Promoter Name :
ASHOK KUMAR SWAIN
Project Name :
MAHIMA PLAZA
Project Location :
over Plot No.631, Khata No.412/1385 & Plot No.638, Khata No.412/1313, Mouza- Rudrapur, Tahasil-Bhubaneswar, Pin-752101, Dist. Khordha, Odisha

Form- I

A. Promoter's Details

:  Mahima Infracon Pvt. Ltd :  Private Company
:  U70101OR2008PTC009892 :View
NA :  PLOT NO-33, SAMANT VIHAR, NEAR KALINGA HOSPITAL SQUARE, BHUBANESWAR-751016
:  Plot No.33, Samant Vihar, Near Kalinga Hopital Square, Bhubaneswar-751016, Dist. Khordha, Odisha :  mahima.infracon@gmail.com
:  7539269 :  9937539269
:  AAGCM1923K :View
:  I HAVE MORE THAN 10 YEARS OF EXPERIENCE IN REAL ESTATE BUSINESS. :  I HAVE NOT DONE ANY PROJECT OUTSIDE THE STATE.
NA

B. Details of Board of Directors / Partners / MC Members

:  ASHOK KUMAR SWAIN :  
:  Managing Director :  ASNPS8879G
:PAN Card :  mahima.infracon@gmail.com
:  Graduation :  9861064790
:  I HAVE MORE THAN 10 YEARS OF EXPERIENCE IN REAL ESTATE BUSINESS.
:  Yes :  NA
:  ABHAYA KUMAR SWAIN :  
:  Director :  AYJPS2722G
:PAN Card :  mahima.infracon@gmail.com
:  Graduation :  9937539269
:  I HAVE MORE THAN 10 YEARS OF EXPERIENCE IN REAL ESTATE BUSINESS.
:  Yes :  NA
:  AJAY SWAIN :  
:  Director :  EFYJPS9564C
:PAN Card :  mahima.infracon@gmail.com
:  Graduation :  9348519143
:  I HAVE MORE THAN 10 YEARS OF EXPERIENCE IN REAL ESTATE BUSINESS.
:  Yes :  NA

Annexure-1

Details of last projects already implemented (Ongoing or Complete)

Annexure-2

Details of the project to be registered

:   New :  MAHIMA PLAZA
:  Residential :  over Plot No.631, Khata No.412/1385 & Plot No.638, Khata No.412/1313, Mouza- Rudrapur, Tahasil-Bhubaneswar, Pin-752101, Dist. Khordha, Odisha
:  Khordha :  Bhubaneswar
:  752101 :  Development Authority
:  BHUBANESWAR MUNICIPAL CORPORATION
:  RESIDENTIAL APARTMENT, S+4 :  NA

Land Details of the Project

:  631 :  412/1385
:  RUDRAPUR :  1335.95
:  Yes
Yes :  View
:  View
:  Promoter
:  638 :  412/1313
:  RUDRAPUR :  161.93
:  Yes
Yes :  View
:  View
:  Promoter

Development Agreement

: No

Building Plan

  View   View
  Download site plan 30-10-2021

Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 Parking space measuring 797.21 sqm as shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose. 30-10-2021 In progress
2 The land over which construction is proposed is accessible by an approved means of access of 9.15 mtr in width. 30-10-2021 In progress
3 Obtain an Occupancy Certificate from the Authority prior to occupation of building in full or part. 30-10-2021 Not Started
4 The owner/ applicant shall obtain NOC from NAAI/Environmental Clearance from Ministry of Forest & Environment, Govt. of India and submit to BDA wherever applicable, before commencement of construction. 30-10-2021 As applicable
5 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Regulation-44 of BDA (Planning & Building Standards) Regulation, 2008. 30-10-2021 In progress
6 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance, fire tender, physically handicapped persons and outside visitors with signage as per norms under Regulation-35 (11)(12) of BDA (Planning & Building Standards) Regulations, 2008.(Amended-2013 ) 30-10-2021 In progress
7 Plantation over 20% of the plot area shall be made by the applicant as per provision under regulation 28 of BDA (Planning & Building Standards) Regulation, 2008. 30-10-2021 In progress

