Generated by pacms.orera.in on date: 2024-04-27

Promoter Details
Promoter Name :
Devkant Patnaik
Project Name :
OM PARO NIBAS
Project Location :
(S+4, 16 units) over Plot No. 328/556/835, Khata No. 132/76, Mouza- Tamando, Tahasil-Bhubaneswar-752054, Dist.Khordha, Odisha

Form- I

A. Promoter's Details

:  Fortune Infra Properties Private Limited :  Private Company
:  U45201OR2011PTC013152 :View
NA :  E/5, B.J.B Nagar, Bhubaneswar - 751014, Dist- Khordha, Odisha
:  Plot No.E/5, B.J.B Nagar, Behind Kalpana Area, Badagada, Bhubaneswar-751014, Dist.Khordha, Odisha. :  devkant.patnaik@gmail.com
:  7055814 :  9437055814
:  AABCF7002R :View
:  8 years of experience as real estate developer inside Odisha :  No experience
NA

B. Details of Board of Directors / Partners / MC Members

:  Devkant Patnaik :  
:  Managing Director :  ACYPP4072B
:PAN Card :  devkant.patnaik@gmail.com
:  B.A :  9437055814
:  25 years of experience in real estate & construction business
:  Yes :  NA
:  Chandrakant Patnaik :  
:  Director :  AFZPP9269G
:PAN Card :  ckpattnaik@gmail.com
:  B.A LLB :  9861097834
:  20 years of experience in real estate & construction business
:  Yes :  NA
:  Jyotishree Pattnaik :  
:  Director :  BJNPP2561C
:PAN Card :  jyotishreepattnaik@gmail.com
:  M.A. :  9861222487
:  2 years of experience in real estate business
:  Yes :  NA
:  Titili Pattnaik :  
:  Director :  BJTPP5528B
:PAN Card :  dianapattnaik@gmail.com
:  B.A. :  9861306533
:  2 years of experience in real estate business
:  Yes :  NA

Annexure-1

Details of last projects already implemented (Ongoing or Complete)

Annexure-2

Details of the project to be registered

:   New :  OM PARO NIBAS
:  Residential :  (S+4, 16 units) over Plot No. 328/556/835, Khata No. 132/76, Mouza- Tamando, Tahasil-Bhubaneswar-752054, Dist.Khordha, Odisha
:  Khordha :  Bhubaneswar
:  752054 :  Development Authority
:  Bhubaneswar Development Authority
:  S+4 Residential Apartment Building :  NA

Land Details of the Project


:  328/556/835 :  132/76
:  Tamando :  643.66
:  Yes
No :  View
:  View
:  Other Person
:  Sudam Pradhan :  The promoter M/s Fortune Infra Properties Pvt Ltd. has entered into a development agreement with the Land Owner Mr. Sudam Pradhan. The promoter is also a registered GPA holder of the land Plot No.328/556/835, Khata No.132/76 vide document No.11131901425, dtd.13.02.2019
: No
: Yes
:  11131901425 :  13-02-2019
:  Sub-Registrar' KHANDAGIRI :  Attached

Development Agreement

: Yes
Serial No. Particulars of the Person Land/Plot Details Share of the Person Document Attached
1 Sudam Pradhan Plot No.328/556/835, Khata No.132/76,Mouza-Tamando 40% over base FAR   Agreement Copy

Building Plan

  View   View
  Download site plan 13-08-2022

Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 Parking space measuring 408.59 sqm as shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose. 13-08-2022 Not started
2 The land over which construction is proposed is accessible by an approved means of access of 15.25 mtr in width. 13-08-2022 Not started
3 Obtain Occupancy Certificate from the Authority prior to occupation of the building in full or part. 13-08-2022 Not started
4 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per BDA (Planning & Building Standards) Regulations, 2018. 13-08-2022 Not started
5 20% of parking space in group housing/apartment building shall be exclusively earmarked for ambulance, fire tender, physically handicapped persons and outside visitors with signage as per norms of BDA (Planning & Building Standards) Regulations, 2018. 13-08-2022 Not started
6 Plantation @80 sq per tree over the plot area shall be made by the applicant as per provision (Planning & Building Standards) Regulations, 2018. 13-08-2022 Not started
7 The applicant shall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/BDA before commencement of construction. 13-08-2022 In progress

