Promoter Details
Promoter Name :
Anshuman Patnaik
Project Name :
ARCHID ELITE
Project Location :
(Residential Project, (B+S+11) & (G+2) storied MIG Residential Apartment Building, No. of Units- 59)

Form- I

A. Promoter's Details

:  M/s. Archid Builders Pvt. Ltd :  Private Company
:  U45201OR2009PTC011159 :View
NA :   4th Floor, Archid Central, Plot No.- 315, District Centre, Chandrasekharpur, Bhubaneswar, Dist- Khordha, Odisha- 751021.
:  4th Floor, Archid Central, Plot No.- 315, District Centre, Chandrasekharpur, Bhubaneswar, Dist- Khordha, Odisha- 751021. :  archidhomes@gmail.com
:  2747940 :  9437076631
:  AAHCA9933C :View
:  WE HAVE AN EXPERIENCE OF 15 YEARS IN REAL ESTATE & HAVE COMPLETED APPROX 250000 SQFT OF CONSTRUCTION :   NO EXPERIENCE OUTSIDE STATE
:  www.archidhomes.in

B. Details of Board of Directors / Partners / MC Members

:  Anshuman Patnaik :  
:  Director :  AWLPP2012N
:PAN Card :  archidhomes@gmail.com
:  MBA :  9437076631
:  Has an experience of 14 years in the real-estate sector
:  Yes :  NA
:  BANDAN MOHANTY :  
:  Managing Director :  AFMPM7898D
:PAN Card :  archidhomes@gmail.com
:  MBA :  9437094412
:  Has an experience of 15 years in the real-estate sector
:  Yes :  NA
:   SIMANTIKA MOHANTY :  
:  Director :  AMDPM3225G
:PAN Card :  archidhomes@gmail.com
:  B.A :  7537000001
:  Has an experience of 14 years in the real-estate sector
:  Yes :  NA

Annexure-1

Details of last projects already implemented (Ongoing or Complete)

Annexure-2

Details of the project to be registered

:   New :  ARCHID ELITE
:  Residential :  (Residential Project, (B+S+11) & (G+2) storied MIG Residential Apartment Building, No. of Units- 59)
:  Khordha :  Bhubaneswar
:  751024 :  Urban Local Body
:   Bhubaneswar Municipal Corporation
:  Proposed (B+S+11) & (G+2) Storied MIG Residential Apartment Building. :  NA

Land Details of the Project


:  403/1972 :  474/246
:  Patia :  971.27
:  Yes
No :  View
:  View
:  Other Person
:  Bharati Roy & Others :   M/s Archid Builders Ltd. has obtained Agreement for development of land and Irrevocable General Power of Attorney from lawful owners named as Smt. Bharati Roy, Smt. Tanushree Roy, Smt. Debashree Roy, Mr. Pradyumna Kishore Roy & Mr. Sanjay Sekhar Roy.
: No
: Yes
:  11081908275 :  25-07-2019
:  DSR Khurda (Bbsr) :  Attached

:  403 :  493/38
:  Patia :  2023.49
:  Yes
No :  View
:  View
:  Other Person
:  Bamadev Mohanty :   M/s Archid Builders Ltd. has obtained a Registered Agreement for development of land and Registered Irrevocable General Power of Attorney from lawful owner named as Dr. Bamadev Mohanty.
: No
: Yes
:  11082116162 :  30-12-2021
:  DSR Khurda (Bbsr) :  Attached

Development Agreement

: Yes
Serial No. Particulars of the Person Land/Plot Details Share of the Person Document Attached
1 Bamadev Mohanty Plot No- 403, Khata No- 493/38, Mouza- Patia 50%   Agreement Copy
2 Bharati Roy & Others Plot No- 493/1972, Khata No- 474/246, Mouza- Patia 40%   Agreement Copy

Building Plan

  View   View
  Download site plan 27-11-2025

Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 The building shall be used exclusively for Residential Apartment purpose and the use shall not be changed to any other use without prior of this Authority. 01-01-2025 work in progress
2 The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement. 01-01-2025 work in progress
3 Parking space measuring 2921.96 Sqm. as shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose and shall not be partitioned/closed in any manner. 01-01-2025 work in progress
4 The land over which construction is proposed is accessible by an approved means of access of 13.71 Mtr. (Thirteen point Seven one mtr) in width. 01-01-2025 work in progress
5 The land in question must be in lawful ownership and peaceful possession of the applicant. 01-01-2025 work in progress
6 The permission granted under these regulations shall remain valid up to three years from the date of issue. However the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year. 01-01-2025 work in progress
7 Storm water from the permises of roof top rain water shall be conveyed and discharged to the rain water Harvesting structure in the premises as per Rule-47 of ODA (Planning & Building Standards) Rules-2020. 01-01-2025 work in progress
8 Provisions of green building norms are to be strictly followed as per Rule-51 of ODA (Planning & Building Standards) Rules-2020. 01-01-2025 work in progress
9 Plantation as required under Rule 30 of ODA (Planning & Building Standards) Rules-2020. shall be strictly adhered. 01-01-2025 work in progress
10 At least 10% of the parking shall be earmarked for visitors and 30% of the parking space shall have facility for Electrical Vehicle Charging Points. 01-01-2025 work in progress
11 The Owner/Applicant/Architect/Structural Engineer/PMO are fully and jointly responsible for any structural failure of building due to any earthquake/cyclone/any other natural disaster, structural/construction defects. Authority will be no way be held responsible for the same in what so ever manner. 01-01-2025 work in progress
12 The applicant shall get the EIDP approved towards development of External infrastructure, execute it and obtain clearance from Engineering Wing of BMC before Occupancy. 01-01-2025 work in progress

Layout Plan

: Yes :  View

Location Map with geo-coordinates of bend points

Point No. Latitude Longitude
1 20°20'43.0"°N 85°49'30.5"°E
2 20°20'45.8"°N 85°49'30.8"°E
3 20°20'45.7"°N 85°49'32.2"°E
4 20°20'43.6"°N 85°49'32.0"°E
5 20°20'43.3"°N 85°49'31.2"°E
View

