: New | : CITY HOMES |
: Residential | : Plot No.4666, Khata No.1988/26, Plot No.4667 Khata No.431 and Plot No.4689 Khata No.30 Mauza-Ghatikia |
: Khordha | : Bhubaneswar |
: 751003 | : Development Authority |
: BHUBANESWAR MUNICIPAL CORPORATION | |
: S+4 | : NA |
: No |
View | View |
Download site plan | 31-12-2021 |
Sl. No. | Description of Conditions | Schedule date of compliance | Present Status |
---|---|---|---|
1 | As per plan approval letter | 16-02-2019 | In progress |
2 | the owner /applicant /technical person shall strictly adhere to the terms and conditions imposed in the NOC/clearances given by Fire Prevention officer/National Airport Authority/SEIAA,Ministry of forest & Environment /PHED etc whereever applicable | 31-12-2021 | work in progress |
3 | Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Regulation-44 of BDA (Planning & Building Standards) Regulation,2008 | 31-12-2021 | work in progress |
4 | The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner | 31-12-2021 | work in progress |
5 | 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance,fire tender,physically handicapped persons and outside visitors with signage as per norms under Regulation -35(11)(12) of BDA (planning & Building Standards) Regulations 2008,Amended -2013 | 31-12-2021 | work in progress |
6 | Plantation over 20% of the plot area shall be made by the applicant as per provision under Regulation 28 of BDA (Planning & Building Standards) Regulations 2008 | 31-12-2021 | work in progress |
7 | If the construction /development are not as per the approved plan /deviated beyond permissible norms, the performance security shall be forfeited and action shall be initiated against the applicant/builder /developer as per the provisions of the ODA Act,1982 Rules and Regulations made there under | 31-12-2021 | work in progress |
8 | The Owner/Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/construction defects ,Authority will be no way be held responsible for the same in what so ever manner | 31-12-2021 | work in progress |
9 | The concerned Architect /Applicant /Developer are Fully Responible for any deviations additions & alternations beyond approved plan/defective construction etc.shall be liable for action as per the provisions of the Regulation. | 31-12-2021 | work in progress |
10 | The applicant shall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/BDA before commencement of construction | 31-12-2021 | work in progress |
11 | All the stipulated conditions of the NOC/Clearances given by BMC,PHED,shall be adhered to strictly | 31-12-2021 | work in progress |
12 | No storm water/water shall be discharged to the public road/public premises and other adjoining plots | 30-12-2021 | work in progress |
13 | Adhere to the provisions of BDA (Planning & Building Standards) Regulation strictly and conditions thereto. | 31-12-2021 | work in progress |
14 | The Authority shall in no way be held responible for any structural failure and damage due to earthquake/cyclone/any other natural disaster | 31-12-2021 | work in progress |
15 | Submit clearance from Fire-Prevention wing at the time of obtaining Occupancy Certificate | 31-12-2021 | work in progress |
: Yes | : View |
Point No. | Latitude | Longitude |
---|---|---|
1 | 85°46'10.8"E | 20°16'03.3"N |
2 | 85°46'13.0"E | 20°16'02.5"''N |
3 | 85°46'13.2"E | 20°16'02.3"N |
4 | 85°46'13.7"E | 20°16'02.1"N |
5 | 85°46'13.4"E | 20°16'01.4"N |
6 | 85°46'10.3"E | 20°16'03.3"N |
7 | 85°46'10.3"E | 20°16'01.4"N |
8 | 85°46'10.2"E | 20°16'02.3"N |
9 | 85°46'10.2"E | 20°16'02.9"N |
Description* | Scheduled date of completion | Current Status | Site Images |
---|---|---|---|
Site Development | 28-02-2019 | N/A | NA |
Roof Casting | NA | NA | NA |
Ground Floor/Stilt Floor | 30-04-2019 | N/A | NA |
1 Floor | 31-05-2019 | N/A | NA |
2 Floor | 30-06-2019 | N/A | NA |
3 Floor | 31-07-2019 | N/A | NA |
4 Floor | 31-08-2019 | N/A | NA |
Brick Work & Plastering | NA | NA | NA |
Ground Floor/Stilt Floor | 15-05-2019 | N/A | NA |
1 Floor | 30-06-2019 | N/A | NA |
2 Floor | 31-07-2019 | N/A | NA |
3 Floor | 31-08-2019 | N/A | NA |
4 Floor | 30-09-2019 | N/A | NA |
Electrical Works | 20-10-2019 | N/A | NA |
Concealed Cabling including Plugs & switches | 30-06-2020 | N/A | NA |
Installation & Charging of Transformer | 28-02-2020 | N/A | NA |
Connection to Flats/Apartments | 30-04-2020 | N/A | NA |
PH works | 30-09-2019 | N/A | NA |
Laying of concealed Pipes | 30-09-2019 | N/A | NA |
PH Fittings | 31-10-2021 | N/A | NA |
Overhead Water Tanks | 31-10-2019 | N/A | NA |
Water Supply Connection to all units | 30-10-2021 | N/A | NA |
STP construction and completion | 30-04-2019 | N/A | NA |
Distempering & Colouring of all units and exteriors | 30-08-2021 | N/A | NA |
Fixation of doors and windows | 31-07-2019 | N/A | NA |
Scheduled Date of handing over possession | 25-12-2021 | N/A | NA |
Development of common areas, parks, gardens etc | 30-10-2021 | N/A | NA |
Site Development | 28-02-2019 | WORK IN PROGRESS | |
NA | NA | NA | NA |
Ground Floor/Stilt Floor | 30-04-2019 | COMPLETE | |
1 Floor | 31-05-2019 | COMPLETE | |
2 Floor | 30-06-2019 | COMPLETE | |
3 Floor | 31-07-2019 | COMPLETE | |
4 Floor | 31-08-2019 | COMPLETE | |
NA | NA | NA | NA |
Ground Floor/Stilt Floor | 15-05-2019 | COMPLETE | |
1 Floor | 30-06-2019 | COMPLETE | |
2 Floor | 31-07-2019 | COMPLETE | |
3 Floor | 31-08-2019 | COMPLETE | |
4 Floor | 30-09-2019 | COMPLETE | |
Electrical Works | 20-10-2019 | WORK IN PROGRESS | |
Concealed Cabling including Plugs & switches | 30-06-2020 | WORK IN PROGRESS | |
Installation & Charging of Transformer | 28-02-2020 | WORK IN PROGRESS | NA |
Connection to Flats/Apartments | 30-04-2020 | WORK IN PROGRESS | NA |
PH works | 30-09-2019 | WORK IN PROGRESS | NA |
Laying of concealed Pipes | 30-09-2019 | COMPLETE | |
PH Fittings | 31-10-2021 | WORK IN PROGRESS | |
Overhead Water Tanks | 31-10-2019 | WORK IN PROGRESS | NA |
Water Supply Connection to all units | 30-10-2021 | WORK IN PROGRESS | NA |
STP construction and completion | 30-04-2019 | WORK IN PROGRESS | NA |
Distempering & Colouring of all units and exteriors | 30-08-2021 | WORK IN PROGRESS | |
Fixation of doors and windows | 31-07-2019 | WORK IN PROGRESS | |
Scheduled Date of handing over possession | 25-12-2021 | WORK IN PROGRESS | NA |
Development of common areas, parks, gardens etc | 30-10-2021 | WORK IN PROGRESS | |
Site Development | 28-02-2019 | Complete | |
NA | 28-02-2019 | Complete | |
Ground Floor/Stilt Floor | 30-04-2019 | COMPLETE | |
1 Floor | 31-05-2019 | COMPLETE | |
2 Floor | 30-06-2019 | COMPLETE | |
3 Floor | 31-07-2019 | COMPLETE | |
4 Floor | 31-08-2019 | COMPLETE | NA |
NA | 31-08-2019 | COMPLETE | |
Ground Floor/Stilt Floor | 15-05-2019 | COMPLETE | |
1 Floor | 30-06-2019 | COMPLETE | |
2 Floor | 31-07-2019 | COMPLETE | |
3 Floor | 31-08-2019 | COMPLETE | |
4 Floor | 30-09-2019 | COMPLETE | |
Electrical Works | 20-10-2019 | WORK IN PROGRESS | |
Concealed Cabling including Plugs & switches | 30-06-2020 | WORK IN PROGRESS | |
Installation & Charging of Transformer | 28-02-2020 | WORK IN PROGRESS | NA |
Connection to Flats/Apartments | 30-04-2020 | WORK IN PROGRESS | NA |
PH works | 30-09-2019 | WORK IN PROGRESS | |
Laying of concealed Pipes | 30-09-2019 | COMPLETE | |
PH Fittings | 31-10-2021 | WORK IN PROGRESS | |
Overhead Water Tanks | 31-10-2019 | WORK IN PROGRESS | NA |
Water Supply Connection to all units | 30-10-2021 | WORK IN PROGRESS | NA |
STP construction and completion | 30-04-2019 | WORK IN PROGRESS | NA |
Distempering & Colouring of all units and exteriors | 30-08-2021 | WORK IN PROGRESS | NA |
Fixation of doors and windows | 31-07-2019 | WORK IN PROGRESS | NA |
Scheduled Date of handing over possession | 25-12-2021 | WORK IN PROGRESS | NA |
Development of common areas, parks, gardens etc | 30-10-2021 | WORK IN PROGRESS | NA |
Site Development | 28-02-2019 | Complete | NA |
NA | 28-02-2019 | Complete | NA |
Ground Floor/Stilt Floor | 30-04-2019 | COMPLETE | NA |
1 Floor | 31-05-2019 | COMPLETE | NA |
2 Floor | 30-06-2019 | COMPLETE | NA |
3 Floor | 31-07-2019 | COMPLETE | NA |
4 Floor | 31-08-2019 | COMPLETE | NA |
