1 |
Parking space measuring 426.22 sqm as shown in the approved plan shall be strictly adhered.
|
19-06-2022
|
NOT STARTED
|
2 |
The land over which construction is proposed is accessble by an approved means of access of 9.75 mtr and 12.19 mtr width.
|
19-06-2022
|
NOT STARTED
|
3 |
10% of the land shall be utilized for plantation.
|
19-06-2022
|
NOT STARTED
|
4 |
The permittee shall keep the BDA brahmapur informed in writing at least one week before starting construction as per regulation No.16 of BDA Planning and Building (Standards) Regulations.
|
19-06-2022
|
NOT STARTED
|
5 |
The conditions relating to development of roads and drains shall be complied first before start of the project as suggested by block development officer, kukudahandi vide letter No.437 dated 19.8.2018 and as per affidavit dtd.07.11.2021.
|
19-06-2022
|
NOT STARTED
|
6 |
For safe discharge of effluent an inverted filter of adequate size is to be constructed and treated effluent BOD5 at 20C should be less than 30mg/l only be disposed to municipal drain to avoid contamination of sub-soil water and for proper drainage and sanitation the condtions imposed by block development officer, kukudahandi vide letter No.437 dated 19.8.2018 and as per affidavit dtd.07.11.2021 are to be strictly adhered for drainage of waste water generated by the occupants of the apartment.
|
19-06-2022
|
NOT STARTED
|
7 |
Fire safety measures and arrangement as per recommendations of the Fire officer, brahmapur circle, brahmapur are to be strictly followed.
|
19-06-2022
|
NOT STARTED
|
8 |
The conditions imposed and communicated by the executive engineer, RWSS division brahmapur vide letter No.2642 dtd 31.8.2018 as per affidavit dtd 07.11.2021 are to be followed to cater the domestic requirements of the occupants and sanitation of the proposed apartment.
|
19-06-2022
|
NOT STARTED
|
9 |
The promoter shall obtain necessary permission from the SOUTHCO regarding safety for electrical installation and connection.
|
19-06-2022
|
NOT STARTED
|
10 |
The applicant shall not occupy or permit to occupy the building or permit to use the building or any part thereof until completion certificate is submitted to this authority as per section-20 of the ODA Act and the Regulations.
|
19-06-2022
|
NOT STARTED
|
11 |
This authority shall stand indemnified and kept harmless against all proceeding in any court of before any authorities and all expenses/ losses claims which this authority may incur or become liable to pay as a result or in consequence thereof.
|
19-06-2022
|
NOT STARTED
|
12 |
Adequate safety measures shall be adopted for treatment and disposal of septic tank effluent under no circumstances untreated night soil shall be discharged into the drains inverted filters. If necessary shall be constructed and the effluent from the septic tank/soak pit shall flow through them to ensure reduction of contaminant level to the standards fixed by OPCB and CPCB before discharge into the drains.
|
19-06-2022
|
NOT STARTED
|
13 |
The developer shall make own arrangement for supply of drinking water shall not insist upon PHED for providing water from the city water supply system.
|
19-06-2022
|
NOT STARTED
|
14 |
The developer will be responsible for ensuring uninterrupted water supply to inmates and the BDA authority is no responsible on this front.
|
19-06-2022
|
NOT STARTED
|
15 |
The residential building shall not be occupied without obtaining occupancy certificate of BDA as required under building regulations.
|
19-06-2022
|
NOT STARTED
|
16 |
The set back as indicated in the building plain shall be strictly adhered.
|
19-06-2022
|
NOT STARTED
|
17 |
The space meant for parking shall not be changed to any other use and shall not be partitioned closed in any manner.
|
19-06-2022
|
NOT STARTED
|
18 |
20% area of parking space shall be earmarked for visitors.
|
19-06-2022
|
NOT STARTED
|
19 |
He has to construct garbage storage bin not less than 100sqm within his premises for smooth management of solid waste.
|
19-06-2022
|
NOT STARTED
|
20 |
The developer has to construct roof rain water harvesting structure @6 cum for 100 sqm of terrace area.