Layout Plan

: Yes :  View

Location Map with geo-coordinates of bend points

Point No. Latitude Longitude
1 85°53'02.1''E 20°18'59.9''N
2 85°53'03.0''E 20°19'01.0''N
3 85°53'03.8''E 20°19'00.5''N
4 85°53'02.8''E 20°18'59.1''N
5 85°53'02'.5''E 20°18'59.3''N
View

Milestone of Project Construction

Description* Scheduled date of completion Current Status Site Images
Site Development 31-01-2019 new NA
Roof Casting NA NA NA
Ground Floor/Stilt Floor 15-04-2019 new NA
1 Floor 15-06-2019 new NA
2 Floor 14-08-2019 new NA
3 Floor 15-10-2019 new NA
4 Floor 15-12-2019 new NA
Brick Work & Plastering NA NA NA
Ground Floor/Stilt Floor 30-04-2019 new NA
1 Floor 15-08-2019 new NA
2 Floor 14-10-2019 new NA
3 Floor 15-12-2019 new NA
4 Floor 15-02-2020 new NA
Electrical Works 31-01-2020 new NA
Concealed Cabling including Plugs & switches 30-04-2020 new NA
Installation & Charging of Transformer 30-10-2021 new NA
Connection to Flats/Apartments 30-10-2021 new NA
PH works 31-01-2020 new NA
Laying of concealed Pipes 31-01-2020 new NA
PH Fittings 15-08-2021 new NA
Overhead Water Tanks 30-09-2021 new NA
Water Supply Connection to all units 30-09-2021 new NA
STP construction and completion 15-07-2021 new NA
Distempering & Colouring of all units and exteriors 31-08-2021 new NA
Fixation of doors and windows 31-05-2021 new NA
Scheduled Date of handing over possession 30-10-2021 new NA
Development of common areas, parks, gardens etc 01-09-2021 new NA
Site Development 31-01-2019 new
NA NA NA NA
Ground Floor/Stilt Floor 15-04-2019 new
1 Floor 04-09-2019 new
2 Floor 06-11-2019 new
3 Floor 10-12-2019 new
4 Floor 15-12-2019 new NA
NA NA NA NA
Ground Floor/Stilt Floor 30-04-2019 new NA
1 Floor 15-08-2019 new NA
2 Floor 14-10-2019 new NA
3 Floor 15-12-2019 new NA
4 Floor 15-02-2020 new NA
Electrical Works 31-01-2020 new NA
Concealed Cabling including Plugs & switches 30-04-2020 new NA
Installation & Charging of Transformer 30-10-2021 new NA
Connection to Flats/Apartments 30-10-2021 new NA
PH works 31-01-2020 new NA
Laying of concealed Pipes 31-01-2020 new NA
PH Fittings 15-08-2021 new NA
Overhead Water Tanks 30-09-2021 new NA
Water Supply Connection to all units 30-09-2021 new NA
STP construction and completion 15-07-2021 new NA
Distempering & Colouring of all units and exteriors 31-08-2021 new NA
Fixation of doors and windows 31-05-2021 new NA
Scheduled Date of handing over possession 30-10-2021 new NA
Development of common areas, parks, gardens etc 01-09-2021 new NA
Site Development 31-01-2019 in progress NA
NA 15-02-2019 in progress
Ground Floor/Stilt Floor 15-04-2019 in progress NA
1 Floor 04-09-2019 in progress NA
2 Floor 06-11-2019 in progress NA
3 Floor 10-12-2019 in progress NA
4 Floor 25-01-2020 new NA
NA 25-01-2020 new NA
Ground Floor/Stilt Floor 30-04-2019 new NA
1 Floor 15-08-2019 new NA
2 Floor 14-10-2019 new NA
3 Floor 15-12-2019 new NA
4 Floor 15-02-2020 new NA
Electrical Works 31-01-2020 new NA
Concealed Cabling including Plugs & switches 30-04-2020 new NA
Installation & Charging of Transformer 30-10-2021 new NA
Connection to Flats/Apartments 30-10-2021 new NA
PH works 31-01-2020 new NA
Laying of concealed Pipes 31-01-2020 new NA
PH Fittings 15-08-2021 new NA
Overhead Water Tanks 30-09-2021 new NA
Water Supply Connection to all units 30-09-2021 new NA
STP construction and completion 15-07-2021 new NA
Distempering & Colouring of all units and exteriors 31-08-2021 new NA
Fixation of doors and windows 31-05-2021 new NA
Scheduled Date of handing over possession 30-10-2021 new NA
Development of common areas, parks, gardens etc 01-09-2021 new NA
Site Development 31-01-2019 COMPLETED NA
NA 15-02-2019 COMPLETED NA
Ground Floor/Stilt Floor 15-04-2019 COMPLETED NA
1 Floor 04-09-2019 COMPLETED NA
2 Floor 06-11-2019 COMPLETED NA
3 Floor 10-12-2019 COMPLETED NA
4 Floor 25-01-2020 COMPLETED NA
NA 25-01-2020 COMPLETED NA
Ground Floor/Stilt Floor 30-04-2019 COMPLETED NA
1 Floor 15-08-2019 COMPLETED NA
2 Floor 14-10-2019 COMPLETED NA
3 Floor 15-12-2019 COMPLETED NA
4 Floor 15-02-2020 COMPLETED NA
Electrical Works 31-01-2020 COMPLETED NA
Concealed Cabling including Plugs & switches 30-04-2020 COMPLETED NA
Installation & Charging of Transformer 30-10-2021 COMPLETED NA
Connection to Flats/Apartments 30-10-2021 COMPLETED NA
PH works 31-01-2020 COMPLETED NA
Laying of concealed Pipes 31-01-2020 COMPLETED NA
PH Fittings 15-08-2021 COMPLETED NA
Overhead Water Tanks 30-09-2021 COMPLETED NA
Water Supply Connection to all units 30-09-2021 COMPLETED NA
STP construction and completion 15-07-2021 COMPLETED NA
Distempering & Colouring of all units and exteriors 31-08-2021 COMPLETED NA
Fixation of doors and windows 31-05-2021 COMPLETED NA
Scheduled Date of handing over possession 30-10-2021 COMPLETED NA
Development of common areas, parks, gardens etc 01-09-2021 COMPLETED NA