Milestone of Project Construction

Description* Scheduled date of completion Current Status Site Images
Site Development 15-01-2023 Work not Started
Roof Casting NA NA NA
Ground Floor/Stilt Floor 01-03-2023 Work not Started NA
1 Floor 01-04-2023 Work not Started NA
2 Floor 01-05-2023 Work not Started NA
3 Floor 01-06-2023 Work not Started NA
4 Floor 01-07-2023 Work not Started NA
5 Floor 01-08-2023 Work not Started NA
6 Floor 01-09-2023 Work not Started NA
7 Floor 01-11-2023 Work not Started NA
8 Floor 15-12-2023 Work not Started NA
9 Floor 10-01-2024 Work not Started NA
10 Floor 01-02-2024 Work not Started NA
11 Floor 01-03-2024 Work not Started NA
Brick Work & Plastering NA NA NA
Ground Floor/Stilt Floor 01-01-2024 Work not Started NA
1 Floor 01-02-2024 Work not Started NA
2 Floor 01-03-2024 Work not Started NA
3 Floor 01-04-2024 Work not Started NA
4 Floor 01-05-2024 Work not Started NA
5 Floor 01-06-2024 Work not Started NA
6 Floor 01-07-2024 Work not Started NA
7 Floor 01-08-2024 Work not Started NA
8 Floor 25-08-2024 Work not Started NA
9 Floor 10-09-2024 Work not Started NA
10 Floor 30-09-2024 Work not Started NA
11 Floor 10-10-2024 Work not Started NA
Electrical Works 01-01-2025 Work not Started NA
Concealed Cabling including Plugs & switches 01-02-2025 Work not Started NA
Installation & Charging of Transformer 01-03-2025 Work not Started NA
Connection to Flats/Apartments 01-04-2025 Work not Started NA
PH works 01-05-2025 Work not Started NA
Laying of concealed Pipes 01-01-2025 Work not Started NA
PH Fittings 01-01-2025 Work not Started NA
Overhead Water Tanks 01-01-2025 Work not Started NA
Water Supply Connection to all units 01-01-2025 Work not Started NA
STP construction and completion 01-01-2025 Work not Started NA
Distempering & Colouring of all units and exteriors 01-01-2025 Work not Started NA
Fixation of doors and windows 01-01-2025 Work not Started NA
Scheduled Date of handing over possession 01-01-2025 Work not Started NA
Development of common areas, parks, gardens etc 01-01-2025 Work not Started NA
Site Development 15-01-2023 Work not Started NA
NA NA NA NA
Ground Floor/Stilt Floor 31-08-2023 Work not Started
1 Floor 31-10-2023 Work not Started NA
2 Floor 30-11-2023 Work not Started NA
3 Floor 31-12-2023 Work not Started NA
4 Floor 31-01-2024 Work not Started NA
5 Floor 29-02-2024 Work not Started NA
6 Floor 31-03-2024 Work not Started NA
7 Floor 30-04-2024 Work not Started NA
8 Floor 31-05-2024 Work not Started NA
9 Floor 30-06-2024 Work not Started NA
10 Floor 31-07-2024 Work not Started NA
11 Floor 31-08-2024 Work not Started NA
NA NA NA NA
Ground Floor/Stilt Floor 01-01-2024 Work not Started NA
1 Floor 01-02-2024 Work not Started NA
2 Floor 01-03-2024 Work not Started NA
3 Floor 01-04-2024 Work not Started NA
4 Floor 01-05-2024 Work not Started NA
5 Floor 01-06-2024 Work not Started NA
6 Floor 01-07-2024 Work not Started NA
7 Floor 01-08-2024 Work not Started NA
8 Floor 25-08-2024 Work not Started NA
9 Floor 10-09-2024 Work not Started NA
10 Floor 30-09-2024 Work not Started NA
11 Floor 10-10-2024 Work not Started NA
Electrical Works 01-01-2025 Work not Started NA
Concealed Cabling including Plugs & switches 01-02-2025 Work not Started NA
Installation & Charging of Transformer 01-03-2025 Work not Started NA
Connection to Flats/Apartments 01-04-2025 Work not Started NA
PH works 01-05-2025 Work not Started NA
Laying of concealed Pipes 01-01-2025 Work not Started NA
PH Fittings 01-01-2025 Work not Started NA
Overhead Water Tanks 01-01-2025 Work not Started NA
Water Supply Connection to all units 01-01-2025 Work not Started NA
STP construction and completion 01-01-2025 Work not Started NA
Distempering & Colouring of all units and exteriors 01-01-2025 Work not Started NA
Fixation of doors and windows 01-01-2025 Work not Started NA
Scheduled Date of handing over possession 01-01-2025 Work not Started NA
Development of common areas, parks, gardens etc 01-01-2025 Work not Started NA
Site Development 15-12-2023 Work Started
NA 30-11-2023 Basement work in progress
Ground Floor/Stilt Floor 30-11-2023 Work Started
1 Floor 31-12-2023 Work not Started NA
2 Floor 31-01-2024 Work not Started NA
3 Floor 05-03-2024 Work not Started NA
4 Floor 15-04-2024 Work not Started NA
5 Floor 31-05-2024 Work not Started NA
6 Floor 30-06-2024 Work not Started NA
7 Floor 31-07-2024 Work not Started NA
8 Floor 31-08-2024 Work not Started NA
9 Floor 30-09-2024 Work not Started NA
10 Floor 31-10-2024 Work not Started NA
11 Floor 30-11-2024 Work not Started NA
NA 31-01-2025 Work not Started NA
Ground Floor/Stilt Floor 01-01-2024 Work not Started NA
1 Floor 01-02-2024 Work not Started NA
2 Floor 01-03-2024 Work not Started NA
3 Floor 01-04-2024 Work not Started NA
4 Floor 01-05-2024 Work not Started NA
5 Floor 01-06-2024 Work not Started NA
6 Floor 01-07-2024 Work not Started NA
7 Floor 01-08-2024 Work not Started NA
8 Floor 25-08-2024 Work not Started NA
9 Floor 10-09-2024 Work not Started NA
10 Floor 30-09-2024 Work not Started NA
11 Floor 10-10-2024 Work not Started NA
Electrical Works 01-01-2025 Work not Started NA
Concealed Cabling including Plugs & switches 01-02-2025 Work not Started NA
Installation & Charging of Transformer 01-03-2025 Work not Started NA
Connection to Flats/Apartments 01-04-2025 Work not Started NA
PH works 01-05-2025 Work not Started NA
Laying of concealed Pipes 01-01-2025 Work not Started NA
PH Fittings 01-01-2025 Work not Started NA
Overhead Water Tanks 01-01-2025 Work not Started NA
Water Supply Connection to all units 01-01-2025 Work not Started NA
STP construction and completion 01-01-2025 Work not Started NA
Distempering & Colouring of all units and exteriors 01-01-2025 Work not Started NA
Fixation of doors and windows 01-01-2025 Work not Started NA
Scheduled Date of handing over possession 01-01-2025 Work not Started NA
Development of common areas, parks, gardens etc 01-01-2025 Work not Started NA
Site Development 15-12-2023 Work Started NA
NA 28-02-2024 Basement work in progress NA
Ground Floor/Stilt Floor 01-03-2024 Work Started NA
1 Floor 01-05-2024 Work not Started
2 Floor 01-08-2024 Work not Started
3 Floor 01-10-2024 Work not Started NA
4 Floor 01-11-2024 Work not Started NA
5 Floor 01-12-2024 Work not Started NA
6 Floor 31-01-2025 Work not Started NA
7 Floor 28-02-2025 Work not Started NA
8 Floor 31-03-2025 Work not Started NA
9 Floor 30-04-2025 Work not Started NA
10 Floor 31-05-2025 Work not Started NA
11 Floor 30-06-2025 Work not Started NA
NA 31-01-2025 Work not Started NA
Ground Floor/Stilt Floor 01-04-2024 Work not Started NA
1 Floor 01-05-2024 Work not Started NA
2 Floor 01-06-2024 Work not Started NA
3 Floor 01-07-2024 Work not Started NA
4 Floor 01-08-2024 Work not Started NA
5 Floor 01-09-2024 Work not Started NA
6 Floor 01-07-2024 Work not Started NA
7 Floor 01-08-2024 Work not Started NA
8 Floor 25-08-2024 Work not Started NA
9 Floor 10-09-2024 Work not Started NA
10 Floor 30-09-2024 Work not Started NA
11 Floor 10-10-2024 Work not Started NA
Electrical Works 01-01-2025 Work not Started NA
Concealed Cabling including Plugs & switches 01-02-2025 Work not Started NA
Installation & Charging of Transformer 01-03-2025 Work not Started NA
Connection to Flats/Apartments 01-04-2025 Work not Started NA
PH works 01-05-2025 Work not Started NA
Laying of concealed Pipes 01-01-2025 Work not Started NA
PH Fittings 01-01-2025 Work not Started NA
Overhead Water Tanks 01-01-2025 Work not Started NA
Water Supply Connection to all units 01-01-2025 Work not Started NA
STP construction and completion 01-01-2025 Work not Started NA
Distempering & Colouring of all units and exteriors 01-01-2025 Work not Started NA
Fixation of doors and windows 01-01-2025 Work not Started NA
Scheduled Date of handing over possession 01-01-2025 Work not Started NA
Development of common areas, parks, gardens etc 01-01-2025 Work not Started NA
Site Development 15-12-2023 Work Started NA
NA 28-02-2024 Basement Slab casting work under progress
Ground Floor/Stilt Floor 01-05-2024 Work not Started
1 Floor 01-07-2024 Work not Started
2 Floor 01-10-2024 Work not Started
3 Floor 01-12-2024 Work not Started NA
4 Floor 01-01-2025 Work not Started NA
5 Floor 01-02-2025 Work not Started NA
6 Floor 01-03-2025 Work not Started NA
7 Floor 01-04-2025 Work not Started NA
8 Floor 01-05-2025 Work not Started NA
9 Floor 01-06-2025 Work not Started NA
10 Floor 01-07-2025 Work not Started NA
11 Floor 01-09-2025 Work not Started NA
NA 31-01-2025 Work not Started NA
Ground Floor/Stilt Floor 01-07-2024 Work not Started NA
1 Floor 01-08-2024 Work not Started NA
2 Floor 01-10-2024 Work not Started NA
3 Floor 01-12-2024 Work not Started NA
4 Floor 01-01-2025 Work not Started NA
5 Floor 01-03-2025 Work not Started NA
6 Floor 01-05-2025 Work not Started NA
7 Floor 01-07-2025 Work not Started NA
8 Floor 01-08-2025 Work not Started NA
9 Floor 01-09-2025 Work not Started NA
10 Floor 01-11-2025 Work not Started NA
11 Floor 01-12-2025 Work not Started NA
Electrical Works 01-02-2026 Work not Started NA
Concealed Cabling including Plugs & switches 01-03-2026 Work not Started NA
Installation & Charging of Transformer 01-02-2026 Work not Started NA
Connection to Flats/Apartments 01-04-2026 Work not Started NA
PH works 01-03-2026 Work not Started NA
Laying of concealed Pipes 01-04-2026 Work not Started NA
PH Fittings 01-03-2026 Work not Started NA
Overhead Water Tanks 01-03-2026 Work not Started NA
Water Supply Connection to all units 01-04-2026 Work not Started NA
STP construction and completion 01-01-2026 Work not Started NA
Distempering & Colouring of all units and exteriors 01-01-2026 Work not Started NA
Fixation of doors and windows 01-01-2026 Work not Started NA
Scheduled Date of handing over possession 01-05-2026 Work not Started NA
Development of common areas, parks, gardens etc 01-01-2025 Work not Started NA

