Generated by pacms.orera.in on date: 2024-04-20

Promoter Details
Promoter Name :
M/s Evos Buildcon Pvt Ltd
Project Name :
CITY HOMES
Project Location :
Plot No.4666, Khata No.1988/26, Plot No.4667 Khata No.431 and Plot No.4689 Khata No.30 Mauza-Ghatikia

Form- I

A. Promoter's Details

:  M/s Evos Buildcon Pvt Ltd :  Private Company
:  U70101OR2010PTC012674 :View
NA :  PLOT NO-284/2485,PATRAPADA,BHUBANESWAR
:  Plot No. 780, Maharshi College Road, Bhubaneswar :  ranjan.evos@gmail.com
:  2360854 :  9040051152
:  AACCE5477G :View
:  10 YEARS :  Odisha
NA

B. Details of Board of Directors / Partners / MC Members

:  KALINGA KESHARI RATH :  
:  Managing Director :  ALWPR1547G
:PAN Card :  kkrath@evos.co.in
:  MBA :  9040051152
:  10 YEARS
:  Yes :  NA
:  RAJASHREE RATH :  
:  Director :  AWMPR6439C
:PAN Card :  kkrath@evos.co.in
:  BA :  9040051152
:  10 YEARS
:  Yes :  NA

Annexure-1

Details of last projects already implemented (Ongoing or Complete)

Annexure-2

Details of the project to be registered

:   New :  CITY HOMES
:  Residential :  Plot No.4666, Khata No.1988/26, Plot No.4667 Khata No.431 and Plot No.4689 Khata No.30 Mauza-Ghatikia
:  Khordha :  Bhubaneswar
:  751003 :  Development Authority
:  BHUBANESWAR MUNICIPAL CORPORATION
:  S+4 :  NA

Land Details of the Project


:  4666 :  1988/26
:  GHATIKIA :  1315
:  Yes
No :  View
:  View
:  Other Person
:   k AND B INFRATECH(DIRECTOR-CHANDI CHARAN DASH) :  THROUGH POWER OF ATTORNEY
: No
: Yes
:  31131710056 :  23-12-2017
:  KHANDAGIRI :  Attached

:  4667 :  431
:  GHATIKIA :  1275
:  Yes
No :  View
:  View
:  Other Person
:  K AND B INFRATECH PVT LTD. :  THROUGH THE POWER OF ATTORNEY
: No
: Yes
:  1131710056 :  23-12-2017
:  KHANDAGIRI :  Attached

:  4689 :  30
:  GHATIKIA :  348
:  Yes
No :  View
:  View
:  Other Person
:  K AND B INFRATECH PVT LTD :  THROUGH THE POWER OF ATTORNEY
: No
: Yes
:  11131709991 :  23-12-2017
:  KHANDAGIRI :  Attached

Development Agreement

: No

Building Plan

  View   View
  Download site plan 31-12-2021

Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 As per plan approval letter 16-02-2019 In progress
2 the owner /applicant /technical person shall strictly adhere to the terms and conditions imposed in the NOC/clearances given by Fire Prevention officer/National Airport Authority/SEIAA,Ministry of forest & Environment /PHED etc whereever applicable 31-12-2021 work in progress
3 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Regulation-44 of BDA (Planning & Building Standards) Regulation,2008 31-12-2021 work in progress
4 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner 31-12-2021 work in progress
5 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance,fire tender,physically handicapped persons and outside visitors with signage as per norms under Regulation -35(11)(12) of BDA (planning & Building Standards) Regulations 2008,Amended -2013 31-12-2021 work in progress
6 Plantation over 20% of the plot area shall be made by the applicant as per provision under Regulation 28 of BDA (Planning & Building Standards) Regulations 2008 31-12-2021 work in progress
7 If the construction /development are not as per the approved plan /deviated beyond permissible norms, the performance security shall be forfeited and action shall be initiated against the applicant/builder /developer as per the provisions of the ODA Act,1982 Rules and Regulations made there under 31-12-2021 work in progress
8 The Owner/Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/construction defects ,Authority will be no way be held responsible for the same in what so ever manner 31-12-2021 work in progress
9 The concerned Architect /Applicant /Developer are Fully Responible for any deviations additions & alternations beyond approved plan/defective construction etc.shall be liable for action as per the provisions of the Regulation. 31-12-2021 work in progress
10 The applicant shall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/BDA before commencement of construction 31-12-2021 work in progress
11 All the stipulated conditions of the NOC/Clearances given by BMC,PHED,shall be adhered to strictly 31-12-2021 work in progress
12 No storm water/water shall be discharged to the public road/public premises and other adjoining plots 30-12-2021 work in progress
13 Adhere to the provisions of BDA (Planning & Building Standards) Regulation strictly and conditions thereto. 31-12-2021 work in progress
14 The Authority shall in no way be held responible for any structural failure and damage due to earthquake/cyclone/any other natural disaster 31-12-2021 work in progress
15 Submit clearance from Fire-Prevention wing at the time of obtaining Occupancy Certificate 31-12-2021 work in progress

Layout Plan

: Yes :  View

Location Map with geo-coordinates of bend points

Point No. Latitude Longitude
1 85°46'10.8"E 20°16'03.3"N
2 85°46'13.0"E 20°16'02.5"''N
3 85°46'13.2"E 20°16'02.3"N
4 85°46'13.7"E 20°16'02.1"N
5 85°46'13.4"E 20°16'01.4"N
6 85°46'10.3"E 20°16'03.3"N
7 85°46'10.3"E 20°16'01.4"N
8 85°46'10.2"E 20°16'02.3"N
9 85°46'10.2"E 20°16'02.9"N
View