Layout Plan

: Yes :  View

Location Map with geo-coordinates of bend points

Point No. Latitude Longitude
1 85°74'71.35" 20°24'13.7''
2 85°74'72.44" 20°24'12.45"
3 85°74'72.74" 20°24'11.62"
4 85°74'.71.10" 20°24'07.90"
5 85°74'69.78" 20°24'08.60"
View

Milestone of Project Construction

Description* Scheduled date of completion Current Status Site Images
Site Development 30-09-2019 In progress
Roof Casting NA NA NA
Ground Floor/Stilt Floor 31-12-2019 Not started NA
1 Floor 29-02-2020 Not started NA
2 Floor 30-04-2020 Not started NA
3 Floor 30-06-2020 Not started NA
4 Floor 31-08-2020 Not started NA
Brick Work & Plastering NA NA NA
Ground Floor/Stilt Floor 15-11-2020 Not started NA
1 Floor 31-12-2020 Not started NA
2 Floor 15-02-2021 Not started NA
3 Floor 30-04-2021 Not started NA
4 Floor 15-06-2021 Not started NA
Electrical Works 15-08-2021 Not started NA
Concealed Cabling including Plugs & switches 31-08-2021 Not started NA
Installation & Charging of Transformer 15-06-2021 Not started NA
Connection to Flats/Apartments 15-06-2021 Not started NA
PH works 30-09-2021 Not started NA
Laying of concealed Pipes 31-10-2021 Not started NA
PH Fittings 31-10-2021 Not started NA
Overhead Water Tanks 31-10-2021 Not started NA
Water Supply Connection to all units 30-11-2021 Not started NA
STP construction and completion 31-12-2021 Not started NA
Distempering & Colouring of all units and exteriors 28-02-2022 Not started NA
Fixation of doors and windows 28-02-2022 Not started NA
Scheduled Date of handing over possession 31-05-2022 Not started NA
Development of common areas, parks, gardens etc 31-03-2022 Not started NA
Site Development 30-09-2019 COMPLETE NA
NA NA NA NA
Ground Floor/Stilt Floor 31-12-2019 COMPLETE NA
1 Floor 29-02-2020 COMPLETE NA
2 Floor 30-04-2020 COMPLETE NA
3 Floor 30-06-2020 COMPLETE NA
4 Floor 31-08-2020 COMPLETE NA
NA NA NA NA
Ground Floor/Stilt Floor 15-11-2020 COMPLETE NA
1 Floor 31-12-2020 COMPLETE NA
2 Floor 15-02-2021 COMPLETE NA
3 Floor 30-04-2021 COMPLETE NA
4 Floor 15-06-2021 COMPLETE NA
Electrical Works 15-08-2021 COMPLETE NA
Concealed Cabling including Plugs & switches 31-08-2021 COMPLETE NA
Installation & Charging of Transformer 15-06-2021 COMPLETE NA
Connection to Flats/Apartments 15-06-2021 COMPLETE NA
PH works 30-09-2021 COMPLETE NA
Laying of concealed Pipes 31-10-2021 COMPLETE NA
PH Fittings 31-10-2021 COMPLETE NA
Overhead Water Tanks 31-10-2021 COMPLETE NA
Water Supply Connection to all units 30-11-2021 COMPLETE NA
STP construction and completion 31-12-2021 COMPLETE NA
Distempering & Colouring of all units and exteriors 28-02-2022 COMPLETE NA
Fixation of doors and windows 28-02-2022 COMPLETE NA
Scheduled Date of handing over possession 31-05-2022 IN PROGRESS NA
Development of common areas, parks, gardens etc 31-03-2022 IN PROGRESS NA
Site Development 30-09-2019 COMPLETE NA
NA 31-12-2019 COMPLETE NA
Ground Floor/Stilt Floor 31-12-2019 COMPLETE NA
1 Floor 29-02-2020 COMPLETE NA
2 Floor 30-04-2020 COMPLETE NA
3 Floor 30-06-2020 COMPLETE NA
4 Floor 31-08-2020 COMPLETE NA
NA 15-11-2020 COMPLETE NA
Ground Floor/Stilt Floor 15-11-2020 COMPLETE NA
1 Floor 31-12-2020 COMPLETE NA
2 Floor 15-02-2021 COMPLETE NA
3 Floor 30-04-2021 COMPLETE NA
4 Floor 15-06-2021 COMPLETE NA
Electrical Works 15-08-2021 COMPLETE NA
Concealed Cabling including Plugs & switches 31-08-2021 COMPLETE NA
Installation & Charging of Transformer 15-06-2021 COMPLETE NA
Connection to Flats/Apartments 15-06-2021 COMPLETE NA
PH works 30-09-2021 COMPLETE NA
Laying of concealed Pipes 31-10-2021 COMPLETE NA
PH Fittings 31-10-2021 COMPLETE NA
Overhead Water Tanks 31-10-2021 COMPLETE NA
Water Supply Connection to all units 30-11-2021 COMPLETE NA
STP construction and completion 31-12-2021 COMPLETE NA
Distempering & Colouring of all units and exteriors 28-02-2022 COMPLETE NA
Fixation of doors and windows 28-02-2022 COMPLETE NA
Scheduled Date of handing over possession 31-05-2022 IN PROGRESS NA
Development of common areas, parks, gardens etc 31-03-2022 IN PROGRESS NA