Category and no. of units to be developed

:  Residential
:  
:  59
:  
:  
:  
Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership
Carpet Area Balcony Area Exclusive Open Terrace Area
1 101 3BHK 123.24 17.24 00 Promoter
2 102 4BHK 152.55 17.93 00 Land Owner
3 103 3BHK 120.63 17.24 00 Land Owner
4 104 3BHK 120.63 17.24 00 Promoter
5 105 4BHK 152.55 17.93 00 Promoter
6 106 3BHK 123.24 17.24 00 Land Owner
7 201 3BHK 123.24 17.24 00 Land Owner
8 202 4BHK 152.55 17.93 00 Promoter
9 203 3BHK 120.63 17.24 00 Land Owner
10 204 3BHK 120.63 17.24 00 Promoter
11 205 4BHK 152.55 17.93 00 Land Owner
12 206 3BHK 123.24 17.24 00 Promoter
13 301 3BHK 123.24 17.24 00 Land Owner
14 302 4BHK 152.55 17.93 00 Land Owner
15 303 3BHK 120.63 17.24 00 Promoter
16 304 3BHK 120.63 17.24 00 Land Owner
17 305 4BHK 152.55 17.93 00 Promoter
18 306 3BHK 123.24 17.24 00 Promoter
19 401 3BHK 123.24 17.24 00 Promoter
20 402 4BHK 152.55 17.93 00 Promoter
21 403 3BHK 120.63 17.24 00 Promoter
22 404 3BHK 120.63 17.24 00 Land Owner
23 405 4BHK 152.55 17.93 00 Land Owner
24 406 3BHK 123.24 17.24 00 Land Owner
25 501 3BHK 123.24 17.24 00 Land Owner
26 502 4BHK 152.55 17.93 00 Land Owner
27 503 3BHK 120.63 17.24 00 Land Owner
28 504 3BHK 120.63 17.24 00 Promoter
29 505 4BHK 152.55 17.93 00 Promoter
30 506 3BHK 123.24 17.24 00 Promoter
31 601 3BHK 123.24 17.24 00 Promoter
32 602 4BHK 152.55 17.93 00 Promoter
33 603 3BHK 120.63 17.24 00 Promoter
34 604 3BHK 120.63 17.24 00 Land Owner
35 605 4BHK 152.55 17.93 00 Land Owner
36 606 3BHK 123.24 17.24 00 Promoter
37 701 3BHK 123.24 17.24 00 Promoter
38 702 4BHK 152.55 17.93 00 Land Owner
39 703 3BHK 120.63 17.24 00 Land Owner
40 704 3BHK 120.63 17.24 00 Promoter
41 705 4BHK 152.55 17.93 00 Promoter
42 706 3BHK 123.24 17.24 00 Land Owner
43 801 3BHK 123.24 17.24 00 Land Owner
44 802 4BHK 152.55 17.93 00 Land Owner
45 803 3BHK 120.63 17.24 00 Promoter
46 804 3BHK 120.63 17.24 00 Land Owner
47 805 4BHK 152.55 17.93 00 Promoter
48 806 3BHK 123.24 17.24 00 Promoter
49 901 4BHK 187.9 51.26 00 Promoter
50 902 4BHK 152.55 17.93 00 Promoter
51 903 4BHK 187.9 51.26 00 Land Owner
52 904 4BHK 187.9 51.26 00 Promoter
53 905 4BHK 152.55 17.93 00 Land Owner
54 906 4BHK 187.9 51.26 00 Land Owner
55 1002 4BHK 152.55 17.93 00 Promoter
56 1005 4BHK 152.55 17.93 00 Land Owner
57 B-101 3BHK 67.84 6.7 00 Land Owner
58 B-102 3BHK 77.62 9.96 00 Land Owner
59 B-103 3BHK 77.62 6.96 00 Land Owner
Types of garages and parking
House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
101 Covered Parking 101 3.66 X 2.50 9.15 Included
102 Covered Parking 102 3.66 X 2.50 9.15 Included
103 Covered Parking 103 3.66 X 2.50 9.15 Included
104 Covered Parking 104 3.66 X 2.50 9.15 Included
105 Covered Parking 105 3.66 X 2.50 9.15 Included
106 Covered Parking 106 3.66 X 2.50 9.15 Included
201 Covered Parking 201 3.66 X 2.50 9.15 Included
202 Covered Parking 202 3.66 X 2.50 9.15 Included
203 Covered Parking 203 3.66 X 2.50 9.15 Included
204 Covered Parking 204 3.66 X 2.50 9.15 Included
205 Covered Parking 205 3.66 X 2.50 9.15 Included
206 Covered Parking 206 3.66 X 2.50 9.15 Included
301 Covered Parking 301 3.66 X 2.50 9.15 Included
302 Covered Parking 302 3.66 X 2.50 9.15 Included
303 Covered Parking 303 3.66 X 2.50 9.15 Included
304 Covered Parking 304 3.66 X 2.50 9.15 Included
305 Covered Parking 305 3.66 X 2.50 9.15 Included
306 Covered Parking 306 3.66 X 2.50 9.15 Included
401 Covered Parking 401 3.66 X 2.50 9.15 Included
402 Covered Parking 402 3.66 X 2.50 9.15 Included
403 Covered Parking 403 3.66 X 2.50 9.15 Included
404 Covered Parking 404 3.66 X 2.50 9.15 Included
405 Covered Parking 405 3.66 X 2.50 9.15 Included
406 Covered Parking 406 3.66 X 2.50 9.15 Included
501 Covered Parking 501 3.66 X 2.50 9.15 Included
502 Covered Parking 502 3.66 X 2.50 9.15 Included
503 Covered Parking 503 3.66 X 2.50 9.15 Included
504 Covered Parking 504 3.66 X 2.50 9.15 Included
505 Covered Parking 505 3.66 X 2.50 9.15 Included
506 Covered Parking 506 3.66 X 2.50 9.15 Included
601 Covered Parking 601 3.66 X 2.50 9.15 Included
602 Covered Parking 602 3.66 X 2.50 9.15 Included
603 Covered Parking 603 3.66 X 2.50 9.15 Included
604 Covered Parking 604 3.66 X 2.50 9.15 Included
605 Covered Parking 605 3.66 X 2.50 9.15 Included
606 Covered Parking 606 3.66 X 2.50 9.15 Included
701 Covered Parking 701 3.66 X 2.50 9.15 Included
702 Covered Parking 702 3.66 X 2.50 9.15 Included
703 Covered Parking 703 3.66 X 2.50 9.15 Included
704 Covered Parking 704 3.66 X 2.50 9.15 Included
705 Covered Parking 705 3.66 X 2.50 9.15 Included
706 Covered Parking 706 3.66 X 2.50 9.15 Included
801 Covered Parking 801 3.66 X 2.50 9.15 Included
802 Covered Parking 802 3.66 X 2.50 9.15 Included
803 Covered Parking 803 3.66 X 2.50 9.15 Included
804 Covered Parking 804 3.66 X 2.50 9.15 Included
805 Covered Parking 805 3.66 X 2.50 9.15 Included
806 Covered Parking 806 3.66 X 2.50 9.15 Included
901 Covered Parking 901 3.66 X 2.50 9.15 Included
902 Covered Parking 902 3.66 X 2.50 9.15 Included
903 Covered Parking 903 3.66 X 2.50 9.15 Included
904 Covered Parking 904 3.66 X 2.50 9.15 Included
905 Covered Parking 905 3.66 X 2.50 9.15 Included
906 Covered Parking 906 3.66 X 2.50 9.15 Included
1002 Covered Parking 1002 3.66 X 2.50 9.15 Included
1005 Covered Parking 1005 3.66 X 2.50 9.15 Included
B-101 Covered Parking B-101 3.66 X 2.50 9.15 Included
B-102 Covered Parking B-102 3.66 X 2.50 9.15 Included
B-103 Covered Parking B-103 3.66 X 2.50 9.15 Included
Yes