Milestone of Project Construction

Description* Scheduled date of completion Current Status Site Images
Site Development 28-02-2019 N/A NA
Roof Casting NA NA NA
Ground Floor/Stilt Floor 30-04-2019 N/A NA
1 Floor 31-05-2019 N/A NA
2 Floor 30-06-2019 N/A NA
3 Floor 31-07-2019 N/A NA
4 Floor 31-08-2019 N/A NA
Brick Work & Plastering NA NA NA
Ground Floor/Stilt Floor 15-05-2019 N/A NA
1 Floor 30-06-2019 N/A NA
2 Floor 31-07-2019 N/A NA
3 Floor 31-08-2019 N/A NA
4 Floor 30-09-2019 N/A NA
Electrical Works 20-10-2019 N/A NA
Concealed Cabling including Plugs & switches 30-06-2020 N/A NA
Installation & Charging of Transformer 28-02-2020 N/A NA
Connection to Flats/Apartments 30-04-2020 N/A NA
PH works 30-09-2019 N/A NA
Laying of concealed Pipes 30-09-2019 N/A NA
PH Fittings 31-10-2021 N/A NA
Overhead Water Tanks 31-10-2019 N/A NA
Water Supply Connection to all units 30-10-2021 N/A NA
STP construction and completion 30-04-2019 N/A NA
Distempering & Colouring of all units and exteriors 30-08-2021 N/A NA
Fixation of doors and windows 31-07-2019 N/A NA
Scheduled Date of handing over possession 25-12-2021 N/A NA
Development of common areas, parks, gardens etc 30-10-2021 N/A NA
Site Development 28-02-2019 WORK IN PROGRESS
NA NA NA NA
Ground Floor/Stilt Floor 30-04-2019 COMPLETE
1 Floor 31-05-2019 COMPLETE
2 Floor 30-06-2019 COMPLETE
3 Floor 31-07-2019 COMPLETE
4 Floor 31-08-2019 COMPLETE
NA NA NA NA
Ground Floor/Stilt Floor 15-05-2019 COMPLETE
1 Floor 30-06-2019 COMPLETE
2 Floor 31-07-2019 COMPLETE
3 Floor 31-08-2019 COMPLETE
4 Floor 30-09-2019 COMPLETE
Electrical Works 20-10-2019 WORK IN PROGRESS
Concealed Cabling including Plugs & switches 30-06-2020 WORK IN PROGRESS
Installation & Charging of Transformer 28-02-2020 WORK IN PROGRESS NA
Connection to Flats/Apartments 30-04-2020 WORK IN PROGRESS NA
PH works 30-09-2019 WORK IN PROGRESS NA
Laying of concealed Pipes 30-09-2019 COMPLETE
PH Fittings 31-10-2021 WORK IN PROGRESS
Overhead Water Tanks 31-10-2019 WORK IN PROGRESS NA
Water Supply Connection to all units 30-10-2021 WORK IN PROGRESS NA
STP construction and completion 30-04-2019 WORK IN PROGRESS NA
Distempering & Colouring of all units and exteriors 30-08-2021 WORK IN PROGRESS
Fixation of doors and windows 31-07-2019 WORK IN PROGRESS
Scheduled Date of handing over possession 25-12-2021 WORK IN PROGRESS NA
Development of common areas, parks, gardens etc 30-10-2021 WORK IN PROGRESS
Site Development 28-02-2019 Complete
NA 28-02-2019 Complete
Ground Floor/Stilt Floor 30-04-2019 COMPLETE
1 Floor 31-05-2019 COMPLETE
2 Floor 30-06-2019 COMPLETE
3 Floor 31-07-2019 COMPLETE
4 Floor 31-08-2019 COMPLETE NA
NA 31-08-2019 COMPLETE
Ground Floor/Stilt Floor 15-05-2019 COMPLETE
1 Floor 30-06-2019 COMPLETE
2 Floor 31-07-2019 COMPLETE
3 Floor 31-08-2019 COMPLETE
4 Floor 30-09-2019 COMPLETE
Electrical Works 20-10-2019 WORK IN PROGRESS
Concealed Cabling including Plugs & switches 30-06-2020 WORK IN PROGRESS
Installation & Charging of Transformer 28-02-2020 WORK IN PROGRESS NA
Connection to Flats/Apartments 30-04-2020 WORK IN PROGRESS NA
PH works 30-09-2019 WORK IN PROGRESS
Laying of concealed Pipes 30-09-2019 COMPLETE
PH Fittings 31-10-2021 WORK IN PROGRESS
Overhead Water Tanks 31-10-2019 WORK IN PROGRESS NA
Water Supply Connection to all units 30-10-2021 WORK IN PROGRESS NA
STP construction and completion 30-04-2019 WORK IN PROGRESS NA
Distempering & Colouring of all units and exteriors 30-08-2021 WORK IN PROGRESS NA
Fixation of doors and windows 31-07-2019 WORK IN PROGRESS NA
Scheduled Date of handing over possession 25-12-2021 WORK IN PROGRESS NA
Development of common areas, parks, gardens etc 30-10-2021 WORK IN PROGRESS NA
Site Development 28-02-2019 Complete NA
NA 28-02-2019 Complete NA
Ground Floor/Stilt Floor 30-04-2019 COMPLETE NA
1 Floor 31-05-2019 COMPLETE NA
2 Floor 30-06-2019 COMPLETE NA
3 Floor 31-07-2019 COMPLETE NA
4 Floor 31-08-2019 COMPLETE NA
NA 31-08-2019 COMPLETE NA
Ground Floor/Stilt Floor 15-05-2019 COMPLETE NA
1 Floor 30-06-2019 COMPLETE NA
2 Floor 31-07-2019 COMPLETE NA
3 Floor 31-08-2019 COMPLETE NA
4 Floor 30-09-2019 COMPLETE NA
Electrical Works 20-10-2019 complete NA
Concealed Cabling including Plugs & switches 30-06-2020 complete NA
Installation & Charging of Transformer 28-02-2020 complete
Connection to Flats/Apartments 30-04-2020 WORK IN PROGRESS NA
PH works 30-09-2019 WORK IN PROGRESS NA
Laying of concealed Pipes 30-09-2019 COMPLETE NA
PH Fittings 31-10-2021 WORK IN PROGRESS NA
Overhead Water Tanks 31-10-2019 WORK IN PROGRESS NA
Water Supply Connection to all units 30-10-2021 WORK IN PROGRESS NA
STP construction and completion 30-04-2019 WORK IN PROGRESS NA
Distempering & Colouring of all units and exteriors 30-08-2021 WORK IN PROGRESS NA
Fixation of doors and windows 31-07-2019 WORK IN PROGRESS NA
Scheduled Date of handing over possession 25-12-2021 WORK IN PROGRESS NA
Development of common areas, parks, gardens etc 30-10-2021 WORK IN PROGRESS NA
Site Development 28-02-2019 Complete NA
NA 28-02-2019 Complete NA
Ground Floor/Stilt Floor 30-04-2019 COMPLETE NA
1 Floor 31-05-2019 COMPLETE NA
2 Floor 30-06-2019 COMPLETE NA
3 Floor 31-07-2019 COMPLETE NA
4 Floor 31-08-2019 COMPLETE NA
NA 31-08-2019 COMPLETE NA
Ground Floor/Stilt Floor 15-05-2019 COMPLETE NA
1 Floor 30-06-2019 COMPLETE NA
2 Floor 31-07-2019 COMPLETE NA
3 Floor 31-08-2019 COMPLETE NA
4 Floor 30-09-2019 COMPLETE NA
Electrical Works 20-10-2019 complete NA
Concealed Cabling including Plugs & switches 30-06-2020 complete NA
Installation & Charging of Transformer 28-02-2020 complete NA
Connection to Flats/Apartments 30-04-2020 complete NA
PH works 30-09-2019 complete NA
Laying of concealed Pipes 30-09-2019 COMPLETE NA
PH Fittings 31-10-2021 complete NA
Overhead Water Tanks 31-10-2019 complete NA
Water Supply Connection to all units 30-10-2021 complete NA
STP construction and completion 30-04-2019 WORK IN PROGRESS
Distempering & Colouring of all units and exteriors 30-08-2021 complete
Fixation of doors and windows 31-07-2019 complete NA
Scheduled Date of handing over possession 25-12-2021 WORK IN PROGRESS NA
Development of common areas, parks, gardens etc 30-10-2021 complete NA
Site Development 28-02-2019 Complete NA
NA 28-02-2019 Complete NA
Ground Floor/Stilt Floor 30-04-2019 COMPLETE NA
1 Floor 31-05-2019 COMPLETE NA
2 Floor 30-06-2019 COMPLETE NA
3 Floor 31-07-2019 COMPLETE NA
4 Floor 31-08-2019 COMPLETE NA
NA 31-08-2019 COMPLETE NA
Ground Floor/Stilt Floor 15-05-2019 COMPLETE NA
1 Floor 30-06-2019 COMPLETE NA
2 Floor 31-07-2019 COMPLETE NA
3 Floor 31-08-2019 COMPLETE NA
4 Floor 30-09-2019 COMPLETE NA
Electrical Works 20-10-2019 complete NA
Concealed Cabling including Plugs & switches 30-06-2020 complete NA
Installation & Charging of Transformer 28-02-2020 complete NA
Connection to Flats/Apartments 30-04-2020 complete NA
PH works 30-09-2019 complete NA
Laying of concealed Pipes 30-09-2019 COMPLETE NA
PH Fittings 31-10-2021 complete NA
Overhead Water Tanks 31-10-2019 complete NA
Water Supply Connection to all units 30-10-2021 complete NA
STP construction and completion 30-04-2019 WORK IN PROGRESS NA
Distempering & Colouring of all units and exteriors 30-08-2021 complete NA
Fixation of doors and windows 31-07-2019 complete NA
Scheduled Date of handing over possession 25-12-2021 WORK IN PROGRESS NA
Development of common areas, parks, gardens etc 30-10-2021 complete NA
Site Development 28-02-2019 Complete NA
NA 28-02-2019 Complete NA
Ground Floor/Stilt Floor 30-04-2019 COMPLETE NA
1 Floor 31-05-2019 COMPLETE NA
2 Floor 30-06-2019 COMPLETE NA
3 Floor 31-07-2019 COMPLETE NA
4 Floor 31-08-2019 COMPLETE NA
NA 31-08-2019 COMPLETE NA
Ground Floor/Stilt Floor 15-05-2019 COMPLETE NA
1 Floor 30-06-2019 COMPLETE NA
2 Floor 31-07-2019 COMPLETE NA
3 Floor 31-08-2019 COMPLETE NA
4 Floor 30-09-2019 COMPLETE NA
Electrical Works 20-10-2019 complete NA
Concealed Cabling including Plugs & switches 30-06-2020 complete NA
Installation & Charging of Transformer 28-02-2020 complete NA
Connection to Flats/Apartments 30-04-2020 complete NA
PH works 30-09-2019 complete NA
Laying of concealed Pipes 30-09-2019 COMPLETE NA
PH Fittings 31-10-2021 complete NA
Overhead Water Tanks 31-10-2019 complete NA
Water Supply Connection to all units 30-10-2021 complete NA
STP construction and completion 30-04-2019 WORK IN PROGRESS NA
Distempering & Colouring of all units and exteriors 30-08-2021 complete NA
Fixation of doors and windows 31-07-2019 complete NA
Scheduled Date of handing over possession 25-12-2021 WORK IN PROGRESS NA
Development of common areas, parks, gardens etc 30-10-2021 complete NA