Category and no. of units to be developed

:  Residential
:  
:  24
:  
:  
:  
Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership
Carpet Area Balcony Area Exclusive Open Terrace Area
1 101 79.13 5.85 23.44 Promoter
2 102 79.13 5.85 23.44 Promoter
3 103 75.69 4.48 23.44 Promoter
4 104 75.69 4.48 23.44 Promoter
5 105 79.13 5.85 23.44 Promoter
6 106 79.13 5.85 23.44 Promoter
7 201 79.13 5.85 23.44 Promoter
8 202 79.13 5.85 23.44 Promoter
9 203 75.69 4.48 23.44 Promoter
10 204 75.69 4.48 23.44 Promoter
11 205 79.13 5.85 23.44 Promoter
12 206 79.13 5.85 23.44 Promoter
13 301 79.13 5.85 23.44 Promoter
14 302 79.13 5.85 23.44 Promoter
15 303 75.69 4.48 23.44 Promoter
16 304 75.69 4.48 23.44 Promoter
17 305 79.13 5.85 23.44 Promoter
18 306 79.13 5.85 23.44 Promoter
19 401 79.13 5.85 23.44 Promoter
20 402 79.13 5.85 23.44 Promoter
21 403 75.69 4.48 23.44 Promoter
22 404 75.69 4.48 23.44 Promoter
23 405 79.13 5.85 23.44 Promoter
24 406 79.13 5.85 23.44 Promoter
Types of garages and parking
House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
101 Covered Parking 101 5.2*3.66 34.73 Included
102 Covered Parking 102 5.2*2.79 34.73 Included
103 Covered Parking 103 5.2*3.2 34.73 Included
104 Covered Parking 104 5.2*3.05 34.73 Included
105 Covered Parking 105 5.2*3.21 34.73 Included
106 Covered Parking 106 5.2*2.79 34.73 Included
201 Covered Parking 201 5.2*3.2 34.73 Included
202 Covered Parking 202 5.2*3.05 34.73 Included
203 Covered Parking 203 5.2*3.2 34.73 Included
204 Covered Parking 204 5.2*2.79 34.73 Included
205 Covered Parking 205 5.2*3.66 34.73 Included
206 Covered Parking 206 4.5*3.2 34.73 Included
301 Covered Parking 301 5.2*4.16 34.73 Included
302 Covered Parking 302 5.35*3.66 34.73 Included
303 Covered Parking 303 5.35*2.79 34.73 Included
304 Covered Parking 304 5.35*3.2 34.73 Included
305 Covered Parking 305 5.35*3.05 34.73 Included
306 Covered Parking 306 5.35*3.21 34.73 Included
401 Covered Parking 401 5.35*2.79 34.73 Included
402 Covered Parking 402 5.35*3.2 34.73 Included
403 Covered Parking 403 5.35*3.05 34.73 Included
404 Covered Parking 404 5.35*3.2 34.73 Included
405 Covered Parking 405 5.35*2.79 34.73 Included
406 Covered Parking 406 5.35*3.66 34.73 Included
No
NA

Facilities to be provided

Particulars of Facilities Status of the facility Brief description of facility
Drinking Water Facility Ground Water Copy of Consent Letter
Fire Fighting Facility Yes 10 Nos of ABC Eco fire Estinguisher, 2 KG, ISI and ISO certified
Emergency Evacuation Services No
Use of Renewable Energy No
Lift Facility Yes 2 nos KONE lifts, Passenger Elevator, Capacity-06 persons-408KG with ARD facility
Market Complex No
Community Hall Yes 300 sqft, Vertified floor
Gymnasium No
Swimming Pool No
Play Ground No
Park/Garden No
Plantation Area Yes 232 sqm
Others(Please Specify) No
Internal Road Yes LENGTH-4.32 METER, WIDTH- 1.5 METER
External Road No
Elecricity Supply Yes Copy of Consent Letter
Other Amenities No

Bank Particulars of the Project

  UNION BANK OF INDIA
  OMFED
  588901010050278
  UBIN0558893
   View
  2300156
  8763841005

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
SOUMYA RANJAN MOHANTY Contractor NANPUR, BALICHANDRAPUR, JAJPUR-754205, CONTACT-943887624 REGISTRATION NO-986 Yes
AKSHAYA KUMAR MUDULI Architect A-151, SAHEED NAGAR, BHUBANESWAR-751007, MOB-9238308095 CA/97/21736 Yes
BIBUDHENDU KESHARI BHOLA Construction Engineer A/48, NILAKANTHA NAGAR, NAYAPALLI, UNIT-8, NEAR PASSPORT OFFICE, BHUBANESWAR-751003 RTP/DTP (ST. ER)-019/2017 Yes
PARSURAM BAISAKH Chartered Accountant PLOT NO-1407/9200, SATYA VIHAR, RASULGARH, BHUBANESWAR-751010, MOB-9437024673 59633 Yes
. Construction Engineer . .