NA | 31-08-2019 | COMPLETE | NA |
Ground Floor/Stilt Floor | 15-05-2019 | COMPLETE | NA |
1 Floor | 30-06-2019 | COMPLETE | NA |
2 Floor | 31-07-2019 | COMPLETE | NA |
3 Floor | 31-08-2019 | COMPLETE | NA |
4 Floor | 30-09-2019 | COMPLETE | NA |
Electrical Works | 20-10-2019 | complete | NA |
Concealed Cabling including Plugs & switches | 30-06-2020 | complete | NA |
Installation & Charging of Transformer | 28-02-2020 | complete | |
Connection to Flats/Apartments | 30-04-2020 | WORK IN PROGRESS | NA |
PH works | 30-09-2019 | WORK IN PROGRESS | NA |
Laying of concealed Pipes | 30-09-2019 | COMPLETE | NA |
PH Fittings | 31-10-2021 | WORK IN PROGRESS | NA |
Overhead Water Tanks | 31-10-2019 | WORK IN PROGRESS | NA |
Water Supply Connection to all units | 30-10-2021 | WORK IN PROGRESS | NA |
STP construction and completion | 30-04-2019 | WORK IN PROGRESS | NA |
Distempering & Colouring of all units and exteriors | 30-08-2021 | WORK IN PROGRESS | NA |
Fixation of doors and windows | 31-07-2019 | WORK IN PROGRESS | NA |
Scheduled Date of handing over possession | 25-12-2021 | WORK IN PROGRESS | NA |
Development of common areas, parks, gardens etc | 30-10-2021 | WORK IN PROGRESS | NA |
Site Development | 28-02-2019 | Complete | NA |
NA | 28-02-2019 | Complete | NA |
Ground Floor/Stilt Floor | 30-04-2019 | COMPLETE | NA |
1 Floor | 31-05-2019 | COMPLETE | NA |
2 Floor | 30-06-2019 | COMPLETE | NA |
3 Floor | 31-07-2019 | COMPLETE | NA |
4 Floor | 31-08-2019 | COMPLETE | NA |
NA | 31-08-2019 | COMPLETE | NA |
Ground Floor/Stilt Floor | 15-05-2019 | COMPLETE | NA |
1 Floor | 30-06-2019 | COMPLETE | NA |
2 Floor | 31-07-2019 | COMPLETE | NA |
3 Floor | 31-08-2019 | COMPLETE | NA |
4 Floor | 30-09-2019 | COMPLETE | NA |
Electrical Works | 20-10-2019 | complete | NA |
Concealed Cabling including Plugs & switches | 30-06-2020 | complete | NA |
Installation & Charging of Transformer | 28-02-2020 | complete | NA |
Connection to Flats/Apartments | 30-04-2020 | complete | NA |
PH works | 30-09-2019 | complete | NA |
Laying of concealed Pipes | 30-09-2019 | COMPLETE | NA |
PH Fittings | 31-10-2021 | complete | NA |
Overhead Water Tanks | 31-10-2019 | complete | NA |
Water Supply Connection to all units | 30-10-2021 | complete | NA |
STP construction and completion | 30-04-2019 | WORK IN PROGRESS | |
Distempering & Colouring of all units and exteriors | 30-08-2021 | complete | |
Fixation of doors and windows | 31-07-2019 | complete | NA |
Scheduled Date of handing over possession | 25-12-2021 | WORK IN PROGRESS | NA |
Development of common areas, parks, gardens etc | 30-10-2021 | complete | NA |
Site Development | 28-02-2019 | Complete | NA |
NA | 28-02-2019 | Complete | NA |
Ground Floor/Stilt Floor | 30-04-2019 | COMPLETE | NA |
1 Floor | 31-05-2019 | COMPLETE | NA |
2 Floor | 30-06-2019 | COMPLETE | NA |
3 Floor | 31-07-2019 | COMPLETE | NA |
4 Floor | 31-08-2019 | COMPLETE | NA |
NA | 31-08-2019 | COMPLETE | NA |
Ground Floor/Stilt Floor | 15-05-2019 | COMPLETE | NA |
1 Floor | 30-06-2019 | COMPLETE | NA |
2 Floor | 31-07-2019 | COMPLETE | NA |
3 Floor | 31-08-2019 | COMPLETE | NA |
4 Floor | 30-09-2019 | COMPLETE | NA |
Electrical Works | 20-10-2019 | complete | NA |
Concealed Cabling including Plugs & switches | 30-06-2020 | complete | NA |
Installation & Charging of Transformer | 28-02-2020 | complete | NA |
Connection to Flats/Apartments | 30-04-2020 | complete | NA |
PH works | 30-09-2019 | complete | NA |
Laying of concealed Pipes | 30-09-2019 | COMPLETE | NA |
PH Fittings | 31-10-2021 | complete | NA |
Overhead Water Tanks | 31-10-2019 | complete | NA |
Water Supply Connection to all units | 30-10-2021 | complete | NA |
STP construction and completion | 30-04-2019 | WORK IN PROGRESS | NA |
Distempering & Colouring of all units and exteriors | 30-08-2021 | complete | NA |
Fixation of doors and windows | 31-07-2019 | complete | NA |
Scheduled Date of handing over possession | 25-12-2021 | WORK IN PROGRESS | NA |
Development of common areas, parks, gardens etc | 30-10-2021 | complete | NA |
Site Development | 28-02-2019 | Complete | NA |
NA | 28-02-2019 | Complete | NA |
Ground Floor/Stilt Floor | 30-04-2019 | COMPLETE | NA |
1 Floor | 31-05-2019 | COMPLETE | NA |
2 Floor | 30-06-2019 | COMPLETE | NA |
3 Floor | 31-07-2019 | COMPLETE | NA |
4 Floor | 31-08-2019 | COMPLETE | NA |
NA | 31-08-2019 | COMPLETE | NA |
Ground Floor/Stilt Floor | 15-05-2019 | COMPLETE | NA |
1 Floor | 30-06-2019 | COMPLETE | NA |
2 Floor | 31-07-2019 | COMPLETE | NA |
3 Floor | 31-08-2019 | COMPLETE | NA |
4 Floor | 30-09-2019 | COMPLETE | NA |
Electrical Works | 20-10-2019 | complete | NA |
Concealed Cabling including Plugs & switches | 30-06-2020 | complete | NA |
Installation & Charging of Transformer | 28-02-2020 | complete | NA |
Connection to Flats/Apartments | 30-04-2020 | complete | NA |
PH works | 30-09-2019 | complete | NA |
Laying of concealed Pipes | 30-09-2019 | COMPLETE | NA |
PH Fittings | 31-10-2021 | complete | NA |
Overhead Water Tanks | 31-10-2019 | complete | NA |
Water Supply Connection to all units | 30-10-2021 | complete | NA |
STP construction and completion | 30-04-2019 | WORK IN PROGRESS | NA |
Distempering & Colouring of all units and exteriors | 30-08-2021 | complete | NA |
Fixation of doors and windows | 31-07-2019 | complete | NA |
Scheduled Date of handing over possession | 25-12-2021 | WORK IN PROGRESS | NA |
Development of common areas, parks, gardens etc | 30-10-2021 | complete | NA |
: Residential | |
: 56
|
|
Residential Flats/ House | |||||
---|---|---|---|---|---|
S. No. | Flat No./ House No. | ||||
Area in square metres |
Ownership | ||||
Carpet Area | Balcony Area | Exclusive Open Terrace Area | |||
1 | 101 | 95.416 | 105.412 | N/A | Promoter |
2 | 102 | 98.283 | 108.542 | N/A | Promoter |
3 | 103 | 81.183 | 90.835 | N/A | Promoter |
4 | 104 | 81.195 | 90.691 | N/A | Promoter |
5 | 105 | 83.854 | 93.242 | N/A | Promoter |
6 | 106 | 83.854 | 93.242 | N/A | Promoter |
7 | 107 | 81.195 | 90.691 | N/A | Promoter |
8 | 108 | 100.103 | 111.241 | N/A | Promoter |
9 | 109 | 97.840 | 108.809 | N/A | Land Owner |
10 | 110 | 80.928 | 90.360 | N/A | Promoter |
11 | 111 | 82.752 | 92.218 | N/A | Land Owner |
12 | 112 | 82.752 | 92.221 | N/A | Land Owner |
13 | 113 | 80.928 | 90.360 | N/A | Land Owner |
14 | 114 | 81.183 | 91.066 | N/A | Promoter |
15 | 201 | 95.416 | 105.412 | N/A | Promoter |
16 | 202 | 98.283 | 108.542 | N/A | Promoter |
17 | 203 | 81.183 | 90.835 | N/A | Promoter |
18 | 204 | 81.195 | 90.691 | N/A | Promoter |
19 | 205 | 83.854 | 93.242 | N/A | Promoter |
20 | 206 | 83.854 | 93.242 | N/A | Promoter |
21 | 207 | 81.195 | 90.691 | N/A | Promoter |
22 | 208 | 100.103 | 111.241 | N/A | Promoter |
23 | 209 | 97.840 | 108.809 | N/A | Land Owner |
24 | 210 | 80.928 | 90.360 | N/A | Promoter |
25 | 211 | 82.752 | 92.218 | N/A | Land Owner |
26 | 212 | 82.752 | 92.221 | N/A | Land Owner |
27 | 213 | 80.928 | 90.360 | N/A | Land Owner |
28 | 214 | 81.183 | 91.066 | N/A | Promoter |
29 | 301 | 95.416 | 105.412 | N/A | Promoter |
30 | 302 | 98.283 | 108.542 | N/A | Promoter |
31 | 303 | 81.183 | 90.835 | N/A | Promoter |
32 | 304 | 81.195 | 90.691 | N/A | Promoter |
33 | 305 | 83.854 | 93.242 | N/A | Land Owner |
34 | 306 | 83.854 | 93.242 | N/A | Promoter |
35 | 307 | 81.195 | 90.691 | N/A | Land Owner |
36 | 308 | 100.103 | 111.241 | N/A | Promoter |
37 | 309 | 97.840 | 108.809 | N/A | Promoter |
38 | 310 | 80.928 | 90.360 | N/A | Land Owner |
39 | 311 | 82.752 | 92.218 | N/A | Land Owner |
40 | 312 | 82.752 | 92.221 | N/A | Promoter |
41 | 313 | 80.928 | 90.360 | N/A | Promoter |
42 | 314 | 81.183 | 91.066 | N/A | Promoter |
43 | 401 | 95.416 | 105.412 | N/A | Promoter |
44 | 402 | 98.283 | 108.542 | N/A | Promoter |
45 | 403 | 81.183 | 90.835 | N/A | Promoter |
46 | 404 | 81.195 | 90.691 | N/A | Promoter |
47 | 405 | 83.854 | 93.242 | N/A | Promoter |
48 | 406 | 83.854 | 93.242 | N/A | Promoter |
49 | 407 | 81.195 | 90.691 | N/A | Promoter |
50 | 408 | 100.103 | 111.241 | N/A | Promoter |
51 | 409 | 97.840 | 108.809 | N/A | Promoter |
52 | 410 | 80.928 | 90.360 | N/A | Promoter |
53 | 411 | 82.752 | 92.218 | N/A | Land Owner |