Category and no. of units to be developed

:  Residential
:  
:  56
:  
:  
:  
Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership
Carpet Area Balcony Area Exclusive Open Terrace Area
1 101 95.416 105.412 N/A Promoter
2 102 98.283 108.542 N/A Promoter
3 103 81.183 90.835 N/A Promoter
4 104 81.195 90.691 N/A Promoter
5 105 83.854 93.242 N/A Promoter
6 106 83.854 93.242 N/A Promoter
7 107 81.195 90.691 N/A Promoter
8 108 100.103 111.241 N/A Promoter
9 109 97.840 108.809 N/A Land Owner
10 110 80.928 90.360 N/A Promoter
11 111 82.752 92.218 N/A Land Owner
12 112 82.752 92.221 N/A Land Owner
13 113 80.928 90.360 N/A Land Owner
14 114 81.183 91.066 N/A Promoter
15 201 95.416 105.412 N/A Promoter
16 202 98.283 108.542 N/A Promoter
17 203 81.183 90.835 N/A Promoter
18 204 81.195 90.691 N/A Promoter
19 205 83.854 93.242 N/A Promoter
20 206 83.854 93.242 N/A Promoter
21 207 81.195 90.691 N/A Promoter
22 208 100.103 111.241 N/A Promoter
23 209 97.840 108.809 N/A Land Owner
24 210 80.928 90.360 N/A Promoter
25 211 82.752 92.218 N/A Land Owner
26 212 82.752 92.221 N/A Land Owner
27 213 80.928 90.360 N/A Land Owner
28 214 81.183 91.066 N/A Promoter
29 301 95.416 105.412 N/A Promoter
30 302 98.283 108.542 N/A Promoter
31 303 81.183 90.835 N/A Promoter
32 304 81.195 90.691 N/A Promoter
33 305 83.854 93.242 N/A Land Owner
34 306 83.854 93.242 N/A Promoter
35 307 81.195 90.691 N/A Land Owner
36 308 100.103 111.241 N/A Promoter
37 309 97.840 108.809 N/A Promoter
38 310 80.928 90.360 N/A Land Owner
39 311 82.752 92.218 N/A Land Owner
40 312 82.752 92.221 N/A Promoter
41 313 80.928 90.360 N/A Promoter
42 314 81.183 91.066 N/A Promoter
43 401 95.416 105.412 N/A Promoter
44 402 98.283 108.542 N/A Promoter
45 403 81.183 90.835 N/A Promoter
46 404 81.195 90.691 N/A Promoter
47 405 83.854 93.242 N/A Promoter
48 406 83.854 93.242 N/A Promoter
49 407 81.195 90.691 N/A Promoter
50 408 100.103 111.241 N/A Promoter
51 409 97.840 108.809 N/A Promoter
52 410 80.928 90.360 N/A Promoter
53 411 82.752 92.218 N/A Land Owner
54 412 82.752 92.221 N/A Land Owner
55 413 80.928 90.360 N/A Land Owner
56 414 81.183 91.066 N/A Promoter
Types of garages and parking
House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
101 Covered Parking 18 2.45m*5.05m 12.3725 Included
102 Covered Parking 22 2.45m*5.05m 12.3725 Included
103 Covered Parking 24 2.45m*5.05m 12.3725 Included
104 Covered Parking 54 2.45m*5.05m 12.3725 Included
105 Covered Parking 26 2.45m*5.05m 12.3725 Included
106 Covered Parking 28 2.45m*5.05m 12.3725 Included
107 Covered Parking 46 2.45m*5.05m 12.3725 Included
108 Covered Parking 42 2.45m*5.05m 12.3725 Included
109 Covered Parking 38 2.45m*5.05m 12.3725 Included
110 Covered Parking 34 2.45m*5.05m 12.3725 Included
111 Covered Parking 02 2.45m*5.05m 12.3725 Included
112 Covered Parking 06 2.45m*5.05m 12.3725 Included
113 Covered Parking 10 2.45m*5.05m 12.3725 Included
114 Covered Parking 14 2.45m*5.05m 12.3725 Included
201 Covered Parking 19 2.45m*5.05m 12.3725 Included
202 Covered Parking 23 2.45m*5.05m 12.3725 Included
203 Covered Parking 25 2.45m*5.05m 12.3725 Included
204 Covered Parking 53 2.45m*5.05m 12.3725 Included
205 Covered Parking 27 2.45m*5.05m 12.3725 Included
206 Covered Parking 29 2.45m*5.05m 12.3725 Included
207 Covered Parking 45 2.45m*5.05m 12.3725 Included
208 Covered Parking 41 2.45m*5.05m 12.3725 Included
209 Covered Parking 37 2.45m*5.05m 12.3725 Included
210 Covered Parking 33 2.45m*5.05m 12.3725 Included
211 Covered Parking 03 2.45m*5.05m 12.3725 Included
212 Covered Parking 07 2.45m*5.05m 12.3725 Included
213 Covered Parking 11 2.45m*5.05m 12.3725 Included
214 Covered Parking 15 2.45m*5.05m 12.3725 Included
301 Covered Parking 20 2.45m*5.05m 12.3725 Included
302 Covered Parking 58 2.45m*5.05m 12.3725 Included
303 Covered Parking 56 2.45m*5.05m 12.3725 Included
304 Covered Parking 52 2.45m*5.05m 12.3725 Included
305 Covered Parking 50 2.45m*5.05m 12.3725 Included
306 Covered Parking 48 2.45m*5.05m 12.3725 Included
307 Covered Parking 44 2.45m*5.05m 12.3725 Included
308 Covered Parking 40 2.45m*5.05m 12.3725 Included
309 Covered Parking 36 2.45m*5.05m 12.3725 Included
310 Covered Parking 32 2.45m*5.05m 12.3725 Included
311 Covered Parking 04 2.45m*5.05m 12.3725 Included
312 Covered Parking 08 2.45m*5.05m 12.3725 Included
313 Covered Parking 12 2.45m*5.05m 12.3725 Included
314 Covered Parking 16 2.45m*5.05m 12.3725 Included
401 Covered Parking 21 2.45m*5.05m 12.3725 Included
402 Covered Parking 57 2.45m*5.05m 12.3725 Included
403 Covered Parking 55 2.45m*5.05m 12.3725 Included
405 Covered Parking 49 2.45m*5.05m 12.3725 Included
406 Covered Parking 47 2.45m*5.05m 12.3725 Included
407 Covered Parking 43 2.45m*5.05m 12.3725 Included
408 Covered Parking 39 2.45m*5.05m 12.3725 Included
409 Covered Parking 35 2.45m*5.05m 12.3725 Included
410 Covered Parking 01 2.45m*5.05m 12.3725 Included
411 Covered Parking 05 2.45m*5.05m 12.3725 Included
412 Covered Parking 09 2.45m*5.05m 12.3725 Included
413 Covered Parking 13 2.45m*5.05m 12.3725 Included
414 Covered Parking 17 2.45m*5.05m 12.3725 Included
Yes

Facilities to be provided

Particulars of Facilities Status of the facility Brief description of facility
Drinking Water Facility Ground Water NA Copy of Consent Letter
Fire Fighting Facility Yes NA FIRE RECOMENDATION
Emergency Evacuation Services No NA
Use of Renewable Energy No NA
Lift Facility Yes NA 3 Nos. of 6 passenger 408kg capacity, KONE or OTIS or EQUIVALENT brand lift with ARD facility
Market Complex No NA
Community Hall Yes NA STILT FLOOR(57.93 SQMTRS)
Gymnasium No NA
Swimming Pool No NA
Play Ground No NA
Park/Garden No NA
Plantation Area Yes NA 710.02 SQMTRS
Others(Please Specify) No NA
Internal Road No NA
External Road Yes NA 9.14M
Elecricity Supply Yes NA Copy of Consent Letter
Other Amenities No NA

Bank Particulars of the Project

  EVOS BUILDCON PVT LTD HILL VIEW HEAVEN
  RCECAMPUS
  37574715762
  SBIN0005302
   View
  2541473
  9437488712

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
KESHARI NANDAN PRAKALPA PRIVATE LIMITED Contractor PLOT NO-284/2485,PATRAPADA,BHUBANESWAR-751019 U70101OR2015PTC019206
AR. NARESH AGRAWAL Architect PLOT NO-A-610,RAJENDRA BIHAR APARTMENT,FOREST PARK,BHUBANESWAR NO.CA/97/22353
CA. GOURAV CHOUDHRY Chartered Accountant BAPUJI NAGAR,BHUBANESWAR,MOB-9776022240 FRN-329356E,M.NO-309583
ADITYA PRATAP LENKA Construction Engineer PATRAPADA BHUBANESWAR,MOB-7809653552

Financial Details

:  106.028 :   View
  31-12-2021 :  500
:  300 :  0

Documents Attached

Description of Document Option Documents
Fire Safety Certificate Undertaking Attached
Affidavit in Form-A as per clause-l of sub-section-2 of section-4 of the Act Yes Attached
Allotment letter format Yes Attached
Conveyance Deed Format No Attached
Annual Report 2015-16 Attached
Annual Report 2016-17 Attached
Annual Report 2017-18 Attached
IT Return 2015-16 Attached
IT Return 2016-17 Attached
Audit Report 2016-17 Attached
Audit Report 2015-16 Attached
IT Return 2017-18 Attached
Audit Report 2017-18 Attached


Other documents

Sl No Document Name Attached File
1 Affidavit 15/07/2019:   View
“I undertake that the information submitted by me in this application are correct and true to best my knowledge. I also understand that providing false or wrong information is punishable under the Section-60 of the Real Estate (Regulation & Development) Act, 2016. I also further understand that furnishing wrong or false information will lead to rejection of my application registration of the project with forfeiture of registration fee and other charges deposited by me.”
  no need