Facilities to be provided

Particulars of Facilities Status of the facility Brief description of facility
Drinking Water Facility Ground Water Copy of Consent Letter
Fire Fighting Facility Yes Automatic Sprinkler system in basement & complex,hydrant system,wet riser & first aid hoss reel system,water curtain system,fire detection & alarm system,fire pumps,fire alarm,hose reel &port
Emergency Evacuation Services Yes Stair case & Refuse platform As per norms
Use of Renewable Energy No
Lift Facility Yes (8 -PASSENGER lift with size -1.84x2.00mtr & 4-SERVICES LIFT with size 2.575x2.10) & also 2 lifts in complex Of MITSUBISHI Brand
Market Complex No
Community Hall Yes 77.82 Sqmtr
Gymnasium Yes Gymnasium - With Area of 156sqmtr.
Swimming Pool Yes Swimming pool with area of 60 sqmtr.
Play Ground Yes inside the residential apartment
Park/Garden No
Plantation Area Yes Tree plantation on the periphery of compound wall & small plants, shrubs.
Others(Please Specify) No
Internal Road Yes Finish with Pavitt tile 6 mtr wide drive way
External Road Yes Finish with black top 13.71 mtr Wide Road
Elecricity Supply Yes Copy of Consent Letter
Other Amenities No

Bank Particulars of the Project

  DCB Bank Ltd.
  Chandrasekharpur
  42122000000161
  DCBL0000421
   View
   6812024
   977601999

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
M.AKASH DEEP Architect PLOT NO- 948/A, PRSANTI VIHAR, DELTA SQUARE, BARMUNDA, BBSR, GMAIL- kaashdeep@gmail.com, MOB- 9668723099 REGD NO-CA/2005/35305 BDA
LOKANATH MOHANTY Construction Engineer PLOT NO- 948/A, PRSANTI VIHAR, DELTA SQUARE, BARMUNDA, BBSR, GMAIL- vaastuarcon_bbsr@rediffmail.com, Mob- 7978469288 AM1911735
S.S TEKRIWAL Chartered Accountant Kathagarh Road, Cuttack, Odisha, Mobile no- 9437017625, Email id- sst_ca@rediffmail.com 319218E
RAY INFRA PROJECTS PVT LTD. Contractor 2ND FLOOR, MIG-108, BARAMUNDA HOUSING COLONY, BHUBANESWAR-751003, RAYINFRAPROJECTSPVTLTD@GMAIL.COM, MOBILE NO- 9937317262 21AAHCR1850R1Z3

Financial Details

:  2533 :   View
  31-12-2026 :  1000
:  1533 :  0

Documents Attached

Description of Document Option Documents
Fire Safety Certificate Certificate Attached
Affidavit in Form-A as per clause-l of sub-section-2 of section-4 of the Act Yes Attached
Allotment letter format Yes Attached
Conveyance Deed Format Yes Attached
Affidavit to adopt agreement for sale format as per Rule-8(1) of ORE (R and D) Rules, 2017 Yes Attached
Annual Report 2020-21 Attached
Annual Report 2021-22 Attached
Annual Report 2022-23 Attached
IT Return 2020-21 Attached
IT Return 2021-22 Attached
IT Return 2022-23 Attached
Audit Report 2020-21 Attached
Audit Report 2021-22 Attached
Audit Report 2022-23 Attached

Additional Documents Attached

Sl. No. Title of the document Upload Document
1 Legal hair certificate plot no - 403/1972
2 Structural Vetting Certificate
3 P H Noc
4 Kanakalata Roy Death Certificate
5 Clarification Regarding Block-B Parking

Other documents

“I undertake that the information submitted by me in this application are correct and true to best my knowledge. I also understand that providing false or wrong information is punishable under the Section-60 of the Real Estate (Regulation & Development) Act, 2016. I also further understand that furnishing wrong or false information will lead to rejection of my application registration of the project with forfeiture of registration fee and other charges deposited by me.”
  