54 | 412 | 82.752 | 92.221 | N/A | Land Owner |
55 | 413 | 80.928 | 90.360 | N/A | Land Owner |
56 | 414 | 81.183 | 91.066 | N/A | Promoter |
Types of garages and parking | ||||||
---|---|---|---|---|---|---|
House No. | Type of Garage/ Parking allotted | Serial No., if any | Dimension (Length x Width) in Metres | Floor area in sq. metres | Garage/Parking area cost is included or additional | |
101 | Covered Parking | 18 | 2.45m*5.05m | 12.3725 | Included | 102 | Covered Parking | 22 | 2.45m*5.05m | 12.3725 | Included | 103 | Covered Parking | 24 | 2.45m*5.05m | 12.3725 | Included | 104 | Covered Parking | 54 | 2.45m*5.05m | 12.3725 | Included | 105 | Covered Parking | 26 | 2.45m*5.05m | 12.3725 | Included | 106 | Covered Parking | 28 | 2.45m*5.05m | 12.3725 | Included | 107 | Covered Parking | 46 | 2.45m*5.05m | 12.3725 | Included | 108 | Covered Parking | 42 | 2.45m*5.05m | 12.3725 | Included | 109 | Covered Parking | 38 | 2.45m*5.05m | 12.3725 | Included | 110 | Covered Parking | 34 | 2.45m*5.05m | 12.3725 | Included | 111 | Covered Parking | 02 | 2.45m*5.05m | 12.3725 | Included | 112 | Covered Parking | 06 | 2.45m*5.05m | 12.3725 | Included | 113 | Covered Parking | 10 | 2.45m*5.05m | 12.3725 | Included | 114 | Covered Parking | 14 | 2.45m*5.05m | 12.3725 | Included | 201 | Covered Parking | 19 | 2.45m*5.05m | 12.3725 | Included | 202 | Covered Parking | 23 | 2.45m*5.05m | 12.3725 | Included | 203 | Covered Parking | 25 | 2.45m*5.05m | 12.3725 | Included | 204 | Covered Parking | 53 | 2.45m*5.05m | 12.3725 | Included | 205 | Covered Parking | 27 | 2.45m*5.05m | 12.3725 | Included | 206 | Covered Parking | 29 | 2.45m*5.05m | 12.3725 | Included | 207 | Covered Parking | 45 | 2.45m*5.05m | 12.3725 | Included | 208 | Covered Parking | 41 | 2.45m*5.05m | 12.3725 | Included | 209 | Covered Parking | 37 | 2.45m*5.05m | 12.3725 | Included | 210 | Covered Parking | 33 | 2.45m*5.05m | 12.3725 | Included | 211 | Covered Parking | 03 | 2.45m*5.05m | 12.3725 | Included | 212 | Covered Parking | 07 | 2.45m*5.05m | 12.3725 | Included | 213 | Covered Parking | 11 | 2.45m*5.05m | 12.3725 | Included | 214 | Covered Parking | 15 | 2.45m*5.05m | 12.3725 | Included | 301 | Covered Parking | 20 | 2.45m*5.05m | 12.3725 | Included | 302 | Covered Parking | 58 | 2.45m*5.05m | 12.3725 | Included | 303 | Covered Parking | 56 | 2.45m*5.05m | 12.3725 | Included | 304 | Covered Parking | 52 | 2.45m*5.05m | 12.3725 | Included | 305 | Covered Parking | 50 | 2.45m*5.05m | 12.3725 | Included | 306 | Covered Parking | 48 | 2.45m*5.05m | 12.3725 | Included | 307 | Covered Parking | 44 | 2.45m*5.05m | 12.3725 | Included | 308 | Covered Parking | 40 | 2.45m*5.05m | 12.3725 | Included | 309 | Covered Parking | 36 | 2.45m*5.05m | 12.3725 | Included | 310 | Covered Parking | 32 | 2.45m*5.05m | 12.3725 | Included | 311 | Covered Parking | 04 | 2.45m*5.05m | 12.3725 | Included | 312 | Covered Parking | 08 | 2.45m*5.05m | 12.3725 | Included | 313 | Covered Parking | 12 | 2.45m*5.05m | 12.3725 | Included | 314 | Covered Parking | 16 | 2.45m*5.05m | 12.3725 | Included | 401 | Covered Parking | 21 | 2.45m*5.05m | 12.3725 | Included | 402 | Covered Parking | 57 | 2.45m*5.05m | 12.3725 | Included | 403 | Covered Parking | 55 | 2.45m*5.05m | 12.3725 | Included | 405 | Covered Parking | 49 | 2.45m*5.05m | 12.3725 | Included | 406 | Covered Parking | 47 | 2.45m*5.05m | 12.3725 | Included | 407 | Covered Parking | 43 | 2.45m*5.05m | 12.3725 | Included | 408 | Covered Parking | 39 | 2.45m*5.05m | 12.3725 | Included | 409 | Covered Parking | 35 | 2.45m*5.05m | 12.3725 | Included | 410 | Covered Parking | 01 | 2.45m*5.05m | 12.3725 | Included | 411 | Covered Parking | 05 | 2.45m*5.05m | 12.3725 | Included | 412 | Covered Parking | 09 | 2.45m*5.05m | 12.3725 | Included | 413 | Covered Parking | 13 | 2.45m*5.05m | 12.3725 | Included | 414 | Covered Parking | 17 | 2.45m*5.05m | 12.3725 | Included |
Particulars of Facilities | Status of the facility | Brief description of facility |
---|---|---|
Drinking Water Facility | Ground Water | NA Copy of Consent Letter |
Fire Fighting Facility | Yes | NA FIRE RECOMENDATION |
Emergency Evacuation Services | No | NA |
Use of Renewable Energy | No | NA |
Lift Facility | Yes | NA 3 Nos. of 6 passenger 408kg capacity, KONE or OTIS or EQUIVALENT brand lift with ARD facility |
Market Complex | No | NA |
Community Hall | Yes | NA STILT FLOOR(57.93 SQMTRS) |
Gymnasium | No | NA |
Swimming Pool | No | NA |
Play Ground | No | NA |
Park/Garden | No | NA |
Plantation Area | Yes | NA 710.02 SQMTRS |
Others(Please Specify) | No | NA |
Internal Road | No | NA |
External Road | Yes | NA 9.14M |
Elecricity Supply | Yes | NA Copy of Consent Letter |
Other Amenities | No | NA |
SL NO. | Description | Scheduled date of completion | Current Status | Remarks |
---|---|---|---|---|
1 | Site Development | 28-02-2019 | N/A | NA |
2 | Roof Casting | NA | NA | NA |
3 | Ground Floor/Stilt Floor | 30-04-2019 | N/A | NA |
4 | 1 Floor | 31-05-2019 | N/A | NA |
5 | 2 Floor | 30-06-2019 | N/A | NA |
6 | 3 Floor | 31-07-2019 | N/A | NA |
7 | 4 Floor | 31-08-2019 | N/A | NA |
8 | Brick Work & Plastering | NA | NA | NA |
9 | Ground Floor/Stilt Floor | 15-05-2019 | N/A | NA |
10 | 1 Floor | 30-06-2019 | N/A | NA |
11 | 2 Floor | 31-07-2019 | N/A | NA |
12 | 3 Floor | 31-08-2019 | N/A | NA |
13 | 4 Floor | 30-09-2019 | N/A | NA |
14 | Electrical Works | 20-10-2019 | N/A | NA |
15 | Concealed Cabling including Plugs & switches | 30-06-2020 | N/A | NA |
16 | Installation & Charging of Transformer | 28-02-2020 | N/A | NA |
17 | Connection to Flats/Apartments | 30-04-2020 | N/A | NA |
18 | PH works | 30-09-2019 | N/A | NA |
19 | Laying of concealed Pipes | 30-09-2019 | N/A | NA |
20 | PH Fittings | 31-10-2021 | N/A | NA |
21 | Overhead Water Tanks | 31-10-2019 | N/A | NA |
22 | Water Supply Connection to all units | 30-10-2021 | N/A | NA |
23 | STP construction and completion | 30-04-2019 | N/A | NA |
24 | Distempering & Colouring of all units and exteriors | 30-08-2021 | N/A | NA |
25 | Fixation of doors and windows | 31-07-2019 | N/A | NA |
26 | Scheduled Date of handing over possession | 25-12-2021 | N/A | NA |
27 | Development of common areas, parks, gardens etc | 30-10-2021 | N/A | NA |
Updated Changes on 01-12-2021 | ||||
28 | Site Development | 28-02-2019 | WORK IN PROGRESS | |
29 | NA | NA | NA | NA |
30 | Ground Floor/Stilt Floor | 30-04-2019 | COMPLETE | |
31 | 1 Floor | 31-05-2019 | COMPLETE | |
32 | 2 Floor | 30-06-2019 | COMPLETE | |
33 | 3 Floor | 31-07-2019 | COMPLETE | |
34 | 4 Floor | 31-08-2019 | COMPLETE | |
35 | NA | NA | NA | NA |
36 | Ground Floor/Stilt Floor | 15-05-2019 | COMPLETE | |
37 | 1 Floor | 30-06-2019 | COMPLETE | |
38 | 2 Floor | 31-07-2019 | COMPLETE | |
39 | 3 Floor | 31-08-2019 | COMPLETE | |
40 | 4 Floor | 30-09-2019 | COMPLETE | |
41 | Electrical Works | 20-10-2019 | WORK IN PROGRESS | |
42 | Concealed Cabling including Plugs & switches | 30-06-2020 | WORK IN PROGRESS | |
43 | Installation & Charging of Transformer | 28-02-2020 | WORK IN PROGRESS | NA |
44 | Connection to Flats/Apartments | 30-04-2020 | WORK IN PROGRESS | NA |
45 | PH works | 30-09-2019 | WORK IN PROGRESS | NA |
46 | Laying of concealed Pipes | 30-09-2019 | COMPLETE | |
47 | PH Fittings | 31-10-2021 | WORK IN PROGRESS | |
48 | Overhead Water Tanks | 31-10-2019 | WORK IN PROGRESS | NA |
49 | Water Supply Connection to all units | 30-10-2021 | WORK IN PROGRESS | NA |
50 | STP construction and completion | 30-04-2019 | WORK IN PROGRESS | NA |
51 | Distempering & Colouring of all units and exteriors | 30-08-2021 | WORK IN PROGRESS | |
52 | Fixation of doors and windows | 31-07-2019 | WORK IN PROGRESS | |
53 | Scheduled Date of handing over possession | 25-12-2021 | WORK IN PROGRESS | NA |
54 | Development of common areas, parks, gardens etc | 30-10-2021 | WORK IN PROGRESS | |
Updated Changes on 13-07-2022 | ||||
55 | Site Development | 28-02-2019 | Complete | |
56 | NA | 28-02-2019 | Complete | |
57 | Ground Floor/Stilt Floor | 30-04-2019 | COMPLETE | |
58 | 1 Floor | 31-05-2019 | COMPLETE | |
59 | 2 Floor | 30-06-2019 | COMPLETE | |
60 | 3 Floor | 31-07-2019 | COMPLETE | |