Construction Progress

Updated Construction Progress

SL NO. Description Scheduled date of completion Current Status Remarks
1 Site Development 28-02-2019 N/A NA
2 Roof Casting NA NA NA
3 Ground Floor/Stilt Floor 30-04-2019 N/A NA
4 1 Floor 31-05-2019 N/A NA
5 2 Floor 30-06-2019 N/A NA
6 3 Floor 31-07-2019 N/A NA
7 4 Floor 31-08-2019 N/A NA
8 Brick Work & Plastering NA NA NA
9 Ground Floor/Stilt Floor 15-05-2019 N/A NA
10 1 Floor 30-06-2019 N/A NA
11 2 Floor 31-07-2019 N/A NA
12 3 Floor 31-08-2019 N/A NA
13 4 Floor 30-09-2019 N/A NA
14 Electrical Works 20-10-2019 N/A NA
15 Concealed Cabling including Plugs & switches 30-06-2020 N/A NA
16 Installation & Charging of Transformer 28-02-2020 N/A NA
17 Connection to Flats/Apartments 30-04-2020 N/A NA
18 PH works 30-09-2019 N/A NA
19 Laying of concealed Pipes 30-09-2019 N/A NA
20 PH Fittings 31-10-2021 N/A NA
21 Overhead Water Tanks 31-10-2019 N/A NA
22 Water Supply Connection to all units 30-10-2021 N/A NA
23 STP construction and completion 30-04-2019 N/A NA
24 Distempering & Colouring of all units and exteriors 30-08-2021 N/A NA
25 Fixation of doors and windows 31-07-2019 N/A NA
26 Scheduled Date of handing over possession 25-12-2021 N/A NA
27 Development of common areas, parks, gardens etc 30-10-2021 N/A NA
Updated Changes on 01-12-2021
28 Site Development 28-02-2019 WORK IN PROGRESS
29 NA NA NA NA
30 Ground Floor/Stilt Floor 30-04-2019 COMPLETE
31 1 Floor 31-05-2019 COMPLETE
32 2 Floor 30-06-2019 COMPLETE
33 3 Floor 31-07-2019 COMPLETE
34 4 Floor 31-08-2019 COMPLETE
35 NA NA NA NA
36 Ground Floor/Stilt Floor 15-05-2019 COMPLETE
37 1 Floor 30-06-2019 COMPLETE
38 2 Floor 31-07-2019 COMPLETE
39 3 Floor 31-08-2019 COMPLETE
40 4 Floor 30-09-2019 COMPLETE
41 Electrical Works 20-10-2019 WORK IN PROGRESS
42 Concealed Cabling including Plugs & switches 30-06-2020 WORK IN PROGRESS
43 Installation & Charging of Transformer 28-02-2020 WORK IN PROGRESS NA
44 Connection to Flats/Apartments 30-04-2020 WORK IN PROGRESS NA
45 PH works 30-09-2019 WORK IN PROGRESS NA
46 Laying of concealed Pipes 30-09-2019 COMPLETE
47 PH Fittings 31-10-2021 WORK IN PROGRESS
48 Overhead Water Tanks 31-10-2019 WORK IN PROGRESS NA
49 Water Supply Connection to all units 30-10-2021 WORK IN PROGRESS NA
50 STP construction and completion 30-04-2019 WORK IN PROGRESS NA
51 Distempering & Colouring of all units and exteriors 30-08-2021 WORK IN PROGRESS
52 Fixation of doors and windows 31-07-2019 WORK IN PROGRESS
53 Scheduled Date of handing over possession 25-12-2021 WORK IN PROGRESS NA
54 Development of common areas, parks, gardens etc 30-10-2021 WORK IN PROGRESS
Updated Changes on 13-07-2022
55 Site Development 28-02-2019 Complete
56 NA 28-02-2019 Complete
57 Ground Floor/Stilt Floor 30-04-2019 COMPLETE
58 1 Floor 31-05-2019 COMPLETE
59 2 Floor 30-06-2019 COMPLETE
60 3 Floor 31-07-2019 COMPLETE
61 4 Floor 31-08-2019 COMPLETE NA
62 NA 31-08-2019 COMPLETE
63 Ground Floor/Stilt Floor 15-05-2019 COMPLETE
64 1 Floor 30-06-2019 COMPLETE
65 2 Floor 31-07-2019 COMPLETE
66 3 Floor 31-08-2019 COMPLETE
67 4 Floor 30-09-2019 COMPLETE
68 Electrical Works 20-10-2019 WORK IN PROGRESS
69 Concealed Cabling including Plugs & switches 30-06-2020 WORK IN PROGRESS
70 Installation & Charging of Transformer 28-02-2020 WORK IN PROGRESS NA
71 Connection to Flats/Apartments 30-04-2020 WORK IN PROGRESS NA
72 PH works 30-09-2019 WORK IN PROGRESS
73 Laying of concealed Pipes 30-09-2019 COMPLETE
74 PH Fittings 31-10-2021 WORK IN PROGRESS
75 Overhead Water Tanks 31-10-2019 WORK IN PROGRESS NA
76 Water Supply Connection to all units 30-10-2021 WORK IN PROGRESS NA
77 STP construction and completion 30-04-2019 WORK IN PROGRESS NA
78 Distempering & Colouring of all units and exteriors 30-08-2021 WORK IN PROGRESS NA
79 Fixation of doors and windows 31-07-2019 WORK IN PROGRESS NA
80 Scheduled Date of handing over possession 25-12-2021 WORK IN PROGRESS NA
81 Development of common areas, parks, gardens etc 30-10-2021 WORK IN PROGRESS NA
Updated Changes on 11-10-2022
82 Site Development 28-02-2019 Complete NA
83 NA 28-02-2019 Complete NA
84 Ground Floor/Stilt Floor 30-04-2019 COMPLETE NA
85 1 Floor 31-05-2019 COMPLETE NA
86 2 Floor 30-06-2019 COMPLETE NA
87 3 Floor 31-07-2019 COMPLETE NA
88 4 Floor 31-08-2019 COMPLETE NA
89 NA 31-08-2019 COMPLETE NA
90 Ground Floor/Stilt Floor 15-05-2019 COMPLETE NA
91 1 Floor 30-06-2019 COMPLETE NA
92 2 Floor 31-07-2019 COMPLETE NA
93 3 Floor 31-08-2019 COMPLETE NA
94 4 Floor 30-09-2019 COMPLETE NA
95 Electrical Works 20-10-2019 complete NA
96 Concealed Cabling including Plugs & switches 30-06-2020 complete NA
97 Installation & Charging of Transformer 28-02-2020 complete
98 Connection to Flats/Apartments 30-04-2020 WORK IN PROGRESS NA
99 PH works 30-09-2019 WORK IN PROGRESS NA
100 Laying of concealed Pipes 30-09-2019 COMPLETE NA
101 PH Fittings 31-10-2021 WORK IN PROGRESS NA
102 Overhead Water Tanks 31-10-2019 WORK IN PROGRESS NA
103 Water Supply Connection to all units 30-10-2021 WORK IN PROGRESS NA
104 STP construction and completion 30-04-2019 WORK IN PROGRESS NA
105 Distempering & Colouring of all units and exteriors 30-08-2021 WORK IN PROGRESS NA
106 Fixation of doors and windows 31-07-2019 WORK IN PROGRESS NA
107 Scheduled Date of handing over possession 25-12-2021 WORK IN PROGRESS NA
108 Development of common areas, parks, gardens etc 30-10-2021 WORK IN PROGRESS NA
Updated Changes on 13-07-2023
109 Site Development 28-02-2019 Complete NA
110 NA 28-02-2019 Complete NA
111 Ground Floor/Stilt Floor 30-04-2019 COMPLETE NA
112 1 Floor 31-05-2019 COMPLETE NA
113 2 Floor 30-06-2019 COMPLETE NA
114 3 Floor 31-07-2019 COMPLETE NA
115 4 Floor 31-08-2019 COMPLETE NA
116 NA 31-08-2019 COMPLETE NA
117 Ground Floor/Stilt Floor 15-05-2019 COMPLETE NA
118 1 Floor 30-06-2019 COMPLETE NA
119 2 Floor 31-07-2019 COMPLETE NA
120 3 Floor 31-08-2019 COMPLETE NA
121 4 Floor 30-09-2019 COMPLETE NA
122 Electrical Works 20-10-2019 complete NA
123 Concealed Cabling including Plugs & switches 30-06-2020 complete NA
124 Installation & Charging of Transformer 28-02-2020 complete NA
125 Connection to Flats/Apartments 30-04-2020 complete NA
126 PH works 30-09-2019 complete NA
127 Laying of concealed Pipes 30-09-2019 COMPLETE NA
128 PH Fittings 31-10-2021 complete NA
129 Overhead Water Tanks 31-10-2019 complete NA
130 Water Supply Connection to all units 30-10-2021 complete NA
131 STP construction and completion 30-04-2019 WORK IN PROGRESS
132 Distempering & Colouring of all units and exteriors 30-08-2021 complete
133 Fixation of doors and windows 31-07-2019 complete NA
134 Scheduled Date of handing over possession 25-12-2021 WORK IN PROGRESS NA
135 Development of common areas, parks, gardens etc 30-10-2021 complete NA
Updated Changes on 22-11-2023
136 Site Development 28-02-2019 Complete NA
137 NA 28-02-2019 Complete NA
138 Ground Floor/Stilt Floor 30-04-2019 COMPLETE NA
139 1 Floor 31-05-2019 COMPLETE NA
140 2 Floor 30-06-2019 COMPLETE NA
141 3 Floor 31-07-2019 COMPLETE NA
142 4 Floor 31-08-2019 COMPLETE NA
143 NA 31-08-2019 COMPLETE NA
144 Ground Floor/Stilt Floor 15-05-2019 COMPLETE NA
145 1 Floor 30-06-2019 COMPLETE NA
146 2 Floor 31-07-2019 COMPLETE NA
147 3 Floor 31-08-2019 COMPLETE NA
148 4 Floor 30-09-2019 COMPLETE NA
149 Electrical Works 20-10-2019 complete NA
150 Concealed Cabling including Plugs & switches 30-06-2020 complete NA
151 Installation & Charging of Transformer 28-02-2020 complete NA
152 Connection to Flats/Apartments 30-04-2020 complete NA
153 PH works 30-09-2019 complete NA
154 Laying of concealed Pipes 30-09-2019 COMPLETE NA
155 PH Fittings 31-10-2021 complete NA
156 Overhead Water Tanks 31-10-2019 complete NA
157 Water Supply Connection to all units 30-10-2021 complete NA
158 STP construction and completion 30-04-2019 WORK IN PROGRESS NA
159 Distempering & Colouring of all units and exteriors 30-08-2021 complete NA
160 Fixation of doors and windows 31-07-2019 complete NA
161 Scheduled Date of handing over possession 25-12-2021 WORK IN PROGRESS NA
162 Development of common areas, parks, gardens etc 30-10-2021 complete NA
Updated Changes on 03-04-2024
163 Site Development 28-02-2019 Complete NA
164 NA 28-02-2019 Complete NA
165 Ground Floor/Stilt Floor 30-04-2019 COMPLETE NA
166 1 Floor 31-05-2019 COMPLETE NA
167 2 Floor 30-06-2019 COMPLETE NA
168 3 Floor 31-07-2019 COMPLETE NA
169 4 Floor 31-08-2019 COMPLETE NA
170 NA 31-08-2019 COMPLETE NA
171 Ground Floor/Stilt Floor 15-05-2019 COMPLETE NA
172 1 Floor 30-06-2019 COMPLETE NA
173 2 Floor 31-07-2019 COMPLETE NA
174 3 Floor 31-08-2019 COMPLETE NA
175 4 Floor 30-09-2019 COMPLETE NA
176 Electrical Works 20-10-2019 complete NA
177 Concealed Cabling including Plugs & switches 30-06-2020 complete NA
178 Installation & Charging of Transformer 28-02-2020 complete NA
179 Connection to Flats/Apartments 30-04-2020 complete NA
180 PH works 30-09-2019 complete NA
181 Laying of concealed Pipes 30-09-2019 COMPLETE NA
182 PH Fittings 31-10-2021 complete NA
183 Overhead Water Tanks 31-10-2019 complete NA
184 Water Supply Connection to all units 30-10-2021 complete NA
185 STP construction and completion 30-04-2019 WORK IN PROGRESS NA
186 Distempering & Colouring of all units and exteriors 30-08-2021 complete NA
187 Fixation of doors and windows 31-07-2019 complete NA
188 Scheduled Date of handing over possession 25-12-2021 WORK IN PROGRESS NA
189 Development of common areas, parks, gardens etc 30-10-2021 complete NA