Construction Progress

Updated Construction Progress

SL NO. Description Scheduled date of completion Current Status Remarks
1 Site Development 15-01-2023 Work not Started
2 Roof Casting NA NA NA
3 Ground Floor/Stilt Floor 01-03-2023 Work not Started NA
4 1 Floor 01-04-2023 Work not Started NA
5 2 Floor 01-05-2023 Work not Started NA
6 3 Floor 01-06-2023 Work not Started NA
7 4 Floor 01-07-2023 Work not Started NA
8 5 Floor 01-08-2023 Work not Started NA
9 6 Floor 01-09-2023 Work not Started NA
10 7 Floor 01-11-2023 Work not Started NA
11 8 Floor 15-12-2023 Work not Started NA
12 9 Floor 10-01-2024 Work not Started NA
13 10 Floor 01-02-2024 Work not Started NA
14 11 Floor 01-03-2024 Work not Started NA
15 Brick Work & Plastering NA NA NA
16 Ground Floor/Stilt Floor 01-01-2024 Work not Started NA
17 1 Floor 01-02-2024 Work not Started NA
18 2 Floor 01-03-2024 Work not Started NA
19 3 Floor 01-04-2024 Work not Started NA
20 4 Floor 01-05-2024 Work not Started NA
21 5 Floor 01-06-2024 Work not Started NA
22 6 Floor 01-07-2024 Work not Started NA
23 7 Floor 01-08-2024 Work not Started NA
24 8 Floor 25-08-2024 Work not Started NA
25 9 Floor 10-09-2024 Work not Started NA
26 10 Floor 30-09-2024 Work not Started NA
27 11 Floor 10-10-2024 Work not Started NA
28 Electrical Works 01-01-2025 Work not Started NA
29 Concealed Cabling including Plugs & switches 01-02-2025 Work not Started NA
30 Installation & Charging of Transformer 01-03-2025 Work not Started NA
31 Connection to Flats/Apartments 01-04-2025 Work not Started NA
32 PH works 01-05-2025 Work not Started NA
33 Laying of concealed Pipes 01-01-2025 Work not Started NA
34 PH Fittings 01-01-2025 Work not Started NA
35 Overhead Water Tanks 01-01-2025 Work not Started NA
36 Water Supply Connection to all units 01-01-2025 Work not Started NA
37 STP construction and completion 01-01-2025 Work not Started NA
38 Distempering & Colouring of all units and exteriors 01-01-2025 Work not Started NA
39 Fixation of doors and windows 01-01-2025 Work not Started NA
40 Scheduled Date of handing over possession 01-01-2025 Work not Started NA
41 Development of common areas, parks, gardens etc 01-01-2025 Work not Started NA
Updated Changes on 13-07-2023
42 Site Development 15-01-2023 Work not Started NA
43 NA NA NA NA
44 Ground Floor/Stilt Floor 31-08-2023 Work not Started
45 1 Floor 31-10-2023 Work not Started NA
46 2 Floor 30-11-2023 Work not Started NA
47 3 Floor 31-12-2023 Work not Started NA
48 4 Floor 31-01-2024 Work not Started NA
49 5 Floor 29-02-2024 Work not Started NA
50 6 Floor 31-03-2024 Work not Started NA
51 7 Floor 30-04-2024 Work not Started NA
52 8 Floor 31-05-2024 Work not Started NA
53 9 Floor 30-06-2024 Work not Started NA
54 10 Floor 31-07-2024 Work not Started NA
55 11 Floor 31-08-2024 Work not Started NA
56 NA NA NA NA
57 Ground Floor/Stilt Floor 01-01-2024 Work not Started NA
58 1 Floor 01-02-2024 Work not Started NA
59 2 Floor 01-03-2024 Work not Started NA
60 3 Floor 01-04-2024 Work not Started NA
61 4 Floor 01-05-2024 Work not Started NA
62 5 Floor 01-06-2024 Work not Started NA
63 6 Floor 01-07-2024 Work not Started NA
64 7 Floor 01-08-2024 Work not Started NA
65 8 Floor 25-08-2024 Work not Started NA
66 9 Floor 10-09-2024 Work not Started NA
67 10 Floor 30-09-2024 Work not Started NA
68 11 Floor 10-10-2024 Work not Started NA
69 Electrical Works 01-01-2025 Work not Started NA
70 Concealed Cabling including Plugs & switches 01-02-2025 Work not Started NA
71 Installation & Charging of Transformer 01-03-2025 Work not Started NA
72 Connection to Flats/Apartments 01-04-2025 Work not Started NA
73 PH works 01-05-2025 Work not Started NA
74 Laying of concealed Pipes 01-01-2025 Work not Started NA
75 PH Fittings 01-01-2025 Work not Started NA
76 Overhead Water Tanks 01-01-2025 Work not Started NA
77 Water Supply Connection to all units 01-01-2025 Work not Started NA
78 STP construction and completion 01-01-2025 Work not Started NA
79 Distempering & Colouring of all units and exteriors 01-01-2025 Work not Started NA
80 Fixation of doors and windows 01-01-2025 Work not Started NA
81 Scheduled Date of handing over possession 01-01-2025 Work not Started NA
82 Development of common areas, parks, gardens etc 01-01-2025 Work not Started NA
Updated Changes on 14-10-2023
83 Site Development 15-12-2023 Work Started
84 NA 30-11-2023 Basement work in progress
85 Ground Floor/Stilt Floor 30-11-2023 Work Started
86 1 Floor 31-12-2023 Work not Started NA
87 2 Floor 31-01-2024 Work not Started NA
88 3 Floor 05-03-2024 Work not Started NA
89 4 Floor 15-04-2024 Work not Started NA
90 5 Floor 31-05-2024 Work not Started NA
91 6 Floor 30-06-2024 Work not Started NA
92 7 Floor 31-07-2024 Work not Started NA
93 8 Floor 31-08-2024 Work not Started NA
94 9 Floor 30-09-2024 Work not Started NA
95 10 Floor 31-10-2024 Work not Started NA
96 11 Floor 30-11-2024 Work not Started NA
97 NA 31-01-2025 Work not Started NA
98 Ground Floor/Stilt Floor 01-01-2024 Work not Started NA
99 1 Floor 01-02-2024 Work not Started NA
100 2 Floor 01-03-2024 Work not Started NA
101 3 Floor 01-04-2024 Work not Started NA
102 4 Floor 01-05-2024 Work not Started NA
103 5 Floor 01-06-2024 Work not Started NA
104 6 Floor 01-07-2024 Work not Started NA
105 7 Floor 01-08-2024 Work not Started NA
106 8 Floor 25-08-2024 Work not Started NA
107 9 Floor 10-09-2024 Work not Started NA
108 10 Floor 30-09-2024 Work not Started NA
109 11 Floor 10-10-2024 Work not Started NA
110 Electrical Works 01-01-2025 Work not Started NA
111 Concealed Cabling including Plugs & switches 01-02-2025 Work not Started NA
112 Installation & Charging of Transformer 01-03-2025 Work not Started NA
113 Connection to Flats/Apartments 01-04-2025 Work not Started NA
114 PH works 01-05-2025 Work not Started NA
115 Laying of concealed Pipes 01-01-2025 Work not Started NA
116 PH Fittings 01-01-2025 Work not Started NA
117 Overhead Water Tanks 01-01-2025 Work not Started NA
118 Water Supply Connection to all units 01-01-2025 Work not Started NA
119 STP construction and completion 01-01-2025 Work not Started NA
120 Distempering & Colouring of all units and exteriors 01-01-2025 Work not Started NA
121 Fixation of doors and windows 01-01-2025 Work not Started NA
122 Scheduled Date of handing over possession 01-01-2025 Work not Started NA
123 Development of common areas, parks, gardens etc 01-01-2025 Work not Started NA
Updated Changes on 12-01-2024
124 Site Development 15-12-2023 Work Started NA
125 NA 28-02-2024 Basement work in progress NA
126 Ground Floor/Stilt Floor 01-03-2024 Work Started NA
127 1 Floor 01-05-2024 Work not Started
128 2 Floor 01-08-2024 Work not Started
129 3 Floor 01-10-2024 Work not Started NA
130 4 Floor 01-11-2024 Work not Started NA
131 5 Floor 01-12-2024 Work not Started NA
132 6 Floor 31-01-2025 Work not Started NA
133 7 Floor 28-02-2025 Work not Started NA
134 8 Floor 31-03-2025 Work not Started NA
135 9 Floor 30-04-2025 Work not Started NA
136 10 Floor 31-05-2025 Work not Started NA
137 11 Floor 30-06-2025 Work not Started NA
138 NA 31-01-2025 Work not Started NA
139 Ground Floor/Stilt Floor 01-04-2024 Work not Started NA
140 1 Floor 01-05-2024 Work not Started NA
141 2 Floor 01-06-2024 Work not Started NA
142 3 Floor 01-07-2024 Work not Started NA
143 4 Floor 01-08-2024 Work not Started NA
144 5 Floor 01-09-2024 Work not Started NA
145 6 Floor 01-07-2024 Work not Started NA
146 7 Floor 01-08-2024 Work not Started NA
147 8 Floor 25-08-2024 Work not Started NA
148 9 Floor 10-09-2024 Work not Started NA
149 10 Floor 30-09-2024 Work not Started NA
150 11 Floor 10-10-2024 Work not Started NA
151 Electrical Works 01-01-2025 Work not Started NA
152 Concealed Cabling including Plugs & switches 01-02-2025 Work not Started NA
153 Installation & Charging of Transformer 01-03-2025 Work not Started NA
154 Connection to Flats/Apartments 01-04-2025 Work not Started NA
155 PH works 01-05-2025 Work not Started NA
156 Laying of concealed Pipes 01-01-2025 Work not Started NA
157 PH Fittings 01-01-2025 Work not Started NA
158 Overhead Water Tanks 01-01-2025 Work not Started NA
159 Water Supply Connection to all units 01-01-2025 Work not Started NA
160 STP construction and completion 01-01-2025 Work not Started NA
161 Distempering & Colouring of all units and exteriors 01-01-2025 Work not Started NA
162 Fixation of doors and windows 01-01-2025 Work not Started NA
163 Scheduled Date of handing over possession 01-01-2025 Work not Started NA
164 Development of common areas, parks, gardens etc 01-01-2025 Work not Started NA
Updated Changes on 11-04-2024
165 Site Development 15-12-2023 Work Started NA
166 NA 28-02-2024 Basement Slab casting work under progress
167 Ground Floor/Stilt Floor 01-05-2024 Work not Started
168 1 Floor 01-07-2024 Work not Started
169 2 Floor 01-10-2024 Work not Started
170 3 Floor 01-12-2024 Work not Started NA
171 4 Floor 01-01-2025 Work not Started NA
172 5 Floor 01-02-2025 Work not Started NA
173 6 Floor 01-03-2025 Work not Started NA
174 7 Floor 01-04-2025 Work not Started NA
175 8 Floor 01-05-2025 Work not Started NA
176 9 Floor 01-06-2025 Work not Started NA
177 10 Floor 01-07-2025 Work not Started NA
178 11 Floor 01-09-2025 Work not Started NA
179 NA 31-01-2025 Work not Started NA
180 Ground Floor/Stilt Floor 01-07-2024 Work not Started NA
181 1 Floor 01-08-2024 Work not Started NA
182 2 Floor 01-10-2024 Work not Started NA
183 3 Floor 01-12-2024 Work not Started NA
184 4 Floor 01-01-2025 Work not Started NA
185 5 Floor 01-03-2025 Work not Started NA
186 6 Floor 01-05-2025 Work not Started NA
187 7 Floor 01-07-2025 Work not Started NA
188 8 Floor 01-08-2025 Work not Started NA
189 9 Floor 01-09-2025 Work not Started NA
190 10 Floor 01-11-2025 Work not Started NA
191 11 Floor 01-12-2025 Work not Started NA
192 Electrical Works 01-02-2026 Work not Started NA
193 Concealed Cabling including Plugs & switches 01-03-2026 Work not Started NA
194 Installation & Charging of Transformer 01-02-2026 Work not Started NA
195 Connection to Flats/Apartments 01-04-2026 Work not Started NA
196 PH works 01-03-2026 Work not Started NA
197 Laying of concealed Pipes 01-04-2026 Work not Started NA
198 PH Fittings 01-03-2026 Work not Started NA
199 Overhead Water Tanks 01-03-2026 Work not Started NA
200 Water Supply Connection to all units 01-04-2026 Work not Started NA
201 STP construction and completion 01-01-2026 Work not Started NA
202 Distempering & Colouring of all units and exteriors 01-01-2026 Work not Started NA
203 Fixation of doors and windows 01-01-2026 Work not Started NA
204 Scheduled Date of handing over possession 01-05-2026 Work not Started NA
205 Development of common areas, parks, gardens etc 01-01-2025 Work not Started NA