61 | 4 Floor | 31-08-2019 | COMPLETE | NA |
62 | NA | 31-08-2019 | COMPLETE | |
63 | Ground Floor/Stilt Floor | 15-05-2019 | COMPLETE | |
64 | 1 Floor | 30-06-2019 | COMPLETE | |
65 | 2 Floor | 31-07-2019 | COMPLETE | |
66 | 3 Floor | 31-08-2019 | COMPLETE | |
67 | 4 Floor | 30-09-2019 | COMPLETE | |
68 | Electrical Works | 20-10-2019 | WORK IN PROGRESS | |
69 | Concealed Cabling including Plugs & switches | 30-06-2020 | WORK IN PROGRESS | |
70 | Installation & Charging of Transformer | 28-02-2020 | WORK IN PROGRESS | NA |
71 | Connection to Flats/Apartments | 30-04-2020 | WORK IN PROGRESS | NA |
72 | PH works | 30-09-2019 | WORK IN PROGRESS | |
73 | Laying of concealed Pipes | 30-09-2019 | COMPLETE | |
74 | PH Fittings | 31-10-2021 | WORK IN PROGRESS | |
75 | Overhead Water Tanks | 31-10-2019 | WORK IN PROGRESS | NA |
76 | Water Supply Connection to all units | 30-10-2021 | WORK IN PROGRESS | NA |
77 | STP construction and completion | 30-04-2019 | WORK IN PROGRESS | NA |
78 | Distempering & Colouring of all units and exteriors | 30-08-2021 | WORK IN PROGRESS | NA |
79 | Fixation of doors and windows | 31-07-2019 | WORK IN PROGRESS | NA |
80 | Scheduled Date of handing over possession | 25-12-2021 | WORK IN PROGRESS | NA |
81 | Development of common areas, parks, gardens etc | 30-10-2021 | WORK IN PROGRESS | NA |
Updated Changes on 11-10-2022 | ||||
82 | Site Development | 28-02-2019 | Complete | NA |
83 | NA | 28-02-2019 | Complete | NA |
84 | Ground Floor/Stilt Floor | 30-04-2019 | COMPLETE | NA |
85 | 1 Floor | 31-05-2019 | COMPLETE | NA |
86 | 2 Floor | 30-06-2019 | COMPLETE | NA |
87 | 3 Floor | 31-07-2019 | COMPLETE | NA |
88 | 4 Floor | 31-08-2019 | COMPLETE | NA |
89 | NA | 31-08-2019 | COMPLETE | NA |
90 | Ground Floor/Stilt Floor | 15-05-2019 | COMPLETE | NA |
91 | 1 Floor | 30-06-2019 | COMPLETE | NA |
92 | 2 Floor | 31-07-2019 | COMPLETE | NA |
93 | 3 Floor | 31-08-2019 | COMPLETE | NA |
94 | 4 Floor | 30-09-2019 | COMPLETE | NA |
95 | Electrical Works | 20-10-2019 | complete | NA |
96 | Concealed Cabling including Plugs & switches | 30-06-2020 | complete | NA |
97 | Installation & Charging of Transformer | 28-02-2020 | complete | |
98 | Connection to Flats/Apartments | 30-04-2020 | WORK IN PROGRESS | NA |
99 | PH works | 30-09-2019 | WORK IN PROGRESS | NA |
100 | Laying of concealed Pipes | 30-09-2019 | COMPLETE | NA |
101 | PH Fittings | 31-10-2021 | WORK IN PROGRESS | NA |
102 | Overhead Water Tanks | 31-10-2019 | WORK IN PROGRESS | NA |
103 | Water Supply Connection to all units | 30-10-2021 | WORK IN PROGRESS | NA |
104 | STP construction and completion | 30-04-2019 | WORK IN PROGRESS | NA |
105 | Distempering & Colouring of all units and exteriors | 30-08-2021 | WORK IN PROGRESS | NA |
106 | Fixation of doors and windows | 31-07-2019 | WORK IN PROGRESS | NA |
107 | Scheduled Date of handing over possession | 25-12-2021 | WORK IN PROGRESS | NA |
108 | Development of common areas, parks, gardens etc | 30-10-2021 | WORK IN PROGRESS | NA |
Updated Changes on 13-07-2023 | ||||
109 | Site Development | 28-02-2019 | Complete | NA |
110 | NA | 28-02-2019 | Complete | NA |
111 | Ground Floor/Stilt Floor | 30-04-2019 | COMPLETE | NA |
112 | 1 Floor | 31-05-2019 | COMPLETE | NA |
113 | 2 Floor | 30-06-2019 | COMPLETE | NA |
114 | 3 Floor | 31-07-2019 | COMPLETE | NA |
115 | 4 Floor | 31-08-2019 | COMPLETE | NA |
116 | NA | 31-08-2019 | COMPLETE | NA |
117 | Ground Floor/Stilt Floor | 15-05-2019 | COMPLETE | NA |
118 | 1 Floor | 30-06-2019 | COMPLETE | NA |
119 | 2 Floor | 31-07-2019 | COMPLETE | NA |
120 | 3 Floor | 31-08-2019 | COMPLETE | NA |
121 | 4 Floor | 30-09-2019 | COMPLETE | NA |
122 | Electrical Works | 20-10-2019 | complete | NA |
123 | Concealed Cabling including Plugs & switches | 30-06-2020 | complete | NA |
124 | Installation & Charging of Transformer | 28-02-2020 | complete | NA |
125 | Connection to Flats/Apartments | 30-04-2020 | complete | NA |
126 | PH works | 30-09-2019 | complete | NA |
127 | Laying of concealed Pipes | 30-09-2019 | COMPLETE | NA |
128 | PH Fittings | 31-10-2021 | complete | NA |
129 | Overhead Water Tanks | 31-10-2019 | complete | NA |
130 | Water Supply Connection to all units | 30-10-2021 | complete | NA |
131 | STP construction and completion | 30-04-2019 | WORK IN PROGRESS | |
132 | Distempering & Colouring of all units and exteriors | 30-08-2021 | complete | |
133 | Fixation of doors and windows | 31-07-2019 | complete | NA |
134 | Scheduled Date of handing over possession | 25-12-2021 | WORK IN PROGRESS | NA |
135 | Development of common areas, parks, gardens etc | 30-10-2021 | complete | NA |
Updated Changes on 22-11-2023 | ||||
136 | Site Development | 28-02-2019 | Complete | NA |
137 | NA | 28-02-2019 | Complete | NA |
138 | Ground Floor/Stilt Floor | 30-04-2019 | COMPLETE | NA |
139 | 1 Floor | 31-05-2019 | COMPLETE | NA |
140 | 2 Floor | 30-06-2019 | COMPLETE | NA |
141 | 3 Floor | 31-07-2019 | COMPLETE | NA |
142 | 4 Floor | 31-08-2019 | COMPLETE | NA |
143 | NA | 31-08-2019 | COMPLETE | NA |
144 | Ground Floor/Stilt Floor | 15-05-2019 | COMPLETE | NA |
145 | 1 Floor | 30-06-2019 | COMPLETE | NA |
146 | 2 Floor | 31-07-2019 | COMPLETE | NA |
147 | 3 Floor | 31-08-2019 | COMPLETE | NA |
148 | 4 Floor | 30-09-2019 | COMPLETE | NA |
149 | Electrical Works | 20-10-2019 | complete | NA |
150 | Concealed Cabling including Plugs & switches | 30-06-2020 | complete | NA |
151 | Installation & Charging of Transformer | 28-02-2020 | complete | NA |
152 | Connection to Flats/Apartments | 30-04-2020 | complete | NA |
153 | PH works | 30-09-2019 | complete | NA |
154 | Laying of concealed Pipes | 30-09-2019 | COMPLETE | NA |
155 | PH Fittings | 31-10-2021 | complete | NA |
156 | Overhead Water Tanks | 31-10-2019 | complete | NA |
157 | Water Supply Connection to all units | 30-10-2021 | complete | NA |
158 | STP construction and completion | 30-04-2019 | WORK IN PROGRESS | NA |
159 | Distempering & Colouring of all units and exteriors | 30-08-2021 | complete | NA |
160 | Fixation of doors and windows | 31-07-2019 | complete | NA |
161 | Scheduled Date of handing over possession | 25-12-2021 | WORK IN PROGRESS | NA |
162 | Development of common areas, parks, gardens etc | 30-10-2021 | complete | NA |
Updated Changes on 03-04-2024 | ||||
163 | Site Development | 28-02-2019 | Complete | NA |
164 | NA | 28-02-2019 | Complete | NA |
165 | Ground Floor/Stilt Floor | 30-04-2019 | COMPLETE | NA |
166 | 1 Floor | 31-05-2019 | COMPLETE | NA |
167 | 2 Floor | 30-06-2019 | COMPLETE | NA |
168 | 3 Floor | 31-07-2019 | COMPLETE | NA |
169 | 4 Floor | 31-08-2019 | COMPLETE | NA |
170 | NA | 31-08-2019 | COMPLETE | NA |
171 | Ground Floor/Stilt Floor | 15-05-2019 | COMPLETE | NA |
172 | 1 Floor | 30-06-2019 | COMPLETE | NA |
173 | 2 Floor | 31-07-2019 | COMPLETE | NA |
174 | 3 Floor | 31-08-2019 | COMPLETE | NA |
175 | 4 Floor | 30-09-2019 | COMPLETE | NA |
176 | Electrical Works | 20-10-2019 | complete | NA |
177 | Concealed Cabling including Plugs & switches | 30-06-2020 | complete | NA |
178 | Installation & Charging of Transformer | 28-02-2020 | complete | NA |
179 | Connection to Flats/Apartments | 30-04-2020 | complete | NA |
180 | PH works | 30-09-2019 | complete | NA |
181 | Laying of concealed Pipes | 30-09-2019 | COMPLETE | NA |
182 | PH Fittings | 31-10-2021 | complete | NA |
183 | Overhead Water Tanks | 31-10-2019 | complete | NA |
184 | Water Supply Connection to all units | 30-10-2021 | complete | NA |
185 | STP construction and completion | 30-04-2019 | WORK IN PROGRESS | NA |
186 | Distempering & Colouring of all units and exteriors | 30-08-2021 | complete | NA |
187 | Fixation of doors and windows | 31-07-2019 | complete | NA |
188 | Scheduled Date of handing over possession | 25-12-2021 | WORK IN PROGRESS | NA |
189 | Development of common areas, parks, gardens etc | 30-10-2021 | complete | NA |
Residential Flats/ House | |||||||
---|---|---|---|---|---|---|---|
S. No. | Flat No./ House No. | ||||||
Area in square metres |
Ownership | Status | |||||
Carpet Area | Balcony Area | Exclusive Open Terrace Area | |||||
1 | 101 | 95.416 | 105.412 | N/A | Promoter | ||