Booking Status

Residential Flats/ House
S. No. Flat No./ House No.

Area in square metres

Ownership Status
Carpet Area Balcony Area Exclusive Open Terrace Area
1 101 95.416 105.412 N/A Promoter
2 102 98.283 108.542 N/A Promoter
3 103 81.183 90.835 N/A Promoter
4 104 81.195 90.691 N/A Promoter
5 105 83.854 93.242 N/A Promoter
6 106 83.854 93.242 N/A Promoter
7 107 81.195 90.691 N/A Promoter
8 108 100.103 111.241 N/A Promoter
9 109 97.840 108.809 N/A Land Owner
10 110 80.928 90.360 N/A Promoter
11 111 82.752 92.218 N/A Land Owner
12 112 82.752 92.221 N/A Land Owner
13 113 80.928 90.360 N/A Land Owner
14 114 81.183 91.066 N/A Promoter
15 201 95.416 105.412 N/A Promoter
16 202 98.283 108.542 N/A Promoter
17 203 81.183 90.835 N/A Promoter
18 204 81.195 90.691 N/A Promoter
19 205 83.854 93.242 N/A Promoter
20 206 83.854 93.242 N/A Promoter
21 207 81.195 90.691 N/A Promoter
22 208 100.103 111.241 N/A Promoter
23 209 97.840 108.809 N/A Land Owner
24 210 80.928 90.360 N/A Promoter
25 211 82.752 92.218 N/A Land Owner
26 212 82.752 92.221 N/A Land Owner
27 213 80.928 90.360 N/A Land Owner
28 214 81.183 91.066 N/A Promoter
29 301 95.416 105.412 N/A Promoter
30 302 98.283 108.542 N/A Promoter
31 303 81.183 90.835 N/A Promoter
32 304 81.195 90.691 N/A Promoter
33 305 83.854 93.242 N/A Land Owner
34 306 83.854 93.242 N/A Promoter
35 307 81.195 90.691 N/A Land Owner
36 308 100.103 111.241 N/A Promoter
37 309 97.840 108.809 N/A Promoter
38 310 80.928 90.360 N/A Land Owner
39 311 82.752 92.218 N/A Land Owner
40 312 82.752 92.221 N/A Promoter
41 313 80.928 90.360 N/A Promoter
42 314 81.183 91.066 N/A Promoter
43 401 95.416 105.412 N/A Promoter
44 402 98.283 108.542 N/A Promoter
45 403 81.183 90.835 N/A Promoter
46 404 81.195 90.691 N/A Promoter
47 405 83.854 93.242 N/A Promoter
48 406 83.854 93.242 N/A Promoter
49 407 81.195 90.691 N/A Promoter
50 408 100.103 111.241 N/A Promoter
51 409 97.840 108.809 N/A Promoter
52 410 80.928 90.360 N/A Promoter
53 411 82.752 92.218 N/A Land Owner
54 412 82.752 92.221 N/A Land Owner
55 413 80.928 90.360 N/A Land Owner
56 414 81.183 91.066 N/A Promoter

Financial Status

SL No. Funds Collected from the Allottees Funds Borrowed from Financial Institutions Funds Employed from Own Sources Expenditure As On Date Status
1 237544988 0 50000000 160009256 30-11-2021 110858
2 269790027 0 0 167308689 30-06-2023 235777.22
3 301264646 0 0 227806391 22-10-2023 1577
4 301264646 0 227806391 03-03-2024 As on 31-12-2023