Booking Status

Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership Status
Carpet Area Balcony Area Exclusive Open Terrace Area
1 101 3BHK 123.24 17.24 00 Promoter
2 102 4BHK 152.55 17.93 00 Land Owner
3 103 3BHK 120.63 17.24 00 Land Owner
4 104 3BHK 120.63 17.24 00 Promoter
5 105 4BHK 152.55 17.93 00 Promoter
6 106 3BHK 123.24 17.24 00 Land Owner
7 201 3BHK 123.24 17.24 00 Land Owner
8 202 4BHK 152.55 17.93 00 Promoter
9 203 3BHK 120.63 17.24 00 Land Owner
10 204 3BHK 120.63 17.24 00 Promoter
11 205 4BHK 152.55 17.93 00 Land Owner
12 206 3BHK 123.24 17.24 00 Promoter
13 301 3BHK 123.24 17.24 00 Land Owner
14 302 4BHK 152.55 17.93 00 Land Owner
15 303 3BHK 120.63 17.24 00 Promoter
16 304 3BHK 120.63 17.24 00 Land Owner
17 305 4BHK 152.55 17.93 00 Promoter
18 306 3BHK 123.24 17.24 00 Promoter
19 401 3BHK 123.24 17.24 00 Promoter
20 402 4BHK 152.55 17.93 00 Promoter
21 403 3BHK 120.63 17.24 00 Promoter
22 404 3BHK 120.63 17.24 00 Land Owner
23 405 4BHK 152.55 17.93 00 Land Owner
24 406 3BHK 123.24 17.24 00 Land Owner
25 501 3BHK 123.24 17.24 00 Land Owner
26 502 4BHK 152.55 17.93 00 Land Owner
27 503 3BHK 120.63 17.24 00 Land Owner
28 504 3BHK 120.63 17.24 00 Promoter
29 505 4BHK 152.55 17.93 00 Promoter
30 506 3BHK 123.24 17.24 00 Promoter
31 601 3BHK 123.24 17.24 00 Promoter
32 602 4BHK 152.55 17.93 00 Promoter
33 603 3BHK 120.63 17.24 00 Promoter
34 604 3BHK 120.63 17.24 00 Land Owner
35 605 4BHK 152.55 17.93 00 Land Owner
36 606 3BHK 123.24 17.24 00 Promoter
37 701 3BHK 123.24 17.24 00 Promoter
38 702 4BHK 152.55 17.93 00 Land Owner
39 703 3BHK 120.63 17.24 00 Land Owner
40 704 3BHK 120.63 17.24 00 Promoter
41 705 4BHK 152.55 17.93 00 Promoter
42 706 3BHK 123.24 17.24 00 Land Owner
43 801 3BHK 123.24 17.24 00 Land Owner
44 802 4BHK 152.55 17.93 00 Land Owner
45 803 3BHK 120.63 17.24 00 Promoter
46 804 3BHK 120.63 17.24 00 Land Owner
47 805 4BHK 152.55 17.93 00 Promoter
48 806 3BHK 123.24 17.24 00 Promoter
49 901 4BHK 187.9 51.26 00 Promoter
50 902 4BHK 152.55 17.93 00 Promoter
51 903 4BHK 187.9 51.26 00 Land Owner
52 904 4BHK 187.9 51.26 00 Promoter
53 905 4BHK 152.55 17.93 00 Land Owner
54 906 4BHK 187.9 51.26 00 Land Owner
55 1002 4BHK 152.55 17.93 00 Promoter
56 1005 4BHK 152.55 17.93 00 Land Owner
57 B-101 3BHK 67.84 6.7 00 Land Owner
58 B-102 3BHK 77.62 9.96 00 Land Owner
59 B-103 3BHK 77.62 6.96 00 Land Owner

Financial Status

SL No. Funds Collected from the Allottees Funds Borrowed from Financial Institutions Funds Employed from Own Sources Expenditure As On Date Status
1 7000000 0 26956960 33956960 13-07-2023 Plinth work started
2 17738095 20000000 26961905 64700000 14-10-2023 Basement Work in Progress
3 18690476 50000000 37209524 105900000 31-12-2023 Basement Work in Progress
4 18690476 50000000 10000006 118690000 31-03-2024 ONGOING

