Generated by pacms.orera.in on date: 2024-05-22

Promoter Details
Promoter Name :
JYOTIRANJAN BEHURIA
Project Name :
JB ESTELLA
Project Location :
(Plotted Scheme, sub-division of lay-out plan, No. of Units-44)

Form- I

A. Promoter's Details

:  M/S. JB ASSETS PRIVATE LIMITED :  Private Company
:  U45201OR2012PTC016061 :View
NA :  Plot No. N-6/178, IRC Village, Nayapalli, Bhubaneswar-751015, Dist. Khordha, Odisha
:  Plot No.- N-6/178, IRC Village, Nayapalli, Bhubaneswar, Dist- khordha, Odisha- 751015. :  jbassets.sales@gmail.com
:  9438671073
:  AACCJ9444L :View
:  11 YEAR EXPRIENCE IN CONSTRUCTION SECTOR :  NA
NA

B. Details of Board of Directors / Partners / MC Members

:  JYOTIRANJAN BEHURIA :  
:  Managing Director :  ALSPB7226L
:PAN Card :  jyoti_behuria2008@rediffmail.com
:  GRADUATE :  9438671073
:  11 YEAR EXPRIENCE IN CONSTRUCTION SECTOR
:  Yes :  NA
:  BILASINI BEHURIA :  
:  Director :  AUHPB0011F
:PAN Card :  jb.associates@rediffmail.com
:  GRADUATE :  9438671073
:  11 YEAR EXPRIENCE IN CONSTRUCTION SECTOR
:  Yes :  NA

Annexure-1

Details of last projects already implemented (Ongoing or Complete)

Annexure-2

Details of the project to be registered

:   New :  JB ESTELLA
:  Plotted Scheme :  (Plotted Scheme, sub-division of lay-out plan, No. of Units-44)
:  Khordha :  Balianta
:  752101 :  Development Authority
:  BHUBANESWAR DEVELOPMENT AUTHORITY
:  NA :  NA

Land Details of the Project

:  295 :  983/1253
:  Benupur :  2307
:  No :  2145
No :  View
:  View
:  Promoter
:  296 :  983/1440
:  Benupur :  2671.89
:  No :  2530
No :  View
:  View
:  Promoter
:  296 :  983/1263
:  Benupur :  2671
:  Yes
No :  View
:  View
:  Promoter
:  297 :  983/1249
:  Benupur :  1295
:  Yes
No :  View
:  View
:  Promoter