2 | 102 | 98.283 | 108.542 | N/A | Promoter | ||
3 | 103 | 81.183 | 90.835 | N/A | Promoter | ||
4 | 104 | 81.195 | 90.691 | N/A | Promoter | ||
5 | 105 | 83.854 | 93.242 | N/A | Promoter | ||
6 | 106 | 83.854 | 93.242 | N/A | Promoter | ||
7 | 107 | 81.195 | 90.691 | N/A | Promoter | ||
8 | 108 | 100.103 | 111.241 | N/A | Promoter | ||
9 | 109 | 97.840 | 108.809 | N/A | Land Owner | ||
10 | 110 | 80.928 | 90.360 | N/A | Promoter | ||
11 | 111 | 82.752 | 92.218 | N/A | Land Owner | ||
12 | 112 | 82.752 | 92.221 | N/A | Land Owner | ||
13 | 113 | 80.928 | 90.360 | N/A | Land Owner | ||
14 | 114 | 81.183 | 91.066 | N/A | Promoter | ||
15 | 201 | 95.416 | 105.412 | N/A | Promoter | ||
16 | 202 | 98.283 | 108.542 | N/A | Promoter | ||
17 | 203 | 81.183 | 90.835 | N/A | Promoter | ||
18 | 204 | 81.195 | 90.691 | N/A | Promoter | ||
19 | 205 | 83.854 | 93.242 | N/A | Promoter | ||
20 | 206 | 83.854 | 93.242 | N/A | Promoter | ||
21 | 207 | 81.195 | 90.691 | N/A | Promoter | ||
22 | 208 | 100.103 | 111.241 | N/A | Promoter | ||
23 | 209 | 97.840 | 108.809 | N/A | Land Owner | ||
24 | 210 | 80.928 | 90.360 | N/A | Promoter | ||
25 | 211 | 82.752 | 92.218 | N/A | Land Owner | ||
26 | 212 | 82.752 | 92.221 | N/A | Land Owner | ||
27 | 213 | 80.928 | 90.360 | N/A | Land Owner | ||
28 | 214 | 81.183 | 91.066 | N/A | Promoter | ||
29 | 301 | 95.416 | 105.412 | N/A | Promoter | ||
30 | 302 | 98.283 | 108.542 | N/A | Promoter | ||
31 | 303 | 81.183 | 90.835 | N/A | Promoter | ||
32 | 304 | 81.195 | 90.691 | N/A | Promoter | ||
33 | 305 | 83.854 | 93.242 | N/A | Land Owner | ||
34 | 306 | 83.854 | 93.242 | N/A | Promoter | ||
35 | 307 | 81.195 | 90.691 | N/A | Land Owner | ||
36 | 308 | 100.103 | 111.241 | N/A | Promoter | ||
37 | 309 | 97.840 | 108.809 | N/A | Promoter | ||
38 | 310 | 80.928 | 90.360 | N/A | Land Owner | ||
39 | 311 | 82.752 | 92.218 | N/A | Land Owner | ||
40 | 312 | 82.752 | 92.221 | N/A | Promoter | ||
41 | 313 | 80.928 | 90.360 | N/A | Promoter | ||
42 | 314 | 81.183 | 91.066 | N/A | Promoter | ||
43 | 401 | 95.416 | 105.412 | N/A | Promoter | ||
44 | 402 | 98.283 | 108.542 | N/A | Promoter | ||
45 | 403 | 81.183 | 90.835 | N/A | Promoter | ||
46 | 404 | 81.195 | 90.691 | N/A | Promoter | ||
47 | 405 | 83.854 | 93.242 | N/A | Promoter | ||
48 | 406 | 83.854 | 93.242 | N/A | Promoter | ||
49 | 407 | 81.195 | 90.691 | N/A | Promoter | ||
50 | 408 | 100.103 | 111.241 | N/A | Promoter | ||
51 | 409 | 97.840 | 108.809 | N/A | Promoter | ||
52 | 410 | 80.928 | 90.360 | N/A | Promoter | ||
53 | 411 | 82.752 | 92.218 | N/A | Land Owner | ||
54 | 412 | 82.752 | 92.221 | N/A | Land Owner | ||
55 | 413 | 80.928 | 90.360 | N/A | Land Owner | ||
56 | 414 | 81.183 | 91.066 | N/A | Promoter |
SL No. | Funds Collected from the Allottees | Funds Borrowed from Financial Institutions | Funds Employed from Own Sources | Expenditure | As On Date | Status |
---|---|---|---|---|---|---|
1 | 237544988 | 0 | 50000000 | 160009256 | 30-11-2021 | 110858 |
2 | 269790027 | 0 | 0 | 167308689 | 30-06-2023 | 235777.22 |
3 | 301264646 | 0 | 0 | 227806391 | 22-10-2023 | 1577 |
4 | 301264646 | 0 | 227806391 | 03-03-2024 | As on 31-12-2023 |
Sl. No. | Description of Conditions | Schedule date of compliance | Present Status |
---|---|---|---|
1 | As per plan approval letter | 16-02-2019 | In progress |
2 | the owner /applicant /technical person shall strictly adhere to the terms and conditions imposed in the NOC/clearances given by Fire Prevention officer/National Airport Authority/SEIAA,Ministry of forest & Environment /PHED etc whereever applicable | 31-12-2021 | work in progress |
3 | Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Regulation-44 of BDA (Planning & Building Standards) Regulation,2008 | 31-12-2021 | work in progress |
4 | The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner | 31-12-2021 | work in progress |
5 | 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance,fire tender,physically handicapped persons and outside visitors with signage as per norms under Regulation -35(11)(12) of BDA (planning & Building Standards) Regulations 2008,Amended -2013 | 31-12-2021 | work in progress |
6 | Plantation over 20% of the plot area shall be made by the applicant as per provision under Regulation 28 of BDA (Planning & Building Standards) Regulations 2008 | 31-12-2021 | work in progress |
7 | If the construction /development are not as per the approved plan /deviated beyond permissible norms, the performance security shall be forfeited and action shall be initiated against the applicant/builder /developer as per the provisions of the ODA Act,1982 Rules and Regulations made there under | 31-12-2021 | work in progress |
8 | The Owner/Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/construction defects ,Authority will be no way be held responsible for the same in what so ever manner | 31-12-2021 | work in progress |
9 | The concerned Architect /Applicant /Developer are Fully Responible for any deviations additions & alternations beyond approved plan/defective construction etc.shall be liable for action as per the provisions of the Regulation. | 31-12-2021 | work in progress |
10 | The applicant shall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/BDA before commencement of construction | 31-12-2021 | work in progress |
11 | All the stipulated conditions of the NOC/Clearances given by BMC,PHED,shall be adhered to strictly | 31-12-2021 | work in progress |
12 | No storm water/water shall be discharged to the public road/public premises and other adjoining plots | 30-12-2021 | work in progress |
13 | Adhere to the provisions of BDA (Planning & Building Standards) Regulation strictly and conditions thereto. | 31-12-2021 | work in progress |
14 | The Authority shall in no way be held responible for any structural failure and damage due to earthquake/cyclone/any other natural disaster | 31-12-2021 | work in progress |
15 | Submit clearance from Fire-Prevention wing at the time of obtaining Occupancy Certificate | 31-12-2021 | work in progress |
Updated Changes on 01-12-2021 | |||
16 | As per plan approval letter | 16-02-2019 | YES STRICTLY FOLLOWED |
17 | the owner /applicant /technical person shall strictly adhere to the terms and conditions imposed in the NOC/clearances given by Fire Prevention officer/National Airport Authority/SEIAA,Ministry of forest & Environment /PHED etc whereever applicable | 31-12-2021 | NOT YET STARTED,IT WILL BE STARTED AFTER COMPLETION OF CONSTRCTION OF WORK |
18 | Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Regulation-44 of BDA (Planning & Building Standards) Regulation,2008 | 31-12-2021 | NOT YET STARTED,IT WILL BE STARTED AFTER COMPLETION OF CONSTRCTION OF WORKNOT YET STARTED IT WILL BE STARTED AFTER COMPLITION OF CONSTRUCTION WORK |
19 | The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner | 31-12-2021 | YES STRICTLY FOLLOWED |
20 | 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance,fire tender,physically handicapped persons and outside visitors with signage as per norms under Regulation -35(11)(12) of BDA (planning & Building Standards) Regulations 2008,Amended -2013 | 31-12-2021 | YES STRICTLY FOLLOWED |
21 | Plantation over 20% of the plot area shall be made by the applicant as per provision under Regulation 28 of BDA (Planning & Building Standards) Regulations 2008 | 31-12-2021 | NOT YET STARTED,IT SHOULD BE FOLLOWED |
22 | If the construction /development are not as per the approved plan /deviated beyond permissible norms, the performance security shall be forfeited and action shall be initiated against the applicant/builder /developer as per the provisions of the ODA Act,1982 Rules and Regulations made there under | 31-12-2021 | NOT DEVIATED |
23 | The Owner/Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/construction defects ,Authority will be no way be held responsible for the same in what so ever manner | 31-12-2021 | STRCTILY FOLLWED |
24 | The concerned Architect /Applicant /Developer are Fully Responible for any deviations additions & alternations beyond approved plan/defective construction etc.shall be liable for action as per the provisions of the Regulation. | 31-12-2021 | YES |