Category and no. of units to be developed

:  Residential
:  
:  16
:  
:  
:  
Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership
Carpet Area Balcony Area Exclusive Open Terrace Area
1 101 69.14 6.58 NIL Land Owner
2 102 70.72 4.71 NIL Land Owner
3 103 64.94 3.68 NIL Promoter
4 104 69.35 6.96 NIL Promoter
5 201 69.14 6.58 NIL Promoter
6 202 70.72 4.71 NIL Promoter
7 203 64.94 3.68 NIL Land Owner
8 204 69.35 6.96 NIL Promoter
9 301 69.14 6.58 NIL Promoter
10 302 70.72 4.71 NIL Promoter
11 303 64.94 3.68 NIL Land Owner
12 304 69.35 6.96 NIL Promoter
13 401 69.14 6.58 NIL Promoter
14 402 70.72 4.71 NIL Promoter
15 403 47.55 3.68 NIL Land Owner
16 404 69.35 6.96 NIL Promoter
Types of garages and parking
House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
101 Open Parking 12 6.0x4.08 24.48 Included
102 Covered Parking 13 6.0x4.08 24.48 Included
103 Covered Parking 1 6.0x4.08 24.48 Included
104 Covered Parking 2 6.0x4.08 24.48 Included
201 Covered Parking 3 6.0x4.08 24.48 Included
202 Covered Parking 4 6.0x4.08 24.48 Included
203 Covered Parking 14 6.0x4.08 24.48 Included
204 Covered Parking 5 6.0x4.08 24.48 Included
301 Covered Parking 6 6.0x4.08 24.48 Included
302 Covered Parking 7 6.0x4.08 24.48 Included
303 Covered Parking 15 6.0x4.08 24.48 Included
304 Covered Parking 8 6.0x4.08 24.48 Included
401 Covered Parking 9 6.0x4.08 24.48 Included
402 Covered Parking 10 6.0x4.08 24.48 Included
403 Covered Parking 16 6.0x4.08 24.48 Included
404 Covered Parking 11 6.0x4.08 24.48 Included
Yes