|
19-06-2022
|
NOT STARTED
|
Updated Changes on 24-02-2024 |
21 |
Parking space measuring 426.22 sqm as shown in the approved plan shall be strictly adhered.
|
19-06-2022
|
COMPLETED
|
22 |
The land over which construction is proposed is accessble by an approved means of access of 9.75 mtr and 12.19 mtr width.
|
19-06-2022
|
COMPLETED
|
23 |
10% of the land shall be utilized for plantation.
|
19-06-2022
|
INPROGRESS
|
24 |
The permittee shall keep the BDA brahmapur informed in writing at least one week before starting construction as per regulation No.16 of BDA Planning and Building (Standards) Regulations.
|
19-06-2022
|
COMPLETED
|
25 |
The conditions relating to development of roads and drains shall be complied first before start of the project as suggested by block development officer, kukudahandi vide letter No.437 dated 19.8.2018 and as per affidavit dtd.07.11.2021.
|
19-06-2022
|
COMPLETED
|
26 |
For safe discharge of effluent an inverted filter of adequate size is to be constructed and treated effluent BOD5 at 20C should be less than 30mg/l only be disposed to municipal drain to avoid contamination of sub-soil water and for proper drainage and sanitation the condtions imposed by block development officer, kukudahandi vide letter No.437 dated 19.8.2018 and as per affidavit dtd.07.11.2021 are to be strictly adhered for drainage of waste water generated by the occupants of the apartment.
|
19-06-2022
|
COMPLETED
|
27 |
Fire safety measures and arrangement as per recommendations of the Fire officer, brahmapur circle, brahmapur are to be strictly followed.
|
19-06-2022
|
COMPLETED
|
28 |
The conditions imposed and communicated by the executive engineer, RWSS division brahmapur vide letter No.2642 dtd 31.8.2018 as per affidavit dtd 07.11.2021 are to be followed to cater the domestic requirements of the occupants and sanitation of the proposed apartment.
|
19-06-2022
|
COMPLETED
|
29 |
The promoter shall obtain necessary permission from the SOUTHCO regarding safety for electrical installation and connection.
|
19-06-2022
|
COMPLETED
|
30 |
The applicant shall not occupy or permit to occupy the building or permit to use the building or any part thereof until completion certificate is submitted to this authority as per section-20 of the ODA Act and the Regulations.
|
19-06-2022
|
IN PROGRESS
|
31 |
This authority shall stand indemnified and kept harmless against all proceeding in any court of before any authorities and all expenses/ losses claims which this authority may incur or become liable to pay as a result or in consequence thereof.
|
19-06-2022
|
COMPLETED
|
32 |
Adequate safety measures shall be adopted for treatment and disposal of septic tank effluent under no circumstances untreated night soil shall be discharged into the drains inverted filters. If necessary shall be constructed and the effluent from the septic tank/soak pit shall flow through them to ensure reduction of contaminant level to the standards fixed by OPCB and CPCB before discharge into the drains.
|
19-06-2022
|
COMPLETED
|
33 |
The developer shall make own arrangement for supply of drinking water shall not insist upon PHED for providing water from the city water supply system.
|
19-06-2022
|
COMPLETED
|
34 |
The developer will be responsible for ensuring uninterrupted water supply to inmates and the BDA authority is no responsible on this front.
|
19-06-2022
|
COMPLETED
|
35 |
The residential building shall not be occupied without obtaining occupancy certificate of BDA as required under building regulations.
|
19-06-2022
|
IN PROGRESS
|
36 |
The set back as indicated in the building plain shall be strictly adhered.
|
19-06-2022
|
COMPLETED
|
37 |
The space meant for parking shall not be changed to any other use and shall not be partitioned closed in any manner.
|
19-06-2022
|
COMPLETED
|
38 |
20% area of parking space shall be earmarked for visitors.
|
19-06-2022
|
COMPLETED
|
39 |
He has to construct garbage storage bin not less than 100sqm within his premises for smooth management of solid waste.
|
19-06-2022
|
COMPLETED
|
40 |
The developer has to construct roof rain water harvesting structure @6 cum for 100 sqm of terrace area.