Development Agreement

: No

Building Plan

  View   View
  Download site plan 19-03-2026
20-03-2023

Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 The land over which sub-divisional layout is proposed shall be accessible by an approved means of access of 9.14 mtr, in width. 26-04-2023 NOT STARTED
2 The applicant shall construct the drain till the public disposal point. 26-04-2023 NOT STARTED
3 Internal road and area for widening of approach road shall. be in the nature of public thoroughfare and shäll not be blocked by any boundary wal/gate/ physical obstruction. 26-04-2023 NOT STARTED
4 The water supply, electricity, internal roads and drains shall be developed and provided by the applicant at his own cost and transferred to respective Government agencies for further maintenance. 26-04-2023 NOT STARTED
5 Plantation along the internal roads is to be made before delivering the sub-plots. 26-04-2023 NOT STARTED
6 All road side drains are to be developed maintaining proper slope sO as to convey storm water to the public drain with intimation to BDA for verification. 26-04-2023 NOT STARTED
7 All the Layout roads shall be developed with permeable pavers block along with recharging pits of adequate capacity shall be developed to minimize the storm water runoff to the drain. 26-04-2023 NOT STARTED
8 All the sub-plots shall be demarcated strictly as per the approved plan. 26-04-2023 NOT STARTED
9 The applicant shall make own arrangement of solid waste management through micro Composting plant within the project premises as shown in the layout plan. 26-04-2023 NOT STARTED
10 The applicant shall free gift the internal road, open space and common plot for public utility to BDA, Bhubaneswar failing which the Occupancy Certificate shall not be issued. 26-04-2023 NOT STARTED
11 In case the Kisam of plot is not "Gharabari", then the applicant shall convert the Kisam of the subdivided plots to Gharbari Kisam before selling or utilizing or leasing out or disposing it off, prior to construction of the byilding. 26-04-2023 COMPLETED
12 Permit the Authority to enter the layout or premises, for which the permission has been granted at any reasonable time for the purp0se of enforcing the rules/regulations 26-04-2023 NOT STARTED
13 Give written notice to the Authority before commencement of work on building site in Form-V, periodic progress report in Form-VI, notice of completion in Form-VI and notice in case of termination of services of Technical persons engaged by him. 26-04-2023 NOT STARTED
14 Obtain Occupancy Certificate from the Authority prior to occupation of buildings in full or part. 26-04-2023 NOT STARTED
15 Wherever tests of any material are made to ensure conformity of the requirements of the rules/regulations in force, records of the test data shall be kept available for inspection during the construction of buildings and for such period thereafter as required by the Authority 26-04-2023 NOT STARTED
16 Adhere to the provisions of ODA (Planning & Bilding Standards) Rules, 2020, strictly and conditions thereto. 26-04-2023 NOT STARTED
17 The plinth level of the building shall be raised 2 ft above the High Flood Level (HFL). 26-04-2023 NOT STARTED
18 No storm water shall be discharged to the public road/public premises and other adjoining plots 26-04-2023 NOT STARTED
19 Rain Water harvesting structure and recharging pits of adequate capacity shall be developed through micro-compost unit 26-04-2023 NOT STARTED
20 Drainage shall be discharged up to the public disposal point through own arrangement 26-04-2023 NOT STARTED
21 The site/area liable to flooding as a result of not taking proper drainage arrangement as per the natural lay of the land, etc and 26-04-2023 NOT STARTED
22 Plantation @one tree per 80 Sq.m. of the plot area shall be made by the applícant as per ODA (Planning & Building Standards) Rules, 2020. 26-04-2023 NOT STARTED
23 The area under internal road, community facilities and open spaces have been free gifted to the RLB vide gift deed No.1822204594 dtd.23.09.2022 However, the applicant shall ensure construction of internal road and drain on his own cost within the layout in consultation with RLB. 26-04-2023 NOT STARTED
24 The applicant shall obtain the registration from ORERA as per affidavit submitted on dtd.28.12.22. 26-04-2023 NOT STARTED
25 The applicant shall develop external infrastructure as per External Infrastructure Development Plan duly vetted by C.E.Cum-EM, BDA vide letter No.604/EM dtd.11.07.2022 the applicant shall not dispose any sub-plot before execution of the External Infrastructure on ground. In case of contravention of the aforesaid Condition of the permission, the layout plan So approved shall be revoked and deemed to be an unauthorized layout. 26-04-2023 NOT STARTED

Layout Plan

: Yes :  View

Location Map with geo-coordinates of bend points

Point No. Latitude Longitude
1 20°17'26.7"N 85°54'06.7"E
2 20°17'26.8"N 85°54'08.9"E
3 20°17'26.7"N 85°54'08.9"E
4 20°17'26.9"N 85°54'11.7"E
5 20°17'26.0"N 85°54'11.8"E
6 20°17'26.1"N 85°54'12.3"E
7 20°17'23.6"N 85°54'12.5"E
8 20°17'23.5"N 85°54'11.8"E
9 20°17'23.4"N 85°54'11.9"E
10 20°17'23.3"N 85°54'11.5"E
11 20°17'24.9"N 85°54'11.2"E
12 20°17'24.7"N 85°54'08.8"E
13 20°17'26.0"N 85°54'08.7"E
14 20°17'26.0"N 85°54'06.6"E
15 20°17'26.3"N 85°54'06.6"E
16 NA NA
17 NA NA
View