Updated Conditions of building plan approval

Sl. No. Description of Conditions Schedule date of compliance Present Status
1 As per plan approval letter 16-02-2019 In progress
2 the owner /applicant /technical person shall strictly adhere to the terms and conditions imposed in the NOC/clearances given by Fire Prevention officer/National Airport Authority/SEIAA,Ministry of forest & Environment /PHED etc whereever applicable 31-12-2021 work in progress
3 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Regulation-44 of BDA (Planning & Building Standards) Regulation,2008 31-12-2021 work in progress
4 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner 31-12-2021 work in progress
5 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance,fire tender,physically handicapped persons and outside visitors with signage as per norms under Regulation -35(11)(12) of BDA (planning & Building Standards) Regulations 2008,Amended -2013 31-12-2021 work in progress
6 Plantation over 20% of the plot area shall be made by the applicant as per provision under Regulation 28 of BDA (Planning & Building Standards) Regulations 2008 31-12-2021 work in progress
7 If the construction /development are not as per the approved plan /deviated beyond permissible norms, the performance security shall be forfeited and action shall be initiated against the applicant/builder /developer as per the provisions of the ODA Act,1982 Rules and Regulations made there under 31-12-2021 work in progress
8 The Owner/Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/construction defects ,Authority will be no way be held responsible for the same in what so ever manner 31-12-2021 work in progress
9 The concerned Architect /Applicant /Developer are Fully Responible for any deviations additions & alternations beyond approved plan/defective construction etc.shall be liable for action as per the provisions of the Regulation. 31-12-2021 work in progress
10 The applicant shall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/BDA before commencement of construction 31-12-2021 work in progress
11 All the stipulated conditions of the NOC/Clearances given by BMC,PHED,shall be adhered to strictly 31-12-2021 work in progress
12 No storm water/water shall be discharged to the public road/public premises and other adjoining plots 30-12-2021 work in progress
13 Adhere to the provisions of BDA (Planning & Building Standards) Regulation strictly and conditions thereto. 31-12-2021 work in progress
14 The Authority shall in no way be held responible for any structural failure and damage due to earthquake/cyclone/any other natural disaster 31-12-2021 work in progress
15 Submit clearance from Fire-Prevention wing at the time of obtaining Occupancy Certificate 31-12-2021 work in progress
Updated Changes on 01-12-2021
16 As per plan approval letter 16-02-2019 YES STRICTLY FOLLOWED
17 the owner /applicant /technical person shall strictly adhere to the terms and conditions imposed in the NOC/clearances given by Fire Prevention officer/National Airport Authority/SEIAA,Ministry of forest & Environment /PHED etc whereever applicable 31-12-2021 NOT YET STARTED,IT WILL BE STARTED AFTER COMPLETION OF CONSTRCTION OF WORK
18 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Regulation-44 of BDA (Planning & Building Standards) Regulation,2008 31-12-2021 NOT YET STARTED,IT WILL BE STARTED AFTER COMPLETION OF CONSTRCTION OF WORKNOT YET STARTED IT WILL BE STARTED AFTER COMPLITION OF CONSTRUCTION WORK
19 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner 31-12-2021 YES STRICTLY FOLLOWED
20 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance,fire tender,physically handicapped persons and outside visitors with signage as per norms under Regulation -35(11)(12) of BDA (planning & Building Standards) Regulations 2008,Amended -2013 31-12-2021 YES STRICTLY FOLLOWED
21 Plantation over 20% of the plot area shall be made by the applicant as per provision under Regulation 28 of BDA (Planning & Building Standards) Regulations 2008 31-12-2021 NOT YET STARTED,IT SHOULD BE FOLLOWED
22 If the construction /development are not as per the approved plan /deviated beyond permissible norms, the performance security shall be forfeited and action shall be initiated against the applicant/builder /developer as per the provisions of the ODA Act,1982 Rules and Regulations made there under 31-12-2021 NOT DEVIATED
23 The Owner/Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/construction defects ,Authority will be no way be held responsible for the same in what so ever manner 31-12-2021 STRCTILY FOLLWED
24 The concerned Architect /Applicant /Developer are Fully Responible for any deviations additions & alternations beyond approved plan/defective construction etc.shall be liable for action as per the provisions of the Regulation. 31-12-2021 YES
25 The applicant shall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/BDA before commencement of construction 31-12-2021 YES
26 All the stipulated conditions of the NOC/Clearances given by BMC,PHED,shall be adhered to strictly 31-12-2021 OBTAINED
27 No storm water/water shall be discharged to the public road/public premises and other adjoining plots 30-12-2021 YES STRICTLY FOLLOWED
28 Adhere to the provisions of BDA (Planning & Building Standards) Regulation strictly and conditions thereto. 31-12-2021 YES STRICTLY FOLLOWED
29 The Authority shall in no way be held responible for any structural failure and damage due to earthquake/cyclone/any other natural disaster 31-12-2021 YES
30 Submit clearance from Fire-Prevention wing at the time of obtaining Occupancy Certificate 31-12-2021 YES
Updated Changes on 11-07-2022
31 As per plan approval letter 16-02-2019 YES STRICTLY FOLLOWED
32 the owner /applicant /technical person shall strictly adhere to the terms and conditions imposed in the NOC/clearances given by Fire Prevention officer/National Airport Authority/SEIAA,Ministry of forest & Environment /PHED etc whereever applicable 31-12-2021 NOT YET STARTED,IT WILL BE STARTED AFTER COMPLETION OF CONSTRCTION OF WORK
33 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Regulation-44 of BDA (Planning & Building Standards) Regulation,2008 31-12-2021 NOT YET STARTED,IT WILL BE STARTED AFTER COMPLETION OF CONSTRCTION OF WORKNOT YET STARTED IT WILL BE STARTED AFTER COMPLITION OF CONSTRUCTION WORK
34 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner 31-12-2021 YES STRICTLY FOLLOWED
35 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance,fire tender,physically handicapped persons and outside visitors with signage as per norms under Regulation -35(11)(12) of BDA (planning & Building Standards) Regulations 2008,Amended -2013 31-12-2021 YES STRICTLY FOLLOWED
36 Plantation over 20% of the plot area shall be made by the applicant as per provision under Regulation 28 of BDA (Planning & Building Standards) Regulations 2008 31-12-2021 NOT YET STARTED,IT SHOULD BE FOLLOWED
37 If the construction /development are not as per the approved plan /deviated beyond permissible norms, the performance security shall be forfeited and action shall be initiated against the applicant/builder /developer as per the provisions of the ODA Act,1982 Rules and Regulations made there under 31-12-2021 NOT DEVIATED
38 The Owner/Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/construction defects ,Authority will be no way be held responsible for the same in what so ever manner 31-12-2021 STRCTILY FOLLWED
39 The concerned Architect /Applicant /Developer are Fully Responible for any deviations additions & alternations beyond approved plan/defective construction etc.shall be liable for action as per the provisions of the Regulation. 31-12-2021 YES
40 The applicant shall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/BDA before commencement of construction 31-12-2021 YES
41 All the stipulated conditions of the NOC/Clearances given by BMC,PHED,shall be adhered to strictly 31-12-2021 OBTAINED
42 No storm water/water shall be discharged to the public road/public premises and other adjoining plots 30-12-2021 YES STRICTLY FOLLOWED
43 Adhere to the provisions of BDA (Planning & Building Standards) Regulation strictly and conditions thereto. 31-12-2021 YES STRICTLY FOLLOWED
44 The Authority shall in no way be held responible for any structural failure and damage due to earthquake/cyclone/any other natural disaster 31-12-2021 YES
45 Submit clearance from Fire-Prevention wing at the time of obtaining Occupancy Certificate 31-12-2021 YES
Updated Changes on 11-10-2022
46 As per plan approval letter 16-02-2019 YES STRICTLY FOLLOWED
47 the owner /applicant /technical person shall strictly adhere to the terms and conditions imposed in the NOC/clearances given by Fire Prevention officer/National Airport Authority/SEIAA,Ministry of forest & Environment /PHED etc whereever applicable 31-12-2021 NOT YET STARTED,IT WILL BE STARTED AFTER COMPLETION OF CONSTRCTION OF WORK
48 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Regulation-44 of BDA (Planning & Building Standards) Regulation,2008 31-12-2021 NOT YET STARTED,IT WILL BE STARTED AFTER COMPLETION OF CONSTRCTION OF WORKNOT YET STARTED IT WILL BE STARTED AFTER COMPLITION OF CONSTRUCTION WORK
49 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner 31-12-2021 YES STRICTLY FOLLOWED
50 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance,fire tender,physically handicapped persons and outside visitors with signage as per norms under Regulation -35(11)(12) of BDA (planning & Building Standards) Regulations 2008,Amended -2013 31-12-2021 YES STRICTLY FOLLOWED
51 Plantation over 20% of the plot area shall be made by the applicant as per provision under Regulation 28 of BDA (Planning & Building Standards) Regulations 2008 31-12-2021 NOT YET STARTED,IT SHOULD BE FOLLOWED
52 If the construction /development are not as per the approved plan /deviated beyond permissible norms, the performance security shall be forfeited and action shall be initiated against the applicant/builder /developer as per the provisions of the ODA Act,1982 Rules and Regulations made there under 31-12-2021 NOT DEVIATED