Financial Details

:  840 :   View
  30-10-2021 :  275
:  100 :  0

Documents Attached

Description of Document Option Documents
Fire Safety Certificate Undertaking Attached
Affidavit in Form-A as per clause-l of sub-section-2 of section-4 of the Act Yes Attached
Allotment letter format Yes Attached
Conveyance Deed Format Yes Attached
Affidavit to adopt agreement for sale format as per Rule-8(1) of ORE (R and D) Rules, 2017 Yes Attached
Annual Report 2015-16 Attached
Annual Report 2016-17 Attached
Annual Report 2017-18 Attached
IT Return 2015-16 Attached
IT Return 2016-17 Attached
IT Return 2017-18 Attached
Audit Report 2015-16 Attached
Audit Report 2016-17 Attached
Audit Report 2017-18 Attached


Other documents

“I undertake that the information submitted by me in this application are correct and true to best my knowledge. I also understand that providing false or wrong information is punishable under the Section-60 of the Real Estate (Regulation & Development) Act, 2016. I also further understand that furnishing wrong or false information will lead to rejection of my application registration of the project with forfeiture of registration fee and other charges deposited by me.”
  

Construction Progress

Updated Construction Progress

SL NO. Description Scheduled date of completion Current Status Remarks
1 Site Development 31-01-2019 new NA
2 Roof Casting NA NA NA
3 Ground Floor/Stilt Floor 15-04-2019 new NA
4 1 Floor 15-06-2019 new NA
5 2 Floor 14-08-2019 new NA
6 3 Floor 15-10-2019 new NA
7 4 Floor 15-12-2019 new NA
8 Brick Work & Plastering NA NA NA
9 Ground Floor/Stilt Floor 30-04-2019 new NA
10 1 Floor 15-08-2019 new NA
11 2 Floor 14-10-2019 new NA
12 3 Floor 15-12-2019 new NA
13 4 Floor 15-02-2020 new NA
14 Electrical Works 31-01-2020 new NA
15 Concealed Cabling including Plugs & switches 30-04-2020 new NA
16 Installation & Charging of Transformer 30-10-2021 new NA
17 Connection to Flats/Apartments 30-10-2021 new NA
18 PH works 31-01-2020 new NA
19 Laying of concealed Pipes 31-01-2020 new NA
20 PH Fittings 15-08-2021 new NA
21 Overhead Water Tanks 30-09-2021 new NA
22 Water Supply Connection to all units 30-09-2021 new NA
23 STP construction and completion 15-07-2021 new NA
24 Distempering & Colouring of all units and exteriors 31-08-2021 new NA
25 Fixation of doors and windows 31-05-2021 new NA
26 Scheduled Date of handing over possession 30-10-2021 new NA
27 Development of common areas, parks, gardens etc 01-09-2021 new NA
Updated Changes on 03-01-2020
28 Site Development 31-01-2019 new
29 NA NA NA NA
30 Ground Floor/Stilt Floor 15-04-2019 new
31 1 Floor 04-09-2019 new
32 2 Floor 06-11-2019 new
33 3 Floor 10-12-2019 new
34 4 Floor 15-12-2019 new NA
35 NA NA NA NA
36 Ground Floor/Stilt Floor 30-04-2019 new NA
37 1 Floor 15-08-2019 new NA
38 2 Floor 14-10-2019 new NA
39 3 Floor 15-12-2019 new NA
40 4 Floor 15-02-2020 new NA
41 Electrical Works 31-01-2020 new NA
42 Concealed Cabling including Plugs & switches 30-04-2020 new NA
43 Installation & Charging of Transformer 30-10-2021 new NA
44 Connection to Flats/Apartments 30-10-2021 new NA