25 | The applicant shall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/BDA before commencement of construction | 31-12-2021 | YES |
26 | All the stipulated conditions of the NOC/Clearances given by BMC,PHED,shall be adhered to strictly | 31-12-2021 | OBTAINED |
27 | No storm water/water shall be discharged to the public road/public premises and other adjoining plots | 30-12-2021 | YES STRICTLY FOLLOWED |
28 | Adhere to the provisions of BDA (Planning & Building Standards) Regulation strictly and conditions thereto. | 31-12-2021 | YES STRICTLY FOLLOWED |
29 | The Authority shall in no way be held responible for any structural failure and damage due to earthquake/cyclone/any other natural disaster | 31-12-2021 | YES |
30 | Submit clearance from Fire-Prevention wing at the time of obtaining Occupancy Certificate | 31-12-2021 | YES |
Updated Changes on 11-07-2022 | |||
31 | As per plan approval letter | 16-02-2019 | YES STRICTLY FOLLOWED |
32 | the owner /applicant /technical person shall strictly adhere to the terms and conditions imposed in the NOC/clearances given by Fire Prevention officer/National Airport Authority/SEIAA,Ministry of forest & Environment /PHED etc whereever applicable | 31-12-2021 | NOT YET STARTED,IT WILL BE STARTED AFTER COMPLETION OF CONSTRCTION OF WORK |
33 | Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Regulation-44 of BDA (Planning & Building Standards) Regulation,2008 | 31-12-2021 | NOT YET STARTED,IT WILL BE STARTED AFTER COMPLETION OF CONSTRCTION OF WORKNOT YET STARTED IT WILL BE STARTED AFTER COMPLITION OF CONSTRUCTION WORK |
34 | The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner | 31-12-2021 | YES STRICTLY FOLLOWED |
35 | 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance,fire tender,physically handicapped persons and outside visitors with signage as per norms under Regulation -35(11)(12) of BDA (planning & Building Standards) Regulations 2008,Amended -2013 | 31-12-2021 | YES STRICTLY FOLLOWED |
36 | Plantation over 20% of the plot area shall be made by the applicant as per provision under Regulation 28 of BDA (Planning & Building Standards) Regulations 2008 | 31-12-2021 | NOT YET STARTED,IT SHOULD BE FOLLOWED |
37 | If the construction /development are not as per the approved plan /deviated beyond permissible norms, the performance security shall be forfeited and action shall be initiated against the applicant/builder /developer as per the provisions of the ODA Act,1982 Rules and Regulations made there under | 31-12-2021 | NOT DEVIATED |
38 | The Owner/Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/construction defects ,Authority will be no way be held responsible for the same in what so ever manner | 31-12-2021 | STRCTILY FOLLWED |
39 | The concerned Architect /Applicant /Developer are Fully Responible for any deviations additions & alternations beyond approved plan/defective construction etc.shall be liable for action as per the provisions of the Regulation. | 31-12-2021 | YES |
40 | The applicant shall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/BDA before commencement of construction | 31-12-2021 | YES |
41 | All the stipulated conditions of the NOC/Clearances given by BMC,PHED,shall be adhered to strictly | 31-12-2021 | OBTAINED |
42 | No storm water/water shall be discharged to the public road/public premises and other adjoining plots | 30-12-2021 | YES STRICTLY FOLLOWED |
43 | Adhere to the provisions of BDA (Planning & Building Standards) Regulation strictly and conditions thereto. | 31-12-2021 | YES STRICTLY FOLLOWED |
44 | The Authority shall in no way be held responible for any structural failure and damage due to earthquake/cyclone/any other natural disaster | 31-12-2021 | YES |
45 | Submit clearance from Fire-Prevention wing at the time of obtaining Occupancy Certificate | 31-12-2021 | YES |
Updated Changes on 11-10-2022 | |||
46 | As per plan approval letter | 16-02-2019 | YES STRICTLY FOLLOWED |
47 | the owner /applicant /technical person shall strictly adhere to the terms and conditions imposed in the NOC/clearances given by Fire Prevention officer/National Airport Authority/SEIAA,Ministry of forest & Environment /PHED etc whereever applicable | 31-12-2021 | NOT YET STARTED,IT WILL BE STARTED AFTER COMPLETION OF CONSTRCTION OF WORK |
48 | Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Regulation-44 of BDA (Planning & Building Standards) Regulation,2008 | 31-12-2021 | NOT YET STARTED,IT WILL BE STARTED AFTER COMPLETION OF CONSTRCTION OF WORKNOT YET STARTED IT WILL BE STARTED AFTER COMPLITION OF CONSTRUCTION WORK |
49 | The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner | 31-12-2021 | YES STRICTLY FOLLOWED |
50 | 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance,fire tender,physically handicapped persons and outside visitors with signage as per norms under Regulation -35(11)(12) of BDA (planning & Building Standards) Regulations 2008,Amended -2013 | 31-12-2021 | YES STRICTLY FOLLOWED |
51 | Plantation over 20% of the plot area shall be made by the applicant as per provision under Regulation 28 of BDA (Planning & Building Standards) Regulations 2008 | 31-12-2021 | NOT YET STARTED,IT SHOULD BE FOLLOWED |
52 | If the construction /development are not as per the approved plan /deviated beyond permissible norms, the performance security shall be forfeited and action shall be initiated against the applicant/builder /developer as per the provisions of the ODA Act,1982 Rules and Regulations made there under | 31-12-2021 | NOT DEVIATED |
53 | The Owner/Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/construction defects ,Authority will be no way be held responsible for the same in what so ever manner | 31-12-2021 | STRCTILY FOLLWED |
54 | The concerned Architect /Applicant /Developer are Fully Responible for any deviations additions & alternations beyond approved plan/defective construction etc.shall be liable for action as per the provisions of the Regulation. | 31-12-2021 | YES |
55 | The applicant shall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/BDA before commencement of construction | 31-12-2021 | YES |
56 | All the stipulated conditions of the NOC/Clearances given by BMC,PHED,shall be adhered to strictly | 31-12-2021 | OBTAINED |
57 | No storm water/water shall be discharged to the public road/public premises and other adjoining plots | 30-12-2021 | YES STRICTLY FOLLOWED |
58 | Adhere to the provisions of BDA (Planning & Building Standards) Regulation strictly and conditions thereto. | 31-12-2021 | YES STRICTLY FOLLOWED |
59 | The Authority shall in no way be held responible for any structural failure and damage due to earthquake/cyclone/any other natural disaster | 31-12-2021 | YES |
60 | Submit clearance from Fire-Prevention wing at the time of obtaining Occupancy Certificate | 31-12-2021 | YES |
Updated Changes on 13-07-2023 | |||
61 | As per plan approval letter | 16-02-2019 | YES STRICTLY FOLLOWED |
62 | the owner /applicant /technical person shall strictly adhere to the terms and conditions imposed in the NOC/clearances given by Fire Prevention officer/National Airport Authority/SEIAA,Ministry of forest & Environment /PHED etc whereever applicable | 31-12-2021 | NOT YET STARTED,IT WILL BE STARTED AFTER COMPLETION OF CONSTRCTION OF WORK |
63 | Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Regulation-44 of BDA (Planning & Building Standards) Regulation,2008 | 31-12-2021 | NOT YET STARTED,IT WILL BE STARTED AFTER COMPLETION OF CONSTRCTION OF WORKNOT YET STARTED IT WILL BE STARTED AFTER COMPLITION OF CONSTRUCTION WORK |
64 | The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner | 31-12-2021 | YES STRICTLY FOLLOWED |
65 | 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance,fire tender,physically handicapped persons and outside visitors with signage as per norms under Regulation -35(11)(12) of BDA (planning & Building Standards) Regulations 2008,Amended -2013 | 31-12-2021 | YES STRICTLY FOLLOWED |
66 | Plantation over 20% of the plot area shall be made by the applicant as per provision under Regulation 28 of BDA (Planning & Building Standards) Regulations 2008 | 31-12-2021 | NOT YET STARTED,IT SHOULD BE FOLLOWED |