Category and no. of units to be developed

:  Plotted Scheme
:  44
:  
:  
:  
:  
Details of each Plot (Plotted Schemes)
S. No. Plot No. Dimension (length x Width) in metres Area in sq. metres Ownership
1 01 12.130x10.619 128.808 SQM Promoter
2 02 12.015x10.422 125.220 SOM Promoter
3 03 12.304x10.178 125.231 SQM Promoter
4 04 12.603x9.930 125.149 SQM Promoter
5 05 12.880x9.712 125.091 SQM Promoter
6 06 13.123x9.616 126.189 SQM Promoter
7 07 10.051x11.190 112.469 SQM Promoter
8 08 8.865x12.728 112.832 SQM Promoter
9 09 9.755x11.775 114.867 SOM Promoter
10 10 10.550x11.959 126.168 SQM Promoter
11 11 11.891x10.006 118.983 SQM Promoter
12 12 12.858x9.103 117.047 SQM Promoter
13 13 13.524x9.141 123.621 SQM Promoter
14 14 11.539x10.084 116.359 SQM Promoter
15 15 11.855x9.611 113.937 SQM Promoter
16 16 12.155x9.370 113.892 SQM Promoter
17 17 12.450x9.246 115.111 SQM Promoter
18 18 9.140x12.150 111.051 SQM Promoter
19 19 9.140x12.150 111.051 SQM Promoter
20 20 9.140x12.150 111.051 SQM Promoter
21 21 9.140x12.150 111.051 SQM Promoter
22 22 9.140x12.150 111.051 SQM Promoter
23 23 9.140x12.150 111.051 SQM Promoter
24 24 9.140x12.150 111.051 SQM Promoter
25 25 9.140x12.150 111.051 SQM Promoter
26 26 9.140x12.150 111.051 SQM Promoter
27 27 9.140x12.150 111.051 SQM Promoter
28 28 12.215x9.923 121.209 SQM Promoter
29 29 11.670x9.680 112.965 SOM Promoter
30 30 11.216x10.046 112.675 SOM Promoter
31 31 10.829x10.409 112.719 SOM Promoter
32 32 10.310x10.919 112.574 SQM Promoter
33 33 10.000x11.930 119.30 SQM Promoter
34 .34 12.174x9.872 120.181 SQM Promoter
35 35 11.923x9.352 117.466 SQM Promoter
36 36 11.754x9.870 116.011 SQM Promoter
37 37 11.619x9.882 114.818 SQM Promoter
38 38 10.611x10.776 114.344 SQM Promoter
39 39 12.178x10.562 128.624 SQM Promoter
40 40 12.961x9.358 121.288 SOM Promoter
41 41 13.565x8.930 121.136 SOM Promoter
42 42 14.075x8.601 121.059 SOM Promoter
43 43 14.392x8.408 121.007 SQM Promoter
44 44 14.604x8.375 122.308 SQM Promoter
No
NA

Bank Particulars of the Project

  AXIS BANK
  JAYDEV VIHAR
  923020016939051
  UTIB0003656
   View
  26409322
  7926409322

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
M.AKASH DEEP Architect PLOT NO-948/A, PRASANTI VIHAR, BARAMUNDA, BBSR, MOB-9437015399, EMAIL-vaastuarcon_bbsr@rediffmail.com CA/2005/35305 NA
G.P. Mohanty Construction Engineer PLOT NO-948/A, PRASANTI VIHAR, BARAMUNDA, BBSR,PHONE-6742560663, EMAIL-vaastuarcon_bbsr@rediffmail.com AM1911735 NA
L.LAL & ASSOCIATES Chartered Accountant 2/75, PRIYADARSHINI MARKET, BBSR, PHONE-9437164555,EMAIL-LAL_ASSOCIATES@REDIFFMAIL.COM M.No.067035 NA

Financial Details

:  1320 :   View
  20-04-2026 :  200
:  1120 :  0

Documents Attached

Description of Document Option Documents
Fire Safety Certificate Undertaking Attached
Affidavit in Form-A as per clause-l of sub-section-2 of section-4 of the Act Yes Attached
Allotment letter format Yes Attached
Conveyance Deed Format Yes Attached
Affidavit to adopt agreement for sale format as per Rule-8(1) of ORE (R and D) Rules, 2017 Yes Attached
Annual Report 2020-21 Attached
Annual Report 2021-22 Attached
Annual Report 2022-23 Attached
IT Return 2020-21 Attached
IT Return 2021-22 Attached
IT Return 2022-23 Attached
Audit Report 2020-21 Attached
Audit Report 2021-22 Attached
Audit Report 2022-23 Attached

Additional Documents Attached

Sl. No. Title of the document Upload Document
1 BOARD RESOLUTION
2 STATEMENT OF SUB PLOT WITH RESPECT TO REVENUE PLOT
3 GROUND WATER
4 ELECTRICITY NOC
5 Clarification on mentioning Plot No.296 twice
6 Clarification on uploading a rectified cadastral map

Other documents

“I undertake that the information submitted by me in this application are correct and true to best my knowledge. I also understand that providing false or wrong information is punishable under the Section-60 of the Real Estate (Regulation & Development) Act, 2016. I also further understand that furnishing wrong or false information will lead to rejection of my application registration of the project with forfeiture of registration fee and other charges deposited by me.”
  

