07.11.2021. 19-06-2022 COMPLETED
46 For safe discharge of effluent an inverted filter of adequate size is to be constructed and treated effluent BOD5 at 20C should be less than 30mg/l only be disposed to municipal drain to avoid contamination of sub-soil water and for proper drainage and sanitation the condtions imposed by block development officer, kukudahandi vide letter No.437 dated 19.8.2018 and as per affidavit dtd.07.11.2021 are to be strictly adhered for drainage of waste water generated by the occupants of the apartment. 19-06-2022 COMPLETED
47 Fire safety measures and arrangement as per recommendations of the Fire officer, brahmapur circle, brahmapur are to be strictly followed. 19-06-2022 COMPLETED
48 The conditions imposed and communicated by the executive engineer, RWSS division brahmapur vide letter No.2642 dtd 31.8.2018 as per affidavit dtd 07.11.2021 are to be followed to cater the domestic requirements of the occupants and sanitation of the proposed apartment. 19-06-2022 COMPLETED
49 The promoter shall obtain necessary permission from the SOUTHCO regarding safety for electrical installation and connection. 19-06-2022 COMPLETED
50 The applicant shall not occupy or permit to occupy the building or permit to use the building or any part thereof until completion certificate is submitted to this authority as per section-20 of the ODA Act and the Regulations. 19-06-2022 IN PROGRESS
51 This authority shall stand indemnified and kept harmless against all proceeding in any court of before any authorities and all expenses/ losses claims which this authority may incur or become liable to pay as a result or in consequence thereof. 19-06-2022 COMPLETED
52 Adequate safety measures shall be adopted for treatment and disposal of septic tank effluent under no circumstances untreated night soil shall be discharged into the drains inverted filters. If necessary shall be constructed and the effluent from the septic tank/soak pit shall flow through them to ensure reduction of contaminant level to the standards fixed by OPCB and CPCB before discharge into the drains. 19-06-2022 COMPLETED
53 The developer shall make own arrangement for supply of drinking water shall not insist upon PHED for providing water from the city water supply system. 19-06-2022 COMPLETED
54 The developer will be responsible for ensuring uninterrupted water supply to inmates and the BDA authority is no responsible on this front. 19-06-2022 COMPLETED
55 The residential building shall not be occupied without obtaining occupancy certificate of BDA as required under building regulations. 19-06-2022 IN PROGRESS
56 The set back as indicated in the building plain shall be strictly adhered. 19-06-2022 COMPLETED
57 The space meant for parking shall not be changed to any other use and shall not be partitioned closed in any manner. 19-06-2022 COMPLETED
58 20% area of parking space shall be earmarked for visitors. 19-06-2022 COMPLETED
59 He has to construct garbage storage bin not less than 100sqm within his premises for smooth management of solid waste. 19-06-2022 COMPLETED
60 The developer has to construct roof rain water harvesting structure @6 cum for 100 sqm of terrace area. 19-06-2022 COMPLETED

Updated Project Documents

Sl. No. Title of the document Upload Document
1 PROFORMA-I AND II (JUL-2022 TO SEPT-2022)
2 PROFORMA-I AND II (OCT-2022 TO DEC-2022)
3 PROFORMA-I AND II (JAN-2023 TO MAR-2023)
4 PROFORMA-I AND II (APR-2023 TO JUN-2023)
5 PROFORMA-I AND II (JUL-2023 TO SEPT-2023)
6 PROFORMA-I AND II (OCT-2023 TO DEC-2023)
7 BANK STATEMENT
8 PROFORMA-I AND II (JAN-2024 TO MAR-2024)
9 PROFORMA-I AND II (APR-2024 TO JUN-2024)
10 ANNUAL AUDIT CERTIFICATE FY 23-24
11 OCCUPANCY CERTIFICATE
:  Sova Rani Pradhan :  
NA :  AKTPP7655F
:PAN Card :  sovaranipradhan@gmail.com
:  Graduate :  8917280313
:  5 years in real estate
:  Yes :  NA
:  SUREN KUMAR PRADHAN :  
NA :  BVQPP7562J
:PAN Card :  surenkumarpradhan8@gmail.com
:  Post Graduate :  8249340541
:  10 years experience in real estate
:  Yes :  NA

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
BIROJA PRASAD PATRA Architect GANDHI NAGAR, 2ND LANE, BERHAMPUR-II, GANJAM, MOB-9861878632, EMAIL-birojapatra@yahoo.co.in REGD.NO.-M118959/4 NA
SURESH KUMAR SISTA Construction Engineer GANDHI NAGAR, 5TH LANE, BERHAMPUR-II, GANJAM, MOB-9437322869, EMAIL-suresh_sista@yahoo.co.in RTP/DTP(C.ER)/003/2017 NA
RAJ KIRAN PADHI Chartered Accountant AYODHYA NAGAR, 3RD LANE, BERHAMPUR, GANJAM-10, MOB-9439634428, EMAIL-carajkiran@gmail.com M.NO.302196 NA

Updated Units

House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
Updated Changes
101 Covered Parking 101 5.5Mx3.5M 19.25 sqm Included
102 Covered Parking 102 5.5Mx3.5M 19.25 sqm Included
103 Covered Parking 103 5.5Mx3.5M 19.25 sqm Included
104 Covered Parking 104 5.5Mx3.5M 19.25 sqm Included
201 Covered Parking 201 5.5Mx3.5M 19.25 sqm Included
202 Covered Parking 202 5.5Mx3.5M 19.25 sqm Included
203 Covered Parking 203 5.5Mx3.5M 19.25 sqm Included
204 Covered Parking 204 5.5Mx3.5M 19.25 sqm Included
301 Covered Parking 301 5.5Mx3.5M 19.25 sqm Included
302 Covered Parking 302 5.5Mx3.5M 19.25 sqm Included
303 Covered Parking 303 5.5Mx3.5M 19.25 sqm Included
304 Covered Parking 304 5.5Mx3.5M 19.25 sqm Included
401 Covered Parking 401 5.5Mx3.5M 19.25 sqm Included
402 Covered Parking 402 5.5Mx3.5M 19.25 sqm Included
403 Covered Parking 403 5.5Mx3.5M 19.25 sqm Included
404 Covered Parking 404 5.5Mx3.5M 19.25 sqm Included

Generated by pacms.orera.in on date: 2024-07-22