Updated Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 The building shall be used exclusively for Residential Apartment purpose and the use shall not be changed to any other use without prior of this Authority. 01-01-2025 work in progress
2 The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement. 01-01-2025 work in progress
3 Parking space measuring 2921.96 Sqm. as shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose and shall not be partitioned/closed in any manner. 01-01-2025 work in progress
4 The land over which construction is proposed is accessible by an approved means of access of 13.71 Mtr. (Thirteen point Seven one mtr) in width. 01-01-2025 work in progress
5 The land in question must be in lawful ownership and peaceful possession of the applicant. 01-01-2025 work in progress
6 The permission granted under these regulations shall remain valid up to three years from the date of issue. However the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year. 01-01-2025 work in progress
7 Storm water from the permises of roof top rain water shall be conveyed and discharged to the rain water Harvesting structure in the premises as per Rule-47 of ODA (Planning & Building Standards) Rules-2020. 01-01-2025 work in progress
8 Provisions of green building norms are to be strictly followed as per Rule-51 of ODA (Planning & Building Standards) Rules-2020. 01-01-2025 work in progress
9 Plantation as required under Rule 30 of ODA (Planning & Building Standards) Rules-2020. shall be strictly adhered. 01-01-2025 work in progress
10 At least 10% of the parking shall be earmarked for visitors and 30% of the parking space shall have facility for Electrical Vehicle Charging Points. 01-01-2025 work in progress
11 The Owner/Applicant/Architect/Structural Engineer/PMO are fully and jointly responsible for any structural failure of building due to any earthquake/cyclone/any other natural disaster, structural/construction defects. Authority will be no way be held responsible for the same in what so ever manner. 01-01-2025 work in progress
12 The applicant shall get the EIDP approved towards development of External infrastructure, execute it and obtain clearance from Engineering Wing of BMC before Occupancy. 01-01-2025 work in progress
Updated Changes on 06-07-2023
13 The building shall be used exclusively for Residential Apartment purpose and the use shall not be changed to any other use without prior of this Authority. 01-01-2025 work in progress
14 The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement. 01-01-2025 work in progress
15 Parking space measuring 2921.96 Sqm. as shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose and shall not be partitioned/closed in any manner. 01-01-2025 work in progress
16 The land over which construction is proposed is accessible by an approved means of access of 13.71 Mtr. (Thirteen point Seven one mtr) in width. 01-01-2025 work in progress
17 The land in question must be in lawful ownership and peaceful possession of the applicant. 01-01-2025 work in progress
18 The permission granted under these regulations shall remain valid up to three years from the date of issue. However the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year. 01-01-2025 work in progress
19 Storm water from the permises of roof top rain water shall be conveyed and discharged to the rain water Harvesting structure in the premises as per Rule-47 of ODA (Planning & Building Standards) Rules-2020. 01-01-2025 work in progress
20 Provisions of green building norms are to be strictly followed as per Rule-51 of ODA (Planning & Building Standards) Rules-2020. 01-01-2025 work in progress
21 Plantation as required under Rule 30 of ODA (Planning & Building Standards) Rules-2020. shall be strictly adhered. 01-01-2025 work in progress
22 At least 10% of the parking shall be earmarked for visitors and 30% of the parking space shall have facility for Electrical Vehicle Charging Points. 01-01-2025 work in progress
23 The Owner/Applicant/Architect/Structural Engineer/PMO are fully and jointly responsible for any structural failure of building due to any earthquake/cyclone/any other natural disaster, structural/construction defects. Authority will be no way be held responsible for the same in what so ever manner. 01-01-2025 work in progress
24 The applicant shall get the EIDP approved towards development of External infrastructure, execute it and obtain clearance from Engineering Wing of BMC before Occupancy. 01-01-2025 work in progress
Updated Changes on 14-10-2023
25 The building shall be used exclusively for Residential Apartment purpose and the use shall not be changed to any other use without prior of this Authority. 01-01-2025 work in progress
26 The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement. 01-01-2025 work in progress
27 Parking space measuring 2921.96 Sqm. as shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose and shall not be partitioned/closed in any manner. 01-01-2025 work in progress
28 The land over which construction is proposed is accessible by an approved means of access of 13.71 Mtr. (Thirteen point Seven one mtr) in width. 01-01-2025 work in progress
29 The land in question must be in lawful ownership and peaceful possession of the applicant. 01-01-2025 work in progress
30 The permission granted under these regulations shall remain valid up to three years from the date of issue. However the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year. 01-01-2025 work in progress
31 Storm water from the permises of roof top rain water shall be conveyed and discharged to the rain water Harvesting structure in the premises as per Rule-47 of ODA (Planning & Building Standards) Rules-2020. 01-01-2025 work in progress
32 Provisions of green building norms are to be strictly followed as per Rule-51 of ODA (Planning & Building Standards) Rules-2020. 01-01-2025 work in progress
33 Plantation as required under Rule 30 of ODA (Planning & Building Standards) Rules-2020. shall be strictly adhered. 01-01-2025 work in progress
34 At least 10% of the parking shall be earmarked for visitors and 30% of the parking space shall have facility for Electrical Vehicle Charging Points. 01-01-2025 work in progress
35 The Owner/Applicant/Architect/Structural Engineer/PMO are fully and jointly responsible for any structural failure of building due to any earthquake/cyclone/any other natural disaster, structural/construction defects. Authority will be no way be held responsible for the same in what so ever manner. 01-01-2025 work in progress
36 The applicant shall get the EIDP approved towards development of External infrastructure, execute it and obtain clearance from Engineering Wing of BMC before Occupancy. 01-01-2025 work in progress
Updated Changes on 12-01-2024
37 The building shall be used exclusively for Residential Apartment purpose and the use shall not be changed to any other use without prior of this Authority. 01-01-2025 work in progress
38 The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement. 01-01-2025 work in progress
39 Parking space measuring 2921.96 Sqm. as shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose and shall not be partitioned/closed in any manner. 01-01-2025 work in progress
40 The land over which construction is proposed is accessible by an approved means of access of 13.71 Mtr. (Thirteen point Seven one mtr) in width. 01-01-2025 work in progress
41 The land in question must be in lawful ownership and peaceful possession of the applicant. 01-01-2025 work in progress
42 The permission granted under these regulations shall remain valid up to three years from the date of issue. However the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year. 01-01-2025 work in progress
43 Storm water from the permises of roof top rain water shall be conveyed and discharged to the rain water Harvesting structure in the premises as per Rule-47 of ODA (Planning & Building Standards) Rules-2020. 01-01-2025 work in progress
44 Provisions of green building norms are to be strictly followed as per Rule-51 of ODA (Planning & Building Standards) Rules-2020. 01-01-2025 work in progress
45 Plantation as required under Rule 30 of ODA (Planning & Building Standards) Rules-2020. shall be strictly adhered. 01-01-2025 work in progress
46 At least 10% of the parking shall be earmarked for visitors and 30% of the parking space shall have facility for Electrical Vehicle Charging Points. 01-01-2025 work in progress
47 The Owner/Applicant/Architect/Structural Engineer/PMO are fully and jointly responsible for any structural failure of building due to any earthquake/cyclone/any other natural disaster, structural/construction defects. Authority will be no way be held responsible for the same in what so ever manner. 01-01-2025 work in progress
48 The applicant shall get the EIDP approved towards development of External infrastructure, execute it and obtain clearance from Engineering Wing of BMC before Occupancy. 01-01-2025 work in progress
Updated Changes on 11-04-2024
49 The building shall be used exclusively for Residential Apartment purpose and the use shall not be changed to any other use without prior of this Authority. 01-01-2025 work in progress
50 The development shall be undertaken strictly according to plans enclosed with necessary permission endorsement. 01-01-2025 work in progress
51 Parking space measuring 2921.96 Sqm. as shown in the approved plan shall be left for parking of vehicles and no part of it will be used for any other purpose and shall not be partitioned/closed in any manner. 01-01-2025 work in progress
52 The land over which construction is proposed is accessible by an approved means of access of 13.71 Mtr. (Thirteen point Seven one mtr) in width. 01-01-2025 work in progress
53 The land in question must be in lawful ownership and peaceful possession of the applicant. 01-01-2025 work in progress
54 The permission granted under these regulations shall remain valid up to three years from the date of issue. However the permission shall have to be revalidated before the expiry of the above period on payment of such fee as may be prescribed under rules and such revalidation shall be valid for one year. 01-01-2025 work in progress
55 Storm water from the permises of roof top rain water shall be conveyed and discharged to the rain water Harvesting structure in the premises as per Rule-47 of ODA (Planning & Building Standards) Rules-2020. 01-01-2025 work in progress
56 Provisions of green building norms are to be strictly followed as per Rule-51 of ODA (Planning & Building Standards) Rules-2020. 01-01-2025 work in progress
57 Plantation as required under Rule 30 of ODA (Planning & Building Standards) Rules-2020. shall be strictly adhered. 01-01-2025 work in progress
58 At least 10% of the parking shall be earmarked for visitors and 30% of the parking space shall have facility for Electrical Vehicle Charging Points. 01-01-2025 work in progress
59 The Owner/Applicant/Architect/Structural Engineer/PMO are fully and jointly responsible for any structural failure of building due to any earthquake/cyclone/any other natural disaster, structural/construction defects. Authority will be no way be held responsible for the same in what so ever manner. 01-01-2025 work in progress
60 The applicant shall get the EIDP approved towards development of External infrastructure, execute it and obtain clearance from Engineering Wing of BMC before Occupancy. 01-01-2025 work in progress

Updated Project Documents

Sl. No. Title of the document Upload Document
1 PERFORMA I-II
2 PERFORMA I-II
3 PERFORMA-I
4 PERFORMA-II
5 PERFORMA-III
6 PERFORMA-I 01.10.2023 TO 31.12.2023
7 PERFORMA-II 01.10.2023 TO 31.12.2023
8 PERFORMA-III 01.10.2023 TO 31.12.2023
9 BANK STATEMENT OCTOBER 2023
10 BANK STATEMENT NOVEMBER 2023
11 BANK STATEMENT DECEMBER 2023
12 PERFORMA-I JAN-MAR 2024
13 PERFORMA-II JAN-MAR 2024
14 PERFORMA-III JAN-MAR 2024
:  Anshuman Patnaik :  
NA :  AWLPP2012N
:PAN Card :  archidhomes@gmail.com
:  MBA :  9437076631
:  Has an experience of 14 years in the real-estate sector
:  Yes :  NA
:  BANDAN MOHANTY :  
NA :  AFMPM7898D
:PAN Card :  archidhomes@gmail.com
:  MBA :  9437094412
:  Has an experience of 15 years in the real-estate sector
:  Yes :  NA
:   SIMANTIKA MOHANTY :  
NA :  AMDPM3225G
:PAN Card :  archidhomes@gmail.com
:  B.A :  7537000001
:  Has an experience of 14 years in the real-estate sector
:  Yes :  NA

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
M.AKASH DEEP Architect PLOT NO- 948/A, PRSANTI VIHAR, DELTA SQUARE, BARMUNDA, BBSR, GMAIL- kaashdeep@gmail.com, MOB- 9668723099 REGD NO-CA/2005/35305 BDA
LOKANATH MOHANTY Construction Engineer PLOT NO- 948/A, PRSANTI VIHAR, DELTA SQUARE, BARMUNDA, BBSR, GMAIL- vaastuarcon_bbsr@rediffmail.com, Mob- 7978469288 AM1911735
S.S TEKRIWAL Chartered Accountant Kathagarh Road, Cuttack, Odisha, Mobile no- 9437017625, Email id- sst_ca@rediffmail.com 319218E
RAY INFRA PROJECTS PVT LTD. Contractor 2ND FLOOR, MIG-108, BARAMUNDA HOUSING COLONY, BHUBANESWAR-751003, RAYINFRAPROJECTSPVTLTD@GMAIL.COM, MOBILE NO- 9937317262 21AAHCR1850R1Z3