53 The Owner/Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/construction defects ,Authority will be no way be held responsible for the same in what so ever manner 31-12-2021 STRCTILY FOLLWED
54 The concerned Architect /Applicant /Developer are Fully Responible for any deviations additions & alternations beyond approved plan/defective construction etc.shall be liable for action as per the provisions of the Regulation. 31-12-2021 YES
55 The applicant shall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/BDA before commencement of construction 31-12-2021 YES
56 All the stipulated conditions of the NOC/Clearances given by BMC,PHED,shall be adhered to strictly 31-12-2021 OBTAINED
57 No storm water/water shall be discharged to the public road/public premises and other adjoining plots 30-12-2021 YES STRICTLY FOLLOWED
58 Adhere to the provisions of BDA (Planning & Building Standards) Regulation strictly and conditions thereto. 31-12-2021 YES STRICTLY FOLLOWED
59 The Authority shall in no way be held responible for any structural failure and damage due to earthquake/cyclone/any other natural disaster 31-12-2021 YES
60 Submit clearance from Fire-Prevention wing at the time of obtaining Occupancy Certificate 31-12-2021 YES
Updated Changes on 13-07-2023
61 As per plan approval letter 16-02-2019 YES STRICTLY FOLLOWED
62 the owner /applicant /technical person shall strictly adhere to the terms and conditions imposed in the NOC/clearances given by Fire Prevention officer/National Airport Authority/SEIAA,Ministry of forest & Environment /PHED etc whereever applicable 31-12-2021 NOT YET STARTED,IT WILL BE STARTED AFTER COMPLETION OF CONSTRCTION OF WORK
63 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Regulation-44 of BDA (Planning & Building Standards) Regulation,2008 31-12-2021 NOT YET STARTED,IT WILL BE STARTED AFTER COMPLETION OF CONSTRCTION OF WORKNOT YET STARTED IT WILL BE STARTED AFTER COMPLITION OF CONSTRUCTION WORK
64 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner 31-12-2021 YES STRICTLY FOLLOWED
65 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance,fire tender,physically handicapped persons and outside visitors with signage as per norms under Regulation -35(11)(12) of BDA (planning & Building Standards) Regulations 2008,Amended -2013 31-12-2021 YES STRICTLY FOLLOWED
66 Plantation over 20% of the plot area shall be made by the applicant as per provision under Regulation 28 of BDA (Planning & Building Standards) Regulations 2008 31-12-2021 NOT YET STARTED,IT SHOULD BE FOLLOWED
67 If the construction /development are not as per the approved plan /deviated beyond permissible norms, the performance security shall be forfeited and action shall be initiated against the applicant/builder /developer as per the provisions of the ODA Act,1982 Rules and Regulations made there under 31-12-2021 NOT DEVIATED
68 The Owner/Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/construction defects ,Authority will be no way be held responsible for the same in what so ever manner 31-12-2021 STRCTILY FOLLWED
69 The concerned Architect /Applicant /Developer are Fully Responible for any deviations additions & alternations beyond approved plan/defective construction etc.shall be liable for action as per the provisions of the Regulation. 31-12-2021 YES
70 The applicant shall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/BDA before commencement of construction 31-12-2021 YES
71 All the stipulated conditions of the NOC/Clearances given by BMC,PHED,shall be adhered to strictly 31-12-2021 OBTAINED
72 No storm water/water shall be discharged to the public road/public premises and other adjoining plots 30-12-2021 YES STRICTLY FOLLOWED
73 Adhere to the provisions of BDA (Planning & Building Standards) Regulation strictly and conditions thereto. 31-12-2021 YES STRICTLY FOLLOWED
74 The Authority shall in no way be held responible for any structural failure and damage due to earthquake/cyclone/any other natural disaster 31-12-2021 YES
75 Submit clearance from Fire-Prevention wing at the time of obtaining Occupancy Certificate 31-12-2021 YES
Updated Changes on 22-11-2023
76 As per plan approval letter 16-02-2019 YES STRICTLY FOLLOWED
77 the owner /applicant /technical person shall strictly adhere to the terms and conditions imposed in the NOC/clearances given by Fire Prevention officer/National Airport Authority/SEIAA,Ministry of forest & Environment /PHED etc whereever applicable 31-12-2021 NOT YET STARTED,IT WILL BE STARTED AFTER COMPLETION OF CONSTRCTION OF WORK
78 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Regulation-44 of BDA (Planning & Building Standards) Regulation,2008 31-12-2021 NOT YET STARTED,IT WILL BE STARTED AFTER COMPLETION OF CONSTRCTION OF WORKNOT YET STARTED IT WILL BE STARTED AFTER COMPLITION OF CONSTRUCTION WORK
79 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner 31-12-2021 YES STRICTLY FOLLOWED
80 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance,fire tender,physically handicapped persons and outside visitors with signage as per norms under Regulation -35(11)(12) of BDA (planning & Building Standards) Regulations 2008,Amended -2013 31-12-2021 YES STRICTLY FOLLOWED
81 Plantation over 20% of the plot area shall be made by the applicant as per provision under Regulation 28 of BDA (Planning & Building Standards) Regulations 2008 31-12-2021 NOT YET STARTED,IT SHOULD BE FOLLOWED
82 If the construction /development are not as per the approved plan /deviated beyond permissible norms, the performance security shall be forfeited and action shall be initiated against the applicant/builder /developer as per the provisions of the ODA Act,1982 Rules and Regulations made there under 31-12-2021 NOT DEVIATED
83 The Owner/Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/construction defects ,Authority will be no way be held responsible for the same in what so ever manner 31-12-2021 STRCTILY FOLLWED
84 The concerned Architect /Applicant /Developer are Fully Responible for any deviations additions & alternations beyond approved plan/defective construction etc.shall be liable for action as per the provisions of the Regulation. 31-12-2021 YES
85 The applicant shall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/BDA before commencement of construction 31-12-2021 YES
86 All the stipulated conditions of the NOC/Clearances given by BMC,PHED,shall be adhered to strictly 31-12-2021 OBTAINED
87 No storm water/water shall be discharged to the public road/public premises and other adjoining plots 30-12-2021 YES STRICTLY FOLLOWED
88 Adhere to the provisions of BDA (Planning & Building Standards) Regulation strictly and conditions thereto. 31-12-2021 YES STRICTLY FOLLOWED
89 The Authority shall in no way be held responible for any structural failure and damage due to earthquake/cyclone/any other natural disaster 31-12-2021 YES
90 Submit clearance from Fire-Prevention wing at the time of obtaining Occupancy Certificate 31-12-2021 YES
Updated Changes on 03-04-2024
91 As per plan approval letter 16-02-2019 YES STRICTLY FOLLOWED
92 the owner /applicant /technical person shall strictly adhere to the terms and conditions imposed in the NOC/clearances given by Fire Prevention officer/National Airport Authority/SEIAA,Ministry of forest & Environment /PHED etc whereever applicable 31-12-2021 NOT YET STARTED,IT WILL BE STARTED AFTER COMPLETION OF CONSTRCTION OF WORK
93 Storm water from the premises of roof top shall be conveyed and discharged to the rain water recharging pits as per Regulation-44 of BDA (Planning & Building Standards) Regulation,2008 31-12-2021 NOT YET STARTED,IT WILL BE STARTED AFTER COMPLETION OF CONSTRCTION OF WORKNOT YET STARTED IT WILL BE STARTED AFTER COMPLITION OF CONSTRUCTION WORK
94 The space which is meant for parking shall not be changed to any other use and shall not be partitioned/closed in any manner 31-12-2021 YES STRICTLY FOLLOWED
95 20% of the parking space in group housing/apartment building shall be exclusively earmarked for ambulance,fire tender,physically handicapped persons and outside visitors with signage as per norms under Regulation -35(11)(12) of BDA (planning & Building Standards) Regulations 2008,Amended -2013 31-12-2021 YES STRICTLY FOLLOWED
96 Plantation over 20% of the plot area shall be made by the applicant as per provision under Regulation 28 of BDA (Planning & Building Standards) Regulations 2008 31-12-2021 NOT YET STARTED,IT SHOULD BE FOLLOWED
97 If the construction /development are not as per the approved plan /deviated beyond permissible norms, the performance security shall be forfeited and action shall be initiated against the applicant/builder /developer as per the provisions of the ODA Act,1982 Rules and Regulations made there under 31-12-2021 NOT DEVIATED
98 The Owner/Applicant/Architect/Structural Engineer are fully and jointly responsible for any structural failure of building due to any structural/construction defects ,Authority will be no way be held responsible for the same in what so ever manner 31-12-2021 STRCTILY FOLLWED
99 The concerned Architect /Applicant /Developer are Fully Responible for any deviations additions & alternations beyond approved plan/defective construction etc.shall be liable for action as per the provisions of the Regulation. 31-12-2021 YES
100 The applicant shall obtain infrastructural specification and subsequent clearance with regard to development of infrastructure from BMC/BDA before commencement of construction 31-12-2021 YES
101 All the stipulated conditions of the NOC/Clearances given by BMC,PHED,shall be adhered to strictly 31-12-2021 OBTAINED
102 No storm water/water shall be discharged to the public road/public premises and other adjoining plots 30-12-2021 YES STRICTLY FOLLOWED
103 Adhere to the provisions of BDA (Planning & Building Standards) Regulation strictly and conditions thereto. 31-12-2021 YES STRICTLY FOLLOWED
104 The Authority shall in no way be held responible for any structural failure and damage due to earthquake/cyclone/any other natural disaster 31-12-2021 YES
105 Submit clearance from Fire-Prevention wing at the time of obtaining Occupancy Certificate 31-12-2021 YES