67 | If the construction /development are not as per the approved plan /deviated beyond permissible norms, the performance security shall be forfeited and action shall be initiated against the applicant/builder /developer as per the provisions of the ODA Act,1982 Rules and Regulations made there under | 31-12-2021 | NOT DEVIATED |
68 | The Owner/Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/construction defects ,Authority will be no way be held responsible for the same in what so ever manner | 31-12-2021 | STRCTILY FOLLWED |
69 | The concerned Architect /Applicant /Developer are Fully Responible for any deviations additions & alternations beyond approved plan/defective construction etc.shall be liable for action as per the provisions of the Regulation. | 31-12-2021 | YES |
70 | The applicant shall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/BDA before commencement of construction | 31-12-2021 | YES |
71 | All the stipulated conditions of the NOC/Clearances given by BMC,PHED,shall be adhered to strictly | 31-12-2021 | OBTAINED |
72 | No storm water/water shall be discharged to the public road/public premises and other adjoining plots | 30-12-2021 | YES STRICTLY FOLLOWED |
73 | Adhere to the provisions of BDA (Planning & Building Standards) Regulation strictly and conditions thereto. | 31-12-2021 | YES STRICTLY FOLLOWED |
74 | The Authority shall in no way be held responible for any structural failure and damage due to earthquake/cyclone/any other natural disaster | 31-12-2021 | YES |
75 | Submit clearance from Fire-Prevention wing at the time of obtaining Occupancy Certificate | 31-12-2021 | YES |
Updated Changes on 22-11-2023 | |||
76 | As per plan approval letter | 16-02-2019 | YES STRICTLY FOLLOWED |
77 | the owner /applicant /technical person shall strictly adhere to the terms and conditions imposed in the NOC/clearances given by Fire Prevention officer/National Airport Authority/SEIAA,Ministry of forest & Environment /PHED etc whereever applicable | 31-12-2021 | NOT YET STARTED,IT WILL BE STARTED AFTER COMPLETION OF CONSTRCTION OF WORK |
78 | Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Regulation-44 of BDA (Planning & Building Standards) Regulation,2008 | 31-12-2021 | NOT YET STARTED,IT WILL BE STARTED AFTER COMPLETION OF CONSTRCTION OF WORKNOT YET STARTED IT WILL BE STARTED AFTER COMPLITION OF CONSTRUCTION WORK |
79 | The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner | 31-12-2021 | YES STRICTLY FOLLOWED |
80 | 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance,fire tender,physically handicapped persons and outside visitors with signage as per norms under Regulation -35(11)(12) of BDA (planning & Building Standards) Regulations 2008,Amended -2013 | 31-12-2021 | YES STRICTLY FOLLOWED |
81 | Plantation over 20% of the plot area shall be made by the applicant as per provision under Regulation 28 of BDA (Planning & Building Standards) Regulations 2008 | 31-12-2021 | NOT YET STARTED,IT SHOULD BE FOLLOWED |
82 | If the construction /development are not as per the approved plan /deviated beyond permissible norms, the performance security shall be forfeited and action shall be initiated against the applicant/builder /developer as per the provisions of the ODA Act,1982 Rules and Regulations made there under | 31-12-2021 | NOT DEVIATED |
83 | The Owner/Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/construction defects ,Authority will be no way be held responsible for the same in what so ever manner | 31-12-2021 | STRCTILY FOLLWED |
84 | The concerned Architect /Applicant /Developer are Fully Responible for any deviations additions & alternations beyond approved plan/defective construction etc.shall be liable for action as per the provisions of the Regulation. | 31-12-2021 | YES |
85 | The applicant shall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/BDA before commencement of construction | 31-12-2021 | YES |
86 | All the stipulated conditions of the NOC/Clearances given by BMC,PHED,shall be adhered to strictly | 31-12-2021 | OBTAINED |
87 | No storm water/water shall be discharged to the public road/public premises and other adjoining plots | 30-12-2021 | YES STRICTLY FOLLOWED |
88 | Adhere to the provisions of BDA (Planning & Building Standards) Regulation strictly and conditions thereto. | 31-12-2021 | YES STRICTLY FOLLOWED |
89 | The Authority shall in no way be held responible for any structural failure and damage due to earthquake/cyclone/any other natural disaster | 31-12-2021 | YES |
90 | Submit clearance from Fire-Prevention wing at the time of obtaining Occupancy Certificate | 31-12-2021 | YES |
Updated Changes on 03-04-2024 | |||
91 | As per plan approval letter | 16-02-2019 | YES STRICTLY FOLLOWED |
92 | the owner /applicant /technical person shall strictly adhere to the terms and conditions imposed in the NOC/clearances given by Fire Prevention officer/National Airport Authority/SEIAA,Ministry of forest & Environment /PHED etc whereever applicable | 31-12-2021 | NOT YET STARTED,IT WILL BE STARTED AFTER COMPLETION OF CONSTRCTION OF WORK |
93 | Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Regulation-44 of BDA (Planning & Building Standards) Regulation,2008 | 31-12-2021 | NOT YET STARTED,IT WILL BE STARTED AFTER COMPLETION OF CONSTRCTION OF WORKNOT YET STARTED IT WILL BE STARTED AFTER COMPLITION OF CONSTRUCTION WORK |
94 | The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner | 31-12-2021 | YES STRICTLY FOLLOWED |
95 | 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance,fire tender,physically handicapped persons and outside visitors with signage as per norms under Regulation -35(11)(12) of BDA (planning & Building Standards) Regulations 2008,Amended -2013 | 31-12-2021 | YES STRICTLY FOLLOWED |
96 | Plantation over 20% of the plot area shall be made by the applicant as per provision under Regulation 28 of BDA (Planning & Building Standards) Regulations 2008 | 31-12-2021 | NOT YET STARTED,IT SHOULD BE FOLLOWED |
97 | If the construction /development are not as per the approved plan /deviated beyond permissible norms, the performance security shall be forfeited and action shall be initiated against the applicant/builder /developer as per the provisions of the ODA Act,1982 Rules and Regulations made there under | 31-12-2021 | NOT DEVIATED |
98 | The Owner/Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/construction defects ,Authority will be no way be held responsible for the same in what so ever manner | 31-12-2021 | STRCTILY FOLLWED |
99 | The concerned Architect /Applicant /Developer are Fully Responible for any deviations additions & alternations beyond approved plan/defective construction etc.shall be liable for action as per the provisions of the Regulation. | 31-12-2021 | YES |
100 | The applicant shall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/BDA before commencement of construction | 31-12-2021 | YES |
101 | All the stipulated conditions of the NOC/Clearances given by BMC,PHED,shall be adhered to strictly | 31-12-2021 | OBTAINED |
102 | No storm water/water shall be discharged to the public road/public premises and other adjoining plots | 30-12-2021 | YES STRICTLY FOLLOWED |
103 | Adhere to the provisions of BDA (Planning & Building Standards) Regulation strictly and conditions thereto. | 31-12-2021 | YES STRICTLY FOLLOWED |
104 | The Authority shall in no way be held responible for any structural failure and damage due to earthquake/cyclone/any other natural disaster | 31-12-2021 | YES |
105 | Submit clearance from Fire-Prevention wing at the time of obtaining Occupancy Certificate | 31-12-2021 | YES |
Sl. No. | Title of the document | Upload Document |
1 | RERA CERTIFICATE | |
2 | BMC LETTER | |
3 | Rera Certificate | |
4 | BMC Letter | |
5 | Rera Certificate | |
6 | Bmc | |
7 | Proforma I | |
8 | Proforma II | |
9 | Proforma III | |
10 | Completion certificate | |
11 | Proforma-I | |
12 | Proforma-II | |
13 | Proforma-III | |
14 | Completion Certificate | |
15 | Proforma I |
: KALINGA KESHARI RATH | : |
: Managing Director | : ALWPR1547G |