Facilities to be provided

Particulars of Facilities Status of the facility Brief description of facility
Drinking Water Facility Ground Water Copy of Consent Letter
Fire Fighting Facility Yes Fire Extinguisher, Fire Alarm
Emergency Evacuation Services Yes Staircase
Use of Renewable Energy No
Lift Facility Yes 01 No. lift of KONE/Johnson/ECE brand of 6 Passenger capacity with ARD facility.
Market Complex No
Community Hall Yes 16.77 sqm community hall with tile flooring
Gymnasium No
Swimming Pool No
Play Ground No
Park/Garden No
Plantation Area Yes 128.732 sqm
Others(Please Specify) No
Internal Road Yes 30.818 sqm internal road of flooring tile
External Road No
Elecricity Supply Yes Copy of Consent Letter
Other Amenities No

Bank Particulars of the Project

  ICICI Bank
  Bhubaneswar
  006105027357
  ICIC0000061
   View
  67575275
  2267575275

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
Sagarendra Mohapatra Architect Plot No-300 , Kharvel Nagar, Unit-III, BBSR(Odisha) CA/99/25469 NIL
Santosh Kumar Sahoo Construction Engineer Plot No-25/238, Samntapuri, P.O-Sainaik School Chhack, BBSR (Odisha) BDA/SER/005 NIL
Dweipayan Das Chartered Accountant Plot No-L-3/76, Acharya Vihar, BBSR (Odisha) 325180E NIL

Financial Details

:  377.33 :   View
  13-08-2022 :  50
:  0 :  0

Documents Attached

Description of Document Option Documents
Fire Safety Certificate Undertaking Attached
Affidavit in Form-A as per clause-l of sub-section-2 of section-4 of the Act Yes Attached
Allotment letter format Yes Attached
Conveyance Deed Format Yes Attached
Affidavit to adopt agreement for sale format as per Rule-8(1) of ORE (R and D) Rules, 2017 Yes Attached
Annual Report 2017-18 Attached
Annual Report 2016-17 Attached
Annual Report 2018-19 Attached
IT Return 2015-16 Attached
IT Return 2016-17 Attached
IT Return 2017-18 Attached
Audit Report 2017-18 Attached
Audit Report 2016-17 Attached
Audit Report 2018-19 Attached


Other documents

“I undertake that the information submitted by me in this application are correct and true to best my knowledge. I also understand that providing false or wrong information is punishable under the Section-60 of the Real Estate (Regulation & Development) Act, 2016. I also further understand that furnishing wrong or false information will lead to rejection of my application registration of the project with forfeiture of registration fee and other charges deposited by me.”
  