45 PH works 31-01-2020 new NA
46 Laying of concealed Pipes 31-01-2020 new NA
47 PH Fittings 15-08-2021 new NA
48 Overhead Water Tanks 30-09-2021 new NA
49 Water Supply Connection to all units 30-09-2021 new NA
50 STP construction and completion 15-07-2021 new NA
51 Distempering & Colouring of all units and exteriors 31-08-2021 new NA
52 Fixation of doors and windows 31-05-2021 new NA
53 Scheduled Date of handing over possession 30-10-2021 new NA
54 Development of common areas, parks, gardens etc 01-09-2021 new NA
Updated Changes on 03-01-2020
55 Site Development 31-01-2019 in progress NA
56 NA 15-02-2019 in progress
57 Ground Floor/Stilt Floor 15-04-2019 in progress NA
58 1 Floor 04-09-2019 in progress NA
59 2 Floor 06-11-2019 in progress NA
60 3 Floor 10-12-2019 in progress NA
61 4 Floor 25-01-2020 new NA
62 NA 25-01-2020 new NA
63 Ground Floor/Stilt Floor 30-04-2019 new NA
64 1 Floor 15-08-2019 new NA
65 2 Floor 14-10-2019 new NA
66 3 Floor 15-12-2019 new NA
67 4 Floor 15-02-2020 new NA
68 Electrical Works 31-01-2020 new NA
69 Concealed Cabling including Plugs & switches 30-04-2020 new NA
70 Installation & Charging of Transformer 30-10-2021 new NA
71 Connection to Flats/Apartments 30-10-2021 new NA
72 PH works 31-01-2020 new NA
73 Laying of concealed Pipes 31-01-2020 new NA
74 PH Fittings 15-08-2021 new NA
75 Overhead Water Tanks 30-09-2021 new NA
76 Water Supply Connection to all units 30-09-2021 new NA
77 STP construction and completion 15-07-2021 new NA
78 Distempering & Colouring of all units and exteriors 31-08-2021 new NA
79 Fixation of doors and windows 31-05-2021 new NA
80 Scheduled Date of handing over possession 30-10-2021 new NA
81 Development of common areas, parks, gardens etc 01-09-2021 new NA
Updated Changes on 17-12-2023
82 Site Development 31-01-2019 COMPLETED NA
83 NA 15-02-2019 COMPLETED NA
84 Ground Floor/Stilt Floor 15-04-2019 COMPLETED NA
85 1 Floor 04-09-2019 COMPLETED NA
86 2 Floor 06-11-2019 COMPLETED NA
87 3 Floor 10-12-2019 COMPLETED NA
88 4 Floor 25-01-2020 COMPLETED NA
89 NA 25-01-2020 COMPLETED NA
90 Ground Floor/Stilt Floor 30-04-2019 COMPLETED NA
91 1 Floor 15-08-2019 COMPLETED NA
92 2 Floor 14-10-2019 COMPLETED NA
93 3 Floor 15-12-2019 COMPLETED NA
94 4 Floor 15-02-2020 COMPLETED NA
95 Electrical Works 31-01-2020 COMPLETED NA
96 Concealed Cabling including Plugs & switches 30-04-2020 COMPLETED NA
97 Installation & Charging of Transformer 30-10-2021 COMPLETED NA
98 Connection to Flats/Apartments 30-10-2021 COMPLETED NA
99 PH works 31-01-2020 COMPLETED NA
100 Laying of concealed Pipes 31-01-2020 COMPLETED NA
101 PH Fittings 15-08-2021 COMPLETED NA
102 Overhead Water Tanks 30-09-2021 COMPLETED NA
103 Water Supply Connection to all units 30-09-2021 COMPLETED NA
104 STP construction and completion 15-07-2021 COMPLETED NA
105 Distempering & Colouring of all units and exteriors 31-08-2021 COMPLETED NA
106 Fixation of doors and windows 31-05-2021 COMPLETED NA
107 Scheduled Date of handing over possession 30-10-2021 COMPLETED NA
108 Development of common areas, parks, gardens etc 01-09-2021 COMPLETED NA