Updated Project Documents

Sl. No. Title of the document Upload Document
1 RERA CERTIFICATE
2 BMC LETTER
3 Rera Certificate
4 BMC Letter
5 Rera Certificate
6 Bmc
7 Proforma I
8 Proforma II
9 Proforma III
10 Completion certificate
11 Proforma-I
12 Proforma-II
13 Proforma-III
14 Completion Certificate
15 Proforma I

Updated Member Details

1
:  KALINGA KESHARI RATH :  
:  Managing Director :  ALWPR1547G
:Pan Card :  Plot No.17, Sarala Nagar, Laxmi Sagar, Bhubaneswar
:  kkrath@evos.co.in :  MBA
:  9040051152 :  10 YEARS
:   :  NA
2
:  RAJASHREE RATH :  
:  Director :  AWMPR6439C
:Pan Card :  Plot No.17, Sarala Nagar, Laxmi Sagar, Bhubaneswar
:  kkrath@evos.co.in :  BA
:  9040051152 :  10 YEARS
:   :  NA

Particulars of Architect/Construction Engineer/Contractor/Chartered Accountant

Name position Address with mobile number and email address Registration number Key real estate projects Is active Effective date
KESHARI NANDAN PRAKALPA PRIVATE LIMITED Contractor PLOT NO-284/2485,PATRAPADA,BHUBANESWAR-751019 U70101OR2015PTC019206
AR. NARESH AGRAWAL Architect PLOT NO-A-610,RAJENDRA BIHAR APARTMENT,FOREST PARK,BHUBANESWAR NO.CA/97/22353
CA. GOURAV CHOUDHRY Chartered Accountant BAPUJI NAGAR,BHUBANESWAR,MOB-9776022240 FRN-329356E,M.NO-309583
ADITYA PRATAP LENKA Construction Engineer PATRAPADA BHUBANESWAR,MOB-7809653552

Updated Units

House No. Type of Garage/ Parking allotted Serial No., if any Dimension (Length x Width) in Metres Floor area in sq. metres Garage/Parking area cost is included or additional
101 Covered Parking 18 2.45m*5.05m 12.3725 Included
102 Covered Parking 22 2.45m*5.05m 12.3725 Included
103 Covered Parking 24 2.45m*5.05m 12.3725 Included
104 Covered Parking 54 2.45m*5.05m 12.3725 Included
105 Covered Parking 26 2.45m*5.05m 12.3725 Included
106 Covered Parking 28 2.45m*5.05m 12.3725 Included
107 Covered Parking 46 2.45m*5.05m 12.3725 Included
108 Covered Parking 42 2.45m*5.05m 12.3725 Included
109 Covered Parking 38 2.45m*5.05m 12.3725 Included
110 Covered Parking 34 2.45m*5.05m 12.3725 Included
111 Covered Parking 02 2.45m*5.05m 12.3725 Included
112 Covered Parking 06 2.45m*5.05m 12.3725 Included
113 Covered Parking 10 2.45m*5.05m 12.3725 Included
114 Covered Parking 14 2.45m*5.05m 12.3725 Included
201 Covered Parking 19 2.45m*5.05m 12.3725 Included
202 Covered Parking 23 2.45m*5.05m 12.3725 Included
203 Covered Parking 25 2.45m*5.05m 12.3725 Included
204 Covered Parking 53 2.45m*5.05m 12.3725 Included
205 Covered Parking 27 2.45m*5.05m 12.3725 Included
206 Covered Parking 29 2.45m*5.05m 12.3725 Included
207 Covered Parking 45 2.45m*5.05m 12.3725 Included
208 Covered Parking 41 2.45m*5.05m 12.3725 Included
209 Covered Parking 37 2.45m*5.05m 12.3725 Included
210 Covered Parking 33 2.45m*5.05m 12.3725 Included
211 Covered Parking 03 2.45m*5.05m 12.3725 Included
212 Covered Parking 07 2.45m*5.05m 12.3725 Included
213 Covered Parking 11 2.45m*5.05m 12.3725 Included
214 Covered Parking 15 2.45m*5.05m 12.3725 Included
301 Covered Parking 20 2.45m*5.05m 12.3725 Included
302 Covered Parking 58 2.45m*5.05m 12.3725 Included
303 Covered Parking 56 2.45m*5.05m 12.3725 Included
304 Covered Parking 52 2.45m*5.05m 12.3725 Included
305 Covered Parking 50 2.45m*5.05m 12.3725 Included
306 Covered Parking 48 2.45m*5.05m 12.3725 Included
307 Covered Parking 44 2.45m*5.05m 12.3725 Included
308 Covered Parking 40 2.45m*5.05m 12.3725 Included
309 Covered Parking 36 2.45m*5.05m 12.3725 Included
310 Covered Parking 32 2.45m*5.05m 12.3725 Included
311 Covered Parking 04 2.45m*5.05m 12.3725 Included
312 Covered Parking 08 2.45m*5.05m 12.3725 Included
313 Covered Parking 12 2.45m*5.05m 12.3725 Included
314 Covered Parking 16 2.45m*5.05m 12.3725 Included
401 Covered Parking 21 2.45m*5.05m 12.3725 Included
402 Covered Parking 57 2.45m*5.05m 12.3725 Included
403 Covered Parking 55 2.45m*5.05m 12.3725 Included
405 Covered Parking 49 2.45m*5.05m 12.3725 Included
406 Covered Parking 47 2.45m*5.05m 12.3725 Included
407 Covered Parking 43 2.45m*5.05m 12.3725 Included
408 Covered Parking 39 2.45m*5.05m 12.3725 Included
409 Covered Parking 35 2.45m*5.05m 12.3725 Included
410 Covered Parking 01 2.45m*5.05m 12.3725 Included
411 Covered Parking 05 2.45m*5.05m 12.3725 Included
412 Covered Parking 09 2.45m*5.05m 12.3725 Included
413 Covered Parking 13 2.45m*5.05m 12.3725 Included
414 Covered Parking 17 2.45m*5.05m 12.3725 Included
Updated Changes
101 Covered Parking 18 2.45m*5.05m 12.3725 Included
102 Covered Parking 22 2.45m*5.05m 12.3725 Included
103 Covered Parking 24 2.45m*5.05m 12.3725 Included
104 Covered Parking 54 2.45m*5.05m 12.3725 Included
105 Covered Parking 26 2.45m*5.05m 12.3725 Included
106 Covered Parking 28 2.45m*5.05m 12.3725 Included
107 Covered Parking 46 2.45m*5.05m 12.3725 Included
108 Covered Parking 42 2.45m*5.05m 12.3725 Included
109 Covered Parking 38 2.45m*5.05m 12.3725 Included
110 Covered Parking 34 2.45m*5.05m 12.3725 Included
111 Covered Parking 02 2.45m*5.05m 12.3725 Included
112 Covered Parking 06 2.45m*5.05m 12.3725 Included
113 Covered Parking 10 2.45m*5.05m 12.3725 Included
114 Covered Parking 14 2.45m*5.05m 12.3725 Included
201 Covered Parking 19 2.45m*5.05m 12.3725 Included
202 Covered Parking 23 2.45m*5.05m 12.3725 Included
203 Covered Parking 25 2.45m*5.05m 12.3725 Included
204 Covered Parking 53 2.45m*5.05m 12.3725 Included
205 Covered Parking 27 2.45m*5.05m 12.3725 Included
206 Covered Parking 29 2.45m*5.05m 12.3725 Included
207 Covered Parking 45 2.45m*5.05m 12.3725 Included
208 Covered Parking 41 2.45m*5.05m 12.3725 Included
209 Covered Parking 37 2.45m*5.05m 12.3725 Included
210 Covered Parking 33 2.45m*5.05m 12.3725 Included
211 Covered Parking 03 2.45m*5.05m 12.3725 Included
212 Covered Parking 07 2.45m*5.05m 12.3725 Included
213 Covered Parking 11 2.45m*5.05m 12.3725 Included
214 Covered Parking 15 2.45m*5.05m 12.3725 Included
301 Covered Parking 20 2.45m*5.05m 12.3725 Included
302 Covered Parking 58 2.45m*5.05m 12.3725 Included
303 Covered Parking 56 2.45m*5.05m 12.3725 Included
304 Covered Parking 52 2.45m*5.05m 12.3725 Included
305 Covered Parking 50 2.45m*5.05m 12.3725 Included
306 Covered Parking 48 2.45m*5.05m 12.3725 Included
307 Covered Parking 44 2.45m*5.05m 12.3725 Included
308 Covered Parking 40 2.45m*5.05m 12.3725 Included
309 Covered Parking 36 2.45m*5.05m 12.3725 Included
310 Covered Parking 32 2.45m*5.05m 12.3725 Included
311 Covered Parking 04 2.45m*5.05m 12.3725 Included
312 Covered Parking 08 2.45m*5.05m 12.3725 Included
313 Covered Parking 12 2.45m*5.05m 12.3725 Included
314 Covered Parking 16 2.45m*5.05m 12.3725 Included
401 Covered Parking 21 2.45m*5.05m 12.3725 Included
402 Covered Parking 57 2.45m*5.05m 12.3725 Included
403 Covered Parking 55 2.45m*5.05m 12.3725 Included
405 Covered Parking 49 2.45m*5.05m 12.3725 Included
406 Covered Parking 47 2.45m*5.05m 12.3725 Included
407 Covered Parking 43 2.45m*5.05m 12.3725 Included
408 Covered Parking 39 2.45m*5.05m 12.3725 Included
409 Covered Parking 35 2.45m*5.05m 12.3725 Included
410 Covered Parking 01 2.45m*5.05m 12.3725 Included
411 Covered Parking 05 2.45m*5.05m 12.3725 Included
412 Covered Parking 09 2.45m*5.05m 12.3725 Included
413 Covered Parking 13 2.45m*5.05m 12.3725 Included
414 Covered Parking 17 2.45m*5.05m 12.3725 Included

Generated by pacms.orera.in on date: 2024-04-20