Construction Progress

Updated Construction Progress

SL NO. Description Scheduled date of completion Current Status Remarks
1 Site Development 30-09-2019 In progress
2 Roof Casting NA NA NA
3 Ground Floor/Stilt Floor 31-12-2019 Not started NA
4 1 Floor 29-02-2020 Not started NA
5 2 Floor 30-04-2020 Not started NA
6 3 Floor 30-06-2020 Not started NA
7 4 Floor 31-08-2020 Not started NA
8 Brick Work & Plastering NA NA NA
9 Ground Floor/Stilt Floor 15-11-2020 Not started NA
10 1 Floor 31-12-2020 Not started NA
11 2 Floor 15-02-2021 Not started NA
12 3 Floor 30-04-2021 Not started NA
13 4 Floor 15-06-2021 Not started NA
14 Electrical Works 15-08-2021 Not started NA
15 Concealed Cabling including Plugs & switches 31-08-2021 Not started NA
16 Installation & Charging of Transformer 15-06-2021 Not started NA
17 Connection to Flats/Apartments 15-06-2021 Not started NA
18 PH works 30-09-2021 Not started NA
19 Laying of concealed Pipes 31-10-2021 Not started NA
20 PH Fittings 31-10-2021 Not started NA
21 Overhead Water Tanks 31-10-2021 Not started NA
22 Water Supply Connection to all units 30-11-2021 Not started NA
23 STP construction and completion 31-12-2021 Not started NA
24 Distempering & Colouring of all units and exteriors 28-02-2022 Not started NA
25 Fixation of doors and windows 28-02-2022 Not started NA
26 Scheduled Date of handing over possession 31-05-2022 Not started NA
27 Development of common areas, parks, gardens etc 31-03-2022 Not started NA
Updated Changes on 12-01-2024
28 Site Development 30-09-2019 COMPLETE NA
29 NA NA NA NA
30 Ground Floor/Stilt Floor 31-12-2019 COMPLETE NA
31 1 Floor 29-02-2020 COMPLETE NA
32 2 Floor 30-04-2020 COMPLETE NA
33 3 Floor 30-06-2020 COMPLETE NA
34 4 Floor 31-08-2020 COMPLETE NA
35 NA NA NA NA
36 Ground Floor/Stilt Floor 15-11-2020 COMPLETE NA
37 1 Floor 31-12-2020 COMPLETE NA
38 2 Floor 15-02-2021 COMPLETE NA
39 3 Floor 30-04-2021 COMPLETE NA
40 4 Floor 15-06-2021 COMPLETE NA
41 Electrical Works 15-08-2021 COMPLETE NA
42 Concealed Cabling including Plugs & switches 31-08-2021 COMPLETE NA
43 Installation & Charging of Transformer 15-06-2021 COMPLETE NA
44 Connection to Flats/Apartments 15-06-2021 COMPLETE NA
45 PH works 30-09-2021 COMPLETE NA
46 Laying of concealed Pipes 31-10-2021 COMPLETE NA
47 PH Fittings 31-10-2021 COMPLETE NA
48 Overhead Water Tanks 31-10-2021 COMPLETE NA
49 Water Supply Connection to all units 30-11-2021 COMPLETE NA
50 STP construction and completion 31-12-2021 COMPLETE NA
51 Distempering & Colouring of all units and exteriors 28-02-2022 COMPLETE NA
52 Fixation of doors and windows 28-02-2022 COMPLETE NA
53 Scheduled Date of handing over possession 31-05-2022 IN PROGRESS NA
54 Development of common areas, parks, gardens etc 31-03-2022 IN PROGRESS NA
Updated Changes on 15-04-2024
55 Site Development 30-09-2019 COMPLETE NA
56 NA 31-12-2019 COMPLETE NA
57 Ground Floor/Stilt Floor 31-12-2019 COMPLETE NA
58 1 Floor 29-02-2020 COMPLETE NA
59 2 Floor 30-04-2020 COMPLETE NA
60 3 Floor 30-06-2020 COMPLETE NA
61 4 Floor 31-08-2020 COMPLETE NA
62 NA 15-11-2020 COMPLETE NA
63 Ground Floor/Stilt Floor 15-11-2020 COMPLETE NA
64 1 Floor 31-12-2020 COMPLETE NA
65 2 Floor 15-02-2021 COMPLETE NA
66 3 Floor 30-04-2021 COMPLETE NA
67 4 Floor 15-06-2021 COMPLETE NA
68 Electrical Works 15-08-2021 COMPLETE NA
69 Concealed Cabling including Plugs & switches 31-08-2021 COMPLETE NA
70 Installation & Charging of Transformer 15-06-2021 COMPLETE NA
71 Connection to Flats/Apartments 15-06-2021 COMPLETE NA
72 PH works 30-09-2021 COMPLETE NA
73 Laying of concealed Pipes 31-10-2021 COMPLETE NA
74 PH Fittings 31-10-2021 COMPLETE NA
75 Overhead Water Tanks 31-10-2021 COMPLETE NA
76 Water Supply Connection to all units 30-11-2021 COMPLETE NA
77 STP construction and completion 31-12-2021 COMPLETE NA
78 Distempering & Colouring of all units and exteriors 28-02-2022 COMPLETE NA
79 Fixation of doors and windows 28-02-2022 COMPLETE NA
80 Scheduled Date of handing over possession 31-05-2022 IN PROGRESS NA
81 Development of common areas, parks, gardens etc 31-03-2022 IN PROGRESS NA