Booking Status

Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership Status
Carpet Area Balcony Area Exclusive Open Terrace Area
1 101 79.13 5.85 23.44 Promoter
2 102 79.13 5.85 23.44 Promoter
3 103 75.69 4.48 23.44 Promoter
4 104 75.69 4.48 23.44 Promoter
5 105 79.13 5.85 23.44 Promoter
6 106 79.13 5.85 23.44 Promoter
7 201 79.13 5.85 23.44 Promoter
8 202 79.13 5.85 23.44 Promoter
9 203 75.69 4.48 23.44 Promoter
10 204 75.69 4.48 23.44 Promoter
11 205 79.13 5.85 23.44 Promoter
12 206 79.13 5.85 23.44 Promoter
13 301 79.13 5.85 23.44 Promoter
14 302 79.13 5.85 23.44 Promoter
15 303 75.69 4.48 23.44 Promoter
16 304 75.69 4.48 23.44 Promoter
17 305 79.13 5.85 23.44 Promoter
18 306 79.13 5.85 23.44 Promoter
19 401 79.13 5.85 23.44 Promoter
20 402 79.13 5.85 23.44 Promoter
21 403 75.69 4.48 23.44 Promoter
22 404 75.69 4.48 23.44 Promoter
23 405 79.13 5.85 23.44 Promoter
24 406 79.13 5.85 23.44 Promoter