:Pan Card | : Plot No.17, Sarala Nagar, Laxmi Sagar, Bhubaneswar |
: kkrath@evos.co.in | : MBA |
: 9040051152 | : 10 YEARS |
: | : NA |
: RAJASHREE RATH | : |
: Director | : AWMPR6439C |
:Pan Card | : Plot No.17, Sarala Nagar, Laxmi Sagar, Bhubaneswar |
: kkrath@evos.co.in | : BA |
: 9040051152 | : 10 YEARS |
: | : NA |
Name | position | Address with mobile number and email address | Registration number | Key real estate projects | Is active | Effective date |
---|---|---|---|---|---|---|
KESHARI NANDAN PRAKALPA PRIVATE LIMITED | Contractor | PLOT NO-284/2485,PATRAPADA,BHUBANESWAR-751019 | U70101OR2015PTC019206 | |||
AR. NARESH AGRAWAL | Architect | PLOT NO-A-610,RAJENDRA BIHAR APARTMENT,FOREST PARK,BHUBANESWAR | NO.CA/97/22353 | |||
CA. GOURAV CHOUDHRY | Chartered Accountant | BAPUJI NAGAR,BHUBANESWAR,MOB-9776022240 | FRN-329356E,M.NO-309583 | |||
ADITYA PRATAP LENKA | Construction Engineer | PATRAPADA BHUBANESWAR,MOB-7809653552 |
House No. | Type of Garage/ Parking allotted | Serial No., if any | Dimension (Length x Width) in Metres | Floor area in sq. metres | Garage/Parking area cost is included or additional |
101 | Covered Parking | 18 | 2.45m*5.05m | 12.3725 | Included |
102 | Covered Parking | 22 | 2.45m*5.05m | 12.3725 | Included |
103 | Covered Parking | 24 | 2.45m*5.05m | 12.3725 | Included |
104 | Covered Parking | 54 | 2.45m*5.05m | 12.3725 | Included |
105 | Covered Parking | 26 | 2.45m*5.05m | 12.3725 | Included |
106 | Covered Parking | 28 | 2.45m*5.05m | 12.3725 | Included |
107 | Covered Parking | 46 | 2.45m*5.05m | 12.3725 | Included |
108 | Covered Parking | 42 | 2.45m*5.05m | 12.3725 | Included |
109 | Covered Parking | 38 | 2.45m*5.05m | 12.3725 | Included |
110 | Covered Parking | 34 | 2.45m*5.05m | 12.3725 | Included |
111 | Covered Parking | 02 | 2.45m*5.05m | 12.3725 | Included |
112 | Covered Parking | 06 | 2.45m*5.05m | 12.3725 | Included |
113 | Covered Parking | 10 | 2.45m*5.05m | 12.3725 | Included |
114 | Covered Parking | 14 | 2.45m*5.05m | 12.3725 | Included |
201 | Covered Parking | 19 | 2.45m*5.05m | 12.3725 | Included |
202 | Covered Parking | 23 | 2.45m*5.05m | 12.3725 | Included |
203 | Covered Parking | 25 | 2.45m*5.05m | 12.3725 | Included |
204 | Covered Parking | 53 | 2.45m*5.05m | 12.3725 | Included |
205 | Covered Parking | 27 | 2.45m*5.05m | 12.3725 | Included |
206 | Covered Parking | 29 | 2.45m*5.05m | 12.3725 | Included |
207 | Covered Parking | 45 | 2.45m*5.05m | 12.3725 | Included |
208 | Covered Parking | 41 | 2.45m*5.05m | 12.3725 | Included |
209 | Covered Parking | 37 | 2.45m*5.05m | 12.3725 | Included |
210 | Covered Parking | 33 | 2.45m*5.05m | 12.3725 | Included |
211 | Covered Parking | 03 | 2.45m*5.05m | 12.3725 | Included |
212 | Covered Parking | 07 | 2.45m*5.05m | 12.3725 | Included |
213 | Covered Parking | 11 | 2.45m*5.05m | 12.3725 | Included |
214 | Covered Parking | 15 | 2.45m*5.05m | 12.3725 | Included |
301 | Covered Parking | 20 | 2.45m*5.05m | 12.3725 | Included |
302 | Covered Parking | 58 | 2.45m*5.05m | 12.3725 | Included |
303 | Covered Parking | 56 | 2.45m*5.05m | 12.3725 | Included |
304 | Covered Parking | 52 | 2.45m*5.05m | 12.3725 | Included |
305 | Covered Parking | 50 | 2.45m*5.05m | 12.3725 | Included |
306 | Covered Parking | 48 | 2.45m*5.05m | 12.3725 | Included |
307 | Covered Parking | 44 | 2.45m*5.05m | 12.3725 | Included |
308 | Covered Parking | 40 | 2.45m*5.05m | 12.3725 | Included |
309 | Covered Parking | 36 | 2.45m*5.05m | 12.3725 | Included |
310 | Covered Parking | 32 | 2.45m*5.05m | 12.3725 | Included |
311 | Covered Parking | 04 | 2.45m*5.05m | 12.3725 | Included |
312 | Covered Parking | 08 | 2.45m*5.05m | 12.3725 | Included |
313 | Covered Parking | 12 | 2.45m*5.05m | 12.3725 | Included |
314 | Covered Parking | 16 | 2.45m*5.05m | 12.3725 | Included |
401 | Covered Parking | 21 | 2.45m*5.05m | 12.3725 | Included |
402 | Covered Parking | 57 | 2.45m*5.05m | 12.3725 | Included |
403 | Covered Parking | 55 | 2.45m*5.05m | 12.3725 | Included |
405 | Covered Parking | 49 | 2.45m*5.05m | 12.3725 | Included |
406 | Covered Parking | 47 | 2.45m*5.05m | 12.3725 | Included |
407 | Covered Parking | 43 | 2.45m*5.05m | 12.3725 | Included |
408 | Covered Parking | 39 | 2.45m*5.05m | 12.3725 | Included |
409 | Covered Parking | 35 | 2.45m*5.05m | 12.3725 | Included |
410 | Covered Parking | 01 | 2.45m*5.05m | 12.3725 | Included |
411 | Covered Parking | 05 | 2.45m*5.05m | 12.3725 | Included |
412 | Covered Parking | 09 | 2.45m*5.05m | 12.3725 | Included |
413 | Covered Parking | 13 | 2.45m*5.05m | 12.3725 | Included |
414 | Covered Parking | 17 | 2.45m*5.05m | 12.3725 | Included |
Updated Changes | |||||
101 | Covered Parking | 18 | 2.45m*5.05m | 12.3725 | Included |
102 | Covered Parking | 22 | 2.45m*5.05m | 12.3725 | Included |
103 | Covered Parking | 24 | 2.45m*5.05m | 12.3725 | Included |
104 | Covered Parking | 54 | 2.45m*5.05m | 12.3725 | Included |
105 | Covered Parking | 26 | 2.45m*5.05m | 12.3725 | Included |
106 | Covered Parking | 28 | 2.45m*5.05m | 12.3725 | Included |
107 | Covered Parking | 46 | 2.45m*5.05m | 12.3725 | Included |
108 | Covered Parking | 42 | 2.45m*5.05m | 12.3725 | Included |
109 | Covered Parking | 38 | 2.45m*5.05m | 12.3725 | Included |
110 | Covered Parking | 34 | 2.45m*5.05m | 12.3725 | Included |
111 | Covered Parking | 02 | 2.45m*5.05m | 12.3725 | Included |
112 | Covered Parking | 06 | 2.45m*5.05m | 12.3725 | Included |
113 | Covered Parking | 10 | 2.45m*5.05m | 12.3725 | Included |
114 | Covered Parking | 14 | 2.45m*5.05m | 12.3725 | Included |
201 | Covered Parking | 19 | 2.45m*5.05m | 12.3725 | Included |
202 | Covered Parking | 23 | 2.45m*5.05m | 12.3725 | Included |
203 | Covered Parking | 25 | 2.45m*5.05m | 12.3725 | Included |
204 | Covered Parking | 53 | 2.45m*5.05m | 12.3725 | Included |
205 | Covered Parking | 27 | 2.45m*5.05m | 12.3725 | Included |
206 | Covered Parking | 29 | 2.45m*5.05m | 12.3725 | Included |
207 | Covered Parking | 45 | 2.45m*5.05m | 12.3725 | Included |
208 | Covered Parking | 41 | 2.45m*5.05m | 12.3725 | Included |
209 | Covered Parking | 37 | 2.45m*5.05m | 12.3725 | Included |
210 | Covered Parking | 33 | 2.45m*5.05m | 12.3725 | Included |
211 | Covered Parking | 03 | 2.45m*5.05m | 12.3725 | Included |
212 | Covered Parking | 07 | 2.45m*5.05m | 12.3725 | Included |
213 | Covered Parking | 11 | 2.45m*5.05m | 12.3725 | Included |
214 | Covered Parking | 15 | 2.45m*5.05m | 12.3725 | Included |
301 | Covered Parking | 20 | 2.45m*5.05m | 12.3725 | Included |
302 | Covered Parking | 58 | 2.45m*5.05m | 12.3725 | Included |
303 | Covered Parking | 56 | 2.45m*5.05m | 12.3725 | Included |
304 | Covered Parking | 52 | 2.45m*5.05m | 12.3725 | Included |
305 | Covered Parking | 50 | 2.45m*5.05m | 12.3725 | Included |
306 | Covered Parking | 48 | 2.45m*5.05m | 12.3725 | Included |
307 | Covered Parking | 44 | 2.45m*5.05m | 12.3725 | Included |
308 | Covered Parking | 40 | 2.45m*5.05m | 12.3725 | Included |
309 | Covered Parking | 36 | 2.45m*5.05m | 12.3725 | Included |
310 | Covered Parking | 32 | 2.45m*5.05m | 12.3725 | Included |
311 | Covered Parking | 04 | 2.45m*5.05m | 12.3725 | Included |
312 | Covered Parking | 08 | 2.45m*5.05m | 12.3725 | Included |
313 | Covered Parking | 12 | 2.45m*5.05m | 12.3725 | Included |
314 | Covered Parking | 16 | 2.45m*5.05m | 12.3725 | Included |
401 | Covered Parking | 21 | 2.45m*5.05m | 12.3725 | Included |
402 | Covered Parking | 57 | 2.45m*5.05m | 12.3725 | Included |
403 | Covered Parking | 55 | 2.45m*5.05m | 12.3725 | Included |
405 | Covered Parking | 49 | 2.45m*5.05m | 12.3725 | Included |
406 | Covered Parking | 47 | 2.45m*5.05m | 12.3725 | Included |
407 | Covered Parking | 43 | 2.45m*5.05m | 12.3725 | Included |
408 | Covered Parking | 39 | 2.45m*5.05m | 12.3725 | Included |
409 | Covered Parking | 35 | 2.45m*5.05m | 12.3725 | Included |
410 | Covered Parking | 01 | 2.45m*5.05m | 12.3725 | Included |
411 | Covered Parking | 05 | 2.45m*5.05m | 12.3725 | Included |
412 | Covered Parking | 09 | 2.45m*5.05m | 12.3725 | Included |
413 | Covered Parking | 13 | 2.45m*5.05m | 12.3725 | Included |
414 | Covered Parking | 17 | 2.45m*5.05m | 12.3725 | Included |