Booking Status

Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership Status
Carpet Area Balcony Area Exclusive Open Terrace Area
1 101 69.14 6.58 NIL Land Owner
2 102 70.72 4.71 NIL Land Owner
3 103 64.94 3.68 NIL Promoter
4 104 69.35 6.96 NIL Promoter
5 201 69.14 6.58 NIL Promoter
6 202 70.72 4.71 NIL Promoter
7 203 64.94 3.68 NIL Land Owner
8 204 69.35 6.96 NIL Promoter
9 301 69.14 6.58 NIL Promoter
10 302 70.72 4.71 NIL Promoter
11 303 64.94 3.68 NIL Land Owner
12 304 69.35 6.96 NIL Promoter
13 401 69.14 6.58 NIL Promoter
14 402 70.72 4.71 NIL Promoter
15 403 47.55 3.68 NIL Land Owner
16 404 69.35 6.96 NIL Promoter

Financial Status

SL No. Funds Collected from the Allottees Funds Borrowed from Financial Institutions Funds Employed from Own Sources Expenditure As On Date Status
1 0 0 0 37958500 12-01-2024 ONGOING
2 49803925 0 0 38003500 31-03-2024 INPROGRESS

Updated Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 Parking space measuring 408.59 sqm as shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose. 13-08-2022 Not started
2 The land over which construction is proposed is accessible by an approved means of access of 15.25 mtr in width. 13-08-2022 Not started
3 Obtain Occupancy Certificate from the Authority prior to occupation of the building in full or part. 13-08-2022 Not started
4 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per BDA (Planning & Building Standards) Regulations, 2018. 13-08-2022 Not started
5 20% of parking space in group housing/apartment building shall be exclusively earmarked for ambulance, fire tender, physically handicapped persons and outside visitors with signage as per norms of BDA (Planning & Building Standards) Regulations, 2018. 13-08-2022 Not started
6 Plantation @80 sq per tree over the plot area shall be made by the applicant as per provision (Planning & Building Standards) Regulations, 2018. 13-08-2022 Not started
7 The applicant shall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/BDA before commencement of construction. 13-08-2022 In progress
Updated Changes on 12-01-2024
8 Parking space measuring 408.59 sqm as shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose. 13-08-2022 Not started
9 The land over which construction is proposed is accessible by an approved means of access of 15.25 mtr in width. 13-08-2022 Not started
10 Obtain Occupancy Certificate from the Authority prior to occupation of the building in full or part. 13-08-2022 Not started
11 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per BDA (Planning & Building Standards) Regulations, 2018. 13-08-2022 Not started
12 20% of parking space in group housing/apartment building shall be exclusively earmarked for ambulance, fire tender, physically handicapped persons and outside visitors with signage as per norms of BDA (Planning & Building Standards) Regulations, 2018. 13-08-2022 Not started
13 Plantation @80 sq per tree over the plot area shall be made by the applicant as per provision (Planning & Building Standards) Regulations, 2018. 13-08-2022 Not started
14 The applicant shall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/BDA before commencement of construction. 13-08-2022 In progress
Updated Changes on 15-04-2024
15 Parking space measuring 408.59 sqm as shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose. 13-08-2022 In progress
16 The land over which construction is proposed is accessible by an approved means of access of 15.25 mtr in width. 13-08-2022 In progress
17 Obtain Occupancy Certificate from the Authority prior to occupation of the building in full or part. 13-08-2022 In progress
18 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per BDA (Planning & Building Standards) Regulations, 2018. 13-08-2022 In progress
19 20% of parking space in group housing/apartment building shall be exclusively earmarked for ambulance, fire tender, physically handicapped persons and outside visitors with signage as per norms of BDA (Planning & Building Standards) Regulations, 2018. 13-08-2022 In progress
20 Plantation @80 sq per tree over the plot area shall be made by the applicant as per provision (Planning & Building Standards) Regulations, 2018. 13-08-2022 In progress
21 The applicant shall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/BDA before commencement of construction. 13-08-2022 In progress