Financial Status

SL No. Funds Collected from the Allottees Funds Borrowed from Financial Institutions Funds Employed from Own Sources Expenditure As On Date Status
1 21768716.48 0 11238262.52 33006979 31-12-2019 in progress
2 136984356 0 0 104937294 17-11-2023 COMPLETED

Updated Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 Parking space measuring 797.21 sqm as shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose. 30-10-2021 In progress
2 The land over which construction is proposed is accessible by an approved means of access of 9.15 mtr in width. 30-10-2021 In progress
3 Obtain an Occupancy Certificate from the Authority prior to occupation of building in full or part. 30-10-2021 Not Started
4 The owner/ applicant shall obtain NOC from NAAI/Environmental Clearance from Ministry of Forest & Environment, Govt. of India and submit to BDA wherever applicable, before commencement of construction. 30-10-2021 As applicable
5 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Regulation-44 of BDA (Planning & Building Standards) Regulation, 2008. 30-10-2021 In progress
6 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance, fire tender, physically handicapped persons and outside visitors with signage as per norms under Regulation-35 (11)(12) of BDA (Planning & Building Standards) Regulations, 2008.(Amended-2013 ) 30-10-2021 In progress
7 Plantation over 20% of the plot area shall be made by the applicant as per provision under regulation 28 of BDA (Planning & Building Standards) Regulation, 2008. 30-10-2021 In progress
Updated Changes on 17-12-2023
8 Parking space measuring 797.21 sqm as shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose. 30-10-2021 COMPLETED
9 The land over which construction is proposed is accessible by an approved means of access of 9.15 mtr in width. 30-10-2021 COMPLETED
10 Obtain an Occupancy Certificate from the Authority prior to occupation of building in full or part. 30-10-2021 COMPLETED
11 The owner/ applicant shall obtain NOC from NAAI/Environmental Clearance from Ministry of Forest & Environment, Govt. of India and submit to BDA wherever applicable, before commencement of construction. 30-10-2021 COMPLETED
12 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Regulation-44 of BDA (Planning & Building Standards) Regulation, 2008. 30-10-2021 COMPLETED
13 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance, fire tender, physically handicapped persons and outside visitors with signage as per norms under Regulation-35 (11)(12) of BDA (Planning & Building Standards) Regulations, 2008.(Amended-2013 ) 30-10-2021 COMPLETED
14 Plantation over 20% of the plot area shall be made by the applicant as per provision under regulation 28 of BDA (Planning & Building Standards) Regulation, 2008. 30-10-2021 COMPLETED
Updated Changes on 15-04-2024
15 Parking space measuring 797.21 sqm as shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose. 30-10-2021 COMPLETED
16 The land over which construction is proposed is accessible by an approved means of access of 9.15 mtr in width. 30-10-2021 COMPLETED
17 Obtain an Occupancy Certificate from the Authority prior to occupation of building in full or part. 30-10-2021 COMPLETED
18 The owner/ applicant shall obtain NOC from NAAI/Environmental Clearance from Ministry of Forest & Environment, Govt. of India and submit to BDA wherever applicable, before commencement of construction. 30-10-2021 COMPLETED
19 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Regulation-44 of BDA (Planning & Building Standards) Regulation, 2008. 30-10-2021 COMPLETED
20 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance, fire tender, physically handicapped persons and outside visitors with signage as per norms under Regulation-35 (11)(12) of BDA (Planning & Building Standards) Regulations, 2008.(Amended-2013 ) 30-10-2021 COMPLETED
21 Plantation over 20% of the plot area shall be made by the applicant as per provision under regulation 28 of BDA (Planning & Building Standards) Regulation, 2008. 30-10-2021 COMPLETED