Updated Units

House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
Updated Changes
101 Covered Parking 101 3.66 X 2.50 9.15 Included
102 Covered Parking 102 3.66 X 2.50 9.15 Included
103 Covered Parking 103 3.66 X 2.50 9.15 Included
104 Covered Parking 104 3.66 X 2.50 9.15 Included
105 Covered Parking 105 3.66 X 2.50 9.15 Included
106 Covered Parking 106 3.66 X 2.50 9.15 Included
201 Covered Parking 201 3.66 X 2.50 9.15 Included
202 Covered Parking 202 3.66 X 2.50 9.15 Included
203 Covered Parking 203 3.66 X 2.50 9.15 Included
204 Covered Parking 204 3.66 X 2.50 9.15 Included
205 Covered Parking 205 3.66 X 2.50 9.15 Included
206 Covered Parking 206 3.66 X 2.50 9.15 Included
301 Covered Parking 301 3.66 X 2.50 9.15 Included
302 Covered Parking 302 3.66 X 2.50 9.15 Included
303 Covered Parking 303 3.66 X 2.50 9.15 Included
304 Covered Parking 304 3.66 X 2.50 9.15 Included
305 Covered Parking 305 3.66 X 2.50 9.15 Included
306 Covered Parking 306 3.66 X 2.50 9.15 Included
401 Covered Parking 401 3.66 X 2.50 9.15 Included
402 Covered Parking 402 3.66 X 2.50 9.15 Included
403 Covered Parking 403 3.66 X 2.50 9.15 Included
404 Covered Parking 404 3.66 X 2.50 9.15 Included
405 Covered Parking 405 3.66 X 2.50 9.15 Included
406 Covered Parking 406 3.66 X 2.50 9.15 Included
501 Covered Parking 501 3.66 X 2.50 9.15 Included
502 Covered Parking 502 3.66 X 2.50 9.15 Included
503 Covered Parking 503 3.66 X 2.50 9.15 Included
504 Covered Parking 504 3.66 X 2.50 9.15 Included
505 Covered Parking 505 3.66 X 2.50 9.15 Included
506 Covered Parking 506 3.66 X 2.50 9.15 Included
601 Covered Parking 601 3.66 X 2.50 9.15 Included
602 Covered Parking 602 3.66 X 2.50 9.15 Included
603 Covered Parking 603 3.66 X 2.50 9.15 Included
604 Covered Parking 604 3.66 X 2.50 9.15 Included
605 Covered Parking 605 3.66 X 2.50 9.15 Included
606 Covered Parking 606 3.66 X 2.50 9.15 Included
701 Covered Parking 701 3.66 X 2.50 9.15 Included
702 Covered Parking 702 3.66 X 2.50 9.15 Included
703 Covered Parking 703 3.66 X 2.50 9.15 Included
704 Covered Parking 704 3.66 X 2.50 9.15 Included
705 Covered Parking 705 3.66 X 2.50 9.15 Included
706 Covered Parking 706 3.66 X 2.50 9.15 Included
801 Covered Parking 801 3.66 X 2.50 9.15 Included
802 Covered Parking 802 3.66 X 2.50 9.15 Included
803 Covered Parking 803 3.66 X 2.50 9.15 Included
804 Covered Parking 804 3.66 X 2.50 9.15 Included
805 Covered Parking 805 3.66 X 2.50 9.15 Included
806 Covered Parking 806 3.66 X 2.50 9.15 Included
901 Covered Parking 901 3.66 X 2.50 9.15 Included
902 Covered Parking 902 3.66 X 2.50 9.15 Included
903 Covered Parking 903 3.66 X 2.50 9.15 Included
904 Covered Parking 904 3.66 X 2.50 9.15 Included
905 Covered Parking 905 3.66 X 2.50 9.15 Included
906 Covered Parking 906 3.66 X 2.50 9.15 Included
1002 Covered Parking 1002 3.66 X 2.50 9.15 Included
1005 Covered Parking 1005 3.66 X 2.50 9.15 Included
B-101 Covered Parking B-101 3.66 X 2.50 9.15 Included
B-102 Covered Parking B-102 3.66 X 2.50 9.15 Included
B-103 Covered Parking B-103 3.66 X 2.50 9.15 Included
Updated Changes
101 Covered Parking 101 3.66 X 2.50 9.15 Included
102 Covered Parking 102 3.66 X 2.50 9.15 Included
103 Covered Parking 103 3.66 X 2.50 9.15 Included
104 Covered Parking 104 3.66 X 2.50 9.15 Included
105 Covered Parking 105 3.66 X 2.50 9.15 Included
106 Covered Parking 106 3.66 X 2.50 9.15 Included
201 Covered Parking 201 3.66 X 2.50 9.15 Included
202 Covered Parking 202 3.66 X 2.50 9.15 Included
203 Covered Parking 203 3.66 X 2.50 9.15 Included
204 Covered Parking 204 3.66 X 2.50 9.15 Included
205 Covered Parking 205 3.66 X 2.50 9.15 Included
206 Covered Parking 206 3.66 X 2.50 9.15 Included
301 Covered Parking 301 3.66 X 2.50 9.15 Included
302 Covered Parking 302 3.66 X 2.50 9.15 Included
303 Covered Parking 303 3.66 X 2.50 9.15 Included
304 Covered Parking 304 3.66 X 2.50 9.15 Included
305 Covered Parking 305 3.66 X 2.50 9.15 Included
306 Covered Parking 306 3.66 X 2.50 9.15 Included
401 Covered Parking 401 3.66 X 2.50 9.15 Included
402 Covered Parking 402 3.66 X 2.50 9.15 Included
403 Covered Parking 403 3.66 X 2.50 9.15 Included
404 Covered Parking 404 3.66 X 2.50 9.15 Included
405 Covered Parking 405 3.66 X 2.50 9.15 Included
406 Covered Parking 406 3.66 X 2.50 9.15 Included
501 Covered Parking 501 3.66 X 2.50 9.15 Included
502 Covered Parking 502 3.66 X 2.50 9.15 Included
503 Covered Parking 503 3.66 X 2.50 9.15 Included
504 Covered Parking 504 3.66 X 2.50 9.15 Included
505 Covered Parking 505 3.66 X 2.50 9.15 Included
506 Covered Parking 506 3.66 X 2.50 9.15 Included
601 Covered Parking 601 3.66 X 2.50 9.15 Included
602 Covered Parking 602 3.66 X 2.50 9.15 Included
603 Covered Parking 603 3.66 X 2.50 9.15 Included
604 Covered Parking 604 3.66 X 2.50 9.15 Included
605 Covered Parking 605 3.66 X 2.50 9.15 Included
606 Covered Parking 606 3.66 X 2.50 9.15 Included
701 Covered Parking 701 3.66 X 2.50 9.15 Included
702 Covered Parking 702 3.66 X 2.50 9.15 Included
703 Covered Parking 703 3.66 X 2.50 9.15 Included
704 Covered Parking 704 3.66 X 2.50 9.15 Included
705 Covered Parking 705 3.66 X 2.50 9.15 Included
706 Covered Parking 706 3.66 X 2.50 9.15 Included
801 Covered Parking 801 3.66 X 2.50 9.15 Included
802 Covered Parking 802 3.66 X 2.50 9.15 Included
803 Covered Parking 803 3.66 X 2.50 9.15 Included
804 Covered Parking 804 3.66 X 2.50 9.15 Included
805 Covered Parking 805 3.66 X 2.50 9.15 Included
806 Covered Parking 806 3.66 X 2.50 9.15 Included
901 Covered Parking 901 3.66 X 2.50 9.15 Included
902 Covered Parking 902 3.66 X 2.50 9.15 Included
903 Covered Parking 903 3.66 X 2.50 9.15 Included
904 Covered Parking 904 3.66 X 2.50 9.15 Included
905 Covered Parking 905 3.66 X 2.50 9.15 Included
906 Covered Parking 906 3.66 X 2.50 9.15 Included
1002 Covered Parking 1002 3.66 X 2.50 9.15 Included
1005 Covered Parking 1005 3.66 X 2.50 9.15 Included
B-101 Covered Parking B-101 3.66 X 2.50 9.15 Included
B-102 Covered Parking B-102 3.66 X 2.50 9.15 Included
B-103 Covered Parking B-103 3.66 X 2.50 9.15 Included