Updated Project Documents

Sl. No. Title of the document Upload Document
1 QUATERLY PROGRESS REPORT PROFORMA- I & II Q4,2023
2 AUDIT STATEMENT OF ACCOUNT PROFORMA- III Q4,2023
3 QUATERLY PROGRESS REPORT MARCH 20
4 QUATERLY PROGRESS REPORT JUNE 20
5 QUATERLY PROGRESS REPORT SEPETMBER 20
6 QUATERLY PROGRESS REPORT DECEMBER 20
7 QUATERLY PROGRESS REPORT MARCH 21
8 QUATERLY PROGRESS REPORT JUNE 21
9 QUATERLY PROGRESS REPORT SEPETMBER 21
10 QUATERLY PROGRESS REPORT DECEMBER 21
11 QUATERLY PROGRESS REPORT MARCH 22
12 QUATERLY PROGRESS REPORT JUNE 22
13 QUATERLY PROGRESS REPORT SEPETMBER 22
14 QUATERLY PROGRESS REPORT DECEMBER 22
15 QUATERLY PROGRESS REPORT MARCH 23
16 QUATERLY PROGRESS REPORT JUNE 23
17 QUATERLY PROGRESS REPORT SEPETMBER 23
18 ANNUAL AUDIT CERTIFICATE F:Y 19-20
19 ANNUAL AUDIT CERTIFICATE F:Y 20-21
20 ANNUAL AUDIT CERTIFICATE F:Y 21-22
21 ANNUAL AUDIT CERTIFICATE F:Y 22-23
22 QUATERLY PROGRESS REPORT MARCH 24
:  Devkant Patnaik :  
NA :  ACYPP4072B
:PAN Card :  devkant.patnaik@gmail.com
:  B.A :  9437055814
:  25 years of experience in real estate & construction business
:  Yes :  NA
:  Chandrakant Patnaik :  
NA :  AFZPP9269G
:PAN Card :  ckpattnaik@gmail.com
:  B.A LLB :  9861097834
:  20 years of experience in real estate & construction business
:  Yes :  NA
:  Jyotishree Pattnaik :  
NA :  BJNPP2561C
:PAN Card :  jyotishreepattnaik@gmail.com
:  M.A. :  9861222487
:  2 years of experience in real estate business
:  Yes :  NA
:  Titili Pattnaik :  
NA :  BJTPP5528B
:PAN Card :  dianapattnaik@gmail.com
:  B.A. :  9861306533
:  2 years of experience in real estate business
:  Yes :  NA

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
Sagarendra Mohapatra Architect Plot No-300 , Kharvel Nagar, Unit-III, BBSR(Odisha) CA/99/25469 NIL
Santosh Kumar Sahoo Construction Engineer Plot No-25/238, Samntapuri, P.O-Sainaik School Chhack, BBSR (Odisha) BDA/SER/005 NIL
Dweipayan Das Chartered Accountant Plot No-L-3/76, Acharya Vihar, BBSR (Odisha) 325180E NIL

Updated Units

House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
101 Open Parking 12 6.0x4.08 24.48 Included
102 Covered Parking 13 6.0x4.08 24.48 Included
103 Covered Parking 1 6.0x4.08 24.48 Included
104 Covered Parking 2 6.0x4.08 24.48 Included
201 Covered Parking 3 6.0x4.08 24.48 Included
202 Covered Parking 4 6.0x4.08 24.48 Included
203 Covered Parking 14 6.0x4.08 24.48 Included
204 Covered Parking 5 6.0x4.08 24.48 Included
301 Covered Parking 6 6.0x4.08 24.48 Included
302 Covered Parking 7 6.0x4.08 24.48 Included
303 Covered Parking 15 6.0x4.08 24.48 Included
304 Covered Parking 8 6.0x4.08 24.48 Included
401 Covered Parking 9 6.0x4.08 24.48 Included
402 Covered Parking 10 6.0x4.08 24.48 Included
403 Covered Parking 16 6.0x4.08 24.48 Included
404 Covered Parking 11 6.0x4.08 24.48 Included

Generated by pacms.orera.in on date: 2024-04-27