Updated Project Documents

Sl. No. Title of the document Upload Document
1 PROFORMA-I
2 PROFORMA-II
3 PROFORMA-I
4 PROFORMA-II
5 PROFORMA-II
6 PROFORMA-I
7 PROFORMA-II
:  ASHOK KUMAR SWAIN :  
NA :  ASNPS8879G
:PAN Card :  mahima.infracon@gmail.com
:  Graduation :  9861064790
:  I HAVE MORE THAN 10 YEARS OF EXPERIENCE IN REAL ESTATE BUSINESS.
:  Yes :  NA
:  ABHAYA KUMAR SWAIN :  
NA :  AYJPS2722G
:PAN Card :  mahima.infracon@gmail.com
:  Graduation :  9937539269
:  I HAVE MORE THAN 10 YEARS OF EXPERIENCE IN REAL ESTATE BUSINESS.
:  Yes :  NA
:  AJAY SWAIN :  
NA :  EFYJPS9564C
:PAN Card :  mahima.infracon@gmail.com
:  Graduation :  9348519143
:  I HAVE MORE THAN 10 YEARS OF EXPERIENCE IN REAL ESTATE BUSINESS.
:  Yes :  NA

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
SOUMYA RANJAN MOHANTY Contractor NANPUR, BALICHANDRAPUR, JAJPUR-754205, CONTACT-943887624 REGISTRATION NO-986 Yes
AKSHAYA KUMAR MUDULI Architect A-151, SAHEED NAGAR, BHUBANESWAR-751007, MOB-9238308095 CA/97/21736 Yes
BIBUDHENDU KESHARI BHOLA Construction Engineer A/48, NILAKANTHA NAGAR, NAYAPALLI, UNIT-8, NEAR PASSPORT OFFICE, BHUBANESWAR-751003 RTP/DTP (ST. ER)-019/2017 Yes
PARSURAM BAISAKH Chartered Accountant PLOT NO-1407/9200, SATYA VIHAR, RASULGARH, BHUBANESWAR-751010, MOB-9437024673 59633 Yes
. Construction Engineer . .

Updated Units

House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
101 Covered Parking 101 5.2*3.66 34.73 Included
102 Covered Parking 102 5.2*2.79 34.73 Included
103 Covered Parking 103 5.2*3.2 34.73 Included
104 Covered Parking 104 5.2*3.05 34.73 Included
105 Covered Parking 105 5.2*3.21 34.73 Included
106 Covered Parking 106 5.2*2.79 34.73 Included
201 Covered Parking 201 5.2*3.2 34.73 Included
202 Covered Parking 202 5.2*3.05 34.73 Included
203 Covered Parking 203 5.2*3.2 34.73 Included
204 Covered Parking 204 5.2*2.79 34.73 Included
205 Covered Parking 205 5.2*3.66 34.73 Included
206 Covered Parking 206 4.5*3.2 34.73 Included
301 Covered Parking 301 5.2*4.16 34.73 Included
302 Covered Parking 302 5.35*3.66 34.73 Included
303 Covered Parking 303 5.35*2.79 34.73 Included
304 Covered Parking 304 5.35*3.2 34.73 Included
305 Covered Parking 305 5.35*3.05 34.73 Included
306 Covered Parking 306 5.35*3.21 34.73 Included
401 Covered Parking 401 5.35*2.79 34.73 Included
402 Covered Parking 402 5.35*3.2 34.73 Included
403 Covered Parking 403 5.35*3.05 34.73 Included
404 Covered Parking 404 5.35*3.2 34.73 Included
405 Covered Parking 405 5.35*2.79 34.73 Included
406 Covered Parking 406 5.35*3.66 34.73 Included

Generated by pacms.orera.in on date: 2024-05-14