Booking Status

Details of each Plot (Plotted Schemes)
S. No. Plot No. Dimension (length x Width) in metres Area in sq. metres Ownership Status
1 01 12.130x10.619 128.808 SQM Promoter
2 02 12.015x10.422 125.220 SOM Promoter
3 03 12.304x10.178 125.231 SQM Promoter
4 04 12.603x9.930 125.149 SQM Promoter
5 05 12.880x9.712 125.091 SQM Promoter
6 06 13.123x9.616 126.189 SQM Promoter
7 07 10.051x11.190 112.469 SQM Promoter
8 08 8.865x12.728 112.832 SQM Promoter
9 09 9.755x11.775 114.867 SOM Promoter
10 10 10.550x11.959 126.168 SQM Promoter
11 11 11.891x10.006 118.983 SQM Promoter
12 12 12.858x9.103 117.047 SQM Promoter
13 13 13.524x9.141 123.621 SQM Promoter
14 14 11.539x10.084 116.359 SQM Promoter
15 15 11.855x9.611 113.937 SQM Promoter
16 16 12.155x9.370 113.892 SQM Promoter
17 17 12.450x9.246 115.111 SQM Promoter
18 18 9.140x12.150 111.051 SQM Promoter
19 19 9.140x12.150 111.051 SQM Promoter
20 20 9.140x12.150 111.051 SQM Promoter
21 21 9.140x12.150 111.051 SQM Promoter
22 22 9.140x12.150 111.051 SQM Promoter
23 23 9.140x12.150 111.051 SQM Promoter
24 24 9.140x12.150 111.051 SQM Promoter
25 25 9.140x12.150 111.051 SQM Promoter
26 26 9.140x12.150 111.051 SQM Promoter
27 27 9.140x12.150 111.051 SQM Promoter
28 28 12.215x9.923 121.209 SQM Promoter
29 29 11.670x9.680 112.965 SOM Promoter
30 30 11.216x10.046 112.675 SOM Promoter
31 31 10.829x10.409 112.719 SOM Promoter
32 32 10.310x10.919 112.574 SQM Promoter
33 33 10.000x11.930 119.30 SQM Promoter
34 .34 12.174x9.872 120.181 SQM Promoter
35 35 11.923x9.352 117.466 SQM Promoter
36 36 11.754x9.870 116.011 SQM Promoter
37 37 11.619x9.882 114.818 SQM Promoter
38 38 10.611x10.776 114.344 SQM Promoter
39 39 12.178x10.562 128.624 SQM Promoter
40 40 12.961x9.358 121.288 SOM Promoter
41 41 13.565x8.930 121.136 SOM Promoter
42 42 14.075x8.601 121.059 SOM Promoter
43 43 14.392x8.408 121.007 SQM Promoter
44 44 14.604x8.375 122.308 SQM Promoter

Financial Status

SL No. Funds Collected from the Allottees Funds Borrowed from Financial Institutions Funds Employed from Own Sources Expenditure As On Date Status
No Records Found