|
19-06-2022
|
COMPLETED
|
Updated Changes on 15-07-2024 |
41 |
Parking space measuring 426.22 sqm as shown in the approved plan shall be strictly adhered.
|
19-06-2022
|
COMPLETED
|
42 |
The land over which construction is proposed is accessble by an approved means of access of 9.75 mtr and 12.19 mtr width.
|
19-06-2022
|
COMPLETED
|
43 |
10% of the land shall be utilized for plantation.
|
19-06-2022
|
INPROGRESS
|
44 |
The permittee shall keep the BDA brahmapur informed in writing at least one week before starting construction as per regulation No.16 of BDA Planning and Building (Standards) Regulations.
|
19-06-2022
|
COMPLETED
|
45 |
The conditions relating to development of roads and drains shall be complied first before start of the project as suggested by block development officer, kukudahandi vide letter No.437 dated 19.8.2018 and as per affidavit dtd.07.11.2021.
|
19-06-2022
|
COMPLETED
|
46 |
For safe discharge of effluent an inverted filter of adequate size is to be constructed and treated effluent BOD5 at 20C should be less than 30mg/l only be disposed to municipal drain to avoid contamination of sub-soil water and for proper drainage and sanitation the condtions imposed by block development officer, kukudahandi vide letter No.437 dated 19.8.2018 and as per affidavit dtd.07.11.2021 are to be strictly adhered for drainage of waste water generated by the occupants of the apartment.
|
19-06-2022
|
COMPLETED
|
47 |
Fire safety measures and arrangement as per recommendations of the Fire officer, brahmapur circle, brahmapur are to be strictly followed.
|
19-06-2022
|
COMPLETED
|
48 |
The conditions imposed and communicated by the executive engineer, RWSS division brahmapur vide letter No.2642 dtd 31.8.2018 as per affidavit dtd 07.11.2021 are to be followed to cater the domestic requirements of the occupants and sanitation of the proposed apartment.
|
19-06-2022
|
COMPLETED
|
49 |
The promoter shall obtain necessary permission from the SOUTHCO regarding safety for electrical installation and connection.
|
19-06-2022
|
COMPLETED
|
50 |
The applicant shall not occupy or permit to occupy the building or permit to use the building or any part thereof until completion certificate is submitted to this authority as per section-20 of the ODA Act and the Regulations.
|
19-06-2022
|
IN PROGRESS
|
51 |
This authority shall stand indemnified and kept harmless against all proceeding in any court of before any authorities and all expenses/ losses claims which this authority may incur or become liable to pay as a result or in consequence thereof.
|
19-06-2022
|
COMPLETED
|
52 |
Adequate safety measures shall be adopted for treatment and disposal of septic tank effluent under no circumstances untreated night soil shall be discharged into the drains inverted filters. If necessary shall be constructed and the effluent from the septic tank/soak pit shall flow through them to ensure reduction of contaminant level to the standards fixed by OPCB and CPCB before discharge into the drains.
|
19-06-2022
|
COMPLETED
|
53 |
The developer shall make own arrangement for supply of drinking water shall not insist upon PHED for providing water from the city water supply system.
|
19-06-2022
|
COMPLETED
|
54 |
The developer will be responsible for ensuring uninterrupted water supply to inmates and the BDA authority is no responsible on this front.
|
19-06-2022
|
COMPLETED
|
55 |
The residential building shall not be occupied without obtaining occupancy certificate of BDA as required under building regulations.
|
19-06-2022
|
IN PROGRESS
|
56 |
The set back as indicated in the building plain shall be strictly adhered.
|
19-06-2022
|
COMPLETED
|
57 |
The space meant for parking shall not be changed to any other use and shall not be partitioned closed in any manner.
|
19-06-2022
|
COMPLETED
|
58 |
20% area of parking space shall be earmarked for visitors.
|
19-06-2022
|
COMPLETED
|
59 |
He has to construct garbage storage bin not less than 100sqm within his premises for smooth management of solid waste.
|
19-06-2022
|
COMPLETED
|
60 |
The developer has to construct roof rain water harvesting structure @6 cum for 100 sqm of terrace area.
|
19-06-2022
|
COMPLETED
|