Updated Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 The land over which sub-divisional layout is proposed shall be accessible by an approved means of access of 9.14 mtr, in width. 26-04-2023 NOT STARTED
2 The applicant shall construct the drain till the public disposal point. 26-04-2023 NOT STARTED
3 Internal road and area for widening of approach road shall. be in the nature of public thoroughfare and shäll not be blocked by any boundary wal/gate/ physical obstruction. 26-04-2023 NOT STARTED
4 The water supply, electricity, internal roads and drains shall be developed and provided by the applicant at his own cost and transferred to respective Government agencies for further maintenance. 26-04-2023 NOT STARTED
5 Plantation along the internal roads is to be made before delivering the sub-plots. 26-04-2023 NOT STARTED
6 All road side drains are to be developed maintaining proper slope sO as to convey storm water to the public drain with intimation to BDA for verification. 26-04-2023 NOT STARTED
7 All the Layout roads shall be developed with permeable pavers block along with recharging pits of adequate capacity shall be developed to minimize the storm water runoff to the drain. 26-04-2023 NOT STARTED
8 All the sub-plots shall be demarcated strictly as per the approved plan. 26-04-2023 NOT STARTED
9 The applicant shall make own arrangement of solid waste management through micro Composting plant within the project premises as shown in the layout plan. 26-04-2023 NOT STARTED
10 The applicant shall free gift the internal road, open space and common plot for public utility to BDA, Bhubaneswar failing which the Occupancy Certificate shall not be issued. 26-04-2023 NOT STARTED
11 In case the Kisam of plot is not "Gharabari", then the applicant shall convert the Kisam of the subdivided plots to Gharbari Kisam before selling or utilizing or leasing out or disposing it off, prior to construction of the byilding. 26-04-2023 COMPLETED
12 Permit the Authority to enter the layout or premises, for which the permission has been granted at any reasonable time for the purp0se of enforcing the rules/regulations 26-04-2023 NOT STARTED
13 Give written notice to the Authority before commencement of work on building site in Form-V, periodic progress report in Form-VI, notice of completion in Form-VI and notice in case of termination of services of Technical persons engaged by him. 26-04-2023 NOT STARTED
14 Obtain Occupancy Certificate from the Authority prior to occupation of buildings in full or part. 26-04-2023 NOT STARTED
15 Wherever tests of any material are made to ensure conformity of the requirements of the rules/regulations in force, records of the test data shall be kept available for inspection during the construction of buildings and for such period thereafter as required by the Authority 26-04-2023 NOT STARTED
16 Adhere to the provisions of ODA (Planning & Bilding Standards) Rules, 2020, strictly and conditions thereto. 26-04-2023 NOT STARTED
17 The plinth level of the building shall be raised 2 ft above the High Flood Level (HFL). 26-04-2023 NOT STARTED
18 No storm water shall be discharged to the public road/public premises and other adjoining plots 26-04-2023 NOT STARTED
19 Rain Water harvesting structure and recharging pits of adequate capacity shall be developed through micro-compost unit 26-04-2023 NOT STARTED
20 Drainage shall be discharged up to the public disposal point through own arrangement 26-04-2023 NOT STARTED
21 The site/area liable to flooding as a result of not taking proper drainage arrangement as per the natural lay of the land, etc and 26-04-2023 NOT STARTED
22 Plantation @one tree per 80 Sq.m. of the plot area shall be made by the applícant as per ODA (Planning & Building Standards) Rules, 2020. 26-04-2023 NOT STARTED
23 The area under internal road, community facilities and open spaces have been free gifted to the RLB vide gift deed No.1822204594 dtd.23.09.2022 However, the applicant shall ensure construction of internal road and drain on his own cost within the layout in consultation with RLB. 26-04-2023 NOT STARTED
24 The applicant shall obtain the registration from ORERA as per affidavit submitted on dtd.28.12.22. 26-04-2023 NOT STARTED
25 The applicant shall develop external infrastructure as per External Infrastructure Development Plan duly vetted by C.E.Cum-EM, BDA vide letter No.604/EM dtd.11.07.2022 the applicant shall not dispose any sub-plot before execution of the External Infrastructure on ground. In case of contravention of the aforesaid Condition of the permission, the layout plan So approved shall be revoked and deemed to be an unauthorized layout. 26-04-2023 NOT STARTED

Updated Project Documents

Sl. No. Title of the document Upload Document
1 BANK DETAILS
2 Quarterly Progress Report Up to - 30.09.2023
3 Quarterly Progress Report Up to - 31.12.2023
4 Quarterly Progress Report Up to - 31.03.2024
5 Bank Statement
:  JYOTIRANJAN BEHURIA :  
NA :  ALSPB7226L
:PAN Card :  jyoti_behuria2008@rediffmail.com
:  GRADUATE :  9438671073
:  11 YEAR EXPRIENCE IN CONSTRUCTION SECTOR
:  Yes :  NA
:  BILASINI BEHURIA :  
NA :  AUHPB0011F
:PAN Card :  jb.associates@rediffmail.com
:  GRADUATE :  9438671073
:  11 YEAR EXPRIENCE IN CONSTRUCTION SECTOR
:  Yes :  NA

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
M.AKASH DEEP Architect PLOT NO-948/A, PRASANTI VIHAR, BARAMUNDA, BBSR, MOB-9437015399, EMAIL-vaastuarcon_bbsr@rediffmail.com CA/2005/35305 NA
G.P. Mohanty Construction Engineer PLOT NO-948/A, PRASANTI VIHAR, BARAMUNDA, BBSR,PHONE-6742560663, EMAIL-vaastuarcon_bbsr@rediffmail.com AM1911735 NA
L.LAL & ASSOCIATES Chartered Accountant 2/75, PRIYADARSHINI MARKET, BBSR, PHONE-9437164555,EMAIL-LAL_ASSOCIATES@REDIFFMAIL.COM M.No.067035 NA
No Record Found

Generated by pacms.orera.in on date: 2024-05-22